Your Engineering Solutions Partner
At a Glance

 Successful operations since 2001 with commitment to provide quality and cost
 effective Engineering Services
 Our Business Ethics determine that we want only few strong alliances in each
 segment to focus our attention
 Huge Domain expertise with over 100 Engineering Resources working across
 various verticals

         Process driven with ready templates for
         outsourcing of Engineering Services
         24X7 Global Support with over 100%
         growth in manpower over the past 5 years
         Over 85% Client Retention Rate
Head Office Location
Headquartered in Pune, INDIA – Major
Engineering Center
                         Pune: India’s foremost Engineering Hub
                                                                 Lowest cost of
  •   Pune – Major IT Destination in India boasting large   infrastructure… yet best
      no of engineering colleges and typically IT talent      quality of resources
  •   Approximately USD 5 bn of Technology Services
      Exports and over 2.5 million workers

  •   Over 50 Engineering colleges and a major
      engineering center including some of the big names
      in Automotive and Engineering sector.

  •   Major Defence, Electronic, Computing & Vehicle
      Development Research labs


                     •    2 Hours drive from Mumbai – Financial capital of India
                          bustling with development and economic activities
Domain Expertise
                  Automotive               Engineering / Heavy Engineering

Engine                           Hydraulic Pumps and Motors
Body                             Industrial Valves, Control Valves
Chassis                          Actuators, Regulators & Compressors
Interior                         Process Equipments
Tooling & molding                Motors & Generators
Power Train                      Pressure Vessels
FE Modeling and Analysis         Gear Boxes
Full vehicle structure
synthesis & FE Analysis


                   Aerospace              Energy / Tooling / Consumer Goods

Aircraft Interior Design         Upstream applications: Exploration, re-injection, LNG
Concept and Development          Midstream applications: Pipelines, power generation,
Noise Reduction                  sea lines
Weight Optimizations
Computational Fluid Dynamics
Structural,Thermal Analysis of
Aero-Engine components
Body and Fuselage Components
                                 Consumer goods and Tooling
Technology

         CAD                        CAE                      CAM

CATIA V4 & V5              Ansys               Pro / NC
I-DEAS                     Hypermesh           Unigraphics
Pro/Engineer               Nastran             I-DEAS
Unigraphics                I-DEAS Simulation   DelCAM
CADDS 5                    Pro/Mechanica
Inventor / MDT / AutoCAD   FEMAP
Solid Designer / ME10      Patran                    Application Development
Solid Works                LS Dyna
Solid Edge                 ABAQUS              CATIA V4 IUA/GII
ICEM Surf                                      CATIA V5 CAA –VC++
Design and Engineering Capabilities
              Data Migration                   Solid & Surface modeling

         Free-form surface design                 Assembly Design

          Legacy Data Conversion                   Digital Mock up

        Advanced Surface Design                  Drafting & Detailing

     Product Design / Catalog Creation           Reverse engineering

      Design Changes / Modification      Finite Element Modeling and Analysis
Offerings
          CAD / CAM                   Engineering Analysis                 Tool Design

Product Design               Finite Element Meshing          Press Tool

Plant Layout & Engineering   Structural Analysis             Mould Design

Tool Engineering             Thermal Analysis                Fixture Design

3D Modeling & Detailing      Fatigue Analysis                      CAD Appl. Development

Jig/Fixture Design           Mold Flow Simulation            Customization

Motion Simulation            Design Optimization/Redesign    Migration

Legacy Data Conversion       Computational Fluid Dynamics
                                                             Integration
NC Tool path Generation

Reverse Engineering
Typical Project Organization

                                                    Local Management Team
                                                    for governance - Bring its
                                                    considerable technical and
                                                    executive talent to bear on
                                                    the EDC




        Skeleton onsite presence and onsite rates
        can be mutually discussed for specific
        assignments
Project Methodology :

  Initiate          Prepare                Execute & Control               Close


                                                Track
                                               & Control




                              Planning
              Definition /       and                                       Completion &
Startup        Scope /        Resource                         Reporting
                                                                           Assessment
             Requirements     Allocation




                                                Review




             Project Management Tools : MS Project 2007, MS Groove 2007,
                              Communication Management
Methodology

•   Daily Documentation as per ISO Standards                    Feasibility & SWOT Analysis

•   Project Information System – a Customized Software             Joint Discussions to
    (Under Implementation)                                      formulate the Statement of
     –     Daily Work Allocation                                work & Client specification
     –     Daily Time/Effort Estimation                         Check sheet and Standards
     –     Defect Tracking
     –     Rework Tracking                                      AT’s Cost & Time Estimation
                                                               & Joint Agreement with client
     –     Project Report Generation (Project History)

                                                                 Client P.O. Project planning
    Project configuration is version controlled using
           Configuration Management System
                                                         Project Execution with reviews to control &
                                                                     Monitor the project
                                                             Documentation & Client Follow up


                                                                     Client Feedback &
                                                                     Project Conclusion
Partial Clients List

              • Tata Motors Ltd.             • Wartsila, Finland
                                               Wartsila,
              • JCB India Ltd                • Citec Engineering,Finland
              • Wartsila India Ltd.          • John Deere
              • Cotton Greaves Ltd           • Krones ,Germany
              • ThyssenKrupp India ltd.      • Mouture, USA
                                               Mouture,
              • Hindustan Aeronautics Ltd.   • BFG International
              • Cummins India Ltd
              • Kirloskar Oil Engines ltd.
              • Comau India Ltd.
Case-Studies
Solid Modeling of D.G Set
                   Generate 3D solid model of each and every part of the D.G. Set from the drawings provided by
     Scope         customer. As well as carry out structural and Modal finite element analysis for Base frame as
                   per the Inputs provided by Customer.



                   Soft copy and hard copy of all the D.G. drawings
                   including Engine and Alternator, Piping and Base
                   Frame details, casting details and machining
  Project Inputs   details for 1MW D.G. set. Material of Base frame
                   (mild Steel) Loading locations and Internal
                   pressure. Maximum allowable stress.


                   3D solid model, FE model and complete report
   Deliverables    including various stress plots. Software : Pro/E,
                   Hypermesh, Ansys
                                                                        3D Modeling and Detailing

                                                       Analysis Results




                             Meshing
Fixture Design and Detailing
                   Fixture Design and Detailing of given input panel data and Generate 3D solid model of each
     Scope         and every unit of the fixture.


                   Panel Data.
                   Welding Spot Points.
  Project Inputs
                   Clamping And Location Points.
                   Standard Parts Library.


                   Concept Design, 3D solid model, Detail drawing.
  Deliverables
                   Software: CATIA V5


                                                                                    Fixture Modeling



                                      Detailing


                                                                                            Panel Data
Solid Modeling and CFD : Wind Mill
                             Generate 3D solid model of each and every part of the wind Mill Set from the drawings
      Scope                  provided by customer. As well as carry out Computational Fluid dynamics analysis for wind
                             mill as per the Inputs provided by Customer.



                             Soft copy and hard copy of all the drawings
                             including Blade and Spindle, Gear Box and
   Project Inputs            Structural Frame details and machining details for
                             50MW wind mill set. Material of Blade, Loading
                             locations and Inlet velocity and RPM and Torque.


                             3D solid model, FE model and complete report
   Deliverables              including various CFD stress plots. Software :
                             Pro/E, Hypermesh, Fluent
                                                                                  3D Modeling and Detailing


                                                                                                              Outlet to Atm.


      Velocity contour plots over the blade               Inlet velocity
                    TS velocities are visible             12 m/sec


                                                             Analysis Results
Other Solid Modeling Projects

                                                 MODEL NAME : Manifold

                                                 SOFTWARE: Catia V5

                                                 CLIENT NAME: Mautour USA




                                                    Project NAME : HPDC Die Design
                                                    SOFTWARE: Catia V5
 Project NAME : Engine Component Modeling           CLIENTS NAME: Tata Motors Pune
 SOFTWARE: Catia V5
 CLIENTS NAME: Mautour USA




       Project NAME : Cold Rolled Pipe Machine
       SOFTWARE: Pro-E
       CLIENTS NAME: indian Client
Other FEM/FEA Projects
MODEL NAME : Hood Analysis

SOFTWARE:       Hypermesh / Ansys        MODEL NAME : Body-Four Wheel

CLIENT NAME: Ital Design, Italy.         SOFTWARE: Hypermesh




                                    MODEL NAME : Three Wheel Chassis

                                    SOFTWARE: Catia Hypermesh and Ansys

                                    CLIENT NAME: Piaggio
Complete IP Protection – Best Practices


     Software     Hardware       Data         Process          People




    • Complete Encryption    • Rights and          • NDA with each
    • Firewalls                Responsibilities      Employee
    • Authorization          • Passwords           • Training on Security
                                                     Measures
    • Malware Protection     • Recovery and
                                                   • Process Design
    • Access Management        Data Backup
                                                   • Regular Assessment
    • Surveillance &         • Physical Security
      Monitoring
Why Us?
Project Management – Highly Process Oriented
Quality - “First Time Right”
Cost –       Indian Cost-Advantage
Time – Minimum Turnaround Time
Complete IP Protection

High level of Commitment to Business
   Driven by highly committed individuals

   Able to successfully run operations and grow the business under tough environment for the
   past ten years

   Capability to survive the ups and downs of the Business Cycle - Assured long term stability

Focused Relationship
   Being a small company will also help to be agile and have undivided management attention
   (very important in such relationships)

   Customer success integral to our success
Thank You

For further information, please visit us at :

      www.shivamtech.com
    Skype : shivamengineering
    e-mail : manoj@shivamtech.com
    Cell :    +91 90110 58126

Shivamtech brochure

  • 1.
  • 2.
    At a Glance Successful operations since 2001 with commitment to provide quality and cost effective Engineering Services Our Business Ethics determine that we want only few strong alliances in each segment to focus our attention Huge Domain expertise with over 100 Engineering Resources working across various verticals Process driven with ready templates for outsourcing of Engineering Services 24X7 Global Support with over 100% growth in manpower over the past 5 years Over 85% Client Retention Rate
  • 3.
    Head Office Location Headquarteredin Pune, INDIA – Major Engineering Center Pune: India’s foremost Engineering Hub Lowest cost of • Pune – Major IT Destination in India boasting large infrastructure… yet best no of engineering colleges and typically IT talent quality of resources • Approximately USD 5 bn of Technology Services Exports and over 2.5 million workers • Over 50 Engineering colleges and a major engineering center including some of the big names in Automotive and Engineering sector. • Major Defence, Electronic, Computing & Vehicle Development Research labs • 2 Hours drive from Mumbai – Financial capital of India bustling with development and economic activities
  • 4.
    Domain Expertise Automotive Engineering / Heavy Engineering Engine Hydraulic Pumps and Motors Body Industrial Valves, Control Valves Chassis Actuators, Regulators & Compressors Interior Process Equipments Tooling & molding Motors & Generators Power Train Pressure Vessels FE Modeling and Analysis Gear Boxes Full vehicle structure synthesis & FE Analysis Aerospace Energy / Tooling / Consumer Goods Aircraft Interior Design Upstream applications: Exploration, re-injection, LNG Concept and Development Midstream applications: Pipelines, power generation, Noise Reduction sea lines Weight Optimizations Computational Fluid Dynamics Structural,Thermal Analysis of Aero-Engine components Body and Fuselage Components Consumer goods and Tooling
  • 5.
    Technology CAD CAE CAM CATIA V4 & V5 Ansys Pro / NC I-DEAS Hypermesh Unigraphics Pro/Engineer Nastran I-DEAS Unigraphics I-DEAS Simulation DelCAM CADDS 5 Pro/Mechanica Inventor / MDT / AutoCAD FEMAP Solid Designer / ME10 Patran Application Development Solid Works LS Dyna Solid Edge ABAQUS CATIA V4 IUA/GII ICEM Surf CATIA V5 CAA –VC++
  • 6.
    Design and EngineeringCapabilities Data Migration Solid & Surface modeling Free-form surface design Assembly Design Legacy Data Conversion Digital Mock up Advanced Surface Design Drafting & Detailing Product Design / Catalog Creation Reverse engineering Design Changes / Modification Finite Element Modeling and Analysis
  • 7.
    Offerings CAD / CAM Engineering Analysis Tool Design Product Design Finite Element Meshing Press Tool Plant Layout & Engineering Structural Analysis Mould Design Tool Engineering Thermal Analysis Fixture Design 3D Modeling & Detailing Fatigue Analysis CAD Appl. Development Jig/Fixture Design Mold Flow Simulation Customization Motion Simulation Design Optimization/Redesign Migration Legacy Data Conversion Computational Fluid Dynamics Integration NC Tool path Generation Reverse Engineering
  • 8.
    Typical Project Organization Local Management Team for governance - Bring its considerable technical and executive talent to bear on the EDC Skeleton onsite presence and onsite rates can be mutually discussed for specific assignments
  • 9.
    Project Methodology : Initiate Prepare Execute & Control Close Track & Control Planning Definition / and Completion & Startup Scope / Resource Reporting Assessment Requirements Allocation Review Project Management Tools : MS Project 2007, MS Groove 2007, Communication Management
  • 10.
    Methodology • Daily Documentation as per ISO Standards Feasibility & SWOT Analysis • Project Information System – a Customized Software Joint Discussions to (Under Implementation) formulate the Statement of – Daily Work Allocation work & Client specification – Daily Time/Effort Estimation Check sheet and Standards – Defect Tracking – Rework Tracking AT’s Cost & Time Estimation & Joint Agreement with client – Project Report Generation (Project History) Client P.O. Project planning Project configuration is version controlled using Configuration Management System Project Execution with reviews to control & Monitor the project Documentation & Client Follow up Client Feedback & Project Conclusion
  • 11.
    Partial Clients List • Tata Motors Ltd. • Wartsila, Finland Wartsila, • JCB India Ltd • Citec Engineering,Finland • Wartsila India Ltd. • John Deere • Cotton Greaves Ltd • Krones ,Germany • ThyssenKrupp India ltd. • Mouture, USA Mouture, • Hindustan Aeronautics Ltd. • BFG International • Cummins India Ltd • Kirloskar Oil Engines ltd. • Comau India Ltd.
  • 12.
  • 13.
    Solid Modeling ofD.G Set Generate 3D solid model of each and every part of the D.G. Set from the drawings provided by Scope customer. As well as carry out structural and Modal finite element analysis for Base frame as per the Inputs provided by Customer. Soft copy and hard copy of all the D.G. drawings including Engine and Alternator, Piping and Base Frame details, casting details and machining Project Inputs details for 1MW D.G. set. Material of Base frame (mild Steel) Loading locations and Internal pressure. Maximum allowable stress. 3D solid model, FE model and complete report Deliverables including various stress plots. Software : Pro/E, Hypermesh, Ansys 3D Modeling and Detailing Analysis Results Meshing
  • 14.
    Fixture Design andDetailing Fixture Design and Detailing of given input panel data and Generate 3D solid model of each Scope and every unit of the fixture. Panel Data. Welding Spot Points. Project Inputs Clamping And Location Points. Standard Parts Library. Concept Design, 3D solid model, Detail drawing. Deliverables Software: CATIA V5 Fixture Modeling Detailing Panel Data
  • 15.
    Solid Modeling andCFD : Wind Mill Generate 3D solid model of each and every part of the wind Mill Set from the drawings Scope provided by customer. As well as carry out Computational Fluid dynamics analysis for wind mill as per the Inputs provided by Customer. Soft copy and hard copy of all the drawings including Blade and Spindle, Gear Box and Project Inputs Structural Frame details and machining details for 50MW wind mill set. Material of Blade, Loading locations and Inlet velocity and RPM and Torque. 3D solid model, FE model and complete report Deliverables including various CFD stress plots. Software : Pro/E, Hypermesh, Fluent 3D Modeling and Detailing Outlet to Atm. Velocity contour plots over the blade Inlet velocity TS velocities are visible 12 m/sec Analysis Results
  • 16.
    Other Solid ModelingProjects MODEL NAME : Manifold SOFTWARE: Catia V5 CLIENT NAME: Mautour USA Project NAME : HPDC Die Design SOFTWARE: Catia V5 Project NAME : Engine Component Modeling CLIENTS NAME: Tata Motors Pune SOFTWARE: Catia V5 CLIENTS NAME: Mautour USA Project NAME : Cold Rolled Pipe Machine SOFTWARE: Pro-E CLIENTS NAME: indian Client
  • 17.
    Other FEM/FEA Projects MODELNAME : Hood Analysis SOFTWARE: Hypermesh / Ansys MODEL NAME : Body-Four Wheel CLIENT NAME: Ital Design, Italy. SOFTWARE: Hypermesh MODEL NAME : Three Wheel Chassis SOFTWARE: Catia Hypermesh and Ansys CLIENT NAME: Piaggio
  • 18.
    Complete IP Protection– Best Practices Software Hardware Data Process People • Complete Encryption • Rights and • NDA with each • Firewalls Responsibilities Employee • Authorization • Passwords • Training on Security Measures • Malware Protection • Recovery and • Process Design • Access Management Data Backup • Regular Assessment • Surveillance & • Physical Security Monitoring
  • 19.
    Why Us? Project Management– Highly Process Oriented Quality - “First Time Right” Cost – Indian Cost-Advantage Time – Minimum Turnaround Time Complete IP Protection High level of Commitment to Business Driven by highly committed individuals Able to successfully run operations and grow the business under tough environment for the past ten years Capability to survive the ups and downs of the Business Cycle - Assured long term stability Focused Relationship Being a small company will also help to be agile and have undivided management attention (very important in such relationships) Customer success integral to our success
  • 20.
    Thank You For furtherinformation, please visit us at : www.shivamtech.com Skype : shivamengineering e-mail : manoj@shivamtech.com Cell : +91 90110 58126