Presentation Synopsis
1. Pressure and fracture gradient determination
2. Calculation and selection of casing type (Proposed casing
programmed)
3. Cementing Plan
4. Mud Plan
5. Bit Plan
6. Well Head Housing
7. Rig selection
8. Drill time estimation 3
1. Type of completion for production well
2. Well completion equipment
3. Packer Selection
4. Wellhead and Christmas Tree
5. Perforation
6. Completion and Packer Fluid
7. Summary
Completion Goal
4
Formation & Fracture Pressure
0
500
1000
1500
2000
2500
3000
3500
4000
4500
0 500 1000 1500 2000 2500 3000
DEPTH(FT)
PRESSURE (PSI)
Fracture Pressure (psi) Formation Pressure Gradient (psi)
Pressure gradient
Formation
pressure
Overburden
0.442 psi/ ft 1 psi/ ft
• Formation pressure
• Depth
• Method used to determine
fracture gradient : Eaton’s
Method
5
Type of
Casing
Casing Size,
in
Casing
Grade
Casing
Weight,
lb/ft
OD, in ID, in
Body Yield
Strength, lb
Conductor 30 X-52 310 30 28 1685000
Surface 20 J-55 94 20 19.124 1480000
Production 9 5/8 N-80 40 9 5/8 8.535 800000
Casing Program – Producer Well
6
Type of
Casing
Casing Size,
in
Casing
Grade
Casing
Weight,
lb/ft
OD, in ID, in
Body Yield
Strength, lb
Conductor 30 X-52 310 30 28 1685000
Surface 20 J-55 94 20 19.124 1480000
Production 9 5/8 N-80 40 9 5/8 8.535 800000
Casing Program – Injector Well
7
Hole Size, in Casing
Size
Mud Type Mud
Weight,
ppg
Total Amount,
bbl
36 30” Seawater,
Sweep/Pad
mud
9.5 850
26 20” Seawater,
Sweep/Pad
mud
10 1400
12 ½” 9 5/8” KCL Polymer
Mud
12 665
Mud Plan
8
Cement Classification
9
Cement Classification
10
Hole
Size
Casing
Size
Total Volume
Cu.Ft
In BBL Total Sk of Cement
36” 30” 1033.47 ft3 184 bbl 675 sk
Additives ( To be mixed with Mixed Water)
Water Req Slurry Yield Required
4% Bentonite 7.6 gal/sk 1.53 ft3/ sk 2540 lbs
Defoamer ( D Air 3000L) 0.05 gal/sk 34 gal
Dispersant (CFR – 3L) 0.07 gal/sk 47 gal
Cement Plan for 30”
11
Hole
Size
Casing
Size
Total
Volume
Cu.Ft
In BBL Total Sk of Cement
26” 20” 965 ft3 406 BBL 934 sk
Water Req Slurry Yield Mix Water
Tune Lite Cement 7.4 gal/sk 2.440 ft3/sk 8.31 gal/sk
Anti Gas Migration (GasStop Exp) 0.06 gal/sk 56 gal
Defoamer ( D Air 3000L) 0.05 gal/sk 34 gal
Dispersant (CFR – 3L) 0.07 gal/sk 47 gal
Cement Retarder (SCR 500L) 0.25 gal/sk 235 gal
Fluid Loss Additive (Halad-413L) 0.20 gal/sk 185 gal
Cement Plan for 20” Lead
12
Hole
Size
Casing
Size
Total
Volume
Cu.Ft
In BBL Total Sk of Cement
26” 20” 2280 ft3 172 BBL 840 sk
Water Req Slurry Yield Mix Water
G Neat Cement 4.91 gal/sk 1.150 ft3/sk 5.01 gal/sk
Defoamer ( D Air 3000L) 0.1 gal/sk 84 gal
Cement Plan for 20” Tail
13
Hole
Size
Casing
Size
Total Volume
Cu.Ft
In BBL Total Sk of Cement
12 1/2” 9 5/8” 1011 ft3 140 BBL 415 sk
Water Req Slurry Yield Mix Water
Tune Lite Cement 7.4 gal/sk 2.440 ft3/sk 8.31 gal/sk
Anti Gas Migration (GasStop Exp) 0.13 gal/sk 55 gal.
Defoamer ( D Air 3000L) 0.1 gal/sk. 45 gal.
Dispersant (CFR – 3L) 0.09 gal/sk. 40 gal.
Cement Retarder (SCR 500L) 0.40 gal/sk 166 gal
Fluid Loss Additive (Halad-413L) 0.30 gal/sk 125 gal
Cement Plan for 9 5/8” Lead
14
Hole
Size
Casing
Size
Total
Volume
Cu.Ft
In BBL Total Sk of Cement
12 1/2” 9 5/8” 225 ft3 40 BBL 196 sk.
Water Req Slurry Yield Mix Water
G Neat Cement
4.91 gal/sk 1.150 ft3/sk 5.01 gal/sk
Defoamer ( D Air 3000L) 0.1 gal/sk 20 gal
Cement Plan for 9 5/8” Tail
15
Volumetric mixing controls. Q1 = mixwater
rate; Q2 = dry solids rate; Q3 = slurry rate
Tune Lite Mixing & Cement Head
16
Hole Size, in Bit Type Bit Size, in
36
Mill Tooth, Hole
Opener
36”
26 Tricone Roller 26”
12 ½” TD506 PDC 12 ½”
Bit Planning
17
Bit Planning
18
Bit Planning
19
Well Head Housing
20
Drillship Aban Ice Semi Submersible Blackford Dolphin
Rigs
21
B1 B2 B3 B4 B5 B6 B7 B8 B9
Top Section 30” 30” 30” 30” 30” 30” 30” 30” 30”
20” 20” 20” 20” 20” 20” 20” 20” 20”
Estimated
Time
(Days)
13 13 13 13 13 13 13 13 13
Total Time to Complete Top Section for all Wells – 117 days
13 days including Rig move and prepare to drill
De-hire Drillship after completion of Top Sections
Drilling Time Estimation
22
B1 B2 B3 B4 B5 B6 B7 B8 B9
Lower
Section
13 3/8” 13 3/8” 13 3/8” 13 3/8” 13 3/8” 13 3/8” 13 3/8” 13 3/8” 13 3/8”
9 5/8” 9 5/8” 9 5/8” 9 5/8” 9 5/8” 9 5/8” 9 5/8” 9 5/8” 9 5/8”
Estimated
Time
(Days)
25 25 25 25 25 25 25 25 25
Total Time to Complete Top Section for all Wells – 225 days
25 days including Rig move and prepare to drill and Running BOP
De-hire Semi Sub after completion of Lower Sections
Drilling Time Estimation
23
• Pipe Sticking
• Differential-Pressure Pipe Sticking
• Mechanical Pipe Sticking
• Loss of Circulation
• Drillpipe Failures
• Twistoff
• Fatigue
• Pipe-Failure Prevention
• Hydrogen-Sulfide-Bearing Zones and Shallow Gas
• Since we don’t have log data, we very much depend on the real time
drilling operations, Hence we have to be very careful about gas kick
or loss.
Drilling Challenge
24
• Fire-fighting equipment must be available for emergency use in the event of a fire
and should be provided in first-class working order.
• Unauthorized person should not be allowed to be on the rig at any time.
• Personnel who not involved directly in the particular operation should keep away
from operation site.
• Sea survival and offshore course is compulsory for all personnel.
Safety
25

More Related Content

What's hot

Streamline based history matching of arrival times and bottom-hole pressure d...
Streamline based history matching of arrival times and bottom-hole pressure d...Streamline based history matching of arrival times and bottom-hole pressure d...
Streamline based history matching of arrival times and bottom-hole pressure d...Shusei Tanaka
 
04 Hpht Gas Migration Co2(4 08 06)
04 Hpht Gas Migration Co2(4 08 06)04 Hpht Gas Migration Co2(4 08 06)
04 Hpht Gas Migration Co2(4 08 06)JRThompson8747
 
Productivity improvement & waste reduction
Productivity improvement & waste reductionProductivity improvement & waste reduction
Productivity improvement & waste reductionAbdullah Ansari
 
Use of streamline flow diagnostics for injection production rate allocation o...
Use of streamline flow diagnostics for injection production rate allocation o...Use of streamline flow diagnostics for injection production rate allocation o...
Use of streamline flow diagnostics for injection production rate allocation o...Shusei Tanaka
 
10 year periodic testing of lpg spherical tank
10 year periodic testing of lpg spherical tank10 year periodic testing of lpg spherical tank
10 year periodic testing of lpg spherical tanklpgbnhgastank
 
Short Paper on Braze Repair of Gas Turbine Blades
Short Paper on Braze Repair of Gas Turbine BladesShort Paper on Braze Repair of Gas Turbine Blades
Short Paper on Braze Repair of Gas Turbine BladesAdeniran Oluokun
 
Horizontal Well Performance Optimization Analysis
Horizontal Well Performance Optimization AnalysisHorizontal Well Performance Optimization Analysis
Horizontal Well Performance Optimization AnalysisMahmood Ghazi
 
A novel approach for incorporation of capillary and gravity into streamline s...
A novel approach for incorporation of capillary and gravity into streamline s...A novel approach for incorporation of capillary and gravity into streamline s...
A novel approach for incorporation of capillary and gravity into streamline s...Shusei Tanaka
 
A mathematical model for cement kilns c i-rcle - university of british ( p...
A mathematical model for cement kilns   c i-rcle - university of british  ( p...A mathematical model for cement kilns   c i-rcle - university of british  ( p...
A mathematical model for cement kilns c i-rcle - university of british ( p...mkpq pasha
 
Lab 1 measurement of density of drilling mud samples using mud balance.
Lab 1 measurement of density of drilling mud samples using mud balance.Lab 1 measurement of density of drilling mud samples using mud balance.
Lab 1 measurement of density of drilling mud samples using mud balance.Awais Qureshi
 
10000 psi H2 storage cylinders - US
10000 psi H2 storage cylinders - US10000 psi H2 storage cylinders - US
10000 psi H2 storage cylinders - USfmjpguerrero
 

What's hot (20)

INTERNSHIP PPT
INTERNSHIP PPTINTERNSHIP PPT
INTERNSHIP PPT
 
Streamline based history matching of arrival times and bottom-hole pressure d...
Streamline based history matching of arrival times and bottom-hole pressure d...Streamline based history matching of arrival times and bottom-hole pressure d...
Streamline based history matching of arrival times and bottom-hole pressure d...
 
Superpave orientation local agencies
Superpave orientation local agenciesSuperpave orientation local agencies
Superpave orientation local agencies
 
Lines Drawing
Lines DrawingLines Drawing
Lines Drawing
 
04 Hpht Gas Migration Co2(4 08 06)
04 Hpht Gas Migration Co2(4 08 06)04 Hpht Gas Migration Co2(4 08 06)
04 Hpht Gas Migration Co2(4 08 06)
 
Productivity improvement & waste reduction
Productivity improvement & waste reductionProductivity improvement & waste reduction
Productivity improvement & waste reduction
 
HPHT2014_Presentation_Larry_Vincent
HPHT2014_Presentation_Larry_VincentHPHT2014_Presentation_Larry_Vincent
HPHT2014_Presentation_Larry_Vincent
 
Superpave - Low Volume
Superpave - Low VolumeSuperpave - Low Volume
Superpave - Low Volume
 
Use of streamline flow diagnostics for injection production rate allocation o...
Use of streamline flow diagnostics for injection production rate allocation o...Use of streamline flow diagnostics for injection production rate allocation o...
Use of streamline flow diagnostics for injection production rate allocation o...
 
10 year periodic testing of lpg spherical tank
10 year periodic testing of lpg spherical tank10 year periodic testing of lpg spherical tank
10 year periodic testing of lpg spherical tank
 
Superpavemixdesign
Superpavemixdesign Superpavemixdesign
Superpavemixdesign
 
Port folio
Port folio Port folio
Port folio
 
Short Paper on Braze Repair of Gas Turbine Blades
Short Paper on Braze Repair of Gas Turbine BladesShort Paper on Braze Repair of Gas Turbine Blades
Short Paper on Braze Repair of Gas Turbine Blades
 
Horizontal Well Performance Optimization Analysis
Horizontal Well Performance Optimization AnalysisHorizontal Well Performance Optimization Analysis
Horizontal Well Performance Optimization Analysis
 
A novel approach for incorporation of capillary and gravity into streamline s...
A novel approach for incorporation of capillary and gravity into streamline s...A novel approach for incorporation of capillary and gravity into streamline s...
A novel approach for incorporation of capillary and gravity into streamline s...
 
Toni Carroll - Superpave in California
Toni Carroll - Superpave in CaliforniaToni Carroll - Superpave in California
Toni Carroll - Superpave in California
 
A mathematical model for cement kilns c i-rcle - university of british ( p...
A mathematical model for cement kilns   c i-rcle - university of british  ( p...A mathematical model for cement kilns   c i-rcle - university of british  ( p...
A mathematical model for cement kilns c i-rcle - university of british ( p...
 
Lab 1 measurement of density of drilling mud samples using mud balance.
Lab 1 measurement of density of drilling mud samples using mud balance.Lab 1 measurement of density of drilling mud samples using mud balance.
Lab 1 measurement of density of drilling mud samples using mud balance.
 
Rubberized Hot Mix Asphalt (RHMA) Mix Design
Rubberized Hot Mix Asphalt (RHMA) Mix DesignRubberized Hot Mix Asphalt (RHMA) Mix Design
Rubberized Hot Mix Asphalt (RHMA) Mix Design
 
10000 psi H2 storage cylinders - US
10000 psi H2 storage cylinders - US10000 psi H2 storage cylinders - US
10000 psi H2 storage cylinders - US
 

Viewers also liked (14)

Field Development Project Report - EAB_7_157
Field Development Project Report - EAB_7_157Field Development Project Report - EAB_7_157
Field Development Project Report - EAB_7_157
 
MSc Group Project Presentation
MSc Group Project PresentationMSc Group Project Presentation
MSc Group Project Presentation
 
Final Year Project Report
Final Year Project ReportFinal Year Project Report
Final Year Project Report
 
Elast1
Elast1Elast1
Elast1
 
The birth of a star
The birth of a starThe birth of a star
The birth of a star
 
Api 6 fa
Api 6 faApi 6 fa
Api 6 fa
 
Pago del autobús del viaje de fin de curso
Pago del autobús del viaje de fin de cursoPago del autobús del viaje de fin de curso
Pago del autobús del viaje de fin de curso
 
Justin Casey resume
Justin Casey resumeJustin Casey resume
Justin Casey resume
 
KF_Flyer_D_final
KF_Flyer_D_finalKF_Flyer_D_final
KF_Flyer_D_final
 
Startup metrics
Startup metricsStartup metrics
Startup metrics
 
P4 แบบทดสอบคิดคำนวณคล่อง
P4 แบบทดสอบคิดคำนวณคล่องP4 แบบทดสอบคิดคำนวณคล่อง
P4 แบบทดสอบคิดคำนวณคล่อง
 
Caaa07 Teaser Deutsch
Caaa07 Teaser   DeutschCaaa07 Teaser   Deutsch
Caaa07 Teaser Deutsch
 
Art Nouveau y Art Decó - Gabriela Sánez Méndez
Art Nouveau y Art Decó - Gabriela Sánez MéndezArt Nouveau y Art Decó - Gabriela Sánez Méndez
Art Nouveau y Art Decó - Gabriela Sánez Méndez
 
Casos d'èxit: Nice Things (Borja Santaolalla, Head of Digital)
Casos d'èxit: Nice Things (Borja Santaolalla, Head of Digital)Casos d'èxit: Nice Things (Borja Santaolalla, Head of Digital)
Casos d'èxit: Nice Things (Borja Santaolalla, Head of Digital)
 

Similar to Field Development Project of E11 drilling dept.ppt

Arki tabulated-reviewer
Arki tabulated-reviewerArki tabulated-reviewer
Arki tabulated-reviewerFann Portento
 
Kearney Precast Concrete Deck Panel Bridge Project
Kearney Precast Concrete Deck Panel Bridge ProjectKearney Precast Concrete Deck Panel Bridge Project
Kearney Precast Concrete Deck Panel Bridge ProjectJill Reeves
 
Kearney Precast Concrete Deck Panel Bridge Project
Kearney Precast Concrete Deck Panel Bridge ProjectKearney Precast Concrete Deck Panel Bridge Project
Kearney Precast Concrete Deck Panel Bridge ProjectJill Reeves
 
Prefeseability study of petroleum field
Prefeseability study of petroleum fieldPrefeseability study of petroleum field
Prefeseability study of petroleum fieldSafwen Sakhraoui
 
Monitor drilling performance
Monitor drilling performanceMonitor drilling performance
Monitor drilling performanceAndi Anriansyah
 
Basic Kick calculatinvggzhnxnxhxjdhxbxbxbxbbshdjdhdhdksskowsbzbjsuehxbzkzkxbx...
Basic Kick calculatinvggzhnxnxhxjdhxbxbxbxbbshdjdhdhdksskowsbzbjsuehxbzkzkxbx...Basic Kick calculatinvggzhnxnxhxjdhxbxbxbxbbshdjdhdhdksskowsbzbjsuehxbzkzkxbx...
Basic Kick calculatinvggzhnxnxhxjdhxbxbxbxbbshdjdhdhdksskowsbzbjsuehxbzkzkxbx...AbdallahTayea99
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training reportkiransuresh7
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training reportkiransuresh7
 
Casing Design | Tubing | Well Control | Drilling | Gaurav Singh Rajput
Casing Design | Tubing | Well Control | Drilling | Gaurav Singh RajputCasing Design | Tubing | Well Control | Drilling | Gaurav Singh Rajput
Casing Design | Tubing | Well Control | Drilling | Gaurav Singh RajputGaurav Singh Rajput
 
Cesium formate brine
Cesium formate brine Cesium formate brine
Cesium formate brine John Downs
 
Unlock Your Reservoir Presentation
Unlock Your Reservoir PresentationUnlock Your Reservoir Presentation
Unlock Your Reservoir Presentationtimothyrsmart
 
Unlock Your Reservoir Presentation
Unlock Your Reservoir PresentationUnlock Your Reservoir Presentation
Unlock Your Reservoir Presentationtimothyrsmart
 
IJSRED-V2I3P90
IJSRED-V2I3P90IJSRED-V2I3P90
IJSRED-V2I3P90IJSRED
 
IJSRED-V2I3P90
IJSRED-V2I3P90IJSRED-V2I3P90
IJSRED-V2I3P90IJSRED
 

Similar to Field Development Project of E11 drilling dept.ppt (20)

Arki tabulated-reviewer
Arki tabulated-reviewerArki tabulated-reviewer
Arki tabulated-reviewer
 
Kearney Precast Concrete Deck Panel Bridge Project
Kearney Precast Concrete Deck Panel Bridge ProjectKearney Precast Concrete Deck Panel Bridge Project
Kearney Precast Concrete Deck Panel Bridge Project
 
Kearney Precast Concrete Deck Panel Bridge Project
Kearney Precast Concrete Deck Panel Bridge ProjectKearney Precast Concrete Deck Panel Bridge Project
Kearney Precast Concrete Deck Panel Bridge Project
 
Prefeseability study of petroleum field
Prefeseability study of petroleum fieldPrefeseability study of petroleum field
Prefeseability study of petroleum field
 
Monitor drilling performance
Monitor drilling performanceMonitor drilling performance
Monitor drilling performance
 
Basic Kick calculatinvggzhnxnxhxjdhxbxbxbxbbshdjdhdhdksskowsbzbjsuehxbzkzkxbx...
Basic Kick calculatinvggzhnxnxhxjdhxbxbxbxbbshdjdhdhdksskowsbzbjsuehxbzkzkxbx...Basic Kick calculatinvggzhnxnxhxjdhxbxbxbxbbshdjdhdhdksskowsbzbjsuehxbzkzkxbx...
Basic Kick calculatinvggzhnxnxhxjdhxbxbxbxbbshdjdhdhdksskowsbzbjsuehxbzkzkxbx...
 
Drill.pptx
Drill.pptxDrill.pptx
Drill.pptx
 
GNwafor Group 1 Project
GNwafor Group 1 ProjectGNwafor Group 1 Project
GNwafor Group 1 Project
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training report
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training report
 
Casing Design | Tubing | Well Control | Drilling | Gaurav Singh Rajput
Casing Design | Tubing | Well Control | Drilling | Gaurav Singh RajputCasing Design | Tubing | Well Control | Drilling | Gaurav Singh Rajput
Casing Design | Tubing | Well Control | Drilling | Gaurav Singh Rajput
 
GP Report
GP ReportGP Report
GP Report
 
Cesium formate brine
Cesium formate brine Cesium formate brine
Cesium formate brine
 
My FS2 DEE
My FS2 DEEMy FS2 DEE
My FS2 DEE
 
Unlock Your Reservoir Presentation
Unlock Your Reservoir PresentationUnlock Your Reservoir Presentation
Unlock Your Reservoir Presentation
 
Unlock Your Reservoir Presentation
Unlock Your Reservoir PresentationUnlock Your Reservoir Presentation
Unlock Your Reservoir Presentation
 
Casing_Design(1).ppt
Casing_Design(1).pptCasing_Design(1).ppt
Casing_Design(1).ppt
 
IJSRED-V2I3P90
IJSRED-V2I3P90IJSRED-V2I3P90
IJSRED-V2I3P90
 
IJSRED-V2I3P90
IJSRED-V2I3P90IJSRED-V2I3P90
IJSRED-V2I3P90
 
Connecting Bridge
Connecting BridgeConnecting Bridge
Connecting Bridge
 

Recently uploaded

main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 

Recently uploaded (20)

main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 

Field Development Project of E11 drilling dept.ppt

  • 1.
  • 2. Drilling Department Presented By: Muhammad Noman Khan s/o Muhammad Hanif Khan 2
  • 3. Presentation Synopsis 1. Pressure and fracture gradient determination 2. Calculation and selection of casing type (Proposed casing programmed) 3. Cementing Plan 4. Mud Plan 5. Bit Plan 6. Well Head Housing 7. Rig selection 8. Drill time estimation 3
  • 4. 1. Type of completion for production well 2. Well completion equipment 3. Packer Selection 4. Wellhead and Christmas Tree 5. Perforation 6. Completion and Packer Fluid 7. Summary Completion Goal 4
  • 5. Formation & Fracture Pressure 0 500 1000 1500 2000 2500 3000 3500 4000 4500 0 500 1000 1500 2000 2500 3000 DEPTH(FT) PRESSURE (PSI) Fracture Pressure (psi) Formation Pressure Gradient (psi) Pressure gradient Formation pressure Overburden 0.442 psi/ ft 1 psi/ ft • Formation pressure • Depth • Method used to determine fracture gradient : Eaton’s Method 5
  • 6. Type of Casing Casing Size, in Casing Grade Casing Weight, lb/ft OD, in ID, in Body Yield Strength, lb Conductor 30 X-52 310 30 28 1685000 Surface 20 J-55 94 20 19.124 1480000 Production 9 5/8 N-80 40 9 5/8 8.535 800000 Casing Program – Producer Well 6
  • 7. Type of Casing Casing Size, in Casing Grade Casing Weight, lb/ft OD, in ID, in Body Yield Strength, lb Conductor 30 X-52 310 30 28 1685000 Surface 20 J-55 94 20 19.124 1480000 Production 9 5/8 N-80 40 9 5/8 8.535 800000 Casing Program – Injector Well 7
  • 8. Hole Size, in Casing Size Mud Type Mud Weight, ppg Total Amount, bbl 36 30” Seawater, Sweep/Pad mud 9.5 850 26 20” Seawater, Sweep/Pad mud 10 1400 12 ½” 9 5/8” KCL Polymer Mud 12 665 Mud Plan 8
  • 11. Hole Size Casing Size Total Volume Cu.Ft In BBL Total Sk of Cement 36” 30” 1033.47 ft3 184 bbl 675 sk Additives ( To be mixed with Mixed Water) Water Req Slurry Yield Required 4% Bentonite 7.6 gal/sk 1.53 ft3/ sk 2540 lbs Defoamer ( D Air 3000L) 0.05 gal/sk 34 gal Dispersant (CFR – 3L) 0.07 gal/sk 47 gal Cement Plan for 30” 11
  • 12. Hole Size Casing Size Total Volume Cu.Ft In BBL Total Sk of Cement 26” 20” 965 ft3 406 BBL 934 sk Water Req Slurry Yield Mix Water Tune Lite Cement 7.4 gal/sk 2.440 ft3/sk 8.31 gal/sk Anti Gas Migration (GasStop Exp) 0.06 gal/sk 56 gal Defoamer ( D Air 3000L) 0.05 gal/sk 34 gal Dispersant (CFR – 3L) 0.07 gal/sk 47 gal Cement Retarder (SCR 500L) 0.25 gal/sk 235 gal Fluid Loss Additive (Halad-413L) 0.20 gal/sk 185 gal Cement Plan for 20” Lead 12
  • 13. Hole Size Casing Size Total Volume Cu.Ft In BBL Total Sk of Cement 26” 20” 2280 ft3 172 BBL 840 sk Water Req Slurry Yield Mix Water G Neat Cement 4.91 gal/sk 1.150 ft3/sk 5.01 gal/sk Defoamer ( D Air 3000L) 0.1 gal/sk 84 gal Cement Plan for 20” Tail 13
  • 14. Hole Size Casing Size Total Volume Cu.Ft In BBL Total Sk of Cement 12 1/2” 9 5/8” 1011 ft3 140 BBL 415 sk Water Req Slurry Yield Mix Water Tune Lite Cement 7.4 gal/sk 2.440 ft3/sk 8.31 gal/sk Anti Gas Migration (GasStop Exp) 0.13 gal/sk 55 gal. Defoamer ( D Air 3000L) 0.1 gal/sk. 45 gal. Dispersant (CFR – 3L) 0.09 gal/sk. 40 gal. Cement Retarder (SCR 500L) 0.40 gal/sk 166 gal Fluid Loss Additive (Halad-413L) 0.30 gal/sk 125 gal Cement Plan for 9 5/8” Lead 14
  • 15. Hole Size Casing Size Total Volume Cu.Ft In BBL Total Sk of Cement 12 1/2” 9 5/8” 225 ft3 40 BBL 196 sk. Water Req Slurry Yield Mix Water G Neat Cement 4.91 gal/sk 1.150 ft3/sk 5.01 gal/sk Defoamer ( D Air 3000L) 0.1 gal/sk 20 gal Cement Plan for 9 5/8” Tail 15
  • 16. Volumetric mixing controls. Q1 = mixwater rate; Q2 = dry solids rate; Q3 = slurry rate Tune Lite Mixing & Cement Head 16
  • 17. Hole Size, in Bit Type Bit Size, in 36 Mill Tooth, Hole Opener 36” 26 Tricone Roller 26” 12 ½” TD506 PDC 12 ½” Bit Planning 17
  • 21. Drillship Aban Ice Semi Submersible Blackford Dolphin Rigs 21
  • 22. B1 B2 B3 B4 B5 B6 B7 B8 B9 Top Section 30” 30” 30” 30” 30” 30” 30” 30” 30” 20” 20” 20” 20” 20” 20” 20” 20” 20” Estimated Time (Days) 13 13 13 13 13 13 13 13 13 Total Time to Complete Top Section for all Wells – 117 days 13 days including Rig move and prepare to drill De-hire Drillship after completion of Top Sections Drilling Time Estimation 22
  • 23. B1 B2 B3 B4 B5 B6 B7 B8 B9 Lower Section 13 3/8” 13 3/8” 13 3/8” 13 3/8” 13 3/8” 13 3/8” 13 3/8” 13 3/8” 13 3/8” 9 5/8” 9 5/8” 9 5/8” 9 5/8” 9 5/8” 9 5/8” 9 5/8” 9 5/8” 9 5/8” Estimated Time (Days) 25 25 25 25 25 25 25 25 25 Total Time to Complete Top Section for all Wells – 225 days 25 days including Rig move and prepare to drill and Running BOP De-hire Semi Sub after completion of Lower Sections Drilling Time Estimation 23
  • 24. • Pipe Sticking • Differential-Pressure Pipe Sticking • Mechanical Pipe Sticking • Loss of Circulation • Drillpipe Failures • Twistoff • Fatigue • Pipe-Failure Prevention • Hydrogen-Sulfide-Bearing Zones and Shallow Gas • Since we don’t have log data, we very much depend on the real time drilling operations, Hence we have to be very careful about gas kick or loss. Drilling Challenge 24
  • 25. • Fire-fighting equipment must be available for emergency use in the event of a fire and should be provided in first-class working order. • Unauthorized person should not be allowed to be on the rig at any time. • Personnel who not involved directly in the particular operation should keep away from operation site. • Sea survival and offshore course is compulsory for all personnel. Safety 25

Editor's Notes

  1. A Polymer drilling fluids provide inhibition against reactive formations by providing viscosity, without the need for bentonite, when using inhibitors such as Potassium Chloride, glycols and amines. Bentonite will not yield in the presence of the inhibition agents. Potassium Chloride is also very important for maintaining permeability after filtrate invasion.