HDPE PERFORATION GUIDE 
                                                                     PERFORATIONS PER AASHTO M252/M294 

PERFORATIONS – GENERAL 
Lane’s  perforated  pipe  offerings  follow  the  AASHTO  classification  system  and  conform  to  AASHTO 
requirements for size, spacing and placement of the perforations. It is not the intent of this guide to cite 
AASHTO  requirements  but  to  describe  Lane’s  perforated  pipe  offerings  with  the  added  note  that 
AASHTO specifications are met. 
 
CLASS 1 PERFORATIONS (PARTIALLY PERFORATED PIPE) 
Class 1 perforations are for pipe intended to be used for subsurface drainage or combination storm and 
underdrain.  As such,  the  pipe  maintains an unperforated segment above the invert to serve as a flow 
channel.  Perforations  are  circular  and  arranged  in  rows  parallel  to  the  axis  of  the  pipe  with  one 
perforation  in  each  row  for  each  corrugation.  Rows  of  perforations  are  arranged  in  two  equal  groups 
placed symmetrically on each side of a lower unperforated segment corresponding  to the  flow line of 
the pipe. 
 
CLASS 2 PERFORATIONS (STANDARD OR FULLY PERFORATED PIPE) 
Class 2 perforations are for pipe intended to be used for subsurface drainage only. Perforations may be 
circular or slotted and are uniformly spaced along the length and circumference of the pipe. Perforated 
pipe shall conform to the requirements for Class 2 unless noted otherwise. 
 
                                                                                                                   
 
 
AASHTO M252 CLASS 2 SLOTTED PERFORATIONS FOR SINGLE‐WALL (CP) AND DOUBLE‐WALL (SP) PIPE
 
 
         Type CP Class 2 Slotted Perforations                        Type SP Class 2 Slotted Perforations 
    D      P        n         l        w       WIA            D        P        n          l       w         WIA 
    4    0.645      4       0.783  0.069  4.02                 6     0.773      4       0.769  0.055         2.63 
    6    0.824      4       0.769  0.055  2.46                 8     0.975      4       0.759  0.050         1.87 
    8     1.02      4       0.759  0.050  1.79                10     1.525      4       0.779  0.054         1.32 
                                                           
D = Nominal pipe diameter (in) 
P = Period of Corrugations (in) 
n = number of slots per corrugation valley 
l = average length of slotted perforation (in) 
w = average width of slotted perforation (in) 
WIA = Water inlet area (in2/ft) 

Summary description 
Class  2  slotted  perforations  includes  a 
total of four equally spaced slots in each 
corrugation  valley  as  shown  by  the 
black centerlines at right. 




                                                Perforation Guide 
                                                      PG‐1 
 
HDPE PERFORATION GUIDE 
                                                                    PERFORATIONS PER AASHTO M252/M294 

 
 
        AASHTO M294 CLASS 2 SLOTTED PERFORATIONS FOR DOUBLE‐WALL (SP) PIPE 
 
     
          Type SP Class 2 Perforations                                
                        
          D        d        L      WIA 
          12    0.3125  1.94       2.85 
          15    0.3125  2.62       2.11 
          18    0.3125  2.96       1.87 

        D = Nominal pipe diameter (in) 
        d = diameter of circular perforation (in) 
        L = Longitudinal spacing between holes (in) 
        WIA = Water inlet area (in2/ft) 

        Summary description 
        Class 2 perforations for 12", 15" and 18" 
        HDPE pipes include a total of six equally 
        spaced  5/16"  diameter  holes  in  each 
        corrugation valley as shown at right. 
     


     
          Type SP Class 2 Perforations 
          D        d        L      WIA 
          24    0.3750  3.95       2.68 
          30    0.3750  4.01       2.64 
          36    0.3750  4.06       2.61 
          42    0.3750  5.38       1.97 
          48    0.3750  5.37       1.97 

        D = Nominal pipe diameter (in) 
        d = diameter of circular perforation (in) 
        L = Longitudinal spacing between holes (in) 
        WIA = Water inlet area (in2/ft) 

        Summary description 
        Class  2  perforations  for  24",  30",  36", 
        42"  and  48"  HDPE  pipes  include  a  total 
        of  eight  equally  spaced  3/8"  diameter 
        holes  in  each  corrugation  valley  as 
        shown at right. 
     
                                               Perforation Guide 
                                                     PG‐2 
 
HDPE PERFORATION GUIDE 
                                                            PERFORATIONS PER AASHTO M252/M294 

    AASHTO M252 CLASS 1 PERFORATIONS FOR DOUBLE‐WALL (SP) PIPE 

       
                AASHTO M252 Type SP Class 1 Perforations (6" through 10")  
          D     1    2      L     Lmin  H      Hmax       s1/2       d      S  WIA 
          6     48    70    4.46    3.74 1.97    2.76       1.15    0.1875  0.75  1.77 
          8     48    70    5.95    5.12 2.63    3.70       1.54    0.1875  1.00  1.33 
          10    48    70    7.43    6.30 3.29    4.72       1.92    0.3125  1.75  2.10 

          D = Nominal diameter (in) 
          1 ≥ 37.5°, 2 ≤ 85° (AASHTO maximum and minimum angles) 
          s = arc length between holes (in) 
          d = diameter of circular perforation (in) 
          S = longitudinal spacing between perforations (in) 
          WIA = Water inlet area (in2/ft) 

          Summary description 
          Class 1 perforations for 6", 8" and 10" HDPE pipes include a total of four 
          holes in each corrugation valley as shown below. Perforations for the 6" 
          and 8" pipes shall be 3/16" diameter, while the perforations for the 10" 
          pipe shall be 5/16" diameter. 




                                       Perforation Guide 
                                             PG‐3 
 
HDPE PERFORATION GUIDE 
                                                               PERFORATIONS PER AASHTO M252/M294 


               AASHTO M294 CLASS 1 PERFORATIONS FOR DOUBLE‐WALL (SP) PIPE 
     
                    AASHTO M294 Type SP Class 1 Perforations (12" through 18")  
        D     1    2    3     L      Lmin    H      Hmax     s1/2     s2/3    d     S    WIA
        12    47    62    78  8.78  7.56  4.75         5.43     1.57 1.68 0.38  1.94  4.10
        15    47    62    78  10.97  9.45  5.94        6.77     1.96 2.09 0.38  2.62  3.04
        18    47    62    78  13.16  11.34 7.13        8.15     2.36 2.51 0.38  2.96  2.69

        D = Nominal diameter (in) 
        1 ≥ 40°, 3 ≤ 85° (AASHTO maximum and minimum angles) 
        s = arc length between holes (in), must be ≥ 1 inch 
        d = diameter of circular perforation (in) 
        S = longitudinal spacing between perforations (in) 
        WIA = Water inlet area (in2/ft) 

                                   Summary description 
        Class 1 perforations for 12 through 18‐in HDPE pipes include a total of six 
        ⅜" diameter holes in each corrugation valley as shown below. 




                                          Perforation Guide 
                                                PG‐4 
 
HDPE PERFORATION GUIDE 
                                                                           PERFORATIONS PER AASHTO M252/M294 


                        AASHTO M294 CLASS 1 PERFORATIONS FOR DOUBLE‐WALL (SP) PIPE 
     
                            AASHTO M294 Type SP Class 1 Perforations (24" through 48") 
        D     1     2    3  4    L     Lmin     H      Hmax  s1/2  s2/3  s3/4       d           S    WIA
        24    46     57    68  79  17.26  15.36 9.71  11.04 2.30 2.30 2.30  0.375                 3.95   2.68
        30    46     57    68  79  21.58  19.20 12.14 13.80 2.88 2.88 2.88  0.375                 4.01   2.64
        36    46     57    68  79  25.90  23.04 14.57 16.56 3.46 3.46 3.46  0.375                 4.06   2.61
        42    46     57    68  79  30.21  26.88 16.99 19.32 4.03 4.03 4.03  0.375                 5.38   1.97
        48    46     57    68  79  34.53  30.72 19.42 22.08 4.61 4.61 4.61  0.375                 5.37   1.97

        Summary description 
        Class  1  perforations  for  24  through  48‐in  HDPE  pipes  include  a  total  of 
        eight ⅜" diameter holes in each corrugation valley as shown below. 

        D = Nominal diameter (in) 
        1 ≥ 40°, 4 ≤ 85° (AASHTO maximum and minimum angles) 
        s = arc length between holes (in), must be ≥ 1 inch 
        d = diameter of circular perforation (in) 
        S = longitudinal spacing between perforations (in) 
        WIA = Water inlet area (in2/ft) 




                                                      Perforation Guide 
                                                            PG‐5 
 

More Related Content

What's hot

Cap6 adutoras
Cap6 adutorasCap6 adutoras
Cap6 adutoras
dcaldeira
 
Water distribution system design report
Water distribution system design reportWater distribution system design report
Water distribution system design report
Muhammad Magsi
 
Hot Tapping Requirement
Hot Tapping RequirementHot Tapping Requirement
Hot Tapping Requirement
wael el ariny
 
Design of overhead RCC rectangular water tank
Design of overhead RCC rectangular water tankDesign of overhead RCC rectangular water tank
Design of overhead RCC rectangular water tank
Shoaib Wani
 
Design of Anchor Blister
Design of Anchor Blister Design of Anchor Blister
Design of Anchor Blister
shahriermahmud13
 
Modelling Building Frame with STAAD.Pro & ETABS - Rahul Leslie
Modelling Building Frame with STAAD.Pro & ETABS - Rahul LeslieModelling Building Frame with STAAD.Pro & ETABS - Rahul Leslie
Modelling Building Frame with STAAD.Pro & ETABS - Rahul Leslie
Rahul Leslie
 
09-Strength of Gusset Plate (Steel Structural Design & Prof. Shehab Mourad)
09-Strength of Gusset Plate (Steel Structural Design & Prof. Shehab Mourad)09-Strength of Gusset Plate (Steel Structural Design & Prof. Shehab Mourad)
09-Strength of Gusset Plate (Steel Structural Design & Prof. Shehab Mourad)
Hossam Shafiq II
 
BBS Preparation
BBS PreparationBBS Preparation
BBS Preparation
Abhay Gharpure
 
Aula 18 orifícios - parte ii
Aula 18   orifícios - parte iiAula 18   orifícios - parte ii
Aula 18 orifícios - parte ii
Thiago Pantarotto
 
Bolted connections
Bolted connectionsBolted connections
Bolted connections
Dr.Subramanian Narayanan
 
Lec.5 strength design method rectangular sections 1
Lec.5   strength design method rectangular sections  1Lec.5   strength design method rectangular sections  1
Lec.5 strength design method rectangular sections 1
Muthanna Abbu
 
Tigre -pex
Tigre  -pexTigre  -pex
Tigre -pex
Andrei Santos
 
Ch 7 design of rcc footing
Ch 7 design of rcc footingCh 7 design of rcc footing
Ch 7 design of rcc footing
MD.MAHBUB UL ALAM
 
Design of floor slab
Design of floor slabDesign of floor slab
Design of floor slab
sathananthankartheep
 
Six storey residential building design
Six storey residential building designSix storey residential building design
Six storey residential building design
Presidency Univesity,Bnagladesh
 
Steel stacks guide
Steel stacks guideSteel stacks guide
Steel stacks guide
Khaled Eid
 
Sewerage design
Sewerage designSewerage design
Sewerage design
Sharifah Ain
 
Water tank 1
Water tank 1Water tank 1
Water tank 1
SachinThakre10
 

What's hot (20)

Cap6 adutoras
Cap6 adutorasCap6 adutoras
Cap6 adutoras
 
Water distribution system design report
Water distribution system design reportWater distribution system design report
Water distribution system design report
 
Hot Tapping Requirement
Hot Tapping RequirementHot Tapping Requirement
Hot Tapping Requirement
 
Design of overhead RCC rectangular water tank
Design of overhead RCC rectangular water tankDesign of overhead RCC rectangular water tank
Design of overhead RCC rectangular water tank
 
Design of Anchor Blister
Design of Anchor Blister Design of Anchor Blister
Design of Anchor Blister
 
Modelling Building Frame with STAAD.Pro & ETABS - Rahul Leslie
Modelling Building Frame with STAAD.Pro & ETABS - Rahul LeslieModelling Building Frame with STAAD.Pro & ETABS - Rahul Leslie
Modelling Building Frame with STAAD.Pro & ETABS - Rahul Leslie
 
water tank
water tankwater tank
water tank
 
09-Strength of Gusset Plate (Steel Structural Design & Prof. Shehab Mourad)
09-Strength of Gusset Plate (Steel Structural Design & Prof. Shehab Mourad)09-Strength of Gusset Plate (Steel Structural Design & Prof. Shehab Mourad)
09-Strength of Gusset Plate (Steel Structural Design & Prof. Shehab Mourad)
 
BBS Preparation
BBS PreparationBBS Preparation
BBS Preparation
 
Aula 18 orifícios - parte ii
Aula 18   orifícios - parte iiAula 18   orifícios - parte ii
Aula 18 orifícios - parte ii
 
Bolted connections
Bolted connectionsBolted connections
Bolted connections
 
Drill pipe specifications
Drill pipe specificationsDrill pipe specifications
Drill pipe specifications
 
Lec.5 strength design method rectangular sections 1
Lec.5   strength design method rectangular sections  1Lec.5   strength design method rectangular sections  1
Lec.5 strength design method rectangular sections 1
 
Tigre -pex
Tigre  -pexTigre  -pex
Tigre -pex
 
Ch 7 design of rcc footing
Ch 7 design of rcc footingCh 7 design of rcc footing
Ch 7 design of rcc footing
 
Design of floor slab
Design of floor slabDesign of floor slab
Design of floor slab
 
Six storey residential building design
Six storey residential building designSix storey residential building design
Six storey residential building design
 
Steel stacks guide
Steel stacks guideSteel stacks guide
Steel stacks guide
 
Sewerage design
Sewerage designSewerage design
Sewerage design
 
Water tank 1
Water tank 1Water tank 1
Water tank 1
 

Similar to Hdpe perforation guide

Pump Hose Kit - Rental Series Linecard
Pump Hose Kit - Rental Series LinecardPump Hose Kit - Rental Series Linecard
Pump Hose Kit - Rental Series Linecard
JGB Enterprises, Inc.
 
Jyoti Industries, Mumbai, Pipes & Pipe Fittings
Jyoti Industries, Mumbai, Pipes & Pipe FittingsJyoti Industries, Mumbai, Pipes & Pipe Fittings
Jyoti Industries, Mumbai, Pipes & Pipe Fittings
IndiaMART InterMESH Limited
 
Hawke 501 421
Hawke 501 421Hawke 501 421
Hawke 501 421
AKBAR TRADING
 
Lecture Riveted Joints by molvie imran.pptx
Lecture  Riveted Joints by molvie imran.pptxLecture  Riveted Joints by molvie imran.pptx
Lecture Riveted Joints by molvie imran.pptx
BDULQAYYUM
 
Hawke 501/414 Hazardous Area Cable Glands
Hawke 501/414 Hazardous Area Cable GlandsHawke 501/414 Hazardous Area Cable Glands
Hawke 501/414 Hazardous Area Cable Glands
Thorne & Derrick International
 
Crimping-Booklet-March-2020.pdf
Crimping-Booklet-March-2020.pdfCrimping-Booklet-March-2020.pdf
Crimping-Booklet-March-2020.pdf
tepumsosa1
 
Hydraulic Fittings to Din 2353
Hydraulic Fittings to Din 2353Hydraulic Fittings to Din 2353
Hydraulic Fittings to Din 2353
Panarc Techno-metier
 
Jgb industrial cleaning catalog
Jgb industrial cleaning catalogJgb industrial cleaning catalog
Jgb industrial cleaning catalog
JGB Enterprises, Inc.
 
Vacuum Switch MN Series
Vacuum Switch MN SeriesVacuum Switch MN Series
Vacuum Switch MN Series
NK Instruments Pvt. Ltd.
 
casing-design for drilling engineering-2005.ppt
casing-design for drilling engineering-2005.pptcasing-design for drilling engineering-2005.ppt
casing-design for drilling engineering-2005.ppt
mohammedsaaed1
 
09 mirror shine stainless steel
09 mirror shine stainless steel09 mirror shine stainless steel
09 mirror shine stainless steel
Arteferro Botnic
 
604.pptx
604.pptx604.pptx
604.pptx
sn2mondal
 
Guia gestra
Guia gestraGuia gestra
|AKBAR TRADING EST. SAUDI ARABIA|HAWKE 501 453 ATEX – IECEx Safety Exe / Dust...
|AKBAR TRADING EST. SAUDI ARABIA|HAWKE 501 453 ATEX – IECEx Safety Exe / Dust...|AKBAR TRADING EST. SAUDI ARABIA|HAWKE 501 453 ATEX – IECEx Safety Exe / Dust...
|AKBAR TRADING EST. SAUDI ARABIA|HAWKE 501 453 ATEX – IECEx Safety Exe / Dust...
AKBAR TRADING
 
Tangential entry hollow cone nozzles
Tangential entry hollow cone nozzlesTangential entry hollow cone nozzles
Tangential entry hollow cone nozzles
Abhi Industrial Corporation
 
Eg34799802
Eg34799802Eg34799802
Eg34799802
IJERA Editor
 
Hawke 501/423 Hazardous Area Cable Gland
Hawke 501/423 Hazardous Area Cable GlandHawke 501/423 Hazardous Area Cable Gland
Hawke 501/423 Hazardous Area Cable Gland
Thorne & Derrick International
 
Raccordi per alte pressioni - Fitok serie 20
Raccordi per alte pressioni - Fitok serie 20Raccordi per alte pressioni - Fitok serie 20
Raccordi per alte pressioni - Fitok serie 20
GIGA TECH SRL - Distribuzione componenti per impianti di processo
 
Hawke 501/453/Universal Hazardous Area Cable Gland
Hawke 501/453/Universal Hazardous Area Cable GlandHawke 501/453/Universal Hazardous Area Cable Gland
Hawke 501/453/Universal Hazardous Area Cable Gland
Thorne & Derrick International
 
Catalogo dorot
Catalogo dorotCatalogo dorot
Catalogo dorot
Carlos Rovello
 

Similar to Hdpe perforation guide (20)

Pump Hose Kit - Rental Series Linecard
Pump Hose Kit - Rental Series LinecardPump Hose Kit - Rental Series Linecard
Pump Hose Kit - Rental Series Linecard
 
Jyoti Industries, Mumbai, Pipes & Pipe Fittings
Jyoti Industries, Mumbai, Pipes & Pipe FittingsJyoti Industries, Mumbai, Pipes & Pipe Fittings
Jyoti Industries, Mumbai, Pipes & Pipe Fittings
 
Hawke 501 421
Hawke 501 421Hawke 501 421
Hawke 501 421
 
Lecture Riveted Joints by molvie imran.pptx
Lecture  Riveted Joints by molvie imran.pptxLecture  Riveted Joints by molvie imran.pptx
Lecture Riveted Joints by molvie imran.pptx
 
Hawke 501/414 Hazardous Area Cable Glands
Hawke 501/414 Hazardous Area Cable GlandsHawke 501/414 Hazardous Area Cable Glands
Hawke 501/414 Hazardous Area Cable Glands
 
Crimping-Booklet-March-2020.pdf
Crimping-Booklet-March-2020.pdfCrimping-Booklet-March-2020.pdf
Crimping-Booklet-March-2020.pdf
 
Hydraulic Fittings to Din 2353
Hydraulic Fittings to Din 2353Hydraulic Fittings to Din 2353
Hydraulic Fittings to Din 2353
 
Jgb industrial cleaning catalog
Jgb industrial cleaning catalogJgb industrial cleaning catalog
Jgb industrial cleaning catalog
 
Vacuum Switch MN Series
Vacuum Switch MN SeriesVacuum Switch MN Series
Vacuum Switch MN Series
 
casing-design for drilling engineering-2005.ppt
casing-design for drilling engineering-2005.pptcasing-design for drilling engineering-2005.ppt
casing-design for drilling engineering-2005.ppt
 
09 mirror shine stainless steel
09 mirror shine stainless steel09 mirror shine stainless steel
09 mirror shine stainless steel
 
604.pptx
604.pptx604.pptx
604.pptx
 
Guia gestra
Guia gestraGuia gestra
Guia gestra
 
|AKBAR TRADING EST. SAUDI ARABIA|HAWKE 501 453 ATEX – IECEx Safety Exe / Dust...
|AKBAR TRADING EST. SAUDI ARABIA|HAWKE 501 453 ATEX – IECEx Safety Exe / Dust...|AKBAR TRADING EST. SAUDI ARABIA|HAWKE 501 453 ATEX – IECEx Safety Exe / Dust...
|AKBAR TRADING EST. SAUDI ARABIA|HAWKE 501 453 ATEX – IECEx Safety Exe / Dust...
 
Tangential entry hollow cone nozzles
Tangential entry hollow cone nozzlesTangential entry hollow cone nozzles
Tangential entry hollow cone nozzles
 
Eg34799802
Eg34799802Eg34799802
Eg34799802
 
Hawke 501/423 Hazardous Area Cable Gland
Hawke 501/423 Hazardous Area Cable GlandHawke 501/423 Hazardous Area Cable Gland
Hawke 501/423 Hazardous Area Cable Gland
 
Raccordi per alte pressioni - Fitok serie 20
Raccordi per alte pressioni - Fitok serie 20Raccordi per alte pressioni - Fitok serie 20
Raccordi per alte pressioni - Fitok serie 20
 
Hawke 501/453/Universal Hazardous Area Cable Gland
Hawke 501/453/Universal Hazardous Area Cable GlandHawke 501/453/Universal Hazardous Area Cable Gland
Hawke 501/453/Universal Hazardous Area Cable Gland
 
Catalogo dorot
Catalogo dorotCatalogo dorot
Catalogo dorot
 

More from TADSA1

CATÁLOGO DE PRODUCTOS TADSA
CATÁLOGO DE PRODUCTOS TADSACATÁLOGO DE PRODUCTOS TADSA
CATÁLOGO DE PRODUCTOS TADSATADSA1
 
FICHA TÉCNICA LANE
FICHA TÉCNICA LANEFICHA TÉCNICA LANE
FICHA TÉCNICA LANETADSA1
 
GUÍA DE PERFORACIÓN
GUÍA DE PERFORACIÓNGUÍA DE PERFORACIÓN
GUÍA DE PERFORACIÓNTADSA1
 
HDPE ROLLOS DE TUBERÍA
HDPE ROLLOS DE TUBERÍAHDPE ROLLOS DE TUBERÍA
HDPE ROLLOS DE TUBERÍATADSA1
 
Manual de instalacion
Manual de instalacionManual de instalacion
Manual de instalacionTADSA1
 
Hdpe coil-pipe-brochure2
Hdpe coil-pipe-brochure2Hdpe coil-pipe-brochure2
Hdpe coil-pipe-brochure2TADSA1
 
Hdpe installation practice
Hdpe installation practiceHdpe installation practice
Hdpe installation practiceTADSA1
 
Hdpe installation practice
Hdpe installation practiceHdpe installation practice
Hdpe installation practiceTADSA1
 
Ficha tecnica lane
Ficha tecnica laneFicha tecnica lane
Ficha tecnica laneTADSA1
 

More from TADSA1 (9)

CATÁLOGO DE PRODUCTOS TADSA
CATÁLOGO DE PRODUCTOS TADSACATÁLOGO DE PRODUCTOS TADSA
CATÁLOGO DE PRODUCTOS TADSA
 
FICHA TÉCNICA LANE
FICHA TÉCNICA LANEFICHA TÉCNICA LANE
FICHA TÉCNICA LANE
 
GUÍA DE PERFORACIÓN
GUÍA DE PERFORACIÓNGUÍA DE PERFORACIÓN
GUÍA DE PERFORACIÓN
 
HDPE ROLLOS DE TUBERÍA
HDPE ROLLOS DE TUBERÍAHDPE ROLLOS DE TUBERÍA
HDPE ROLLOS DE TUBERÍA
 
Manual de instalacion
Manual de instalacionManual de instalacion
Manual de instalacion
 
Hdpe coil-pipe-brochure2
Hdpe coil-pipe-brochure2Hdpe coil-pipe-brochure2
Hdpe coil-pipe-brochure2
 
Hdpe installation practice
Hdpe installation practiceHdpe installation practice
Hdpe installation practice
 
Hdpe installation practice
Hdpe installation practiceHdpe installation practice
Hdpe installation practice
 
Ficha tecnica lane
Ficha tecnica laneFicha tecnica lane
Ficha tecnica lane
 

Recently uploaded

Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !
KatiaHIMEUR1
 
Elevating Tactical DDD Patterns Through Object Calisthenics
Elevating Tactical DDD Patterns Through Object CalisthenicsElevating Tactical DDD Patterns Through Object Calisthenics
Elevating Tactical DDD Patterns Through Object Calisthenics
Dorra BARTAGUIZ
 
Free Complete Python - A step towards Data Science
Free Complete Python - A step towards Data ScienceFree Complete Python - A step towards Data Science
Free Complete Python - A step towards Data Science
RinaMondal9
 
Quantum Computing: Current Landscape and the Future Role of APIs
Quantum Computing: Current Landscape and the Future Role of APIsQuantum Computing: Current Landscape and the Future Role of APIs
Quantum Computing: Current Landscape and the Future Role of APIs
Vlad Stirbu
 
The Metaverse and AI: how can decision-makers harness the Metaverse for their...
The Metaverse and AI: how can decision-makers harness the Metaverse for their...The Metaverse and AI: how can decision-makers harness the Metaverse for their...
The Metaverse and AI: how can decision-makers harness the Metaverse for their...
Jen Stirrup
 
DevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA ConnectDevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA Connect
Kari Kakkonen
 
PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)
Ralf Eggert
 
RESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for studentsRESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for students
KAMESHS29
 
Climate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing DaysClimate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing Days
Kari Kakkonen
 
Leading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdfLeading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdf
OnBoard
 
Elizabeth Buie - Older adults: Are we really designing for our future selves?
Elizabeth Buie - Older adults: Are we really designing for our future selves?Elizabeth Buie - Older adults: Are we really designing for our future selves?
Elizabeth Buie - Older adults: Are we really designing for our future selves?
Nexer Digital
 
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdfFIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance
 
SAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdf
SAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdfSAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdf
SAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdf
Peter Spielvogel
 
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdfSmart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
91mobiles
 
GraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge GraphGraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge Graph
Guy Korland
 
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
Sri Ambati
 
Removing Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software FuzzingRemoving Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software Fuzzing
Aftab Hussain
 
By Design, not by Accident - Agile Venture Bolzano 2024
By Design, not by Accident - Agile Venture Bolzano 2024By Design, not by Accident - Agile Venture Bolzano 2024
By Design, not by Accident - Agile Venture Bolzano 2024
Pierluigi Pugliese
 
UiPath Community Day Dubai: AI at Work..
UiPath Community Day Dubai: AI at Work..UiPath Community Day Dubai: AI at Work..
UiPath Community Day Dubai: AI at Work..
UiPathCommunity
 
Secstrike : Reverse Engineering & Pwnable tools for CTF.pptx
Secstrike : Reverse Engineering & Pwnable tools for CTF.pptxSecstrike : Reverse Engineering & Pwnable tools for CTF.pptx
Secstrike : Reverse Engineering & Pwnable tools for CTF.pptx
nkrafacyberclub
 

Recently uploaded (20)

Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !
 
Elevating Tactical DDD Patterns Through Object Calisthenics
Elevating Tactical DDD Patterns Through Object CalisthenicsElevating Tactical DDD Patterns Through Object Calisthenics
Elevating Tactical DDD Patterns Through Object Calisthenics
 
Free Complete Python - A step towards Data Science
Free Complete Python - A step towards Data ScienceFree Complete Python - A step towards Data Science
Free Complete Python - A step towards Data Science
 
Quantum Computing: Current Landscape and the Future Role of APIs
Quantum Computing: Current Landscape and the Future Role of APIsQuantum Computing: Current Landscape and the Future Role of APIs
Quantum Computing: Current Landscape and the Future Role of APIs
 
The Metaverse and AI: how can decision-makers harness the Metaverse for their...
The Metaverse and AI: how can decision-makers harness the Metaverse for their...The Metaverse and AI: how can decision-makers harness the Metaverse for their...
The Metaverse and AI: how can decision-makers harness the Metaverse for their...
 
DevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA ConnectDevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA Connect
 
PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)
 
RESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for studentsRESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for students
 
Climate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing DaysClimate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing Days
 
Leading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdfLeading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdf
 
Elizabeth Buie - Older adults: Are we really designing for our future selves?
Elizabeth Buie - Older adults: Are we really designing for our future selves?Elizabeth Buie - Older adults: Are we really designing for our future selves?
Elizabeth Buie - Older adults: Are we really designing for our future selves?
 
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdfFIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
 
SAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdf
SAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdfSAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdf
SAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdf
 
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdfSmart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
 
GraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge GraphGraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge Graph
 
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
 
Removing Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software FuzzingRemoving Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software Fuzzing
 
By Design, not by Accident - Agile Venture Bolzano 2024
By Design, not by Accident - Agile Venture Bolzano 2024By Design, not by Accident - Agile Venture Bolzano 2024
By Design, not by Accident - Agile Venture Bolzano 2024
 
UiPath Community Day Dubai: AI at Work..
UiPath Community Day Dubai: AI at Work..UiPath Community Day Dubai: AI at Work..
UiPath Community Day Dubai: AI at Work..
 
Secstrike : Reverse Engineering & Pwnable tools for CTF.pptx
Secstrike : Reverse Engineering & Pwnable tools for CTF.pptxSecstrike : Reverse Engineering & Pwnable tools for CTF.pptx
Secstrike : Reverse Engineering & Pwnable tools for CTF.pptx
 

Hdpe perforation guide

  • 1. HDPE PERFORATION GUIDE  PERFORATIONS PER AASHTO M252/M294  PERFORATIONS – GENERAL  Lane’s  perforated  pipe  offerings  follow  the  AASHTO  classification  system  and  conform  to  AASHTO  requirements for size, spacing and placement of the perforations. It is not the intent of this guide to cite  AASHTO  requirements  but  to  describe  Lane’s  perforated  pipe  offerings  with  the  added  note  that  AASHTO specifications are met.    CLASS 1 PERFORATIONS (PARTIALLY PERFORATED PIPE)  Class 1 perforations are for pipe intended to be used for subsurface drainage or combination storm and  underdrain.  As such,  the  pipe  maintains an unperforated segment above the invert to serve as a flow  channel.  Perforations  are  circular  and  arranged  in  rows  parallel  to  the  axis  of  the  pipe  with  one  perforation  in  each  row  for  each  corrugation.  Rows  of  perforations  are  arranged  in  two  equal  groups  placed symmetrically on each side of a lower unperforated segment corresponding  to the  flow line of  the pipe.    CLASS 2 PERFORATIONS (STANDARD OR FULLY PERFORATED PIPE)  Class 2 perforations are for pipe intended to be used for subsurface drainage only. Perforations may be  circular or slotted and are uniformly spaced along the length and circumference of the pipe. Perforated  pipe shall conform to the requirements for Class 2 unless noted otherwise.          AASHTO M252 CLASS 2 SLOTTED PERFORATIONS FOR SINGLE‐WALL (CP) AND DOUBLE‐WALL (SP) PIPE     Type CP Class 2 Slotted Perforations  Type SP Class 2 Slotted Perforations  D  P  n  l  w  WIA  D  P  n  l  w  WIA  4  0.645  4  0.783  0.069  4.02  6  0.773  4  0.769  0.055  2.63  6  0.824  4  0.769  0.055  2.46  8  0.975  4  0.759  0.050  1.87  8  1.02  4  0.759  0.050  1.79  10  1.525  4  0.779  0.054  1.32    D = Nominal pipe diameter (in)  P = Period of Corrugations (in)  n = number of slots per corrugation valley  l = average length of slotted perforation (in)  w = average width of slotted perforation (in)  WIA = Water inlet area (in2/ft)  Summary description  Class  2  slotted  perforations  includes  a  total of four equally spaced slots in each  corrugation  valley  as  shown  by  the  black centerlines at right.  Perforation Guide  PG‐1   
  • 2. HDPE PERFORATION GUIDE  PERFORATIONS PER AASHTO M252/M294        AASHTO M294 CLASS 2 SLOTTED PERFORATIONS FOR DOUBLE‐WALL (SP) PIPE          Type SP Class 2 Perforations        D  d  L  WIA  12  0.3125  1.94  2.85  15  0.3125  2.62  2.11  18  0.3125  2.96  1.87  D = Nominal pipe diameter (in)  d = diameter of circular perforation (in)  L = Longitudinal spacing between holes (in)  WIA = Water inlet area (in2/ft)  Summary description  Class 2 perforations for 12", 15" and 18"  HDPE pipes include a total of six equally  spaced  5/16"  diameter  holes  in  each  corrugation valley as shown at right.      Type SP Class 2 Perforations  D  d  L  WIA  24  0.3750  3.95  2.68  30  0.3750  4.01  2.64  36  0.3750  4.06  2.61  42  0.3750  5.38  1.97  48  0.3750  5.37  1.97  D = Nominal pipe diameter (in)  d = diameter of circular perforation (in)  L = Longitudinal spacing between holes (in)  WIA = Water inlet area (in2/ft)  Summary description  Class  2  perforations  for  24",  30",  36",  42"  and  48"  HDPE  pipes  include  a  total  of  eight  equally  spaced  3/8"  diameter  holes  in  each  corrugation  valley  as  shown at right.    Perforation Guide  PG‐2   
  • 3. HDPE PERFORATION GUIDE  PERFORATIONS PER AASHTO M252/M294  AASHTO M252 CLASS 1 PERFORATIONS FOR DOUBLE‐WALL (SP) PIPE    AASHTO M252 Type SP Class 1 Perforations (6" through 10")   D  1  2  L  Lmin  H  Hmax  s1/2  d  S  WIA  6  48  70  4.46  3.74 1.97 2.76  1.15 0.1875  0.75  1.77  8  48  70  5.95  5.12 2.63 3.70  1.54 0.1875  1.00  1.33  10  48  70  7.43  6.30 3.29 4.72  1.92 0.3125  1.75  2.10  D = Nominal diameter (in)  1 ≥ 37.5°, 2 ≤ 85° (AASHTO maximum and minimum angles)  s = arc length between holes (in)  d = diameter of circular perforation (in)  S = longitudinal spacing between perforations (in)  WIA = Water inlet area (in2/ft)  Summary description  Class 1 perforations for 6", 8" and 10" HDPE pipes include a total of four  holes in each corrugation valley as shown below. Perforations for the 6"  and 8" pipes shall be 3/16" diameter, while the perforations for the 10"  pipe shall be 5/16" diameter.  Perforation Guide  PG‐3   
  • 4. HDPE PERFORATION GUIDE  PERFORATIONS PER AASHTO M252/M294  AASHTO M294 CLASS 1 PERFORATIONS FOR DOUBLE‐WALL (SP) PIPE    AASHTO M294 Type SP Class 1 Perforations (12" through 18")   D  1  2  3  L  Lmin  H  Hmax  s1/2  s2/3  d  S  WIA 12  47  62  78  8.78  7.56  4.75 5.43  1.57 1.68 0.38  1.94  4.10 15  47  62  78  10.97  9.45  5.94 6.77  1.96 2.09 0.38  2.62  3.04 18  47  62  78  13.16  11.34 7.13 8.15  2.36 2.51 0.38  2.96  2.69 D = Nominal diameter (in)  1 ≥ 40°, 3 ≤ 85° (AASHTO maximum and minimum angles)  s = arc length between holes (in), must be ≥ 1 inch  d = diameter of circular perforation (in)  S = longitudinal spacing between perforations (in)  WIA = Water inlet area (in2/ft)  Summary description  Class 1 perforations for 12 through 18‐in HDPE pipes include a total of six  ⅜" diameter holes in each corrugation valley as shown below.  Perforation Guide  PG‐4   
  • 5. HDPE PERFORATION GUIDE  PERFORATIONS PER AASHTO M252/M294  AASHTO M294 CLASS 1 PERFORATIONS FOR DOUBLE‐WALL (SP) PIPE    AASHTO M294 Type SP Class 1 Perforations (24" through 48")  D  1  2  3  4  L  Lmin  H  Hmax  s1/2  s2/3  s3/4  d  S  WIA 24  46  57  68  79  17.26  15.36 9.71  11.04 2.30 2.30 2.30  0.375  3.95 2.68 30  46  57  68  79  21.58  19.20 12.14 13.80 2.88 2.88 2.88  0.375  4.01 2.64 36  46  57  68  79  25.90  23.04 14.57 16.56 3.46 3.46 3.46  0.375  4.06 2.61 42  46  57  68  79  30.21  26.88 16.99 19.32 4.03 4.03 4.03  0.375  5.38 1.97 48  46  57  68  79  34.53  30.72 19.42 22.08 4.61 4.61 4.61  0.375  5.37 1.97 Summary description  Class  1  perforations  for  24  through  48‐in  HDPE  pipes  include  a  total  of  eight ⅜" diameter holes in each corrugation valley as shown below.  D = Nominal diameter (in)  1 ≥ 40°, 4 ≤ 85° (AASHTO maximum and minimum angles)  s = arc length between holes (in), must be ≥ 1 inch  d = diameter of circular perforation (in)  S = longitudinal spacing between perforations (in)  WIA = Water inlet area (in2/ft)  Perforation Guide  PG‐5