Presentation of QualificationsOrlando, Florida
AgendaFirm BackgroundPre QualificationsProfessional Staff
Firm BackgroundEssential Firm IngredientsFounding Principal – Former Corporate VP\Incorporated in 2010Strong FDOT Pre-QualificationsCore Professional Services Under One RoofExperienced / Engaged Staff “Cost Efficient” Business Model
Recognition / Accountability ModelAchieve Client and Firm Expectations     Productivity  Retention    Engagement
Accountability /Quality ProcessLEVEL 1 REVIEW    LEVEL 2 REVIEW    Quality ManagerPlanningPD&E StudiesConstructability EngineerEngineeringEnvironmental Science
AgendaFirm Background Pre Qualifications Professional Staff
Pre-Qualifications2.0 - PD&E Studies3.1 - Minor Roadway Design3.2 - Complex Roadway Design3.3 - Controlled Access Roadway Design7.1 - Signing and Pavement Marking Plans           (FUTURE)6 – Traffic Engineering7 - Signalization13 – Planning15 – Landscape Architecture 
Professional Services
AgendaFirm Background Pre Qualifications Professional Staff
                     OrganizationGeorge Botner, AICP, RLAPlanningDwayne Darbonne, PEQuality ManagerFraser Howe, Jr, PEPD&E StudiesProject ManagerRichard Bobletz, PE EngineeringNader Moghadas, EIConcepts EngineerNathan Kreuser, EIProject EngineerKevin HamiltonGIS / DesignerRay Emmett, PhDEnvironmental Science
Dwayne Darbonne, PEPrincipal – Sr. Transportation EngineerBS Civil Engineering, LA Tech UniversityFES Leadership Institute GraduateJacobs Sr. Project Manager TrainingD1 Transp. Engineering ContractsDistrictwide Design I-4 / US 27 Interchange ReconstructionI-75 Peace River CrossingSR 84 Widening
Dwayne Darbonne, PEPrincipal – Sr. Transportation EngineerPD&E ProjectsAlton Road FlyoverNW 12th Ave BridgeNW 21st / NW 32 Ave BridgeControlled Access ProjectsEller Drive ICTFI-75 Peace River CrossingI-4 / US 27 InterchangeSR 826 (Palmetto Expwy.)I-595 Construction ManagementI-49 Urban SegmentGreater NO Bridge No. 2Westbank ExpresswayI-10 / LA 3188 InterchangeAlternative Transportation FacilitiesI-4 Pedestrian Bridge Gateway at Lake IvanhoeSouth Lake TrailOrmond Beach Sidewalks
Fraser Howe, Jr., PESr. Transportation  / PD&E EngineerBS Civil Engineering, Michigan State UniversityFES Leadership Institute GraduateJacobs Sr. Project Manager TrainingD1 Transp. Engineering ContractsDistrictwide Design I-4 / US 27 Interchange ReconstructionI-75 Peace River CrossingSR 84 Widening
Fraser Howe, Jr., PESr. Transportation / PD&E EngineerPD&E ProjectsAlton Road FlyoverNW 12th Ave BridgeNW 21st / NW 32 Ave BridgeControlled Access ProjectsEller Drive ICTFI-75 Peace River CrossingI-4 / US 27 InterchangeSR 826 (Palmetto Expwy.)I-595 Construction ManagementI-49 Urban SegmentGreater NO Bridge No. 2Westbank ExpresswayI-10 / LA 3188 InterchangeAlternative Transportation FacilitiesI-4 Pedestrian Bridge Gateway at Lake IvanhoeSouth Lake TrailOrmond Beach Sidewalks
George Botner, AICP, RLASr. Planner / Landscape ArchitectMA Landscape Architecture, Cornell UniversityBA Landscape Architecture, University of Florida20 National and State AwardsDowntown RedevelopmentStreet Network PlanningLand Use PlansStreetscapes / /GatewaysPark PlanningWalkability Master Plans
Planning ServicesPD&E StudiesPublic InvolvementToll Facility Planning Land PlanningPark PlanningStreetscapes / GatewaysDowntown Redevelopment
Richard Bobletz, PESr. Roadway / Stormwater EngineerBS Civil Engineering, University of FloridaJacobs Project Manager TrainingRoadway ExperiencePavement DesignRoadway DesignDrainage DesignTraffic Control DesignUtility Design / CoordinationStormwater PermittingRoadway Plan Development
Richard Bobletz, PESr. Roadway / Stormwater EngineerRoadway Minor ProjectsD5 Drainage DistrictwideStimulus Brevard / OsceolaMajor ProjectsI-4 Braided RampsSR 25  / US 27 WideningNorth Hancock RoadStormwater ProjectsI-75 PD&E StudyLittle Lake Howell Basin StudyBridge Hydraulics
Engineering ServicesMinor Roadway Complex Roadway Controlled Access  Trails / SidewalksDrainage DesignStormwater PermittingUtility CoordinationSigning and Pavement Markings
Raymond Emmett, Ph.D.Sr. Environmental ScientistBA, MA and PhD Botany, University of TexasNEPA, Section 4 (f), Ecological Surveys, PermittingTexas ExperienceCategorical Exclusions to Environmental Impact StatementsFlorida ExperienceNew Regional AirportDistrictwide Environmental ServicesSR 40 ( Ocala to Barberville )I-95 ( SR 50 to I-4 )I-4 ( Kennedy to Ivanhoe )
Environmental ServicesSocialCommunityHistorical ScreeningPhysicalNoise AssessmentsPhase I ContaminationNatural Wetland SurveysEnvironmental PermittingPublic InvolvementGIS Services
Firm / Professional StaffStrong Pre-QualificationsServices Under One RoofFDOT Experienced StaffCost Efficient Business Model

FDOT D1 Presentation

  • 1.
  • 2.
  • 3.
    Firm BackgroundEssential FirmIngredientsFounding Principal – Former Corporate VP\Incorporated in 2010Strong FDOT Pre-QualificationsCore Professional Services Under One RoofExperienced / Engaged Staff “Cost Efficient” Business Model
  • 4.
    Recognition / AccountabilityModelAchieve Client and Firm Expectations Productivity Retention Engagement
  • 5.
    Accountability /Quality ProcessLEVEL1 REVIEW LEVEL 2 REVIEW Quality ManagerPlanningPD&E StudiesConstructability EngineerEngineeringEnvironmental Science
  • 6.
    AgendaFirm Background PreQualifications Professional Staff
  • 7.
    Pre-Qualifications2.0 - PD&EStudies3.1 - Minor Roadway Design3.2 - Complex Roadway Design3.3 - Controlled Access Roadway Design7.1 - Signing and Pavement Marking Plans (FUTURE)6 – Traffic Engineering7 - Signalization13 – Planning15 – Landscape Architecture 
  • 8.
  • 9.
    AgendaFirm Background PreQualifications Professional Staff
  • 10.
    OrganizationGeorge Botner, AICP, RLAPlanningDwayne Darbonne, PEQuality ManagerFraser Howe, Jr, PEPD&E StudiesProject ManagerRichard Bobletz, PE EngineeringNader Moghadas, EIConcepts EngineerNathan Kreuser, EIProject EngineerKevin HamiltonGIS / DesignerRay Emmett, PhDEnvironmental Science
  • 11.
    Dwayne Darbonne, PEPrincipal– Sr. Transportation EngineerBS Civil Engineering, LA Tech UniversityFES Leadership Institute GraduateJacobs Sr. Project Manager TrainingD1 Transp. Engineering ContractsDistrictwide Design I-4 / US 27 Interchange ReconstructionI-75 Peace River CrossingSR 84 Widening
  • 12.
    Dwayne Darbonne, PEPrincipal– Sr. Transportation EngineerPD&E ProjectsAlton Road FlyoverNW 12th Ave BridgeNW 21st / NW 32 Ave BridgeControlled Access ProjectsEller Drive ICTFI-75 Peace River CrossingI-4 / US 27 InterchangeSR 826 (Palmetto Expwy.)I-595 Construction ManagementI-49 Urban SegmentGreater NO Bridge No. 2Westbank ExpresswayI-10 / LA 3188 InterchangeAlternative Transportation FacilitiesI-4 Pedestrian Bridge Gateway at Lake IvanhoeSouth Lake TrailOrmond Beach Sidewalks
  • 13.
    Fraser Howe, Jr.,PESr. Transportation / PD&E EngineerBS Civil Engineering, Michigan State UniversityFES Leadership Institute GraduateJacobs Sr. Project Manager TrainingD1 Transp. Engineering ContractsDistrictwide Design I-4 / US 27 Interchange ReconstructionI-75 Peace River CrossingSR 84 Widening
  • 14.
    Fraser Howe, Jr.,PESr. Transportation / PD&E EngineerPD&E ProjectsAlton Road FlyoverNW 12th Ave BridgeNW 21st / NW 32 Ave BridgeControlled Access ProjectsEller Drive ICTFI-75 Peace River CrossingI-4 / US 27 InterchangeSR 826 (Palmetto Expwy.)I-595 Construction ManagementI-49 Urban SegmentGreater NO Bridge No. 2Westbank ExpresswayI-10 / LA 3188 InterchangeAlternative Transportation FacilitiesI-4 Pedestrian Bridge Gateway at Lake IvanhoeSouth Lake TrailOrmond Beach Sidewalks
  • 15.
    George Botner, AICP,RLASr. Planner / Landscape ArchitectMA Landscape Architecture, Cornell UniversityBA Landscape Architecture, University of Florida20 National and State AwardsDowntown RedevelopmentStreet Network PlanningLand Use PlansStreetscapes / /GatewaysPark PlanningWalkability Master Plans
  • 16.
    Planning ServicesPD&E StudiesPublicInvolvementToll Facility Planning Land PlanningPark PlanningStreetscapes / GatewaysDowntown Redevelopment
  • 17.
    Richard Bobletz, PESr.Roadway / Stormwater EngineerBS Civil Engineering, University of FloridaJacobs Project Manager TrainingRoadway ExperiencePavement DesignRoadway DesignDrainage DesignTraffic Control DesignUtility Design / CoordinationStormwater PermittingRoadway Plan Development
  • 18.
    Richard Bobletz, PESr.Roadway / Stormwater EngineerRoadway Minor ProjectsD5 Drainage DistrictwideStimulus Brevard / OsceolaMajor ProjectsI-4 Braided RampsSR 25 / US 27 WideningNorth Hancock RoadStormwater ProjectsI-75 PD&E StudyLittle Lake Howell Basin StudyBridge Hydraulics
  • 19.
    Engineering ServicesMinor RoadwayComplex Roadway Controlled Access Trails / SidewalksDrainage DesignStormwater PermittingUtility CoordinationSigning and Pavement Markings
  • 20.
    Raymond Emmett, Ph.D.Sr.Environmental ScientistBA, MA and PhD Botany, University of TexasNEPA, Section 4 (f), Ecological Surveys, PermittingTexas ExperienceCategorical Exclusions to Environmental Impact StatementsFlorida ExperienceNew Regional AirportDistrictwide Environmental ServicesSR 40 ( Ocala to Barberville )I-95 ( SR 50 to I-4 )I-4 ( Kennedy to Ivanhoe )
  • 21.
    Environmental ServicesSocialCommunityHistorical ScreeningPhysicalNoiseAssessmentsPhase I ContaminationNatural Wetland SurveysEnvironmental PermittingPublic InvolvementGIS Services
  • 22.
    Firm / ProfessionalStaffStrong Pre-QualificationsServices Under One RoofFDOT Experienced StaffCost Efficient Business Model