1. National Orientation-Workshop on the Teaching-Learning Component of the
Pilot Implementation of Limited Face-to-Face Classes (Blended Learning)
COMPLETE NAME OF SCHOOL: Paco National High School
REGION: XII GRADE LEVEL: EIM 12
SCHOOLS DIVISION: Kidapawan City
LEARNING AREA: Electrical Installation and
Maintenance
ContentStandard
PamantayangNilalaman
The learner demonstrates an understanding of underlying principles in
the installation of standard electrical system for lighting and
grounding.
Performance Standard
PamantayangPagkatuto
The learner independently installs electrical protection system for
lighting and grounding based on the Philippine Electrical Code (PEC)
and Local Code/ Utility Company Regulations.
Most Essential Learning
Competency/ies(withcode,ifany)
LO1: 3.4.1 Plan and Prepare
electrical materials and tools for
the installation of: Electrical
Meter Connection and grounding.
TLE_IAEI9-12EP-Ia-j-1
LO2: 2.1.1 Perform the
installation of: Electrical Meter
connection and Grounding.
TLE_IAEI9-12EP-Ia-j-2
Understanding Elections, Political, Civil Society and
Social Movements
DEVELOPMENTAL
LEVELS
/
LEVELS
OF
MASTERY
5
Perform ElectricMeter Installation and
Grounding
4
Draw proper wirer connectionsin installing
ElectricMeter Connection and Grounding.
3
Identify the Material and Devicesused in Electric
Meter Installation and Grounding.
2 Identify and define the types of Electric Meters.
1 Define Electric Meter Connection and Grounding.
Preparedby: Wiljhon n. Sunio
Checkedby: Arturo L. Jimenez,Jr.
Verifiedby: Antonio R.Pasigado,Jr.