Smart Cabling Infrastructure Solutions for Data Centers Constantin Ciuperca Project Manager Genesys Systems
Agenda Data Center Infrastructure requirements Smart Cabling Solutions for  Data Center Infrastructures
Tyco Electronics –  AMP NETCONNECT Strategic Division for  Complete Communication Infrastructures
Data Center Infrastructure Requirements
Data Center –  Overview / Subsystems Cabling Infrastructure IT Security Control system Raised floor Air Conditioning & Ventilation Systems Early fire Warning system Fire detection Fire extinguishing Water warning systems Access control Monitoring & Infrastructure Management Systems Power Supply, UPS & Generator Systems
Main issues & concerns of Data Center Owners & Operators   Data Center –  What is important ? (Source: Datacenter Dynamics)
Power supply and air conditioning have become the limiting factor for implementation of Data Centers. Data Center  - Limiting Factors Picture: Knürr
Data Center –  Power Consumption Sources:  EYP Mission Critical Facilities, Cisco IT, Network World, Customer Interviews, APC Reducing  Data Center Power Consumption  is a multi-faceted challenge.  All areas need to be addressed to maximize data center compute capacity and minimize power costs.
Cold air pumped into plenum space beneath floor tiles and vented into cold aisles and returns through a ceiling plenum. Data Center –  Airflow Efficiency
Airflow is blocked by a fully loaded raised floor  For new buildings, cabling in the ceiling shall be considered for better management and improved airflow. Data Center –  Airflow & Cable Placement Cable trays Cable trays Cable trays Cable trays Cable trays Cable trays Power cables Power cables Power cables
millions server units Data Center –  Server Trends (1G, 10G, 40G and 100G) Source: Intel & Broadcom 10 year transition for 1G Ethernet 6 years for 10GBE 5 years for 40GBE
Comparison:  Office Cabling <> Data Center Cabling Office Cabling: Static after installation Technology cycle: 5-10 years Lower density acceptable Downtimes less critical Physical environment less important Data Center Cabling: Dynamic Technology cycle: 3-5 years Highest density required Downtimes very critical Physical environment very important
Data Center –  Infrastructure Requirements Highest Reliability  and  Availabilit y  (= Quality ). High Infrastructure Performance to support various kinds of services. Shortest Deployment Time  for  Moves, Adds & Changes (MAC’s). Highest Density  of all equipment. Redundancy Support to  save Power Best possible control via  Network and Infrastructure Management (including reliable documentation).
Smart Cabling Solutions for Data Center Infrastructures
Data Center  –  Relevant Standards EN 50173-5 Data Center Cabling   ISO/IEC 24764 (created according EN 50173-5) EIA/TIA 942   “Telecommunications Infrastructure Standards for Data Centers”
Ad-hoc growth and cabling Point to point cabling Pathway confusion Documentation errors Data Center  –  Why standards ? Network Cabinets Server Cabinets Server Cabinets Server Cabinets Server Cabinets More an evolution than a real planning from the beginning Finally leading to a difficult to handle chaos !
Data Center  –  Structure acc. Standards MDA HDA EDA Telecommunication Room
Data Center  –  Structure & Cabling Requirements Main Distribution Area (MDA) Horizontal Distribution Area (HDA) Equipment Distribution Area (EDA) Optional: Zone Distribution Area (ZDA) HDA EDA ZDA HC HC HC MC Primary Entrance Room HC Scondary Entrance Room Access Providers Access Providers Access Providers Offices, Operations Center Support Rooms Telecom Room Interconnect Active Equip. Storage Area Devices etc. Interconnect Active Equipment Interconnect Active Equipment Active Equipment Interconnect Backbone Cabling Backbone Cabling Backbone Cabling Horizontal Cabling Horizontal Cabling Horizontal Cabling MDA Highest Performance Cat. 6 A  / 7 A  or Fiber Optic Density & Flexibility MRJ 21 MPO  “Plug & Go”
Complete Data Center Solutions AMP NETCONNECT provide the complete Cabling Infrastructure:  Classical High Performance Cabling Systems Data Center Optimized Plug&Go Solutions “Smart Cabling for Data Centers” Cable Management Systems ready to be integrated into Intelligent Infrastructure Management System (IIMS)
Data Center Optimized Solutions “Smart Cabling for Data Centers” MRJ21,  Σ-Link  & MPO Cabling Systems Shortest deployment time Fastest Moves, Adds & Changes 100% factory pre-tested Highest Density Easy to plan & design Re-useable AMP TRAC  Ready
Data Center Optimized – Pre-Terminated Solutions “AMP Σ-Link System” Pre-Terminated Solutions based on Bundled Cables & Cassettes . Class F A  (Cat.7 A ),  Class E A  (Cat.6 A ) Shielded Solutions Class E (Cat.6) UTP Solution
Data Center Optimized – Pre-Terminated Solutions MRJ21 System Special designed High Density Systems: Easy to install (just Plug & Go) Easy to change without interference of other channels 6 x 1000Base-T in one compact cable & interface Space saving Compact Pre-Terminated Trunk Cables allow efficient airflow Re-useable Example: MRJ21 Plug&Go System http://www.cisco.com/pcgi-bin/ctdp/displayProfile.pl?PARTNER_ID=59368
Data Center Optimized - Pre-Terminated Solutions   MRJ21 Plug & Go System MRJ21 Panel to Panel configuration:
MRJ21 System -  Applications Compact, Flexible & Easy to manage Consistent Quality & Performance
Data Center Optimized – Pre-Terminated Solutions MPO Fiber Optic System Fiber Optic Plug&Go System: Based on the industry standard MT-Ferrule 12 Fibers OM2, OM3, OM4 or Singlemode Cassettes for all important Interfaces (LC, SC, MT-RJ) Compact & Consistent Quality (100% Factory tested!) No installation errors AMP TRAC  Ready! Standard MT 2.45mm 6.4mm
MPO Next Generation Low Loss MPOptimate System Insertion Loss:   0,35 dB/Cassette  maximum  ! = Best performing MPO System in the world market
Data Center Optimized Solutions “Smart Cabling for Data Centers” Benefits: Fast Setup Time and MAC’s All Performance requirement (1/10/40/100 GBit) Pre-Tested Improved Cable Management Efficient Airflow Management
Unmanaged  and unstructured connections No documentation 30-40% abandoned patch cords after 1 year of operation Dead ports  in switches and cable  runs  30-40% unused capacity MAC time > 1h per port Adds up to 150% of operational cost Adds up to 200% of floorspace needed  Heat sinks creation ( blocking of air flow ) Poor Cable Management -  Consequences
Hi-D –  Cable Management Platform Very high density Side Cable Management saves space for horizontal management Requires 800mm Rack Compatible with all Copper & Fiber Panels Controlled Bend Radius = Easy access to each Patchcord in case of changes!
 
System Benefits: Integrates all AMP NETCONNECT High Density Data Center Solutions (MPO, MRJ21 & Classical Cabling) Visualizes & Documents complete Data Center Network (Updates all changes automatically) Notifies all changes  = Increasing control over complex Data Center Infrastructures = Reduction of Downtimes!
System  – Process overview
Infrastructure Manager
AMP NETCONNECT –  Total Solution
Data Center –  Green IT The AMP NETCONNECT Data Center Solutions support the  Green Initiative: Re-duce Energy consumption = cost saving = preserves natural resources Re-useable  solutions = cost saving = preserves natural resources Re-cycable  solutions Use only  environmental friendly  materials (RoHS compliant)
One Solution for Your Datacenter ! It is worthwhile to invest into  guaranteed  Performance & Quality!
AMP NETCONNECT  Data Center Solutions Your Benefits Unique Solution – optimized exactly for the special needs in a Data Center (we do not just try to implement office infrastructures into a   data center – as many others do) All changes in a data center (which happens often!) can be done in very short time – without interruption of other services. = maximized uptime! = highest flexibility Space & Energy saving solution = $$$$ savings on operational costs = fast return on investment Complete Management & Documentation Solution (AMPTRAC) = comes up with IT SM requirements from ITIL
Thank You ! -  Questions ? A Solid Foundation for Your Communication Infrastructure

Genesys System - 8dec2010

  • 1.
    Smart Cabling InfrastructureSolutions for Data Centers Constantin Ciuperca Project Manager Genesys Systems
  • 2.
    Agenda Data CenterInfrastructure requirements Smart Cabling Solutions for Data Center Infrastructures
  • 3.
    Tyco Electronics – AMP NETCONNECT Strategic Division for Complete Communication Infrastructures
  • 4.
  • 5.
    Data Center – Overview / Subsystems Cabling Infrastructure IT Security Control system Raised floor Air Conditioning & Ventilation Systems Early fire Warning system Fire detection Fire extinguishing Water warning systems Access control Monitoring & Infrastructure Management Systems Power Supply, UPS & Generator Systems
  • 6.
    Main issues &concerns of Data Center Owners & Operators Data Center – What is important ? (Source: Datacenter Dynamics)
  • 7.
    Power supply andair conditioning have become the limiting factor for implementation of Data Centers. Data Center - Limiting Factors Picture: Knürr
  • 8.
    Data Center – Power Consumption Sources: EYP Mission Critical Facilities, Cisco IT, Network World, Customer Interviews, APC Reducing Data Center Power Consumption is a multi-faceted challenge. All areas need to be addressed to maximize data center compute capacity and minimize power costs.
  • 9.
    Cold air pumpedinto plenum space beneath floor tiles and vented into cold aisles and returns through a ceiling plenum. Data Center – Airflow Efficiency
  • 10.
    Airflow is blockedby a fully loaded raised floor For new buildings, cabling in the ceiling shall be considered for better management and improved airflow. Data Center – Airflow & Cable Placement Cable trays Cable trays Cable trays Cable trays Cable trays Cable trays Power cables Power cables Power cables
  • 11.
    millions server unitsData Center – Server Trends (1G, 10G, 40G and 100G) Source: Intel & Broadcom 10 year transition for 1G Ethernet 6 years for 10GBE 5 years for 40GBE
  • 12.
    Comparison: OfficeCabling <> Data Center Cabling Office Cabling: Static after installation Technology cycle: 5-10 years Lower density acceptable Downtimes less critical Physical environment less important Data Center Cabling: Dynamic Technology cycle: 3-5 years Highest density required Downtimes very critical Physical environment very important
  • 13.
    Data Center – Infrastructure Requirements Highest Reliability and Availabilit y (= Quality ). High Infrastructure Performance to support various kinds of services. Shortest Deployment Time for Moves, Adds & Changes (MAC’s). Highest Density of all equipment. Redundancy Support to save Power Best possible control via Network and Infrastructure Management (including reliable documentation).
  • 14.
    Smart Cabling Solutionsfor Data Center Infrastructures
  • 15.
    Data Center – Relevant Standards EN 50173-5 Data Center Cabling ISO/IEC 24764 (created according EN 50173-5) EIA/TIA 942 “Telecommunications Infrastructure Standards for Data Centers”
  • 16.
    Ad-hoc growth andcabling Point to point cabling Pathway confusion Documentation errors Data Center – Why standards ? Network Cabinets Server Cabinets Server Cabinets Server Cabinets Server Cabinets More an evolution than a real planning from the beginning Finally leading to a difficult to handle chaos !
  • 17.
    Data Center – Structure acc. Standards MDA HDA EDA Telecommunication Room
  • 18.
    Data Center – Structure & Cabling Requirements Main Distribution Area (MDA) Horizontal Distribution Area (HDA) Equipment Distribution Area (EDA) Optional: Zone Distribution Area (ZDA) HDA EDA ZDA HC HC HC MC Primary Entrance Room HC Scondary Entrance Room Access Providers Access Providers Access Providers Offices, Operations Center Support Rooms Telecom Room Interconnect Active Equip. Storage Area Devices etc. Interconnect Active Equipment Interconnect Active Equipment Active Equipment Interconnect Backbone Cabling Backbone Cabling Backbone Cabling Horizontal Cabling Horizontal Cabling Horizontal Cabling MDA Highest Performance Cat. 6 A / 7 A or Fiber Optic Density & Flexibility MRJ 21 MPO “Plug & Go”
  • 19.
    Complete Data CenterSolutions AMP NETCONNECT provide the complete Cabling Infrastructure: Classical High Performance Cabling Systems Data Center Optimized Plug&Go Solutions “Smart Cabling for Data Centers” Cable Management Systems ready to be integrated into Intelligent Infrastructure Management System (IIMS)
  • 20.
    Data Center OptimizedSolutions “Smart Cabling for Data Centers” MRJ21, Σ-Link & MPO Cabling Systems Shortest deployment time Fastest Moves, Adds & Changes 100% factory pre-tested Highest Density Easy to plan & design Re-useable AMP TRAC Ready
  • 21.
    Data Center Optimized– Pre-Terminated Solutions “AMP Σ-Link System” Pre-Terminated Solutions based on Bundled Cables & Cassettes . Class F A (Cat.7 A ), Class E A (Cat.6 A ) Shielded Solutions Class E (Cat.6) UTP Solution
  • 22.
    Data Center Optimized– Pre-Terminated Solutions MRJ21 System Special designed High Density Systems: Easy to install (just Plug & Go) Easy to change without interference of other channels 6 x 1000Base-T in one compact cable & interface Space saving Compact Pre-Terminated Trunk Cables allow efficient airflow Re-useable Example: MRJ21 Plug&Go System http://www.cisco.com/pcgi-bin/ctdp/displayProfile.pl?PARTNER_ID=59368
  • 23.
    Data Center Optimized- Pre-Terminated Solutions MRJ21 Plug & Go System MRJ21 Panel to Panel configuration:
  • 24.
    MRJ21 System - Applications Compact, Flexible & Easy to manage Consistent Quality & Performance
  • 25.
    Data Center Optimized– Pre-Terminated Solutions MPO Fiber Optic System Fiber Optic Plug&Go System: Based on the industry standard MT-Ferrule 12 Fibers OM2, OM3, OM4 or Singlemode Cassettes for all important Interfaces (LC, SC, MT-RJ) Compact & Consistent Quality (100% Factory tested!) No installation errors AMP TRAC Ready! Standard MT 2.45mm 6.4mm
  • 26.
    MPO Next GenerationLow Loss MPOptimate System Insertion Loss: 0,35 dB/Cassette maximum ! = Best performing MPO System in the world market
  • 27.
    Data Center OptimizedSolutions “Smart Cabling for Data Centers” Benefits: Fast Setup Time and MAC’s All Performance requirement (1/10/40/100 GBit) Pre-Tested Improved Cable Management Efficient Airflow Management
  • 28.
    Unmanaged andunstructured connections No documentation 30-40% abandoned patch cords after 1 year of operation Dead ports in switches and cable runs 30-40% unused capacity MAC time > 1h per port Adds up to 150% of operational cost Adds up to 200% of floorspace needed Heat sinks creation ( blocking of air flow ) Poor Cable Management - Consequences
  • 29.
    Hi-D – Cable Management Platform Very high density Side Cable Management saves space for horizontal management Requires 800mm Rack Compatible with all Copper & Fiber Panels Controlled Bend Radius = Easy access to each Patchcord in case of changes!
  • 30.
  • 31.
    System Benefits: Integratesall AMP NETCONNECT High Density Data Center Solutions (MPO, MRJ21 & Classical Cabling) Visualizes & Documents complete Data Center Network (Updates all changes automatically) Notifies all changes = Increasing control over complex Data Center Infrastructures = Reduction of Downtimes!
  • 32.
    System –Process overview
  • 33.
  • 34.
    AMP NETCONNECT – Total Solution
  • 35.
    Data Center – Green IT The AMP NETCONNECT Data Center Solutions support the Green Initiative: Re-duce Energy consumption = cost saving = preserves natural resources Re-useable solutions = cost saving = preserves natural resources Re-cycable solutions Use only environmental friendly materials (RoHS compliant)
  • 36.
    One Solution forYour Datacenter ! It is worthwhile to invest into guaranteed Performance & Quality!
  • 37.
    AMP NETCONNECT Data Center Solutions Your Benefits Unique Solution – optimized exactly for the special needs in a Data Center (we do not just try to implement office infrastructures into a data center – as many others do) All changes in a data center (which happens often!) can be done in very short time – without interruption of other services. = maximized uptime! = highest flexibility Space & Energy saving solution = $$$$ savings on operational costs = fast return on investment Complete Management & Documentation Solution (AMPTRAC) = comes up with IT SM requirements from ITIL
  • 38.
    Thank You !- Questions ? A Solid Foundation for Your Communication Infrastructure

Editor's Notes

  • #9 Power including the power to remove the heat created in the data center has many root causes. If a customer wants to reduce their operational costs associated with power and cooling as well as increasing the useful life of their data center facility, they will need to address data center power in a more holistic fashion, and address issues such as cooling which have historically been less important
  • #29 All these concerns and the market trends brings us with the consequences of shown chaos… It is obvious that in this case it is a nightmare to handle yout cords. How are you going to document this. After 1 year at east 30-40% of the patchcordds are just hanging there and will not been used anymore. Drawback of this is that the switches will loose capacity due to the unused capacity. Think about how time consuming it is for the technician to do a job when he’s in front of such a mess. Funny thing about this picture is that explicitly is asked to DO NOT TOUCH ANY OF THESE WIRES. Offcourse if we look ninto the operational cost it is going skyhigh. Not only the additional floorspace is needed but this curtain of cords is blocking the airflow of the electronic components, again this influences the power and cooling requirements.