Overview:
In the Philippines, a Utility Plant within a Refinery operates Gas Turbines
that were originally packaged by US Turbines each comprising of MHI
MF-111B turbines and Brush generators. Obsolete Allen Bradley PLC
Series 5 were still in service performing the operating sequencing and fuel
control functions of the turbine-generator sets. Schneider Electric was
awarded as the Main Automation Contractor (MAC) the upgrade project.
The scope of retrofit included the turbine controls, safeguarding and fire
& gas systems, automatic voltage regulator, electrical protection systems,
mechanical equipment, and field instrumentation to address safety,
integrity, reliability issues while achieving operation cost reductions.
Challenges:
Documentation: The existing systems had been commissioned
twenty years earlier and documentation was lacking accurate as-built
information.
Integration: Initial biggest challenge was the review and re-design
of complex interfacing of the existing system that comprised of
numerous third party instruments and devices.
Safety: To understand and address the safety enhancements for all
of instruments associated with the upgrade project.
System Reliability: Customer highlighted known reliability issues that
they wanted to address during the project. Such as the unreliable
start-up performance, online switching of firing mode issues, DeNOx
system performance, improving the safeguarding instrumentation
reliability, and electromagnetic compatibility related to earthing and
signal segregation. Mechanical reliability improvement required the
replacement of existing the pneumatic actuated Inlet Guide Vane
(IGV) that was known to be unable to achieve the desired opening
position accurately.
Installation & Commissioning: Significant engineering effort was
deployed to help the end-user recover the lack of accurate as-built
plant data, including discrepancies between drawings and actual
switch gear wiring. The commissioning schedule did not allow for
site delay or any online disturbances to the power network for the
operating plant.
Location: Electrical and mechanical installation was done at a remote
site location with limited local skilled resources and readily available
installation materials.
Gas Turbine Generators Control System Philippines
Turbomachinery Control
Case Study
Summary
PROJECT AT A GLANCE:
Location: Philippines
refinery operates gas turbines that were
originally packaged by US Turbines,
each comprised of Mitsubishi turbines
and Brush generators. An obsolete Allen
Bradley PLC Series 5 was still performing
the operating sequencing and fuel control
functions of the turbine-generator sets.
safeguarding systems, fire and gas
systems, automatic voltage regulator,
electrical protection systems, mechanical
equipment, and field instrumentation.
These upgrades improved safety,
integrity, and reliability while reducing
operating costs.
CUSTOMER BENEFITS:
Improved safety and integrity
A utility plant in Philippines upgraded their obsolete technology and improved operational capacity by engaging Schneider
Electric to retrofit their three gas turbine control systems, upgrade electrical and mechanical equipment, replace fire & gas
and field instrumentation.
For prompt support, call +65 6829 8123
or email APAC.TMC@schneider-electric.om
Schneider Electric: 15 Changi Business Park Central 1 Singapore 486057 Tel: +65 6829 8888
means, electronic or mechanical, including photocopying, recording, broadcasting, or by any information storage or retrieval systems, without permission in writing from Schneider Electric Singapore.
Solutions:
Control System: Schneider Electric designed and engineered an Integrated Gas Turbine and Generator Control
System built on a Triconex Triple Modular Redundant (TMR) system and Wonderware InTouch Human-Machine
Interface (HMI) that provided improved system reliability and enhanced diagnostic awareness for operations.
Load Sharing: Schneider Electric replaced out-of-date Woodward real power sensor with an embedded software
based load sharing system that integrated three generator sets.
Synchronization:
provided fast response and achieved highly successful Circuit Breaker close rate with minimum disturbance to plant
operations.
Fire & Gas System: The existing fire & gas system was completely replaced including detectors with the Triconex
TMR System.
Auto Voltage Regulator: The existing automatic voltage regulator (AVR) systems was upgraded to a dual redundant
modular AVR configuration that was designed with independent controllers and power circuits.
IGV Actuator: The problematic existing pneumatic actuated IGV was retrofitted with a reliable and precise hydraulic
actuator system.
Cabinets and Instruments: Schneider Electric supplied new cabinets, field devices, and supervised the site installation,
retrofits and startup commissioning.
Results:
Improved Performance: The integrated control system and unit operations significantly improved reliability and
operational performance. Successful single gas turbine firing and start-ups are now achieved while achieving a
reduction of nuisance trip events.
Modernized Assets:
simplified the system maintenance in terms of cost, local support availability and quick turnaround of hardware spares.
With the enhanced diagnostics provided by the new control systems the overall plant’s performance has improved. The
Enhanced reliability & Efficiency: Due to the upgraded Gas Turbine Control system which used a robust and versatile
combination of logic to handle numerous operating scenarios, it has improved the plant’s reliability and operational
efficiency.
Customer Satisfaction: The end-user was extremely satisfied with Schneider Electric’s professional engineering and
project management – from the solution design, configuration and testing through to site installation, startup, training,
local support and service for system handover.
Make the most of your energySM
Turbomachinery Solutions and Services

More Related Content

What's hot

Sustainability for Multi-site
Sustainability for Multi-siteSustainability for Multi-site
Sustainability for Multi-site
Eng Yong CH'NG, CEng MEI, CEM, CMVP, PEM
 
Resumes
ResumesResumes
Resumes
Moses Kamanda
 
EIS Overview & Case Studies Presentation EIS 2016
EIS Overview & Case Studies Presentation EIS 2016EIS Overview & Case Studies Presentation EIS 2016
EIS Overview & Case Studies Presentation EIS 2016
Dennis Cody
 
Alan Bull CTOTF NERC Presentation
Alan Bull CTOTF NERC PresentationAlan Bull CTOTF NERC Presentation
Alan Bull CTOTF NERC Presentation
NAES Corporation
 
George Campbell Resume
George Campbell ResumeGeorge Campbell Resume
George Campbell Resume
George Campbell
 
CV
CVCV
Wind Prospect Poster 023 - Optimising Facility Power Curve Calculations in So...
Wind Prospect Poster 023 - Optimising Facility Power Curve Calculations in So...Wind Prospect Poster 023 - Optimising Facility Power Curve Calculations in So...
Wind Prospect Poster 023 - Optimising Facility Power Curve Calculations in So...
Matthew Behrens
 
Critical Power: NFPA 110: Standard for Emergency and Standby Power
Critical Power: NFPA 110: Standard for Emergency and Standby Power Critical Power: NFPA 110: Standard for Emergency and Standby Power
Critical Power: NFPA 110: Standard for Emergency and Standby Power
ConsultingSpecifyingEngineer
 
A New Simulation Modeling for Nonlinear Current Control in Single Phase Grid ...
A New Simulation Modeling for Nonlinear Current Control in Single Phase Grid ...A New Simulation Modeling for Nonlinear Current Control in Single Phase Grid ...
A New Simulation Modeling for Nonlinear Current Control in Single Phase Grid ...
IRJET Journal
 
Power sytem improvement techniques
Power sytem improvement techniquesPower sytem improvement techniques
Power sytem improvement techniques
Jimmy Thacker
 
Telinstra Presentation
Telinstra PresentationTelinstra Presentation
Telinstra Presentation
telinstra FZCO
 
abid1
abid1abid1
abid1
Abid Ali
 
Critical Power: Integrating Renewable Power into Buildings
Critical Power: Integrating Renewable Power into BuildingsCritical Power: Integrating Renewable Power into Buildings
Critical Power: Integrating Renewable Power into Buildings
ConsultingSpecifyingEngineer
 
Application of Control Strategies to Ride through Capability Over Different T...
Application of Control Strategies to Ride through Capability Over Different T...Application of Control Strategies to Ride through Capability Over Different T...
Application of Control Strategies to Ride through Capability Over Different T...
IRJET Journal
 
Project Fauji Fresh n Freeze
Project Fauji Fresh n FreezeProject Fauji Fresh n Freeze
Project Fauji Fresh n Freeze
Muhammad Raza Waseem
 
US EPA's Electronic Reporting Tool and Compliance and Emissions Data Reportin...
US EPA's Electronic Reporting Tool and Compliance and Emissions Data Reportin...US EPA's Electronic Reporting Tool and Compliance and Emissions Data Reportin...
US EPA's Electronic Reporting Tool and Compliance and Emissions Data Reportin...
All4 Inc.
 
ComEd Retro-Commissioning Program
ComEd Retro-Commissioning ProgramComEd Retro-Commissioning Program
ComEd Retro-Commissioning Program
Illinois ASHRAE
 
Energy storage fauzan kurnia
Energy storage fauzan kurniaEnergy storage fauzan kurnia
Energy storage fauzan kurnia
fznkurnia
 
Energy Storage solutions
Energy Storage solutionsEnergy Storage solutions
Energy Storage solutions
Schneider Electric
 
CEP-Capabilities Listing SellSheet
CEP-Capabilities Listing SellSheetCEP-Capabilities Listing SellSheet
CEP-Capabilities Listing SellSheet
Brian V. Wilson
 

What's hot (20)

Sustainability for Multi-site
Sustainability for Multi-siteSustainability for Multi-site
Sustainability for Multi-site
 
Resumes
ResumesResumes
Resumes
 
EIS Overview & Case Studies Presentation EIS 2016
EIS Overview & Case Studies Presentation EIS 2016EIS Overview & Case Studies Presentation EIS 2016
EIS Overview & Case Studies Presentation EIS 2016
 
Alan Bull CTOTF NERC Presentation
Alan Bull CTOTF NERC PresentationAlan Bull CTOTF NERC Presentation
Alan Bull CTOTF NERC Presentation
 
George Campbell Resume
George Campbell ResumeGeorge Campbell Resume
George Campbell Resume
 
CV
CVCV
CV
 
Wind Prospect Poster 023 - Optimising Facility Power Curve Calculations in So...
Wind Prospect Poster 023 - Optimising Facility Power Curve Calculations in So...Wind Prospect Poster 023 - Optimising Facility Power Curve Calculations in So...
Wind Prospect Poster 023 - Optimising Facility Power Curve Calculations in So...
 
Critical Power: NFPA 110: Standard for Emergency and Standby Power
Critical Power: NFPA 110: Standard for Emergency and Standby Power Critical Power: NFPA 110: Standard for Emergency and Standby Power
Critical Power: NFPA 110: Standard for Emergency and Standby Power
 
A New Simulation Modeling for Nonlinear Current Control in Single Phase Grid ...
A New Simulation Modeling for Nonlinear Current Control in Single Phase Grid ...A New Simulation Modeling for Nonlinear Current Control in Single Phase Grid ...
A New Simulation Modeling for Nonlinear Current Control in Single Phase Grid ...
 
Power sytem improvement techniques
Power sytem improvement techniquesPower sytem improvement techniques
Power sytem improvement techniques
 
Telinstra Presentation
Telinstra PresentationTelinstra Presentation
Telinstra Presentation
 
abid1
abid1abid1
abid1
 
Critical Power: Integrating Renewable Power into Buildings
Critical Power: Integrating Renewable Power into BuildingsCritical Power: Integrating Renewable Power into Buildings
Critical Power: Integrating Renewable Power into Buildings
 
Application of Control Strategies to Ride through Capability Over Different T...
Application of Control Strategies to Ride through Capability Over Different T...Application of Control Strategies to Ride through Capability Over Different T...
Application of Control Strategies to Ride through Capability Over Different T...
 
Project Fauji Fresh n Freeze
Project Fauji Fresh n FreezeProject Fauji Fresh n Freeze
Project Fauji Fresh n Freeze
 
US EPA's Electronic Reporting Tool and Compliance and Emissions Data Reportin...
US EPA's Electronic Reporting Tool and Compliance and Emissions Data Reportin...US EPA's Electronic Reporting Tool and Compliance and Emissions Data Reportin...
US EPA's Electronic Reporting Tool and Compliance and Emissions Data Reportin...
 
ComEd Retro-Commissioning Program
ComEd Retro-Commissioning ProgramComEd Retro-Commissioning Program
ComEd Retro-Commissioning Program
 
Energy storage fauzan kurnia
Energy storage fauzan kurniaEnergy storage fauzan kurnia
Energy storage fauzan kurnia
 
Energy Storage solutions
Energy Storage solutionsEnergy Storage solutions
Energy Storage solutions
 
CEP-Capabilities Listing SellSheet
CEP-Capabilities Listing SellSheetCEP-Capabilities Listing SellSheet
CEP-Capabilities Listing SellSheet
 

Similar to Gas Turbine Generators Control System Philippines

KK Wind Solutions presentation on Control System Retrofit
KK Wind Solutions presentation on Control System RetrofitKK Wind Solutions presentation on Control System Retrofit
KK Wind Solutions presentation on Control System Retrofit
René Balle
 
Power Generation: Coal-Fired
Power Generation: Coal-FiredPower Generation: Coal-Fired
Power Generation: Coal-Fired
GE Measurement & Control
 
11-IAGT-202_paper
11-IAGT-202_paper11-IAGT-202_paper
11-IAGT-202_paper
Don Zinselmeyer
 
prakash_final
prakash_finalprakash_final
prakash_final
Prakash B
 
Eraring_Energy_Case_Study
Eraring_Energy_Case_StudyEraring_Energy_Case_Study
Eraring_Energy_Case_Study
Shreemali Agrawal
 
Steam turbines solutions
Steam turbines solutions Steam turbines solutions
Steam turbines solutions
Farid Nazri
 
Schneider plc
Schneider plcSchneider plc
Schneider plc
Ghadak Mohammad
 
Green, Sustainable Microturbines
Green, Sustainable MicroturbinesGreen, Sustainable Microturbines
Green, Sustainable Microturbines
Murbine
 
Transition to online AMS reduces maintenance costs and improves operations
Transition to online AMS reduces maintenance costs and improves operationsTransition to online AMS reduces maintenance costs and improves operations
Transition to online AMS reduces maintenance costs and improves operations
Emerson Exchange
 
Leon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016RLeon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016R
Leon Chacon
 
Winter Newsletter 1.12.16
Winter Newsletter 1.12.16Winter Newsletter 1.12.16
Winter Newsletter 1.12.16
fidge72
 
Sunderland Resume
Sunderland ResumeSunderland Resume
Sunderland Resume
Steve Sunderland
 
Automation 1.4x
Automation 1.4xAutomation 1.4x
Automation 1.4x
John Skidmore
 
Pegler Yorkshire record 25% uptime improvement after upgrade by Optima
Pegler Yorkshire record 25% uptime improvement after upgrade by OptimaPegler Yorkshire record 25% uptime improvement after upgrade by Optima
Pegler Yorkshire record 25% uptime improvement after upgrade by Optima
Optima Control Solutions
 
Small hydro solutions
Small hydro solutionsSmall hydro solutions
Small hydro solutions
Schneider Electric
 
Siemens Innovation Tools2010
Siemens Innovation Tools2010Siemens Innovation Tools2010
Siemens Innovation Tools2010
Kirkdx
 
bhelppt2
bhelppt2bhelppt2
bhelppt2
Nidhi Gopal
 
Mohammed Tawfik CV 4-2016
Mohammed Tawfik CV 4-2016 Mohammed Tawfik CV 4-2016
Mohammed Tawfik CV 4-2016
Mohamed Tawfik
 
EC Fans Efficiency / Upgrade Projects
EC Fans Efficiency / Upgrade ProjectsEC Fans Efficiency / Upgrade Projects
EC Fans Efficiency / Upgrade Projects
EMEX
 
ahmed mohamed diaa C.V
ahmed mohamed diaa C.Vahmed mohamed diaa C.V
ahmed mohamed diaa C.V
AHMED DIAA
 

Similar to Gas Turbine Generators Control System Philippines (20)

KK Wind Solutions presentation on Control System Retrofit
KK Wind Solutions presentation on Control System RetrofitKK Wind Solutions presentation on Control System Retrofit
KK Wind Solutions presentation on Control System Retrofit
 
Power Generation: Coal-Fired
Power Generation: Coal-FiredPower Generation: Coal-Fired
Power Generation: Coal-Fired
 
11-IAGT-202_paper
11-IAGT-202_paper11-IAGT-202_paper
11-IAGT-202_paper
 
prakash_final
prakash_finalprakash_final
prakash_final
 
Eraring_Energy_Case_Study
Eraring_Energy_Case_StudyEraring_Energy_Case_Study
Eraring_Energy_Case_Study
 
Steam turbines solutions
Steam turbines solutions Steam turbines solutions
Steam turbines solutions
 
Schneider plc
Schneider plcSchneider plc
Schneider plc
 
Green, Sustainable Microturbines
Green, Sustainable MicroturbinesGreen, Sustainable Microturbines
Green, Sustainable Microturbines
 
Transition to online AMS reduces maintenance costs and improves operations
Transition to online AMS reduces maintenance costs and improves operationsTransition to online AMS reduces maintenance costs and improves operations
Transition to online AMS reduces maintenance costs and improves operations
 
Leon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016RLeon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016R
 
Winter Newsletter 1.12.16
Winter Newsletter 1.12.16Winter Newsletter 1.12.16
Winter Newsletter 1.12.16
 
Sunderland Resume
Sunderland ResumeSunderland Resume
Sunderland Resume
 
Automation 1.4x
Automation 1.4xAutomation 1.4x
Automation 1.4x
 
Pegler Yorkshire record 25% uptime improvement after upgrade by Optima
Pegler Yorkshire record 25% uptime improvement after upgrade by OptimaPegler Yorkshire record 25% uptime improvement after upgrade by Optima
Pegler Yorkshire record 25% uptime improvement after upgrade by Optima
 
Small hydro solutions
Small hydro solutionsSmall hydro solutions
Small hydro solutions
 
Siemens Innovation Tools2010
Siemens Innovation Tools2010Siemens Innovation Tools2010
Siemens Innovation Tools2010
 
bhelppt2
bhelppt2bhelppt2
bhelppt2
 
Mohammed Tawfik CV 4-2016
Mohammed Tawfik CV 4-2016 Mohammed Tawfik CV 4-2016
Mohammed Tawfik CV 4-2016
 
EC Fans Efficiency / Upgrade Projects
EC Fans Efficiency / Upgrade ProjectsEC Fans Efficiency / Upgrade Projects
EC Fans Efficiency / Upgrade Projects
 
ahmed mohamed diaa C.V
ahmed mohamed diaa C.Vahmed mohamed diaa C.V
ahmed mohamed diaa C.V
 

Gas Turbine Generators Control System Philippines

  • 1. Overview: In the Philippines, a Utility Plant within a Refinery operates Gas Turbines that were originally packaged by US Turbines each comprising of MHI MF-111B turbines and Brush generators. Obsolete Allen Bradley PLC Series 5 were still in service performing the operating sequencing and fuel control functions of the turbine-generator sets. Schneider Electric was awarded as the Main Automation Contractor (MAC) the upgrade project. The scope of retrofit included the turbine controls, safeguarding and fire & gas systems, automatic voltage regulator, electrical protection systems, mechanical equipment, and field instrumentation to address safety, integrity, reliability issues while achieving operation cost reductions. Challenges: Documentation: The existing systems had been commissioned twenty years earlier and documentation was lacking accurate as-built information. Integration: Initial biggest challenge was the review and re-design of complex interfacing of the existing system that comprised of numerous third party instruments and devices. Safety: To understand and address the safety enhancements for all of instruments associated with the upgrade project. System Reliability: Customer highlighted known reliability issues that they wanted to address during the project. Such as the unreliable start-up performance, online switching of firing mode issues, DeNOx system performance, improving the safeguarding instrumentation reliability, and electromagnetic compatibility related to earthing and signal segregation. Mechanical reliability improvement required the replacement of existing the pneumatic actuated Inlet Guide Vane (IGV) that was known to be unable to achieve the desired opening position accurately. Installation & Commissioning: Significant engineering effort was deployed to help the end-user recover the lack of accurate as-built plant data, including discrepancies between drawings and actual switch gear wiring. The commissioning schedule did not allow for site delay or any online disturbances to the power network for the operating plant. Location: Electrical and mechanical installation was done at a remote site location with limited local skilled resources and readily available installation materials. Gas Turbine Generators Control System Philippines Turbomachinery Control Case Study Summary PROJECT AT A GLANCE: Location: Philippines refinery operates gas turbines that were originally packaged by US Turbines, each comprised of Mitsubishi turbines and Brush generators. An obsolete Allen Bradley PLC Series 5 was still performing the operating sequencing and fuel control functions of the turbine-generator sets. safeguarding systems, fire and gas systems, automatic voltage regulator, electrical protection systems, mechanical equipment, and field instrumentation. These upgrades improved safety, integrity, and reliability while reducing operating costs. CUSTOMER BENEFITS: Improved safety and integrity A utility plant in Philippines upgraded their obsolete technology and improved operational capacity by engaging Schneider Electric to retrofit their three gas turbine control systems, upgrade electrical and mechanical equipment, replace fire & gas and field instrumentation.
  • 2. For prompt support, call +65 6829 8123 or email APAC.TMC@schneider-electric.om Schneider Electric: 15 Changi Business Park Central 1 Singapore 486057 Tel: +65 6829 8888 means, electronic or mechanical, including photocopying, recording, broadcasting, or by any information storage or retrieval systems, without permission in writing from Schneider Electric Singapore. Solutions: Control System: Schneider Electric designed and engineered an Integrated Gas Turbine and Generator Control System built on a Triconex Triple Modular Redundant (TMR) system and Wonderware InTouch Human-Machine Interface (HMI) that provided improved system reliability and enhanced diagnostic awareness for operations. Load Sharing: Schneider Electric replaced out-of-date Woodward real power sensor with an embedded software based load sharing system that integrated three generator sets. Synchronization: provided fast response and achieved highly successful Circuit Breaker close rate with minimum disturbance to plant operations. Fire & Gas System: The existing fire & gas system was completely replaced including detectors with the Triconex TMR System. Auto Voltage Regulator: The existing automatic voltage regulator (AVR) systems was upgraded to a dual redundant modular AVR configuration that was designed with independent controllers and power circuits. IGV Actuator: The problematic existing pneumatic actuated IGV was retrofitted with a reliable and precise hydraulic actuator system. Cabinets and Instruments: Schneider Electric supplied new cabinets, field devices, and supervised the site installation, retrofits and startup commissioning. Results: Improved Performance: The integrated control system and unit operations significantly improved reliability and operational performance. Successful single gas turbine firing and start-ups are now achieved while achieving a reduction of nuisance trip events. Modernized Assets: simplified the system maintenance in terms of cost, local support availability and quick turnaround of hardware spares. With the enhanced diagnostics provided by the new control systems the overall plant’s performance has improved. The Enhanced reliability & Efficiency: Due to the upgraded Gas Turbine Control system which used a robust and versatile combination of logic to handle numerous operating scenarios, it has improved the plant’s reliability and operational efficiency. Customer Satisfaction: The end-user was extremely satisfied with Schneider Electric’s professional engineering and project management – from the solution design, configuration and testing through to site installation, startup, training, local support and service for system handover. Make the most of your energySM Turbomachinery Solutions and Services