3. ROLE & FUNCTION
O&G
CLIENT
CO
COMPANY
ENGINEERING
ENGINEERING EPC
PROCUREMENT
COMPANY COMPANY
CONTRACTOR/ CONSTRUCTION
SUB-CONTRACTOR
06/01/2009
4. ROLE & FUNCTION
CONCEPTUAL
STUDY
OPERATION &
FEED
MAINTENANCE
DETAIL
COMMISIONING/
START-UP
ENGINEERING
FABRICATION
CONSTRUCTION
06/01/2009
5. ROLE & FUNCTION
GENERAL
MANAGEMENT
ASSET BUSINESS COMMERCIAL/ ENGINEERING
SUPPORT SERVICES CONTRACTS AND DESIGN
BUSINESS
HUMAN PROJECT
DEVELOPMENT
RESOURCES SERVICES SHEQ
06/01/2009
6. WORK FLOW & GOAL
Process Engineer Work Flow
P Ei W k Fl
Goal
G l:
Able to solve cases by Produce accurate process
comprehensive study simulation & calculation
Able to execute work with Produce deliverables that
defined scheduled and limited consistent one another and with
supervision less revision
Achieve overall design which fit for
06/01/2009
the purpose, customer requirement
and applicable Code & Standard
7. ROLE OF PROCESS DISCIPLINE
Implement a firm process design that fit
for purposed which follow code &
standard and costumer requirement
Maintain an awareness of the overall
picture of the project
Cooperate as necessary on technical
matters with other engineering
disciplines
Prepare PFD, HMB, P&ID, Calculation note,
Process simulation, Li t ESD SAFE chart as
P i l ti List, ESD, ht
input for other discipline
Produce t h i ll accurate and correct
Pd technically t d t
06/01/2009
deliverables based on Code & Standard which fit
with customer requirement
8. WORK RELATION &
COMMUNICATION
Interface & Inter Discipline Relation
PROCESS
Structure
•P&ID
Piping &
Mechanical
•Equipment
Ei t
PDMS
•P&ID, PFD
List
•P&ID, PFD
• Calculation Note
•Flare
•Line list
radiation
Instrument
It t
Technical Safety Electrical
•P&ID, PFD
•P&ID, HMB •P&ID
•Line list
•Process Design Basis •ESD Logic
•CN
•Process Design Diagram
•ESD Logic
Criteria •CN
Diagram
•SAFE Chart
06/01/2009
9. WORK RELATION &
COMMUNICATION
Mechanical
•Vendor Data
Electrical
El t i l
•Vendor Data
Piping &
PDMS
•Piping Class
PROCESS
•P&ID Legend
Structure
•Flare stack
layout
Instrument
•Vendor data
•CV sizing
g
06/01/2009 •Tag number
10. WORK RELATION &
COMMUNICATION
Projects require that
people work together
Share
to accomplish a common
Comment
C t
goal
Team
Work
Help Each
Ask
Other
It's possible to achieve almost anything as long as you are
It s
06/01/2009
not worried about who gets the credit.
– Harry S. Truman
11. WORK RELATION &
COMMUNICATION
COMMUNICATION
Communicate with other discipline
Communicate with Vendor via other
discipline
Cooperate with designer
Ask f
A k for company document (interface)
d t (i t f )
IDR (Internal Discipline Review)
06/01/2009
12. TECHNICAL EXPERIENCE
Deliverables
Start-up & Operating Manual
Equipment List
Line list
SAFE Chart
Study & Practices
Operating Philosophy
Pump sizing (PD & Centrifugal)
Line sizing
Vessel sizing, review P&ID
System & Sub-System
y y
Code & Standard
Old & Current Project
06/01/2009
Software HYSYS, Flarenet, Flaresim,
InstruCalc, Phast