The document discusses fibre-to-the-home broadband plans in Australia and New Zealand. It presents an analytical framework to critically examine the countries' approaches, focusing on supply-side policies, demand-side policies, and regulatory role. In recent years, both countries committed to constructing high-speed fibre optic networks due to concerns about broadband access and potential economic impacts. The plans involve significant government funding and partnerships with private companies.
Assessing an Enabling Environment for Open Local Contracting in Fako Divisionijtsrd
Open Contracting has become part of public financial management the government uses to generate revenues through the issuance of licenses to operate public services, and in the sale of public property. As one of the measures in which the government spends its money, all levels of government whether at the national or at the local levels enter into contracts to deliver goods, works, and services to citizens. These public contracts are given to all economic sectors and agreements are made ranging from the small procurement of goods to large capital spending for development of major infrastructural projects to take place. However, public contracting has been identified as the government activity in the advanced and less advanced countries most vulnerable to wastefulness, mismanagement, inefficiency, and corruption oftentimes, the governments dishes out little or no information about a the planning of public contracts, b how public contracts are formed e.g. whether by negotiation or through a competitive tender process c the content of the agreements d the progress of their performance or e the relevant government oversight mechanisms. This lack of information can make it difficult for civil society - and sometimes even for auditors and parliaments - to assess whether the government is getting good value for money or whether the parties to the contract are fully complying with their obligations. Agnes Nanyongo Mbua Ndumbe "Assessing an Enabling Environment for Open Local Contracting in Fako Division" Published in International Journal of Trend in Scientific Research and Development (ijtsrd), ISSN: 2456-6470, Volume-5 | Issue-6 , October 2021, URL: https://www.ijtsrd.com/papers/ijtsrd47651.pdf Paper URL : https://www.ijtsrd.com/humanities-and-the-arts/political-science/47651/assessing-an-enabling-environment-for-open-local-contracting-in-fako-division/agnes-nanyongo-mbua-ndumbe
Open Data and Transparency may be the most powerful levers of 21st century public policy. They present multiple opportunities offering benefit to the public sector, individuals, businesses and the UK as a whole. Open Data enables accountability; it improves outcomes and productivity in key services through informed comparison; it transforms social relationships – empowering individuals and communities; and it drives dynamic economic growth.
One story indicates how open data and transparency can help to transform a service: Five years ago, Sir Bruce Keogh, then a cardiac surgeon in Birmingham, convinced his fellow cardiac surgeons to publish their individual patient mortality rates. Five years later, death rates have fallen. Sir Keogh’s work demonstrates how transparency compliments the work of our public service professionals, improves public service quality and performance, and saves lives.
But making data open is not enough, we will also establish mechanisms to promote and collate feedback from those actually using the data. And we will use this feedback to improve our services and ensure they respond to real needs.
The UK Government new Transparency Strategy: “Making Open Data Real” was published on 4th August and is open for public consultation until 27 October 2011 at www.data.gov.uk/openda.... This, together with the UK’s existing strong record on Transparency and Open Data, means that our focus will fall on the Open Government Partnership grand challenges of:
* Improving Public Services; and
* More Effectively Managing Public Resources.
We will consult publicly on this country action plan primarily via existing fora, including the Public Sector Transparency Board; the Local Public Data Panel and the Transparency Sector Boards that are currently being established. These bodies already advise the Government on wider transparency and Open Data issues. In addition, we will also convene and consult with a wider group of stakeholders to consider the country plan specifically.
http://www.opengovpartnership.org/countries/united-kingdom
http://www.data.gov.uk/opendataconsultation
Thoughtful Approaches to Implementation of Electronic Rulemakingijmpict
The Internet could fundamentally change the way that both government and public participates in making public policy but changes must be made in our existing civic infrastructure for that. The change in the law causes modifications in the policies/strategies in which this law has been implemented. This paper focuses on approaches to thoughtful implementation of electronic rulemaking could capture public interest, particularly in higher profile rulemakings and how online forums and dialogues can foster greater public participation in making public policy processes at the centre as well as presenting the need of semantic perspectives and semantic web technology to enhance the inference capability and to provide decision making capability.
Assessing an Enabling Environment for Open Local Contracting in Fako Divisionijtsrd
Open Contracting has become part of public financial management the government uses to generate revenues through the issuance of licenses to operate public services, and in the sale of public property. As one of the measures in which the government spends its money, all levels of government whether at the national or at the local levels enter into contracts to deliver goods, works, and services to citizens. These public contracts are given to all economic sectors and agreements are made ranging from the small procurement of goods to large capital spending for development of major infrastructural projects to take place. However, public contracting has been identified as the government activity in the advanced and less advanced countries most vulnerable to wastefulness, mismanagement, inefficiency, and corruption oftentimes, the governments dishes out little or no information about a the planning of public contracts, b how public contracts are formed e.g. whether by negotiation or through a competitive tender process c the content of the agreements d the progress of their performance or e the relevant government oversight mechanisms. This lack of information can make it difficult for civil society - and sometimes even for auditors and parliaments - to assess whether the government is getting good value for money or whether the parties to the contract are fully complying with their obligations. Agnes Nanyongo Mbua Ndumbe "Assessing an Enabling Environment for Open Local Contracting in Fako Division" Published in International Journal of Trend in Scientific Research and Development (ijtsrd), ISSN: 2456-6470, Volume-5 | Issue-6 , October 2021, URL: https://www.ijtsrd.com/papers/ijtsrd47651.pdf Paper URL : https://www.ijtsrd.com/humanities-and-the-arts/political-science/47651/assessing-an-enabling-environment-for-open-local-contracting-in-fako-division/agnes-nanyongo-mbua-ndumbe
Open Data and Transparency may be the most powerful levers of 21st century public policy. They present multiple opportunities offering benefit to the public sector, individuals, businesses and the UK as a whole. Open Data enables accountability; it improves outcomes and productivity in key services through informed comparison; it transforms social relationships – empowering individuals and communities; and it drives dynamic economic growth.
One story indicates how open data and transparency can help to transform a service: Five years ago, Sir Bruce Keogh, then a cardiac surgeon in Birmingham, convinced his fellow cardiac surgeons to publish their individual patient mortality rates. Five years later, death rates have fallen. Sir Keogh’s work demonstrates how transparency compliments the work of our public service professionals, improves public service quality and performance, and saves lives.
But making data open is not enough, we will also establish mechanisms to promote and collate feedback from those actually using the data. And we will use this feedback to improve our services and ensure they respond to real needs.
The UK Government new Transparency Strategy: “Making Open Data Real” was published on 4th August and is open for public consultation until 27 October 2011 at www.data.gov.uk/openda.... This, together with the UK’s existing strong record on Transparency and Open Data, means that our focus will fall on the Open Government Partnership grand challenges of:
* Improving Public Services; and
* More Effectively Managing Public Resources.
We will consult publicly on this country action plan primarily via existing fora, including the Public Sector Transparency Board; the Local Public Data Panel and the Transparency Sector Boards that are currently being established. These bodies already advise the Government on wider transparency and Open Data issues. In addition, we will also convene and consult with a wider group of stakeholders to consider the country plan specifically.
http://www.opengovpartnership.org/countries/united-kingdom
http://www.data.gov.uk/opendataconsultation
Thoughtful Approaches to Implementation of Electronic Rulemakingijmpict
The Internet could fundamentally change the way that both government and public participates in making public policy but changes must be made in our existing civic infrastructure for that. The change in the law causes modifications in the policies/strategies in which this law has been implemented. This paper focuses on approaches to thoughtful implementation of electronic rulemaking could capture public interest, particularly in higher profile rulemakings and how online forums and dialogues can foster greater public participation in making public policy processes at the centre as well as presenting the need of semantic perspectives and semantic web technology to enhance the inference capability and to provide decision making capability.
The concept of local e-Government has become a key factor for delivering services in an efficient, cost
effective, transparent and convenient way, in circumstances where a) citizens do not have enough time
available to communicate with local authorities in order to perform their responsibilities and needs, and
b) information and communication technologies significantly facilitate administrative procedures and
citizens-government interaction. This paper aims to identify e-services that local authorities provide, and
to investigate their readiness for delivering these services. A pilot research has been conducted to identify
the offer of e-services by local authorities, along with e-readiness in municipalities of the Pelagonia
region in the Republic of Macedonia. The survey was carried out by means of structured interview
questions based on a modified model proposed by Partnership on Measuring ICT for Development – web
analysis of municipal websites in the region has been conducted, as well. The study reveals uneven
distribution according to the age group of users, lack of reliability and confidence for processing the needs
and requests electronically by a large part of the population, and improperly developed set of ICT tools by
local governments for providing a variety of services that can be fully processed electronically.
ODDC Context - Investigating the Impact of Kenya’s Open Data Initiative on Ma...Open Data Research Network
Presentation in the first workshop of the Exploring the Emerging Impacts of Open Data in Developing Countries project. Looking at the context of open data, and the research case study planned for 2013 - 2014. See http://www.opendataresearch.org/project/2013/jhc
CHALLENGES FOR PUBLIC SECTOR ORGANISATIONS IN CLOUD ADOPTION: A CASE STUDY OF...ijmpict
This research explores critical aspects of procurement of ICT cloud services for South Australian public sector organisations with the case of South Australia Police (SAPOL) for evaluation. SAPOL as one of the state government agencies at the time is initiating this transition to the cloud environment. This exploratory research takes place when this public sector agency is doing its due diligence to ensure a successful implementation. In this study the researcher started off with surfacing the challenges in this journey for a public sector organisation before the actual journey commenced. SAPOL being a public sector organisation operates differently from private enterprises and has certain constraints and limitations that pose additional challenges for the organisation to transition towards the cloud. Interview with the CIO of the organisation responsible for the cloud migration initiative was organised. After detailed literature review, an interview questionnaire was prepared in accordance with the subject of interest. The information gathered in the interviews was recorded for detailed analysis. This paper contains a detailed report on the information analysed highlighting fourteen important challenges faced by the organisation in this cloud migration journey.
Using web platforms to promote transparency and strengthen land rightsIIED
Online databases are proving a useful tool for communities facing large-scale agricultural investments and associated conflicts, as a IIED webinar that took place in July 2016 discovered.
The webinar saw Wai Wai Lwin, founder of Open Data Myanmar, discuss how ODM uses web technology to share unbiased and verified data on land conflict to improve governance.
And Sam Szoke-Burke, legal researcher, Columbia Center for Sustainable Investment, discusses the Open Land Contracts database, containing publicly available investment contracts for large-scale projects.
For more information, visit: http://www.iied.org/using-online-technology-empower-communities-facing-land-deals
For more information on the Legal Tools for Citizen Empowerment initiative, visit: http://www.legal-tools.info
Organisational Solutions for Overcoming Barriers to eGovernment ePractice.eu
Authors: Rebecca Eynon, Helen Margetts
This paper, based on the Breaking Barriers to eGovernment Project, presents seven categories of barriers to eGovernment progression and identifies eight associated legal areas that underpin these barriers.
The publication is issued within the grant for organizational development supported by the Open Society Initiative for Europe (OSIFE), as well as within the Think Tank Development Initiative for Ukraine, implemented by the International Renaissance Foundation in partnership with the Open Society Initiative for Europe (OSIFE) with financial support from the Embassy of Sweden to Ukraine. The opinions and content of this publication are the sole responsibility of NGO “DIXI GROUP” and do not necessarily reflect the position of the Embassy of Sweden to Ukraine, the International Renaissance Foundation and the Open Society Initiative for Europe (OSIFE).
Internet development in Africa: a content use, hosting and distribution persp...AFRINIC
With increasing demand for videos, streaming media, and for services such as cloud computing in Africa, broadband performance, and specifically how users experience performance, becomes increasingly important. In order to meet a growing demand for digital content, mobile operators across the continent have extensively invested in increasing capacity by investing in undersea cables, as well as in terrestrial fibre networks. Mobile
LTE networks provision is expanding as well but remains insufficient to cover remote and rural areas.
Functions of e-government- کارکردهای حکومت الکترونیکFaisal Karimi
E-government is a concept that was introduced into public administration in the 1990s.
Electronic government is the use of information and communication technologies by government.
M-government Implications For E-Government In Developing Countries: The Case ...Peachy Essay
This paper contributes to the issue of mGovernment implementations by exploring the government’s policy on ICT and e-Government in Saudi Arabia, and sheds light on the role of mGovernment applications for enhancing information and service delivery to citizens. This also describes the results of a survey on the available mGovernment applications, and provides an overall evaluation of them in Saudi Arabia.
PPP Bankable Feasibility Study: A Case of Road Infrastructure Development in ...inventionjournals
Adequate and reliable bankable project feasibility study according to Adamuet al. (2015) determines the private sectors investment interest in a PPP transaction which centers around project demand forecast taking into account the willingness to pay, inter and intra-model competition, ramp-up effects, and long-term macro-economic effect and population growth rate. In order to achieve this, WEF (2013) noted that public sector needs to determine the project technical specifications, and also carry out a detail cost benefit analysis so as to determine the project’s commercial viability to be followed by proactive and professionalized stakeholder engagement. Efforts must also be made to mitigate the social and environmental impact of the proposed infrastructure. This is very essential in determining the bankability of any infrastructure development. This study is aimed at assessing the effectiveness of bankable feasibility study and factors affecting bankability of road infrastructure development under PPP concession. In order to achieve this aim, the study examined the concept of PPP models for infrastructure development and bankable feasibility process in a PPP framework. Data collection was through administration of well-structured questionnaire on the target population. Data collected were analysed using both descriptive and inferential statistic analytical techniques. The study revealed that there is urgent need to review the current Nigeria National Policy on PPP, institutional structure and individual capacity building in the area of PPP project preparation in order to encourage more private sector participation in the drive for provision and development of road infrastructure facility.
A REPLICATED ASSESSMENT OF THE CRITICAL SUCCESS FACTORS FOR THE ADOPTION OF M...ijcsit
Previous research indicates that there is a failure in the adoption of e-government services to citizens as
planned in the context of developing countries. Obstacles behind this failure are varied, including sociocultural,
economic and technical obstacles. But with recent advances in mobile technologies as well as the
pervasive penetration of mobile phones, governments in developing countries including Jordan have been
able to overcome most of these obstacles through the so-called mobile government (or m-government). This
has provided an alternative channel for governments to improve the interaction with their citizens, as well
as the quality of services provided to them. Accordingly, the exploration of the factors that affect the
adoption of m-government services would reduce the gap between government strategies and policies
relating to the development of m-government services on the one hand, and the perceptions of citizens on
the other hand, allowing for a better understanding of citizens' needs and priorities that must be taken into
account by the governments in order to ensure the success of such services on a large scale. This research
is based on a re-evaluation of the empirical results of a comprehensive study conducted by Susanto and
Goodwin (2010), which concludes that there are fifteen factors that are likely to affect citizens in 25
countries around the world to adopt SMS-based e-g
Next Generation National Broadband Network development - A ppp for an open ac...Mohamed Bouanane
As many countries seek to introduce greater competition there may be valuable lessons to be drawn from applying open access policies to next generation broadband infrastructure with partial public ownership or financed by utilities (e.g. backbone fibre associated with transport or electricity grids). Therefore, governments and regulators need to consider such policies – especially where there is insufficient competition – along with a public-private partnership to enhance capacity; speed, QoS and decrease costs so that the entire economy can continue to fully leverage its potential.
The concept of local e-Government has become a key factor for delivering services in an efficient, cost
effective, transparent and convenient way, in circumstances where a) citizens do not have enough time
available to communicate with local authorities in order to perform their responsibilities and needs, and
b) information and communication technologies significantly facilitate administrative procedures and
citizens-government interaction. This paper aims to identify e-services that local authorities provide, and
to investigate their readiness for delivering these services. A pilot research has been conducted to identify
the offer of e-services by local authorities, along with e-readiness in municipalities of the Pelagonia
region in the Republic of Macedonia. The survey was carried out by means of structured interview
questions based on a modified model proposed by Partnership on Measuring ICT for Development – web
analysis of municipal websites in the region has been conducted, as well. The study reveals uneven
distribution according to the age group of users, lack of reliability and confidence for processing the needs
and requests electronically by a large part of the population, and improperly developed set of ICT tools by
local governments for providing a variety of services that can be fully processed electronically.
ODDC Context - Investigating the Impact of Kenya’s Open Data Initiative on Ma...Open Data Research Network
Presentation in the first workshop of the Exploring the Emerging Impacts of Open Data in Developing Countries project. Looking at the context of open data, and the research case study planned for 2013 - 2014. See http://www.opendataresearch.org/project/2013/jhc
CHALLENGES FOR PUBLIC SECTOR ORGANISATIONS IN CLOUD ADOPTION: A CASE STUDY OF...ijmpict
This research explores critical aspects of procurement of ICT cloud services for South Australian public sector organisations with the case of South Australia Police (SAPOL) for evaluation. SAPOL as one of the state government agencies at the time is initiating this transition to the cloud environment. This exploratory research takes place when this public sector agency is doing its due diligence to ensure a successful implementation. In this study the researcher started off with surfacing the challenges in this journey for a public sector organisation before the actual journey commenced. SAPOL being a public sector organisation operates differently from private enterprises and has certain constraints and limitations that pose additional challenges for the organisation to transition towards the cloud. Interview with the CIO of the organisation responsible for the cloud migration initiative was organised. After detailed literature review, an interview questionnaire was prepared in accordance with the subject of interest. The information gathered in the interviews was recorded for detailed analysis. This paper contains a detailed report on the information analysed highlighting fourteen important challenges faced by the organisation in this cloud migration journey.
Using web platforms to promote transparency and strengthen land rightsIIED
Online databases are proving a useful tool for communities facing large-scale agricultural investments and associated conflicts, as a IIED webinar that took place in July 2016 discovered.
The webinar saw Wai Wai Lwin, founder of Open Data Myanmar, discuss how ODM uses web technology to share unbiased and verified data on land conflict to improve governance.
And Sam Szoke-Burke, legal researcher, Columbia Center for Sustainable Investment, discusses the Open Land Contracts database, containing publicly available investment contracts for large-scale projects.
For more information, visit: http://www.iied.org/using-online-technology-empower-communities-facing-land-deals
For more information on the Legal Tools for Citizen Empowerment initiative, visit: http://www.legal-tools.info
Organisational Solutions for Overcoming Barriers to eGovernment ePractice.eu
Authors: Rebecca Eynon, Helen Margetts
This paper, based on the Breaking Barriers to eGovernment Project, presents seven categories of barriers to eGovernment progression and identifies eight associated legal areas that underpin these barriers.
The publication is issued within the grant for organizational development supported by the Open Society Initiative for Europe (OSIFE), as well as within the Think Tank Development Initiative for Ukraine, implemented by the International Renaissance Foundation in partnership with the Open Society Initiative for Europe (OSIFE) with financial support from the Embassy of Sweden to Ukraine. The opinions and content of this publication are the sole responsibility of NGO “DIXI GROUP” and do not necessarily reflect the position of the Embassy of Sweden to Ukraine, the International Renaissance Foundation and the Open Society Initiative for Europe (OSIFE).
Internet development in Africa: a content use, hosting and distribution persp...AFRINIC
With increasing demand for videos, streaming media, and for services such as cloud computing in Africa, broadband performance, and specifically how users experience performance, becomes increasingly important. In order to meet a growing demand for digital content, mobile operators across the continent have extensively invested in increasing capacity by investing in undersea cables, as well as in terrestrial fibre networks. Mobile
LTE networks provision is expanding as well but remains insufficient to cover remote and rural areas.
Functions of e-government- کارکردهای حکومت الکترونیکFaisal Karimi
E-government is a concept that was introduced into public administration in the 1990s.
Electronic government is the use of information and communication technologies by government.
M-government Implications For E-Government In Developing Countries: The Case ...Peachy Essay
This paper contributes to the issue of mGovernment implementations by exploring the government’s policy on ICT and e-Government in Saudi Arabia, and sheds light on the role of mGovernment applications for enhancing information and service delivery to citizens. This also describes the results of a survey on the available mGovernment applications, and provides an overall evaluation of them in Saudi Arabia.
PPP Bankable Feasibility Study: A Case of Road Infrastructure Development in ...inventionjournals
Adequate and reliable bankable project feasibility study according to Adamuet al. (2015) determines the private sectors investment interest in a PPP transaction which centers around project demand forecast taking into account the willingness to pay, inter and intra-model competition, ramp-up effects, and long-term macro-economic effect and population growth rate. In order to achieve this, WEF (2013) noted that public sector needs to determine the project technical specifications, and also carry out a detail cost benefit analysis so as to determine the project’s commercial viability to be followed by proactive and professionalized stakeholder engagement. Efforts must also be made to mitigate the social and environmental impact of the proposed infrastructure. This is very essential in determining the bankability of any infrastructure development. This study is aimed at assessing the effectiveness of bankable feasibility study and factors affecting bankability of road infrastructure development under PPP concession. In order to achieve this aim, the study examined the concept of PPP models for infrastructure development and bankable feasibility process in a PPP framework. Data collection was through administration of well-structured questionnaire on the target population. Data collected were analysed using both descriptive and inferential statistic analytical techniques. The study revealed that there is urgent need to review the current Nigeria National Policy on PPP, institutional structure and individual capacity building in the area of PPP project preparation in order to encourage more private sector participation in the drive for provision and development of road infrastructure facility.
A REPLICATED ASSESSMENT OF THE CRITICAL SUCCESS FACTORS FOR THE ADOPTION OF M...ijcsit
Previous research indicates that there is a failure in the adoption of e-government services to citizens as
planned in the context of developing countries. Obstacles behind this failure are varied, including sociocultural,
economic and technical obstacles. But with recent advances in mobile technologies as well as the
pervasive penetration of mobile phones, governments in developing countries including Jordan have been
able to overcome most of these obstacles through the so-called mobile government (or m-government). This
has provided an alternative channel for governments to improve the interaction with their citizens, as well
as the quality of services provided to them. Accordingly, the exploration of the factors that affect the
adoption of m-government services would reduce the gap between government strategies and policies
relating to the development of m-government services on the one hand, and the perceptions of citizens on
the other hand, allowing for a better understanding of citizens' needs and priorities that must be taken into
account by the governments in order to ensure the success of such services on a large scale. This research
is based on a re-evaluation of the empirical results of a comprehensive study conducted by Susanto and
Goodwin (2010), which concludes that there are fifteen factors that are likely to affect citizens in 25
countries around the world to adopt SMS-based e-g
Next Generation National Broadband Network development - A ppp for an open ac...Mohamed Bouanane
As many countries seek to introduce greater competition there may be valuable lessons to be drawn from applying open access policies to next generation broadband infrastructure with partial public ownership or financed by utilities (e.g. backbone fibre associated with transport or electricity grids). Therefore, governments and regulators need to consider such policies – especially where there is insufficient competition – along with a public-private partnership to enhance capacity; speed, QoS and decrease costs so that the entire economy can continue to fully leverage its potential.
Public Health Innovation through Cloud Adoption: A Comparative Analysis of Dr...Araz Taeihagh
Governments are increasingly using cloud computing to reduce cost, increase access, improve quality, and create innovations in healthcare. Existing literature is primarily based on successful examples from developed western countries, and there is a lack of similar evidence from Asia. With a population close to 4.5 billion people, Asia faces healthcare challenges that pose an immense burden on economic growth and policymaking. Cloud computing in healthcare can potentially help increase the quality of healthcare delivery and reduce the economic burden, enabling governments to address healthcare challenges effectively and within a short timeframe. Advanced Asian countries such as Japan, South Korea, and Singapore provide successful examples of how cloud computing can be used to develop nationwide databases of electronic health records; real-time health monitoring for the elderly population; genetic database to support advanced research and cancer treatment; telemedicine; and health cities that drive the economy through medical industry, tourism, and research. This article examines these countries and identifies the drivers and barriers of cloud adoption in healthcare and makes policy recommendations to enable successful public health innovations through cloud adoption.
Comparative Broadband Policy: Hong Kong, Singapore, and TaiwanBessie Chu
Presentation for a policy memo providing brief comparative study of how the governments of Hong Kong, Singapore, and Taiwan facilitated high rates of broadband and smartphone adoption. Addresses those interested in how policy implementations influenced the development of broadband and mobile adoption, using these three regions as case studies. More specifically, this memo intends to be used for guidance by regional or national governments or companies for developing policies to grow telecommunications infrastructure and adoption.
Created for Communication and International Economy (CMGT 531) at USC taught by Professor Jonathan Aronson.
By Robert Crandall, William Lehr and Robert Litan
Issues in Economic Policy, The Brookings Institution, Number 6, July 2007.
Key figure:
“For every one percentage point increase in broadband penetration in a state, employment is projected to increase by 0.2 to 0.3 percent per year”
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptxEduSkills OECD
Andreas Schleicher presents at the OECD webinar ‘Digital devices in schools: detrimental distraction or secret to success?’ on 27 May 2024. The presentation was based on findings from PISA 2022 results and the webinar helped launch the PISA in Focus ‘Managing screen time: How to protect and equip students against distraction’ https://www.oecd-ilibrary.org/education/managing-screen-time_7c225af4-en and the OECD Education Policy Perspective ‘Students, digital devices and success’ can be found here - https://oe.cd/il/5yV
The Indian economy is classified into different sectors to simplify the analysis and understanding of economic activities. For Class 10, it's essential to grasp the sectors of the Indian economy, understand their characteristics, and recognize their importance. This guide will provide detailed notes on the Sectors of the Indian Economy Class 10, using specific long-tail keywords to enhance comprehension.
For more information, visit-www.vavaclasses.com
How to Split Bills in the Odoo 17 POS ModuleCeline George
Bills have a main role in point of sale procedure. It will help to track sales, handling payments and giving receipts to customers. Bill splitting also has an important role in POS. For example, If some friends come together for dinner and if they want to divide the bill then it is possible by POS bill splitting. This slide will show how to split bills in odoo 17 POS.
The French Revolution, which began in 1789, was a period of radical social and political upheaval in France. It marked the decline of absolute monarchies, the rise of secular and democratic republics, and the eventual rise of Napoleon Bonaparte. This revolutionary period is crucial in understanding the transition from feudalism to modernity in Europe.
For more information, visit-www.vavaclasses.com
The Art Pastor's Guide to Sabbath | Steve ThomasonSteve Thomason
What is the purpose of the Sabbath Law in the Torah. It is interesting to compare how the context of the law shifts from Exodus to Deuteronomy. Who gets to rest, and why?
The Art Pastor's Guide to Sabbath | Steve Thomason
Fibre to-the-home, high-speed and national broadband plans
1. Fibre-to-the-home, high-speed and national broadband plans:
Tales from Down Under$
Fernando Beltrán n
ISOM Department, University of Auckland Business School, 12 Grafton Road OGGB Of. 472, Auckland 1142, New Zealand
a r t i c l e i n f o
Available online 8 October 2013
Keywords:
Next-generation access networks
Fibre-to-the-home network
Broadband national plan
Public investment in broadband expansion
Australia's National Broadband Network
New Zealand's Ultra-Fast Broadband
Network
a b s t r a c t
In recent years governments in many countries have acknowledged the higher complexity
involved in finding the more efficient path towards a so-called broadband ecosystem.
As the first decade of the twenty first century was ending, the governments of Australia
and New Zealand committed to the construction of high-speed, fibre-optics next-
generation access networks. This paper is about the approach followed by Australia and
New Zealand to developing broadband infrastructure, the means deployed to build the
network, and policy and market issues. The paper critically analyses the short history of
each experience, including the political process, the reasons exhibited to justify the
governments' involvement in infrastructure deployment, and the institutional arrange-
ments introduced to manage the participation of private partners. The paper proposes a
framework for analysis and uses its elements to critically analyse policy and regulatory
decisions affecting the deployment rate and goals set by Australian and New Zealand
government for their respective fibre-based next-generation platforms. The framework is
used to draw comparisons between the two country cases and in so doing allowing the
appreciation of commonalities and differences in the development and expectations for
the future of telecommunications markets in the region.
& 2013 Elsevier Ltd. All rights reserved.
1. Introduction
Governments throughout the world are joining the increasing trend towards deliberate intervention in the deployment
of Next-Generation Access Networks (NGAN), mostly built as fibre-to-the-premises (FTTP), with varying degrees of
participation by the private sector. The governments of Australia and New Zealand are driving, each in its own way, the
deployment of national fibre-optics broadband infrastructures.
This paper uses findings from recent literature to build an analytical framework in which the most salient issues
regarding the construction of a fibre-to-the-home network in each, Australia and New Zealand, are discussed and analysed
as the construction proceeds and the political struggles unfold. As government participation in the build-up of such wholly
new telecommunications infrastructure is seen as an intervention in the market the paper discusses the arguments for
government involvement and situates the particular decisions reached in those two countries within a market failure
approach by providing a suitable justification; for both the Australian and New Zealand initiatives the paper then proceeds
to describe the exact forms that intervention adopts by describing the institutional arrangement and governance of the
Contents lists available at ScienceDirect
URL: www.elsevier.com/locate/telpol
Telecommunications Policy
0308-5961/$ - see front matter & 2013 Elsevier Ltd. All rights reserved.
http://dx.doi.org/10.1016/j.telpol.2013.08.006
☆
This work has been partially supported by University of Auckland Business School FRDF Grant 3627071.
n
Tel.: þ64 9 373 7599x87850; fax: þ64 9 373 7430.
E-mail address: f.beltran@auckland.ac.nz
Telecommunications Policy 38 (2014) 715–729
2. broadband projects. It subsequently contributes elements to the three main analytical issues discussed herein: supply-side
policies, demand-side policies and the role of regulation.
Since neither network is totally operational yet the paper also reports on the progress achieved in each country in terms
of number of broadband connections – fibre, wireless and satellite – installed and activated. The two cases presented
analyse regulatory decisions such as the split of New Zealand's incumbent operator Telecom NZ and the Australian deal with
Telstra; in both countries these companies grown out of the former government-owned monopolies are now major players
in the deployment of their respective broadband networks. The agencies in charge of the projects in each country, Australia's
National Broadband Network Company (NBN Co., 2013a) and New Zealand's Crown Fibre Holdings (CFH) went through
processes that determined the allocation of resources (see the specifics of each plan in sections ahead).
The paper is structured as follows. In Section 2 the literature on recent trends in government initiatives for broadband
expansion is reviewed; it builds an analytical framework to enable a critical view of demand-side and supply-side policies
put in practice in the two countries as well as respective regulatory measures. Section 3 presents the highlights of both
national broadband initiatives in each Australia and New Zealand, including their finance and construction mechanisms,
allocated budgets, coverage goals and governance; by using the analytical framework presented in Section 2 this section
delves into the main five framework components. Section 4 performs a comparative analysis to reveal the pros and cons of
each country's approach to public investment for broadband expansion, analysing the promoters and constraints on the
supply-side and the demand-side, elements of the proposed framework. Section 5 concludes.
2. Towards a framework to analyse public intervention in fibre-based broadband deployment
Several recent articles discuss the reasons for public investment and intervention in the broadband markets (Cave &
Martin, 2010; Crandall & Singer, 2010; Falch & Henten, 2010; FCC, 2010; Greenstein & McDevitt, 2011). In a paper that has
attracted a great deal of attention Cambini and Jiang (2009) classify previous studies on regulation and investment in
broadband into two categories: (i) studies focusing on the impact of incentive regulation on investment, and (ii) studies
exploring the relation between access regulation and investment. Regulators have become increasingly concerned with the
level of broadband coverage and found in access regulation the means to accelerate (or sometimes slow down) further
deployment. However when the market participants signalled that further investment in high-speed access would slow
down or reach a point of stagnation, some governments abandoned efforts to incentivize investment through access
regulation and shifted towards intervention in the market with large-scale actions. This paper focuses on the pathway taken
by Australia and New Zealand to broadband expansion whereby a radical policy to overturn the market is currently being
implemented.
Cave and Martin (2010) provide an analysis of the reasons why to intervene a broadband market, while also discussing
the “where” and “how” components to the analysis. Two reasons presented in (Cave & Martin 2010) are evident in both in
Australia and New Zealand: equity and industrial policy. As will be explained in later chapters both countries grew
frustrated with the pace of broadband deployment, a situation that has seen many people unable to get an acceptable
quality broadband connection or in some cases no connection at all. Also their expectations for a national high-speed
broadband infrastructure to positively impact their economies are reflected in their respective visions: Australian
Government's NBN vision states that “it will drive productivity” (Wong & Conroy, 2010, p. 1), whereas New Zealand's
broadband vision is that UFB's tools and application will “enhance business productivity” with “the potential to bring real
social and economic benefits” (CFH, 2010, p. 3). Their firm expectations have led both governments to use an industrial
policy instrument with which to reach a “critical mass of high-speed broadband users” (Cave & Martin 2010:506).
In answering the “how” question Cave and Martin discuss the role of public funds and whether they should be used to pay
for costs or to impact on the revenue of a NGAN.
Direct investment of public funds in the build-up of a broadband network signals a lack of trust in the market's ability to
deliver on the build-up of critical infrastructure (Falch & Henten, 2010); furthermore, in such situations using public funds
on broadband access expansion is regarded as a strategic component of an economic growth policy. However, on the
opposite shore some voices question the use of subsidies to roll-out fibre-to-the-home networks. For instance (Kenny &
Kenny, 2011) examine the spread belief that “superfast broadband brings substantial economic and societal benefits”,
questioning the use of subsidies on fibre deployment and the value of the applications that are supposed to use the network.
They propose those funds be invested in more access to basic broadband or programs to entice those with no online access
to sign up for broadband services.
In the two country cases studied here public funds have been committed to high-speed broadband expansion. Once the
path towards deployment of public funds for broadband expansion has been undertaken, the next step is to examine the
extent of the government's intervention. For instance, Belloc, Nicita, and Rossi (2012), questioning the government's
intervening role, conclude that governments' efforts throughout the world “appear to be well-grounded” with public
policies exerting a positive impact on broadband growth either on a supply-side or a demand-side basis. OECD advocates
for supply and offer policies that stimulate the construction of broadband infrastructure capable of creating a virtuous circle
by which deployment encourages use and use encourages further deployment (OECD, 2008a); it also advocates for the role
of the private sector in network upgrade and development and calls for government intervention when remote areas and
low-income users are targeted.
F. Beltrán / Telecommunications Policy 38 (2014) 715–729716
3. Intervention in the deployment of telecommunications infrastructure is justified in the neo-classical approach by
the existence of market failures. Regardless of the specific path followed by a country's telecommunications markets,
governments are reappearing as main players in the field by either promoting or developing broadband expansion plans.
Gómez-Barroso and Feijóo (2010) suggest that an acceptable justification for government intervention is a market condition
revealing that markets are not fully competitive. Nevertheless the market failure condition is not the only one justifying
intervention in the information society age; when a government has embarked on plans to push forward the knowledge
economy or has committed to closing the digital divide Gómez Barroso and Feijóo (2010) include such conditions as
justifications for intervention.
In answering the “how” question the split between private and public is a dead end especially when private supply-side
has proven ineffective or too slow in providing society with the means to fair broadband access. One vehicle for uplifting the
efficacy of the supply-side for the expansion of broadband connectivity is the public–private partnership (PPP) scheme
(OECD, 2008b). A PPP is an agreement between the government and one or more private partners by which a private
partner's incentives are aligned with the government's objectives in a manner such that sufficient risk is transferred from
the public side to the private partner (OECD, 2008b). Any PPP in telecommunications infrastructure deployments is expected
to balance out four factors: connectivity; competition; innovation/growth; and social benefit (OECD, 2009).
Getting government and private agents aligned in the pursuit of a goal, which is what a PPP seeks to achieve, reinterprets
the pragmatic logic approach (Mintzberg, 1996) that envisions government and the market as the extreme points of a
continuum where bipolar antagonism is replaced by cooperation. The location of the interaction on the continuum is given
by the level of risk being transferred. However as important as it may be in terms of settling the conditions of the
partnership, risk is only one dimension that characterises the public–private relation. Because of this Gómez Barroso and
Feijóo (2010) refer to “interplay” instead of “partnership”, broadening the scope for interaction especially in the context of
NGAN deployment.
The discussion above can be summarised in a framework that uses the market-failure approach to justify intervention,
placing the form of intervention in the Private–Public interplay domain where a range of solutions is offered by the
literature. The approach followed by Australia and New Zealand is an open-access platform where, it is herein argued that
three elements suffice for a critical analysis: supply-side policies, demand-side policies and the role of regulation. Fig. 1
illustrates the framework.
A well-nourished stream of recent literature exemplifies the richness of the interplay between government and the
private sector. Several country-cases include (Nucciarelli, Sadowski, & Achard, 2010) who describe how the public–private
interplay can facilitate local broadband initiatives in Italy and The Netherlands; (Gómez-Torres & Beltrán, 2011) on a
comparative analysis of New Zealand, Korea and the Netherlands; (Ragoobar, Whalley, & Harle, 2011) on several cases of
public intervention in the UK, Sweden and the Netherlands and local experiences such as (Maglaris & Troulos, 2011) on EU
municipal broadband plans. In spite of these and other cases that exemplify the public–private interplay in the expansion of
NGNs (core and access) both Gómez Barroso and Feijóo (2010) and Falch and Henten (2010) coincide on their opinions that
it is early to evaluate the effects of intervention policy. It is also early to assess which mode of interplay turns out to be the
most effective.
Kim, Kelly, and Raja (2010) conceive broadband deployment as an ecosystem that consists mainly of four elements:
infrastructure; services; applications; and users, which are jointly interpreted as a digital ecosystem. As an ecosystem, high-
speed broadband must include both the supply and demand sides of the market; the very idea of integrating several
domains into a single, yet complex concept also “leads to a rethinking of approaches to spur broadband access and use”
(Kim, Kelly, & Raja, 2010). On a broadband ecosystem governments have to exert actions to favour its development. Belloc,
Nicita, and Rossi (2012) discuss indirect measures, such as regulatory intervention, and direct measures, which are more
akin to industrial policy initiatives. Among direct measures the paper identifies supply-side policies and demand-side
policies.
How public intervention may distort competition is the one aspect not to be disregarded when pondering about the
regulatory implications of adopting one particular path towards broadband expansion. The effects can be either direct or
indirect (Falch & Henten, 2010). Direct effects are observed through the short-term impact of broadband expansion whereas
indirect effects refer to their impact on private investment and the strength of facility-based competition.
Kirsch and Hirschhausen (2008) identify three main regulatory paths as shown in Fig. 2: (i) infrastructure-based
competition, (ii) vertical separation with open access, and (iii) integrated incumbent and regulated access. Countries with no
market intervention exemplify path (i) whereas (iii) is considered by Kirsch and Hirschhausen as the most flexible and
effective.
In this paper it is argued that, in addition to stating a vision of broadband network infrastructure for a country,
government initiatives need to strongly support themselves on the design of investment incentives and the promotion of
broadband use. The analytical framework proposed in this paper to study the Australia and New Zealand broadband
initiatives, summarised in Fig. 1, uses both the market failure approach by Gómez Barroso and Feijóo (2010) and the
motives-for-intervention framework by Cave and Martin (2010) in order to address the issue regarding the form of
intervention: procurement contracts in Australia and a PPP in New Zealand. It proceeds to introduce three main issues,
namely, supply-side policies, demand-side policies and the regulatory constraints that allow seeing where and how
incentives and promotion for broadband deployment growth are placed. As the vehicle to achieve the sought objectives
both countries have chosen to undertake the construction of a high-speed, FTTH, open-access platform with structural
F. Beltrán / Telecommunications Policy 38 (2014) 715–729 717
4. separation of wholesale access services, provided on a monopolistic basis and purchased by retail services providers which
will compete to offer end-user services to households and businesses.
3. National broadband initiatives in Australia and New Zealand
In 2007 and 2008 the governments of Australia and New Zealand, respectively, committed to the construction of high-speed,
fibre-optics next-generation access networks. The National Broadband Network (NBN) in Australia and the Ultra-Fast
Broadband (UFB) Network in New Zealand respond to political decisions and are strategic anchors to the current governments'
Use of incumbent’s infrastructure
Service Provider
Access Provider
Users
RetailerRetailer
Open Access
Users
RetailerRetailer
Retail
Incumbent
Infrastructure-based competition
Users
Mobile/
Wireless
Mobile/
Cable
Telecom
DSL/
Fiber
Network companies
Incumbent
Fiber
Fig. 2. Regulatory trajectories in the transition towards NGNs. Adapted from Kirsch and Hirschhausen (2008).
What form should intervention take?
Cave & Martin2010
Gómez-Barroso & Feijóo 2010
Market failure approach
Conditions for competition Reach everyone Role in economic development
Industrial PolicyEquityShould not distort
competition
Gómez-Barroso & Feijóo 2010
Private-Public Interplay
From subsidiarity to a
broad catalogue of tools
Linder & Rosenau 2000 as summarised by
Gómez-Barroso & Feijóo 2010
Supply Demand Role of regulation
Public finance support for
access infrastructure
Access market
National Digital Strategies
Content market
Beltrán 2012
NBN Co Special Access Undertakings
New Zealand price of copper
Why intervene?
Network architecture and analytical framework
Motives
Open access platform
Fig. 1. Government intervention, forms of intervention and elements of broadband policy.
F. Beltrán / Telecommunications Policy 38 (2014) 715–729718
5. plans. In spite of the political environment, especially in Australia, full turnaround of the commitments to these networks and
the way contents markets are envisioned to operate seems unlikely (Gregory, 2013); nevertheless political uncertainty becomes
increasingly influential in the way the roll-out is carried out in Australia as the September 2013 election approaches.
This section opens with the highlights of both NBN and UFB in terms of each country's vision for their publicly funded
broadband infrastructures, finance and construction mechanism, allocated budget, coverage goals and governance. By using
the analytical framework presented in Section 2 this section delves into the main five framework components, the reasons
for governments' interventions, the type of intervention chosen in each country, the supply-side aspects, the demand-side
aspects, and the role of regulation in both countries and where appropriate reveals comparative views of the two plans.
3.1. Australia's National Broadband Network
The National Broadband Network in Australia is the largest publicly funded infrastructure project in the history of the
country. It aims to build a nationwide fibre-to-the-home next-generation access network reaching 93% of Australian
households and businesses. To manage the building and running of the NBN the government established NBN Co in early
2009. The project receives funds in the amount of A$37.4 billion (NBN Co., 2012a) of public investment. In 2010 a review of
the original proposal was released through the Statement of Expectations for the NBN (Wong & Conroy, 2010). In the
statement the government not only reviewed its NBN vision and objectives but also updated the mandate on NBN Co; in
particular the statement:
deems access to high-speed broadband essential to Australians,
establishes NBN Co as government-owned commercial entity,
expects NBN to be a driver for productivity and improve education and health services,
expects 90% of Australians premises get connected to 100 Mbps with the remaining 10% connected to at least 12 Mbps,
expects NBN Co to seek and secure spectrum on commercial terms,
agrees that NBN is to be planned as a monopolistic fixed-line network able to cross-subsidise entry level prices for all
premises, and
provides long-term financial certainty to NBN Co with equity funding for a $27.5 billion for the rollout period.
The fixed broadband network is expected to service 93% of Australians; the remaining 7% of premises are composed of 4%
being those on the outer fringes of regional towns to be serviced with fixed wireless and satellite networks at 12 Mbps
download and 1 Mbps upload speed (Wong Conroy, 2010). The NBN will be rolled out in a series Fibre Serving Areas (FSA)
of up to 40,000 premises that are made up of up to 12 geographic modules, each covering about 3000 premises. It is
envisaged that for each FSA module it will take about 12 months from the start of site works to activation of the first service
(NBN Co., 2011b).
3.2. New Zealand's Ultra-Fast Broadband Network
In 2009 the government of New Zealand announced it would invest $1.35 billion into the Ultra-Fast Broadband network
initiative, a high-speed fibre-to-the-home next-generation access network that will deliver broadband services at a speed of
100 Mbps downstream and 50 Mbps upstream to business and households. The priority of this project is broadband users
such as businesses, schools and health services, in addition to greenfield developments in particular residential areas (CFH,
2010). The announcement was followed by the creation of Crown Fibre Holdings (CFH), the state-owned company charged
with managing and monitoring Crown's investments in the UFB. A similar share is expected from private investors who have
signed agreements with CFH, who oversees the UFB private–public partnership with the selected partners. The initiative is a
main component of a larger body of policy aimed to reform the telecommunications sector to make it a propeller for
economic growth. In November 2011, after negotiations that involved the government, CFH and the incumbent Telecom NZ,
the latter was finally split into a wholesale branch, now known as Chorus, and a retailer that retained the Telecom brand.
75 per cent of New Zealanders will benefit from UFB for which $300 million are being invested. The remaining
population will benefit from the Rural Broadband Initiative (RBI), a government programme to deploy broadband access
either wireless or satellite-based connections to rural areas. Further investment from the two RBI partners, Chorus and
Vodafone is expected as the two firms in 2011 were awarded the tender to provide broadband to rural New Zealand homes
and businesses in partnership with the government. In rural areas RBI will deliver broadband to 252,000 rural households at
peak speeds of at least 5 Mbps in at least 85% of rural homes and businesses. Public hospitals and schools in rural
New Zealand will get each a fibre connection complemented with extended cellular telephone coverage (CFH, 2010).
The agreement with Chorus states that the partner must “identify opportunities to collaborate with third parties and find
ways to reduce the network set up cost” (Ministry of Business, Innovation Employment, MBIE, 2012a). RBI's targets include
the buildup of 154 new cellphone towers and the upgrade of 387 cellphone towers by Vodafone and more than 3000 km of
new fibre extension by Chorus.
F. Beltrán / Telecommunications Policy 38 (2014) 715–729 719
6. CFH's vision is for a world-class telecommunications infrastructure that will “enable a more productive New Zealand
economy, deliver better outcomes in service key areas such as health and education” (CFH, 2013) and allow improved
Internet services.
3.3. Reasons for intervention
In Australia, one of the country's top ten companies, Telstra, used to dominate the fixed voice market –- including retail
and wholesale connections – with about 85% of market share. A government-owned telecommunications monopoly, Telstra
was progressively privatised throughout the 1990s while retaining its lead as an operator of fixed telephony and becoming
Australia's largest mobile telephone service provider, in terms of both subscriptions and coverage. In 1995 the Australian
Competition and Consumer Commission was established after the merge of two commissions that oversaw trade practices
and prices across the economy. With the introduction of competition in the mid-1990s the dominance of Telstra in the
Australian market has shrunk, its last century dominance steadily eroded with retail market share decreasing from 70% to
66% in 2012 (ACCC, 2013a). Its copper service portfolio mix has also been impacted by the strength of competition with
access seeker services using local loop going from 5% of its services to 12%. And while its fixed-line market shrank, its
dominant position in the mobile market increased with a market share growing from 37% in mid-2010 up to 42% in mid-
2012 (ACCC, 2013a).
It was clear from the low rankings in the OECD tables on broadband uptake and pricing throughout the 2000 s that
Telstra used their continuing control of last-mile infrastructure to dominate the emerging market of fixed broadband.
Frustrated with the shortage of investment into next-generation fixed-line fibre access networks, mainly by Telstra, and
faced with the private sector's diminishing capacity to invest in the wake of the global financial crisis in 2008 the newly
elected Labour government proposed a National Broadband Network (NBN) as one of their ‘nation-building’ initiatives
(Rudd, 2009). In November 2008, all Australian governments endorsed a six-volume National PPP Policy and Guidelines to
replace separate arrangements across the nation (Given, 2010).
In New Zealand the telecommunications market has been dominated by a single player, Telecom New Zealand. Telecom
is the largest fixed-telephony operator and the second largest mobile operator in New Zealand. A precursor to the
government broadband initiative was the recognition in 2005 by the Ministry of Economy Development that Telecom had
not delivered on its 2003 promise to achieve a broadband uptake of more than 250,000 residential consumers and the
deployment of fibre-to-the-node by 2005s end in response to the Commerce Commission's decision to defer unbundled
local loop (Milner, 2009). What followed was a new law for the industry known as the 2006 Telecommunications Act and
Ministerial Determination in 2007 mandating the operational separation of Telecom, based on that for British Telecom in the
UK. Telecom would then consist of three groups: access network services, telecom wholesale and telecom retail.
Since 2005, the New Zealand government grew increasingly distressed about the country's lagging behind most of the
developed world in terms of broadband capability and penetration. With the country's 22nd position in Internet speed
amongst 45 countries and its 35th place out of 66 countries in terms of broadband quality-of-service, in 2008 the National
Party made it part of its political campaign to announce an initiative to provide high-speed broadband to New Zealanders.
Reforming the telecommunications sector to make it a propeller for economic growth a crafted mixture of regulatory reform
and infrastructure investment was needed. The Commerce Commission warned that regulatory reform alone, one of the two
conditions the government could actually dictate, would not be enough to create the right conditions to ensure higher and
sustained growth rates. As a result the National Party government proposed the deployment of a countrywide fibre-optics
infrastructure into New Zealand cities (Milner, 2009) in what would be known as the UFB initiative.
Foreseeing that private investors would not take on building or expanding broadband infrastructure in the country, in
late 2009, the Ministry of Economic Development, MED (2008) prepared and issued an ‘Invitation to Participate’ (ITP) under
which potential investors would submit their proposals on how they would co-invest with the government to achieve the
UFB objective in one or more candidate areas. Crown Fibre Holdings Ltd was created by the government through its Minister
for Communications and Information Technology to manage the investment on the UFB infrastructure. Since its creation
CFH oversees UFB network's construction and operation, but both the Minister and Treasury have an on-going oversight and
monitoring role of CFH.
3.4. Types of intervention
Australia and New Zealand pursue a similar purpose yet the mechanisms chosen to do so are different. Australia's
government decided to fully fund the NBN with taxpayers' money whereas New Zealand adopted a form of PPP with
proportional shares of investment from both sides. This section looks at the types of vehicles chosen for network
deployment and the issues arising from the network architecture which will have repercussions on the future of
telecommunications markets in each country.
3.4.1. Reshaping the telecommunications markets in Australia
In late March 2009 the Australian Government announced plans to invest over 8–10 years at least A$21.5 billion of
taxpayers' money into the NBN using a PPP model with “significant private sector investment” (Conroy, 2009). To manage the
building and running of the NBN the government established NBN Co in early 2009 and indicated this government-owned
F. Beltrán / Telecommunications Policy 38 (2014) 715–729720
7. enterprise should concentrate on Layer 2 services, the building of the network, and then selling wholesale services to retail
service providers (RSPs). However, an implementation study conducted in 2010 by McKinsey and KPMG concluded that the
estimated rate of return was insufficient to attract private investors (Given, 2010). Consequently the Australian government
announced a shift away from the PPP model (Wong Conroy, 2010) with NBN being fully funded with Government equity at
least until the company's cash flows would allow it to support private sector debt. In 2011, doubts about the viability of the
business plan where raised again as the cost to construct the NBN was then estimated at A$37.4 billion (NBN Co., 2012a).
In 2010 NBN Co issued its 2011–2013 Corporate Plan, a document that set out key objectives and priorities for that 3-year
period. In 2012 the 2011–2013 Plan was superseded by the 2012–2015 Corporate Plan (NBN Co., 2012a). In particular the
Plan commands NBN Co to complete deployment of Dark Fibre connectivity, 121 Points of Interconnection and about 650
Fibre Access Nodes by 2015. To enable high-speed connections between the population centres across the continent, the
government launched a $250 million Regional Backbone Blackspots Programme (RBBP) to build some supplementary
broadband ‘highways’ to complete the network already in place, mostly owned by Telstra.
Over 2011 the government and Telstra held negotiations that came to an end in March 2012 that concluded Telstra's
structural separation process on an agreement known as Telstra Definitive Agreement allowing NBN Co to efficiently re-use
Telstra's existing infrastructure as the migration of fixed telecommunications services from copper to fibre is finished
(Battersby, 2012). While Telstra expects to maximise revenue from the outgoing copper network, a large percentage of
Australians will have to migrate to fibre-optic connections for broadband and telephone services. The deal also allows NBN
Co access to Telstra facilities such as ducts, pits, conduits, and dark fibre (NBN Co., 2012a).
The transfer of existing Telstra broadband infrastructure to NBN Co is envisaged to result in the weakening of Telstra's
strong market position as infrastructure owner, wholesaler and retailer. As Telstra gradually shuts down its copper
infrastructure over the next decade and moves its almost 10 million customers to the NBN, it will be compensated by NBN
Co under an A$11 billion deal (NBN Co, 2011c). The deal secures Telstra a cash flow for the next 30 years and is expected to
offset the decrease in revenue raised from fixed telephone lines. In short Telstra has effectively sold its copper network to
NBN Co while not having to sell off its pay TV branch, nor divest from its mobile telecommunications investments. Revenue
will be raised from leasing the already existing Telstra infrastructure to NBN Co and receiving payments when a copper
phone lines is disconnected and replaced by a fibre connection. The deal also represents much sough-after certainty for NBN
Co's as Telstra agrees to prefer the NBN for wholesale fixed line services (NBN Co, 2011c).
In June 2011, while NBN Co announced binding agreements had been entered into with Telstra, it also executed an
agreement with SingTel Optus to “progressively migrate Optus HFC subscribers to the NBN as it is rolled out” (NBN Co.,
2012a, p. 17). A year later, in July, the ACCC authorised the Optus HFC Agreement, which became unconditional. As customers
migrate from Optus to NBN Co, the former will receive compensation payments estimated in A $800 million in steady
payments when NBN Co services become available in areas now served by Optus HFC network which is expect to occur not
earlier than 2014 (Lohman, 2012).
3.4.2. Reshaping the telecommunications markets in New Zealand
In 2011 four companies were chosen as private investors in the new PPPs known as Local Fibre Companies (LFCs). The
purpose of the UFB project is to accelerate the roll-out of an access network deploying optical fibre infrastructure (next-
generation infrastructure) to 75% of New Zealanders by the end of 2019. New Zealanders will be served by a regional LFC
according to their location as follows (see Table 1): the Whangarei region served by North power Limited; Hamilton,
Tauranga, New Plymouth, Wanganui, Hawera and Tokoroa regions (central North Island), users will deal with Ultrafast Fibre
Limited, whereas in Christchurch, Rolleston or Rangiora (east-central South Island), Enable Networks Limited is rolling the
fibre. All other towns and cities, comprising about 70% of the country's premises, will be served by Chorus.
In May 2011, CFH finished agreements with all four LFCs which state that CFH funds the cost of fibre ‘passing’, that is, the
connection running down the street, while the partner must fund each ‘drop’, that is, the connection from the street to the
premise (CFH, 2011). The agreement with Telecom included a condition by which Telecom would have to demerge if it
wanted to participate in the UFB network. Telecom shareholders voted in favour of the proposal and in November 2011
Telecom split into Chorus, owner of the last mile copper and the UFB network, and Telecom retail which kept the PSTN, a 3G
wireless network and the national backhaul network, among others (MacMahon Milner, 2013). The operational separation
from 2007 was abolished.
The New Zealand government will not expect to see any new (subsidised) copper wires to rural locations, instead any
new telephone connections would be provided via broadband connections, some of which will not be optical fibre but fixed
Table 1
LFCs, population to serve and their number of signed-up RSPs for each LFC.
Local fibre company Population in service area
Enable Networks 430,000
North Power Fibre 85,000
UltraFast Fibre 454,000
Chorus 2,300,000
F. Beltrán / Telecommunications Policy 38 (2014) 715–729 721
8. wireless and satellite connections. With the split of Telecom in late 2011 the historic Kiwi Share obligations have been
inherited by Chorus, together with the existing copper wire infrastructure. The ownership restrictions put into place for
Telecom on privatisation in 1990 are after the split only applicable to Chorus. This means Chorus, after the split the 8th
largest company on the NZX, cannot be more than 49.9% foreign owned whereas Telecom NZ, after the split the 3rd largest
company on the NZX, could in future come under foreign majority ownership (Fletcher, 2011). The obligation to provide a
rural phone service is currently split between Chorus as the network provider and Telecom NZ as the retail service provider.
The provision of telephone services brings into play the free local area calling New Zealanders have traditionally enjoyed
which was enshrined in the 1990 Kiwi Share agreement. New Zealand had traditionally one of highest rates and time
durations of local calls in the OECD, exacerbated during the period of dial-up internet connections to local ISPs (Howell,
2008), and it remains to be seen whether consumers are willing to give up their free local phone calls for a bundled
broadband plus IP-based telephony service.
3.5. Supply-side issues
Deployment of a vast fibre-base infrastructure for high-speed broadband access embodies the supply side of policy
efforts to consolidate a digital ecosystem. A plan is put forward that will roll-out fibre to specific regions at higher-than-
normal construction rates. This section reveals the extent to which effective construction is taking place for both NBN and
UFB, comparing the targets to the actual deployment figures.
Current figures on the roll-out of NBN as well as projected numbers of premises passed and activated as stated in NBN
Co's 2012–2015 Corporate Plan (NBN Co., 2012a) are shown in Fig. 3. The figure also displays the achieved and projected
daily run rates, that is, the number of connections built per day (on a 250-day year) on average in a given year. Numbers of
passed and activated fibre connections are used to report on the activated-to-passed ratio, an indicator that exhibits the
adoption of fibre-based services by households where fibre has been installed.
The 2012–2015 Plan updated the expected number of premises passed and premises activated with FTTH previously set
in the 2011–2013 Plan. Fig. 3 shows the total premises passed and total connections activated as of Q1 2013 and the
projected figures of NBN fibre deployment and activation. NBN forecasts an average of 1.7 million connections built per year
once the project is finished (NBN Co., 2013b); it also reports that at end March 363,360 premises were in the overall
coverage footprint, with 96,060 passed with fibre and a total of 48,600 premises activated (fibre, fixed-wireless and
satellite).
NBN CO will sell wholesale services to service providers as inputs to their end-user services across all NBN three
technologies: fibre, wireless, and satellite. An NBN Co Fibre Access Service (NFAS) product consists of a set of product
components used by service providers as building blocks to offer end-user services (NBN Co., 2011b). Prices for NFAS
product components are shown in Table 2.
The information in Table 3 summarises the progress in the deployment of UFB and RBI in New Zealand connections until
the first trimester of 2013. The rate of deployment in both UFB and RBI initiatives can be compared with the targets set by
the New Zealand government in the timeframe shown.
In New Zealand most currently operating Internet service providers have already signed up to the LFCs to become new
retail providers on the new platform. A few newcomers will enter the market as well. New and already established providers
will vie to position themselves on the platform. The number of content providers advertising their broadband-based offers is
slowly increasing as the construction of the networks unfolds.
Local Fibre Companies In New Zealand reached agreements with CFH on wholesale service prices; a LFC will not be
allowed to charge more than a specified “monthly price” when its client RSP signs up a new customer and are “capped” for
an agreed term. For the home/retail customer and business entry segments Table 4 shows the price caps that CHF and its
Millionsofpremises
100%
80%
60%
40%
20%
2011 2012 2013 2014 2015 2016
1
2
3
4
5
Premises passed (millions)
Premises activated (millions)
Activated-to-passed ratio (%)
6850 Numbers show the daily run rate in
a given year
Fig. 3. Past and projected deployment and uptake of NBN's fibre connections.
F. Beltrán / Telecommunications Policy 38 (2014) 715–729722
9. partners have agreed on for entry level broadband connection, high-definition video, and entry level business service prices.
LFCs will charge wholesale prices that will rise steadily during the first 8 years as is the case of Residential Entry and
Residential Triple-Play while others will be kept constant or will slightly decrease as in Triple-Play 100/50.
Both NBN Co and CFH, the latter on a longer term – have committed to keep some key wholesale service prices at
constant levels. In New Zealand, CFH has gone a step further in committing to pre-established, moderate price variations
during the period 2011–2019.
Table 3
State of deployment of New Zealand's UFB and RBI.
Source: MBIE quarterly reports on UFB Jul 2011–March 2031.
Goal: 1,350,000 (end of 2019)
Date Number of premises passed Target Number of connected end-users Number of active RSPs
Dec 2011 16,000
Jun 2012 76,311 70,000 1233 13
Sep 2012 101,786 2445 18
Dec 2012 131,912 3806 18
Mar 2013 171,886 5133 21
Rural broadband initiative
Date Vodafone (number of premises) Chorus (number of premises)
Jun 2012 52,923 19,028
Sep 2012 55,481 23,400
Dec 2012 89,235 36,100
Mar 2013 100,120 42,400
Target (2016) 147,000 105,000
Table 4
Products and prices for home/retail customers agreed on by CFH and LFCs.
Product Downstream/upstream data rates 2011 CCPMa
(NZD) 2019 CCPMa
(NZD)
Basic voice channel Greenfields or LFC-discretional 25.00 25.00
GPONb
residential entry 30 Mbps/10 Mbps 37.50 42.50
GPON residential triple-play 30 Mbps/10 Mbps 41.25 46.25
GPON business entry 30 Mbps/10 Mbps 49.95 49.95
GPON triple-play 100 Mbps/50 Mbps 55.00 49.90
GPON 100/100 100 Mbps/100 Mbps 175.00 175.00
HD video channel 10 Mbps for multicast video 5.00 5.00
a
CCPM—customer charges per month.
b
GPON—Gigabit passive optical network. The notation adopted by CFH for wholesale services such as Triple Play 100/50 means that the service
guarantees 100 Mbps for downstream traffic (from the provider to the end-user) and 50 Mbps for upstream traffic (from the end-user to the provider).
Table 2
NFAS product component prices.
Product component Monthly charge (AUD) Non-recurring charge (AUD)
Facilities access
Optical distribution frame termination point Zero charge Zero charge
Network-network interface
1 Gbps 1000Base LX $200 $1000
10 Gigabit per second 10GBaseLR $400 $5000
Access virtual circuit (downstream/upstream)
12/1 Mbps $24a
N/A
25/5 Mbps $27 N/A
25/10 Mbps $30 N/A
50/20 Mbps $34 N/A
100/40 Mbps $38 N/A
a
A freeze has been imposed on the price of 12/1 AVC until mid-2017; the other prices are also frozen but only until the end of 2013.
F. Beltrán / Telecommunications Policy 38 (2014) 715–729 723
10. 3.6. Demand-side issues
Boosting the demand side in 2011 the Australian government stepped up its efforts to strengthen its take on leading the
way to make Australia a world-leader in the digital economy by launching its National Digital Economy Strategy (Australian
Government, 2011). The Strategy considers NBN a “key step towards its vision” while setting eight goals that focus on online
participation and online engagement by households and businesses, smarter management of the environment, improved
health and age care, expansion in online education, increased teleworking, more online government service delivery and
greater engagement in the digital economy by the regions (Australian Government, 2011).
A study recently released by the University of Melbourne and Swinburne University of Technology on the adoption of
NBN in Brunswick, Australia, (Nansen, Arnold, Wilken, Gibbs, 2012) examines high-speed broadband uptake by
households and how it impacts household consumption patterns and costs of communication technologies. The study
considers high-speed broadband as part of a whole domestic technological environment avoiding any focus on specific
applications.
Main findings can be summarised as follows (Nansen, Arnold, Wilken, Gibbs, 2012):
Early adopters of the NBN are home owners with higher incomes than those with ADSL.
Early adopters are active in deciding to get connected to the NBN and are guided by speed rather than price.
Non adoption of NBN is due to not knowing about it, high perceived cost, lack of information about the installation
process, and satisfaction with current Internet connection.
NBN users are more knowledgeable about speed and monthly data limits, but all across the sample of users, regardless of
their connection type, Internet speed is better understood by experiencing it rather than quantitatively.
Households connected to NBN are twice more likely to use it as a place of work than other households.
In Australia, according to NBN, uptake is voluntary and not the result of final disconnection notices, whereby customers
are told their copper connection will be switched off. As of Q1 2013 NBN Co had announced that uptake was 28% in twelve
FSAs with average data consumption well above the national average (NBN Co, 2013a). Although the sample of twelve areas
may not be statistically significant such rate indicated a faster uptake than ADSL (which took six years to achieve 28%) or
HFC (15 years to reach 34%) (NBN Co, 2013a).
The complementary programmes that would enhance the demand-side of the broadband ecosystem in New Zealand
appear to have been scrapped off the government's plans. In 2008 the Labour government issued the Digital Strategy 2.0
(MED, 2008), a plan that advocated for ‘super-fast connection, enhanced user confidence and cool content’. The 2008
election brought the National Party to power and the Strategy went into oblivion. Current demand-side activities extend
only to local government and Maori communities. Opportunities that will promote the use of UFB in the health sector are
currently being identified by the National Health IT Board and the Ministry of Health.
In New Zealand recent work by Beltrán and Mirza (2013) aimed to empirically explore the drivers and barriers to
consumer adoption of UFB using three different data sets, finds that consumer awareness and pricing are the main factors
that need to be addressed for a successful UFB rollout. Using a mixed-data source approach Beltrán and Mirza (2013)
postulate a framework composed of barriers, drivers, and deciding factors. The barriers are reasons for consumers to refrain
from UFB access adoption whereas the drivers are motivators. The deciding factors can become either a barrier or a driver
depending on the consumer preference or market condition for a particular factor. Current uptake figures suggest that in
spite of the zero-fee connection policy, consumers are still not aware of the potential benefits of FTTH.
3.7. Regulation
Australia and New Zealand have opted for a broadband deployment model following an open-access broadband platform
model, (see Fig. 2 as adapted from (Kirsch Hirschhausen, 2008)), whereby wholly new markets are expected to flourish,
and regulatory concerns focus on compensating the incumbent (such as with the Telstra and Optus agreements in Australia)
and regulating wholesale prices as a means to reduce investment uncertainty.
Australia's NBN Co is the sole operator of the network; in New Zealand, CFH and four private companies, partnered in
four LFCs have been granted exclusive rights to operate the fibre-based platform in mutually exclusive geographical areas.
RSPs will purchase wholesale services from the platforms on a competitive playfield underlain by the open access principle,
the design principle behind NBN and UFB. The regulatory aspects of the fibre-based platform and the wholesale service tariff
schemes in both Australia and New Zealand respond to the open access architecture. Regulators on both sides of the Tasman
Sea have raised their concerns in regards to particular issues as the broadband platforms start to take shape. In Australia
regulatory affairs regarding the NBN are consigned in the Special Access Undertakings issued by NBN Co and submitted to
ACCC. In New Zealand recent decisions by the Commerce Commission on the wholesale price of unbundled local loop access
are expected to impact the business plans of the new UFB service providers.
In 2011 NBN Co delivered its self-regulating undertaking, also known as Special Access Undertakings (SAU), as a part of
the government's intention to provide a regulatory framework to the wholesale portion of the network. NBN Co filed the
document setting out the pricing (as in Table 2 in Section 3.1.1) and regulatory framework for the operation of the NBN for
F. Beltrán / Telecommunications Policy 38 (2014) 715–729724
11. the next 30 years (Taylor, 2013). The submission was signalled by ACCC as not likely to be accepted and NBN Co had to
redraft it to address the concerns from multiple parties (Hutchinson, 2012). ACCC's main criticisms referred to the “nature
and oversight” of ACC over the next 30 years and the level of certainty given to access seekers. In September 2012 and later
in December NBN Co filed new modifications to the SAU describing it as a framework that “strikes a balance between the
long-term interest of end-users, access seekers and NBN Co” for the next 30 years (NBN Co., 2012b).
The current NBN Co's proposed modular SAU provides 30-year regulatory framework for product and service description
and long-term cost recovery, while dealing with uniform national wholesale pricing, pricing stability and predictability and
economic efficiency on a 10-year period after which revisions will be done every three to five years. SAU includes a five-year
freeze on wholesale product prices and cap (rate of annual inflation less 1.5%) on annual price increases. In its reply (ACCC,
2013b) the Australian Competition and Consumer Commission asked NBN Co to further work on commitments to provide
oversight mechanisms to agreements NBN Co enter with customers, while also questioning the declared ability for NBN Co
to withdraw and create products. In particular ACCC believes that “the product withdrawal divisions diminish the prospect
that the price caps in place would incentivise NBN Co to invest and operate efficiently”.
Providing incentives and a less uncertain regulatory environment to investors was a position staunchly defended by the
New Zealand government in 2010 when proposing a “10-year regulatory holiday” (Watson, 2011); the proposal would have
excluded the LFCs from the Telecommunications Act until 2020 (Labour, 2010; Watson, 2011). Since the government was
actively seeking for private money to be invested in the UFB it seemed quite intent on protecting the private investors'
incentives (Beltrán, 2012). Eventually as the pressure mounted the government withdrew its proposal and quickly sought to
include contractual mechanisms to protect its partners from unexpected price changes (Techday, 2011). Wholesale services
on the UFB network are to be provided in a non-discriminatory standard in the initial period ending on December 2019 and
in an “equivalence and non-discriminatory” standard afterward (CFH, 2010).
In 2012 the Commerce Commission's decision to reduce the price of the unbundled copper local loop (UCLL) service sent
a signal to the Internet access market about the price of copper for the following years. The decision affects the plans of LFCs
and commercial RSPs once they start operating services on the UFB. In spite of originally having proposed a reduction of up
to 19% in the monthly rental price of UCCL, in late 2012 the Commission decided to rely on a mixed method approach to
determining a 3.85% reduction in the geographically averaged UCLL monthly rental price setting it at NZD $23.52. In its
decision the Commission benchmarked price trends for countries that applied forward-looking cost-based pricing methods
between 2007 and 2012 (Commerce Commission, 2008).
4. Elements of a framework for broadband policy
The state of development of the broadband national plans in Australia and New Zealand, as of mid-2013, can be better
appreciated on Table 5, which displays information regarding the main figures for the current state of deployment, the total
funds invested, the institutional arrangements, key summary information on network operation, and the regulatory
framework. Information in Table 5 is a solid starting point to discuss the elements that constitute this paper's approach to a
framework for broadband policy.
With reasons for government intervention in both Australia and New Zealand, respectively, having been discussed
previously within the context of a market-failure approach, the precise forms such interventions adopted were then
described. The latter included the projects' respective governances and the main technical aspects of the new broadband
platform architectures including the structure of entry-level wholesale products. Such elements help in organising the rest
of the analysis which, this paper argues, can be summarised in a simple, yet convenient framework that includes the supply-
side policies, the demand-side policies and the regulatory measures. On the supply side amendments and changes to the
original plans play a role in shaping up the output and the kind of offer government fibre agencies are putting out there for
the public at large. They also may constrain the speed of deployment, which is a major factor in the sought-after efficiency of
the new platform. On the demand side consumers' attitude towards connection uptake and consumers' perception on the
future benefits, with an overall appreciation of positive and negative effects on society and economy, are studied by way of
using recent results published after separate academic surveys were conducted in both countries. The demand side also is
further stimulated by two government programs, namely, Australia's National Digital Economy Strategy (Australian
Government, 2011) and New Zealand's Digital Strategy 2.0 (MED, 2008). The third and last element, the regulatory
environment, is the one element where the two countries most visibly differ, with Australia's NBN Co having settled on a set
of regulatory guidelines, the Special Access Undertakings, approved by ACCC in mid-2013. In New Zealand, on the other
hand, effective regulatory measurements affecting the future UFB markets only concern the price of copper lines.
4.1. Supply-side: promoters and constraints
Using the model introduced in Fig. 1 this section explores those supply-side aspects of NBN and UFB that promote their
development or act as constraints to slow it down.
NBN Co Corporate Plan states that by 2015 NBN Co will deliver about 6000 premises per day (see Fig. 3). Current fibre
uptake sits around 16% and NBN Co expects it to increase to about 50% in 2015. In its 2012–2015 Corporate Plan NBN Co also
announced a change from Demand Drops to a Build-drop strategy (NBN Co., 2012a, p.13) a decision that signals an important
F. Beltrán / Telecommunications Policy 38 (2014) 715–729 725
12. change from what was originally state in the 2012–2013 Corporate Plan. The Build drop strategy consists of the installation
of connection devices at the premises while the network (distribution and local segments) is being built instead of waiting
until a Retail Service Provider's order for service is received after its customer wants to activate end-user services (Demand
Drops). Build drop is expected to be more cost effective, particularly in light of the Telstra deal which causes a greater
certainty in uptake. This will cause an acceleration of the capital expenditure over the project's lifetime.
Supply-side is affected by delays incurred in different parts of the country by contractors caused by renegotiations,
scarcity of skilled labour, wrong managerial decisions as reported by the Australian press over the recent months. The most
contentious issue though, is the already chronic NBN Co's failure to meet its build-up targets. Supplying the number of
connection in the numbers expected by the Plan is becoming a very hard target to meet as the daily run rate indicates; it will
take NBN CO a remarkable effort to overturn the current rates. As it stands NBN Co's managerial difficulties are standing in
the way to an effective deployment and threaten to become a constraint to the NBN rather than a promoter.
NBN and UFB were designed as open-access platforms. RSPs need access to wholesale services the platform provides.
Underlying the open-access condition is the respective governments' visions to create conditions for new, innovative
services provided by new entrepreneurs. RSPs play a double-role in the expansion of broadband in that they promote both
the supply-side and demand-side. RSPs are main customers of the fibre-based platform and their commercial success
assures the government's goals to achieve its revenue goals, which can be taken as an indication that supply-side policies
achieve their targets. On the other hand, RSPs have direct contact with end-users and their service offers and bundles
stimulate demand for the platform capacity; their commercial strategies are therefore to increase demand for fibre-based
services.
A service provider will typically purchase wholesale services at monthly capped wholesale prices. Regulatory pricing
approach in both countries is allowing for a period of several years during which wholesale service prices for the residential
end-user market will either be frozen with price reviews promised at 3–5 year intervals – as in Australia (NBN Co., 2011a) –
or are already set for slight increases (with a constant annual growth rate) or slight decreases (with a constant annual
decrease rate) over the next 8 years – as in New Zealand (CFH, 2011).
In Australia NBN Co deems RSPs “access seeker” stating that it must be a licensed carrier, carriage service provider or
content service provider under the Telecommunications Act. Additional conditions include meeting NBN Co's credit test and
interoperability requirements (NBN Co., 2012c).
Table 5
Comparison of the Australian and New Zealand broadband plans across five themes.
Australia New Zealand
How are they
doing?
Deployment By 2020 12.2 million fibre premises passed, 1 million fixed
wireless and satellite premises covered; 8.5 million fibre premises
connected.
By 2019 1,350,000 fibre premises passed;
by 2015 252,000 rural households
covered.
Target
Achieved so far
Mid 2013: 229,633 fibre premises
passed, 5133 activated; 161,000 rural
premises passed.
Mid-2013: 484,000 premises passed, of which 207,500 passed
with fibre; 70,000 activated.
How much
does the
network
cost?
Budget Government funded Government invests half of the total and
private partners afford the rest Funding
Capital
expenditure
$ per person
A $ 37.4 billion [ E 28,8 billiona
]
A $1669 [E 1270] NZ $ 1.5 billion [E 0.95 billiona
]
NZ $ 341 [E 215]
Who is
building the
network?
Leading agency
Private
participation
Supportive
programs
National Broadband Network Company, NBN Co. Crown Fibre Holdings, CFH.
Four partnerships with private parties
(Chorus, Enable Networks, North Power
Fibre, UltraFast Fibre)
NBN Co is wholly owned by the Australian government;
private participation is through procurement contracts for
fibre build-up.
Rural Broadband Initiative, RBI.Regional Backbone Blackspots Programme, RBBP.
How will the
network
operate?
Layer 1
Layer 2
Layer 3
NBN Co builds a high-speed FTTH open-access platform CFH partnering with private operators
builds four regional FTTH networksNBN Co sells wholesale access services to RSPs
LFCs sell wholesale access services to
RSPs
RSPs compete by selling end-user services over the platform
RSPs compete by selling end-user
services over the platform
What are the
regulations?
Regulatory
commitments
Copper
infrastructure
Self-regulatory guidelines and commitments consigned in the
Special Access Undertakings under review by ACCC
Commerce Commission monitors the
buildup process
Commerce Commission rules in favour
of access seekers by reducing the price of
ULCC.
Total decommission of Telstra's last mile copper infrastructure
as dictated by the NBN Co-Telstra agreement
a
Exchange rates in May 2013.
Sources: (NBN Co, 2012a; 2013a,b); (MBIE, 2012a,b; 2013).
F. Beltrán / Telecommunications Policy 38 (2014) 715–729726
13. Currently no RSP advertises IPTV or IP-based television in New Zealand. Pending further regulatory inquiries into the
current hurdles to accessing premium TV programming some service providers may become IPTV providers as well. Thus,
the traditional Internet access plan – with data caps still applied in Australia and New Zealand – will transform into a richer
bundle that includes some type of IPTV. Video services over the Internet have the potential to overturn the status-quo of
video service provision, particularly the pay television business. With broadband networks being able to deliver higher
speeds, Over the Top (OTT) providers – delivering TV to end-users over third party broadband networks (Commerce
Commission, 2012) and offering them on-demand contents would have the ability to reach larger audiences.
4.2. Demand-side: promoters and constraints
The second component of the analytical framework refers to the set of initiatives and incentives created by the fibre
promoter, the government, to enhance the demand-side capacity to acquire and use broadband connections and services.
Demand for fibre connections and activation of the fibre for service consumption are the two central pillars of the fibre-to-
the-home initiatives' success in Australia as well as in New Zealand. Uptake of fibre activations for both countries can be
seen in Fig. 3 and Table 3. Customers' response in Australia is 5-fold larger than in New Zealand. As of mid-2013 New
Zealand has achieved 20% completion and its uptake is about 3%. Uptakes in other countries have been similar at similar
states of completion: Singapore 2% when construction reached 24%; UK 3% when reaching 24% (Adams, 2013).
Current fibre uptake rate in New Zealand reflects the mix of barriers, drivers, and deciding factors that restrain and
promote the activation of FTTH-based services. Recent work by Beltrán and Mirza (2013) found that in New Zealand
consumer awareness and pricing are the main factors that need to be addressed for a successful UFB rollout. Among
deciding factors the study not surprisingly finds that a free or low-cost connection to the premises will enhance the
adoption; nevertheless come 2015 those New Zealanders who do not have it yet may have to pay for the fibre connection as
the government has assured, through an agreement with three of its private partners, free-of-charge residential fibre
connections only until the end of 2015 (Adams, 2013). A remaining partner, Ultra-Fast Fibre has undertaken to provide them
free until 2019. The latter means that fibre connection cost will become a barrier. The results of a consumer study by Canstar
Blue reported in (Wade, 2013) found that that consumers struggle to understand the differences between their current
connection and the fibre technology used by the UFB. Current technology in New Zealand includes an extensive fibre-to-the-
node (FTTN) network. Beltrán and Mirza (2013) also find a high-degree of consumers contentment with existing ADSL-
based Internet connections which may be a consequence of the deployment of FTTN. In other words, lacking an
understanding of the differences between technologies, consumers decisions are driven by their level of awareness which
is strongly influenced by their experience with current connections.
In addition to fibre uptake demand-side stimuli can take varied forms such as those promoted by Australia's National
Digital Economy Strategy (Australian Government, 2011) and New Zealand's Digital Strategy 2.0 (MED, 2008). The Australian
National Digital Economy Strategy is a comprehensive approach to a full utilisation of the newly introduced high-speed
broadband capability and an invitation to all sectors of the economy. The expectations set by the Digital Strategy exert a
particular kind of pressure on NBN Co to deliver on its build up schedule as they will materialise only when the NBN
becomes operational and a critical mass of users engage with the programmes and activities. Coordination between NBN Co
and the government agencies charged with the Digital Strategy's leading projects is essential. The NBN will provide several
key factors which will promote the development of the Strategy's goals such as the higher speed download and upload
services which will allow household and small businesses to access new applications; ubiquitous availability; and a uniform
national wholesale tariff structure.
4.3. The role of regulation
The transformation of the telecommunications markets in Australia and New Zealand is fuelled by demand-side and
supply-side policies as explained thus far; as the governments and respective government companies in charge of the plans
move forward with deployment of fibre connections, disconnection of copper lines and further commitments to the
incumbent (NBN Co and Telstra in Australia) or on-the-go reviews and further negotiations (CFH and Chorus in New
Zealand), respective regulatory bodies do need to keep vigilant and act accordingly when needed. Regulatory action, be it
threats or decisions or reviews, do play a highly important role in shaping up the future telecommunications markets
operating on the high-speed broadband platforms. This section discussed the major platform operation decision affecting
the market structure in both countries known as open-access and the ensuing market model. Then it presents the major
regulatory recent decisions regarding the first evolution stages of the broadband markets in both countries.
ACCC proposes a number of suggested variations. Some of the main areas include providing certainty about how NBN Co
will comply with its obligations under the telecommunications access regimes particularly with any ACCC regulatory
rulings; on the other hand, allowing periodic price rebalancing through an ACCC review and amendments to clarify the
ACCC can have a role in overseeing product withdrawals and new products as well as their prices (ACCC, 2013b). ACCC also
highlighted some merits of the SAU including the prices set out were likely to allow a smooth transition from existing
telecommunications networks and NBN Co's long-term commitment to not raise prices above the CPI – 1.5%.
Cave analyses the price reduction issue reminding first that the regulator's duty is “to promote efficiency and to maintain
incentives on networks to innovate and invest” (Cave, 2012:15). Cave notes that the existence of parallel networks, a copper-based
F. Beltrán / Telecommunications Policy 38 (2014) 715–729 727
14. and a fibre-based, does not promote productive efficiency and, therefore, the period of coexistence needs to be limited, instead of
reducing copper access prices on the basis of replacing the existing network. On the other hand, price reduction does not promote
dynamic efficiency either since it slows down or distorts the emergence of the fibre network.
5. Conclusion
The national broadband initiatives of Australia and New Zealand, currently being developed, are the subject of analysis by
this paper, which draws an upgraded picture of their current status and provides an analysis that inquires about the reasons
for direct government intervention in broadband deployment, the vehicle and mechanisms towards successful deployment
and operation of the broadband platform, the promoters and constrainers of demand-side and supply-side policies and the
regulatory decisions taken thus far.
In recent years both countries found themselves struggling to boost up their respective numbers of high-speed
broadband connections. Grown out of frustration with the incumbent, both governments across the Tasman launched –
within one year's difference – national programs for the expansion of broadband by adopting an innovative scheme that
promised to overturn their telecommunications markets.
Australia's NBN exemplifies the return to public sector's control of essential facilities, having concluded that the
construction of a modern high-speed, FTHH broadband access network cannot be achieved by private initiative alone. New
Zealand, instead, relied on private partners that build and operate the network in association with CFH. In both countries but
at different degrees, fibre-to-the-home technology will be complemented with fixed-wireless and satellite broadband
connections.
This paper built a simple, yet convenient framework for the analysis of the two broadband national plans while
discussing its main proposed elements: supply-side policies, demand-side policies and regulatory measures.
Supply-side policies were analysed to enquire about the promoters and the constraints impacting the roll-out of fibre
connections. On each review period Australia's NBN Co struggles to meet its construction targets; its fibre uptake of about
16%, on the other hand, is rather high if compared with a handful of international experiences. New Zealand, by adopting a
PPP-based deployment strategy has managed to exceed its targets, but the uptake of its FTTH network is only 3%. The
contrasting results follow from the way each country structured the governance and financial strategy of its fibre initiative.
On the demand-side front current information allows to appreciate a better-than-expected rate of uptake in Australia
and a somewhat disappointing rate in New Zealand. Lack of information, inability to appreciate the advantages of the new
technology and a lack of awareness on the consumer side may be contributors to the low uptake rate in New Zealand. On the
other hand the agreement reached with the incumbent that incentivizes the disestablishment of copper connections when
fibre is available and favourable wholesale service rates enticing RSPs may be working in favour of positive results in
Australia.
Finally the implications on competition brought in by the open-access principle were analysed alongside recent
regulatory decisions in both countries.
Acknowledgements
The author wants to acknowledge valuable comments provided by two anonymous referees and Richard Taylor on a
previous version of this article.
References
ACCC (2013a). ACCC draft decision on the 2012 special access undertaking. 〈http://transition.accc.gov.au/content/item.phtml?itemId=1108133nodeId=
9efbdab1ba5dacc4b53267e4a27efba8fn=ACCC%20Draft%20Decision%20on%20the%20Special%20Access%20Undertaking%20lodged%20by%20NBN%
20Co%20on%2018%20December%202012.pdf〉 Accessed 20.5.13.
ACCC (2013b). ACCC telecommunications reports 2011–12: Report 1, 2013. 〈http://transition.accc.gov.au/content/item.phtml?itemId=1100331nodeId=
b4f4686bc69366f95cd7cb5d7d505a2efn=ACCC%20Telecommunications%20Reports.pdf〉 Accessed 20.5.13.
Adams, A. (2013). UFB and RBI programmes exceed year two targets. Beehive Press Release, August 8. 〈http://www.beehive.govt.nz/release/ufb-and-rbi-pro
grammes-exceed-year-two-targets〉 Accessed 20.8.13.
Australian Government (2011). National digital economy strategy. 〈http://www.nbn.gov.au/files/2011/05/National_Digital_Economy_Strategy.pdf〉 Accessed
24.5.13.
Battersby, L. (2012). NBN marathon talks end with landmark deal. The Sydney Morning Herald, Mar. 7 2012. 〈http://www.smh.com.au/business/
nbn-marathon-talks-end-with-landmark-deal-20120307-1ujrk.html〉 Accessed 19.3.12.
Belloc, F., Nicita, A., Rossi, M. A. (2012). Whither policy design for broadband penetration? Evidence from 30 OECD countries. Telecommunications Policy,
36(5), 382–398.
Beltrán, F., Mirza, F. (Sep. 2013). A computational agent-based model to study the effect of drivers and barriers to the uptake of a ftth broadband platform in
New Zealand. Accepted for presentation at Telecommunications Policy Research Conference, VA, USA.
Beltrán, F. (2012). Using the economics of platforms to understand the broadband-based market formation in the New Zealand Ultra-Fast Broadband
Network. Telecommunications Policy, 36(9), 724–735.
Cave, M., Martin, I. (2010). Motives and means for public investment in nationwide next generation networks. Telecommunications Policy 34, 505–512.
Cave, M. (2012). Regulating the price of copper in New Zealand. Submission on the UCLL issue to the NZ Commerce Commission. 〈http://www.comcom.
govt.nz/dmsdocument/8510〉 Accessed 08.08.12.
CFH (2013). NZ's broadband vision. 〈http://www.crownfibre.govt.nz/about/new-zealands-broadband-vision/〉 Accessed 27.5.13.
Cambini, C., Jiang, Y. (2009). Broadband investment and regulation: A literature review. Telecommunications Policy, 33(9), 559–574.
F. Beltrán / Telecommunications Policy 38 (2014) 715–729728
15. CFH (2011). Fact sheet: Agreement with enable networks. 〈http://www.crownfibre.govt.nz/media/13092/fact%20sheet%20-%20agreement%20with%20enable%
20networks.pdf〉 Accessed 19.13.12.
CFH (2010). Ultra fast broadband in business – seizing the opportunity. 〈http://www.crownfibre.govt.nz/media/9669/ultra%20fast%20broadband%20in%
20business%20-%20seizing%20the%20opportunity.pdf〉 Accessed 22.5.10.
Commerce Commission New Zealand (2008). Final TSO cost allocation determination for period 1 July 2009 to 30 June 2010. 〈http://www.comcom.govt.nz/
2009-10-tso-determination/〉 Accessed 27.4.12.
Commerce Commission New Zealand (2012). High speed broadband services demand side study.
Crandall, R. W., Singer, H. J. (2010). The economic impact of broadband investment. Washington D.C: Broadband for America.
Conroy, S. (2009). New national broadband network. Minister for Broadband, Communications and the Digital Economy, Media Release. 〈http://www.
minister.dbcde.gov.au/media/media_releases/2009/022〉 Accessed 27.4.12.
Falch, M., Henten, A. (2010). Public private partnerships as a tool for stimulating investments in broadband. Telecommunications Policy, 34, 496–504.
FCC (2010). Connecting America: the national broadband plan. ohttp://download.broadband.gov/plan/national-broadband-plan.pdf4 Accessed 1.11.12.
Fletcher, H. (Jun. 17, 2011). Telecom open to foreign buyer. The New Zealand Herald. 〈http://www.nzherald.co.nz/business/news/article.cfm?c_id=3
objectid=10732662〉 Accessed 27.4.12.
Greenstein, S., McDevitt, R. C. (2011). The broadband bonus: Estimating broadband Internet's economic value. Telecommunications Policy, 35(7), 617–632.
Given, J. (2010). Take your partners: Public private interplay in Australian and New Zealand plans for next generation broadband. Telecommunications Policy,
34(9), 540–549.
Gómez Barroso, J. L., Feijóo, C. (2010). A conceptual framework for public-private interplay in the telecommunications sector. Telecommunications Policy,
34(9), 487–495.
Gómez-Torres, L., Beltrán, F. (2011). Analysis of an integrated plan for expanding broadband access in Colombia. Telecommunications Policy, 35(9–10),
871–882.
Gregory, M. (Feb. 13, 2013). Asking the tough NBN questions. Technology Spectator. 〈http://www.technologyspectator.com.au/asking-tough-nbn-questions〉
Accessed 26.2.13.
Howell, B. (2008) Strategic interaction under asymmetric regulation: The ‘Kiwi Share’ in New Zealand telecommunications. New Zealand Institute for the Study
of Competition and Regulation Inc. 〈http://www.iscr.org.nz/f467,13555/13555_ITS_Strategic_Interaction_Under_Asymmetric_Tariff_Regulation.pdf〉
Accessed 27.4.12.
Hutchinson, J. (Jun. 21, 2012). NBN Co scales back 30-year regulation, ITNews. 〈http://www.itnews.com.au/News/305724,nbn-co-scales-back-30-year-regula
tion.aspx〉 Accessed 5.7.12.
Kenny, R., Kenny, C. (2011). Superfast broadband: is it really worth a subsidy?. Info, 13(4), 3–29.
Kim, Y., Kelly, T., Raja, S. (2010). Building broadband: Strategies and policies for the developing world. Washignton D.C.: Global Information and
Communication Technologies (GICT) Department, World Bank.
Kirsch, F., Hirschhausen, C. (2008). Regulation of NGN: Structural separation, access regulation, or no regulation at all?. Communications Strategies, 69,
63–83.
Labour (2010). Labour to oppose government plan to exclude broadband prices from Telco Act for 10 years. 〈http://www.tuanz.org.nz/library/52c45615-
a4f5-419d-a2da-22b63c09db84.cmr〉 Accessed 25.5.11.
Lohman, T. (2012). ACCC approves optus HFC to NBN deal. 〈http://www.computerworld.com.au/article/425849/accc_approves_optus_hfc_nbn_deal/〉
Accessed 19.5.13.
MacMahon, R., Milner, M. (2013). Ultra-fast broadband in New Zealand. Telecommunications Journal of Australia, 63(1).
Maglaris, V., Troulos, C. (2011). Factors determining municipal broadband strategies across Europe. Telecommunications Policy, 35(9–10), 842–856.
Milner, M. (2009). Playing the Telecommunications Game in New Zealand. Telecommunications Journal of Australia, 59, 17.
Ministry of Economic Development, MED (August 2008). Digital strategy 2.0. 〈http://www.beehive.govt.nz/release/digital-strategy-20-%E2%80%93-smarter-
through-digital〉 Accessed 20.5.13.
Ministry of Business, Innovation and Employment, MBIE (2013). Broadband deployment update 2013 Q1.
Ministry of Business, Innovation and Employment, MBIE (August 2012a). Rural broadband initiative. 〈http://www.med.govt.nz/sectors-industries/
technology-communication/fast-broadband/rural-broadband-initiative〉 Accessed 25.5.13.
Ministry of Business, Innovation and Employment, MBIE (2012b). Broadband deployment update 2012 Q2.
Mintzberg, H. (1996). Managing government, governing management. Harvard Business Review, 74(3), 75–83.
Nansen, B., Arnold, M., Wilken, R., Gibbs, M. (2012). Broadbanding brunswick – High-speed broadband and household media ecologies: A report on household
take-up and adoption of the national broadband network in a first release site. Australian Communications Consumer Action Network, Sydney. 〈http://
accan.org.au/files/Broadbanding_Brunswick.pdf〉 Accessed 30.4.13.
NBN Co. (May 2013a). Newsletter. 〈http://www.nbnco.com.au/industry/service-providers/newsletter/may-2013.html〉 Accessed 26.5.13.
NBN Co. (Jan. 29 2013b). Media release. 〈http://www.nbnco.com.au/assets/media-releases/2013/rollout-update-29-Jan-2013.pdf〉 Accessed 25.5.13.
NBN Co. (2012a). NBN corporate plan 2012–2015. 〈http://www.nbnco.com.au/assets/documents/nbn-co-corporate-plan-6-aug-2012.pdf〉 Accessed 28.2.13.
NBN Co. (2012b). Incentive based modular SAU: Design principles. 〈http://www.accc.gov.au/content/item.phtml?itemId=1060326nodeId=ffb8fb54-
e17f0ecec20acf908f518257fn=NBN%20Co%20Revised%20SAU%20proposal%20(20%20June%202012).pdf〉 Accessed 4.7.12.
NBN Co. (2012c). Access seekers. 〈http://www.nbnco.com.au/industry/service-providers.html〉 Accessed 23.5.13.
NBN Co. (2011a) NBN Co. 2011c. NBN product and pricing overview for service providers. V2.0.
NBN Co. (2011b). Frequently asked questions. 〈http://www.nbn.gov.au/frequently-asked-questions/#a533〉 Accessed 19.3.12.
NBN Co (June 2011c). NBN Co and telstra sign binding definitive agreements. 〈http://www.nbnco.com.au/assets/media-releases/2011/nbn-co-and-telstra-
sign-binding-definitive-agreements-23-jun-11.pdf〉 Accessed 24.5.13.
Nucciarelli, A., Sadowski, B., Achard, P. (2010). Emerging models of public–private interplay for European broadband access: Evidence from the
Netherlands and Italy. Telecommunications Policy, 34(9), 513–527.
OECD (2008a). Broadband growth and policies in OECD countries. Available from 〈http://www.oecd.org/dataoecd/32/57/40629067.pdf〉 Accessed 6.11.12.
OECD (2008b). Public–private partnerships in pursuit of risk sharing and value for money.
OECD (2009). The role of communication infrastructure investment in economic recovery. Available from 〈http://www.oecd.org/internet/broadbandandt
elecom/42799709.pdf〉 Accessed 6.11.12.
Ragoobar, T., Whalley, J., Harle, D. (2011). Public and private intervention for next-generation access deployment: Possibilities for three European
countries. Telecommunications Policy, 35(9–10), 827–841.
Rudd, K. (Feb 2009) The global financial crisis. The Monthly, 42. 〈http://www.themonthly.com.au/node/1421〉 Accessed 28.4.12.
Taylor, J. (Jan. 11, 2013). “NBN Co exceeds 2012 target”, ZDNet. 〈http://www.zdnet.com/au/nbn〉 Accessed 27.2.13.
Techday. (2011). Updated: Joyce backs down from UFB regulatory holiday. 〈http://www.techday.co.nz/telecommunicationsreview/news/updated-joyce-
backs-down-from-ufb-regulatory/20132/〉 Accessed 3.8.11.
Wade, A. (February 7 2013). Broadband cost ‘too high’ – survey. The New Zealand Herald. 〈http://www.nzherald.co.nz/business/news/article.cfm?
c_id=3objectid=10863862〉 Accessed 28.5.13.
Watson, D. (2011). Joyce defends UFB regulatory holiday at telco conference. Computer World. 〈http://computerworld.co.nz/news.nsf/news/joyce-defends-uf
b-regulatory-holiday-at-telco-conference〉 Accessed 1.7.12.
Wong, P., Conroy, S. (2010). Statement of Expectations. Canberra: Government of Australia. 〈http://www.dbcde.gov.au/__data/assets/pdf_file/0003/
132069/Statement_of_Expectations.pdf〉.
F. Beltrán / Telecommunications Policy 38 (2014) 715–729 729