Fidus Systems
Corporate Overview
June 2011




© 2011 Fidus Systems Incorporated
How Can We Help You?

1.      Increase Your Revenue
        – Help get your product to market faster to generate revenue sooner
        – Complete projects in parallel, not serially

2.      Reduce Your Costs
        – Add staff and expertise only when a long term need justifies it
        – Minimize your capital purchases by relying on our design tools and equipment

3.      Increase Your Speed and Flexibility
        – Augment your team when you are behind schedule
        – Augment your team when an unexpected opportunity arises
        – Augment your expertise when an unfamiliar technology or in-lab crisis arises

4.      Increase Your Focus on Your Core Competency
        – You can focus on your technical differentiator, while we fill in the rest
        – Rely on our design experience, so you can concentrate on your business



     Slide 2                               June 15, 2011
Corporate Profile
• Established in 2001, we have delivered over 800 unique solutions to
  over 215 customers

• 3 Design Center locations
          – Ottawa, Ontario, Canada (Headquarters)
          – Toronto, Ontario, Canada
          – Milpitas, California, USA


• 30 Staff Designers and 25 qualified vetted Contractors specializing
  in:
          – Hardware, RF/Wireless, FPGA, Signal/Power Integrity, Embedded
            Software/Firmware, PCB Layout and Mechanical Design


• > $2M invested in advanced development tools and lab equipment

• 97% of our customers would recommend us to others

Slide 3                                  June 15, 2011
Industries We Serve
We serve a diverse clientele:

• Telecommunications
       – Systems Linecards, Backplanes, Power, LTE/ WiMAX™
• Aerospace and Defense
       – In aircraft systems, RF equipment, Soldier power systems
• Consumer
       – Desktop, Handheld, Battery powered, Wireless
• Semiconductors
       – Eval/Ref/Demo boards, FPGA-based ASIC emulation, IC level simulation
• Industrial/Automotive Controls
       – Air quality sensors, OBD-II systems, Rail transport automation
• Medical
       – Functional testers, Analyzers




 Slide 4                                 June 15, 2011
Our Offerings
•   Electronic Product Development (EPD)
     – Turnkey product development from concept to production
     – Includes Product Definition, High-Level Design, Low-Level
       Design, Prototyping, Verification, Regulatory Approvals, and Project Management

•   Staff Augmentation
     – Augmenting or complementing your existing skill-sets with specific skill-sets, or
       more designers to accelerate your schedule

•   Consulting Services
     – Providing expert review and commentary to supplement your internal knowledge on
       various technologies or processes

•   Products
     – Automatic Identification Systems (AIS): Class B Module, AIS-SART, AIS VME
       Receiver
     – IC Emulators: Developing drop-in replacements for obsolete IC’s




    Slide 5                               June 15, 2011
Your Business Model?
•    Time and Materials (Hourly based billing)
          – You need to get started quickly
          – Your program is research-based, or requires additional definition, and thus
            cannot be accurately estimated at project start
          – You need flexibility in the number of people, the schedule, product features
          – You believe that the program is straightforward, and do not wish to pay the risk
            premiums associated with a fixed price project

•    Fixed Price (Project/Deliverable based billing)
          –   Your program is well defined with a clear scope of work
          –   Your program is well planned
          –   Your internal budget system favors’ a single upfront known cost
          –   Your program is large, and warrants a firm price structure

•    Royalties and Licensing
          – We can assist with financing Your project or providing Product Development IP
          – In return, we would share in some of the future financial rewards



Slide 6                                      June 15, 2011
Technical Areas of Expertise
Fidus enables Your product, with excellence in:


•     System Design and Architecture
•     Hardware Design, Bring-Up and Debug
•     Wireless/RF Design
•     PCB Layout
•     FPGA/DSP Design
•     Embedded Software/Firmware
•     Signal Integrity/Power Integrity/EMC
•     Industrial/Mechanical Design
•     Regulatory Approvals
•     Proof of concept and prototype development




    Slide 7                         June 15, 2011
Technologies
Fidus has technology knowledge and experience with:

•     Telecommunications: ATM, TDM, xDSL, SONET/SDH, TCP/IP
•     Wireless: 0.1 to 24 GHz, AIS, Bluetooth®, Custom Antennas, EMI/EMC, GPS, HDTV, mmWave, RFID, Software
      Defined Radio (SDR), Digital Signal Processing (DSP), UHF/VHF, Wi-Fi/WLAN (802.11), WiMAX™ (OFDM),
      OFDMA, ZigBee®, W-CDMA, GSM
•     High Speed Memory: DDR/2/3, SDR, QDR
•     Storage: Solid State Drives (SSDs)
•     High Speed Design/Signal and Power Integrity: 10G/40G/100G
•     Interfaces: XAUI, Ethernet up to 10GigE, MII/RMII/GMII, USB, OC3 to OC192, XFI, SFI, SATA/SAS, 10GBase-KR
•     Backplane: PCI/PCI-X/PCIe, cPCI, ATCA, VME
•     FPGA/CPLD: Altera, Xilinx, Lattice, most families, IP Cores, and technologies
•     Embedded Software: C/C++, Bootloaders (U-Boot), Visual Basic, GUIs, Embedded Graphics Libraries (TFTs),
      Board Support Packages, Device Drivers, Porting, Scripting (Tcl/tk)
•     µProcessors/µControllers: Marvell, NXP, ST, DesignArt ARM™, ST ARM Cortex-M3, PowerPC, Freescale
      CPU32, x86, IA-32/64, MIPS, 8051, PIC, TI MSP430, Freescale CPU12, Atmel AVR devices
•     Operating Systems: Linux, eCOS, VxWorks, OSE, FreeRTOS, RTX, ThreadX
•     Power: Modules and Discrete Converters (isolated, non-isolated, buck, boost, inverters etc.),
      Batteries/Chargers, Input source switching, Low noise designs & layout techniques, Mobile Power Systems
•     Layout: High Density Interconnect (HDI), µvias, via-in-pad, buried cap/res, mixed technologies (dielectrics)




    Slide 8                                            June 15, 2011
Our Tools Are Your Tools




Slide 9               June 15, 2011
Our Program Team

• Your Success, by our Business Managers:
   – Reviewing your program needs with you, and providing feedback on how Fidus can help
   – Reviewing your requirements and discussing your expectations to ensure that the
     Quotations and SOW’s we generate meet your needs


• Your Confidence, by our Project Managers:
   –    Organizing, planning, and managing the resources and scope of your project
   –    Facilitating program updates, and providing weekly project status charts
   –    Reporting, including burn-rate, money spent, and money remaining
   –    Risk mitigation. Identify and address potential issues before they occur.


• Your Product, by our Engineers
   – Reliability. Our Engineers have experience, technology, tools and business skills.
   – Providing feedback to You. Our design Team is encouraged to provide feedback to our
     Customers to lead to a better end product.
   – Sharing a focus on quality, reliability, and on-time delivery


    Slide 10                              June 15, 2011
Customer      Working With You




                                                          Customer




                                                                                      Customer
                            Customer




                                                                                                                      Customer
                                                          (optional)




                                                                                      (optional)
      Input




                                                            Input




                                                                                        Input
                              Input




                                                                                                                        Input
                                                                                     Client
 Program                 Architecture               Detail Design                                            NPI & Product
                                                                                  Integration
 Definition                 Phase                   Phase (SOW)                                                Support
                                                                                     Phase
                     •   Team Assigned
                                                    • Schematics                • System Integration         • Volume Mfg
• Mutual NDA         •   Detailed Spec              • PCB Layout
• Project Details    •   Select Major Parts                                       Test Support                 Support
                                                    • Signal Integrity
• Business Model     •   Identify Approvals                                     • SW/FPGA/Mech               • Field Support
                                                    • FPGA
  Determined         •   Part Lead Time &           • Software                    Integration Test
• Architecture           Costing                    • Mechanical                  Support
  Proposal           •   Cost Quote                 • DFx Reqs & Review
• Detail Design      •   Schedule                   • Prototype Build
  Preliminary        •   Project Risks                Support
  Estimate           •   SOW                        • Prototype Testing



                                              Milestone                   Milestone                    Milestone


                                   New Products, Variants, New Features, Upgrades


       Slide 11                                           June 15, 2011
You Ready?

Whether You need our help with:

   –    Increasing your Revenue by decreasing your time-to-market
   –    Reducing your costs by augmenting your staff only as needed
   –    Reducing your costs by limiting your tools/equipment expenditures
   –    Increasing your speed and flexibility through staff augmentation or niche expertise
   –    Removing non-core product development distractions

                            Contact Us.
                                  .
           We look forward to being Your qualified partner.



                                      THANK YOU

    Slide 12                                June 15, 2011
Testimonials
“Fidus has been our sole PCB design supplier for almost two years. They have
provided excellent skills, service and support through all the challenges and
difficulties that arise in a complex engineering project. We intend to continue this
relationship for a long time and look forward to many more collaborative projects.”
Mike Chenery, President & Founder, Pliant Technology

“I have enjoyed our collaboration with you folks on this program. Your expertise and
professionalism was very impressive. Despite the churn from the technology suppliers
we’re using, to keep the delivery date to within 2 days of plan is fantastic.”
Tim Winchester, Design Center Manager, Opnext Inc.


Concerning Fidus' development of the FPGA, PCB layout and mechanical design for
a VME card, a high-speed signal processing board for the CP-140 Aurora aircraft.
This was a complex and dynamic project. We needed a high-performance product in
a compact, lightweight and resilient package that withstands a harsh environment and
high vibrations. Fidus accommodated all our design changes, completing the project
on-budget and on-schedule.
Dr. Jean-Francois Rivest, Head, Radar Electronic Warfare, Defence Research and Development
Canada



Slide 13                                 June 15, 2011
Contact Us
                     Fidus Systems Headquarters
                        900 Morrison Drive, Suite 203
                       Ottawa, ON K2H 8K7 Canada
                  1.866.883.4387 (Toll Free - North America)
                            Tel: +1.613.828.0063
                            Fax:+1.613.828.3113
                               info@fidus.com
                                www.fidus.com

Toronto Design Center                                California Design Center
1 Eva Road, Suite 208                                1900 McCarthy Blvd., Suite 415
Toronto, ON M9C 4Z5 Canada                           Milpitas, CA 95035 USA
Tel: +1.416.622.0060                                 Tel: +1.408.217.1928
Fax: +1.416.622.0061                                 Fax: +1.408.899.5822




   Slide 14                          June 15, 2011

Fidus Corporate Presentation June 2011 (For Printing)

  • 1.
    Fidus Systems Corporate Overview June2011 © 2011 Fidus Systems Incorporated
  • 2.
    How Can WeHelp You? 1. Increase Your Revenue – Help get your product to market faster to generate revenue sooner – Complete projects in parallel, not serially 2. Reduce Your Costs – Add staff and expertise only when a long term need justifies it – Minimize your capital purchases by relying on our design tools and equipment 3. Increase Your Speed and Flexibility – Augment your team when you are behind schedule – Augment your team when an unexpected opportunity arises – Augment your expertise when an unfamiliar technology or in-lab crisis arises 4. Increase Your Focus on Your Core Competency – You can focus on your technical differentiator, while we fill in the rest – Rely on our design experience, so you can concentrate on your business Slide 2 June 15, 2011
  • 3.
    Corporate Profile • Establishedin 2001, we have delivered over 800 unique solutions to over 215 customers • 3 Design Center locations – Ottawa, Ontario, Canada (Headquarters) – Toronto, Ontario, Canada – Milpitas, California, USA • 30 Staff Designers and 25 qualified vetted Contractors specializing in: – Hardware, RF/Wireless, FPGA, Signal/Power Integrity, Embedded Software/Firmware, PCB Layout and Mechanical Design • > $2M invested in advanced development tools and lab equipment • 97% of our customers would recommend us to others Slide 3 June 15, 2011
  • 4.
    Industries We Serve Weserve a diverse clientele: • Telecommunications – Systems Linecards, Backplanes, Power, LTE/ WiMAX™ • Aerospace and Defense – In aircraft systems, RF equipment, Soldier power systems • Consumer – Desktop, Handheld, Battery powered, Wireless • Semiconductors – Eval/Ref/Demo boards, FPGA-based ASIC emulation, IC level simulation • Industrial/Automotive Controls – Air quality sensors, OBD-II systems, Rail transport automation • Medical – Functional testers, Analyzers Slide 4 June 15, 2011
  • 5.
    Our Offerings • Electronic Product Development (EPD) – Turnkey product development from concept to production – Includes Product Definition, High-Level Design, Low-Level Design, Prototyping, Verification, Regulatory Approvals, and Project Management • Staff Augmentation – Augmenting or complementing your existing skill-sets with specific skill-sets, or more designers to accelerate your schedule • Consulting Services – Providing expert review and commentary to supplement your internal knowledge on various technologies or processes • Products – Automatic Identification Systems (AIS): Class B Module, AIS-SART, AIS VME Receiver – IC Emulators: Developing drop-in replacements for obsolete IC’s Slide 5 June 15, 2011
  • 6.
    Your Business Model? • Time and Materials (Hourly based billing) – You need to get started quickly – Your program is research-based, or requires additional definition, and thus cannot be accurately estimated at project start – You need flexibility in the number of people, the schedule, product features – You believe that the program is straightforward, and do not wish to pay the risk premiums associated with a fixed price project • Fixed Price (Project/Deliverable based billing) – Your program is well defined with a clear scope of work – Your program is well planned – Your internal budget system favors’ a single upfront known cost – Your program is large, and warrants a firm price structure • Royalties and Licensing – We can assist with financing Your project or providing Product Development IP – In return, we would share in some of the future financial rewards Slide 6 June 15, 2011
  • 7.
    Technical Areas ofExpertise Fidus enables Your product, with excellence in: • System Design and Architecture • Hardware Design, Bring-Up and Debug • Wireless/RF Design • PCB Layout • FPGA/DSP Design • Embedded Software/Firmware • Signal Integrity/Power Integrity/EMC • Industrial/Mechanical Design • Regulatory Approvals • Proof of concept and prototype development Slide 7 June 15, 2011
  • 8.
    Technologies Fidus has technologyknowledge and experience with: • Telecommunications: ATM, TDM, xDSL, SONET/SDH, TCP/IP • Wireless: 0.1 to 24 GHz, AIS, Bluetooth®, Custom Antennas, EMI/EMC, GPS, HDTV, mmWave, RFID, Software Defined Radio (SDR), Digital Signal Processing (DSP), UHF/VHF, Wi-Fi/WLAN (802.11), WiMAX™ (OFDM), OFDMA, ZigBee®, W-CDMA, GSM • High Speed Memory: DDR/2/3, SDR, QDR • Storage: Solid State Drives (SSDs) • High Speed Design/Signal and Power Integrity: 10G/40G/100G • Interfaces: XAUI, Ethernet up to 10GigE, MII/RMII/GMII, USB, OC3 to OC192, XFI, SFI, SATA/SAS, 10GBase-KR • Backplane: PCI/PCI-X/PCIe, cPCI, ATCA, VME • FPGA/CPLD: Altera, Xilinx, Lattice, most families, IP Cores, and technologies • Embedded Software: C/C++, Bootloaders (U-Boot), Visual Basic, GUIs, Embedded Graphics Libraries (TFTs), Board Support Packages, Device Drivers, Porting, Scripting (Tcl/tk) • µProcessors/µControllers: Marvell, NXP, ST, DesignArt ARM™, ST ARM Cortex-M3, PowerPC, Freescale CPU32, x86, IA-32/64, MIPS, 8051, PIC, TI MSP430, Freescale CPU12, Atmel AVR devices • Operating Systems: Linux, eCOS, VxWorks, OSE, FreeRTOS, RTX, ThreadX • Power: Modules and Discrete Converters (isolated, non-isolated, buck, boost, inverters etc.), Batteries/Chargers, Input source switching, Low noise designs & layout techniques, Mobile Power Systems • Layout: High Density Interconnect (HDI), µvias, via-in-pad, buried cap/res, mixed technologies (dielectrics) Slide 8 June 15, 2011
  • 9.
    Our Tools AreYour Tools Slide 9 June 15, 2011
  • 10.
    Our Program Team •Your Success, by our Business Managers: – Reviewing your program needs with you, and providing feedback on how Fidus can help – Reviewing your requirements and discussing your expectations to ensure that the Quotations and SOW’s we generate meet your needs • Your Confidence, by our Project Managers: – Organizing, planning, and managing the resources and scope of your project – Facilitating program updates, and providing weekly project status charts – Reporting, including burn-rate, money spent, and money remaining – Risk mitigation. Identify and address potential issues before they occur. • Your Product, by our Engineers – Reliability. Our Engineers have experience, technology, tools and business skills. – Providing feedback to You. Our design Team is encouraged to provide feedback to our Customers to lead to a better end product. – Sharing a focus on quality, reliability, and on-time delivery Slide 10 June 15, 2011
  • 11.
    Customer Working With You Customer Customer Customer Customer (optional) (optional) Input Input Input Input Input Client Program Architecture Detail Design NPI & Product Integration Definition Phase Phase (SOW) Support Phase • Team Assigned • Schematics • System Integration • Volume Mfg • Mutual NDA • Detailed Spec • PCB Layout • Project Details • Select Major Parts Test Support Support • Signal Integrity • Business Model • Identify Approvals • SW/FPGA/Mech • Field Support • FPGA Determined • Part Lead Time & • Software Integration Test • Architecture Costing • Mechanical Support Proposal • Cost Quote • DFx Reqs & Review • Detail Design • Schedule • Prototype Build Preliminary • Project Risks Support Estimate • SOW • Prototype Testing Milestone Milestone Milestone New Products, Variants, New Features, Upgrades Slide 11 June 15, 2011
  • 12.
    You Ready? Whether Youneed our help with: – Increasing your Revenue by decreasing your time-to-market – Reducing your costs by augmenting your staff only as needed – Reducing your costs by limiting your tools/equipment expenditures – Increasing your speed and flexibility through staff augmentation or niche expertise – Removing non-core product development distractions Contact Us. . We look forward to being Your qualified partner. THANK YOU Slide 12 June 15, 2011
  • 13.
    Testimonials “Fidus has beenour sole PCB design supplier for almost two years. They have provided excellent skills, service and support through all the challenges and difficulties that arise in a complex engineering project. We intend to continue this relationship for a long time and look forward to many more collaborative projects.” Mike Chenery, President & Founder, Pliant Technology “I have enjoyed our collaboration with you folks on this program. Your expertise and professionalism was very impressive. Despite the churn from the technology suppliers we’re using, to keep the delivery date to within 2 days of plan is fantastic.” Tim Winchester, Design Center Manager, Opnext Inc. Concerning Fidus' development of the FPGA, PCB layout and mechanical design for a VME card, a high-speed signal processing board for the CP-140 Aurora aircraft. This was a complex and dynamic project. We needed a high-performance product in a compact, lightweight and resilient package that withstands a harsh environment and high vibrations. Fidus accommodated all our design changes, completing the project on-budget and on-schedule. Dr. Jean-Francois Rivest, Head, Radar Electronic Warfare, Defence Research and Development Canada Slide 13 June 15, 2011
  • 14.
    Contact Us Fidus Systems Headquarters 900 Morrison Drive, Suite 203 Ottawa, ON K2H 8K7 Canada 1.866.883.4387 (Toll Free - North America) Tel: +1.613.828.0063 Fax:+1.613.828.3113 info@fidus.com www.fidus.com Toronto Design Center California Design Center 1 Eva Road, Suite 208 1900 McCarthy Blvd., Suite 415 Toronto, ON M9C 4Z5 Canada Milpitas, CA 95035 USA Tel: +1.416.622.0060 Tel: +1.408.217.1928 Fax: +1.416.622.0061 Fax: +1.408.899.5822 Slide 14 June 15, 2011