STANDARD PROCEDURES FOR PREPARING
11KV AND 6.6KV MAINS CABLES
Single Core Copper Wire Screened Polymeric Cables

3.1.1

Removing the Outer Sheath

ED

3.1

Mark the removal point of the outer sheath as indicated on the relevant jointing instruction,
using a Chinagraph pencil.

•

Remove the sheath to this point using the approved Alroc tool. Starting at the open end
of the cable, set the tool to the correct cutting depth, to avoid damaging the copper wire
screens below. Make a spiral cut up to the position of the sheath removal point.

U

N

C

O
N

TR

O
LL

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 3 I Page 1
Just before reaching the sheath removal point, reset the cutting blade angle so that a square
cut is achieved. If necessary, try this process out on the overlapping section of the cable.

•

Remove the outer sheath by unwinding the spiral made by the stripping tool.

Remove the fabric or plastic tape from the screen wire using an approved knife, taking care
not to damage the copper wires below.

U

N

C

•

O
N

TR

O
LL

ED

•

Section 3 I Page 2

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Flame brush the outer sheath for a distance of 150mm along the sheath, away from the
sheath removal point and allow to cool.

•

Unwind the copper wires and lay them back along the over-sheath in the position required
by the joint being made, then secure with PVC tape. See Sections 4.1.4 to 4.1.6 for details
of the different types of screen-wire preparation.

3.1.2

Removing the Bonded Polymeric Screen

The Alroc bonded screen stripping tool is designed to leave 40mm of black insulation
screen from the copper wire screens.

U

N

C

•

O
N

TR

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 3 I Page 3
•

The only joints that require more than 40mm is the single core polymeric branch, which
requires 60mm and the transition branch where the screen is removed 180mm from the
reference line.

•

Remove the extra 20mm of insulation screen by:
•

Applying several layers of PVC tape on the sheath side of the mark.

•

Using the stripping tool as described in this section.

O
LL

Smear the end of the insulation with a thin film of silicone grease.

U

N

C

O
N

TR

•

Making a Chinagraph pencil mark 20mm from the outer sheath cut.

ED

•

Section 3 I Page 4

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Starting at the open end of the cable, set the tool to the correct cutting depth so that the
entire screen is removed with only the minimum amount of insulation. It is essential that
the core is as straight as possible for this operation, otherwise traces of the screen may
be left behind.

•

Continue turning the tool until it butts up against the copper screen wires and then turn the
tool until a smooth right angled taper is produced. Test the tool on the overlap section of the
core if necessary.

Clean and degrease the insulation with an approved solvent wipe to remove all traces of
conducting material. Always wipe from cut end towards screen wire to avoid contaminating
the insulation with carbon from the uncut screen.

U

N

C

•

O
N

TR

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 3 I Page 5
3.1.3

Removing the ‘Easy-Strip’ Insulation Screen
Mark the removal point of the polymeric screen with a Chinagraph pencil 40mm from the
sheath cut.

•

Apply six layers of PVC Tape, with the sticky side out, around the insulation screen at the
screen cut position, nearest to the sheath cut.

Use an abrafile to make a circular abrasion around the screen, using the PVC tape as a
guide, just deep enough so that the insulation below is visible.

U

N

C

•

O
N

TR

O
LL

ED

•

Section 3 I Page 6

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Remove the PVC tape. Starting at the circular abrasion and using the correct 0.5mm
depth-guarded tool, make two separate score lines along the core towards the cut end.
The lines shall be equally spaced and approximately 30° apart.

•

At the position where the scores meet the cut end, further deepen the score marks and
pull the conducting screen away from the insulation up to the circular abrasion. Repeat this
operation for the other screen section.

Clean and degrease the insulation with a solvent wipe to remove all traces of conducting
material. Always wipe from the cut end towards the screen wire to avoid contaminating the
insulation with carbon from the uncut screen.

U

N

C

•

O
N

TR

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 3 I Page 7
3.1.4

Removing the Polymeric Insulation
Using the Alroc tool, set the ‘stop gauge’ to the connector insertion depth.

•

Position the tool at the open core end. Adjust the blade to the required depth, which is just
deep enough so the blade does not damage the conductor.

Rotate the tool along the core, using the spiral cut setting, until the stop gauge prevents it
moving any further.

U

N

C

•

O
N

TR

O
LL

ED

•

Section 3 I Page 8

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Remove the tool and the removed insulation spiral.

O
LL

ED

•

3.2

Single Core Polylam Cables

3.2.1

Removing the Outer Sheath and Aluminium Foil Layer

Mark the removal point of the outer sheath with a Chinagraph pencil, as indicated on the
relevant jointing instruction. Make an additional line on the sheath 35mm past the original
mark to show the position where the long straight cuts start.

Using a pair of PG3 sheath stripping pliers, make a circular cut around the sheath at the
removal point.

U

N

C

•

O
N

TR

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 3 I Page 9
Make two longitudinal cuts (180° apart) using the PG3 sheath stripping pliers, starting
35mm beyond the circular cut and extending towards the open end of the cable.

•

Lift the two sections of the sheath away from the open end and break them off at the
circular cut position. The aluminium foil layer shall be removed simultaneously with the
outer sheath.

3.2.2

Installing ‘Cheese-Grater’ Earth Connection

Use the approved laminate belling tool to carefully lift the laminate sheath away from the
insulation screen where the two slits remain.

U

N

C

•

O
N

TR

O
LL

ED

•

Section 3 I Page 10

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Ease the sheath outwards, carefully progressing around the sheath in a circular pattern
until it is approximately between 5mm and 7mm above its original position. Do it gently to
avoid cracking the aluminium layer which reduces its fault carrying capability.

•

Position the ‘cheese-grater’s serrated section under the raised laminate sheath so that the
entire section is underneath the remaining sheath. The gap in the ‘cheese-grater’ shall be
positioned so that it does not correspond with the slits in the outer sheath and laminate.

Use the sheath roller tool to compress the sheath on to the serrations of the ‘cheesegrater’, until the sheath is back to its original position.

U

N

C

•

O
N

TR

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 3 I Page 11
Install the first ligerex strap around the cable sheath, 5mm back from the sheath cut, and
secure with the ligerex tightening tool.

•

Install the second ligerex strap around the cable sheath 20mm from the sheath cut and
tighten with the approved ligerex tightening tool.

Fix the tinned copper braid fixed to the ‘cheese-grater’ to the outer sheath of the cable
60mm from the sheath cut.

U

N

C

•

O
N

TR

O
LL

ED

•

Section 3 I Page 12

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
3.2.3

Removing the ‘Easy-Strip’ Insulation Screen
Mark the removal point of the polymeric screen with a Chinagraph pencil, as indicated on
the relevant jointing instruction. Remove the Easy-strip screen to this point.

•

Apply six turns of PVC tape to the insulation screen, sticky side out, to provide a guide for
the abrafile.

Using an abrafile, make a circular abrasion around the screen at the removal point just
deep enough to expose the insulation below.

U

N

C

•

O
N

TR

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 3 I Page 13
Starting at this position, and using the correct 0.6mm depth guarded tool, make two
separate score lines along the core towards the cut end. The lines shall be equally spaced
and approximately 90° apart.

•

Where the score meets the cut end, further deepen the score marks and pull the
conducting screen away from the insulation up to the circular abrasion.

Repeat this operation for the remaining section of insulation screen.

U

N

C

•

O
N

TR

O
LL

ED

•

Section 3 I Page 14

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Carefully remove the PVC tape. Clean and degrease the insulation with an approved
solvent wipe to remove all traces of conducting material. Always wipe from the cut end
towards the screen wires to avoid contaminating the insulation with carbon from the uncut
screen.

3.2.4

Using the Alroc tool, set the ‘stop gauge’ to the depth of the mechanical connector or lug.

Position the tool at the open core end. Adjust the blade to the required depth, which is just
deep enough so the blade does not damage the conductor.

U

N

C

•

O
N

TR

•

Removing the Polymeric Insulation

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 3 I Page 15
Rotate the tool along the core using the spiral cut setting until the stop gauge prevents it
moving any further. Remove the tool and the removed insulation spiral.

3.3

3-Core Polymeric Cables

3.3.1

Removing the Outer Sheath

Make a mark on the sheath at the removal point, as indicated on the relevant jointing
instruction.

Using an approved knife, depth-guarded saw or PG3 stripping pliers, make a circular cut
around the sheath.

U

N

C

•

O
N

TR

•

O
LL

ED

•

Section 3 I Page 16

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
From the open end of the cable make a longitudinal cut down the sheath to the circular
cut mark. Remove the sheath at this mark by unwrapping from the armours or screen
wires below.

3.3.2

Preparation of Plastic Cable Sheath

3.3.2.1 Polyethylene (PE) Sheaths

Flame-brush the outer sheath for a distance of 150mm from the sheath removal point.

O
N

TR

•

O
LL

ED

•

3.3.2.2 PVC Sheaths

Abrade the PVC sheath with a rasp for a distance of 60mm.

U

N

C

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 3 I Page 17
3.3.3

Preparation of Steel Wire Armour (Steel Wire Armour Cables)
A transition straight kit and an additional 3-core polymeric preparation kit is required for
this process.

•

Mark the armour removal point as indicated on the relevant jointing instruction. Place a wire
binder onto the armour wire, adjacent to the armour removal position, on the sheath cut side.

•

Using a depth-guarded or junior hacksaw, cut around the armours approximately halfway
through.

Wear suitable gloves while removing the armour. Lift and unwrap the armour wires a few at
a time and break them off against the binder by bending them backwards and forwards.

U

N

C

•

O
N

TR

O
LL

ED

•

Section 3 I Page 18

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Remove the wire binder and lift all the armour wires so that they are at right-angles to the
cable sheath.

•

Place the piece of black heatshrink tube, supplied in the 3-core polymeric preparation kit,
over the inner bedding layer of the cable and shrink into place.

Place a number of single-width turns of red sealant tape around the red tube over the
outer sheath cut. Build this up in layers until the support ring from the 3-core polymeric
preparation kit just fits over it.

U

N

C

•

O
N

TR

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 3 I Page 19
Fold a length of copper mesh in half over its full length to reduce its width to approximately
30mm. Wrap two layers of the mesh around the support ring in line with the end of the
armour wires when they are folded back on to the ring.

•

Bend all the armours down on to the copper mesh on the support ring and secure in place
with the supplied large worm-drive clip. Bend the long length of ‘cheese-grater’ strip to form
a circle and position it on the support ring, at the opposite end from where the armour wires
have been positioned.

Apply two half-lap layers of red sealant tape to the space between the end of the armour
wires and the ‘cheese-grater’ on the support ring.

U

N

C

•

O
N

TR

O
LL

ED

•

Section 3 I Page 20

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
3.3.4

Preparation of Copper Wire Screen (Copper Wire Screened Cables)
Unwind the copper screen wires and lay them back along the outer sheath.

•

A transition straight kit and an additional 3-core polymeric preparation kit is required for
this process.

•

Make a Chinagraph pencil mark on the abraded cable sheath 50mm from the sheath cut.

Wrap a one-third-lap layer of red sealant tape around the sheath up to the Chinagraph
pencil mark.

U

N

C

•

O
N

TR

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 3 I Page 21
Fold the copper wires back onto the red sealant tape and secure them with a double wire
binder, level with the end of the mastic.

•

Place the piece of black heatshrink tube supplied in the 3 core polymeric preparation kit
over the inner bedding layer of the cable and shrink into place.

Make a Chinagraph pencil mark on the black heatshrink tube 15mm from the outer sheath
cut and wrap a one-third-lap layer of red sealant tape from the mark over the copper wires
up to the wire binder.

U

N

C

•

O
N

TR

O
LL

ED

•

Section 3 I Page 22

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Push the large red crutch sealing sleeve from the transition joint kit over the cable end and
line it up with the wire binder. Shrink into place starting from the wire binder end.

•

Place a number of single-width turns of red sealant tape around the red tube over the
outer sheath cut. Build this up in layers until the support ring from the 3-core polymeric
preparation kit just fits over it.

Place the support ring over the mastic and line the end of it up with the double wire binder.

U

N

C

•

O
N

TR

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 3 I Page 23
Fold a length of copper mesh in half over its full length to reduce its width to approximately
30mm. Wrap two layers of the mesh around the edge of the support ring (furthest away
from the joint) and temporarily secure.

•

Turn back the copper wires and lay them over the copper mesh so they are tidy and do not
cross each other.

Wrap the remaining copper mesh over the wires and secure with a half hitch. Clamp the
copper wires and mesh down on to the support ring with the worm drive clip provided.

U

N

C

•

O
N

TR

O
LL

ED

•

Section 3 I Page 24

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Trim the copper wires with side cutters, so that they are level with the inner end of the
copper wire mesh.

•

Bend the long length of ‘cheese-grater’ strip to form a circle and position it on the support
ring, at the opposite end from where the copper wires have been fixed to the support ring.

Apply two half-lap layers of red sealant tape to the space between the end of the copper
wires and the ‘cheese-grater’ on the support ring.

U

N

C

•

O
N

TR

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 3 I Page 25
3.3.5

Removing the Inner Bedding Layer
Mark the position of the inner bedding removal point with a Chinagraph pencil, as indicated
on the relevant jointing instruction.

•

If there is a rubber bedding layer, remove it with a plastic hack knife by making a circular
cut at the bedding removal point and then making a cut lengthways down the bedding.

Unwrap the bedding and remove it using an approved knife. Take care not to damage the
cores below.

U

N

C

•

O
N

TR

O
LL

ED

•

Section 3 I Page 26

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
3.3.6

Un-lay the fillers and carefully remove them at the inner bedding removal position, using a
pair of side cutters. Do not forget to remove the central filler.

3.3.7

Removing the Insulation Screen

O
LL

ED

•

Removing the Fillers

Mark the removal point of the polymeric screen with a Chinagraph pencil 180mm from the
centre line of the joint.

•

Test the cut end of each core to determine the type of screen before applying any heat to
aid removal.

C

O
N

TR

•

Apply six turns of PVC tape, sticky side out, to the insulation screen to provide a guide for
the abrafile.

U

N

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 3 I Page 27
Use an abrafile to make a circular abrasion around the screen at the removal point, just
deep enough to expose the insulation below. Take extra care on cables with sector-shaped
cores to ensure that only the minimum amount of insulation is removed.

•

Remove the PVC tape. Use a 0.4mm depth-guarded tool to make two separate score lines
along the core from the screen cut to the cut end. The lines shall be equally spaced and
approximately 30° apart.

Further deepen the score marks at the position where they meet the cut end and pull
the conducting screen away from the insulation up to the circular abrasion. Repeat this
operation for the other screen section.

U

N

C

•

O
N

TR

O
LL

ED

•

Section 3 I Page 28

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Clean and degrease the insulation with an approved solvent wipe to remove all traces of
conducting material. Always wipe from cut end towards screen wires to avoid contaminating
the insulation with carbon from the uncut screen.

3.3.8

Using the Alroc tool, set the stop gauge to the connector insertion depth.

Position the tool at the open core end. Adjust the blade to the required depth, which is just
deep enough so the blade does not damage the conductor.

U

N

C

•

O
N

TR

•

Removing the Polymeric Insulation

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 3 I Page 29
Rotate the tool along the core using the spiral cut setting until the stop gauge prevents it
moving any further.

•

Remove the tool and the removed insulation spiral.

3.4
3.4.1

PICAS – Paper Insulated Corrugated Aluminium Sheathed Cables
Removing the Outer PVC Sheath

Make two Chinagraph pencil marks on the PVC sheath, one at the sheath removal point
and the second one 200mm towards the cut end of the cable.

U

N

C

•

O
N

TR

O
LL

ED

•

Section 3 I Page 30

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Cut round the sheath at both of these marks using a pair of PG4 sheath stripping pliers.

•

Now make a lengthwise cut along the PVC sheath between the two circular cuts.

Lift the edge of the sheath with the jaws of the PG4 Pliers and unwrap it, tearing against the
circular cut points. Gentle heat from a gas torch may assist this operation in cold weather.

U

N

C

•

O
N

TR

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 3 I Page 31
3.4.2

Removing the Bitumen Layer
Wear appropriate gloves during this operation. Warm the bitumen layer using a gas torch
and use the approved solvent wipes to clean the aluminium sheath.

•

When this process is complete, the aluminium sheath should be bitumen-free and clean.

3.4.3

Removing the Corrugated Aluminium Sheath

Mark the aluminium sheath at the removal point using a Chinagraph pencil, as indicated on
the relevant jointing instruction. If this mark falls within one of the valleys, move the mark to
the next crest towards the cut end of the cable.

Using the approved tool, make a circular cut around the marked ridge of the aluminium
sheath. The cut should be right through the aluminium. Take care not to damage the
papers below.

U

N

C

•

O
N

TR

•

O
LL

ED

•

Section 3 I Page 32

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Once the circular cut has been made, the aluminium sheath can be removed by pulling
the sheath towards the open cable end. Twisting the sheath from side to side whilst pulling
shall make this task easier.

•

On some occasions, when there is a lot of sheath to remove, it may be necessary to carry
out this process more than once. If this is the case, always make the first cut closest to the
cut cable end.

Mark the PVC sheath with a Chinagraph pencil, 60mm from the PVC sheath cut.

C

O
N

•

Preparation of PVC Sheath

TR

3.4.4

O
LL

ED

•

Abrade the PVC sheath with a rasp between the sheath cut and the Chinagraph pencil mark.

U

N

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 3 I Page 33
3.4.5

Removing the Copper Woven Tapes (CWT) and Core Fillers
Unwind the CWT and remove any surplus length with side cutters.

•

Un-lay the fillers and carefully remove them at the belt paper position using a pair of side
cutters. Do not forget to remove the central filler.

Rewind the CWT tightly around the cable cores at the crutch position for a distance of
20mm from the aluminium sheath cut and tie off. Remove any surplus tape with insulated
side cutters.

U

N

C

•

O
N

TR

O
LL

ED

•

Section 3 I Page 34

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
3.4.6

Removing the Insulation Screen (Screened Cables Only)
Mark the screen papers at the removal point indicated on the relevant jointing instruction.
Tie a twine or wire binder around the screens at this point.

•

Carefully unwrap the first 50-75mm of the screen and secure the end of the core insulation
papers with PVC tape.

Unwind the remainder of the screen to the termination point and remove them by neatly
tearing against the twine or wire binder.

U

N

C

•

O
N

TR

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 3 I Page 35
Remove the number paper and one layer of papers below the screen to the same position
as the screen papers, using the same method.

3.4.7

Removing the Conducting and Belt Papers

Tie a twine binder around the carbon paper layer 5mm from the aluminium sheath cut.

Carefully unwind the carbon paper(s) and tear them off neatly against the twine binder.

U

N

C

•

O
N

TR

•

O
LL

ED

•

Section 3 I Page 36

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Now tie a second twine binder around the belt papers 20mm from the aluminium sheath cut.

•

Carefully unwind two or three of the belt papers at a time and tear them off neatly against
the twine binder.

Install five layers of PVC tape over the prepared belt and carbon papers, sticky side out, to
avoid damaging the papers when the fillers are removed and the heatshrink tubes are fitted.

U

N

C

•

O
N

TR

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 3 I Page 37
3.4.8

Removing the Insulation Papers
Only carry out this process after installing the red insulation tubes as described in Section
4.1.1 or 4.1.3.

•

Mark the red tube over the core papers at the point of removal, as indicated on the
appropriate jointing instruction.

•

Using a sharp knife, make a circular cut around the core through the papers, taking care
not to damage the conductor below.

Remove the red tube by pulling towards the end with a gentle twisting movement.

U

N

C

•

O
N

TR

O
LL

ED

•

Section 3 I Page 38

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Rounding of the conductor with water pump or similar pliers eases this operation and helps
prepare the conductor for insertion into the appropriate connector.

•

Un-wrap the papers up to the cut position and tear off against the remaining red tube.

Clean any surplus compound from the cable conductor with an approved solvent wipe.

U

N

C

•

O
N

TR

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 3 I Page 39
3.5

PILC – Paper Insulated Lead Sheathed Cables

3.5.1

Removing the Outer Serving or Sheath
Mark the position of the serving or sheath termination as indicated on the relevant jointing
instruction.

•

Wear suitable gloves while removing the serving. Put a wire binder around the serving at
the removal point and score in front of the binder with an approved knife.

Remove the serving with an approved knife and heat from a gas torch if required.

U

N

C

•

O
N

TR

O
LL

ED

•

Section 3 I Page 40

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
3.5.2

Preparation of Plastic Cable Sheath

3.5.2.1 Polyethylene (PE) Sheaths
Flame brush the outer sheath for a distance of 150mm from the sheath removal point.

O
LL

ED

•

3.5.2.2 PVC Sheaths

Abrade the PVC sheath with a rasp for a distance of 60mm.

3.5.3

Removing the Steel Wire Armour

Place a wire binder around the armour wires at the point of removal, as indicated on the
relevant jointing instruction.

U

N

C

•

O
N

TR

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 3 I Page 41
Using a depth-guarded or junior hacksaw make a circular cut around the armours at the
binder position. Cut through only half the width of the armour to avoid damaging the lead
sheath below.

•

Wear suitable gloves while removing the armour. Lift and unwrap the armour wires a few at
a time and break them off against the binder by bending them backwards and forwards.

Remove the binder and lift the armours with a plastic hack knife so they are at 90° to the
cable. Clean of all traces of bitumen from the wires using a gas torch and approved solvent
wipes.

U

N

C

•

O
N

TR

O
LL

ED

•

Section 3 I Page 42

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
3.5.4

Removing the Steel Tape Armour
Heat the armours for a distance of 150mm with a gas torch and clean them with approved
solvent wipes.

•

Place a wire binder around the tape armour 60mm from the outer serving removal point.

Wear suitable gloves while removing the armour. Using a depth-guarded or junior hacksaw,
cut through the first layer of tape armour at the binder position.

U

N

C

•

O
N

TR

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 3 I Page 43
Lift the point of the armours at the binder position, unwrap and remove.

•

Repeat the process with the second layer of tape armour making sure not to damage the
lead sheath below.

3.5.5

Removing the Inner Bitumen Layer

Wear suitable gloves for this operation. Score around the inner bedding layers with an
approved knife adjacent to the armour removal point taking great care not to score into the
underlying lead sheath.

U

N

C

•

O
N

TR

O
LL

ED

•

Section 3 I Page 44

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
At the open cable end lift the bitumen impregnated textile layer with the knife and unwrap it
back to the armour position, tearing it against the end of the cut armours. The use of a gas
torch assists this process.

•

Apply sufficient heat to the inner bitumen paper layer to soften it before removing it.

Apply more heat to the final layer of bitumen on the lead sheath and armours and wipe off
any traces of bitumen with approved solvent wipes.

U

N

C

•

O
N

TR

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 3 I Page 45
The lead sheath will be clean and bright after this process.

3.5.6

Clean and degrease the lead sheath using approved solvent wipes. Mark the lead sheath
at the removal point as indicated on the relevant jointing instruction, using a Chinagraph
pencil.

Wear suitable gloves for this operation. Using an approved insulated hack-knife, make a
circular indented ring cut around the lead sheath, taking care to only cut part-way through
the sheath.

U

N

C

•

O
N

TR

•

Removing the Lead Sheath

O
LL

ED

•

Section 3 I Page 46

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
From the cut cable end, cut the lead sheath longitudinally to the round cut, using an
approved insulated hack-knife. Take care not to damage the belt papers below.

•

Open the lead sheath up along the length of the cut and carefully unwrap the lead sheath
against the round cut.

3.5.7

Removing the Conducting and Belt Papers

Tie a twine binder around the carbon paper layer 5mm from the lead sheath cut.

U

N

C

•

O
N

TR

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 3 I Page 47
Carefully unwind the carbon paper(s) and tear them off neatly against the twine binder.

•

Now tie a second twine binder around the belt papers 20mm from the lead sheath cut.

Carefully unwind two or three of the belt papers at a time and tear them off neatly against
the twine binder.

U

N

C

•

O
N

TR

O
LL

ED

•

Section 3 I Page 48

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Install five layers of PVC tape over the prepared belt and carbon papers, sticky side out, to
ensure that the papers are not damaged by the next step.

3.5.8

Removing the Core Fillers from Belted Cables

Un-lay the fillers and carefully remove them at the belt paper position using a pair of side
cutters. Do not forget to remove the central filler.

Carefully separate the cores and secure the core paper ends with PVC tape.

U

N

C

•

O
N

TR

•

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 3 I Page 49
3.5.9

Removing the Copper Woven Tapes (CWT) (Screened Cables Only)
Unwind the CWT and remove the core fillers carefully with side cutters.

•

Rewind the CWT tightly around the cable cores at the crutch position for a distance
of 20mm from the aluminium sheath cut and tie off and remove any surplus tape with
insulated side cutters.

O
N

TR

O
LL

ED

•

3.5.10 Removing the Insulation Screen (Screened Cables Only)
Using an approved solvent wipe, remove any surplus cable compound from the screened
core insulation.

U

N

C

•

Section 3 I Page 50

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Mark the screen papers at the removal point indicated on the relevant jointing instruction.
Tie a twine or wire binder around the screens at this point.

•

Carefully unwrap the first 50-75mm of the screen and secure the end of the core insulation
papers with PVC tape. Unwind the remainder of the screen to the termination point and
remove them by neatly tearing against the twine binder.

Remove the number paper and one layer of papers below the screen to the same position
as the screen papers, using the same method.

U

N

C

•

O
N

TR

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 3 I Page 51
3.5.11 Removing the Insulation Papers
Only remove the papers after fitting the red insulation tubes as described in Section 4.1.3.

•

Mark the red tube over the core papers at the point of removal as indicated on the
appropriate jointing instruction.

•

Using a sharp knife, cut around the core through the papers taking care not to damage the
conductor below.

Remove the red tube by pulling towards the end with a gentle twisting movement.

U

N

C

•

O
N

TR

O
LL

ED

•

Section 3 I Page 52

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Rounding of the conductor with water pump or similar pliers assists this operation and
helps prepare the conductor for insertion into the appropriate connector.

•

Unwrap the papers up to the cut position and tear off against the remaining red tube.

Clean any surplus compound from the cable conductor with an approved solvent wipe.

U

N

C

•

O
N

TR

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 3 I Page 53
3.6

Moisture Testing on Paper Insulated Cables
Wear full Personal Protective Equipment for this test.

•

Gently heat the paraffin wax container on a low heat. Insert the thermometer through one of
the rubber grommets in the top and wait until the wax reaches 125°C.

•

Always handle the papers to be tested with gloves, as moisture from hands is enough to
give a positive test.

•

Lift out the basket and place the paper tapes to be tested into it.

•

The samples from the following layers shall be tested:

TR

O
LL

ED

•

Inner and outer belt papers.

•

Paper or string fillers.

•

Inner and outer core papers.

U

N

C

O
N

•

Section 3 I Page 54

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Immerse the basket complete with papers into the paraffin wax bath and observe the results.

•

If there is no reaction from the wax, or it only froths slightly, the papers are dry and the
cable is fit to be jointed.

•

If the wax froths a lot and makes a crackling noise, this means that the papers are wet and
the cable is not to be jointed.

•

Remove the heat from the container and leave it to cool before moving it.
The wax can be re-used until it starts to discolour. There is no need to dispose of it after
each moisture test.

U

N

C

•

O
N

TR

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 3 I Page 55
O
N

C

N

U
TR
O
LL

ED
4.1
•
4.1.1

STANDARD PROCEDURES FOR INSTALLING
MATERIALS AND COMPONENTS
Installing Stress Control and Insulation Materials
All heatshrink materials shall only be installed using a soft flame blow torch.
Belted Paper Cables

ED

4

Prepare the cable as described in Sections 3.4 or 3.5.

•

Using an approved solvent wipe remove any surplus cable compound from the paper core
insulation.

•

Tape up the paper insulation on the end of each core to stop them unravelling.

C

O
N

TR

O
LL

•

Slide the correct lengths of red insulating tube over each core, until they are approximately
50mm from the crutch.

U

N

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 4 I Page 1
Partly shrink the tubes for a distance of 50mm from the end.

•

Whilst the tubes are still hot, gently twist and turn them so that the shrunk section is
positioned on the inside and the ends of the tubes are level with the PVC tape protecting
the belt papers.

Continue to shrink the tubes starting from the crutch and working towards the cut ends.

U

N

C

•

O
N

TR

O
LL

ED

•

Section 4 I Page 2

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Whilst the red tubes are still hot slide the supplied yellow mastic wedge into the crutch so
that the tip is just below the belt paper. The yellow mastic wedge shall be applied with a thin
coating of silicone grease and a plastic wedge insertion tool.

•

Remove the PVC Tape from the belt papers and make a Chinagraph pencil mark on the red
tubes 40mm from the lead sheath cut.

Make a second Chinagraph pencil mark 20mm onto the lead sheath.

U

N

C

•

O
N

TR

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 4 I Page 3
Wrap two of the supplied strips of yellow mastic around the crutch between the two
Chinagraph pencil marks, applying sufficient tension to stretch the tape to half its original
width. Build up the gap between the end of the red tubes and the lead sheath first, before
covering the red tubes and the lead sheath. The yellow mastic shall be left to form a domed
area.

•

Position the red crutch sealing sleeve centrally over the yellow mastic, sheath and red
tubes, and then shrink into position. Apply sufficient heat to ensure that the tube has been
fully shrunk, thus making sure that the yellow mastic fills any voids in the crutch area.

U

N

C

O
N

TR

O
LL

ED

•

Section 4 I Page 4

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
4.1.2

Build-Up Kit for Small Section Paper Cables
The core tube and sealing sleeves supplied in the two sizes of transition straight joints are
not suitable for use with cables that are below the minimum size on the kit label.

•

For smaller cross-section cables between 16mm2 (0.0225sq.in) and 70mm2 (0.1sq.in) an
additional build-up kit is required. How the kit is used is dependant upon which joint is being
made.

4.1.2.1 95-185mm2 Joint

ED

•

Replace the three red tubes in the base kit with the smaller ones in the build-up kit.

•

Use the yellow mastic from the build-up kit.

•

Replace the red crutch sealing tube in the base kit with the smaller one in the build-up kit.

•

Shrink the three red (MWJS 30/10) build-up tubes on top of the red tubes level with the
insulation removal point.

•
•
•
•

Replace the three red tubes in the base kit with the smaller ones in the build-up kit.
Use the yellow mastic from the build-up kit.
Replace the red crutch sealing tube in the base kit with the smaller one in the build-up kit.
Shrink the three red (MWJS 30/10) build-up tubes on top of the red tubes level with the
insulation removal point.
Shrink the three red (MWJS 40/16) build-up tubes on top of the first set of red build tubes
level with the insulation removal point.

U

N

C

•

O
N

4.1.2.2 240-300mm2 Joint

TR

O
LL

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 4 I Page 5
4.1.3

Screened Paper Cables
Prepare the cable as described in Sections 3.4 or 3.5 before installing these components.

•

On each core, remove the twine or wire binder and make a Chinagraph pencil mark either
side of the screen cut, one 20mm on to the screen and the other 10mm on to the insulation.

•

Wrap a 50mm long piece of yellow mastic, stretched to half its original width, around the
screen cuts between the two Chinagraph pencil marks.

Slide the correct lengths of red insulating tube over each core, until they are approximately
50mm from the crutch.

U

N

C

•

O
N

TR

O
LL

ED

•

Section 4 I Page 6

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Partly shrink the tubes for a distance of 50mm from the end. Whilst the tubes are still hot,
gently twist and turn them so that the shrunk section is positioned on the inside and the
ends of the tubes are level with the CWT tape protecting the belt papers.

•

Continue to shrink the tubes starting from the crutch and working towards the cut ends.

Slide the supplied yellow mastic wedge into the crutch so that the tip is just below the
copper woven tape. A plastic wedge insertion tool can be used to aid this process.

U

N

C

•

O
N

TR

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 4 I Page 7
Make a Chinagraph pencil mark on the red tubes 40mm from the aluminium sheath cut.

•

Make a second Chinagraph pencil mark 20mm onto the aluminium sheath.

Wrap two of the supplied strips of yellow mastic around the crutch between the two
Chinagraph pencil marks, applying sufficient tension to stretch the tape to half its original
width.

U

N

C

•

O
N

TR

O
LL

ED

•

Section 4 I Page 8

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Position the red crutch sealing sleeve centrally over the yellow mastic, sheath and red
tubes, and then shrink into position. Apply sufficient heat to ensure that the tube has been
fully shrunk, thus making sure that the yellow mastic fills any voids in the crutch area.

4.1.4

O
LL

ED

•

Single Core Polymeric Cables in Single and Triplex Straight/Branch Joints
Prepare the cables as described in Sections 3.1 or 3.2.

•

Clean and degrease the insulation with an approved solvent wipe to remove all traces of
conducting material. Always wipe from cut end towards screen wire to avoid contaminating
the insulation with carbon from the uncut screen.

C

O
N

TR

•

Make a Chinagraph pencil mark on the black insulation screen of the cable 20mm from the
screen cut.

U

N

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 4 I Page 9
Make a second Chinagraph pencil mark on the insulation 10mm from the screen cut.

•

Stretch one of the short yellow mastic strips, supplied in the kit, to half its original width and
wrap it around the core screen and insulation between the two Chinagraph pencil marks.

Slide the black stress control tube over the core until the end is level with the insulation cut.
The tube shall fully overlap the yellow mastic tape.

U

N

C

•

O
N

TR

O
LL

ED

•

Section 4 I Page 10

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Shrink the tubing down starting at the insulation cut, then work back towards the cable over
sheath.

4.1.5

O
LL

ED

•

Single Core Polymeric Cables in Transitional Straight or Branch Joints
Prepare the cables as described in Sections 3.1 or 3.2.

•

Make a Chinagraph pencil mark on the outer sheath of the cable, 60mm from the sheath cut.

Wrap a one-third-lap layer of red sealant tape over the cable sheath up to the Chinagraph
pencil mark.

U

N

C

•

O
N

TR

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 4 I Page 11
Bend back the screen wires and lay them onto the mastic tape, taking care not to cross
over any of the wires.

•

Apply a double wire binder to the screen wires level with the end of the red sealant tape.

Make a Chinagraph pencil mark on the insulation screen 15mm in from the sheath cut.

U

N

C

•

O
N

TR

O
LL

ED

•

Section 4 I Page 12

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Wrap a one-third-lap layer of red sealant tape from the mark on the insulation screen up
over the copper screen wires to the wire binder. Ensure that there are no gaps in the tape
as this is an important moisture seal for the completed joint.

•

Make a Chinagraph pencil mark on the insulation 10mm from the screen cut.

Make a second Chinagraph pencil mark on the black insulation screen of the cable, 20mm
from the screen cut.

U

N

C

•

O
N

TR

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 4 I Page 13
Wrap the short piece of yellow mastic around the screen cut between the previously made
marks. Stretch the tape to half its original width and form a smooth taper with no sharp edges.

•

Install the red core tubing over the cable up to the wire binder.

Shrink the tube into place, starting from the end where the red sealant has been applied to
the copper wires.

U

N

C

•

O
N

TR

O
LL

ED

•

Section 4 I Page 14

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
4.1.6

Single Core Polymeric Cable Terminations
Fit the mechanical lug as described in Section 4.2.5.

•

Use an approved solvent wipe to clean and degrease the outer sheath of the cable for
100mm below the sheath cut.

•

Make a Chinagraph pencil mark on the outer sheath of the cable, 60mm from the sheath cut.

Wrap a one-third-lap layer of red sealant tape over the cable sheath down to the
Chinagraph pencil mark.

U

N

C

•

O
N

TR

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 4 I Page 15
Bend back the screen wires and lay them onto the mastic tape taking care not to cross over
any of the wires.

•

Apply a double wire binder to the screen wires level with the end of the red sealant tape.

Make a Chinagraph pencil mark on the black insulation screen of the cable, 20mm from the
screen cut.

U

N

C

•

O
N

TR

O
LL

ED

•

Section 4 I Page 16

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Make a second Chinagraph pencil mark on the insulation 10mm from the screen cut.

•

Wrap the short piece of yellow mastic around the screen cut between the two marks.
Stretch the tape to half its original width and form a smooth taper with no sharp edges.

Preheat the cable lug before placing the red tubing over the core.

U

N

C

•

O
N

TR

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 4 I Page 17
Place the green-mastic-lined red tube on the termination until the bottom is level with the
wire binder.

•

Use a soft yellow flame to shrink the red tube starting at the screen cut. Then shrink from
the screen cut up to the cable lug, before finally shrinking from the screen cut to the bottom.

U

N

C

O
N

TR

O
LL

ED

•

Section 4 I Page 18

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
The termination is now ready to be installed in the end box.

•

Note: After installing the termination, reheat the cable lug area until a bead of green mastic
appears at the top.

U

N

C

O
N

TR

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 4 I Page 19
4.1.7

3-Core Polymeric Cables
Remove the insulation screens as described in Section 3.3.7.

•

Make a Chinagraph pencil mark on the insulation of each core 10mm from the screen cut.

•

Make Chinagraph pencil marks on the black insulation screen of each core at 20mm,
40mm, 60mm and 90mm from the screen cut.

U

N

C

O
N

TR

O
LL

ED

•

Section 4 I Page 20

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Wrap one of the short pointed yellow mastic strips around the semi-conducting screen cut
of each core, between the first and second Chinagraph pencil marks. Stretch the tape to
half its original width during this operation.

•

Apply one turn of red sealant tape around the semi-conducting screen of each core
between the third and fourth Chinagraph pencil marks.

Carefully slide the red core tubes over the end of each core until the tubes are level with
the fifth Chinagraph pencil mark.

U

N

C

•

O
N

TR

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 4 I Page 21
Shrink the tubes down starting at the insulation screen cut end before working towards the
cut cable end.

O
LL

ED

•

4.2

Installing Mechanical Connectors and Lugs

4.2.1

Single Core and Triplex Straight Joints

Remove the insulation as described in Section 3.3.8.

Check at this stage that any connector insulating tubes have been positioned over one of
the cables.

U

N

C

•

O
N

TR

•

Section 4 I Page 22

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
The connector comes with a metal insert to fit small conductors. If the conductor does not
fit the connector, discard the insert and use the connector without it.

•

Fit the conductors into the connector. The insulation butts up against the end of the connector.

Using the approved insulated tool to hold the connector, take up the tension on all of the
bolts equally without shearing them off.

U

N

C

•

O
N

TR

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 4 I Page 23
Continue to tighten and shear off all four bolts, starting with the bolts at either end of the
connector, followed by the two in the centre.

4.2.2
•

O
LL

ED

•

3-Core Transition and 3-Core PICAS/PILC Joints

Remove the insulation as described in the following sections:
•

Screened paper cables – Section 3.5.11.

•

Polymeric cables – Section 3.3.8.

Ensure that the support ring is parked on the triplex cable side of the joint and that the
connector insulating tubes are now parked over their respective cores.

U

N

C

O
N

•

Belted paper cables – Section 3.4.8.

TR

•

Section 4 I Page 24

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Set the cores in their final jointing position. Ensure that the conductors have been cut to
allow for the connector central moisture block.

•

Insert each end of the core into its respective ‘connector half’ and finger-tighten the bolts.

Align and position the two connector halves so that the central fixing bolt can be inserted
into the central fixing hole. The use of force should not be necessary.

U

N

C

•

O
N

TR

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 4 I Page 25
Hold the connector with the approved holding tool and tighten the two bolts on one side
until they shear off.

•

Repeat this operation on the other side of the connector, then shear off the central fixing bolt.

4.2.3
•

Single Core Branch Joints

Install the stress control materials and heatshrink tubes as described in Section 4.1.4
before completing this section.
Position and shrink the red heatshrink shim over the single core cable end, so it is in line
with the black stress control tube underneath.

U

N

C

•

O
N

TR

O
LL

ED

•

Section 4 I Page 26

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Line up the two cables of the branch end so that they are parallel and the insulation cuts
are level.

•

Insert the red and black insulating spacer between the two cores of the double cable end.
Ensure that the red spacer lines up with the end of the two insulation cuts.

U

N

C

O
N

TR

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 4 I Page 27
Fit the two conductors into the mechanical connector, ensuring that the insulation edge
butts against the connector body. Tape the two cables together with the supplied tape to
stop the inserts falling out.

•

The connector comes with a plastic centralising insert for the single cable end. If the
conductor is able to pass through the hole in plastic insert, fit the insert into the connector
and insert the single cable. If the conductor is too large to pass through the insert, discard it.

U

N

C

O
N

TR

O
LL

ED

•

Section 4 I Page 28

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Place the black stress-control tube inside the red and black insulation tube and park it on
the single cable end. Insert the single cable into the connector and finger-tighten the bolts.

•

Starting with the two bolts on the single cable end, tighten all the bolts in sequence in
several steps until the heads shear off.

If any of the bolts shear off proud of the connector surface, remove the edge with a file.

U

N

C

•

O
N

TR

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 4 I Page 29
Clean and degrease the connector, fill the bolt holes with the supplied clay pack to obtain a
smooth finish.

4.2.4

3-Core Transition Branch Joints

O
LL

ED

•

Remove the insulation as described in Section 3.3.8 for polymeric cables and Section
3.5.11 for paper cables. Check that the connector insulating tubes have been positioned
over the double cable end and support ring(s) over the triplex cables.

•

Slide the three short pieces of red thick-wall tube over each core end on the single cable
end of the joint. Position these away from the connector area.

U

N

C

O
N

TR

•

Section 4 I Page 30

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
It is important that the position and setup of the cores is correct at this stage as it helps with
installing the connectors.

•

Cut each core to length, allowing for the water block in the connector, and remove the core
insulation to the connector bore depth.

•

Bring together each pair of cores on the branch side of the joint and bind them together
with the ties provided.

Slide the (red and black) insulating sleeves carefully over each pair of cores on the branch
side as shown in the relevant jointing instruction. Position the connector over the pair of
cores on the branch side and finger-tighten the bolts.

U

N

C

•

O
N

TR

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 4 I Page 31
Slide the connector collar over the remaining single core. Place the core into the open
channel of the connector and position the connector insert over the conductor.

•

Slide the connector collar over the insert, locking it in place. Fit the bolts and tighten them
by hand.

Tighten up the bolts in turn until they shear off.

U

N

C

•

O
N

TR

O
LL

ED

•

Section 4 I Page 32

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Position the three pieces of short red tube so that they butt up with the single end of the
connector and shrink into position, starting from the end closest to the connector.

4.2.5

O
LL

ED

•

Mechanical Lugs for Indoor and Outdoor Terminations

Follow the cable preparation procedures for polymeric cables in Sections 3.1 and 3.2
before installing any mechanical lugs.

•

Each kit comes with the correct size and types of lug for each termination. Remove the
insulation on the conductor to the depth of the thimble.

U

N

C

O
N

TR

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 4 I Page 33
Place the lug over the conductor so that the bottom of the barrel butts up against the core
insulation.

•

Tighten the bolts by hand and check that the palm hole lines up with the bushing or
insulator stud.

•

Fully tighten the bolts until the bolt heads shear off.

C

O
N

TR

O
LL

ED

•

Complete the termination as detailed in the appropriate instruction.

U

N

•

Section 4 I Page 34

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
4.2.6

Mechanical Thimbles for Use in T1 Transformer End Boxes
Prepare the cable following the procedures for polymeric cables in Sections 3.1 and 3.2
before installing any mechanical lugs.

•

The kit comes with a mechanical thimble for 95mm2 stranded aluminium cables only. The
insulation on the conductor shall be removed to the depth of the thimble.

•

Place the thimble over the conductor so that the top of the barrel is level with the top of the
cut core.

U

N

C

O
N

TR

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 4 I Page 35
Tighten the bolts by hand and check that the final positioning of the thimble is correctly
aligned with the half clamps on the bushing.

•

Fully tighten the bolts until the bolt heads shear off.

•

Complete the termination as detailed in the appropriate instruction.

4.3

Installing Connector Stress Control and Heatshrink Insulation

4.3.1

Single Core and Triplex Straight/Branch Joints

O
LL

ED

•

Fit the mechanical connectors as described in Section 4.2.1.

•

Clean and degrease the mechanical connector with an approved solvent wipe.

U

N

C

O
N

TR

•

Section 4 I Page 36

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Fill the bolt holes in the mechanical connector with the grey clay material supplied in the
joint kit.

•

Remove one of the backing sheets from the black mastic patch and position so that the
connector is in the centre of the sticky side.

Wrap the black mastic patch around the connector and remove the other backing sheet.

U

N

C

•

O
N

TR

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 4 I Page 37
Slide the red and black insulation tube over the installed black patch and position it over the
centre of the joint.

•

Starting in the middle, shrink the insulation tube using equal heat on all the surfaces. When
the tube is properly shrunk, the ridges on the black layer of the tube shall no longer be
visible and the tube cannot be moved.

Continue to shrink the tube from the centre to within 50mm of one end.

U

N

C

•

O
N

TR

O
LL

ED

•

Section 4 I Page 38

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Remove the heat from that end and start shrinking from the middle again towards the other
end. Stop again 50mm from the end. This ensures that as the tube shrinks, any air inside is
pushed out.

•

Return to each end in turn and continue to shrink the tube completely.

4.3.2
•

Transition and Paper to Paper Straight Joints

Fit the mechanical connectors as described in Section 4.2.2.
Clean and degrease the mechanical connector with an approved solvent wipe.

U

N

C

•

O
N

TR

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 4 I Page 39
Remove one of the backing sheets from the yellow mastic patch and position it underneath
the connector, so it is in the centre of the sticky side and the overlap is over the bolt holes.

•

Wrap the yellow mastic patch around the connector. Leave the outer backing sheet in place
so the patch for the next connector does not stick to the first one.

•

Remove all the release papers from the wrapped connectors.

Roll the overlapped ends of the yellow mastic patch over to help with filling the gap
between the edge of the connector and the core tubes. Complete this stage for all three
cores before attempting to shrink the red and black insulation tubes in place.

U

N

C

•

O
N

TR

O
LL

ED

•

Section 4 I Page 40

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Slide the red and black insulation tube over the installed yellow patch and position over the
centre of the joint. Position all three before starting the shrinking process.

•

Starting in the middle, shrink the insulation tubes, using equal heat on all the surfaces.
When the tubes are properly shrunk, the ridges on the black layers of each tube shall no
longer be visible and the tube cannot be moved.

Continue to shrink the tubes from the centre to within 50mm of one end.

U

N

C

•

O
N

TR

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 4 I Page 41
Remove the heat from that end and start shrinking from the middle again towards the other
end. Stop again 50mm from the end. This ensures that as the tubes shrink any air inside is
pushed out.

•

Return to each end in turn and continue to shrink the tubes completely.

4.3.3
•

Single Core Branch Joints

Fit the mechanical connectors as described in Section 4.2.3.
Remove one release paper from a long strip of yellow mastic. Starting from the single core
side, wrap it around the core, stretching it to approximately half its original width.

U

N

C

•

O
N

TR

O
LL

ED

•

Section 4 I Page 42

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Fill in the gaps between the core and the connector, continuing across the connector and
on to the red insulating piece. Ensure that a smooth profile is formed so that when the heat
shrink tubes are applied all the voids are filled with yellow mastic.

•

Lubricate the yellow mastic with the supplied silicone tissue to stop the black stress control
tube sticking when it is pulled across the joint.

U

N

C

O
N

TR

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 4 I Page 43
Push the black stress control tube over the connector and onto the rubber spacers, until it
lines up with the end of the black spacer.

•

Shrink the stress control tube down, starting at the branch side before working towards the
single core side.

Apply additional heat over the connector to ensure that the tube is fully shrunk and wrinkle
free. The second picture below shows what the finished tube should look like.

U

N

C

•

O
N

TR

O
LL

ED

•

Section 4 I Page 44

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Now position the red and black insulating sleeve centrally over the stress control tube.

•

Start shrinking the sleeve from the centre, continuing to within 50mm of each end. Finally
complete the shrinking process on both ends. Following this sequence ensures that no air
is trapped in the tube.

When complete, the sleeve shall be fully shrunk, with no visible ridges on the sleeve surface.

U

N

C

•

O
N

TR

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 4 I Page 45
4.3.4

3-Core Transition Branch Joints
Fit the mechanical connectors as described in Section 4.2.4.

•

Using one of the thin lengths of yellow mastic, stretched to half its original width, tape
around both ends of the connector to reduce the size of the step.

•

Remove one of the backing sheets from the yellow mastic patch and position it underneath
the connector, so it is in the centre of the sticky side and the overlap is over the bolt holes.

Wrap the yellow mastic patch around the single end of the connector, leaving the outer
backing sheet in place to prevent other patches sticking to it.

U

N

C

•

O
N

TR

O
LL

ED

•

Section 4 I Page 46

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Take two yellow mastic patches and remove the backing sheet from one side. Stick the two
patches together with a 50% overlap.

•

Wrap the double length yellow mastic patch around the bottom of the double cable end of
the connector.

U

N

C

O
N

TR

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 4 I Page 47
Remove the backing sheet partly from the yellow mastic patch on the top of the connector
and continue to wrap it around the connector until it is evenly covered.

•

To help with the application of the yellow mastic on the remaining cores, wrap each
completed core with two of the removed backing sheets. This stops the yellow mastic from
one core sticking to another.

O
N

Apply a thin smear of silicone grease over the yellow mastic on each core and position the
red and black insulating sleeves centrally over each connector. Position all three before
starting the shrinking process.

U

N

C

•

TR

O
LL

ED

•

Section 4 I Page 48

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Starting in the middle, shrink the insulation tubes, using equal heat on all the surfaces.
When the tubes are properly shrunk, the ridges on the black layers of each tube shall no
longer be visible and the tube cannot be moved.

•

Continue to shrink the tubes from the centre to within 50mm of one end.

Remove the heat from that end and start shrinking from the middle again towards the other
end, stopping again 50mm from the end. This ensures that as the tubes shrink any air
inside is pushed out.

U

N

C

•

O
N

TR

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 4 I Page 49
Return to each end in turn and continue to shrink the tubes completely.

4.3.5
•

Polymeric and Paper Pot End Joints

O
LL

ED

•

Install stress control and insulation materials on the following cable types before installing
any of the following materials:
•

Screened paper cables – Section 4.1.2.

•

Single core polymeric cables in transitional straight/branch joints – Section 4.1.4.

•

3-core polymeric cables – Section 4.1.7.

Cut one of the short lengths of yellow mastic into three equal lengths with scissors.

U

N

C

O
N

•

Belted paper cables – Section 4.1.1.

TR

•

Section 4 I Page 50

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Stretch each piece of yellow mastic to half its original width and use it to cover the cut end
of the cable.

•

Make a Chinagraph pencil mark on the insulation, 40mm from the cut end.

U

N

C

O
N

TR

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 4 I Page 51
Apply another short piece of yellow mastic, stretched to half its original width, between the
Chinagraph pencil mark and the end of the core

•

Place the black heatshrink cap over the end of the core so that it fully covers the yellow
mastic.

U

N

C

O
N

TR

O
LL

ED

•

Section 4 I Page 52

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Heatshrink the cap into place starting from the end. Hold the cap in place with a hammer
handle to ensure that the cap doesn’t come off while it is being shrunk.

•

Position the red and black insulation tube over the core so that it is 30mm past the end.

U

N

C

O
N

TR

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 4 I Page 53
Starting in the middle, shrink the insulation tube, using equal heat on all the surfaces. When
the tube is properly shrunk, the ridges on the black layer of the tube shall no longer be
visible and the tube cannot be moved.

•

Continue to shrink the tube, moving from the centre up to within 50mm of one end.

Remove the heat from that end and start shrinking from the middle again towards the other
end. Stop again 50mm from the end. This ensures that as the tubes shrink any air inside is
pushed out.

U

N

C

•

O
N

TR

O
LL

ED

•

Section 4 I Page 54

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Return to each end in turn and continue to shrink the tube completely.

•

Repeat the process for the other two cores.

4.4

Installing Bushing Boots

4.4.1

Cold Applied Switchgear Boots

O
LL

ED

•

Fit the single core termination as described in Section 4.1.6.

•

Clean and degrease the terminations and the bushings using an approved solvent wipe.

•

Apply a thin layer of silicone grease to the top 50mm of each termination. Slide the
concertina flexible boots over the termination and park them below the lugs.

U

N

C

O
N

TR

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 4 I Page 55
Apply a thin layer of silicone grease to the top 50mm of the termination.

•

Apply a thin layer of silicone grease to the bushing.

Bolt the lugs to the bushings using the nuts and bolts supplied with the switchgear. Tighten
the connections up to the required torque.

U

N

C

•

O
N

TR

O
LL

ED

•

Section 4 I Page 56

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Now push the boot upwards and over onto the bushing as far as it will go. When installed it
shall not be more than 15mm away from the back plate of the end box.

U

N

C

O
N

TR

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 4 I Page 57
4.4.2

Heat Shrink Boots
Fit the single core termination lug or thimbles as described in Section 4.2.5 and 4.2.6.

•

Clean and degrease the terminations and the bushings using an approved solvent wipe.

•

Slide the heat shrink boots over the terminations and park them below the lugs.

•

Bolt the lugs to the bushings using the nuts and bolts supplied with the switchgear. Tighten
the connections up to the required torque.

•

Apply the supplied black mastic to the bushing nut and the exposed metal work of the
connector. Ensure that any sharp edges are fully covered by the mastic.

U

N

C

O
N

TR

O
LL

ED

•

Section 4 I Page 58

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Push the boots up and over the bushings as far as they will go. Begin shrinking each boot
in place with a soft flame, starting at the inside leg/body interface, before moving up the
bushing. Finally shrink from the centre of the boot down to the bottom of each leg.

•

The boots shall form into a right angle. If the position does not look right, reposition the boot
while it is still hot, using suitable protective gloves.

N

C

O
N

TR

O
LL

ED

•

Allow to cool before moving the termination.

U

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 4 I Page 59
4.5

Installing Mechanical Earth Bonds and Associated Components

4.5.1

Single Core Straight Joints
Complete the joint as described in Section 4.3.1 before fitting this earth bond arrangement.

•

Install a double wire binder onto the copper wires at the end of the joint with the shortest
length of copper wire screens, 50mm from the outer sheath cut.

•

Wrap one half-lap layer of copper woven tape over the length of the joint, starting from the
wire binder up to the copper screen wire at the other end, tying off with a half hitch.

C

O
N

TR

O
LL

ED

•

Form the copper wire screens at both ends of the joint into two equal bunches, one on each
side.

U

N

•

Section 4 I Page 60

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Using one of the tinned aluminium connectors as a guide, cut the copper wire screens to
length so that the connectors sit in the gap between the wire binder and the end of the
insulation tube.

•

Shear off one bolt on each connector, ensuring that space is left in the connector to fit the
rest of the copper wires in the other end.

Offer up the copper wire screen bunches from the opposite end of the joint and cut to
length using the installed connector as a guide.

U

N

C

•

O
N

TR

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 4 I Page 61
Insert each bunch into each of the connectors and shear off the second bolt.

•

Wrap a half-lap layer of copper woven tape over the complete joint from end to end.

4.5.2
•

Triplex Straight Joints

Complete the joint as described in Section 4.3.1 before fitting this earth bond arrangement.

Pull the three completed cores of the joint together into a trefoil arrangement and apply a
half-lap layer of copper woven tape between the two sheath cuts, tying off with a half hitch
at one end.

U

N

C

•

O
N

TR

O
LL

ED

•

Section 4 I Page 62

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Form the three sections of copper wire screen at each end of the joint into a single
conductor. Position each bunch in such a way to ensure that they fit into the plastic joint
shell.

•

Cut one bunch of copper wire screens in the centre of the joint and fit into one half of the
mechanical connector. The copper wire screens may have to be doubled over to make the
connector fit. The copper wires shall be held together with tinned copper mesh.

Cut the other bunch of copper wire screens to length and fit into the other end of the
mechanical connector.

U

N

C

•

O
N

TR

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 4 I Page 63
Shear off all four bolts on the mechanical connector, ensuring that the top plates do not slip
out.

4.5.3

Single Core Branch Joints

O
LL

ED

•

Complete the joint as described in Section 4.3.3 before fitting this earth bond arrangement.

•

Starting on the branch side of the joint, apply a half-lap layer of copper woven tape over the
insulation sleeve until it is fully covered. Tie off the mesh with a half hitch knot at the single
cable end.

U

N

C

O
N

TR

•

Section 4 I Page 64

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Form the three bunches of copper wire screens into three separate conductors.

•

Lay the three separate conductors across the joint and connect them together using the
two mechanical shear bolt connectors provided in the kit. Use the branch cable with the
longest length of copper wire to bridge the gap between the copper wires on the main.

U

N

C

O
N

TR

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 4 I Page 65
4.5.4

Triplex Cables into Transition Joints Using a Support Ring
Complete the joint as described in Section 4.3.2 or 4.3.4 before fitting this earth bond
arrangement.

•

Pull the three cores of the joint together and tie them together with the supplied length of
copper woven tape, secured with a half hitch.

•

Reheat the crutch sealing sleeve of any paper insulated cables before proceeding.

Position the support ring so that the inner end is level with the end of the red tubes.
The screen wires shall stick out from the outer edge of the support ring.

U

N

C

•

O
N

TR

O
LL

ED

•

Section 4 I Page 66

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Bend the long length of ‘cheese-grater’ strip to form a circle and position it on the support
ring, at the opposite end from where the copper wires are sticking out.

•

Fold a length of copper mesh in half over its full length so that its width is reduced to
approximately 30mm. Wrap two layers of the mesh around the edge of the support ring
(furthest away from the joint) and temporarily secure them.

Offer up the aluminium cage to the joint to check that the support ring is in the right place.
The petals at each end line up with and overlap the ‘cheese-grater’s at both ends.

U

N

C

•

O
N

TR

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 4 I Page 67
Turn back and lay the copper wires of the single core cables over on to the copper mesh,
so they are tidy and do not cross each other.

•

Wrap the remaining copper mesh over the wires and secure with a half hitch. Clamp the
copper wires and mesh down on to the support ring with the worm drive clip provided. Trim
the copper wires with side cutters, so that they are level with the inner end of the copper
wire mesh.

Apply two half-lap layers of red sealant tape to the space between the end of the copper
wires and the ‘cheese-grater’ on the support ring.

U

N

C

•

O
N

TR

O
LL

ED

•

Section 4 I Page 68

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
4.5.5

Standard PILC Earth Steel Wire Armour Cables (EPN and Pot Ends Only)
Prepare the lead sheath as described in Section 3.5 before fitting this earth bond
arrangement.

•

Using one of the lifted armours as a guide, make a mark on the lead sheath with a
Chinagraph pencil.

•

Fold a length of copper mesh in half over its full length so that its width is reduced to 30mm.
Wrap the mesh around the lead sheath level with the end of the armour wire mark, so that
the armours cover it when they are folded down.

Bend the steel wire armours back down and secure in place with the worm drive clip
supplied in the kit.

U

N

C

•

O
N

TR

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 4 I Page 69
Fold a length of copper mesh in half over its full length so that its width is reduced to 30mm.
Wrap the mesh around the lead sheath level with the end of the red crutch tube.

•

Trim the ‘cheese-grater’ strip to length and form it into a circular shape, so that it fits neatly
and securely around the copper mesh.

•

4.5.6

Fit the metallic cage to the joint, overlapping the cage fingers fully on to the ‘cheese-grater’
area.
PICAS Earth (SPN Only)

Form the short ‘cheese-grater’ strip into a circular shape, so that it fits around the
aluminium sheath.

U

N

C

•

O
N

TR

O
LL

ED

•

Section 4 I Page 70

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Install the ‘cheese-grater’ strip next to the red crutch sealing sleeve, ensuring that it bridges
two adjacent peaks on the corrugated aluminium sheath.

•

Fit the metallic cage to the joint, overlapping the cage fingers onto the ‘cheese-grater’ area.

4.5.7

O
LL

ED

•

13kA PILC Earth Kit – Steel Wire Armoured Cables (LPN and SPN Areas Only)
Lift and clean the armours as described in Section 3.5.3.

•

Abrade and degrease the lead sheath between the lifted steel wire armours and the red
crutch sealing tube. Make two Chinagraph pencil marks on the lead sheath, at 60mm and
100mm from the outer sheath cut.

U

N

C

O
N

TR

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 4 I Page 71
Apply two half-lap layers of red sealant tape for 40mm between the two Chinagraph pencil
marks.

•

Position the black sealing sleeve provided in the kit against the raised armours and shrink
into place keeping the sleeve as close to the armours as possible.

U

N

C

O
N

TR

O
LL

ED

•

Section 4 I Page 72

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Apply two layers of red sealant tape over the black sealing sleeve for 40mm, starting at the
end nearest to the lead sheath and working towards the armours.

•

Fold a length of copper mesh in half over its full length, so that its width is reduced by half,
and wrap it around the lead at the end of the black sealing sleeve.

Remove the backing paper from one piece of red sealant tape and stick it down the centre
of the tinned copper earth strip with fingers each end. This is an important moisture seal
and shall not be left out.

U

N

C

•

O
N

TR

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 4 I Page 73
Wrap the earth clip around the cable so that the red sealant strip is located over the red
sealant on the sealing sleeve, and that the fingers of the earth strip are positioned over the
copper mesh. Secure in place with a double width copper wire binder. ‘Dress down’ the
ends of the clip to suit the size of the lead sheath.

•

Fold a length of copper mesh in half over its full length, so that the width is reduced by half,
and wrap it around the fingers on the lead sheath end of the clip.

Form the short length of ‘cheese-grater’ strip in the kit into a circle and fit over the copper
woven mesh at the lead sheath end.

U

N

C

•

O
N

TR

O
LL

ED

•

Section 4 I Page 74

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Fold another length of copper mesh in half over its full length, so that the width is reduced
by half, and wrap it around the fingers on the armour end of the clip.

•

Now lay the armours down over the copper mesh and secure them with the worm drive clip
supplied in the kit.

N

C

O
N

TR

O
LL

ED

•

If the wire binder becomes loose, cut it with insulated side cutters and remove.

U

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 4 I Page 75
Wrap two lapped layers of red sealant tape around the exposed earth clip between the
armours and the ‘cheese-grater’.

4.5.8

O
LL

ED

•

13kA PILC Earth Kit – Steel Tape Armoured Cables (LPN and SPN Areas Only)
Prepare and clean the armours as described in Section 3.5.4.

•

Abrade and degrease the lead sheath between the armours and the red sealing sleeve in
the crutch. Make a Chinagraph pencil mark on the lead sheath 50mm from the armour cut.

Wrap two layers of red sealant tape around the lead sheath, starting at the armour cut up to
the Chinagraph pencil mark.

U

N

C

•

O
N

TR

•

Section 4 I Page 76

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Fold two lengths of copper mesh in half over their full length. Wrap one length around the
lead sheath 10mm from the (red) mastic tape and the other around the armours 10mm
back from the edge.

•

Lay a red sealant tape strip down the centre of the tinned copper strip with fingers at each
end. This is an important moisture seal and shall not be left out.

With the strip face down, slightly raise the fingers on the edge of the clip which will be fitted
to the steel tape armour. Wrap the strip around the cable so that the red sealant strip is
located over the red sealant strip on the lead sheath. Position the fingers of the strip over
the copper mesh on the lead sheath and the copper mesh on the armours.

U

N

C

•

O
N

TR

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 4 I Page 77
Dress down the earth strip fingers onto the copper mesh, over the lead sheath and armours
area at the other end. Secure the earth strip in this position with a double binder around the
centre.

•

Fold the remaining copper mesh roll in half lengthways. Wrap it around the end of the earth
strip over the lead sheath end. Form the ‘cheese-grater’ strip into a circle and fit it over the
mesh.

Fasten the other ends of the fingers onto the armours using a worm drive clip.

U

N

C

•

O
N

TR

O
LL

ED

•

Section 4 I Page 78

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Apply two one-third-lap layers of red sealant tape on the earth strip between the ‘cheesegrater’ and the worm drive clip at the armour end.

•

Fit the metallic cage to the joint, overlapping the cage fingers fully onto the ‘cheese-grater’
area.

4.5.9

Installing Aluminium Cages

O
LL

ED

•

Install the ‘cheese-grater’ connection strips as described in Sections 4.5.4 to 4.5.8 before
fitting the aluminium cage.

•

Position the aluminium earth cage around the joint, spacing the fingers equally over the
‘cheese-grater’ areas.

U

N

C

O
N

TR

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 4 I Page 79
Apply a temporary tape binder around the cage to secure it in position and clamp the earth
cage securely at each end, using the worm drive clips provided in the kit.

U

N

C

O
N

TR

O
LL

ED

•

Section 4 I Page 80

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Remove the temporary PVC tape binder.

•

On pot ends, bend the last fingers of the aluminium cage into the centre, so they overlap
and close in the end of the joint.

•

On branch joints, separate the cage fingers equally between the two cable entries and
shape them such that they lie flat on top of the ‘cheese-grater’ areas.

O
LL

ED

•

4.5.10 Connection of Earth Screens on Indoor and Outdoor Terminations
Prepare the termination as described in Section 4.1.6.

•

Ensure that the mechanical connector has been installed in the cable end box or on to the
crucifix. Form the outdoor termination.

U

N

C

O
N

TR

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 4 I Page 81
Form the copper wire screens from each cable into a conductor, using PVC tape to keep
the wires in a bunch.

•

Cut each bunch of copper wires to the correct length using the installed mechanical
connector as a guide.

Install all three bunches into the connector, followed by the brass pressure plate.

U

N

C

•

O
N

TR

O
LL

ED

•

Section 4 I Page 82

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Install the brass bridge piece and tighten until the brass head shears off.

4.6

Fitting Plastic Joint boxes

O
LL

ED

•

Trim off the ends of the joint box supplied with the kit, so that it fits over the cables entering
the box.

•

Offer the joint box up to the joint and mark the stand-off positions on the aluminium cage
with a Chinagraph pencil.

Remove the backing from the rubber patches supplied in the kit and apply centrally, sticky
side out, over the Chinagraph pencil marks on the aluminium cage. Ensure that any
mechanical earth connectors are pulled tight into the mesh.

U

N

C

•

O
N

TR

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 4 I Page 83
Place the two halves of the joint shell over the joint and clip the two halves together with the
metal clips or plastic slider provided. Ensure enough clips are used to stop the resin leaking
out when it is poured in.

Tape the joint box to the incoming cable with PVC or another suitable tape. If necessary,
pack the ends of the joint shell out with the clay pack supplied in some kits.

U

N

C

•

O
N

TR

O
LL

ED

•

Section 4 I Page 84

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
For extra security, run a length of PVC tape down the seams of the joint shell and fit the
plastic lid.

4.7

O
LL

ED

•

Mixing and Installing Polyurethane Resin

Fill all 11kV joints with three-part polyurethane resin. Wear the correct Personal Protective
Equipment at all times and do not mix the resin in a confined space.

•

Check the label on the bucket to ensure that the resin has not passed it use by date.

Empty the contents of the bucket and check for any damage to the packaging.

U

N

C

•

O
N

TR

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 4 I Page 85
Pick up the foil bag containing the resin and hardener. Apply pressure to the large resin
pouch so that the resin breaks the seal between the two sections and mixes with the
hardener.

•

Mix the contents of the bag by kneading the foil bag for at least two minutes.

Carefully cut one of the corners off the foil bag and pour all the contents into the supplied
plastic bucket.

U

N

C

•

O
N

TR

O
LL

ED

•

Section 4 I Page 86

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
Pour approximately half of the sand supplied in the plastic bag into the bucket and stir until
it is thoroughly mixed into the resin.

•

Pour the rest of the sand into the bucket and mix until no raw sand is visible and the resin
has no lumps in it.

Pour the mixed resin into the joint shell.

U

N

C

•

O
N

TR

O
LL

ED

•

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

Section 4 I Page 87
4.8

Mixing and Installing Guruflex
Guruflex is a cold pour replacement for bitumen compound. Use it in switchgear end boxes
where the clearances are too small to allow the use of cold applied or heatshrink bushing
boots.

•

Guruflex comes in two metal tins; the larger one is the resin and the smaller one the
hardener.

•

Before filling the cable box, the inner metallic surface shall be coated with a thin film of
petroleum jelly. This makes it easier to remove the Guruflex, if and when it needs to be
removed.

C

O
N

TR

O
LL

ED

•

Open both tins and pour the small tin into the large one.

•

Mix the two liquids together until they are a uniform light blue colour with no streaks of dark
blue.

N

•

Pour the mixture into the box to be filled and leave to cure.

•

U

•

The box can be energised as soon as it is sealed.

4.9

Removing Guruflex

•

Remove the cable box covers.

•

Cut the Guruflex out with a sharp knife, taking care not to damage the termination inside.

•

The Guruflex should pull away easily from the metallic surfaces that have been previously
coated with petroleum jelly.

Section 4 I Page 88

UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011

More Related Content

What's hot

Pengalir Voltan Tinggi
Pengalir Voltan TinggiPengalir Voltan Tinggi
Pengalir Voltan Tinggi
Wan Ameerul Arsyad
 
Heat Shrink Cable Joint (HV) - 11kV 3 Core XLPE BS6622 Cables
Heat Shrink Cable Joint (HV) - 11kV 3 Core XLPE BS6622 CablesHeat Shrink Cable Joint (HV) - 11kV 3 Core XLPE BS6622 Cables
Heat Shrink Cable Joint (HV) - 11kV 3 Core XLPE BS6622 Cables
Thorne & Derrick International
 
Heat Shrink Cable Terminations - High Voltage Cable Terminations, 6.6kV 3 Co...
Heat Shrink Cable Terminations - High Voltage  Cable Terminations, 6.6kV 3 Co...Heat Shrink Cable Terminations - High Voltage  Cable Terminations, 6.6kV 3 Co...
Heat Shrink Cable Terminations - High Voltage Cable Terminations, 6.6kV 3 Co...
Thorne & Derrick International
 
2. Heat Shrink Cable Termination (HV) - 11kV 33kV Single Core XLPE BS6622 Cables
2. Heat Shrink Cable Termination (HV) - 11kV 33kV Single Core XLPE BS6622 Cables2. Heat Shrink Cable Termination (HV) - 11kV 33kV Single Core XLPE BS6622 Cables
2. Heat Shrink Cable Termination (HV) - 11kV 33kV Single Core XLPE BS6622 Cables
Thorne & Derrick International
 
6. Heat Shrink Cable Joint (HV) - 11kV Trifurcating Transition (3 Core PILC t...
6. Heat Shrink Cable Joint (HV) - 11kV Trifurcating Transition (3 Core PILC t...6. Heat Shrink Cable Joint (HV) - 11kV Trifurcating Transition (3 Core PILC t...
6. Heat Shrink Cable Joint (HV) - 11kV Trifurcating Transition (3 Core PILC t...
Thorne & Derrick International
 
Talian Atas Voltan Rendah
Talian Atas Voltan Rendah Talian Atas Voltan Rendah
Talian Atas Voltan Rendah
Azhar Basha
 
Heat Shrink Cable Joints - 11kV 3 Core XLPE SWA (HV Cable Joints) - SPS SPAJ ...
Heat Shrink Cable Joints - 11kV 3 Core XLPE SWA (HV Cable Joints) - SPS SPAJ ...Heat Shrink Cable Joints - 11kV 3 Core XLPE SWA (HV Cable Joints) - SPS SPAJ ...
Heat Shrink Cable Joints - 11kV 3 Core XLPE SWA (HV Cable Joints) - SPS SPAJ ...
Thorne & Derrick International
 
LOW VOLTAGE UNDERGROUND CABLE SYSTEM INSTALLATION & MAINTENANCE
LOW VOLTAGE UNDERGROUND CABLE SYSTEM INSTALLATION & MAINTENANCELOW VOLTAGE UNDERGROUND CABLE SYSTEM INSTALLATION & MAINTENANCE
LOW VOLTAGE UNDERGROUND CABLE SYSTEM INSTALLATION & MAINTENANCE
Akilan36
 
126515918 kabel-bawah-tanah
126515918 kabel-bawah-tanah126515918 kabel-bawah-tanah
126515918 kabel-bawah-tanah
Pok Nik
 
Epp 0317-4 08 solder less(2)
Epp 0317-4 08 solder less(2)Epp 0317-4 08 solder less(2)
Epp 0317-4 08 solder less(2)
AKBAR TRADING
 
Resin Cable Joints, Multicore Power Cables XLPE PILC - Branch Joints - Cable ...
Resin Cable Joints, Multicore Power Cables XLPE PILC - Branch Joints - Cable ...Resin Cable Joints, Multicore Power Cables XLPE PILC - Branch Joints - Cable ...
Resin Cable Joints, Multicore Power Cables XLPE PILC - Branch Joints - Cable ...
Thorne & Derrick International
 
Jenis-jenis Papan Suis Utama ( Main Switch Board)
Jenis-jenis  Papan Suis Utama ( Main Switch Board) Jenis-jenis  Papan Suis Utama ( Main Switch Board)
Jenis-jenis Papan Suis Utama ( Main Switch Board)
Akilan36
 
Regulacion de tension en instalaciones electricas
Regulacion de tension en instalaciones electricasRegulacion de tension en instalaciones electricas
Regulacion de tension en instalaciones electricas
Diego Rosales Diaz
 
Pdf pengujian-elektrik
Pdf pengujian-elektrikPdf pengujian-elektrik
Pdf pengujian-elektrik
AgusKurniawan117
 
11kV 33kV Heat Shrink Terminations - Outdoor Armour Earthing Kits XLPE AWA Si...
11kV 33kV Heat Shrink Terminations - Outdoor Armour Earthing Kits XLPE AWA Si...11kV 33kV Heat Shrink Terminations - Outdoor Armour Earthing Kits XLPE AWA Si...
11kV 33kV Heat Shrink Terminations - Outdoor Armour Earthing Kits XLPE AWA Si...
Thorne & Derrick International
 
LOW VOLTAGE UNDERGROUND CABLE SYSTEM INSTALLATION & MAINTENANCE
LOW VOLTAGE UNDERGROUND CABLE SYSTEM INSTALLATION & MAINTENANCELOW VOLTAGE UNDERGROUND CABLE SYSTEM INSTALLATION & MAINTENANCE
LOW VOLTAGE UNDERGROUND CABLE SYSTEM INSTALLATION & MAINTENANCE
Akilan36
 
LOW VOLTAGE UNDERGROUND CABLE SYSTEM INSTALLATION & MAINTENANCE
LOW VOLTAGE UNDERGROUND CABLE SYSTEM  INSTALLATION & MAINTENANCELOW VOLTAGE UNDERGROUND CABLE SYSTEM  INSTALLATION & MAINTENANCE
LOW VOLTAGE UNDERGROUND CABLE SYSTEM INSTALLATION & MAINTENANCE
Akilan36
 
Cable Ladder Bonding with Earth Wire, Is it Necessary?
Cable Ladder Bonding with Earth Wire, Is it Necessary?Cable Ladder Bonding with Earth Wire, Is it Necessary?
Cable Ladder Bonding with Earth Wire, Is it Necessary?
Mike Hamilton
 

What's hot (20)

Pengalir Voltan Tinggi
Pengalir Voltan TinggiPengalir Voltan Tinggi
Pengalir Voltan Tinggi
 
Heat Shrink Cable Joint (HV) - 11kV 3 Core XLPE BS6622 Cables
Heat Shrink Cable Joint (HV) - 11kV 3 Core XLPE BS6622 CablesHeat Shrink Cable Joint (HV) - 11kV 3 Core XLPE BS6622 Cables
Heat Shrink Cable Joint (HV) - 11kV 3 Core XLPE BS6622 Cables
 
Heat Shrink Cable Terminations - High Voltage Cable Terminations, 6.6kV 3 Co...
Heat Shrink Cable Terminations - High Voltage  Cable Terminations, 6.6kV 3 Co...Heat Shrink Cable Terminations - High Voltage  Cable Terminations, 6.6kV 3 Co...
Heat Shrink Cable Terminations - High Voltage Cable Terminations, 6.6kV 3 Co...
 
2. Heat Shrink Cable Termination (HV) - 11kV 33kV Single Core XLPE BS6622 Cables
2. Heat Shrink Cable Termination (HV) - 11kV 33kV Single Core XLPE BS6622 Cables2. Heat Shrink Cable Termination (HV) - 11kV 33kV Single Core XLPE BS6622 Cables
2. Heat Shrink Cable Termination (HV) - 11kV 33kV Single Core XLPE BS6622 Cables
 
6. Heat Shrink Cable Joint (HV) - 11kV Trifurcating Transition (3 Core PILC t...
6. Heat Shrink Cable Joint (HV) - 11kV Trifurcating Transition (3 Core PILC t...6. Heat Shrink Cable Joint (HV) - 11kV Trifurcating Transition (3 Core PILC t...
6. Heat Shrink Cable Joint (HV) - 11kV Trifurcating Transition (3 Core PILC t...
 
Talian Atas Voltan Rendah
Talian Atas Voltan Rendah Talian Atas Voltan Rendah
Talian Atas Voltan Rendah
 
Heat Shrink Cable Joints - 11kV 3 Core XLPE SWA (HV Cable Joints) - SPS SPAJ ...
Heat Shrink Cable Joints - 11kV 3 Core XLPE SWA (HV Cable Joints) - SPS SPAJ ...Heat Shrink Cable Joints - 11kV 3 Core XLPE SWA (HV Cable Joints) - SPS SPAJ ...
Heat Shrink Cable Joints - 11kV 3 Core XLPE SWA (HV Cable Joints) - SPS SPAJ ...
 
LOW VOLTAGE UNDERGROUND CABLE SYSTEM INSTALLATION & MAINTENANCE
LOW VOLTAGE UNDERGROUND CABLE SYSTEM INSTALLATION & MAINTENANCELOW VOLTAGE UNDERGROUND CABLE SYSTEM INSTALLATION & MAINTENANCE
LOW VOLTAGE UNDERGROUND CABLE SYSTEM INSTALLATION & MAINTENANCE
 
126515918 kabel-bawah-tanah
126515918 kabel-bawah-tanah126515918 kabel-bawah-tanah
126515918 kabel-bawah-tanah
 
Epp 0317-4 08 solder less(2)
Epp 0317-4 08 solder less(2)Epp 0317-4 08 solder less(2)
Epp 0317-4 08 solder less(2)
 
Resin Cable Joints, Multicore Power Cables XLPE PILC - Branch Joints - Cable ...
Resin Cable Joints, Multicore Power Cables XLPE PILC - Branch Joints - Cable ...Resin Cable Joints, Multicore Power Cables XLPE PILC - Branch Joints - Cable ...
Resin Cable Joints, Multicore Power Cables XLPE PILC - Branch Joints - Cable ...
 
Jenis-jenis Papan Suis Utama ( Main Switch Board)
Jenis-jenis  Papan Suis Utama ( Main Switch Board) Jenis-jenis  Papan Suis Utama ( Main Switch Board)
Jenis-jenis Papan Suis Utama ( Main Switch Board)
 
Regulacion de tension en instalaciones electricas
Regulacion de tension en instalaciones electricasRegulacion de tension en instalaciones electricas
Regulacion de tension en instalaciones electricas
 
Pdf pengujian-elektrik
Pdf pengujian-elektrikPdf pengujian-elektrik
Pdf pengujian-elektrik
 
11kV 33kV Heat Shrink Terminations - Outdoor Armour Earthing Kits XLPE AWA Si...
11kV 33kV Heat Shrink Terminations - Outdoor Armour Earthing Kits XLPE AWA Si...11kV 33kV Heat Shrink Terminations - Outdoor Armour Earthing Kits XLPE AWA Si...
11kV 33kV Heat Shrink Terminations - Outdoor Armour Earthing Kits XLPE AWA Si...
 
LOW VOLTAGE UNDERGROUND CABLE SYSTEM INSTALLATION & MAINTENANCE
LOW VOLTAGE UNDERGROUND CABLE SYSTEM INSTALLATION & MAINTENANCELOW VOLTAGE UNDERGROUND CABLE SYSTEM INSTALLATION & MAINTENANCE
LOW VOLTAGE UNDERGROUND CABLE SYSTEM INSTALLATION & MAINTENANCE
 
Pembumian CB204
Pembumian CB204Pembumian CB204
Pembumian CB204
 
LOW VOLTAGE UNDERGROUND CABLE SYSTEM INSTALLATION & MAINTENANCE
LOW VOLTAGE UNDERGROUND CABLE SYSTEM  INSTALLATION & MAINTENANCELOW VOLTAGE UNDERGROUND CABLE SYSTEM  INSTALLATION & MAINTENANCE
LOW VOLTAGE UNDERGROUND CABLE SYSTEM INSTALLATION & MAINTENANCE
 
Trunking
TrunkingTrunking
Trunking
 
Cable Ladder Bonding with Earth Wire, Is it Necessary?
Cable Ladder Bonding with Earth Wire, Is it Necessary?Cable Ladder Bonding with Earth Wire, Is it Necessary?
Cable Ladder Bonding with Earth Wire, Is it Necessary?
 

Similar to UKPN 11kV 6.6kV HV Cable Jointing, Preparation & Installation Manual (Uncontrolled 2011)

Instruction- 3 Core Polymeric (XLPE EPR) 6.6kV-7.2kV Heat Shrink Cable Termin...
Instruction- 3 Core Polymeric (XLPE EPR) 6.6kV-7.2kV Heat Shrink Cable Termin...Instruction- 3 Core Polymeric (XLPE EPR) 6.6kV-7.2kV Heat Shrink Cable Termin...
Instruction- 3 Core Polymeric (XLPE EPR) 6.6kV-7.2kV Heat Shrink Cable Termin...
Thorne & Derrick International
 
Nexans Euromold AIN Slip-On Indoor High Voltage HV Cable Termination 33kV 36k...
Nexans Euromold AIN Slip-On Indoor High Voltage HV Cable Termination 33kV 36k...Nexans Euromold AIN Slip-On Indoor High Voltage HV Cable Termination 33kV 36k...
Nexans Euromold AIN Slip-On Indoor High Voltage HV Cable Termination 33kV 36k...
Thorne & Derrick International
 
Hunky Dory Repair iPhone 3G and 3GS Tear Down Guide
Hunky Dory Repair iPhone 3G and 3GS Tear Down GuideHunky Dory Repair iPhone 3G and 3GS Tear Down Guide
Hunky Dory Repair iPhone 3G and 3GS Tear Down Guide
Marc Mourning
 
Hunky Dory iPhone 5 Tear Down and Repair Guide
Hunky Dory iPhone 5 Tear Down and Repair GuideHunky Dory iPhone 5 Tear Down and Repair Guide
Hunky Dory iPhone 5 Tear Down and Repair Guide
Marc Mourning
 
RAYCHEM TERMINATION KIT-TYCO TERMINATION-케이블 종단-거-瑞侃工具包电缆终端-阿克巴交易
RAYCHEM TERMINATION KIT-TYCO TERMINATION-케이블 종단-거-瑞侃工具包电缆终端-阿克巴交易RAYCHEM TERMINATION KIT-TYCO TERMINATION-케이블 종단-거-瑞侃工具包电缆终端-阿克巴交易
RAYCHEM TERMINATION KIT-TYCO TERMINATION-케이블 종단-거-瑞侃工具包电缆终端-阿克巴交易
AKBAR TRADING
 
Dish4You Cables and Connectors
Dish4You Cables and ConnectorsDish4You Cables and Connectors
Dish4You Cables and Connectorsspicherheidi
 
11kV Heat Shrink Cable Terminations - Prysmian HIT3XB11 3 Core 35-70sqmm 11kV...
11kV Heat Shrink Cable Terminations - Prysmian HIT3XB11 3 Core 35-70sqmm 11kV...11kV Heat Shrink Cable Terminations - Prysmian HIT3XB11 3 Core 35-70sqmm 11kV...
11kV Heat Shrink Cable Terminations - Prysmian HIT3XB11 3 Core 35-70sqmm 11kV...
Thorne & Derrick International
 
Cable preparation in CCTV
Cable preparation in CCTVCable preparation in CCTV
Cable preparation in CCTV
hepzijustin
 
CCG Cable Terminations E1EX-QS Corrosion Guard Cable Glands For Steel / Alumi...
CCG Cable Terminations E1EX-QS Corrosion Guard Cable Glands For Steel / Alumi...CCG Cable Terminations E1EX-QS Corrosion Guard Cable Glands For Steel / Alumi...
CCG Cable Terminations E1EX-QS Corrosion Guard Cable Glands For Steel / Alumi...
Thorne & Derrick International
 
Weidmuller Cable Stripping Tools - Stripax Insulation Stripping Tools
Weidmuller Cable Stripping Tools - Stripax Insulation Stripping Tools Weidmuller Cable Stripping Tools - Stripax Insulation Stripping Tools
Weidmuller Cable Stripping Tools - Stripax Insulation Stripping Tools
Thorne & Derrick International
 
Kubota gr1600 ec2 ride on mower service repair manual
Kubota gr1600 ec2 ride on mower service repair manualKubota gr1600 ec2 ride on mower service repair manual
Kubota gr1600 ec2 ride on mower service repair manual
fujsjefkskemm
 
Kubota gr1600 ec2 ride on mower service repair manual
Kubota gr1600 ec2 ride on mower service repair manualKubota gr1600 ec2 ride on mower service repair manual
Kubota gr1600 ec2 ride on mower service repair manual
fujjsekfkksekm
 
STI 7555AED Instruction Manual
STI 7555AED Instruction ManualSTI 7555AED Instruction Manual
STI 7555AED Instruction Manual
JMAC Supply
 
STI 7554 Instruction Manual
STI 7554 Instruction ManualSTI 7554 Instruction Manual
STI 7554 Instruction Manual
JMAC Supply
 
Pfisterer Sicon High Voltage Mechanical Shearbolt Connectors
Pfisterer Sicon High Voltage Mechanical Shearbolt ConnectorsPfisterer Sicon High Voltage Mechanical Shearbolt Connectors
Pfisterer Sicon High Voltage Mechanical Shearbolt Connectors
Thorne & Derrick International
 
Heat shrink cable joint (hv) 11k v 3 core xlpe bs6622 cables
Heat shrink cable joint (hv)   11k v 3 core xlpe bs6622 cablesHeat shrink cable joint (hv)   11k v 3 core xlpe bs6622 cables
Heat shrink cable joint (hv) 11k v 3 core xlpe bs6622 cablesThorne & Derrick International
 
3. Heat Shrink Cable Joint (HV) - 11kV 3 Core XLPE BS6622 Cables
3. Heat Shrink Cable Joint (HV) - 11kV 3 Core XLPE BS6622 Cables3. Heat Shrink Cable Joint (HV) - 11kV 3 Core XLPE BS6622 Cables
3. Heat Shrink Cable Joint (HV) - 11kV 3 Core XLPE BS6622 Cables
Thorne & Derrick International
 
Corona Treater's Cleaning & maintenance.pptx
Corona Treater's Cleaning & maintenance.pptxCorona Treater's Cleaning & maintenance.pptx
Corona Treater's Cleaning & maintenance.pptx
JUAN RODRIGUEZ
 

Similar to UKPN 11kV 6.6kV HV Cable Jointing, Preparation & Installation Manual (Uncontrolled 2011) (20)

Instruction- 3 Core Polymeric (XLPE EPR) 6.6kV-7.2kV Heat Shrink Cable Termin...
Instruction- 3 Core Polymeric (XLPE EPR) 6.6kV-7.2kV Heat Shrink Cable Termin...Instruction- 3 Core Polymeric (XLPE EPR) 6.6kV-7.2kV Heat Shrink Cable Termin...
Instruction- 3 Core Polymeric (XLPE EPR) 6.6kV-7.2kV Heat Shrink Cable Termin...
 
Nexans Euromold AIN Slip-On Indoor High Voltage HV Cable Termination 33kV 36k...
Nexans Euromold AIN Slip-On Indoor High Voltage HV Cable Termination 33kV 36k...Nexans Euromold AIN Slip-On Indoor High Voltage HV Cable Termination 33kV 36k...
Nexans Euromold AIN Slip-On Indoor High Voltage HV Cable Termination 33kV 36k...
 
Foc pulling
Foc pullingFoc pulling
Foc pulling
 
Hunky Dory Repair iPhone 3G and 3GS Tear Down Guide
Hunky Dory Repair iPhone 3G and 3GS Tear Down GuideHunky Dory Repair iPhone 3G and 3GS Tear Down Guide
Hunky Dory Repair iPhone 3G and 3GS Tear Down Guide
 
Final_Filament
Final_FilamentFinal_Filament
Final_Filament
 
Hunky Dory iPhone 5 Tear Down and Repair Guide
Hunky Dory iPhone 5 Tear Down and Repair GuideHunky Dory iPhone 5 Tear Down and Repair Guide
Hunky Dory iPhone 5 Tear Down and Repair Guide
 
RAYCHEM TERMINATION KIT-TYCO TERMINATION-케이블 종단-거-瑞侃工具包电缆终端-阿克巴交易
RAYCHEM TERMINATION KIT-TYCO TERMINATION-케이블 종단-거-瑞侃工具包电缆终端-阿克巴交易RAYCHEM TERMINATION KIT-TYCO TERMINATION-케이블 종단-거-瑞侃工具包电缆终端-阿克巴交易
RAYCHEM TERMINATION KIT-TYCO TERMINATION-케이블 종단-거-瑞侃工具包电缆终端-阿克巴交易
 
Dish4You Cables and Connectors
Dish4You Cables and ConnectorsDish4You Cables and Connectors
Dish4You Cables and Connectors
 
11kV Heat Shrink Cable Terminations - Prysmian HIT3XB11 3 Core 35-70sqmm 11kV...
11kV Heat Shrink Cable Terminations - Prysmian HIT3XB11 3 Core 35-70sqmm 11kV...11kV Heat Shrink Cable Terminations - Prysmian HIT3XB11 3 Core 35-70sqmm 11kV...
11kV Heat Shrink Cable Terminations - Prysmian HIT3XB11 3 Core 35-70sqmm 11kV...
 
Cable preparation in CCTV
Cable preparation in CCTVCable preparation in CCTV
Cable preparation in CCTV
 
CCG Cable Terminations E1EX-QS Corrosion Guard Cable Glands For Steel / Alumi...
CCG Cable Terminations E1EX-QS Corrosion Guard Cable Glands For Steel / Alumi...CCG Cable Terminations E1EX-QS Corrosion Guard Cable Glands For Steel / Alumi...
CCG Cable Terminations E1EX-QS Corrosion Guard Cable Glands For Steel / Alumi...
 
Weidmuller Cable Stripping Tools - Stripax Insulation Stripping Tools
Weidmuller Cable Stripping Tools - Stripax Insulation Stripping Tools Weidmuller Cable Stripping Tools - Stripax Insulation Stripping Tools
Weidmuller Cable Stripping Tools - Stripax Insulation Stripping Tools
 
Kubota gr1600 ec2 ride on mower service repair manual
Kubota gr1600 ec2 ride on mower service repair manualKubota gr1600 ec2 ride on mower service repair manual
Kubota gr1600 ec2 ride on mower service repair manual
 
Kubota gr1600 ec2 ride on mower service repair manual
Kubota gr1600 ec2 ride on mower service repair manualKubota gr1600 ec2 ride on mower service repair manual
Kubota gr1600 ec2 ride on mower service repair manual
 
STI 7555AED Instruction Manual
STI 7555AED Instruction ManualSTI 7555AED Instruction Manual
STI 7555AED Instruction Manual
 
STI 7554 Instruction Manual
STI 7554 Instruction ManualSTI 7554 Instruction Manual
STI 7554 Instruction Manual
 
Pfisterer Sicon High Voltage Mechanical Shearbolt Connectors
Pfisterer Sicon High Voltage Mechanical Shearbolt ConnectorsPfisterer Sicon High Voltage Mechanical Shearbolt Connectors
Pfisterer Sicon High Voltage Mechanical Shearbolt Connectors
 
Heat shrink cable joint (hv) 11k v 3 core xlpe bs6622 cables
Heat shrink cable joint (hv)   11k v 3 core xlpe bs6622 cablesHeat shrink cable joint (hv)   11k v 3 core xlpe bs6622 cables
Heat shrink cable joint (hv) 11k v 3 core xlpe bs6622 cables
 
3. Heat Shrink Cable Joint (HV) - 11kV 3 Core XLPE BS6622 Cables
3. Heat Shrink Cable Joint (HV) - 11kV 3 Core XLPE BS6622 Cables3. Heat Shrink Cable Joint (HV) - 11kV 3 Core XLPE BS6622 Cables
3. Heat Shrink Cable Joint (HV) - 11kV 3 Core XLPE BS6622 Cables
 
Corona Treater's Cleaning & maintenance.pptx
Corona Treater's Cleaning & maintenance.pptxCorona Treater's Cleaning & maintenance.pptx
Corona Treater's Cleaning & maintenance.pptx
 

More from Thorne & Derrick International

Isolation procedures for safe working on electrical systems and equipment by ...
Isolation procedures for safe working on electrical systems and equipment by ...Isolation procedures for safe working on electrical systems and equipment by ...
Isolation procedures for safe working on electrical systems and equipment by ...
Thorne & Derrick International
 
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical EqptTHORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
Thorne & Derrick International
 
The Children North East Annual Golf Day Wednesday 9th May 2018
The Children North East Annual Golf Day Wednesday 9th May 2018The Children North East Annual Golf Day Wednesday 9th May 2018
The Children North East Annual Golf Day Wednesday 9th May 2018
Thorne & Derrick International
 
3M Electrical Products Stocked By Thorne & Derrick International
3M Electrical Products Stocked By Thorne & Derrick International3M Electrical Products Stocked By Thorne & Derrick International
3M Electrical Products Stocked By Thorne & Derrick International
Thorne & Derrick International
 
CATU Electrical Safety Catalogue
CATU Electrical Safety CatalogueCATU Electrical Safety Catalogue
CATU Electrical Safety Catalogue
Thorne & Derrick International
 
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
Thorne & Derrick International
 
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
Thorne & Derrick International
 
Roxtec Cable Transit - B Frame Dimensional Drawing
Roxtec Cable Transit - B Frame Dimensional DrawingRoxtec Cable Transit - B Frame Dimensional Drawing
Roxtec Cable Transit - B Frame Dimensional Drawing
Thorne & Derrick International
 
Pepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
Pepperl & Fuchs SIL Training Certificate - T&D Adam RowePepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
Pepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
Thorne & Derrick International
 
T&D Experts In Equipment For Explosive Atmospheres
T&D Experts In Equipment For Explosive AtmospheresT&D Experts In Equipment For Explosive Atmospheres
T&D Experts In Equipment For Explosive Atmospheres
Thorne & Derrick International
 
Ultrasonic Flow Meters - Customer Specification Demand
Ultrasonic Flow Meters - Customer Specification DemandUltrasonic Flow Meters - Customer Specification Demand
Ultrasonic Flow Meters - Customer Specification Demand
Thorne & Derrick International
 
Emtelle Fibre Optic Cables - Product Catalogue 2016
Emtelle Fibre Optic Cables - Product Catalogue 2016Emtelle Fibre Optic Cables - Product Catalogue 2016
Emtelle Fibre Optic Cables - Product Catalogue 2016
Thorne & Derrick International
 
Thorne & Derrick Process Heating Brochure 2016
Thorne & Derrick Process Heating Brochure 2016Thorne & Derrick Process Heating Brochure 2016
Thorne & Derrick Process Heating Brochure 2016
Thorne & Derrick International
 
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282DSIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
Thorne & Derrick International
 
Ripley Utility Tool Cable Preparation Tools
Ripley Utility Tool Cable Preparation ToolsRipley Utility Tool Cable Preparation Tools
Ripley Utility Tool Cable Preparation Tools
Thorne & Derrick International
 
RIDGID micro CD100 Combustible Gas Detector
RIDGID micro CD100 Combustible Gas DetectorRIDGID micro CD100 Combustible Gas Detector
RIDGID micro CD100 Combustible Gas Detector
Thorne & Derrick International
 
Itron Fact Sheet
Itron Fact SheetItron Fact Sheet
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
Thorne & Derrick International
 
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec SheetFiloform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
Thorne & Derrick International
 
Eltherm Self-Regulating Trace Heating Cables
Eltherm Self-Regulating Trace Heating CablesEltherm Self-Regulating Trace Heating Cables
Eltherm Self-Regulating Trace Heating Cables
Thorne & Derrick International
 

More from Thorne & Derrick International (20)

Isolation procedures for safe working on electrical systems and equipment by ...
Isolation procedures for safe working on electrical systems and equipment by ...Isolation procedures for safe working on electrical systems and equipment by ...
Isolation procedures for safe working on electrical systems and equipment by ...
 
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical EqptTHORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
 
The Children North East Annual Golf Day Wednesday 9th May 2018
The Children North East Annual Golf Day Wednesday 9th May 2018The Children North East Annual Golf Day Wednesday 9th May 2018
The Children North East Annual Golf Day Wednesday 9th May 2018
 
3M Electrical Products Stocked By Thorne & Derrick International
3M Electrical Products Stocked By Thorne & Derrick International3M Electrical Products Stocked By Thorne & Derrick International
3M Electrical Products Stocked By Thorne & Derrick International
 
CATU Electrical Safety Catalogue
CATU Electrical Safety CatalogueCATU Electrical Safety Catalogue
CATU Electrical Safety Catalogue
 
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
 
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
 
Roxtec Cable Transit - B Frame Dimensional Drawing
Roxtec Cable Transit - B Frame Dimensional DrawingRoxtec Cable Transit - B Frame Dimensional Drawing
Roxtec Cable Transit - B Frame Dimensional Drawing
 
Pepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
Pepperl & Fuchs SIL Training Certificate - T&D Adam RowePepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
Pepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
 
T&D Experts In Equipment For Explosive Atmospheres
T&D Experts In Equipment For Explosive AtmospheresT&D Experts In Equipment For Explosive Atmospheres
T&D Experts In Equipment For Explosive Atmospheres
 
Ultrasonic Flow Meters - Customer Specification Demand
Ultrasonic Flow Meters - Customer Specification DemandUltrasonic Flow Meters - Customer Specification Demand
Ultrasonic Flow Meters - Customer Specification Demand
 
Emtelle Fibre Optic Cables - Product Catalogue 2016
Emtelle Fibre Optic Cables - Product Catalogue 2016Emtelle Fibre Optic Cables - Product Catalogue 2016
Emtelle Fibre Optic Cables - Product Catalogue 2016
 
Thorne & Derrick Process Heating Brochure 2016
Thorne & Derrick Process Heating Brochure 2016Thorne & Derrick Process Heating Brochure 2016
Thorne & Derrick Process Heating Brochure 2016
 
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282DSIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
 
Ripley Utility Tool Cable Preparation Tools
Ripley Utility Tool Cable Preparation ToolsRipley Utility Tool Cable Preparation Tools
Ripley Utility Tool Cable Preparation Tools
 
RIDGID micro CD100 Combustible Gas Detector
RIDGID micro CD100 Combustible Gas DetectorRIDGID micro CD100 Combustible Gas Detector
RIDGID micro CD100 Combustible Gas Detector
 
Itron Fact Sheet
Itron Fact SheetItron Fact Sheet
Itron Fact Sheet
 
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
 
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec SheetFiloform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
 
Eltherm Self-Regulating Trace Heating Cables
Eltherm Self-Regulating Trace Heating CablesEltherm Self-Regulating Trace Heating Cables
Eltherm Self-Regulating Trace Heating Cables
 

Recently uploaded

From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
Product School
 
Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........
Alison B. Lowndes
 
UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3
DianaGray10
 
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdfFIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance
 
Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !
KatiaHIMEUR1
 
Monitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR EventsMonitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR Events
Ana-Maria Mihalceanu
 
Assuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyesAssuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyes
ThousandEyes
 
Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*
Frank van Harmelen
 
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
James Anderson
 
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered QualitySoftware Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Inflectra
 
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Tobias Schneck
 
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
Product School
 
Key Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdfKey Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdf
Cheryl Hung
 
How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...
Product School
 
Accelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish CachingAccelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish Caching
Thijs Feryn
 
Connector Corner: Automate dynamic content and events by pushing a button
Connector Corner: Automate dynamic content and events by pushing a buttonConnector Corner: Automate dynamic content and events by pushing a button
Connector Corner: Automate dynamic content and events by pushing a button
DianaGray10
 
Epistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI supportEpistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI support
Alan Dix
 
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
Sri Ambati
 
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Product School
 
GraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge GraphGraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge Graph
Guy Korland
 

Recently uploaded (20)

From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
 
Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........
 
UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3
 
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdfFIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
 
Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !
 
Monitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR EventsMonitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR Events
 
Assuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyesAssuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyes
 
Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*
 
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
 
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered QualitySoftware Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
 
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
 
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
 
Key Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdfKey Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdf
 
How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...
 
Accelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish CachingAccelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish Caching
 
Connector Corner: Automate dynamic content and events by pushing a button
Connector Corner: Automate dynamic content and events by pushing a buttonConnector Corner: Automate dynamic content and events by pushing a button
Connector Corner: Automate dynamic content and events by pushing a button
 
Epistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI supportEpistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI support
 
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
 
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
 
GraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge GraphGraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge Graph
 

UKPN 11kV 6.6kV HV Cable Jointing, Preparation & Installation Manual (Uncontrolled 2011)

  • 1. 3 STANDARD PROCEDURES FOR PREPARING 11KV AND 6.6KV MAINS CABLES Single Core Copper Wire Screened Polymeric Cables 3.1.1 Removing the Outer Sheath ED 3.1 Mark the removal point of the outer sheath as indicated on the relevant jointing instruction, using a Chinagraph pencil. • Remove the sheath to this point using the approved Alroc tool. Starting at the open end of the cable, set the tool to the correct cutting depth, to avoid damaging the copper wire screens below. Make a spiral cut up to the position of the sheath removal point. U N C O N TR O LL • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 3 I Page 1
  • 2. Just before reaching the sheath removal point, reset the cutting blade angle so that a square cut is achieved. If necessary, try this process out on the overlapping section of the cable. • Remove the outer sheath by unwinding the spiral made by the stripping tool. Remove the fabric or plastic tape from the screen wire using an approved knife, taking care not to damage the copper wires below. U N C • O N TR O LL ED • Section 3 I Page 2 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 3. Flame brush the outer sheath for a distance of 150mm along the sheath, away from the sheath removal point and allow to cool. • Unwind the copper wires and lay them back along the over-sheath in the position required by the joint being made, then secure with PVC tape. See Sections 4.1.4 to 4.1.6 for details of the different types of screen-wire preparation. 3.1.2 Removing the Bonded Polymeric Screen The Alroc bonded screen stripping tool is designed to leave 40mm of black insulation screen from the copper wire screens. U N C • O N TR O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 3 I Page 3
  • 4. • The only joints that require more than 40mm is the single core polymeric branch, which requires 60mm and the transition branch where the screen is removed 180mm from the reference line. • Remove the extra 20mm of insulation screen by: • Applying several layers of PVC tape on the sheath side of the mark. • Using the stripping tool as described in this section. O LL Smear the end of the insulation with a thin film of silicone grease. U N C O N TR • Making a Chinagraph pencil mark 20mm from the outer sheath cut. ED • Section 3 I Page 4 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 5. Starting at the open end of the cable, set the tool to the correct cutting depth so that the entire screen is removed with only the minimum amount of insulation. It is essential that the core is as straight as possible for this operation, otherwise traces of the screen may be left behind. • Continue turning the tool until it butts up against the copper screen wires and then turn the tool until a smooth right angled taper is produced. Test the tool on the overlap section of the core if necessary. Clean and degrease the insulation with an approved solvent wipe to remove all traces of conducting material. Always wipe from cut end towards screen wire to avoid contaminating the insulation with carbon from the uncut screen. U N C • O N TR O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 3 I Page 5
  • 6. 3.1.3 Removing the ‘Easy-Strip’ Insulation Screen Mark the removal point of the polymeric screen with a Chinagraph pencil 40mm from the sheath cut. • Apply six layers of PVC Tape, with the sticky side out, around the insulation screen at the screen cut position, nearest to the sheath cut. Use an abrafile to make a circular abrasion around the screen, using the PVC tape as a guide, just deep enough so that the insulation below is visible. U N C • O N TR O LL ED • Section 3 I Page 6 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 7. Remove the PVC tape. Starting at the circular abrasion and using the correct 0.5mm depth-guarded tool, make two separate score lines along the core towards the cut end. The lines shall be equally spaced and approximately 30° apart. • At the position where the scores meet the cut end, further deepen the score marks and pull the conducting screen away from the insulation up to the circular abrasion. Repeat this operation for the other screen section. Clean and degrease the insulation with a solvent wipe to remove all traces of conducting material. Always wipe from the cut end towards the screen wire to avoid contaminating the insulation with carbon from the uncut screen. U N C • O N TR O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 3 I Page 7
  • 8. 3.1.4 Removing the Polymeric Insulation Using the Alroc tool, set the ‘stop gauge’ to the connector insertion depth. • Position the tool at the open core end. Adjust the blade to the required depth, which is just deep enough so the blade does not damage the conductor. Rotate the tool along the core, using the spiral cut setting, until the stop gauge prevents it moving any further. U N C • O N TR O LL ED • Section 3 I Page 8 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 9. Remove the tool and the removed insulation spiral. O LL ED • 3.2 Single Core Polylam Cables 3.2.1 Removing the Outer Sheath and Aluminium Foil Layer Mark the removal point of the outer sheath with a Chinagraph pencil, as indicated on the relevant jointing instruction. Make an additional line on the sheath 35mm past the original mark to show the position where the long straight cuts start. Using a pair of PG3 sheath stripping pliers, make a circular cut around the sheath at the removal point. U N C • O N TR • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 3 I Page 9
  • 10. Make two longitudinal cuts (180° apart) using the PG3 sheath stripping pliers, starting 35mm beyond the circular cut and extending towards the open end of the cable. • Lift the two sections of the sheath away from the open end and break them off at the circular cut position. The aluminium foil layer shall be removed simultaneously with the outer sheath. 3.2.2 Installing ‘Cheese-Grater’ Earth Connection Use the approved laminate belling tool to carefully lift the laminate sheath away from the insulation screen where the two slits remain. U N C • O N TR O LL ED • Section 3 I Page 10 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 11. Ease the sheath outwards, carefully progressing around the sheath in a circular pattern until it is approximately between 5mm and 7mm above its original position. Do it gently to avoid cracking the aluminium layer which reduces its fault carrying capability. • Position the ‘cheese-grater’s serrated section under the raised laminate sheath so that the entire section is underneath the remaining sheath. The gap in the ‘cheese-grater’ shall be positioned so that it does not correspond with the slits in the outer sheath and laminate. Use the sheath roller tool to compress the sheath on to the serrations of the ‘cheesegrater’, until the sheath is back to its original position. U N C • O N TR O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 3 I Page 11
  • 12. Install the first ligerex strap around the cable sheath, 5mm back from the sheath cut, and secure with the ligerex tightening tool. • Install the second ligerex strap around the cable sheath 20mm from the sheath cut and tighten with the approved ligerex tightening tool. Fix the tinned copper braid fixed to the ‘cheese-grater’ to the outer sheath of the cable 60mm from the sheath cut. U N C • O N TR O LL ED • Section 3 I Page 12 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 13. 3.2.3 Removing the ‘Easy-Strip’ Insulation Screen Mark the removal point of the polymeric screen with a Chinagraph pencil, as indicated on the relevant jointing instruction. Remove the Easy-strip screen to this point. • Apply six turns of PVC tape to the insulation screen, sticky side out, to provide a guide for the abrafile. Using an abrafile, make a circular abrasion around the screen at the removal point just deep enough to expose the insulation below. U N C • O N TR O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 3 I Page 13
  • 14. Starting at this position, and using the correct 0.6mm depth guarded tool, make two separate score lines along the core towards the cut end. The lines shall be equally spaced and approximately 90° apart. • Where the score meets the cut end, further deepen the score marks and pull the conducting screen away from the insulation up to the circular abrasion. Repeat this operation for the remaining section of insulation screen. U N C • O N TR O LL ED • Section 3 I Page 14 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 15. Carefully remove the PVC tape. Clean and degrease the insulation with an approved solvent wipe to remove all traces of conducting material. Always wipe from the cut end towards the screen wires to avoid contaminating the insulation with carbon from the uncut screen. 3.2.4 Using the Alroc tool, set the ‘stop gauge’ to the depth of the mechanical connector or lug. Position the tool at the open core end. Adjust the blade to the required depth, which is just deep enough so the blade does not damage the conductor. U N C • O N TR • Removing the Polymeric Insulation O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 3 I Page 15
  • 16. Rotate the tool along the core using the spiral cut setting until the stop gauge prevents it moving any further. Remove the tool and the removed insulation spiral. 3.3 3-Core Polymeric Cables 3.3.1 Removing the Outer Sheath Make a mark on the sheath at the removal point, as indicated on the relevant jointing instruction. Using an approved knife, depth-guarded saw or PG3 stripping pliers, make a circular cut around the sheath. U N C • O N TR • O LL ED • Section 3 I Page 16 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 17. From the open end of the cable make a longitudinal cut down the sheath to the circular cut mark. Remove the sheath at this mark by unwrapping from the armours or screen wires below. 3.3.2 Preparation of Plastic Cable Sheath 3.3.2.1 Polyethylene (PE) Sheaths Flame-brush the outer sheath for a distance of 150mm from the sheath removal point. O N TR • O LL ED • 3.3.2.2 PVC Sheaths Abrade the PVC sheath with a rasp for a distance of 60mm. U N C • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 3 I Page 17
  • 18. 3.3.3 Preparation of Steel Wire Armour (Steel Wire Armour Cables) A transition straight kit and an additional 3-core polymeric preparation kit is required for this process. • Mark the armour removal point as indicated on the relevant jointing instruction. Place a wire binder onto the armour wire, adjacent to the armour removal position, on the sheath cut side. • Using a depth-guarded or junior hacksaw, cut around the armours approximately halfway through. Wear suitable gloves while removing the armour. Lift and unwrap the armour wires a few at a time and break them off against the binder by bending them backwards and forwards. U N C • O N TR O LL ED • Section 3 I Page 18 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 19. Remove the wire binder and lift all the armour wires so that they are at right-angles to the cable sheath. • Place the piece of black heatshrink tube, supplied in the 3-core polymeric preparation kit, over the inner bedding layer of the cable and shrink into place. Place a number of single-width turns of red sealant tape around the red tube over the outer sheath cut. Build this up in layers until the support ring from the 3-core polymeric preparation kit just fits over it. U N C • O N TR O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 3 I Page 19
  • 20. Fold a length of copper mesh in half over its full length to reduce its width to approximately 30mm. Wrap two layers of the mesh around the support ring in line with the end of the armour wires when they are folded back on to the ring. • Bend all the armours down on to the copper mesh on the support ring and secure in place with the supplied large worm-drive clip. Bend the long length of ‘cheese-grater’ strip to form a circle and position it on the support ring, at the opposite end from where the armour wires have been positioned. Apply two half-lap layers of red sealant tape to the space between the end of the armour wires and the ‘cheese-grater’ on the support ring. U N C • O N TR O LL ED • Section 3 I Page 20 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 21. 3.3.4 Preparation of Copper Wire Screen (Copper Wire Screened Cables) Unwind the copper screen wires and lay them back along the outer sheath. • A transition straight kit and an additional 3-core polymeric preparation kit is required for this process. • Make a Chinagraph pencil mark on the abraded cable sheath 50mm from the sheath cut. Wrap a one-third-lap layer of red sealant tape around the sheath up to the Chinagraph pencil mark. U N C • O N TR O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 3 I Page 21
  • 22. Fold the copper wires back onto the red sealant tape and secure them with a double wire binder, level with the end of the mastic. • Place the piece of black heatshrink tube supplied in the 3 core polymeric preparation kit over the inner bedding layer of the cable and shrink into place. Make a Chinagraph pencil mark on the black heatshrink tube 15mm from the outer sheath cut and wrap a one-third-lap layer of red sealant tape from the mark over the copper wires up to the wire binder. U N C • O N TR O LL ED • Section 3 I Page 22 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 23. Push the large red crutch sealing sleeve from the transition joint kit over the cable end and line it up with the wire binder. Shrink into place starting from the wire binder end. • Place a number of single-width turns of red sealant tape around the red tube over the outer sheath cut. Build this up in layers until the support ring from the 3-core polymeric preparation kit just fits over it. Place the support ring over the mastic and line the end of it up with the double wire binder. U N C • O N TR O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 3 I Page 23
  • 24. Fold a length of copper mesh in half over its full length to reduce its width to approximately 30mm. Wrap two layers of the mesh around the edge of the support ring (furthest away from the joint) and temporarily secure. • Turn back the copper wires and lay them over the copper mesh so they are tidy and do not cross each other. Wrap the remaining copper mesh over the wires and secure with a half hitch. Clamp the copper wires and mesh down on to the support ring with the worm drive clip provided. U N C • O N TR O LL ED • Section 3 I Page 24 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 25. Trim the copper wires with side cutters, so that they are level with the inner end of the copper wire mesh. • Bend the long length of ‘cheese-grater’ strip to form a circle and position it on the support ring, at the opposite end from where the copper wires have been fixed to the support ring. Apply two half-lap layers of red sealant tape to the space between the end of the copper wires and the ‘cheese-grater’ on the support ring. U N C • O N TR O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 3 I Page 25
  • 26. 3.3.5 Removing the Inner Bedding Layer Mark the position of the inner bedding removal point with a Chinagraph pencil, as indicated on the relevant jointing instruction. • If there is a rubber bedding layer, remove it with a plastic hack knife by making a circular cut at the bedding removal point and then making a cut lengthways down the bedding. Unwrap the bedding and remove it using an approved knife. Take care not to damage the cores below. U N C • O N TR O LL ED • Section 3 I Page 26 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 27. 3.3.6 Un-lay the fillers and carefully remove them at the inner bedding removal position, using a pair of side cutters. Do not forget to remove the central filler. 3.3.7 Removing the Insulation Screen O LL ED • Removing the Fillers Mark the removal point of the polymeric screen with a Chinagraph pencil 180mm from the centre line of the joint. • Test the cut end of each core to determine the type of screen before applying any heat to aid removal. C O N TR • Apply six turns of PVC tape, sticky side out, to the insulation screen to provide a guide for the abrafile. U N • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 3 I Page 27
  • 28. Use an abrafile to make a circular abrasion around the screen at the removal point, just deep enough to expose the insulation below. Take extra care on cables with sector-shaped cores to ensure that only the minimum amount of insulation is removed. • Remove the PVC tape. Use a 0.4mm depth-guarded tool to make two separate score lines along the core from the screen cut to the cut end. The lines shall be equally spaced and approximately 30° apart. Further deepen the score marks at the position where they meet the cut end and pull the conducting screen away from the insulation up to the circular abrasion. Repeat this operation for the other screen section. U N C • O N TR O LL ED • Section 3 I Page 28 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 29. Clean and degrease the insulation with an approved solvent wipe to remove all traces of conducting material. Always wipe from cut end towards screen wires to avoid contaminating the insulation with carbon from the uncut screen. 3.3.8 Using the Alroc tool, set the stop gauge to the connector insertion depth. Position the tool at the open core end. Adjust the blade to the required depth, which is just deep enough so the blade does not damage the conductor. U N C • O N TR • Removing the Polymeric Insulation O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 3 I Page 29
  • 30. Rotate the tool along the core using the spiral cut setting until the stop gauge prevents it moving any further. • Remove the tool and the removed insulation spiral. 3.4 3.4.1 PICAS – Paper Insulated Corrugated Aluminium Sheathed Cables Removing the Outer PVC Sheath Make two Chinagraph pencil marks on the PVC sheath, one at the sheath removal point and the second one 200mm towards the cut end of the cable. U N C • O N TR O LL ED • Section 3 I Page 30 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 31. Cut round the sheath at both of these marks using a pair of PG4 sheath stripping pliers. • Now make a lengthwise cut along the PVC sheath between the two circular cuts. Lift the edge of the sheath with the jaws of the PG4 Pliers and unwrap it, tearing against the circular cut points. Gentle heat from a gas torch may assist this operation in cold weather. U N C • O N TR O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 3 I Page 31
  • 32. 3.4.2 Removing the Bitumen Layer Wear appropriate gloves during this operation. Warm the bitumen layer using a gas torch and use the approved solvent wipes to clean the aluminium sheath. • When this process is complete, the aluminium sheath should be bitumen-free and clean. 3.4.3 Removing the Corrugated Aluminium Sheath Mark the aluminium sheath at the removal point using a Chinagraph pencil, as indicated on the relevant jointing instruction. If this mark falls within one of the valleys, move the mark to the next crest towards the cut end of the cable. Using the approved tool, make a circular cut around the marked ridge of the aluminium sheath. The cut should be right through the aluminium. Take care not to damage the papers below. U N C • O N TR • O LL ED • Section 3 I Page 32 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 33. Once the circular cut has been made, the aluminium sheath can be removed by pulling the sheath towards the open cable end. Twisting the sheath from side to side whilst pulling shall make this task easier. • On some occasions, when there is a lot of sheath to remove, it may be necessary to carry out this process more than once. If this is the case, always make the first cut closest to the cut cable end. Mark the PVC sheath with a Chinagraph pencil, 60mm from the PVC sheath cut. C O N • Preparation of PVC Sheath TR 3.4.4 O LL ED • Abrade the PVC sheath with a rasp between the sheath cut and the Chinagraph pencil mark. U N • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 3 I Page 33
  • 34. 3.4.5 Removing the Copper Woven Tapes (CWT) and Core Fillers Unwind the CWT and remove any surplus length with side cutters. • Un-lay the fillers and carefully remove them at the belt paper position using a pair of side cutters. Do not forget to remove the central filler. Rewind the CWT tightly around the cable cores at the crutch position for a distance of 20mm from the aluminium sheath cut and tie off. Remove any surplus tape with insulated side cutters. U N C • O N TR O LL ED • Section 3 I Page 34 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 35. 3.4.6 Removing the Insulation Screen (Screened Cables Only) Mark the screen papers at the removal point indicated on the relevant jointing instruction. Tie a twine or wire binder around the screens at this point. • Carefully unwrap the first 50-75mm of the screen and secure the end of the core insulation papers with PVC tape. Unwind the remainder of the screen to the termination point and remove them by neatly tearing against the twine or wire binder. U N C • O N TR O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 3 I Page 35
  • 36. Remove the number paper and one layer of papers below the screen to the same position as the screen papers, using the same method. 3.4.7 Removing the Conducting and Belt Papers Tie a twine binder around the carbon paper layer 5mm from the aluminium sheath cut. Carefully unwind the carbon paper(s) and tear them off neatly against the twine binder. U N C • O N TR • O LL ED • Section 3 I Page 36 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 37. Now tie a second twine binder around the belt papers 20mm from the aluminium sheath cut. • Carefully unwind two or three of the belt papers at a time and tear them off neatly against the twine binder. Install five layers of PVC tape over the prepared belt and carbon papers, sticky side out, to avoid damaging the papers when the fillers are removed and the heatshrink tubes are fitted. U N C • O N TR O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 3 I Page 37
  • 38. 3.4.8 Removing the Insulation Papers Only carry out this process after installing the red insulation tubes as described in Section 4.1.1 or 4.1.3. • Mark the red tube over the core papers at the point of removal, as indicated on the appropriate jointing instruction. • Using a sharp knife, make a circular cut around the core through the papers, taking care not to damage the conductor below. Remove the red tube by pulling towards the end with a gentle twisting movement. U N C • O N TR O LL ED • Section 3 I Page 38 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 39. Rounding of the conductor with water pump or similar pliers eases this operation and helps prepare the conductor for insertion into the appropriate connector. • Un-wrap the papers up to the cut position and tear off against the remaining red tube. Clean any surplus compound from the cable conductor with an approved solvent wipe. U N C • O N TR O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 3 I Page 39
  • 40. 3.5 PILC – Paper Insulated Lead Sheathed Cables 3.5.1 Removing the Outer Serving or Sheath Mark the position of the serving or sheath termination as indicated on the relevant jointing instruction. • Wear suitable gloves while removing the serving. Put a wire binder around the serving at the removal point and score in front of the binder with an approved knife. Remove the serving with an approved knife and heat from a gas torch if required. U N C • O N TR O LL ED • Section 3 I Page 40 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 41. 3.5.2 Preparation of Plastic Cable Sheath 3.5.2.1 Polyethylene (PE) Sheaths Flame brush the outer sheath for a distance of 150mm from the sheath removal point. O LL ED • 3.5.2.2 PVC Sheaths Abrade the PVC sheath with a rasp for a distance of 60mm. 3.5.3 Removing the Steel Wire Armour Place a wire binder around the armour wires at the point of removal, as indicated on the relevant jointing instruction. U N C • O N TR • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 3 I Page 41
  • 42. Using a depth-guarded or junior hacksaw make a circular cut around the armours at the binder position. Cut through only half the width of the armour to avoid damaging the lead sheath below. • Wear suitable gloves while removing the armour. Lift and unwrap the armour wires a few at a time and break them off against the binder by bending them backwards and forwards. Remove the binder and lift the armours with a plastic hack knife so they are at 90° to the cable. Clean of all traces of bitumen from the wires using a gas torch and approved solvent wipes. U N C • O N TR O LL ED • Section 3 I Page 42 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 43. 3.5.4 Removing the Steel Tape Armour Heat the armours for a distance of 150mm with a gas torch and clean them with approved solvent wipes. • Place a wire binder around the tape armour 60mm from the outer serving removal point. Wear suitable gloves while removing the armour. Using a depth-guarded or junior hacksaw, cut through the first layer of tape armour at the binder position. U N C • O N TR O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 3 I Page 43
  • 44. Lift the point of the armours at the binder position, unwrap and remove. • Repeat the process with the second layer of tape armour making sure not to damage the lead sheath below. 3.5.5 Removing the Inner Bitumen Layer Wear suitable gloves for this operation. Score around the inner bedding layers with an approved knife adjacent to the armour removal point taking great care not to score into the underlying lead sheath. U N C • O N TR O LL ED • Section 3 I Page 44 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 45. At the open cable end lift the bitumen impregnated textile layer with the knife and unwrap it back to the armour position, tearing it against the end of the cut armours. The use of a gas torch assists this process. • Apply sufficient heat to the inner bitumen paper layer to soften it before removing it. Apply more heat to the final layer of bitumen on the lead sheath and armours and wipe off any traces of bitumen with approved solvent wipes. U N C • O N TR O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 3 I Page 45
  • 46. The lead sheath will be clean and bright after this process. 3.5.6 Clean and degrease the lead sheath using approved solvent wipes. Mark the lead sheath at the removal point as indicated on the relevant jointing instruction, using a Chinagraph pencil. Wear suitable gloves for this operation. Using an approved insulated hack-knife, make a circular indented ring cut around the lead sheath, taking care to only cut part-way through the sheath. U N C • O N TR • Removing the Lead Sheath O LL ED • Section 3 I Page 46 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 47. From the cut cable end, cut the lead sheath longitudinally to the round cut, using an approved insulated hack-knife. Take care not to damage the belt papers below. • Open the lead sheath up along the length of the cut and carefully unwrap the lead sheath against the round cut. 3.5.7 Removing the Conducting and Belt Papers Tie a twine binder around the carbon paper layer 5mm from the lead sheath cut. U N C • O N TR O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 3 I Page 47
  • 48. Carefully unwind the carbon paper(s) and tear them off neatly against the twine binder. • Now tie a second twine binder around the belt papers 20mm from the lead sheath cut. Carefully unwind two or three of the belt papers at a time and tear them off neatly against the twine binder. U N C • O N TR O LL ED • Section 3 I Page 48 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 49. Install five layers of PVC tape over the prepared belt and carbon papers, sticky side out, to ensure that the papers are not damaged by the next step. 3.5.8 Removing the Core Fillers from Belted Cables Un-lay the fillers and carefully remove them at the belt paper position using a pair of side cutters. Do not forget to remove the central filler. Carefully separate the cores and secure the core paper ends with PVC tape. U N C • O N TR • O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 3 I Page 49
  • 50. 3.5.9 Removing the Copper Woven Tapes (CWT) (Screened Cables Only) Unwind the CWT and remove the core fillers carefully with side cutters. • Rewind the CWT tightly around the cable cores at the crutch position for a distance of 20mm from the aluminium sheath cut and tie off and remove any surplus tape with insulated side cutters. O N TR O LL ED • 3.5.10 Removing the Insulation Screen (Screened Cables Only) Using an approved solvent wipe, remove any surplus cable compound from the screened core insulation. U N C • Section 3 I Page 50 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 51. Mark the screen papers at the removal point indicated on the relevant jointing instruction. Tie a twine or wire binder around the screens at this point. • Carefully unwrap the first 50-75mm of the screen and secure the end of the core insulation papers with PVC tape. Unwind the remainder of the screen to the termination point and remove them by neatly tearing against the twine binder. Remove the number paper and one layer of papers below the screen to the same position as the screen papers, using the same method. U N C • O N TR O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 3 I Page 51
  • 52. 3.5.11 Removing the Insulation Papers Only remove the papers after fitting the red insulation tubes as described in Section 4.1.3. • Mark the red tube over the core papers at the point of removal as indicated on the appropriate jointing instruction. • Using a sharp knife, cut around the core through the papers taking care not to damage the conductor below. Remove the red tube by pulling towards the end with a gentle twisting movement. U N C • O N TR O LL ED • Section 3 I Page 52 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 53. Rounding of the conductor with water pump or similar pliers assists this operation and helps prepare the conductor for insertion into the appropriate connector. • Unwrap the papers up to the cut position and tear off against the remaining red tube. Clean any surplus compound from the cable conductor with an approved solvent wipe. U N C • O N TR O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 3 I Page 53
  • 54. 3.6 Moisture Testing on Paper Insulated Cables Wear full Personal Protective Equipment for this test. • Gently heat the paraffin wax container on a low heat. Insert the thermometer through one of the rubber grommets in the top and wait until the wax reaches 125°C. • Always handle the papers to be tested with gloves, as moisture from hands is enough to give a positive test. • Lift out the basket and place the paper tapes to be tested into it. • The samples from the following layers shall be tested: TR O LL ED • Inner and outer belt papers. • Paper or string fillers. • Inner and outer core papers. U N C O N • Section 3 I Page 54 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 55. Immerse the basket complete with papers into the paraffin wax bath and observe the results. • If there is no reaction from the wax, or it only froths slightly, the papers are dry and the cable is fit to be jointed. • If the wax froths a lot and makes a crackling noise, this means that the papers are wet and the cable is not to be jointed. • Remove the heat from the container and leave it to cool before moving it. The wax can be re-used until it starts to discolour. There is no need to dispose of it after each moisture test. U N C • O N TR O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 3 I Page 55
  • 57. 4.1 • 4.1.1 STANDARD PROCEDURES FOR INSTALLING MATERIALS AND COMPONENTS Installing Stress Control and Insulation Materials All heatshrink materials shall only be installed using a soft flame blow torch. Belted Paper Cables ED 4 Prepare the cable as described in Sections 3.4 or 3.5. • Using an approved solvent wipe remove any surplus cable compound from the paper core insulation. • Tape up the paper insulation on the end of each core to stop them unravelling. C O N TR O LL • Slide the correct lengths of red insulating tube over each core, until they are approximately 50mm from the crutch. U N • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 4 I Page 1
  • 58. Partly shrink the tubes for a distance of 50mm from the end. • Whilst the tubes are still hot, gently twist and turn them so that the shrunk section is positioned on the inside and the ends of the tubes are level with the PVC tape protecting the belt papers. Continue to shrink the tubes starting from the crutch and working towards the cut ends. U N C • O N TR O LL ED • Section 4 I Page 2 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 59. Whilst the red tubes are still hot slide the supplied yellow mastic wedge into the crutch so that the tip is just below the belt paper. The yellow mastic wedge shall be applied with a thin coating of silicone grease and a plastic wedge insertion tool. • Remove the PVC Tape from the belt papers and make a Chinagraph pencil mark on the red tubes 40mm from the lead sheath cut. Make a second Chinagraph pencil mark 20mm onto the lead sheath. U N C • O N TR O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 4 I Page 3
  • 60. Wrap two of the supplied strips of yellow mastic around the crutch between the two Chinagraph pencil marks, applying sufficient tension to stretch the tape to half its original width. Build up the gap between the end of the red tubes and the lead sheath first, before covering the red tubes and the lead sheath. The yellow mastic shall be left to form a domed area. • Position the red crutch sealing sleeve centrally over the yellow mastic, sheath and red tubes, and then shrink into position. Apply sufficient heat to ensure that the tube has been fully shrunk, thus making sure that the yellow mastic fills any voids in the crutch area. U N C O N TR O LL ED • Section 4 I Page 4 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 61. 4.1.2 Build-Up Kit for Small Section Paper Cables The core tube and sealing sleeves supplied in the two sizes of transition straight joints are not suitable for use with cables that are below the minimum size on the kit label. • For smaller cross-section cables between 16mm2 (0.0225sq.in) and 70mm2 (0.1sq.in) an additional build-up kit is required. How the kit is used is dependant upon which joint is being made. 4.1.2.1 95-185mm2 Joint ED • Replace the three red tubes in the base kit with the smaller ones in the build-up kit. • Use the yellow mastic from the build-up kit. • Replace the red crutch sealing tube in the base kit with the smaller one in the build-up kit. • Shrink the three red (MWJS 30/10) build-up tubes on top of the red tubes level with the insulation removal point. • • • • Replace the three red tubes in the base kit with the smaller ones in the build-up kit. Use the yellow mastic from the build-up kit. Replace the red crutch sealing tube in the base kit with the smaller one in the build-up kit. Shrink the three red (MWJS 30/10) build-up tubes on top of the red tubes level with the insulation removal point. Shrink the three red (MWJS 40/16) build-up tubes on top of the first set of red build tubes level with the insulation removal point. U N C • O N 4.1.2.2 240-300mm2 Joint TR O LL • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 4 I Page 5
  • 62. 4.1.3 Screened Paper Cables Prepare the cable as described in Sections 3.4 or 3.5 before installing these components. • On each core, remove the twine or wire binder and make a Chinagraph pencil mark either side of the screen cut, one 20mm on to the screen and the other 10mm on to the insulation. • Wrap a 50mm long piece of yellow mastic, stretched to half its original width, around the screen cuts between the two Chinagraph pencil marks. Slide the correct lengths of red insulating tube over each core, until they are approximately 50mm from the crutch. U N C • O N TR O LL ED • Section 4 I Page 6 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 63. Partly shrink the tubes for a distance of 50mm from the end. Whilst the tubes are still hot, gently twist and turn them so that the shrunk section is positioned on the inside and the ends of the tubes are level with the CWT tape protecting the belt papers. • Continue to shrink the tubes starting from the crutch and working towards the cut ends. Slide the supplied yellow mastic wedge into the crutch so that the tip is just below the copper woven tape. A plastic wedge insertion tool can be used to aid this process. U N C • O N TR O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 4 I Page 7
  • 64. Make a Chinagraph pencil mark on the red tubes 40mm from the aluminium sheath cut. • Make a second Chinagraph pencil mark 20mm onto the aluminium sheath. Wrap two of the supplied strips of yellow mastic around the crutch between the two Chinagraph pencil marks, applying sufficient tension to stretch the tape to half its original width. U N C • O N TR O LL ED • Section 4 I Page 8 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 65. Position the red crutch sealing sleeve centrally over the yellow mastic, sheath and red tubes, and then shrink into position. Apply sufficient heat to ensure that the tube has been fully shrunk, thus making sure that the yellow mastic fills any voids in the crutch area. 4.1.4 O LL ED • Single Core Polymeric Cables in Single and Triplex Straight/Branch Joints Prepare the cables as described in Sections 3.1 or 3.2. • Clean and degrease the insulation with an approved solvent wipe to remove all traces of conducting material. Always wipe from cut end towards screen wire to avoid contaminating the insulation with carbon from the uncut screen. C O N TR • Make a Chinagraph pencil mark on the black insulation screen of the cable 20mm from the screen cut. U N • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 4 I Page 9
  • 66. Make a second Chinagraph pencil mark on the insulation 10mm from the screen cut. • Stretch one of the short yellow mastic strips, supplied in the kit, to half its original width and wrap it around the core screen and insulation between the two Chinagraph pencil marks. Slide the black stress control tube over the core until the end is level with the insulation cut. The tube shall fully overlap the yellow mastic tape. U N C • O N TR O LL ED • Section 4 I Page 10 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 67. Shrink the tubing down starting at the insulation cut, then work back towards the cable over sheath. 4.1.5 O LL ED • Single Core Polymeric Cables in Transitional Straight or Branch Joints Prepare the cables as described in Sections 3.1 or 3.2. • Make a Chinagraph pencil mark on the outer sheath of the cable, 60mm from the sheath cut. Wrap a one-third-lap layer of red sealant tape over the cable sheath up to the Chinagraph pencil mark. U N C • O N TR • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 4 I Page 11
  • 68. Bend back the screen wires and lay them onto the mastic tape, taking care not to cross over any of the wires. • Apply a double wire binder to the screen wires level with the end of the red sealant tape. Make a Chinagraph pencil mark on the insulation screen 15mm in from the sheath cut. U N C • O N TR O LL ED • Section 4 I Page 12 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 69. Wrap a one-third-lap layer of red sealant tape from the mark on the insulation screen up over the copper screen wires to the wire binder. Ensure that there are no gaps in the tape as this is an important moisture seal for the completed joint. • Make a Chinagraph pencil mark on the insulation 10mm from the screen cut. Make a second Chinagraph pencil mark on the black insulation screen of the cable, 20mm from the screen cut. U N C • O N TR O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 4 I Page 13
  • 70. Wrap the short piece of yellow mastic around the screen cut between the previously made marks. Stretch the tape to half its original width and form a smooth taper with no sharp edges. • Install the red core tubing over the cable up to the wire binder. Shrink the tube into place, starting from the end where the red sealant has been applied to the copper wires. U N C • O N TR O LL ED • Section 4 I Page 14 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 71. 4.1.6 Single Core Polymeric Cable Terminations Fit the mechanical lug as described in Section 4.2.5. • Use an approved solvent wipe to clean and degrease the outer sheath of the cable for 100mm below the sheath cut. • Make a Chinagraph pencil mark on the outer sheath of the cable, 60mm from the sheath cut. Wrap a one-third-lap layer of red sealant tape over the cable sheath down to the Chinagraph pencil mark. U N C • O N TR O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 4 I Page 15
  • 72. Bend back the screen wires and lay them onto the mastic tape taking care not to cross over any of the wires. • Apply a double wire binder to the screen wires level with the end of the red sealant tape. Make a Chinagraph pencil mark on the black insulation screen of the cable, 20mm from the screen cut. U N C • O N TR O LL ED • Section 4 I Page 16 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 73. Make a second Chinagraph pencil mark on the insulation 10mm from the screen cut. • Wrap the short piece of yellow mastic around the screen cut between the two marks. Stretch the tape to half its original width and form a smooth taper with no sharp edges. Preheat the cable lug before placing the red tubing over the core. U N C • O N TR O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 4 I Page 17
  • 74. Place the green-mastic-lined red tube on the termination until the bottom is level with the wire binder. • Use a soft yellow flame to shrink the red tube starting at the screen cut. Then shrink from the screen cut up to the cable lug, before finally shrinking from the screen cut to the bottom. U N C O N TR O LL ED • Section 4 I Page 18 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 75. The termination is now ready to be installed in the end box. • Note: After installing the termination, reheat the cable lug area until a bead of green mastic appears at the top. U N C O N TR O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 4 I Page 19
  • 76. 4.1.7 3-Core Polymeric Cables Remove the insulation screens as described in Section 3.3.7. • Make a Chinagraph pencil mark on the insulation of each core 10mm from the screen cut. • Make Chinagraph pencil marks on the black insulation screen of each core at 20mm, 40mm, 60mm and 90mm from the screen cut. U N C O N TR O LL ED • Section 4 I Page 20 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 77. Wrap one of the short pointed yellow mastic strips around the semi-conducting screen cut of each core, between the first and second Chinagraph pencil marks. Stretch the tape to half its original width during this operation. • Apply one turn of red sealant tape around the semi-conducting screen of each core between the third and fourth Chinagraph pencil marks. Carefully slide the red core tubes over the end of each core until the tubes are level with the fifth Chinagraph pencil mark. U N C • O N TR O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 4 I Page 21
  • 78. Shrink the tubes down starting at the insulation screen cut end before working towards the cut cable end. O LL ED • 4.2 Installing Mechanical Connectors and Lugs 4.2.1 Single Core and Triplex Straight Joints Remove the insulation as described in Section 3.3.8. Check at this stage that any connector insulating tubes have been positioned over one of the cables. U N C • O N TR • Section 4 I Page 22 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 79. The connector comes with a metal insert to fit small conductors. If the conductor does not fit the connector, discard the insert and use the connector without it. • Fit the conductors into the connector. The insulation butts up against the end of the connector. Using the approved insulated tool to hold the connector, take up the tension on all of the bolts equally without shearing them off. U N C • O N TR O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 4 I Page 23
  • 80. Continue to tighten and shear off all four bolts, starting with the bolts at either end of the connector, followed by the two in the centre. 4.2.2 • O LL ED • 3-Core Transition and 3-Core PICAS/PILC Joints Remove the insulation as described in the following sections: • Screened paper cables – Section 3.5.11. • Polymeric cables – Section 3.3.8. Ensure that the support ring is parked on the triplex cable side of the joint and that the connector insulating tubes are now parked over their respective cores. U N C O N • Belted paper cables – Section 3.4.8. TR • Section 4 I Page 24 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 81. Set the cores in their final jointing position. Ensure that the conductors have been cut to allow for the connector central moisture block. • Insert each end of the core into its respective ‘connector half’ and finger-tighten the bolts. Align and position the two connector halves so that the central fixing bolt can be inserted into the central fixing hole. The use of force should not be necessary. U N C • O N TR O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 4 I Page 25
  • 82. Hold the connector with the approved holding tool and tighten the two bolts on one side until they shear off. • Repeat this operation on the other side of the connector, then shear off the central fixing bolt. 4.2.3 • Single Core Branch Joints Install the stress control materials and heatshrink tubes as described in Section 4.1.4 before completing this section. Position and shrink the red heatshrink shim over the single core cable end, so it is in line with the black stress control tube underneath. U N C • O N TR O LL ED • Section 4 I Page 26 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 83. Line up the two cables of the branch end so that they are parallel and the insulation cuts are level. • Insert the red and black insulating spacer between the two cores of the double cable end. Ensure that the red spacer lines up with the end of the two insulation cuts. U N C O N TR O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 4 I Page 27
  • 84. Fit the two conductors into the mechanical connector, ensuring that the insulation edge butts against the connector body. Tape the two cables together with the supplied tape to stop the inserts falling out. • The connector comes with a plastic centralising insert for the single cable end. If the conductor is able to pass through the hole in plastic insert, fit the insert into the connector and insert the single cable. If the conductor is too large to pass through the insert, discard it. U N C O N TR O LL ED • Section 4 I Page 28 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 85. Place the black stress-control tube inside the red and black insulation tube and park it on the single cable end. Insert the single cable into the connector and finger-tighten the bolts. • Starting with the two bolts on the single cable end, tighten all the bolts in sequence in several steps until the heads shear off. If any of the bolts shear off proud of the connector surface, remove the edge with a file. U N C • O N TR O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 4 I Page 29
  • 86. Clean and degrease the connector, fill the bolt holes with the supplied clay pack to obtain a smooth finish. 4.2.4 3-Core Transition Branch Joints O LL ED • Remove the insulation as described in Section 3.3.8 for polymeric cables and Section 3.5.11 for paper cables. Check that the connector insulating tubes have been positioned over the double cable end and support ring(s) over the triplex cables. • Slide the three short pieces of red thick-wall tube over each core end on the single cable end of the joint. Position these away from the connector area. U N C O N TR • Section 4 I Page 30 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 87. It is important that the position and setup of the cores is correct at this stage as it helps with installing the connectors. • Cut each core to length, allowing for the water block in the connector, and remove the core insulation to the connector bore depth. • Bring together each pair of cores on the branch side of the joint and bind them together with the ties provided. Slide the (red and black) insulating sleeves carefully over each pair of cores on the branch side as shown in the relevant jointing instruction. Position the connector over the pair of cores on the branch side and finger-tighten the bolts. U N C • O N TR O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 4 I Page 31
  • 88. Slide the connector collar over the remaining single core. Place the core into the open channel of the connector and position the connector insert over the conductor. • Slide the connector collar over the insert, locking it in place. Fit the bolts and tighten them by hand. Tighten up the bolts in turn until they shear off. U N C • O N TR O LL ED • Section 4 I Page 32 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 89. Position the three pieces of short red tube so that they butt up with the single end of the connector and shrink into position, starting from the end closest to the connector. 4.2.5 O LL ED • Mechanical Lugs for Indoor and Outdoor Terminations Follow the cable preparation procedures for polymeric cables in Sections 3.1 and 3.2 before installing any mechanical lugs. • Each kit comes with the correct size and types of lug for each termination. Remove the insulation on the conductor to the depth of the thimble. U N C O N TR • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 4 I Page 33
  • 90. Place the lug over the conductor so that the bottom of the barrel butts up against the core insulation. • Tighten the bolts by hand and check that the palm hole lines up with the bushing or insulator stud. • Fully tighten the bolts until the bolt heads shear off. C O N TR O LL ED • Complete the termination as detailed in the appropriate instruction. U N • Section 4 I Page 34 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 91. 4.2.6 Mechanical Thimbles for Use in T1 Transformer End Boxes Prepare the cable following the procedures for polymeric cables in Sections 3.1 and 3.2 before installing any mechanical lugs. • The kit comes with a mechanical thimble for 95mm2 stranded aluminium cables only. The insulation on the conductor shall be removed to the depth of the thimble. • Place the thimble over the conductor so that the top of the barrel is level with the top of the cut core. U N C O N TR O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 4 I Page 35
  • 92. Tighten the bolts by hand and check that the final positioning of the thimble is correctly aligned with the half clamps on the bushing. • Fully tighten the bolts until the bolt heads shear off. • Complete the termination as detailed in the appropriate instruction. 4.3 Installing Connector Stress Control and Heatshrink Insulation 4.3.1 Single Core and Triplex Straight/Branch Joints O LL ED • Fit the mechanical connectors as described in Section 4.2.1. • Clean and degrease the mechanical connector with an approved solvent wipe. U N C O N TR • Section 4 I Page 36 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 93. Fill the bolt holes in the mechanical connector with the grey clay material supplied in the joint kit. • Remove one of the backing sheets from the black mastic patch and position so that the connector is in the centre of the sticky side. Wrap the black mastic patch around the connector and remove the other backing sheet. U N C • O N TR O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 4 I Page 37
  • 94. Slide the red and black insulation tube over the installed black patch and position it over the centre of the joint. • Starting in the middle, shrink the insulation tube using equal heat on all the surfaces. When the tube is properly shrunk, the ridges on the black layer of the tube shall no longer be visible and the tube cannot be moved. Continue to shrink the tube from the centre to within 50mm of one end. U N C • O N TR O LL ED • Section 4 I Page 38 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 95. Remove the heat from that end and start shrinking from the middle again towards the other end. Stop again 50mm from the end. This ensures that as the tube shrinks, any air inside is pushed out. • Return to each end in turn and continue to shrink the tube completely. 4.3.2 • Transition and Paper to Paper Straight Joints Fit the mechanical connectors as described in Section 4.2.2. Clean and degrease the mechanical connector with an approved solvent wipe. U N C • O N TR O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 4 I Page 39
  • 96. Remove one of the backing sheets from the yellow mastic patch and position it underneath the connector, so it is in the centre of the sticky side and the overlap is over the bolt holes. • Wrap the yellow mastic patch around the connector. Leave the outer backing sheet in place so the patch for the next connector does not stick to the first one. • Remove all the release papers from the wrapped connectors. Roll the overlapped ends of the yellow mastic patch over to help with filling the gap between the edge of the connector and the core tubes. Complete this stage for all three cores before attempting to shrink the red and black insulation tubes in place. U N C • O N TR O LL ED • Section 4 I Page 40 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 97. Slide the red and black insulation tube over the installed yellow patch and position over the centre of the joint. Position all three before starting the shrinking process. • Starting in the middle, shrink the insulation tubes, using equal heat on all the surfaces. When the tubes are properly shrunk, the ridges on the black layers of each tube shall no longer be visible and the tube cannot be moved. Continue to shrink the tubes from the centre to within 50mm of one end. U N C • O N TR O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 4 I Page 41
  • 98. Remove the heat from that end and start shrinking from the middle again towards the other end. Stop again 50mm from the end. This ensures that as the tubes shrink any air inside is pushed out. • Return to each end in turn and continue to shrink the tubes completely. 4.3.3 • Single Core Branch Joints Fit the mechanical connectors as described in Section 4.2.3. Remove one release paper from a long strip of yellow mastic. Starting from the single core side, wrap it around the core, stretching it to approximately half its original width. U N C • O N TR O LL ED • Section 4 I Page 42 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 99. Fill in the gaps between the core and the connector, continuing across the connector and on to the red insulating piece. Ensure that a smooth profile is formed so that when the heat shrink tubes are applied all the voids are filled with yellow mastic. • Lubricate the yellow mastic with the supplied silicone tissue to stop the black stress control tube sticking when it is pulled across the joint. U N C O N TR O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 4 I Page 43
  • 100. Push the black stress control tube over the connector and onto the rubber spacers, until it lines up with the end of the black spacer. • Shrink the stress control tube down, starting at the branch side before working towards the single core side. Apply additional heat over the connector to ensure that the tube is fully shrunk and wrinkle free. The second picture below shows what the finished tube should look like. U N C • O N TR O LL ED • Section 4 I Page 44 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 101. Now position the red and black insulating sleeve centrally over the stress control tube. • Start shrinking the sleeve from the centre, continuing to within 50mm of each end. Finally complete the shrinking process on both ends. Following this sequence ensures that no air is trapped in the tube. When complete, the sleeve shall be fully shrunk, with no visible ridges on the sleeve surface. U N C • O N TR O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 4 I Page 45
  • 102. 4.3.4 3-Core Transition Branch Joints Fit the mechanical connectors as described in Section 4.2.4. • Using one of the thin lengths of yellow mastic, stretched to half its original width, tape around both ends of the connector to reduce the size of the step. • Remove one of the backing sheets from the yellow mastic patch and position it underneath the connector, so it is in the centre of the sticky side and the overlap is over the bolt holes. Wrap the yellow mastic patch around the single end of the connector, leaving the outer backing sheet in place to prevent other patches sticking to it. U N C • O N TR O LL ED • Section 4 I Page 46 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 103. Take two yellow mastic patches and remove the backing sheet from one side. Stick the two patches together with a 50% overlap. • Wrap the double length yellow mastic patch around the bottom of the double cable end of the connector. U N C O N TR O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 4 I Page 47
  • 104. Remove the backing sheet partly from the yellow mastic patch on the top of the connector and continue to wrap it around the connector until it is evenly covered. • To help with the application of the yellow mastic on the remaining cores, wrap each completed core with two of the removed backing sheets. This stops the yellow mastic from one core sticking to another. O N Apply a thin smear of silicone grease over the yellow mastic on each core and position the red and black insulating sleeves centrally over each connector. Position all three before starting the shrinking process. U N C • TR O LL ED • Section 4 I Page 48 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 105. Starting in the middle, shrink the insulation tubes, using equal heat on all the surfaces. When the tubes are properly shrunk, the ridges on the black layers of each tube shall no longer be visible and the tube cannot be moved. • Continue to shrink the tubes from the centre to within 50mm of one end. Remove the heat from that end and start shrinking from the middle again towards the other end, stopping again 50mm from the end. This ensures that as the tubes shrink any air inside is pushed out. U N C • O N TR O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 4 I Page 49
  • 106. Return to each end in turn and continue to shrink the tubes completely. 4.3.5 • Polymeric and Paper Pot End Joints O LL ED • Install stress control and insulation materials on the following cable types before installing any of the following materials: • Screened paper cables – Section 4.1.2. • Single core polymeric cables in transitional straight/branch joints – Section 4.1.4. • 3-core polymeric cables – Section 4.1.7. Cut one of the short lengths of yellow mastic into three equal lengths with scissors. U N C O N • Belted paper cables – Section 4.1.1. TR • Section 4 I Page 50 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 107. Stretch each piece of yellow mastic to half its original width and use it to cover the cut end of the cable. • Make a Chinagraph pencil mark on the insulation, 40mm from the cut end. U N C O N TR O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 4 I Page 51
  • 108. Apply another short piece of yellow mastic, stretched to half its original width, between the Chinagraph pencil mark and the end of the core • Place the black heatshrink cap over the end of the core so that it fully covers the yellow mastic. U N C O N TR O LL ED • Section 4 I Page 52 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 109. Heatshrink the cap into place starting from the end. Hold the cap in place with a hammer handle to ensure that the cap doesn’t come off while it is being shrunk. • Position the red and black insulation tube over the core so that it is 30mm past the end. U N C O N TR O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 4 I Page 53
  • 110. Starting in the middle, shrink the insulation tube, using equal heat on all the surfaces. When the tube is properly shrunk, the ridges on the black layer of the tube shall no longer be visible and the tube cannot be moved. • Continue to shrink the tube, moving from the centre up to within 50mm of one end. Remove the heat from that end and start shrinking from the middle again towards the other end. Stop again 50mm from the end. This ensures that as the tubes shrink any air inside is pushed out. U N C • O N TR O LL ED • Section 4 I Page 54 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 111. Return to each end in turn and continue to shrink the tube completely. • Repeat the process for the other two cores. 4.4 Installing Bushing Boots 4.4.1 Cold Applied Switchgear Boots O LL ED • Fit the single core termination as described in Section 4.1.6. • Clean and degrease the terminations and the bushings using an approved solvent wipe. • Apply a thin layer of silicone grease to the top 50mm of each termination. Slide the concertina flexible boots over the termination and park them below the lugs. U N C O N TR • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 4 I Page 55
  • 112. Apply a thin layer of silicone grease to the top 50mm of the termination. • Apply a thin layer of silicone grease to the bushing. Bolt the lugs to the bushings using the nuts and bolts supplied with the switchgear. Tighten the connections up to the required torque. U N C • O N TR O LL ED • Section 4 I Page 56 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 113. Now push the boot upwards and over onto the bushing as far as it will go. When installed it shall not be more than 15mm away from the back plate of the end box. U N C O N TR O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 4 I Page 57
  • 114. 4.4.2 Heat Shrink Boots Fit the single core termination lug or thimbles as described in Section 4.2.5 and 4.2.6. • Clean and degrease the terminations and the bushings using an approved solvent wipe. • Slide the heat shrink boots over the terminations and park them below the lugs. • Bolt the lugs to the bushings using the nuts and bolts supplied with the switchgear. Tighten the connections up to the required torque. • Apply the supplied black mastic to the bushing nut and the exposed metal work of the connector. Ensure that any sharp edges are fully covered by the mastic. U N C O N TR O LL ED • Section 4 I Page 58 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 115. Push the boots up and over the bushings as far as they will go. Begin shrinking each boot in place with a soft flame, starting at the inside leg/body interface, before moving up the bushing. Finally shrink from the centre of the boot down to the bottom of each leg. • The boots shall form into a right angle. If the position does not look right, reposition the boot while it is still hot, using suitable protective gloves. N C O N TR O LL ED • Allow to cool before moving the termination. U • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 4 I Page 59
  • 116. 4.5 Installing Mechanical Earth Bonds and Associated Components 4.5.1 Single Core Straight Joints Complete the joint as described in Section 4.3.1 before fitting this earth bond arrangement. • Install a double wire binder onto the copper wires at the end of the joint with the shortest length of copper wire screens, 50mm from the outer sheath cut. • Wrap one half-lap layer of copper woven tape over the length of the joint, starting from the wire binder up to the copper screen wire at the other end, tying off with a half hitch. C O N TR O LL ED • Form the copper wire screens at both ends of the joint into two equal bunches, one on each side. U N • Section 4 I Page 60 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 117. Using one of the tinned aluminium connectors as a guide, cut the copper wire screens to length so that the connectors sit in the gap between the wire binder and the end of the insulation tube. • Shear off one bolt on each connector, ensuring that space is left in the connector to fit the rest of the copper wires in the other end. Offer up the copper wire screen bunches from the opposite end of the joint and cut to length using the installed connector as a guide. U N C • O N TR O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 4 I Page 61
  • 118. Insert each bunch into each of the connectors and shear off the second bolt. • Wrap a half-lap layer of copper woven tape over the complete joint from end to end. 4.5.2 • Triplex Straight Joints Complete the joint as described in Section 4.3.1 before fitting this earth bond arrangement. Pull the three completed cores of the joint together into a trefoil arrangement and apply a half-lap layer of copper woven tape between the two sheath cuts, tying off with a half hitch at one end. U N C • O N TR O LL ED • Section 4 I Page 62 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 119. Form the three sections of copper wire screen at each end of the joint into a single conductor. Position each bunch in such a way to ensure that they fit into the plastic joint shell. • Cut one bunch of copper wire screens in the centre of the joint and fit into one half of the mechanical connector. The copper wire screens may have to be doubled over to make the connector fit. The copper wires shall be held together with tinned copper mesh. Cut the other bunch of copper wire screens to length and fit into the other end of the mechanical connector. U N C • O N TR O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 4 I Page 63
  • 120. Shear off all four bolts on the mechanical connector, ensuring that the top plates do not slip out. 4.5.3 Single Core Branch Joints O LL ED • Complete the joint as described in Section 4.3.3 before fitting this earth bond arrangement. • Starting on the branch side of the joint, apply a half-lap layer of copper woven tape over the insulation sleeve until it is fully covered. Tie off the mesh with a half hitch knot at the single cable end. U N C O N TR • Section 4 I Page 64 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 121. Form the three bunches of copper wire screens into three separate conductors. • Lay the three separate conductors across the joint and connect them together using the two mechanical shear bolt connectors provided in the kit. Use the branch cable with the longest length of copper wire to bridge the gap between the copper wires on the main. U N C O N TR O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 4 I Page 65
  • 122. 4.5.4 Triplex Cables into Transition Joints Using a Support Ring Complete the joint as described in Section 4.3.2 or 4.3.4 before fitting this earth bond arrangement. • Pull the three cores of the joint together and tie them together with the supplied length of copper woven tape, secured with a half hitch. • Reheat the crutch sealing sleeve of any paper insulated cables before proceeding. Position the support ring so that the inner end is level with the end of the red tubes. The screen wires shall stick out from the outer edge of the support ring. U N C • O N TR O LL ED • Section 4 I Page 66 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 123. Bend the long length of ‘cheese-grater’ strip to form a circle and position it on the support ring, at the opposite end from where the copper wires are sticking out. • Fold a length of copper mesh in half over its full length so that its width is reduced to approximately 30mm. Wrap two layers of the mesh around the edge of the support ring (furthest away from the joint) and temporarily secure them. Offer up the aluminium cage to the joint to check that the support ring is in the right place. The petals at each end line up with and overlap the ‘cheese-grater’s at both ends. U N C • O N TR O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 4 I Page 67
  • 124. Turn back and lay the copper wires of the single core cables over on to the copper mesh, so they are tidy and do not cross each other. • Wrap the remaining copper mesh over the wires and secure with a half hitch. Clamp the copper wires and mesh down on to the support ring with the worm drive clip provided. Trim the copper wires with side cutters, so that they are level with the inner end of the copper wire mesh. Apply two half-lap layers of red sealant tape to the space between the end of the copper wires and the ‘cheese-grater’ on the support ring. U N C • O N TR O LL ED • Section 4 I Page 68 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 125. 4.5.5 Standard PILC Earth Steel Wire Armour Cables (EPN and Pot Ends Only) Prepare the lead sheath as described in Section 3.5 before fitting this earth bond arrangement. • Using one of the lifted armours as a guide, make a mark on the lead sheath with a Chinagraph pencil. • Fold a length of copper mesh in half over its full length so that its width is reduced to 30mm. Wrap the mesh around the lead sheath level with the end of the armour wire mark, so that the armours cover it when they are folded down. Bend the steel wire armours back down and secure in place with the worm drive clip supplied in the kit. U N C • O N TR O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 4 I Page 69
  • 126. Fold a length of copper mesh in half over its full length so that its width is reduced to 30mm. Wrap the mesh around the lead sheath level with the end of the red crutch tube. • Trim the ‘cheese-grater’ strip to length and form it into a circular shape, so that it fits neatly and securely around the copper mesh. • 4.5.6 Fit the metallic cage to the joint, overlapping the cage fingers fully on to the ‘cheese-grater’ area. PICAS Earth (SPN Only) Form the short ‘cheese-grater’ strip into a circular shape, so that it fits around the aluminium sheath. U N C • O N TR O LL ED • Section 4 I Page 70 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 127. Install the ‘cheese-grater’ strip next to the red crutch sealing sleeve, ensuring that it bridges two adjacent peaks on the corrugated aluminium sheath. • Fit the metallic cage to the joint, overlapping the cage fingers onto the ‘cheese-grater’ area. 4.5.7 O LL ED • 13kA PILC Earth Kit – Steel Wire Armoured Cables (LPN and SPN Areas Only) Lift and clean the armours as described in Section 3.5.3. • Abrade and degrease the lead sheath between the lifted steel wire armours and the red crutch sealing tube. Make two Chinagraph pencil marks on the lead sheath, at 60mm and 100mm from the outer sheath cut. U N C O N TR • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 4 I Page 71
  • 128. Apply two half-lap layers of red sealant tape for 40mm between the two Chinagraph pencil marks. • Position the black sealing sleeve provided in the kit against the raised armours and shrink into place keeping the sleeve as close to the armours as possible. U N C O N TR O LL ED • Section 4 I Page 72 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 129. Apply two layers of red sealant tape over the black sealing sleeve for 40mm, starting at the end nearest to the lead sheath and working towards the armours. • Fold a length of copper mesh in half over its full length, so that its width is reduced by half, and wrap it around the lead at the end of the black sealing sleeve. Remove the backing paper from one piece of red sealant tape and stick it down the centre of the tinned copper earth strip with fingers each end. This is an important moisture seal and shall not be left out. U N C • O N TR O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 4 I Page 73
  • 130. Wrap the earth clip around the cable so that the red sealant strip is located over the red sealant on the sealing sleeve, and that the fingers of the earth strip are positioned over the copper mesh. Secure in place with a double width copper wire binder. ‘Dress down’ the ends of the clip to suit the size of the lead sheath. • Fold a length of copper mesh in half over its full length, so that the width is reduced by half, and wrap it around the fingers on the lead sheath end of the clip. Form the short length of ‘cheese-grater’ strip in the kit into a circle and fit over the copper woven mesh at the lead sheath end. U N C • O N TR O LL ED • Section 4 I Page 74 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 131. Fold another length of copper mesh in half over its full length, so that the width is reduced by half, and wrap it around the fingers on the armour end of the clip. • Now lay the armours down over the copper mesh and secure them with the worm drive clip supplied in the kit. N C O N TR O LL ED • If the wire binder becomes loose, cut it with insulated side cutters and remove. U • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 4 I Page 75
  • 132. Wrap two lapped layers of red sealant tape around the exposed earth clip between the armours and the ‘cheese-grater’. 4.5.8 O LL ED • 13kA PILC Earth Kit – Steel Tape Armoured Cables (LPN and SPN Areas Only) Prepare and clean the armours as described in Section 3.5.4. • Abrade and degrease the lead sheath between the armours and the red sealing sleeve in the crutch. Make a Chinagraph pencil mark on the lead sheath 50mm from the armour cut. Wrap two layers of red sealant tape around the lead sheath, starting at the armour cut up to the Chinagraph pencil mark. U N C • O N TR • Section 4 I Page 76 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 133. Fold two lengths of copper mesh in half over their full length. Wrap one length around the lead sheath 10mm from the (red) mastic tape and the other around the armours 10mm back from the edge. • Lay a red sealant tape strip down the centre of the tinned copper strip with fingers at each end. This is an important moisture seal and shall not be left out. With the strip face down, slightly raise the fingers on the edge of the clip which will be fitted to the steel tape armour. Wrap the strip around the cable so that the red sealant strip is located over the red sealant strip on the lead sheath. Position the fingers of the strip over the copper mesh on the lead sheath and the copper mesh on the armours. U N C • O N TR O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 4 I Page 77
  • 134. Dress down the earth strip fingers onto the copper mesh, over the lead sheath and armours area at the other end. Secure the earth strip in this position with a double binder around the centre. • Fold the remaining copper mesh roll in half lengthways. Wrap it around the end of the earth strip over the lead sheath end. Form the ‘cheese-grater’ strip into a circle and fit it over the mesh. Fasten the other ends of the fingers onto the armours using a worm drive clip. U N C • O N TR O LL ED • Section 4 I Page 78 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 135. Apply two one-third-lap layers of red sealant tape on the earth strip between the ‘cheesegrater’ and the worm drive clip at the armour end. • Fit the metallic cage to the joint, overlapping the cage fingers fully onto the ‘cheese-grater’ area. 4.5.9 Installing Aluminium Cages O LL ED • Install the ‘cheese-grater’ connection strips as described in Sections 4.5.4 to 4.5.8 before fitting the aluminium cage. • Position the aluminium earth cage around the joint, spacing the fingers equally over the ‘cheese-grater’ areas. U N C O N TR • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 4 I Page 79
  • 136. Apply a temporary tape binder around the cage to secure it in position and clamp the earth cage securely at each end, using the worm drive clips provided in the kit. U N C O N TR O LL ED • Section 4 I Page 80 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 137. Remove the temporary PVC tape binder. • On pot ends, bend the last fingers of the aluminium cage into the centre, so they overlap and close in the end of the joint. • On branch joints, separate the cage fingers equally between the two cable entries and shape them such that they lie flat on top of the ‘cheese-grater’ areas. O LL ED • 4.5.10 Connection of Earth Screens on Indoor and Outdoor Terminations Prepare the termination as described in Section 4.1.6. • Ensure that the mechanical connector has been installed in the cable end box or on to the crucifix. Form the outdoor termination. U N C O N TR • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 4 I Page 81
  • 138. Form the copper wire screens from each cable into a conductor, using PVC tape to keep the wires in a bunch. • Cut each bunch of copper wires to the correct length using the installed mechanical connector as a guide. Install all three bunches into the connector, followed by the brass pressure plate. U N C • O N TR O LL ED • Section 4 I Page 82 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 139. Install the brass bridge piece and tighten until the brass head shears off. 4.6 Fitting Plastic Joint boxes O LL ED • Trim off the ends of the joint box supplied with the kit, so that it fits over the cables entering the box. • Offer the joint box up to the joint and mark the stand-off positions on the aluminium cage with a Chinagraph pencil. Remove the backing from the rubber patches supplied in the kit and apply centrally, sticky side out, over the Chinagraph pencil marks on the aluminium cage. Ensure that any mechanical earth connectors are pulled tight into the mesh. U N C • O N TR • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 4 I Page 83
  • 140. Place the two halves of the joint shell over the joint and clip the two halves together with the metal clips or plastic slider provided. Ensure enough clips are used to stop the resin leaking out when it is poured in. Tape the joint box to the incoming cable with PVC or another suitable tape. If necessary, pack the ends of the joint shell out with the clay pack supplied in some kits. U N C • O N TR O LL ED • Section 4 I Page 84 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 141. For extra security, run a length of PVC tape down the seams of the joint shell and fit the plastic lid. 4.7 O LL ED • Mixing and Installing Polyurethane Resin Fill all 11kV joints with three-part polyurethane resin. Wear the correct Personal Protective Equipment at all times and do not mix the resin in a confined space. • Check the label on the bucket to ensure that the resin has not passed it use by date. Empty the contents of the bucket and check for any damage to the packaging. U N C • O N TR • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 4 I Page 85
  • 142. Pick up the foil bag containing the resin and hardener. Apply pressure to the large resin pouch so that the resin breaks the seal between the two sections and mixes with the hardener. • Mix the contents of the bag by kneading the foil bag for at least two minutes. Carefully cut one of the corners off the foil bag and pour all the contents into the supplied plastic bucket. U N C • O N TR O LL ED • Section 4 I Page 86 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011
  • 143. Pour approximately half of the sand supplied in the plastic bag into the bucket and stir until it is thoroughly mixed into the resin. • Pour the rest of the sand into the bucket and mix until no raw sand is visible and the resin has no lumps in it. Pour the mixed resin into the joint shell. U N C • O N TR O LL ED • UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011 Section 4 I Page 87
  • 144. 4.8 Mixing and Installing Guruflex Guruflex is a cold pour replacement for bitumen compound. Use it in switchgear end boxes where the clearances are too small to allow the use of cold applied or heatshrink bushing boots. • Guruflex comes in two metal tins; the larger one is the resin and the smaller one the hardener. • Before filling the cable box, the inner metallic surface shall be coated with a thin film of petroleum jelly. This makes it easier to remove the Guruflex, if and when it needs to be removed. C O N TR O LL ED • Open both tins and pour the small tin into the large one. • Mix the two liquids together until they are a uniform light blue colour with no streaks of dark blue. N • Pour the mixture into the box to be filled and leave to cure. • U • The box can be energised as soon as it is sealed. 4.9 Removing Guruflex • Remove the cable box covers. • Cut the Guruflex out with a sharp knife, taking care not to damage the termination inside. • The Guruflex should pull away easily from the metallic surfaces that have been previously coated with petroleum jelly. Section 4 I Page 88 UK POWER NETWORKS 11KV CABLE JOINTING MANUAL I 2011