2. Town of Mooresville Engineering
Projects completed or nearing completion
β’ Patterson-Bell Sidewalk and Street
Improvements
β’ Connector Road
3. Town of Mooresville Engineering
Intersection Improvements
β’ NC150/NC115 β Spring 2017
β’ NC150/NC801 β Fall/Winter 2017
β’ NC115/Faith Road β Fall/Winter 2017
β’ Main Street/Statesville Avenue β Under
Construction
4. Town of Mooresville Engineering
Streetscape/Sidewalk Improvements
β’ Mooresville School Network β Spring 2017
β’ Mill Village Improvements (Ph 1) β Spring
2017
β’ West Wilson Improvements β Fall 2018
β’ West McLelland Improvements β
Winter/Spring 2017
5. Town of Mooresville Engineering
Allison Kraft, PE
Engineering Services Director
Engineering Department
Town of Mooresville
akraft@ci.Mooresville.nc.us
704-799-4066
7. Lake Norman Regional Transportation Commission
β’ R β 2307 A&B β Widening of NC 150 from NC 16 (Lincoln/ Catawba Co Line to
just west of UD 21 in Iredell.
β’ A Section is from Lincoln Co line to Harvel Rd (SR 1902) in Catawba and B
Section is from Harvel Rd (SR 1902) to just west of US 21 in Mooresville.
β’ B Section - ROW for B section is in FY 2017 and Construction is in FY
2019. ROW Cost $13.6 million and Construction is $90.5 million. EA for both A
& B signed in early April. Final design work is underway.
β’ A section β ROW is in FY 25 estimated at $30.6 million and Construction is
estimated at $90 million.
8. Lake Norman Regional Transportation Commission
ο§ I-5717 β Reconfigure the NC150 and I-77 Interchange. Being implemented with
R-2307 B Section β NC 150 Widening β Construction Scheduled for FY 2019.
ο§ B5142 β Replace Bridge on Cornelius Rd. Work to begin soon by Blythe
development.
ο§ B-4766 - New Bridge Replacement Project on NC 115 over Rocky Creek North of
Statesville. Detour in place. Approximately 20% complete.
ο§ I-3819A β I-40 & I-77 Interchange. The diverging diamond interchange at US 21
is open to traffic. Project completion is expected by late summer.
9. Lake Norman Regional Transportation Commission
β’ I-3819 B β I-40 & I-77 Interchange. Scheduled 2018 ROW & Construction as a
Design Build.
β’ I-4908 β I-77 Rest Area. Work is well underway (over 50%). Building framing
has been completed.
β’ FS 1512B β Cornelius Rd Interchange. Feasibility study is complete. Selection of
a preferred alternative is expected by March. Project involves relocating the
northern portion of Bluefield Rd to the west to take it away from the proposed
interchange.
β’ R-5711 β Houston Rd and Flower House Loop. Consultant is on board; starting
on planning document.
10. Lake Norman Regional Transportation Commission
β’ R-3833 β Brawley School Rd Functional Design. Talbert Rd to US 21. Stantec
engineering has been hired. Working on a functional design.
β’ R-5100 β Williamson Rd Widening from NC 150 to I-77. Project has been split
into A & B sections.
β’ A Section β From NC 150 to Brawley School Rd will be done first. Notice to
Proceed has not been issued. Hiring of a consultant is underway.
β’ B Section from Brawley School Rd to I-77 Needs more permits (FERC) and will
take more time. NCDOT-PDEA to do the work.
11. Lake Norman Regional Transportation Commission
β’ U-5799 - US 21 Widening from Fort Dobbs Rd to Jane Sowers Rd and Realign
Intersection of Jane Sowers and Shumaker Dr. Not started yet.
β’ U-5779 β Statesville - NC 115 from SR 1645 (Old Wilkesboro Rd) to Hartness Rd
Widen 0.9 miles roadway. Consultant has been hired.
β’ U-5780 β Mooresville β Intersection of NC 150 and SR 2399 (Wiggins Rd) Realign
Intersection & Signalize. Consultant has been hired.
β’ U-5817 β Extend SR 1246 Fairview Rd over I-77 to Connect with SR 1206 Alcove
Rd. Stuart Engineering, planning study in progress.
12. Lake Norman Regional Transportation Commission
β’ SR 1305 (Oates Rd β Midnight Ln) US 21 (Charlotte Hwy) to SR 1474 Bluefield
Rd. Widen to three lane with overpass over I-77. Raleigh Managed project.
Stantec has started the planning work.
13. Lake Norman Regional Transportation Commission
The following slides represent the DRAFT project selection for the 2018 State
Transportation Improvement Plan (STIP) for the CRTPO. NCDOT released the
DRAFT STIP on January 4, 2017.
The projects are selected in 3 Tiers:
Statewide Mobility β 100% Data Driven
Regional Impact β 70% Data Driven, 30% MPO/NCDOT Division
Division Needs β 50% Data Driven, 50% MPO/NCDOT Division
14. Statewide Mobility β Funded Projects
Project Name Jurisdiction
DRAFT
ROW Date
DRAFT
Construction
Date
Programmed
Amount
(2018-2027)
in millions of $
Full or Partially Funded
in 2018-2027 TIP?
US 74 & Secrest Shortcut Road
Intersection Improvements
Monroe 2022 2024 $2.7 Fully Funded
I-77 & Cornelius Road Interchange
Conversion
Mooresville 2022 2024 $27.3 Fully Funded
I-485 & Providence Road Interchange
Improvements
Charlotte 2022 2024 $41.3 Fully Funded
I-77 Widening (Woodlawn Rd β I-
277/Belk Freeway)
Charlotte 2024 2027 $81.8
Partially Funded β
Corridor Cap
I-77 Widening (I-485 to Woodlawn Rd) Charlotte 2024 2027 $198.8
Partially Funded β
Corridor Cap
I-77 & Brookshire Freeway Interchange
Improvements
Charlotte 2024 2027 $38.5
Partially Funded β
Corridor Cap
15. Region E DRAFT Regional Impact Highway Funded
Projects (1 of 2)
Project Name Jurisdiction
$ amount
(millions) in
TIP
P4.0
FINAL
Score (100)
DRAFT ROW
DATE
DRAFT CON
DATE
US 74 Widening (Hanover Dr β Rocky River Road) Monroe $21.6 78.93 2018 2020
NC 160/Steele Creek Road Widening (SC Line β S. Tryon
St)
Charlotte $24.7 65.35 2020 2022
NC 73 Widening (Business NC 16 in Lincoln County to
Vance Road Extension)
Huntersville
Lincoln Co.
$44.3 73.14 2021 2021
NC 73 Widening (Vance Rd Ext β Catawba Avenue) Huntersville $20.1 75.42 2021 2021
NC 73 Widening (Catawba Av β Northcross Drive) Huntersville $28.1 70.45 2021 2021
NC 73 Widening (NC 115 to Davidson- Concord Road) Huntersville $19.8 72.30 2021 2023
NC 73 Widening (Davidson- Concord Rd-Poplar Tent Rd) Huntersville $14.5 76.01 2022 2022
Statewide Mobility project that has cascaded into the Regional Impact tier.
16. Region E DRAFT Regional Impact Highway Funded
Projects (2 of 2)
Project Name Jurisdiction
$ amount
(millions) in
TIP
P4.0
FINAL
Score (100)
DRAFT ROW
DATE
DRAFT CON
DATE
NC 51 Widening (Matthews Township Pkwy β Lawyers
Rd)
Matthews
Mint Hill
$35.1 67.27 2022 2024
NC 115/Old Statesville Rd Widening (Harris Blvd β I-485) Charlotte $24.9 68.21 2022 2024
NC 27/Freedom Drive Widening (Toddville Rd β Moores
Ch. Rd)
Charlotte $17.0 71.61 2022 2024
NC 16 Widening (Rea Road Ext β Cuthbertson Road)
Waxhaw
Weddington
$38.4 73.52 2022 2024
I-485 & NC 16/Brookshire Blvd Interchange
Improvements
Charlotte $14.2 75.72 2022 2024
NC 16/Brookshire Blvd Improvement (Idaho Dr β I-85) Charlotte $9.5 79.68 2022 2024
NC 16 Widening (Cuthbertson Rd β Waxhaw Parkway) Waxhaw $30.3 65.97 2023 2025
Statewide Mobility project that has cascaded into the Regional Impact tier.
17. Region F DRAFT Regional Impact Highway Funded
Projects
Project Name Jurisdiction
$ amount
(millions) in TIP
P4.0
FINAL
Score (100)
DRAFT ROW DATE DRAFT CON DATE
NC 115 Operations Improvement
(Waterlynn Rd β Yellow Wood Dr)
Mooresville $3.6 74.15 N/A 2019
US 21 & US 64 (Five Points) Roundabout Statesville $1.1 74.01 2020 2022
NC 150 Widening (NC 115 to NC 801) Mooresville $28.7 75.89 2023 2025
18. Division 10 DRAFT Division Needs
Highway Funded Projects
Project Name Jurisdiction
$ amount
(millions) in TIP
P4.0
FINAL
Score (100)
DRAFT ROW
DATE
DRAFT CON
DATE
Eastway Drive & Shamrock Drive Intersection
Improvements
Charlotte $8.0 90.22 2020 2022
Mallard Creek Road/Derita Road Widening (I-485 to
Concord Mills Boulevard)
Charlotte
Concord
$13.4 78.02 2022 2024
Gilead Road Widening (US 21 β NC 115) Huntersville $15.3 84.68 2022 2024
Mallard Creek Road Widening (Mallard Creek Ch. Road
to Breezewood Drive)
Charlotte $20.1 84.28 2022 2024
McKee Road Extension (Pleasant Plains Rd β John
Street)
Matthews $6.8 80.28 2022 2024
Poplar Tent Road Widening (Derita Road to NC 73)
Huntersville
Concord
$52.8 80.91 2023 2025
Ballantyne Commons Parkway widening (Annalexa Lane
to Williams Pond Lane)
Charlotte $30.3 65.97 2023 2025
Charlotte Avenue Widening (Seymour Street to NC 200) Monroe $4.6 78.62 2024 2027
19. Division 12 DRAFT Regional Impact Highway Funded
Projects (2 of 2)
Project Name Jurisdiction
$ amount
(millions) in
TIP
P4.0
FINAL
Score (100)
DRAFT ROW
DATE
DRAFT CON
DATE
US 21 Widening (Medical Park Road to NC 150) Mooresville $35.1 83.96 2022 2024
US 21/NC 115 Widening (Cedar Lane to Old Mountain
Road)
Troutman $13.6 83.34 2022 2024
Broad Street Corridor Improvement (Vine Street to
Signal Hill Drive)
Statesville $13.4 76.76 2022 2024
Regional Impact project that has cascaded into the Division Needs tier.
21. Lake Norman Regional Transportation Commission
Lake Norman Regional Transportation Commission (LNTC)
Mooresville Town Hall
413 North Main Street
P. O. Box 878
Mooresville, NC 28115
Bill Thunberg, Executive Director
704-604-5057
billthunberg@gmail.com www.lkntransportation.org