SlideShare a Scribd company logo
A PRESENTATION ON
SUPPLY CHAIN MANAGEMENT AT
WORLD CO. LTD.
Group Members –
 Ajit Kumar
 Saurav Kumar
 Prince Kumar
 Kumar Anand
 Shikha Patel
 Ankit Kumar
 Kajal Agarwal
By Group 3
2
COMPANY PROFILE
• Fashion Retailer
• Responds quickly to market signals
• Gross Margins high
• Inventory Turns high
• ROE/ ROA low
Q.1 WHAT IS SPARCS SYSTEM? EXAMINE
WORLD’S INVENTORY AND F INANCIAL
PERFORMANCE TO UNDERSTAND HOW
SUCCESSFUL THE SYSTEM WAS.
SPARCS SYSTEM
•S- Super, P- production, A- Apparel, R- Retail, CS-
Consumer satisfaction
•Introduced in January 1992, by Hidezo Terai, president
of World co. Ltd.
• Speedy and responsive supply chain
•Basis for promoting SPA (special store private label
apparel) business of world co. Ltd.
•Helps co. to monitor sales trends and focus on
consumer demand to increase efficiency
INVENTORY AND FINANCIAL
PERFORMANCE
Inventory
turns a year
Gross margin
Company As a whole 5 47%
SPA brand which uses SPARCS
system
8.5 47.8%
US Specialty retailers 2.6 41%
‘’The GAP’’ 5 45%
The Limited, Inc. 5.6 37%
Markdown
World Co. 11% of total sales/year
American Women’s Apparel Store 31.8% of total sales/year
Q.2 EXAMINE THE FEATURES OF FASHION
APPAREL RETAILING IN JAPAN. HOW CAN
A COMPANY USE ITS SUPPLY CHAIN TO
COMPETE IN THIS ENVIRONMENT?
• One of the largest and sophisticated clothing market
in the world
• Fashion and product quality enjoy high reputation
• Products have short life cycles as compared to US
• Highly competitive, locally and internationally
• Three distribution alternatives are available :
company owned stand-alone stores, shops in fashion
malls and shops within department stores
• Low inventory levels due to short life cycles and
uncertain demand
• Historical sales data to identify customer needs
• Point- of- sale data f rom retailers to analyze
purchasing trends
• Install systems for efficient and speedy sales ordering
Q 3. EXPLAIN HOW THE ORGANIZATION
STRUCTURE AT WORLD SUPPORTED ITS
SUPPLY CHAIN STRATEGY. EXPLAIN
HOW WORLD USED ITS INFORMATION
SYSTEMS AS KEY DRIVER TO IMPROVE
ITS SUPPLY CHAIN PERFORMANCE.
• Each of 40 brands targeted a distinct set of customer
•Company maintain separate merchandising groups for
each of the brand
•Learning is high from each other group success and
challenges
•Review of each of the co’s & competitor’s brand ,
marketplace at every 6 month
• Each group able to keep their brands fresh and exciting
•Each group empowered to take Merchandising decision
pertaining to its brand which make co quick responsive
• Young and talented employee
• More promotions opportunity to superior performance
ORGANIZATION STRUCTURE WORLD CO.
LTD.
INFORMATION SYSTEM FEATURES
• Real time information
- SKU (Item/Size/Color by store) on daily basis
- Shipment to the stores
- Shipment between stores
- Shipment back to the distribution center
-Accuracy close to 100% during the regular selling
season
•Semi annual sales at a few larger department stores
where items returned to the distribution center are
marked 50% off
•Advance fabric Inspection at the factory and
availability of CAD facilities.
•Proper communication between Merchandisers and
factory about actual need of the factory
• Database of past trends and requirements
•Electronically transfer of measurements and patterns
from headquarters to factories
•Computer system facilities at factories to make
changes in patterns
Q.4 IDENTIFY SALIENT ASPECTS OF
WORLD’S MANUFACTURING PROCESS
THAT HELPED WORLD ACHIEVE THE
DESIRED LEVEL OF RESPONSIVENESS IN
ITS SUPPLY CHAIN.
MANUFACTURING PROCESS
•Domestic manufacturing
•Short lead time
•Fast transportation
•Close collaboration of design & mfg
•2-3 wk replacement
•Flexibility of factories
•Small batch production
• Maintain relationships with manufacturers through
network of business affiliations
• Domestic factories were considered over overseas
factories as they could respond quickly
• Factory was informed in advance of fabric and about
inspection
• CAD was used to cut the fabric
• Maintained an inventory of undyed fabric for faster
response times
• Line workers were versatile
• Measurements & patterns were sent electronically
from headquarters to factories
• Factory maintained small batch sizes to undertake
several different operations
• Major new collections were introduced twice
annually
• To preserve brand focus, designers identified with
the target customer
• Appropriate mechanisms to link dyeing facilities,
suppliers, manufacturers and World in an integrated
supply chain
Q.5 EXPLAIN THE METHOD OF INITIAL
DEMAND FORECAST AND AGGREGATE
DEMAND FORECAST AT WORLD FOR SKU
LEVEL FORECASTS.
INITIAL DEMAND FORECAST
• Initial demand forecast for each product, before sales,
was derived in two stages:
- First process was to derive aggregate
demand forecasts for all SKUs together.
- Second process was to rank the SKUs according
to likely demand and combining these ranks with
aggregate forecasts to derive SKU level forecasts.
19
AGGREGATE DEMAND FORECAST
(HIGHER OF THE TWO)
Category Side
Distribution Side
Yen Nos
• Sales
•Growth Rates
•Seasonality
•Competition
•PESTE
• Brand wise
•Chain wise
Store wise
• Heavy/ medium/ light
• Knit/ woven
• Fabric
Category Sweaters 30 %
Q.6 EXPLAIN THE OBERMEYER METHOD
USED AT WORLD FOR SKU LEVEL
FORECASTS.
OBERMEYER METHOD FOR SKU LEVEL FORECAST
• To derive demand forecasts
• To derive associated standard deviation of demand
• “Obermeyer Vote Meetings” – held twice in a year,
where 20 store managers & assistants from all over
Japan participated.
• Autumn-Winter collections in June & August
• Spring-Summer lines in December & February
– Store personal were shown the planned product
and were asked to predict its popularity.
OBERMEYER METHOD
PARTICIPANTS
• Participants invited to World’s Tokyo office to view
coming line
• Participants almost all women : age 25-29
• Criteria considered while nominating assistant to take
part in vote meeting:
– Manner of dress,
– Fashion sense,
– Understanding of the target audience
• 20 women selected from 20 different stores
ASSESSMENT
• Women use to assess the garments on the basis of:
– Fit and style on themselves as well as peers
– Felt and observed the fabric, evaluated weight relative to
requirement of future
– Photographed one another wearing next styles
– Permitted to share their assessments
– Instructed not to discuss the scores given to SKU’s
• Women recorded their thoughts on the “ballots”
RANKING
• Based on fabric and colours between 1 to 7, and a
comment section
• Separate boxes for ranking style, fabric & colour
• Merchandisers could identify:
– Hot fabrics v/s Styles
– Colours independent of Style
• After ranking
– Weighted-mean score for each SKU
– Standard deviation score for each SKU
RESULTS
• Sorting of Product:
– Mean score
– Standard deviation
• Performing ABCD analysis:
– “A” SKUs : Top 10% of SKUs, comprise 40% of sales
– “B” SKUs : Next 20% of SKUs, comprise 30% of sales
– “C” SKUs : Next 30% of SKUs, comprise 20% of sales
– “D” SKUs : Last 40% of SKUs, comprise 10% of sales
Q.7 EXPLAIN THE ACCURATE RESPONSE
APPROACH USED FOR INVENTORY AND
PRODUCTION PLANNING AT WORLD.
• SKU level forecast is used to calculate the amount of
materials needed
• Fabric is inspected at factory and relaxed for up to 48 hours
• Inventory is kept for quick response
• Domestic manufacturers were used to save cost of lead time
• Reserved production capacity is kept for unusual demands
• Merchandisers’ order 50% of the demand forecast right
away
• Based on the early sales data, the merchandisers extrapolated
sales data
• Depending on the fabric and production available further
orders were placed
• Left over inventory is sent back to the warehouses where it
is marked 50% off and sent back to stores
Q.8 CAN THE WORLD’S SUPPLY CHAIN
PROCESSES BE REPLICATED AT OTHER
APPAREL COMPANIES? IDENTIFY
FEATURES OF THE SUPPLY CHAIN THAT
ARE, AND ARE NOT, WORTH
REPLICATING BY OTHER COMPANIES.
•The process can be replicated to other apparel & non
apparel companies having short product life cycle
• Needs to develop an attitude of efficiency
• Can do a cost benefit analysis
FEATURES OF WORLD CO.'S SUPPLY
CHAIN
• Forecasting new product demand
• Initial product ordering logic
• Material ordering-staged for use when and if needed
• Focus on customer satisfaction and employee morale
• Diversified work force
•Responsive Process:
- Merchandisers working directly with the factory
- Flexible ordering of products
- Shorter lead time
• Great product focus-Very homogeneous target group
group 3 scm.pptx

More Related Content

Similar to group 3 scm.pptx

Lesson-1-Supply-Chain-Management-Introduction.ppt
Lesson-1-Supply-Chain-Management-Introduction.pptLesson-1-Supply-Chain-Management-Introduction.ppt
Lesson-1-Supply-Chain-Management-Introduction.ppt
RDTCPOLYTECHNICMECHD
 
Lesson-1-Supply-Chain-Management-Introduction.ppt
Lesson-1-Supply-Chain-Management-Introduction.pptLesson-1-Supply-Chain-Management-Introduction.ppt
Lesson-1-Supply-Chain-Management-Introduction.ppt
qadeer36
 
Madura Coats supply chain management
Madura Coats supply chain managementMadura Coats supply chain management
Madura Coats supply chain management
Saurabh Srivastava
 
Marico supply chain
Marico supply chainMarico supply chain
Marico supply chain
NandiniBharat1
 
Marico: Supply Chain Management
Marico: Supply Chain ManagementMarico: Supply Chain Management
Marico: Supply Chain Management
Shivesh Ranjan
 
Quick response
Quick responseQuick response
Quick response
Swaati Vohra
 
Fashion forecasting
Fashion forecastingFashion forecasting
Fashion forecasting
Simran Parmar
 
Info systems and scm
Info systems and scmInfo systems and scm
Info systems and scmPrithvi Ghag
 
Coca Cola
Coca ColaCoca Cola
Coca Cola
Asif Hussain
 
Strategic alliance
Strategic allianceStrategic alliance
Strategic alliance
Mandeep Raj
 
A Presentation on PepsiCo
A Presentation on PepsiCoA Presentation on PepsiCo
A Presentation on PepsiCo
Sanket Bhawarkar
 
Zara final
Zara finalZara final
Zara Supply Chain Case Study
Zara Supply Chain Case StudyZara Supply Chain Case Study
Zara Supply Chain Case Study
Siripong Sae-Zhang
 
Supply chain management satyen
Supply chain management satyenSupply chain management satyen
Supply chain management satyen
satyenbharti
 
6. Managing the Merchandise Planning Process.ppt
6. Managing the Merchandise Planning Process.ppt6. Managing the Merchandise Planning Process.ppt
6. Managing the Merchandise Planning Process.ppt
akshatsrivastava934011
 
MARICO - Parachute Oil Distribution Mgmt
MARICO - Parachute Oil Distribution MgmtMARICO - Parachute Oil Distribution Mgmt
MARICO - Parachute Oil Distribution Mgmt
Rajesh Shetty
 

Similar to group 3 scm.pptx (20)

Lesson-1-Supply-Chain-Management-Introduction.ppt
Lesson-1-Supply-Chain-Management-Introduction.pptLesson-1-Supply-Chain-Management-Introduction.ppt
Lesson-1-Supply-Chain-Management-Introduction.ppt
 
Lesson-1-Supply-Chain-Management-Introduction.ppt
Lesson-1-Supply-Chain-Management-Introduction.pptLesson-1-Supply-Chain-Management-Introduction.ppt
Lesson-1-Supply-Chain-Management-Introduction.ppt
 
Madura Coats supply chain management
Madura Coats supply chain managementMadura Coats supply chain management
Madura Coats supply chain management
 
Marico supply chain
Marico supply chainMarico supply chain
Marico supply chain
 
Marico: Supply Chain Management
Marico: Supply Chain ManagementMarico: Supply Chain Management
Marico: Supply Chain Management
 
Quick response
Quick responseQuick response
Quick response
 
Fashion forecasting
Fashion forecastingFashion forecasting
Fashion forecasting
 
Case Study One
Case Study OneCase Study One
Case Study One
 
Retail buying
Retail buyingRetail buying
Retail buying
 
Info systems and scm
Info systems and scmInfo systems and scm
Info systems and scm
 
Scm (1)
Scm (1)Scm (1)
Scm (1)
 
Coca Cola
Coca ColaCoca Cola
Coca Cola
 
Strategic alliance
Strategic allianceStrategic alliance
Strategic alliance
 
A Presentation on PepsiCo
A Presentation on PepsiCoA Presentation on PepsiCo
A Presentation on PepsiCo
 
Zara final
Zara finalZara final
Zara final
 
Zara Supply Chain Case Study
Zara Supply Chain Case StudyZara Supply Chain Case Study
Zara Supply Chain Case Study
 
Supply chain management satyen
Supply chain management satyenSupply chain management satyen
Supply chain management satyen
 
Yoginder Rana- CV
Yoginder Rana- CV Yoginder Rana- CV
Yoginder Rana- CV
 
6. Managing the Merchandise Planning Process.ppt
6. Managing the Merchandise Planning Process.ppt6. Managing the Merchandise Planning Process.ppt
6. Managing the Merchandise Planning Process.ppt
 
MARICO - Parachute Oil Distribution Mgmt
MARICO - Parachute Oil Distribution MgmtMARICO - Parachute Oil Distribution Mgmt
MARICO - Parachute Oil Distribution Mgmt
 

More from KumarAnand99

DM1_3.pdf
DM1_3.pdfDM1_3.pdf
DM1_3.pdf
KumarAnand99
 
ART & ARTIQUES.pdf
ART & ARTIQUES.pdfART & ARTIQUES.pdf
ART & ARTIQUES.pdf
KumarAnand99
 
SIP BVM.pptx
SIP BVM.pptxSIP BVM.pptx
SIP BVM.pptx
KumarAnand99
 
Ingersoll Rand.pptx
Ingersoll Rand.pptxIngersoll Rand.pptx
Ingersoll Rand.pptx
KumarAnand99
 
SCM_Solectron_G6.pptx
SCM_Solectron_G6.pptxSCM_Solectron_G6.pptx
SCM_Solectron_G6.pptx
KumarAnand99
 
PM Project group 4.pptx
PM Project group 4.pptxPM Project group 4.pptx
PM Project group 4.pptx
KumarAnand99
 
Wolfgang_Kohler.pptx
Wolfgang_Kohler.pptxWolfgang_Kohler.pptx
Wolfgang_Kohler.pptx
KumarAnand99
 
ACFrOgAsXX07Hpg-HY2djXIwyrkp9ScWwDAWCKBJPXU45x-d0N8a9ul4Rg41gvTiA_fKj7rc4tEj6...
ACFrOgAsXX07Hpg-HY2djXIwyrkp9ScWwDAWCKBJPXU45x-d0N8a9ul4Rg41gvTiA_fKj7rc4tEj6...ACFrOgAsXX07Hpg-HY2djXIwyrkp9ScWwDAWCKBJPXU45x-d0N8a9ul4Rg41gvTiA_fKj7rc4tEj6...
ACFrOgAsXX07Hpg-HY2djXIwyrkp9ScWwDAWCKBJPXU45x-d0N8a9ul4Rg41gvTiA_fKj7rc4tEj6...
KumarAnand99
 
624b3a5378d51.docx
624b3a5378d51.docx624b3a5378d51.docx
624b3a5378d51.docx
KumarAnand99
 
Jessica · SlidesCarnival.pptx
Jessica · SlidesCarnival.pptxJessica · SlidesCarnival.pptx
Jessica · SlidesCarnival.pptx
KumarAnand99
 
tsk_bbs-converted.docx
tsk_bbs-converted.docxtsk_bbs-converted.docx
tsk_bbs-converted.docx
KumarAnand99
 
bank-loan-66631035.pptx
bank-loan-66631035.pptxbank-loan-66631035.pptx
bank-loan-66631035.pptx
KumarAnand99
 

More from KumarAnand99 (12)

DM1_3.pdf
DM1_3.pdfDM1_3.pdf
DM1_3.pdf
 
ART & ARTIQUES.pdf
ART & ARTIQUES.pdfART & ARTIQUES.pdf
ART & ARTIQUES.pdf
 
SIP BVM.pptx
SIP BVM.pptxSIP BVM.pptx
SIP BVM.pptx
 
Ingersoll Rand.pptx
Ingersoll Rand.pptxIngersoll Rand.pptx
Ingersoll Rand.pptx
 
SCM_Solectron_G6.pptx
SCM_Solectron_G6.pptxSCM_Solectron_G6.pptx
SCM_Solectron_G6.pptx
 
PM Project group 4.pptx
PM Project group 4.pptxPM Project group 4.pptx
PM Project group 4.pptx
 
Wolfgang_Kohler.pptx
Wolfgang_Kohler.pptxWolfgang_Kohler.pptx
Wolfgang_Kohler.pptx
 
ACFrOgAsXX07Hpg-HY2djXIwyrkp9ScWwDAWCKBJPXU45x-d0N8a9ul4Rg41gvTiA_fKj7rc4tEj6...
ACFrOgAsXX07Hpg-HY2djXIwyrkp9ScWwDAWCKBJPXU45x-d0N8a9ul4Rg41gvTiA_fKj7rc4tEj6...ACFrOgAsXX07Hpg-HY2djXIwyrkp9ScWwDAWCKBJPXU45x-d0N8a9ul4Rg41gvTiA_fKj7rc4tEj6...
ACFrOgAsXX07Hpg-HY2djXIwyrkp9ScWwDAWCKBJPXU45x-d0N8a9ul4Rg41gvTiA_fKj7rc4tEj6...
 
624b3a5378d51.docx
624b3a5378d51.docx624b3a5378d51.docx
624b3a5378d51.docx
 
Jessica · SlidesCarnival.pptx
Jessica · SlidesCarnival.pptxJessica · SlidesCarnival.pptx
Jessica · SlidesCarnival.pptx
 
tsk_bbs-converted.docx
tsk_bbs-converted.docxtsk_bbs-converted.docx
tsk_bbs-converted.docx
 
bank-loan-66631035.pptx
bank-loan-66631035.pptxbank-loan-66631035.pptx
bank-loan-66631035.pptx
 

Recently uploaded

Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
Kamal Acharya
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
ShahidSultan24
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 

Recently uploaded (20)

Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 

group 3 scm.pptx

  • 1. A PRESENTATION ON SUPPLY CHAIN MANAGEMENT AT WORLD CO. LTD. Group Members –  Ajit Kumar  Saurav Kumar  Prince Kumar  Kumar Anand  Shikha Patel  Ankit Kumar  Kajal Agarwal By Group 3
  • 2. 2 COMPANY PROFILE • Fashion Retailer • Responds quickly to market signals • Gross Margins high • Inventory Turns high • ROE/ ROA low
  • 3. Q.1 WHAT IS SPARCS SYSTEM? EXAMINE WORLD’S INVENTORY AND F INANCIAL PERFORMANCE TO UNDERSTAND HOW SUCCESSFUL THE SYSTEM WAS.
  • 4. SPARCS SYSTEM •S- Super, P- production, A- Apparel, R- Retail, CS- Consumer satisfaction •Introduced in January 1992, by Hidezo Terai, president of World co. Ltd. • Speedy and responsive supply chain •Basis for promoting SPA (special store private label apparel) business of world co. Ltd. •Helps co. to monitor sales trends and focus on consumer demand to increase efficiency
  • 5. INVENTORY AND FINANCIAL PERFORMANCE Inventory turns a year Gross margin Company As a whole 5 47% SPA brand which uses SPARCS system 8.5 47.8% US Specialty retailers 2.6 41% ‘’The GAP’’ 5 45% The Limited, Inc. 5.6 37% Markdown World Co. 11% of total sales/year American Women’s Apparel Store 31.8% of total sales/year
  • 6. Q.2 EXAMINE THE FEATURES OF FASHION APPAREL RETAILING IN JAPAN. HOW CAN A COMPANY USE ITS SUPPLY CHAIN TO COMPETE IN THIS ENVIRONMENT?
  • 7. • One of the largest and sophisticated clothing market in the world • Fashion and product quality enjoy high reputation • Products have short life cycles as compared to US • Highly competitive, locally and internationally
  • 8. • Three distribution alternatives are available : company owned stand-alone stores, shops in fashion malls and shops within department stores • Low inventory levels due to short life cycles and uncertain demand • Historical sales data to identify customer needs • Point- of- sale data f rom retailers to analyze purchasing trends • Install systems for efficient and speedy sales ordering
  • 9. Q 3. EXPLAIN HOW THE ORGANIZATION STRUCTURE AT WORLD SUPPORTED ITS SUPPLY CHAIN STRATEGY. EXPLAIN HOW WORLD USED ITS INFORMATION SYSTEMS AS KEY DRIVER TO IMPROVE ITS SUPPLY CHAIN PERFORMANCE.
  • 10. • Each of 40 brands targeted a distinct set of customer •Company maintain separate merchandising groups for each of the brand •Learning is high from each other group success and challenges •Review of each of the co’s & competitor’s brand , marketplace at every 6 month • Each group able to keep their brands fresh and exciting •Each group empowered to take Merchandising decision pertaining to its brand which make co quick responsive • Young and talented employee • More promotions opportunity to superior performance ORGANIZATION STRUCTURE WORLD CO. LTD.
  • 11. INFORMATION SYSTEM FEATURES • Real time information - SKU (Item/Size/Color by store) on daily basis - Shipment to the stores - Shipment between stores - Shipment back to the distribution center -Accuracy close to 100% during the regular selling season •Semi annual sales at a few larger department stores where items returned to the distribution center are marked 50% off
  • 12. •Advance fabric Inspection at the factory and availability of CAD facilities. •Proper communication between Merchandisers and factory about actual need of the factory • Database of past trends and requirements •Electronically transfer of measurements and patterns from headquarters to factories •Computer system facilities at factories to make changes in patterns
  • 13. Q.4 IDENTIFY SALIENT ASPECTS OF WORLD’S MANUFACTURING PROCESS THAT HELPED WORLD ACHIEVE THE DESIRED LEVEL OF RESPONSIVENESS IN ITS SUPPLY CHAIN.
  • 14. MANUFACTURING PROCESS •Domestic manufacturing •Short lead time •Fast transportation •Close collaboration of design & mfg •2-3 wk replacement •Flexibility of factories •Small batch production
  • 15. • Maintain relationships with manufacturers through network of business affiliations • Domestic factories were considered over overseas factories as they could respond quickly • Factory was informed in advance of fabric and about inspection • CAD was used to cut the fabric • Maintained an inventory of undyed fabric for faster response times • Line workers were versatile
  • 16. • Measurements & patterns were sent electronically from headquarters to factories • Factory maintained small batch sizes to undertake several different operations • Major new collections were introduced twice annually • To preserve brand focus, designers identified with the target customer • Appropriate mechanisms to link dyeing facilities, suppliers, manufacturers and World in an integrated supply chain
  • 17. Q.5 EXPLAIN THE METHOD OF INITIAL DEMAND FORECAST AND AGGREGATE DEMAND FORECAST AT WORLD FOR SKU LEVEL FORECASTS.
  • 18. INITIAL DEMAND FORECAST • Initial demand forecast for each product, before sales, was derived in two stages: - First process was to derive aggregate demand forecasts for all SKUs together. - Second process was to rank the SKUs according to likely demand and combining these ranks with aggregate forecasts to derive SKU level forecasts.
  • 19. 19 AGGREGATE DEMAND FORECAST (HIGHER OF THE TWO) Category Side Distribution Side Yen Nos • Sales •Growth Rates •Seasonality •Competition •PESTE • Brand wise •Chain wise Store wise • Heavy/ medium/ light • Knit/ woven • Fabric Category Sweaters 30 %
  • 20. Q.6 EXPLAIN THE OBERMEYER METHOD USED AT WORLD FOR SKU LEVEL FORECASTS.
  • 21. OBERMEYER METHOD FOR SKU LEVEL FORECAST • To derive demand forecasts • To derive associated standard deviation of demand • “Obermeyer Vote Meetings” – held twice in a year, where 20 store managers & assistants from all over Japan participated. • Autumn-Winter collections in June & August • Spring-Summer lines in December & February – Store personal were shown the planned product and were asked to predict its popularity.
  • 22. OBERMEYER METHOD PARTICIPANTS • Participants invited to World’s Tokyo office to view coming line • Participants almost all women : age 25-29 • Criteria considered while nominating assistant to take part in vote meeting: – Manner of dress, – Fashion sense, – Understanding of the target audience • 20 women selected from 20 different stores
  • 23. ASSESSMENT • Women use to assess the garments on the basis of: – Fit and style on themselves as well as peers – Felt and observed the fabric, evaluated weight relative to requirement of future – Photographed one another wearing next styles – Permitted to share their assessments – Instructed not to discuss the scores given to SKU’s • Women recorded their thoughts on the “ballots”
  • 24. RANKING • Based on fabric and colours between 1 to 7, and a comment section • Separate boxes for ranking style, fabric & colour • Merchandisers could identify: – Hot fabrics v/s Styles – Colours independent of Style • After ranking – Weighted-mean score for each SKU – Standard deviation score for each SKU
  • 25. RESULTS • Sorting of Product: – Mean score – Standard deviation • Performing ABCD analysis: – “A” SKUs : Top 10% of SKUs, comprise 40% of sales – “B” SKUs : Next 20% of SKUs, comprise 30% of sales – “C” SKUs : Next 30% of SKUs, comprise 20% of sales – “D” SKUs : Last 40% of SKUs, comprise 10% of sales
  • 26. Q.7 EXPLAIN THE ACCURATE RESPONSE APPROACH USED FOR INVENTORY AND PRODUCTION PLANNING AT WORLD.
  • 27. • SKU level forecast is used to calculate the amount of materials needed • Fabric is inspected at factory and relaxed for up to 48 hours • Inventory is kept for quick response • Domestic manufacturers were used to save cost of lead time • Reserved production capacity is kept for unusual demands • Merchandisers’ order 50% of the demand forecast right away • Based on the early sales data, the merchandisers extrapolated sales data • Depending on the fabric and production available further orders were placed • Left over inventory is sent back to the warehouses where it is marked 50% off and sent back to stores
  • 28. Q.8 CAN THE WORLD’S SUPPLY CHAIN PROCESSES BE REPLICATED AT OTHER APPAREL COMPANIES? IDENTIFY FEATURES OF THE SUPPLY CHAIN THAT ARE, AND ARE NOT, WORTH REPLICATING BY OTHER COMPANIES.
  • 29. •The process can be replicated to other apparel & non apparel companies having short product life cycle • Needs to develop an attitude of efficiency • Can do a cost benefit analysis
  • 30. FEATURES OF WORLD CO.'S SUPPLY CHAIN • Forecasting new product demand • Initial product ordering logic • Material ordering-staged for use when and if needed • Focus on customer satisfaction and employee morale • Diversified work force •Responsive Process: - Merchandisers working directly with the factory - Flexible ordering of products - Shorter lead time • Great product focus-Very homogeneous target group