4. DETAILED METHODOLOGY FOR CONSTRUCTION AT SITE:
1. Soil Testing
2. Foundation and Structural
Drawing Preparation
3. Test Piling
4. Piling & Foundation
5. Retaining wall construction
6. Erection of Columns & Platforms
7. Erection of Robotic Units
8. Roofing & Cladding Works
9. Installation of Fire Fighting
System & MEP works
10. Completion of other civil
works
11. Testing of the Robotic System
12. Commissioning.
5. ADVANCED ENERGY EFFICIENCY:
• All the major motors are IE3 Premium class.
• Variable frequency drives (VFD) using advanced energy efficiency modes.
• System uses power Regeneration for better Energy efficiency.
• Counter weight system is used to increase efficiency.
• Power consumption is 0.4 units parking and retrieval considered together.
• Standby mode is activated for energy efficiency whenever the system is idle for more than
10 minutes.
• No manpower needed for parking operation as the system is fully automated.
• Compact space utilization for parking resulting in more green area.
6. • CONTINGENCY PLAN:
• All the lifting steel ropes are backed-up with lifting chain.
• All the major gear motors are backed-up with another motor.
• All the major drives are backed-up with another drive.
• All the sensors come with built-in Triple modular redundancy.
• In case of any emergency situations, all cars could be evacuated
under 2 Hours.