This document provides an overview of the General Data Protection Regulation (GDPR) and outlines steps for compliance. It begins with a disclaimer about the information provided. It then lists resources for learning more about the GDPR and its 99 articles and 173 recitals. The rest of the document outlines key aspects of GDPR compliance, including identifying high and critical risk data, privacy notices, individual rights and redress, lawful and fair processing, privacy by design, data security, and data transfers.
Mastering Article 30 Compliance: Conducting, Maintaining & Reporting on your ...TrustArc
Watch the webinar on-demand: https://info.trustarc.com/mastering-article-30-compliance-webinar.html
78% of companies need help with conducting a data inventory.
As businesses grapple with the requirements of the GDPR one of the most challenging is the need to create a comprehensive record of all of your data processing activities as required under Article 30 of the GDPR. Recent research from Dimensional Research/TrustArc found that 78% of companies said they needed help with conducting a data inventory. With a project of this scale why re-invent the wheel when you can learn from other privacy professionals who have gone through the process of scoping, communicating, managing and delivering a comprehensive data inventory and mapping project.
Watch this webinar on-demand to hear from in-house privacy professionals and consultants how to:
- build a business case for the data inventory
- involve other departments across the business
- understand benefits of different methodologies – such as a systems or process-based approach
- review the tools and technologies available to help for you
- maintain the inventory over time
To register for upcoming/on-demand webinars visit: https://www.trustarc.com/events/webinar-schedule/
Best Practices for Managing Individual Rights under the GDPR [Webinar Slides]TrustArc
Watch the webinar on-demand: https://info.trustarc.com/best-practices-for-managing-individual-rights-under-gdpr-webinar.html
Insights and best practices for managing individual rights under the GDPR.
The GDPR introduces new individual rights for consumers such as the right of deletion, rectification and data portability - and non-compliance can lead to the highest level of fines. Many regulators are planning consumer campaigns that are likely to increase awareness and action on these new data subject access rights once the GDPR comes into effect on May 25th. What are your obligations? What volume of requests should a company prepare for? What best practices and tools are available to support these new requirements?
This on-demand webinar will provide insights and best practices for managing individual rights under the GDPR.
#trustarcGDPRevents
To register for upcoming/on-demand webinars visit: https://www.trustarc.com/events/webinar-schedule/
The European General Data Protection Regulation (GDPR) will come into effect in May 2018 and it will impact all organizations that store or process personal data of EU citizens. The European Commission is exporting European data protection principles to the rest of the world while widening the definition of personal data and enforcing privacy by design. These changes will not only have an impact on the organizations but also on the software which is used for data processing. How does it affect the Hadoop ecosystem?
Distributed data processing at scale is one of Hadoop’s core features and we will explore how the GDPR could potentially affect it. We will also take a look at the technical aspects of the rights of data subjects and see if and how we can address those, with a particular focus on open-source technologies.
This talk will give you an overview of the key themes of the GDPR including the rights of the data subject and will investigate the technical implications for data processing within the Hadoop ecosystem.
This document discusses privacy engineering and assurance. It begins by defining key privacy terminology like personally identifiable information and privacy principles. It then discusses elements of an accountable privacy program, including executive oversight, policies and processes, risk assessment, and complaint handling. The document outlines privacy activities across a product life cycle, including privacy impact assessments and risk management. It also discusses assessing privacy maturity and related business processes. Finally, it provides an example use case for conducting a privacy assessment.
The EU General Protection Regulation and how Oracle can help Niklas Hjorthen
The document discusses Oracle's technology solutions that can help organizations comply with the EU General Data Protection Regulation (GDPR). It provides an overview of GDPR requirements and describes Oracle products that address key areas like data discovery, access controls, monitoring and auditing, and personal data management. It outlines a multi-step approach organizations can take using Oracle technologies to establish the necessary technical foundation and processes for GDPR compliance.
We now have to obey the law and comply with GDPR, ensuring people's data are securely stored, we track who has access to it and if the client requests to review, update or remove their data, we should do so in an automated fashion. But, are you there yet? Chances are, there's still a long way to go.
In this talk I will address some of the challenges we solved in greenfield projects as well in old, legacy applications. We introduced "privacy by design" as just another "by design" mantra we already had build in our workflow and as we worked on the project, we applied it everywhere when we saw user data (personal or not) was processed. This ensured that all data was handled and treated the same way and allowed the business to reorient themselves again to be creative in approaching their customers.
The GDPR comes into effect in May 2018 and impacts any organization that stores personal data. It establishes key principles for processing personal data, including requirements that data be processed lawfully and transparently, only for specified purposes, and kept securely. Organizations must be able to demonstrate compliance with these principles. PRgloo can help organizations comply with the GDPR by documenting how they use personal data lawfully and keep it up-to-date and secure, as well as helping fulfill requests to access, delete, or rectify personal data.
Mastering Article 30 Compliance: Conducting, Maintaining & Reporting on your ...TrustArc
Watch the webinar on-demand: https://info.trustarc.com/mastering-article-30-compliance-webinar.html
78% of companies need help with conducting a data inventory.
As businesses grapple with the requirements of the GDPR one of the most challenging is the need to create a comprehensive record of all of your data processing activities as required under Article 30 of the GDPR. Recent research from Dimensional Research/TrustArc found that 78% of companies said they needed help with conducting a data inventory. With a project of this scale why re-invent the wheel when you can learn from other privacy professionals who have gone through the process of scoping, communicating, managing and delivering a comprehensive data inventory and mapping project.
Watch this webinar on-demand to hear from in-house privacy professionals and consultants how to:
- build a business case for the data inventory
- involve other departments across the business
- understand benefits of different methodologies – such as a systems or process-based approach
- review the tools and technologies available to help for you
- maintain the inventory over time
To register for upcoming/on-demand webinars visit: https://www.trustarc.com/events/webinar-schedule/
Best Practices for Managing Individual Rights under the GDPR [Webinar Slides]TrustArc
Watch the webinar on-demand: https://info.trustarc.com/best-practices-for-managing-individual-rights-under-gdpr-webinar.html
Insights and best practices for managing individual rights under the GDPR.
The GDPR introduces new individual rights for consumers such as the right of deletion, rectification and data portability - and non-compliance can lead to the highest level of fines. Many regulators are planning consumer campaigns that are likely to increase awareness and action on these new data subject access rights once the GDPR comes into effect on May 25th. What are your obligations? What volume of requests should a company prepare for? What best practices and tools are available to support these new requirements?
This on-demand webinar will provide insights and best practices for managing individual rights under the GDPR.
#trustarcGDPRevents
To register for upcoming/on-demand webinars visit: https://www.trustarc.com/events/webinar-schedule/
The European General Data Protection Regulation (GDPR) will come into effect in May 2018 and it will impact all organizations that store or process personal data of EU citizens. The European Commission is exporting European data protection principles to the rest of the world while widening the definition of personal data and enforcing privacy by design. These changes will not only have an impact on the organizations but also on the software which is used for data processing. How does it affect the Hadoop ecosystem?
Distributed data processing at scale is one of Hadoop’s core features and we will explore how the GDPR could potentially affect it. We will also take a look at the technical aspects of the rights of data subjects and see if and how we can address those, with a particular focus on open-source technologies.
This talk will give you an overview of the key themes of the GDPR including the rights of the data subject and will investigate the technical implications for data processing within the Hadoop ecosystem.
This document discusses privacy engineering and assurance. It begins by defining key privacy terminology like personally identifiable information and privacy principles. It then discusses elements of an accountable privacy program, including executive oversight, policies and processes, risk assessment, and complaint handling. The document outlines privacy activities across a product life cycle, including privacy impact assessments and risk management. It also discusses assessing privacy maturity and related business processes. Finally, it provides an example use case for conducting a privacy assessment.
The EU General Protection Regulation and how Oracle can help Niklas Hjorthen
The document discusses Oracle's technology solutions that can help organizations comply with the EU General Data Protection Regulation (GDPR). It provides an overview of GDPR requirements and describes Oracle products that address key areas like data discovery, access controls, monitoring and auditing, and personal data management. It outlines a multi-step approach organizations can take using Oracle technologies to establish the necessary technical foundation and processes for GDPR compliance.
We now have to obey the law and comply with GDPR, ensuring people's data are securely stored, we track who has access to it and if the client requests to review, update or remove their data, we should do so in an automated fashion. But, are you there yet? Chances are, there's still a long way to go.
In this talk I will address some of the challenges we solved in greenfield projects as well in old, legacy applications. We introduced "privacy by design" as just another "by design" mantra we already had build in our workflow and as we worked on the project, we applied it everywhere when we saw user data (personal or not) was processed. This ensured that all data was handled and treated the same way and allowed the business to reorient themselves again to be creative in approaching their customers.
The GDPR comes into effect in May 2018 and impacts any organization that stores personal data. It establishes key principles for processing personal data, including requirements that data be processed lawfully and transparently, only for specified purposes, and kept securely. Organizations must be able to demonstrate compliance with these principles. PRgloo can help organizations comply with the GDPR by documenting how they use personal data lawfully and keep it up-to-date and secure, as well as helping fulfill requests to access, delete, or rectify personal data.
Understanding the EU's new General Data Protection Regulation (GDPR)Acquia
In 2016, the European Union (EU) approved its General Data Protection Regulation (GDPR) to protect European citizens’ data. As a regulation, the GDPR does not require the implementation of legislation, and will immediately become an applicable law as of the 25th of May, 2018.
What is GDPR exactly trying to accomplish? According to the official documents, the goal is the “protection of natural persons with regard to the processing of personal data and on the free movement of such data.”
In short, organizations that conduct business in the EU will need to be compliant with GDPR, and must come to terms with the huge fines that non-compliance can carry. Fines can be up to €20M or 4% of the annual turnover. For companies that experience breaches that result in the loss of personal data (such as Talk Talk, which lost 170,000 people’s data), the fines will be tremendous.
Join us for discussion about GDPR to learn more about:
The principles that organizations that use personal data need to adhere to
The consequences organizations can face if that do not adhere to this new regulation
How your organization can prepare for the future
The document discusses preparing organizations for compliance with the EU General Data Protection Regulation (GDPR). It provides an overview of key GDPR requirements, such as obtaining consent for personal data use, implementing privacy by design, and responding to data breaches. The document recommends developing a GDPR action plan that includes conducting privacy impact assessments and audits. Overall, the summary emphasizes the need for organizations to understand how they use personal data and ensure they can meet GDPR requirements for data protection.
How GDPR works : companies will be expected to be
fully compliant from 25 May 2018. The regulation
is intended to establish one single set of data
protection rules across Europe
Funded by City Bridge Trust, the #CyberSafeLambeth initiative offers free GDPR training for charities in Lambeth
Individuals that lead in IT within charities will be able to attend free General Data Protection Regulation (GDPR) compliance and cybersecurity training, where they will be given expert guidance, support and instruction, thanks to new funding by City Bridge Trust.
#CyberSafeLambeth is a training programme that educates IT Manager level staff in local charities about GDPR and offers insight and knowledge to overcome cybersecurity threats and work more effectively.
The in-depth training programme will run across a number of days and will educate Lambeth-based charity IT professionals about key aspects of cybersecurity and the implications of GDPR, which comes into force from 25 May 2018.
The programme, which is being funded by City Bridge Trust, will require all trainees to commit to help at least one other, smaller Lambeth charity through The Integrate Agency CIC’s innovative ‘Hire a Volunteer’ platform.
This world class training opportunity will be available for Lambeth-based IT manager level charity professionals. Each will be taught about threats and trends within the industry, providing them with the skills and know how to confidently meet the requirements for GDPR.
Eoin Heffernan, Founder of Integrate said: “We are delighted to be able to offer cybersecurity training to local charities and reach out to train charity IT professionals working in the London Borough of Lambeth.
With a fine of up to 4% of an organisation’s annual turnover on the line, Individuals accountable and responsible for data protection are actively seeking clarification and advice regarding the impending changes to the EU General Data Protection Regulation.
The question now? How prepared are you to meet the EU General Data Protection Regulation?
IRM’s resident Data Protection expert Paul Sexby, addresses the areas that need to be considered in order to prepare for the new requirements.
Beginning your General Data Protection Regulation (GDPR) JourneyMicrosoft Österreich
This document provides an overview of the General Data Protection Regulation (GDPR) and how Windows 10 can help organizations comply with it. It begins with background on the GDPR, including its key implications like enhanced privacy rights for EU citizens and mandatory breach reporting. It defines personal and sensitive data under the GDPR. The document then outlines the key steps for an organization's GDPR compliance journey and describes various security and privacy capabilities in Windows 10 that can help with compliance, such as threat protection, identity protection, and information protection features. It concludes by providing Windows 10 resources to help organizations meet GDPR requirements.
The document summarizes key aspects of the EU General Data Protection Regulation (GDPR) that took effect in May 2018. It notes that prior agreements like the EU-US Safe Harbor were invalidated, leading to the GDPR. The GDPR established strict rules for processing and transferring personal data of EU citizens. It requires organizations to implement measures to protect privacy and security, obtain consent, respond to requests, report breaches, designate data protection officers, and only use processors that comply. Non-compliance can result in severe penalties.
This document provides an overview of privacy by design principles and considerations under privacy law, particularly the GDPR. It begins with introductions and an outline of topics to be covered. It then discusses the fundamentals of privacy by design, including its definition, benefits, and the 7 core principles. It covers key legal considerations around personal data, notice and consent requirements, purpose limitations, and individual rights. Practical applications are discussed, including privacy impact assessments and implementing privacy and security by design in product and system designs. Examples are provided of Google's privacy notices and consent mechanisms.
GDPR Basics - General Data Protection RegulationVicky Dallas
The General Data Protection Regulation (GDPR) is a new EU privacy law that strengthens and unifies data protection for individuals within the European Union. It aims to give EU citizens more control over their personal data and to simplify regulations for international businesses. Key aspects of the GDPR include individuals having the right to access, correct and delete their personal data. It also introduces strict rules on obtaining consent and heightened requirements for companies to protect customer data. The GDPR will be enforced beginning May 25, 2018.
Profiling, Big Data & Consent Under the GDPR [TrustArc Webinar Slides]TrustArc
Watch the webinar on-demand: https://info.trustarc.com/profiling-big-data-consent-gdpr-webinar.html
Required Changes around Profiling & Consent for GDPR Compliance
Some of the most closely followed areas of the GDPR negotiations concerned profiling and consent. Profiling, as defined in Articles 4 & 22, is one of the new provisions in the Regulation which could have a significant impact on businesses seeking to use targeted marketing and other analytics for business growth. Consent remains a legal basis for processing but it’s been restricted under the GDPR and must be “freely given, specific, informed and unambiguous.” There is lots of discussion and privacy scare stories around these two areas alone.
Watch this webinar on-demand where we examine:
- the details of the profiling and consent requirements in the GDPR to help determine what is and isn’t in scope for profiling
- where you can and can’t rely on consent
- what solutions are available and how privacy leaders can work with their business and marketing teams to ensure compliance
To register for upcoming/on-demand webinars visit: https://www.trustarc.com/events/webinar-schedule/
Teleran Data Protection - Addressing 5 Critical GDPR RequirementsChris Doolittle
Learn how to quickly and cost effectively meet 5 critical General Data Protection Regulation (GDPR) requirements for structured data with Teleran's Data Protection and Compliance solution. Teleran's solution addresses these key GDPR mandates: Impact Assessments, Purpose Limitation, Data Security, Accountability and Documentation, and Breach Notification. Teleran’s software solution delivers integrated sensitive data discovery, audit and controls. There is little time left to address GDPR. Flexibility, automation, integration and flexibility are key to getting there quickly and cost efficiently.
Key highlights of the General Data Protection Regulation (GDPR), which organisations will need to consider when preparing for its coming into force on 25 May 2018.
General Data Protection Regulations (GDPR): Do you understand it and are you ...Cvent
Whether you’re an event or hospitality professional in a small, medium or large organization, the General Data Protection Regulation (GDPR) is going to affect you. Get prepared with Cvent and Debrah Harding of Market Research Society before the 25th May deadline. GDPR is a new EU regulation, designed for the digital age. GDPR will strengthen an individual's rights and increase business accountability for data privacy and holding personal information. Organizations found breaching the regulations can face fines of up to 20 million Euros or up to 4% of annual global turnover. At Cvent we are already on track to becoming GDPR compliant and we want to advise our industry partners on how to become compliant too.
The document discusses the new General Data Protection Regulation (GDPR) which takes effect in May 2018 and gives EU citizens rights over their personal data. It notes that personal data is increasingly being lost, stolen, sold without consent, and used for criminal purposes. The GDPR gives individuals the rights to access their data, request data transfers or deletions, see data about their children, and have inaccurate data corrected. Companies need policies to demonstrate explicit consent for data collection and use, understand what data they hold and how it is managed, securely delete unneeded data, and be prepared to comply with the GDPR by its effective date.
The document provides an overview of an upcoming presentation on the General Data Protection Regulation (GDPR). It begins with introductions and disclaimers from the presenter and VMware. It then outlines the areas that will be covered in the 30 minute presentation, including timeframes for GDPR compliance, key changes from the previous Data Protection Directive, myths about GDPR requirements, potential fines, and VMware products that can help with GDPR compliance.
72 Hours Notice: Incident Response Management under the GDPR [Webinar Slides]TrustArc
Watch the webinar on-demand: https://info.trustarc.com/72-hours-notice-incident-response-management-under-gdpr-webinar.html
Best practices and suggested tools for addressing Articles 33 and 34 of the GDPR.
The GDPR calls for significant changes in how companies plan for and respond to a data breach. This webinar will provide best practices and suggested tools for addressing Articles 33 and 34 of the GDPR.
Register NOW for this on-demand webinar as we discuss key items such as:
- Addressing the new 72 hour notification requirement
- Revising your security policies
- Launching new employee training programs
#trustarcGDPRevents
To register for upcoming/on-demand webinars visit: https://www.trustarc.com/events/webinar-schedule/
BigData and Privacy webinar at BrighttalkUlf Mattsson
This document discusses bridging the gap between privacy and big data. It begins with an overview of big data adoption rates and security threats to big data systems. It then discusses new techniques for protecting data like tokenization that help balance security and data access. The document advocates classifying sensitive data types and complying with relevant privacy regulations. It provides examples of how to protect data at the field level using techniques like encryption, tokenization, and access controls. Finally, it discusses best practices for enforcing data protection policies.
GDPR The New Data Protection Law coming into effect May 2018. What does it me...eHealth Forum
GDPR The New Data Protection Law coming into effect May 2018. What does it mean for hospitals?
Anthe Papageorgiou, Compliance Officer & Data Protection Officer at Henry Dunant Hospital Center
Trivadis TechEvent 2016 Big Data Privacy and Security Fundamentals by Florian...Trivadis
In Big Data we focus on the 4 V's: Volume, Velocity, Varity and Veracity. But another important topic is often not in the focus: Privacy and Security. Yet as important and if not considered from the beginning it might put your Big Data project at risk. Learn about most important Privacy and Security fundamentals in Big Data, you should take into account in your next Big Data project.
Gain Visibility & Control of IT Assets in a Perimeterless WorldQualys
In today’s perimeterless world, enterprise security teams are challenged with maintaining visibility and control over the exploding number of assets on their networks.
The IT assets that pose the greatest risk to your organization’s security are the ones you don’t know are there. Without knowledge of which software and devices exist in your network — whether on-premises, on endpoints, or in elastic clouds — InfoSec professionals are unable to enact proper security and protection.
During this webcast, Jimmy Graham, Director of Product Management for Qualys AssetView and Darron Gibbard, Chief Technical Security Officer for Qualys EMEA, cover the six key elements of an ideal cloud-based IT asset inventory system:
1. Complete visibility of your IT environment
2. Deep visibility into assets
3. Continuous and automatic updates
4. Asset criticality ranking
5. Interactive, customizable dashboarding and reporting
6. Integration with your CMDB
Those of you in Europe will also be interested to learn about asset inventory for GDPR compliance.
Watch the on-demand webcast: https://www.brighttalk.com/webcast/11673/255291
Read the whitepaper, Cloud-Based IT Asset Inventory: A Solid Foundation for InfoSec Infrastructure: https://www.qualys.com/forms/whitepapers/cloud-based-it-asset-inventory-solid-foundation-infosec-infrastructure/
Free trial of Qualys AssetView: https://www.qualys.com/forms/assetview/
Contact Qualys for more information: 800.745.4355 https://www.qualys.com/company/contacts
Understanding the EU's new General Data Protection Regulation (GDPR)Acquia
In 2016, the European Union (EU) approved its General Data Protection Regulation (GDPR) to protect European citizens’ data. As a regulation, the GDPR does not require the implementation of legislation, and will immediately become an applicable law as of the 25th of May, 2018.
What is GDPR exactly trying to accomplish? According to the official documents, the goal is the “protection of natural persons with regard to the processing of personal data and on the free movement of such data.”
In short, organizations that conduct business in the EU will need to be compliant with GDPR, and must come to terms with the huge fines that non-compliance can carry. Fines can be up to €20M or 4% of the annual turnover. For companies that experience breaches that result in the loss of personal data (such as Talk Talk, which lost 170,000 people’s data), the fines will be tremendous.
Join us for discussion about GDPR to learn more about:
The principles that organizations that use personal data need to adhere to
The consequences organizations can face if that do not adhere to this new regulation
How your organization can prepare for the future
The document discusses preparing organizations for compliance with the EU General Data Protection Regulation (GDPR). It provides an overview of key GDPR requirements, such as obtaining consent for personal data use, implementing privacy by design, and responding to data breaches. The document recommends developing a GDPR action plan that includes conducting privacy impact assessments and audits. Overall, the summary emphasizes the need for organizations to understand how they use personal data and ensure they can meet GDPR requirements for data protection.
How GDPR works : companies will be expected to be
fully compliant from 25 May 2018. The regulation
is intended to establish one single set of data
protection rules across Europe
Funded by City Bridge Trust, the #CyberSafeLambeth initiative offers free GDPR training for charities in Lambeth
Individuals that lead in IT within charities will be able to attend free General Data Protection Regulation (GDPR) compliance and cybersecurity training, where they will be given expert guidance, support and instruction, thanks to new funding by City Bridge Trust.
#CyberSafeLambeth is a training programme that educates IT Manager level staff in local charities about GDPR and offers insight and knowledge to overcome cybersecurity threats and work more effectively.
The in-depth training programme will run across a number of days and will educate Lambeth-based charity IT professionals about key aspects of cybersecurity and the implications of GDPR, which comes into force from 25 May 2018.
The programme, which is being funded by City Bridge Trust, will require all trainees to commit to help at least one other, smaller Lambeth charity through The Integrate Agency CIC’s innovative ‘Hire a Volunteer’ platform.
This world class training opportunity will be available for Lambeth-based IT manager level charity professionals. Each will be taught about threats and trends within the industry, providing them with the skills and know how to confidently meet the requirements for GDPR.
Eoin Heffernan, Founder of Integrate said: “We are delighted to be able to offer cybersecurity training to local charities and reach out to train charity IT professionals working in the London Borough of Lambeth.
With a fine of up to 4% of an organisation’s annual turnover on the line, Individuals accountable and responsible for data protection are actively seeking clarification and advice regarding the impending changes to the EU General Data Protection Regulation.
The question now? How prepared are you to meet the EU General Data Protection Regulation?
IRM’s resident Data Protection expert Paul Sexby, addresses the areas that need to be considered in order to prepare for the new requirements.
Beginning your General Data Protection Regulation (GDPR) JourneyMicrosoft Österreich
This document provides an overview of the General Data Protection Regulation (GDPR) and how Windows 10 can help organizations comply with it. It begins with background on the GDPR, including its key implications like enhanced privacy rights for EU citizens and mandatory breach reporting. It defines personal and sensitive data under the GDPR. The document then outlines the key steps for an organization's GDPR compliance journey and describes various security and privacy capabilities in Windows 10 that can help with compliance, such as threat protection, identity protection, and information protection features. It concludes by providing Windows 10 resources to help organizations meet GDPR requirements.
The document summarizes key aspects of the EU General Data Protection Regulation (GDPR) that took effect in May 2018. It notes that prior agreements like the EU-US Safe Harbor were invalidated, leading to the GDPR. The GDPR established strict rules for processing and transferring personal data of EU citizens. It requires organizations to implement measures to protect privacy and security, obtain consent, respond to requests, report breaches, designate data protection officers, and only use processors that comply. Non-compliance can result in severe penalties.
This document provides an overview of privacy by design principles and considerations under privacy law, particularly the GDPR. It begins with introductions and an outline of topics to be covered. It then discusses the fundamentals of privacy by design, including its definition, benefits, and the 7 core principles. It covers key legal considerations around personal data, notice and consent requirements, purpose limitations, and individual rights. Practical applications are discussed, including privacy impact assessments and implementing privacy and security by design in product and system designs. Examples are provided of Google's privacy notices and consent mechanisms.
GDPR Basics - General Data Protection RegulationVicky Dallas
The General Data Protection Regulation (GDPR) is a new EU privacy law that strengthens and unifies data protection for individuals within the European Union. It aims to give EU citizens more control over their personal data and to simplify regulations for international businesses. Key aspects of the GDPR include individuals having the right to access, correct and delete their personal data. It also introduces strict rules on obtaining consent and heightened requirements for companies to protect customer data. The GDPR will be enforced beginning May 25, 2018.
Profiling, Big Data & Consent Under the GDPR [TrustArc Webinar Slides]TrustArc
Watch the webinar on-demand: https://info.trustarc.com/profiling-big-data-consent-gdpr-webinar.html
Required Changes around Profiling & Consent for GDPR Compliance
Some of the most closely followed areas of the GDPR negotiations concerned profiling and consent. Profiling, as defined in Articles 4 & 22, is one of the new provisions in the Regulation which could have a significant impact on businesses seeking to use targeted marketing and other analytics for business growth. Consent remains a legal basis for processing but it’s been restricted under the GDPR and must be “freely given, specific, informed and unambiguous.” There is lots of discussion and privacy scare stories around these two areas alone.
Watch this webinar on-demand where we examine:
- the details of the profiling and consent requirements in the GDPR to help determine what is and isn’t in scope for profiling
- where you can and can’t rely on consent
- what solutions are available and how privacy leaders can work with their business and marketing teams to ensure compliance
To register for upcoming/on-demand webinars visit: https://www.trustarc.com/events/webinar-schedule/
Teleran Data Protection - Addressing 5 Critical GDPR RequirementsChris Doolittle
Learn how to quickly and cost effectively meet 5 critical General Data Protection Regulation (GDPR) requirements for structured data with Teleran's Data Protection and Compliance solution. Teleran's solution addresses these key GDPR mandates: Impact Assessments, Purpose Limitation, Data Security, Accountability and Documentation, and Breach Notification. Teleran’s software solution delivers integrated sensitive data discovery, audit and controls. There is little time left to address GDPR. Flexibility, automation, integration and flexibility are key to getting there quickly and cost efficiently.
Key highlights of the General Data Protection Regulation (GDPR), which organisations will need to consider when preparing for its coming into force on 25 May 2018.
General Data Protection Regulations (GDPR): Do you understand it and are you ...Cvent
Whether you’re an event or hospitality professional in a small, medium or large organization, the General Data Protection Regulation (GDPR) is going to affect you. Get prepared with Cvent and Debrah Harding of Market Research Society before the 25th May deadline. GDPR is a new EU regulation, designed for the digital age. GDPR will strengthen an individual's rights and increase business accountability for data privacy and holding personal information. Organizations found breaching the regulations can face fines of up to 20 million Euros or up to 4% of annual global turnover. At Cvent we are already on track to becoming GDPR compliant and we want to advise our industry partners on how to become compliant too.
The document discusses the new General Data Protection Regulation (GDPR) which takes effect in May 2018 and gives EU citizens rights over their personal data. It notes that personal data is increasingly being lost, stolen, sold without consent, and used for criminal purposes. The GDPR gives individuals the rights to access their data, request data transfers or deletions, see data about their children, and have inaccurate data corrected. Companies need policies to demonstrate explicit consent for data collection and use, understand what data they hold and how it is managed, securely delete unneeded data, and be prepared to comply with the GDPR by its effective date.
The document provides an overview of an upcoming presentation on the General Data Protection Regulation (GDPR). It begins with introductions and disclaimers from the presenter and VMware. It then outlines the areas that will be covered in the 30 minute presentation, including timeframes for GDPR compliance, key changes from the previous Data Protection Directive, myths about GDPR requirements, potential fines, and VMware products that can help with GDPR compliance.
72 Hours Notice: Incident Response Management under the GDPR [Webinar Slides]TrustArc
Watch the webinar on-demand: https://info.trustarc.com/72-hours-notice-incident-response-management-under-gdpr-webinar.html
Best practices and suggested tools for addressing Articles 33 and 34 of the GDPR.
The GDPR calls for significant changes in how companies plan for and respond to a data breach. This webinar will provide best practices and suggested tools for addressing Articles 33 and 34 of the GDPR.
Register NOW for this on-demand webinar as we discuss key items such as:
- Addressing the new 72 hour notification requirement
- Revising your security policies
- Launching new employee training programs
#trustarcGDPRevents
To register for upcoming/on-demand webinars visit: https://www.trustarc.com/events/webinar-schedule/
BigData and Privacy webinar at BrighttalkUlf Mattsson
This document discusses bridging the gap between privacy and big data. It begins with an overview of big data adoption rates and security threats to big data systems. It then discusses new techniques for protecting data like tokenization that help balance security and data access. The document advocates classifying sensitive data types and complying with relevant privacy regulations. It provides examples of how to protect data at the field level using techniques like encryption, tokenization, and access controls. Finally, it discusses best practices for enforcing data protection policies.
GDPR The New Data Protection Law coming into effect May 2018. What does it me...eHealth Forum
GDPR The New Data Protection Law coming into effect May 2018. What does it mean for hospitals?
Anthe Papageorgiou, Compliance Officer & Data Protection Officer at Henry Dunant Hospital Center
Trivadis TechEvent 2016 Big Data Privacy and Security Fundamentals by Florian...Trivadis
In Big Data we focus on the 4 V's: Volume, Velocity, Varity and Veracity. But another important topic is often not in the focus: Privacy and Security. Yet as important and if not considered from the beginning it might put your Big Data project at risk. Learn about most important Privacy and Security fundamentals in Big Data, you should take into account in your next Big Data project.
Gain Visibility & Control of IT Assets in a Perimeterless WorldQualys
In today’s perimeterless world, enterprise security teams are challenged with maintaining visibility and control over the exploding number of assets on their networks.
The IT assets that pose the greatest risk to your organization’s security are the ones you don’t know are there. Without knowledge of which software and devices exist in your network — whether on-premises, on endpoints, or in elastic clouds — InfoSec professionals are unable to enact proper security and protection.
During this webcast, Jimmy Graham, Director of Product Management for Qualys AssetView and Darron Gibbard, Chief Technical Security Officer for Qualys EMEA, cover the six key elements of an ideal cloud-based IT asset inventory system:
1. Complete visibility of your IT environment
2. Deep visibility into assets
3. Continuous and automatic updates
4. Asset criticality ranking
5. Interactive, customizable dashboarding and reporting
6. Integration with your CMDB
Those of you in Europe will also be interested to learn about asset inventory for GDPR compliance.
Watch the on-demand webcast: https://www.brighttalk.com/webcast/11673/255291
Read the whitepaper, Cloud-Based IT Asset Inventory: A Solid Foundation for InfoSec Infrastructure: https://www.qualys.com/forms/whitepapers/cloud-based-it-asset-inventory-solid-foundation-infosec-infrastructure/
Free trial of Qualys AssetView: https://www.qualys.com/forms/assetview/
Contact Qualys for more information: 800.745.4355 https://www.qualys.com/company/contacts
The document provides an overview and agenda for a conference on achieving compliance with the General Data Protection Regulation (GDPR). It discusses key aspects of GDPR compliance including identifying personal data, data subject rights, security requirements, international data transfers, and remedies for non-compliance. Various vendors also present on how their products can help organizations meet GDPR requirements through features such as digital consent management and customizable reporting on personal data. An example case study highlights how one company used DocuSign to address challenges around manual processes, GDPR readiness, and security of personal information.
The document discusses social media, web 2.0, and privacy. It notes that while social media allows people to share information, it also means that personal data is increasingly collected and used in ways that impact privacy. The document outlines how companies collect and use personal data from social media as well as employees' online activities, and the privacy and legal issues this raises for both individuals and employers. It also provides recommendations for how companies can improve their data privacy and security practices.
Keep Calm and Comply: 3 Keys to GDPR SuccessSirius
Recent surveys benchmarking the status of U.S. companies' efforts to meet the May 25 deadline for the EU Global Data Protection Regulation (GDPR) have revealed a startling lack of preparedness.
Companies not yet in compliance are likely to violate the directive if they don’t take immediate action, and fines can amount to 2-4 percent of a company’s annual gross revenue. Do you have the resources and information you need to comply?
View to learn:
--What GDPR means to your business
--Short, medium, and long-term actions you can take to protect regulated data and achieve compliance
--How you can streamline incident response and third-party risk management capabilities
--How to streamline the resources and technology needed to keep up with the evolving regulatory landscape
Don't fall behind on these compliance regulations. Take the steps needed to protect the data you collect.
An Overview of the new GDPR regulations including:
• Data Protection Frame Work
• GDPR – Responsibilities
• GDPR – Changes
• GDPR - Exemptions
• GDPR – Rights
• Penalty
• Ten High Level Steps
An Overview of the new GDPR regulations including:
• Data Protection Frame Work
• GDPR – Responsibilities
• GDPR – Changes
• GDPR - Exemptions
• GDPR – Rights
• Penalty
• Ten High Level Steps
The document discusses information privacy and the General Data Protection Regulation (GDPR). It defines privacy as the right to be left alone and information privacy as the right to control how personal information is collected and used. Personal data is defined under GDPR as any information related to an identifiable individual. GDPR, approved in 2016, harmonizes data privacy laws across Europe and gives EU citizens control over their personal data and how organizations approach data privacy. The document outlines rights users have over their personal data under GDPR and expectations companies must meet, including obtaining consent, reporting data breaches, appointing data protection officers, and conducting privacy impact assessments.
The European Union General Data Protection Regulation (“EU-GDPR”) will come into effect on May, 25th. Your company may think it does not have to worry about this because you are located in the United States, and you may be wrong. If your company processes or holds personal data for a person residing in a European Union country, your company will have to comply.
Full GDPR toolkit: https://quality.eqms.co.uk/gdpr-general-data-protection-regulation-eu-toolkit
This free online training presentation provides you with information about how to comply with the General Data Protection Regulation, managing breaches, engaging employees, key requirements and more.
The Evolution of Data Privacy: 3 Things You Need To ConsiderSymantec
The European Union’s proposed General Data Protection Regulation (GDPR) has left even the most informed confused. This new regulation has been designed
to update the current directive which was drafted in a time that was in technology terms, prehistoric. It’s time to evolve.
General Data Protection Regulation (GDPR) tidal wave that has hit, are you ready? Is your organization prepared for the extensive privacy requirements GDPR puts forth for any organization handling EU Data Subjects' personal Data? At this point, organizations must have a complete inventory of personal data and have conducted a DPIA against it. A handful of supervisory authorities have issued compliance guidelines, but your organizations must be able to assess compliance with this ambiguous regulation at any time.
Many aspects of GDPR define the distinction between a data collector and a data processor, their respective responsibilities and compliance requirements. Those responsibilities will have an effect on the contracts you negotiate with third parties, the way in which you evaluate the risks involved with establishing a business relationship and the policies you develop to maintain compliance to the regulations.
Join this webinar to learn:
*More information about GDPR and what the industry is experiencing to date
*What minimum requirements you should have had in place by May 25, 2018
*What you should plan to do for the next 12-18 months if you are not completely ready
*What the SEC Privacy Shield program is and why you should self-certify
*How to continuously monitor vendor risk KPIs
New opportunities and business risks with evolving privacy regulationsUlf Mattsson
In the shadow of the global pandemic and the associated economic downturn, organizations are focused on cost optimization, which often leads to impulsive decisions to deprioritize compliance with all nonrevenue programs.
Regulators have evolved to adapt with the notable increase in data subject complaints and are getting more serious about organizations that don’t properly protect consumer data. Marriott was hit with a $124 million fine while Equifax agreed to pay a minimum of $575 million for its breach. The US Federal Trade Commission, the US Consumer Financial Protection Bureau (CFPB), and all 50 U.S. states and territories sued over the company’s failure to take “reasonable steps” to secure its sensitive personal data.
Privacy and data protection are enforced by a growing number of regulations around the world and people are actively demanding privacy protection — and legislators are reacting. More than 60 countries have introduced privacy laws in response to citizens’ cry for transparency and control. By 2023, 65% of the world’s population will have its personal information covered under modern privacy regulations, up from 10% today, according to Gartner. There is a convergence of data privacy principles, standards and regulations on a common set of fundamental principles.
The opportunities to use data are growing exponentially, but so too are the business and financial risks as the number of data protection and privacy regulations grows internationally.
Join this webinar to learn more about:
- Trends in modern privacy regulations
- The impact on organizations to protect and use sensitive data
- Data privacy principles
- The impact of General Data Protection Regulation (GDPR) and data transfer between US and EU
- The evolving CCPA, the new PCI DSS version 4 and new international data privacy laws or regulations
- Data privacy best practices, use cases and how to control sensitive personal data throughout the data life cycle
This document discusses key terms and requirements of the GDPR, provides an example of TalkTalk being fined for a data breach, and outlines the three main causes of data breaches and next steps for compliance. It discusses how existing processes, staff, and cybersecurity need to be addressed to comply with GDPR requirements for handling personal data. Specific actions mentioned include performing a data audit and mapping, implementing documentation and policies, and securing data through appropriate technical measures.
This document provides an overview of the GDPR and its implications for organizations that process personal data. It discusses key GDPR concepts like what constitutes personal data, the rights of data subjects, and the obligations of data controllers and processors. It also summarizes how GDPR compliance impacts business intelligence tools like Business Objects, and introduces 360Suite as a software solution that can help enhance Business Objects deployments and ensure they meet GDPR requirements through features like granular, incremental backups and restores of data.
Privacy experience in Plone and other open source CMSInteraktiv
This document discusses privacy experience in open source content management systems (CMS) like Plone. It begins by explaining why privacy matters and providing examples of recent privacy issues. It then discusses different approaches to privacy internationally and how this affects global open source communities. The document proposes universal privacy principles and discusses how privacy can be ensured in open source CMS communities specifically, with suggestions for Plone. It emphasizes a preventative, privacy by design approach.
How GDPR will change Personal Data Control and Affect EveryoneThomas Goubau
The proposed new EU data protection regime extends the scope of the EU data protection law to all foreign companies processing data of EU residents. It provides for a harmonisation of the data protection regulations throughout the EU, thereby making it easier for non-European companies to comply with these regulations; however, this comes at the cost of a strict data protection compliance regime with severe penalties of up to 4% of worldwide turnover.
EMMA’s EMEA Regional Director Joseph Yammine explains how the EU’s General Data Protection Regulation applies to the Health Care Industry and how you can prepare your team to follow the regulation and avoid any data breaches.
The document discusses the key aspects and requirements of the General Data Protection Regulation (GDPR). It notes that the GDPR strengthens and unifies data protection for individuals within the European Union. It applies to all companies processing personal data of EU residents, regardless of the company's location. The GDPR requires organizations to implement measures regarding data processing activities, data subject rights, security, breaches, and accountability. Non-compliance can result in significant fines of up to 4% of annual global turnover or €20 million. The GDPR has important implications for financial institutions and other organizations in how they manage personal data.
The top 10 GDPR requirements are:
1) Organizations must provide training to employees on protecting personal data and identifying breaches.
2) Companies can only collect the minimum personal data needed and must delete it once the purpose is complete.
3) Data subjects have rights like accessing their data, correcting it, and objecting or deleting it.
Similar to GDPR Benefits and a Technical Overview (20)
This document provides guidance on cybersecurity best practices for organizations. It notes that no network is completely secure and individuals often enable hacking through mistakes. It recommends establishing an incident response plan, purchasing cyber insurance, developing security policies and procedures, considering outsourcing security monitoring, regularly backing up data in multiple secure locations, and using a password manager. The document also warns against common pitfalls like not sustaining long-term security resources and provides links to additional cybersecurity resources.
IT Staff NDA Template Employee Confidentiality AgreementErnest Staats
This is a sample IT Staff NDA or "Employee Confidentiality Agreement" It has more power to educate staff on what they should or should not do with their power & Access.
The document provides legal disclaimers and information about sustainable cybersecurity practices. It discusses starting cybersecurity at the administration level by making it cultural rather than technical, based on needs rather than vendor features, iterative and continuous. It also discusses establishing a data protection steering committee and reducing reliance on people by ensuring responsibilities are understood and policies and processes are documented. The document provides recommendations on cybersecurity frameworks, controls, and best practices.
This document provides guidelines for implementing IT security controls based on the SANS Critical Controls, ISO, and NIST frameworks. It defines 35 key control areas and lists expected controls and examples of roles and responsibilities (RACI matrix) for each. The purpose is to help organizations assess, understand, and prioritize basic IT security needs, then establish controls and accountabilities. It also provides templates for documenting controls, future plans, and evidence of compliance.
How do we separate hype from useful information in Cyber Security? As Congress is debating a National privacy law, and several states have privacy and breach reporting laws, how will that impact our workload? Privacy starts with good cyber-hygiene. We will look at how we can leverage the focus on Privacy to address standards for:
Firewall and network Configs,
Cloud security
Protocols and ports that need attention
Authentication best practices
Server and network rights
Password rules
What does the current research say about the positive and negative influence of emerging technologies on our ministries, our families, and ourselves? It's imperative we comprehend how media impacts our mental and spiritual health. Technology is changing our lives, how we relate to and understand each other.
How to use technology in ministry & parentingErnest Staats
Engaging with technology beyond the level of experience. We need to understand how technology is changing us so we can ensure we are modeling wise habits. There are some good ways we can use technology to understand and shape its use. Suggestions will be given for what we can start doing today that will make positive impacts on our lives and ministries.
How do we separate hype from useful information in Cyber Security? As Congress is debating a National privacy law, and several states have their own privacy and breach reporting laws including Georgia, how will that impact our workload? Privacy starts with good cyber-hygiene. We will look at how we can leverage the focus on Privacy to address standards for:
Firewall and network setups
Cloud security
Protocols and ports that need attention
Authentication best practices
Server and network rights
Password rules
Idwg bimonthly security exchange cyber only sectionErnest Staats
Had a great time sharing with OSAC today on Cyber Security trends, We went over some practical steps organizations, and their staff can take to secure their information and privacy better.
The document discusses the benefits of meditation for reducing stress and anxiety. Regular meditation practice can help calm the mind and body by lowering heart rate and blood pressure. Studies have shown that meditating for just 10-20 minutes per day can have significant positive impacts on both mental and physical health over time.
Computer forensics is the process of applying scientific and analytical techniques to digital systems and file structures to determine potential legal evidence. It involves preserving the computer as a crime scene by powering off and copying the memory and system. Various types of forensic requests include intrusion analysis, damage assessment, suspect examination, and log file analysis to search for evidence such as image files, apps, and deleted or hidden files. The computer forensics process involves preparation, protection and preservation of evidence, imaging systems, examination of operating systems, applications, log files, and file systems, and thorough documentation.
Risk Management Approach to Cyber Security Ernest Staats
The document discusses implementing a risk management approach to cyber security. It emphasizes that security can no longer be outsourced and instead the security team should help others become more self-sufficient. It then discusses various cyber risks like the growing attack surface and risks to health care as a target. Finally, it discusses strategies to implement an enterprise risk management approach like determining how information flows and conducting risk analysis interviews.
Why security is the kidney not the tail of the dog v3Ernest Staats
Security is sometimes thought of being the tail that wags the Dog. A better analogy is that Cyber Security should be the Kidneys of the organization taking out the waste while allowing the useful information to pass.
FBI & Secret Service- Business Email Compromise WorkshopErnest Staats
This document provides information on various open source and low-cost security tools and solutions, including test email servers, phishing training modules, phishing frameworks, password checking tools, email alerts, network mapping tools, and more. It also lists free business intelligence software, and resources on avoiding business email compromise scams.
FBI & Secret Service- Business Email Compromise WorkshopErnest Staats
Compiled some Open source and other tools that I that I have used for BEC/EAC protection, security, & training. I had a great time sitting on the panel with other members.
The document provides tips for securing your digital footprint and privacy online. It discusses securing social media accounts, using strong and unique passwords, deleting personal information from search engines, enabling two-factor authentication, using secure browsers and VPNs, being wary of sharing personal information publicly, and understanding the risks of a large digital shadow and footprint online. It also covers tips for securing mobile devices, IoT devices, and protecting privacy when traveling across borders.
This document provides instructions for securely erasing personal information from various devices before donating or replacing them. It outlines steps to back up data, sign out of accounts, encrypt devices where possible, and perform factory resets. For Android and iOS devices, it recommends backing up data, signing out of accounts, encrypting the device, and performing a factory reset. For computers, it suggests backing up data, using encryption and secure erasing software like CCleaner to overwrite free space before performing a factory reset. Drilling holes in hard drives is presented as the most secure but less usable method for computers.
Border crossing mobile social media life-saving security tipsErnest Staats
This practical talk focused on steps one can take which could save them or someone else while traveling internationally or even around town. The focus was on the information that is “leaked” by mobile devices and social media, along with some of the most-overlooked steps that could lower risk.
This document discusses social and mobile security issues. It covers topics like the psychological impact of social media, internet addiction among college students, privacy concerns with sharing information and photos online, and tips for safe social media and mobile device use. Specific recommendations include educating yourself and loved ones on online risks, setting guidelines for internet and phone use, installing parental control software, using strong passwords, and being aware of location data and metadata attached to photos.
Building RAG with self-deployed Milvus vector database and Snowpark Container...Zilliz
This talk will give hands-on advice on building RAG applications with an open-source Milvus database deployed as a docker container. We will also introduce the integration of Milvus with Snowpark Container Services.
Introducing Milvus Lite: Easy-to-Install, Easy-to-Use vector database for you...Zilliz
Join us to introduce Milvus Lite, a vector database that can run on notebooks and laptops, share the same API with Milvus, and integrate with every popular GenAI framework. This webinar is perfect for developers seeking easy-to-use, well-integrated vector databases for their GenAI apps.
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdfMalak Abu Hammad
Discover how MongoDB Atlas and vector search technology can revolutionize your application's search capabilities. This comprehensive presentation covers:
* What is Vector Search?
* Importance and benefits of vector search
* Practical use cases across various industries
* Step-by-step implementation guide
* Live demos with code snippets
* Enhancing LLM capabilities with vector search
* Best practices and optimization strategies
Perfect for developers, AI enthusiasts, and tech leaders. Learn how to leverage MongoDB Atlas to deliver highly relevant, context-aware search results, transforming your data retrieval process. Stay ahead in tech innovation and maximize the potential of your applications.
#MongoDB #VectorSearch #AI #SemanticSearch #TechInnovation #DataScience #LLM #MachineLearning #SearchTechnology
Pushing the limits of ePRTC: 100ns holdover for 100 daysAdtran
At WSTS 2024, Alon Stern explored the topic of parametric holdover and explained how recent research findings can be implemented in real-world PNT networks to achieve 100 nanoseconds of accuracy for up to 100 days.
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...Neo4j
Leonard Jayamohan, Partner & Generative AI Lead, Deloitte
This keynote will reveal how Deloitte leverages Neo4j’s graph power for groundbreaking digital twin solutions, achieving a staggering 100x performance boost. Discover the essential role knowledge graphs play in successful generative AI implementations. Plus, get an exclusive look at an innovative Neo4j + Generative AI solution Deloitte is developing in-house.
“An Outlook of the Ongoing and Future Relationship between Blockchain Technologies and Process-aware Information Systems.” Invited talk at the joint workshop on Blockchain for Information Systems (BC4IS) and Blockchain for Trusted Data Sharing (B4TDS), co-located with with the 36th International Conference on Advanced Information Systems Engineering (CAiSE), 3 June 2024, Limassol, Cyprus.
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...James Anderson
Effective Application Security in Software Delivery lifecycle using Deployment Firewall and DBOM
The modern software delivery process (or the CI/CD process) includes many tools, distributed teams, open-source code, and cloud platforms. Constant focus on speed to release software to market, along with the traditional slow and manual security checks has caused gaps in continuous security as an important piece in the software supply chain. Today organizations feel more susceptible to external and internal cyber threats due to the vast attack surface in their applications supply chain and the lack of end-to-end governance and risk management.
The software team must secure its software delivery process to avoid vulnerability and security breaches. This needs to be achieved with existing tool chains and without extensive rework of the delivery processes. This talk will present strategies and techniques for providing visibility into the true risk of the existing vulnerabilities, preventing the introduction of security issues in the software, resolving vulnerabilities in production environments quickly, and capturing the deployment bill of materials (DBOM).
Speakers:
Bob Boule
Robert Boule is a technology enthusiast with PASSION for technology and making things work along with a knack for helping others understand how things work. He comes with around 20 years of solution engineering experience in application security, software continuous delivery, and SaaS platforms. He is known for his dynamic presentations in CI/CD and application security integrated in software delivery lifecycle.
Gopinath Rebala
Gopinath Rebala is the CTO of OpsMx, where he has overall responsibility for the machine learning and data processing architectures for Secure Software Delivery. Gopi also has a strong connection with our customers, leading design and architecture for strategic implementations. Gopi is a frequent speaker and well-known leader in continuous delivery and integrating security into software delivery.
A tale of scale & speed: How the US Navy is enabling software delivery from l...sonjaschweigert1
Rapid and secure feature delivery is a goal across every application team and every branch of the DoD. The Navy’s DevSecOps platform, Party Barge, has achieved:
- Reduction in onboarding time from 5 weeks to 1 day
- Improved developer experience and productivity through actionable findings and reduction of false positives
- Maintenance of superior security standards and inherent policy enforcement with Authorization to Operate (ATO)
Development teams can ship efficiently and ensure applications are cyber ready for Navy Authorizing Officials (AOs). In this webinar, Sigma Defense and Anchore will give attendees a look behind the scenes and demo secure pipeline automation and security artifacts that speed up application ATO and time to production.
We will cover:
- How to remove silos in DevSecOps
- How to build efficient development pipeline roles and component templates
- How to deliver security artifacts that matter for ATO’s (SBOMs, vulnerability reports, and policy evidence)
- How to streamline operations with automated policy checks on container images
GraphSummit Singapore | The Art of the Possible with Graph - Q2 2024Neo4j
Neha Bajwa, Vice President of Product Marketing, Neo4j
Join us as we explore breakthrough innovations enabled by interconnected data and AI. Discover firsthand how organizations use relationships in data to uncover contextual insights and solve our most pressing challenges – from optimizing supply chains, detecting fraud, and improving customer experiences to accelerating drug discoveries.
20 Comprehensive Checklist of Designing and Developing a WebsitePixlogix Infotech
Dive into the world of Website Designing and Developing with Pixlogix! Looking to create a stunning online presence? Look no further! Our comprehensive checklist covers everything you need to know to craft a website that stands out. From user-friendly design to seamless functionality, we've got you covered. Don't miss out on this invaluable resource! Check out our checklist now at Pixlogix and start your journey towards a captivating online presence today.
Dr. Sean Tan, Head of Data Science, Changi Airport Group
Discover how Changi Airport Group (CAG) leverages graph technologies and generative AI to revolutionize their search capabilities. This session delves into the unique search needs of CAG’s diverse passengers and customers, showcasing how graph data structures enhance the accuracy and relevance of AI-generated search results, mitigating the risk of “hallucinations” and improving the overall customer journey.
Removing Uninteresting Bytes in Software FuzzingAftab Hussain
Imagine a world where software fuzzing, the process of mutating bytes in test seeds to uncover hidden and erroneous program behaviors, becomes faster and more effective. A lot depends on the initial seeds, which can significantly dictate the trajectory of a fuzzing campaign, particularly in terms of how long it takes to uncover interesting behaviour in your code. We introduce DIAR, a technique designed to speedup fuzzing campaigns by pinpointing and eliminating those uninteresting bytes in the seeds. Picture this: instead of wasting valuable resources on meaningless mutations in large, bloated seeds, DIAR removes the unnecessary bytes, streamlining the entire process.
In this work, we equipped AFL, a popular fuzzer, with DIAR and examined two critical Linux libraries -- Libxml's xmllint, a tool for parsing xml documents, and Binutil's readelf, an essential debugging and security analysis command-line tool used to display detailed information about ELF (Executable and Linkable Format). Our preliminary results show that AFL+DIAR does not only discover new paths more quickly but also achieves higher coverage overall. This work thus showcases how starting with lean and optimized seeds can lead to faster, more comprehensive fuzzing campaigns -- and DIAR helps you find such seeds.
- These are slides of the talk given at IEEE International Conference on Software Testing Verification and Validation Workshop, ICSTW 2022.
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...SOFTTECHHUB
The choice of an operating system plays a pivotal role in shaping our computing experience. For decades, Microsoft's Windows has dominated the market, offering a familiar and widely adopted platform for personal and professional use. However, as technological advancements continue to push the boundaries of innovation, alternative operating systems have emerged, challenging the status quo and offering users a fresh perspective on computing.
One such alternative that has garnered significant attention and acclaim is Nitrux Linux 3.5.0, a sleek, powerful, and user-friendly Linux distribution that promises to redefine the way we interact with our devices. With its focus on performance, security, and customization, Nitrux Linux presents a compelling case for those seeking to break free from the constraints of proprietary software and embrace the freedom and flexibility of open-source computing.
Threats to mobile devices are more prevalent and increasing in scope and complexity. Users of mobile devices desire to take full advantage of the features
available on those devices, but many of the features provide convenience and capability but sacrifice security. This best practices guide outlines steps the users can take to better protect personal devices and information.
Enchancing adoption of Open Source Libraries. A case study on Albumentations.AIVladimir Iglovikov, Ph.D.
Presented by Vladimir Iglovikov:
- https://www.linkedin.com/in/iglovikov/
- https://x.com/viglovikov
- https://www.instagram.com/ternaus/
This presentation delves into the journey of Albumentations.ai, a highly successful open-source library for data augmentation.
Created out of a necessity for superior performance in Kaggle competitions, Albumentations has grown to become a widely used tool among data scientists and machine learning practitioners.
This case study covers various aspects, including:
People: The contributors and community that have supported Albumentations.
Metrics: The success indicators such as downloads, daily active users, GitHub stars, and financial contributions.
Challenges: The hurdles in monetizing open-source projects and measuring user engagement.
Development Practices: Best practices for creating, maintaining, and scaling open-source libraries, including code hygiene, CI/CD, and fast iteration.
Community Building: Strategies for making adoption easy, iterating quickly, and fostering a vibrant, engaged community.
Marketing: Both online and offline marketing tactics, focusing on real, impactful interactions and collaborations.
Mental Health: Maintaining balance and not feeling pressured by user demands.
Key insights include the importance of automation, making the adoption process seamless, and leveraging offline interactions for marketing. The presentation also emphasizes the need for continuous small improvements and building a friendly, inclusive community that contributes to the project's growth.
Vladimir Iglovikov brings his extensive experience as a Kaggle Grandmaster, ex-Staff ML Engineer at Lyft, sharing valuable lessons and practical advice for anyone looking to enhance the adoption of their open-source projects.
Explore more about Albumentations and join the community at:
GitHub: https://github.com/albumentations-team/albumentations
Website: https://albumentations.ai/
LinkedIn: https://www.linkedin.com/company/100504475
Twitter: https://x.com/albumentations
2. DISCLAIMER
This presentation is a commentary on the GDPR, as Ernest Staats, interprets it, as of the date of
publication. We’ve spent some time with GDPR and like to think we’ve been thoughtful about its
intent and meaning. But the application of GDPR is highly fact-specific, and not all aspects and
interpretations of GDPR are well-settled.
As a result, this presentation is provided for informational purposes only and should not be relied
upon as legal advice or to determine how GDPR might apply to you and your organization. We
encourage you to work with a legally qualified professional to discuss GDPR, how it applies
specifically to your organization, and how best to ensure compliance.
Ernest Staats, MAKE NO WARRANTIES, EXPRESS, IMPLIED, OR STATUTORY, AS TO THE
INFORMATION IN THIS PRESENTATION. This presentation is provided “as-is.” information and
views expressed in this presentation, including URL and other Internet website references, may
change without notice.
2
4. TO LEARN MORE ABOUT GDPR
There are 99 Articles, which together define the
Regulation
There are 173 Recitals
Essential how to understand how the Regulation
will be interpreted by the EU Data Protection
Authorities
To understand the Articles and Recitals
http://www.privacy-regulation.eu
Free Guides: from Taylor Wessing
4
5. 5
•Industry Best Practices
•Data Discovery &
Inventory
•Implement Security
Standards
•Enterprise Risk Register
• A shift in thinking
7. (ALL KEY ROLES HAVE A STAKE IN THE
GAME)
Controller
An Entity that
collects personal
data for some
purpose
7
Processer
An entity that
processes data
on behalf of the
controller
Controllers and Processors are to implement controls to ensure a level of security appropriate to the risk (Article 32)
8. Any information relating to an
identified or identifiable natural
person “Data Subject”
Name
IP address / MAC address
Face
All PII or ePHI
What is Personal data?
More care needs to be taken with sensitive personal
data eg. health data, religious beliefs
9. PRIVACY
NOTICE
What information is being collected?
Who is collecting it?
How is it collected?
Why is it being collected?
How will it be used?
Who will it be shared with? http://ico.org.uk/for-organisations/guide-to-
data-protection/privacy-notices-transparency-
and-control/
10. • Right to be informed
• Right to access personal data
• Right to rectification – correct
errors
• Right to erasure
• Right to restriction
• Right to data portability
• Right to object
10
RIGHTS AND REDRESS
11. FAIR AND LAWFUL
Make sure you have a
legal basis to process
personal data
Only collect what you
need
Clearly tell individuals
what personal data
you are collecting and
why
13. Appropriate technical and
organisational measures
shall be taken against
unauthorized use or
unlawful processing of
personal data and against
accidental loss or
destruction of, or damage
to, personal data.
SECURITY OF PERSONAL DATA
14. WHAT CAN YOU DO?
Use the CIS Critical Security Controls to baseline your systems
Critical-Security-Control-Manual-Assessment-Tool-v7
Security-Control-Executive-Assessment-Tool
Critical Security Control SubSet Mappings v7.0b.xlsx
Use the form below to vet your cloud vendors
Cloud_Provider_Security_Assessment_Questionnaire_Templ
ate.xlsx
Write an Incident Response Policy and Procedures
14
Absolute announced new “Free” GDPR Data Risk and Endpoint Readiness Assessments
https://www.absolute.com/en/go/reports/gdpr-data-risk-assessment to accelerate compliance with the
impending General Data Protection Regulation (GDPR
15. GDPR CONSENT
15
43 GDPR Requirements*
1. Provide notification to data subjects,
in clear and plain language.
2. Request and obtain the data
subject’s affirmative and granular
consent.
3. Discontinue with processing
activities if the data subject denies
consent.
4. Provide a mechanism for data
subjects to withdraw consent.
5. Obtain affirmative consent from a
child’s (under age of 16) parent or
guardian.
16. GDPR NOTICE
16
1. Provide notice of processing activities at the
time personal data is obtained.
2. Provide notice of processing activities if
personal data has not been obtained
directly.
3. Provide the data privacy notice at all points
where personal data is collected.
17. GDPR DATA SUBJECT RIGHTS 1-8
17
1. Provide mechanism for validating
identity of the requesting data
subject.
2. Provide mechanism for to request
access to their personal data.
3. Provide a mechanism to respond to
requests on personal data access.
4. Maintain the technological ability to
trace and search personal data.
5. Provide mechanism to request
rectification and rectify personal
data.
6. Provide a mechanism to request the
erasure of personal data.
7. Maintain the technological ability to
locate and erase personal data.
8. Track to which additional controllers
18. GDPR DATA SUBJECTS RIGHTS 9-16
18
9. When personal data is made public,
contact those entities for data
erasure.
10.Provide mechanism to request the
restriction of data processing.
11.Maintain the technological ability to
restrict processing of personal data.
12.Provide mechanism to request
copies and transmit personal.
13.Provide mechanism to respond to
data portability requests.
14.Locate personal data and export in
structured, machine-readable
formats.
15.If processing for direct marketing,
provide mechanism to object.
16.Maintain the technological ability to
19. GDPR DATA GOVERNANCE
19
1. Maintain audit trails to demonstrate
accountability and compliance.
2. Maintain inventory of data detailing
categories of data subjects.
3. Maintain auditable trails of
processing activities.
4. Carry out data protection impact
assessments of processing
operations.
5. Provide the de-identification of
personal data for archiving
purposes.
20. GDPR PRIVACY BY DESIGN
20
1. Embed privacy controls (in service
and development lifecycle).
2. Embed privacy designed to minimize
the amount of personal data
collected.
21. GDPR DATA SECURITY
21
1. Provide mechanism to
pseudonymize, encrypt, or otherwise
secure personal data.
2. Implement security measures in the
service.
3. Confirm ongoing confidentiality,
integrity, and availability of personal
data.
4. Provide mechanism to restore the
availability and access to personal
data.
5. Facilitate regular testing of security
measures.
22. GDPR COMPLIANCE MODEL
22
1. Controllers notify DPA within 72
hours in the event of a data breach
incident.
2. Controllers notify affected data
subjects of a high-risk data breach
incident.
3. Processors notify controllers without
undue delay of a data breach
incident.
23. GDPR DATA TRANSFER
23
1. Track and record personal data that
is forwarded to third-parties.
2. Provide mechanism for tracking and
recording data transfers in and out of
the EU.
3. Maintain inventory of data transfer
contracts with third-parties.
4. Provide appropriate safeguards (e.g.,
Privacy Shield) for effective legal
remedies.
Editor's Notes
There are 99 Articles, which together define the Regulation
•What’s equally important are the Recitals
›173 Recitals in total
›They provide a way to interpret the Articles
›Essential how to understand how the Regulation will be interpreted by the EU Data Protection Authorities
•To help easily navigate the Articles and Recitals, there are some great online resources
›Ex: http://www.privacy-regulation.eu
Data Inventory
•This lists what data you collect, and where you store and process that data
•Keep it simple!
•Your legal representation may have a free spreadsheet for this exercise. If not, create a spreadsheet with the following columns:
›Department
›System
›Admin
›Who is the data about
›Data Type
›Where is it located
›Who provided the data
›Why did you collect the data
•Inventory in-hand, go talk with your outside counsel for next steps
Industry Best Practices
Common Security Standard and Frameworks
A shift in thinking
Who does the data belong to
How are we going to handle data?
To comply with GDPR, organizations must know their data. There’s no way to follow GDPR without knowing about the data that one collects and processes.
Knowing one’s data is essential to protecting it. An organization must understand the type of data it has, why it has it, how it is used, and with whom it is shared, among other things. This is the first step to getting a handle on data protection
You’ve just inventoried your data (Data Inventory). We now need to understand what risks are associated with personal and sensitive data
•Identify which data is high risk, and which is critical risk
•If you don’t have a Risk Register, you can easily create one with the following columns:
›The data set
›The vulnerability associated with that data
›The threat associated with that
›Likelihood of the threat
›Impact of the threat
›Recommended control(s)
Both Data Controllers and Processers must
Detect & prevent a personal data breach, which is a breach of security leading to the accidental or unlawful destruction, loss, alteration, unauthorized disclosure, or access to personal data (Article 4)
GDPR looks for controllers and processors to implement controls to ensure a level of security appropriate to the risk (Article 32)
Controller
“The natural or legal person, which, …, determines the purposes and means of the processing of personal data.”
Processer
“a natural or legal person, public authority, agency or other body which processes personal data on behalf of the controller.”
the natural or legal person, public authority, agency or other body which, alone or jointly with others, determines the purposes and means of the processing of personal data; where the purposes and means of such processing are determined by Union or Member State law, the controller or the specific criteria for its nomination may be provided for by Union or Member State law.”
Solution Purveyor
CSV
ISP
Consultant
Data protection law applies when your Org, as data controllers are processing personal data.
What is personal data?
It includes any records, as well as information held and used about identified or identifiable natural persons. CCTV images, website photos and information, apps, etc. Paper-based and digital.
Personal Data (from GDPR)
“…means any information relating to an identified or identifiable natural person ('data subject'); an identifiable natural person is one who can be identified, directly or indirectly, in particular by reference to an identifier such as a name, an identification number, location data, an online identifier or to one or more factors specific to the physical, physiological, genetic, mental, economic, cultural or social identity of that natural person.”
“Processing” refers to anything you do with personal data – collecting, using, analysing, sharing, and disposal.
The GDPR defines personal data quite broadly. According to the GDPR Article 4, personal data is “any information relating to an identified or identifiable natural person.”
Many privacy laws cover identified people but fail to adequately cover identifiable people. In contrast, the GDPR has a broad definition of identifiable: “[A]n identifiable person is one who can be identified, directly or indirectly, in particular by reference to an identifier such as a name, an identification number, location data, online identifier or to one or more factors specific to the physical, physiological, genetic, mental, economic, cultural or social identity of that person.”
It is alarming how much data that we think isn’t linkable to a person can actually be linked to that person. The GDPR understands this; many other privacy laws don’t
Privacy notices are an important and necessary way of being transparent and telling parents, pupils and staff what you’re doing with their information.
You should have a clear privacy notice and make people aware of it, in a way they’re likely to see and understand – for example, on your website, on your noticeboard, in communications with parents and staff. It should tell people the detail in the bullet points on the slide.
make sure you tailor any templates you use so that they clearly and accurately reflect what you do with people’s data.
You’ll also have to consider how you provide privacy notices to staff, about what you do with their data.
Our recently-updated guidance - Privacy notices, transparency and control code of practice - is a must-read to help you comply in this area.
Right to be informed about the person data organizations have about them
Right to access personal data
Right to rectification – correct errors in personal data or add to incomplete records
Right to erasure (aka “the right to be forgotten”)
Right to restriction on processing of personal data
Right to data portability
Right to object to the processing of personal data
Over the next few minutes, we’re going to highlight some of the principles in a bit more detail to see how they apply to what schools do, and what you need to do about it.
Principle 1 requires that:
Personal data shall be processed fairly, lawfully and in accordance with an appropriate schedule condition (2 or 2&3)
Make sure you have a legal basis for the processing:
Lawful – don’t break any other law e.g. common law duty of confidentiality; Human Rights Act
Need a good legal justifiable reason/basis for the processing. In the DPA these are found in schedules 2 and 3 - for processing personal data you must identify a relevant schedule 2 condition that applies, and if the personal data is sensitive (health, racial or ethnic origin, religious beliefs, criminal offences, sexual life, etc) a relevant schedule 3 condition must also apply.
Example conditions that schools may currently rely on are:
- necessary for a legal obligation
- necessary for a function of a public nature exercised in the public interest
- consent
Note that most of the conditions require the processing to be ‘necessary’ – this means you should only collect and use what you need for your purpose.
Fair:
No unwarranted detrimental effects on individuals
Within the reasonable expectations of users whose personal data it is.
Clearly tell them what you’re doing with their data. Privacy notices and other, more innovative ways.
This is also an important principle when deciding if it’s OK to share / disclose information to, other organisations.
Image used with permission from https://www.serveit.com/gdpr-for-developers-data-protection-by-design-and-default/
Article 25 of the GDPR mandates that data protection be built in starting at the beginning of the design process. This means that data protection cannot be an afterthought and must be documented.
By default, only personal data necessary for each specific purpose of the processing should be processed. Default settings should be set so that personal data isn’t accessible to an indefinite number of people.
To comply, you need to ensure that your organization has taken appropriate technical and organizational measures to protect the personal data it processes.
Think about all the personal data you hold:
Manual records – what files do you have? How can you keep these appropriately secure?
- where do you store them? (locked cabinets, locked rooms etc)
- who has access to them? (staff, other third parties?)
- Have you got any stored away in an archive?
- Do you securely destroy records in line with a retention policy?
- How do you transport them if needed?
- What about if you need to share information? How is it sent? Do you know if it’s been received by the correct recipient?
- Do staff need to take records out of the office, for working at home or at other premises? Do you allow this?
What about electronic files and portable devices? –
- lots of what we have already said already applies
- are the files / devices encrypted?
- do you have a secure password policy that staff stick to?
- do you have role-based access controls with individual logons?
- what about uploading or sending data to other organisations when you need to, what mechanisms do you use? Are they secure?
- do staff have the ability to access internal systems and data outside of organization? How?
- Do you allow BYOD (bring your own device)?
Examples of security incidents we’ve seen:
Human error, often combined with inadequate policies in place:
Full attendance record mistakenly sent to new employer as part of a reference
Letters and emails sent to the wrong clients, staff, including, disciplinary, health and other sometimes sensitive information
Sensitive personal data lost in the post –
- personal data found at printer by another staff or client
Staff or client reports sent to the wrong address
- email addressing - non-use of BCC where it would have been appropriate
- text message re staff behaviour meant for supervisor sent to wrong person in error
- data file with staff and client personal data accidentally placed in shared drive
- spreadsheet uploaded to website - full details of sensitive information
Technical measures - passwords
passwords to access sensitive information not sufficiently strong
Technical security measures
website security - personal data accessible. Insufficient pen testing, inaccurate coding
sending sensitive information via unprotected email
- lost unprotected USB sticks including sensitive private data
- unencrypted drives / laptops / devices stolen from homes / cars / bags
website hacked, administrator passwords stolen. One staff used the same password for their website administrator access and their access to the main organization database. Hackers accessed information from the database.
The seventh principle also sets out the requirements for when you use data processors (as we mentioned before, for example using Iron Mountian or other system providers for processing your data, using shredding companies to shred confidential paper waste, using cloud IT providers)
When you use a data processor, the seventh principle requires:
- that you choose a processor who offers sufficient guarantees that they can look after your data properly
- that you have a written contract in place setting out that the processor keeps the data as secure as you would have to under the law, and that they are to only process data in they way you instruct them to
- that you take reasonable steps to ensure that the processor complies
“…organizations must demonstrate that they have implemented appropriate measures to mitigate privacy risks. Even in the absence of a privacy breach or customer complaint, regulators may require firms to exhibit evidence of their compliance and risk management strategies, including a privacy impact assessment (PIA) when appropriate.”
Source: Brief: You Need An Action Plan For The GDPR; Forrester Research; October 2016