3. Presentation Synopsis
1. Pressure and fracture gradient determination
2. Calculation and selection of casing type (Proposed casing
programmed)
3. Cementing Plan
4. Mud Plan
5. Bit Plan
6. Well Head Housing
7. Rig selection
8. Drill time estimation 3
4. 1. Type of completion for production well
2. Well completion equipment
3. Packer Selection
4. Wellhead and Christmas Tree
5. Perforation
6. Completion and Packer Fluid
7. Summary
Completion Goal
4
11. Hole
Size
Casing
Size
Total Volume
Cu.Ft
In BBL Total Sk of Cement
36” 30” 1033.47 ft3 184 bbl 675 sk
Additives ( To be mixed with Mixed Water)
Water Req Slurry Yield Required
4% Bentonite 7.6 gal/sk 1.53 ft3/ sk 2540 lbs
Defoamer ( D Air 3000L) 0.05 gal/sk 34 gal
Dispersant (CFR – 3L) 0.07 gal/sk 47 gal
Cement Plan for 30”
11
12. Hole
Size
Casing
Size
Total
Volume
Cu.Ft
In BBL Total Sk of Cement
26” 20” 965 ft3 406 BBL 934 sk
Water Req Slurry Yield Mix Water
Tune Lite Cement 7.4 gal/sk 2.440 ft3/sk 8.31 gal/sk
Anti Gas Migration (GasStop Exp) 0.06 gal/sk 56 gal
Defoamer ( D Air 3000L) 0.05 gal/sk 34 gal
Dispersant (CFR – 3L) 0.07 gal/sk 47 gal
Cement Retarder (SCR 500L) 0.25 gal/sk 235 gal
Fluid Loss Additive (Halad-413L) 0.20 gal/sk 185 gal
Cement Plan for 20” Lead
12
13. Hole
Size
Casing
Size
Total
Volume
Cu.Ft
In BBL Total Sk of Cement
26” 20” 2280 ft3 172 BBL 840 sk
Water Req Slurry Yield Mix Water
G Neat Cement 4.91 gal/sk 1.150 ft3/sk 5.01 gal/sk
Defoamer ( D Air 3000L) 0.1 gal/sk 84 gal
Cement Plan for 20” Tail
13
14. Hole
Size
Casing
Size
Total Volume
Cu.Ft
In BBL Total Sk of Cement
12 1/2” 9 5/8” 1011 ft3 140 BBL 415 sk
Water Req Slurry Yield Mix Water
Tune Lite Cement 7.4 gal/sk 2.440 ft3/sk 8.31 gal/sk
Anti Gas Migration (GasStop Exp) 0.13 gal/sk 55 gal.
Defoamer ( D Air 3000L) 0.1 gal/sk. 45 gal.
Dispersant (CFR – 3L) 0.09 gal/sk. 40 gal.
Cement Retarder (SCR 500L) 0.40 gal/sk 166 gal
Fluid Loss Additive (Halad-413L) 0.30 gal/sk 125 gal
Cement Plan for 9 5/8” Lead
14
15. Hole
Size
Casing
Size
Total
Volume
Cu.Ft
In BBL Total Sk of Cement
12 1/2” 9 5/8” 225 ft3 40 BBL 196 sk.
Water Req Slurry Yield Mix Water
G Neat Cement
4.91 gal/sk 1.150 ft3/sk 5.01 gal/sk
Defoamer ( D Air 3000L) 0.1 gal/sk 20 gal
Cement Plan for 9 5/8” Tail
15
22. B1 B2 B3 B4 B5 B6 B7 B8 B9
Top Section 30” 30” 30” 30” 30” 30” 30” 30” 30”
20” 20” 20” 20” 20” 20” 20” 20” 20”
Estimated
Time
(Days)
13 13 13 13 13 13 13 13 13
Total Time to Complete Top Section for all Wells – 117 days
13 days including Rig move and prepare to drill
De-hire Drillship after completion of Top Sections
Drilling Time Estimation
22
23. B1 B2 B3 B4 B5 B6 B7 B8 B9
Lower
Section
13 3/8” 13 3/8” 13 3/8” 13 3/8” 13 3/8” 13 3/8” 13 3/8” 13 3/8” 13 3/8”
9 5/8” 9 5/8” 9 5/8” 9 5/8” 9 5/8” 9 5/8” 9 5/8” 9 5/8” 9 5/8”
Estimated
Time
(Days)
25 25 25 25 25 25 25 25 25
Total Time to Complete Top Section for all Wells – 225 days
25 days including Rig move and prepare to drill and Running BOP
De-hire Semi Sub after completion of Lower Sections
Drilling Time Estimation
23
24. • Pipe Sticking
• Differential-Pressure Pipe Sticking
• Mechanical Pipe Sticking
• Loss of Circulation
• Drillpipe Failures
• Twistoff
• Fatigue
• Pipe-Failure Prevention
• Hydrogen-Sulfide-Bearing Zones and Shallow Gas
• Since we don’t have log data, we very much depend on the real time
drilling operations, Hence we have to be very careful about gas kick
or loss.
Drilling Challenge
24
25. • Fire-fighting equipment must be available for emergency use in the event of a fire
and should be provided in first-class working order.
• Unauthorized person should not be allowed to be on the rig at any time.
• Personnel who not involved directly in the particular operation should keep away
from operation site.
• Sea survival and offshore course is compulsory for all personnel.
Safety
25
Editor's Notes
A Polymer drilling fluids provide inhibition against reactive formations by providing viscosity, without the need for bentonite, when using inhibitors such as Potassium Chloride, glycols and amines. Bentonite will not yield in the presence of the inhibition agents. Potassium Chloride is also very important for maintaining permeability after filtrate invasion.