Six weeks learning about
game design, 2D and 3D art,
sound design, and programming
The last 2 weeks making total of two games
using Unity, a game development platform
Mobile Game Development Project
Development Platform Language
A team consisting of
2 artists, 2 programmers,
and a sound designer
2 weeks given
About Unity
cross-platform game engine developed by Unity Technologies
used to develop video games for PC, consoles, mobile devices
and websites
https://en.wikipedia.org/wiki/Unity_(game_engine)
MonoBehaviour, the Base Class
• The base class every script derives from.
• In C#, you must explicitly derive from the class MonoBehaviour.
• It is important to override suitable “messages” so that the game
can operate as planned.
• http://docs.unity3d.com/ScriptReference/MonoBehaviour.html
Tortoise Hg
• First time to use a repository in order to co-work with others
and share the artifacts.
• Remarks
 We needed to communicate
before pushing changes.
 It is comfortable to use
when working properly.
 However, experienced
many conflicts.
Project Procedure
Brainstorm ideas Sketch each scene/characters
Artists created scene/character.
Programmers began coding main functions/actions.
Art and code put together.
Our team had a poster with task that needed to be completed and fixed.
Test Make game more playable and smooth
Polish
Continue developing
Output
2D Unity Project
Sound files
36 scripts
Image files
36 classes / Main class: PlayerMovement.cs
Source Code Repository
This is a part of our assets folder.
As you can see organization is encouraged when working with
many files and lots of people.
Output - Scripts
Image/sound files
How the assets folder looks inside Unity
Output – Media Files
Image files for opening scene to game
A sequence of image files when the game starts
Output – Image Sequence
Dream Moor - Game Story
An orphan named Piper dreams
about a magical place called the
Dream Moor. There, she gets to
escape the harsh reality.
However, when enemies start
attacking her and she loses health,
the dream slowly turns into a
nightmare. Piper needs to collect the
last idol before she wakes up from
her dream.
Piper
Enemy
Piper loses all her healthPiper has to collect all four idols
scattered around the maze.
Inventory : Bunny bear elephant princess
Win Lose
Health Bar
Screen-shot 1
A simple menu screen
Screen-shot 2
Opening scene when game starts
Screen-shot 3
A look at the tutorial stage of the game
Screen-shot 4
In-game look at the enemy called Hexapod
Remarks (1/3)
• First-time Game Development
As this was the first time I programmed for a game, I
learned a lot through the process.
Collaborating together
Remarks (2/3)
• Emphases
I wish I understood the importance of
 keeping track of all the code,
 keeping a list of what is done and what isn’t
 and the proper way to use the repository before I began the
project.
TO-DO
AS-IS Repository
usage
Remarks (3/3)
• Learning Through Trial and Error
 For example, when creating obstacles,
 I originally programmed each tree and shrub as its
own object which increased storage by a lot and
caused the player to get stuck.
 I found out a more easier way to do this was create
a transparent box and layer the sprite.
gettyimages.com
The game development process was difficult and
the initial attempt was not as good as I had expected.
However, the experience gained from this project
will help me on my next.

Game development

  • 1.
  • 2.
    National High SchoolGame Academy Summer 2015 Pre-College Program in Carnegie Mellon Six weeks learning about game design, 2D and 3D art, sound design, and programming The last 2 weeks making total of two games using Unity, a game development platform
  • 3.
    Mobile Game DevelopmentProject Development Platform Language A team consisting of 2 artists, 2 programmers, and a sound designer 2 weeks given
  • 4.
    About Unity cross-platform gameengine developed by Unity Technologies used to develop video games for PC, consoles, mobile devices and websites https://en.wikipedia.org/wiki/Unity_(game_engine)
  • 5.
    MonoBehaviour, the BaseClass • The base class every script derives from. • In C#, you must explicitly derive from the class MonoBehaviour. • It is important to override suitable “messages” so that the game can operate as planned. • http://docs.unity3d.com/ScriptReference/MonoBehaviour.html
  • 6.
    Tortoise Hg • Firsttime to use a repository in order to co-work with others and share the artifacts. • Remarks  We needed to communicate before pushing changes.  It is comfortable to use when working properly.  However, experienced many conflicts.
  • 7.
    Project Procedure Brainstorm ideasSketch each scene/characters Artists created scene/character. Programmers began coding main functions/actions. Art and code put together. Our team had a poster with task that needed to be completed and fixed. Test Make game more playable and smooth Polish Continue developing
  • 8.
    Output 2D Unity Project Soundfiles 36 scripts Image files
  • 9.
    36 classes /Main class: PlayerMovement.cs Source Code Repository This is a part of our assets folder. As you can see organization is encouraged when working with many files and lots of people. Output - Scripts
  • 10.
    Image/sound files How theassets folder looks inside Unity Output – Media Files
  • 11.
    Image files foropening scene to game A sequence of image files when the game starts Output – Image Sequence
  • 12.
    Dream Moor -Game Story An orphan named Piper dreams about a magical place called the Dream Moor. There, she gets to escape the harsh reality. However, when enemies start attacking her and she loses health, the dream slowly turns into a nightmare. Piper needs to collect the last idol before she wakes up from her dream. Piper Enemy
  • 13.
    Piper loses allher healthPiper has to collect all four idols scattered around the maze. Inventory : Bunny bear elephant princess Win Lose Health Bar
  • 14.
  • 15.
  • 16.
    Screen-shot 3 A lookat the tutorial stage of the game
  • 17.
    Screen-shot 4 In-game lookat the enemy called Hexapod
  • 18.
    Remarks (1/3) • First-timeGame Development As this was the first time I programmed for a game, I learned a lot through the process. Collaborating together
  • 19.
    Remarks (2/3) • Emphases Iwish I understood the importance of  keeping track of all the code,  keeping a list of what is done and what isn’t  and the proper way to use the repository before I began the project. TO-DO AS-IS Repository usage
  • 20.
    Remarks (3/3) • LearningThrough Trial and Error  For example, when creating obstacles,  I originally programmed each tree and shrub as its own object which increased storage by a lot and caused the player to get stuck.  I found out a more easier way to do this was create a transparent box and layer the sprite. gettyimages.com
  • 21.
    The game developmentprocess was difficult and the initial attempt was not as good as I had expected. However, the experience gained from this project will help me on my next.

Editor's Notes

  • #4 Unity(v 5.1.1f1 personal) C# Time given: 2 Weeks Requirement: Create a mobile game A team consisted of two artists, two programmers, and a sound designer.
  • #7 Repository Communicate before pushing changes. Comfortable to use when working properly Experience conflicts when committing source code
  • #8 Brainstorm ideas  sketch each scene/characters  artists created scene/characters & programmers began coding main functions/actions  Art and code put together  have a poster with tasks that need to be completed or fixed  test run  make game more playable and smooth  polish  add sound  polish  finish.
  • #9  2D Unity project Source Code Main Class : PlayerMovement.cs Assets/Scripts Game Story An orphan named Piper dreams about a magical place called the Dream Moor. There, she gets to escape the harsh reality. However, when enemies start attacking her and she lose health, the dream slowly turns into a nightmare. Piper needs to collect the last idol before she wakes up from her dream.
  • #11 Plz attach a description for this page
  • #13  2D Unity project Source Code Main Class : PlayerMovement.cs Assets/Scripts Game Story An orphan named Piper dreams about a magical place called the Dream Moor. There, she gets to escape the harsh reality. However, when enemies start attacking her and she lose health, the dream slowly turns into a nightmare. Piper needs to collect the last idol before she wakes up from her dream.
  • #14  Win: Piper has to collect all four idols scattered around the maze Bunny bear elephant princess Lose: Piper loses all her health