Instructional Design
Model Comparison:
ADDIE vs Dick and
Carey
Francy Guifarro-
Hernandez
HRD 647: Principles of
Instruction and Digital
Design
Analysis: Goal Setting Stage
Development: Start with production
and testing
Design: Focus on learning objective,
content, and subject matter
Implementation: Continuous
modification of program
Evaluation: Meticulous final testing
ID Model Comparison for HRD 647: Fall B 2022 02
Components
of ADDIE
Components of Dick and Carey Model
1 - Instructional goals -
ID what students need
5 - Criterion-Referenced
Test Items - create test
4- Performance
Objectives - specific goals
for the lesson
7- Instructional Materials -
any tools or printed
material you need
9- Summative Evaluation -
Time to revise
2 - Instructional Analysis
- determine skills
needed
3- Entry behaviors and
learned characteristics -
what skills students
already have
6 - Instructional Strategy -
outline lesson plan
8 - Formative Evaluation -
evaluate how the lesson Is
going/went
ID Model Comparison for HRD 647: Fall B 2022 03
Similarities
Your Business Name | SDG Progress Report 2025 04
Analysis Goal Oriented Evaluation
First step of
ADDIE Is to
analyze
In D&C model you
analyze In step 1, 2,
and 3
With each model
you Identify the
goals and plan
around them to
make sure they
are being met
At the end of each
model you have
the evaluation
phase
Formative and
Summative In
both
Differences
Revisions are an Important
component of the ADDIE model
through each step
ADDIE has evaluation throughout the
development process while D&C
Model has It solely at the end
9 stages In D&C as opposed to 5
D&C focuses heavily on objectives
Advantages and Challenges
Advantage: Steps easier to remember
Challenges: Can be too broad and open to
Interpretation which leaves room for error
Advantage: Fully broken down In easy to follow
steps
Challenge: Can be overwhelming and time
consuming, question the ROI
ADDIE Model
Dick and Carey Model
References
Kurt, S. (2016, December 12). Dick and carey instructional model. Educational Technology.
Retrieved November 5, 2022, from https://educationaltechnology.net/dick-and-carey-
instructional-model/
Kurt, S. (2018, December 16). Addie Model: Instructional design. Educational Technology. Retrieved
November 5, 2022, from https://educationaltechnology.net/the-addie-model-instructional-
design/

Francy Guifarro-Hernandez.pdf

  • 1.
    Instructional Design Model Comparison: ADDIEvs Dick and Carey Francy Guifarro- Hernandez HRD 647: Principles of Instruction and Digital Design
  • 2.
    Analysis: Goal SettingStage Development: Start with production and testing Design: Focus on learning objective, content, and subject matter Implementation: Continuous modification of program Evaluation: Meticulous final testing ID Model Comparison for HRD 647: Fall B 2022 02 Components of ADDIE
  • 3.
    Components of Dickand Carey Model 1 - Instructional goals - ID what students need 5 - Criterion-Referenced Test Items - create test 4- Performance Objectives - specific goals for the lesson 7- Instructional Materials - any tools or printed material you need 9- Summative Evaluation - Time to revise 2 - Instructional Analysis - determine skills needed 3- Entry behaviors and learned characteristics - what skills students already have 6 - Instructional Strategy - outline lesson plan 8 - Formative Evaluation - evaluate how the lesson Is going/went ID Model Comparison for HRD 647: Fall B 2022 03
  • 4.
    Similarities Your Business Name| SDG Progress Report 2025 04 Analysis Goal Oriented Evaluation First step of ADDIE Is to analyze In D&C model you analyze In step 1, 2, and 3 With each model you Identify the goals and plan around them to make sure they are being met At the end of each model you have the evaluation phase Formative and Summative In both
  • 5.
    Differences Revisions are anImportant component of the ADDIE model through each step ADDIE has evaluation throughout the development process while D&C Model has It solely at the end 9 stages In D&C as opposed to 5 D&C focuses heavily on objectives
  • 6.
    Advantages and Challenges Advantage:Steps easier to remember Challenges: Can be too broad and open to Interpretation which leaves room for error Advantage: Fully broken down In easy to follow steps Challenge: Can be overwhelming and time consuming, question the ROI ADDIE Model Dick and Carey Model
  • 7.
    References Kurt, S. (2016,December 12). Dick and carey instructional model. Educational Technology. Retrieved November 5, 2022, from https://educationaltechnology.net/dick-and-carey- instructional-model/ Kurt, S. (2018, December 16). Addie Model: Instructional design. Educational Technology. Retrieved November 5, 2022, from https://educationaltechnology.net/the-addie-model-instructional- design/