Statement of Purpose Sustaining and improving the quality of people’s lives Halcrow specializes in the provision of professional planning, design and management services for infrastructure development and the built environment worldwide.
About Halcrow Established in 1868 Owned by a trust (70%) and its staff (30%) – no external shareholders 2008 revenue -  $740 million  8,000  staff worldwide Committed to North American expansion
Our Global Reach New York Washington DC Jacksonville Tampa Atlanta Long Beach Oakland Las Vegas Vancouver Calgary Chicago Austin Houston Norfolk Baton Rouge Cayman Is. W. Palm Beach Dallas Cape Canaveral Boston Toronto
Disciplines And Markets Served Areas of  Expertise : Markets : Transport planning Structural engineering Risk analysis Restructuring / privatization PFI/PPP Asset management Planning and strategy Process design Mechanical / electrical engineering Hydrology / hydraulics Geology Facilities management  Environmental science Economics Due diligence Design and build Coastal engineering Program & construction management Civil engineering Business analysis Water supply & wastewater Water resources & flood  defenses Tunnels Railways and transit Property development Ports and terminals Oil and gas Office Buildings Nuclear Hydropower and dams Highways and bridges Entertainment Education and Healthcare Defense Airports
Our Clients Halcrow  provides consulting services to a full spectrum of private and public sector  clients across the industrial, commercial and consumer fields: Regulators Property owners Project consortia Government entities Infrastructure operators Funding agencies Financial institutions Developers Contractors Architects
Business Structure Consulting Property Transportation Water Maritime Group Board Regions Business Groups UK Europe & C. Asia Middle East North America Latin America South Asia Asia Pacific
Water and Power Project management Geographical Information Systems (GIS) analysis and software support.  Terrestrial laser scanning Bathymetry Traditional survey Land and topographical mapping Hydrography High precision deformation geotechnical surveys Aerial photography Photogrammetry Global Positioning System (GPS) design River and watershed modeling Dam design and safety Hydraulic & hydrologic analysis Gates and weirs  Hard and soft bank protection Software development Water resource master plans  Strategic flood risk management and mapping Demand management  Drought contingency planning  Flood warning  Flood management policy Irrigation and drainage Feasibility studies Detailed design Monitoring and evaluation Management of R&D Market & feasibility studies Design Supervision of installation Onshore wind power  Offshore wind power  Photovoltaics Solar thermal power  Biomass / Combined Heat  and Power (CHP)  Wave and tidal power Hydropower  Strategic planning  Treatment process and detailed design Performance appraisals Construction supervision Wastewater collection and transmission Urban stormwater drainage Effluent disposal & re-use Sludge treatment & disposal Feasibility planning Design & procurement  Distribution network  optimization  Pipeline design  Network modeling  Leakage management  Pressure management  Treatment process design Desalination  Capital management  Strategic planning  Operational audits Value engineering  Expert witness  Due diligence  Wastewater and  Solid Waste Water Supply Water Management  Planning Geomatics Renewable Energy
Water:   Water Supply London Leakage Reduction UK Atlanta Water Distribution  Network Modeling, USA Gwinnett County Planning for System Modifications, USA
Water:  Waste Water/Solid Waste Sharjah Sewage Treatment Works  UAE Water & Sewerage Rehabilitation Venezuela Georgia  Sewer Modeling Gap Analysis USA
Water:   Water Management Planning Flood Management Planning England/Wales  Buenos Aires Storm Drainage Master Plan Argentina Southwest Florida Watershed Management Planning,  USA
Water:  Geomatics Toronto’s Union Station Laser Scanning, Canada New York Utility Management GIS, USA Baltimore LNG Terminal Risk Assessment, USA
Water:  Renewable Energy Wave Hub - Offshore Grid Connection, UK Bridgwater Bay Wet Renewables, UK Platinovryssi Hydroelectric Project, Greece
Transportation Airports funding, privatization and acquisition Policy, strategy, economics and restructuring airport project management Airport and aviation planning Airfield engineering Passenger terminals, airport buildings and hangars Environmental impact assessment Bridge design Bridge construction  Bridge operation Bridge refurbishment Experience with: cable-stayed bridges suspension bridges multi-span viaducts swing bridges arch bridges  footbridges small and medium highway structures Conceptual, preliminary, tender & detailed design Feasibility studies, project planning and cost studies Construction techniques & methodology Construction supervision Project & construction management Contract documentation & procurement Settlement analysis & building damage assessment Tunnel ventilation, fire & life safety Tunnel rehabilitation Project identification  Feasibility studies  Preliminary & detailed design Contract preparation  Pavement engineering  Construction supervision Highway maintenance strategy and procurement options  Organizational change & institutional restructuring  Privately financed highway operation & maintenance services  Development of highway management practices  Highway technical and financial audits Technical and engineering development  Project management Traction and rolling stock engineering Heavy rail infrastructure urban rail systems/infrastructure Risk assessment and control  Rail safety Development of independent financing Rail service delivery and retail Access, contracts and regulation Due diligence Restructuring and commercialization Airports Tunnels Rail Bridges Highways
Transportation:  Airports Incheon Airport Masterplan South Korea  Athens International Airport Greece GAMCO A380 hangar Abu Dhabi, UAE
Transportation:  Tunnels Channel Tunnel Rail Link UK Wadi Muddiq Road Tunnel UAE Black Hill Tunnels  Hong Kong
Transportation:  Railways & Transit Putra LRT Malaysia Vancouver International Airport Canada New Southern Railway Airport Link Australia
Transportation:  Bridges Incheon Bridge South Korea ø resund Crossing Denmark/Sweden Prins Claus Bridge Netherlands
Transportation:  Highways Attiki Odos Highway Greece Chicago Skyway USA I-35 Expansion (TxDOT) USA
Property Corporate Headquarters Office Towers Suburban Office Parks Corporate Interiors Free Standing / Integrated Facilities Precast Structures Cast in Place Structures Maintenance /  Durability Consultation High Rise Apartments / Condos Student Residences Custom Homes Hotels Conference /  Convention Facilities Resorts / Spas Casinos Education Facilities Museums / Galleries Government Buildings Libraries Historical Structures Hospitals Rehabilitation Centers Ambulatory Care Facilities  Long-Term Care Facilities Research Facilities Performing Arts Centers Opera Houses Concert Halls Cinemas Restaurants Shopping Centers Convention Centers Community Centers  Sport Stadiums / Arenas Athletic Facilities Commercial Parking Hospitality/ Residential Healthcare/ Institutional  Sports/Retail/ Entertainment Transportation Airport Terminals Subway Stations
Property:  Commercial Manitoba Hydro Headquarters Canada Battery Park City, Site 26 USA New York World Financial Center USA
Property:  Hospitality/Residential 1 King Street West in Toronto Canada The Shore Club Condominiums in New Jersey USA Trump International in Toronto Canada
Property:  Healthcare/Institutional Canadian Chancery in Washington DC USA Southlake Regional Health Center Redevelopment, Canada University of Toronto, Leslie Dan  Pharmacy Building, Canada
Property:  Transportation Winnipeg International Airport Canada Toronto Pearson International Airport, Canada Toronto Transit Commission,  Leslie Street Station, Canada
Property:  Parking Niagara Fallsview Casino Resort Parking Canada Trillium Health Care Parking Canada  Yorkdale Shopping Center Parking Garage, Canada
Property:  Sports/Retail/Entertainment Air Canada Center in Toronto Canada New York Knicks / Liberty / Rangers Training Center, USA Four Seasons Center for Performing Arts in Toronto  Canada
Maritime Numerical and physical modeling  Monitoring and data acquisition Bathymetric surveys Beach profiling and topographic surveying  Coastal structures design Shoreline management  Dredging & reclamation Estuaries  LNG terminals LPG terminals Petrochemical  Offshore mooring  Dry-bulk Due diligence  Site selection Container terminals Wharf and pier design Paving Power distribution Port planning Operational simulation Above and underwater inspection and rehabilitation  Work performed by professional engineer-divers Condition assessment for every type of underwater structure Preparation of survey reports Rehabilitation design Waterfront development Interaction with landscape architects Port security assessments and training programs  Project security management  Dealing with multilateral & unilateral institutions Public process Cross-sector work Shipyard design Seismic design Utilities Wharf & ramp design Port master planning Navigation Containers Inspection & Rehabilitation Energy Coastal Engineering Shipyards & Ferries Government & Port Services
Maritime:  Containers Salalah Container Terminal Oman Freeport Container Terminal Bahamas Elizabeth Terminal Expansion USA
Maritime:  Inspection & Rehabilitation Above-water and underwater inspection, condition assessment, repair,  worldwide
Maritime:  Energy DeKastri Marine Oil Terminal Russia Refinery Tanker Berth USA LNG Import Terminal USA
Maritime:  Coastal Engineering LNG Terminal Bahamas Al Ashkharah Fishery Harbor Oman Numerical Modeling
Maritime:  Shipyards & Ferries Abu Dhabi Shipbuilding Expansion, UAE Dublin Ro-Ro Berth  Ireland Commuter Ferry Landing USA
Maritime:  Government & Port Services Public Access Recreation Piers  USA Earle Military Pier and Trestle USA Jaxport Maritime Security Services USA
Consulting Transportation Planning Urban Planning  & Design Economics & Business Solutions Environmental Environmental communication Environmental planning/EIA Green transport plans Hydrogeology and contaminated lands Industry and pollution control Landscape architecture Natural resources and ecology Planning and construction advice Strategic and environmental assessment Sustainable development Waste management services Project, design and value management  Contractual and risk transfer solutions  Partnering and stakeholder facilitation  Safety management  Best practice operational and business process development  Project feasibility assessment, evaluation and modelling  Stakeholder and risk mitigation strategies  Public-private partnerships (PPP)  Institutional transformation, transfer of ownership into the private sector  Establishing and operating transportation and utilities concessions  Infrastructure development, capacity and systems studies Audit & operational improvement  Financial and technical due diligence and value appraisals  Tailored expert appraisals  Strategic public policy advice, spanning transport, land-use and the environment Local transport policy advice, including local transport plans, major scheme bids, accessibility planning and public consultation  Demand forecasting and appraisal, including variable demand modelling, highway and public transport modelling, economic appraisal  Development planning, transport assessments & traffic management  Public transport operations  Smarter choices and travel planning  Intelligent transport solutions  Traffic engineering and design Environmental communication Master planning  Urban renewal Regeneration Capacity studies Townscape analysis Traffic & pedestrians Conservation studies  Development guidelines Planning for low-income groups Social planning and research Mass transit planning and operations  Leisure and tourism studies Commercial development studies
Consulting:   Transportation Planning Transport Emission Study Canada Signaling Improvements at New York Grand Central Terminal, USA Chicago Skyway USA
Consulting:   Urban Planning & Design Vision42 Construction Phasing, USA Dubai Internet City, UAE  Saadiyat Island Master Plan, UAE
Consulting:   Economics & Business Solutions The Trans-Texas Corridor System, USA Argyll & Bute Council Waste Management PPP Advisor, UK M3 Clonee to North of Kells PPP Scheme Ireland
Consulting:   Environmental Highland Sewerage Planning UK Proactive Use of Environmental Data Feasibility Study, UK Newhaven Desalination Plant Location Study, UK
Benefits of Working With Us Internationally recognized leader Local solutions using global expertise Environmentally responsible, cost effective, and timely solutions Diversity of staff and large resource base provide a single source for your planning, design, and management needs Desire to develop and maintain long-term relationships If it doesn’t add value, we don’t do it Listening is our first priority
Thank you for your time! Halcrow.com

Halcrow Qualifications

  • 1.
    Statement of PurposeSustaining and improving the quality of people’s lives Halcrow specializes in the provision of professional planning, design and management services for infrastructure development and the built environment worldwide.
  • 2.
    About Halcrow Establishedin 1868 Owned by a trust (70%) and its staff (30%) – no external shareholders 2008 revenue - $740 million 8,000 staff worldwide Committed to North American expansion
  • 3.
    Our Global ReachNew York Washington DC Jacksonville Tampa Atlanta Long Beach Oakland Las Vegas Vancouver Calgary Chicago Austin Houston Norfolk Baton Rouge Cayman Is. W. Palm Beach Dallas Cape Canaveral Boston Toronto
  • 4.
    Disciplines And MarketsServed Areas of Expertise : Markets : Transport planning Structural engineering Risk analysis Restructuring / privatization PFI/PPP Asset management Planning and strategy Process design Mechanical / electrical engineering Hydrology / hydraulics Geology Facilities management Environmental science Economics Due diligence Design and build Coastal engineering Program & construction management Civil engineering Business analysis Water supply & wastewater Water resources & flood defenses Tunnels Railways and transit Property development Ports and terminals Oil and gas Office Buildings Nuclear Hydropower and dams Highways and bridges Entertainment Education and Healthcare Defense Airports
  • 5.
    Our Clients Halcrow provides consulting services to a full spectrum of private and public sector clients across the industrial, commercial and consumer fields: Regulators Property owners Project consortia Government entities Infrastructure operators Funding agencies Financial institutions Developers Contractors Architects
  • 6.
    Business Structure ConsultingProperty Transportation Water Maritime Group Board Regions Business Groups UK Europe & C. Asia Middle East North America Latin America South Asia Asia Pacific
  • 7.
    Water and PowerProject management Geographical Information Systems (GIS) analysis and software support. Terrestrial laser scanning Bathymetry Traditional survey Land and topographical mapping Hydrography High precision deformation geotechnical surveys Aerial photography Photogrammetry Global Positioning System (GPS) design River and watershed modeling Dam design and safety Hydraulic & hydrologic analysis Gates and weirs Hard and soft bank protection Software development Water resource master plans Strategic flood risk management and mapping Demand management Drought contingency planning Flood warning Flood management policy Irrigation and drainage Feasibility studies Detailed design Monitoring and evaluation Management of R&D Market & feasibility studies Design Supervision of installation Onshore wind power Offshore wind power Photovoltaics Solar thermal power Biomass / Combined Heat and Power (CHP) Wave and tidal power Hydropower Strategic planning Treatment process and detailed design Performance appraisals Construction supervision Wastewater collection and transmission Urban stormwater drainage Effluent disposal & re-use Sludge treatment & disposal Feasibility planning Design & procurement Distribution network optimization Pipeline design Network modeling Leakage management Pressure management Treatment process design Desalination Capital management Strategic planning Operational audits Value engineering Expert witness Due diligence Wastewater and Solid Waste Water Supply Water Management Planning Geomatics Renewable Energy
  • 8.
    Water: Water Supply London Leakage Reduction UK Atlanta Water Distribution Network Modeling, USA Gwinnett County Planning for System Modifications, USA
  • 9.
    Water: WasteWater/Solid Waste Sharjah Sewage Treatment Works UAE Water & Sewerage Rehabilitation Venezuela Georgia Sewer Modeling Gap Analysis USA
  • 10.
    Water: Water Management Planning Flood Management Planning England/Wales Buenos Aires Storm Drainage Master Plan Argentina Southwest Florida Watershed Management Planning, USA
  • 11.
    Water: GeomaticsToronto’s Union Station Laser Scanning, Canada New York Utility Management GIS, USA Baltimore LNG Terminal Risk Assessment, USA
  • 12.
    Water: RenewableEnergy Wave Hub - Offshore Grid Connection, UK Bridgwater Bay Wet Renewables, UK Platinovryssi Hydroelectric Project, Greece
  • 13.
    Transportation Airports funding,privatization and acquisition Policy, strategy, economics and restructuring airport project management Airport and aviation planning Airfield engineering Passenger terminals, airport buildings and hangars Environmental impact assessment Bridge design Bridge construction Bridge operation Bridge refurbishment Experience with: cable-stayed bridges suspension bridges multi-span viaducts swing bridges arch bridges footbridges small and medium highway structures Conceptual, preliminary, tender & detailed design Feasibility studies, project planning and cost studies Construction techniques & methodology Construction supervision Project & construction management Contract documentation & procurement Settlement analysis & building damage assessment Tunnel ventilation, fire & life safety Tunnel rehabilitation Project identification Feasibility studies Preliminary & detailed design Contract preparation Pavement engineering Construction supervision Highway maintenance strategy and procurement options Organizational change & institutional restructuring Privately financed highway operation & maintenance services Development of highway management practices Highway technical and financial audits Technical and engineering development Project management Traction and rolling stock engineering Heavy rail infrastructure urban rail systems/infrastructure Risk assessment and control Rail safety Development of independent financing Rail service delivery and retail Access, contracts and regulation Due diligence Restructuring and commercialization Airports Tunnels Rail Bridges Highways
  • 14.
    Transportation: AirportsIncheon Airport Masterplan South Korea Athens International Airport Greece GAMCO A380 hangar Abu Dhabi, UAE
  • 15.
    Transportation: TunnelsChannel Tunnel Rail Link UK Wadi Muddiq Road Tunnel UAE Black Hill Tunnels Hong Kong
  • 16.
    Transportation: Railways& Transit Putra LRT Malaysia Vancouver International Airport Canada New Southern Railway Airport Link Australia
  • 17.
    Transportation: BridgesIncheon Bridge South Korea ø resund Crossing Denmark/Sweden Prins Claus Bridge Netherlands
  • 18.
    Transportation: HighwaysAttiki Odos Highway Greece Chicago Skyway USA I-35 Expansion (TxDOT) USA
  • 19.
    Property Corporate HeadquartersOffice Towers Suburban Office Parks Corporate Interiors Free Standing / Integrated Facilities Precast Structures Cast in Place Structures Maintenance / Durability Consultation High Rise Apartments / Condos Student Residences Custom Homes Hotels Conference / Convention Facilities Resorts / Spas Casinos Education Facilities Museums / Galleries Government Buildings Libraries Historical Structures Hospitals Rehabilitation Centers Ambulatory Care Facilities Long-Term Care Facilities Research Facilities Performing Arts Centers Opera Houses Concert Halls Cinemas Restaurants Shopping Centers Convention Centers Community Centers Sport Stadiums / Arenas Athletic Facilities Commercial Parking Hospitality/ Residential Healthcare/ Institutional Sports/Retail/ Entertainment Transportation Airport Terminals Subway Stations
  • 20.
    Property: CommercialManitoba Hydro Headquarters Canada Battery Park City, Site 26 USA New York World Financial Center USA
  • 21.
    Property: Hospitality/Residential1 King Street West in Toronto Canada The Shore Club Condominiums in New Jersey USA Trump International in Toronto Canada
  • 22.
    Property: Healthcare/InstitutionalCanadian Chancery in Washington DC USA Southlake Regional Health Center Redevelopment, Canada University of Toronto, Leslie Dan Pharmacy Building, Canada
  • 23.
    Property: TransportationWinnipeg International Airport Canada Toronto Pearson International Airport, Canada Toronto Transit Commission, Leslie Street Station, Canada
  • 24.
    Property: ParkingNiagara Fallsview Casino Resort Parking Canada Trillium Health Care Parking Canada Yorkdale Shopping Center Parking Garage, Canada
  • 25.
    Property: Sports/Retail/EntertainmentAir Canada Center in Toronto Canada New York Knicks / Liberty / Rangers Training Center, USA Four Seasons Center for Performing Arts in Toronto Canada
  • 26.
    Maritime Numerical andphysical modeling Monitoring and data acquisition Bathymetric surveys Beach profiling and topographic surveying Coastal structures design Shoreline management Dredging & reclamation Estuaries LNG terminals LPG terminals Petrochemical Offshore mooring Dry-bulk Due diligence Site selection Container terminals Wharf and pier design Paving Power distribution Port planning Operational simulation Above and underwater inspection and rehabilitation Work performed by professional engineer-divers Condition assessment for every type of underwater structure Preparation of survey reports Rehabilitation design Waterfront development Interaction with landscape architects Port security assessments and training programs Project security management Dealing with multilateral & unilateral institutions Public process Cross-sector work Shipyard design Seismic design Utilities Wharf & ramp design Port master planning Navigation Containers Inspection & Rehabilitation Energy Coastal Engineering Shipyards & Ferries Government & Port Services
  • 27.
    Maritime: ContainersSalalah Container Terminal Oman Freeport Container Terminal Bahamas Elizabeth Terminal Expansion USA
  • 28.
    Maritime: Inspection& Rehabilitation Above-water and underwater inspection, condition assessment, repair, worldwide
  • 29.
    Maritime: EnergyDeKastri Marine Oil Terminal Russia Refinery Tanker Berth USA LNG Import Terminal USA
  • 30.
    Maritime: CoastalEngineering LNG Terminal Bahamas Al Ashkharah Fishery Harbor Oman Numerical Modeling
  • 31.
    Maritime: Shipyards& Ferries Abu Dhabi Shipbuilding Expansion, UAE Dublin Ro-Ro Berth Ireland Commuter Ferry Landing USA
  • 32.
    Maritime: Government& Port Services Public Access Recreation Piers USA Earle Military Pier and Trestle USA Jaxport Maritime Security Services USA
  • 33.
    Consulting Transportation PlanningUrban Planning & Design Economics & Business Solutions Environmental Environmental communication Environmental planning/EIA Green transport plans Hydrogeology and contaminated lands Industry and pollution control Landscape architecture Natural resources and ecology Planning and construction advice Strategic and environmental assessment Sustainable development Waste management services Project, design and value management Contractual and risk transfer solutions Partnering and stakeholder facilitation Safety management Best practice operational and business process development Project feasibility assessment, evaluation and modelling Stakeholder and risk mitigation strategies Public-private partnerships (PPP) Institutional transformation, transfer of ownership into the private sector Establishing and operating transportation and utilities concessions Infrastructure development, capacity and systems studies Audit & operational improvement Financial and technical due diligence and value appraisals Tailored expert appraisals Strategic public policy advice, spanning transport, land-use and the environment Local transport policy advice, including local transport plans, major scheme bids, accessibility planning and public consultation Demand forecasting and appraisal, including variable demand modelling, highway and public transport modelling, economic appraisal Development planning, transport assessments & traffic management Public transport operations Smarter choices and travel planning Intelligent transport solutions Traffic engineering and design Environmental communication Master planning Urban renewal Regeneration Capacity studies Townscape analysis Traffic & pedestrians Conservation studies Development guidelines Planning for low-income groups Social planning and research Mass transit planning and operations Leisure and tourism studies Commercial development studies
  • 34.
    Consulting: Transportation Planning Transport Emission Study Canada Signaling Improvements at New York Grand Central Terminal, USA Chicago Skyway USA
  • 35.
    Consulting: Urban Planning & Design Vision42 Construction Phasing, USA Dubai Internet City, UAE Saadiyat Island Master Plan, UAE
  • 36.
    Consulting: Economics & Business Solutions The Trans-Texas Corridor System, USA Argyll & Bute Council Waste Management PPP Advisor, UK M3 Clonee to North of Kells PPP Scheme Ireland
  • 37.
    Consulting: Environmental Highland Sewerage Planning UK Proactive Use of Environmental Data Feasibility Study, UK Newhaven Desalination Plant Location Study, UK
  • 38.
    Benefits of WorkingWith Us Internationally recognized leader Local solutions using global expertise Environmentally responsible, cost effective, and timely solutions Diversity of staff and large resource base provide a single source for your planning, design, and management needs Desire to develop and maintain long-term relationships If it doesn’t add value, we don’t do it Listening is our first priority
  • 39.
    Thank you foryour time! Halcrow.com