Claas xerion 3800 and 3300 tractor parts catalogue manual (sn 78100110 78199999)dujfjjksekmmd
This document provides a parts list and descriptions for fuel system components for Xerion 3800/3300 machines, including:
1. A fuel tank assembly with level indicator, lockable cap, filter, mounting hardware, and sealing rings.
2. A fuel delivery pump with fuel pump, gaskets, mounting plate, fittings and hardware.
3. Fuel pipes connecting the tank, filter, pump, and other components, with clamps, bearings, and a limitation valve.
Claas xerion 3800 and 3300 tractor parts catalogue manual (sn e5209011 e5209999)dujfjjksekmmd
This document provides a parts list and descriptions for fuel system components for Xerion 3800/3300 machines, including:
1. A fuel tank assembly with level indicator, lockable cap, filter, mounting hardware, and sealing components.
2. A fuel delivery pump with mounting hardware and gaskets.
3. Fuel pipes connecting the tank, filter, pump, and other components, with clamps, bearings, and a limitation valve.
CASE 721F TIER 4 WHEEL LOADER Service Repair Manualjksemd dysjekmdm
This is the Highly Detailed factory service repair manual for theCASE 721F TIER 4 WHEEL LOADER, this Service Manual has detailed illustrations as well as step by step instructions,It is 100 percents complete and intact. they are specifically written for the do-it-yourself-er as well as the experienced mechanic.CASE 721F TIER 4 WHEEL LOADER Service Repair Workshop Manual provides step-by-step instructions based on the complete dis-assembly of the machine. It is this level of detail, along with hundreds of photos and illustrations, that guide the reader through each service and repair procedure. Complete download comes in pdf format which can work under all PC based windows operating system and Mac also, All pages are printable. Using this repair manual is an inexpensive way to keep your vehicle working properly.
Service Repair Manual Covers:
Introduction
Engine
Transmission
Four-Wheel Drive (4WD) System
Front Axle System
Rear Axle System
Brakes and Controls
Hydraulic Systems
Steering
Wheels
Cab Climate Control
Electrical System
Platform, Cab, Bodywork, and Decals
Special Tool Index
Electrical Schematic
Hydraulic Schematic – 621F
Hydraulic Schematic – 721F
File Format: PDF
Compatible: All Versions of Windows & Mac
Language: English
Requirements: Adobe PDF Reader
NO waiting, Buy from responsible seller and get INSTANT DOWNLOAD, Without wasting your hard-owned money on uncertainty or surprise! All pages are is great to haveCASE 721F TIER 4 WHEEL LOADER Service Repair Workshop Manual.
Looking for some other Service Repair Manual,please check:
https://www.aservicemanualpdf.com/
Thanks for visiting!
This document provides specifications for a motorcycle including:
- Dimensions, weight, engine specifications, lubrication system details, carburetor information, ignition system, battery, and charging system specifications.
- Maintenance specifications including engine oil capacities, recommended lubricants, valve and cam specifications, cylinder and piston details, crankshaft and connecting rod specifications, clutch and transmission specifications.
- Torque specifications for engine, transmission, and chassis components.
New holland w170 c wheel loader service repair manualufjjdkksmeme
This section provides instructions for removing and installing the engine and radiator on a W170C Wheel Loader. The engine removal process involves disconnecting battery cables, draining fluids, removing mounted components, and using an overhead hoist to lift the engine from the machine. Installation is largely the reverse process. Radiator removal involves draining coolant and removing mounting hardware, while installation reconnects hoses and mounts the radiator back in place.
The document provides instructions for inspecting and repairing a starter system. It describes removing and disassembling a conventional starter and a reduction starter. It includes checking components like the armature, commutator, brushes, springs, and gears for faults. Tests are outlined to check the magnetic switch and starter performance. Reassembly and installation procedures are also provided.
Case ck25 crawler excavator service repair manualfsjefjskekmm
The document provides instructions for removing and installing the engine on CK25-CK28 Crawler Excavators. It outlines 7 steps, including disconnecting the battery, removing the cab/canopy, hydraulic oil reservoir, draining coolant, and removing hood mounting bolts. Reinstallation follows the removal steps in reverse order.
This document provides instructions for servicing a manual transaxle. It describes removing old packing material from sealing surfaces and cleaning components. It also outlines the transaxle types, gear engagements, preparation steps like using special service tools, and removal and installation of the transaxle and various components. Troubleshooting tips are provided in a table listing potential issues and likely causes.
Claas xerion 3800 and 3300 tractor parts catalogue manual (sn 78100110 78199999)dujfjjksekmmd
This document provides a parts list and descriptions for fuel system components for Xerion 3800/3300 machines, including:
1. A fuel tank assembly with level indicator, lockable cap, filter, mounting hardware, and sealing rings.
2. A fuel delivery pump with fuel pump, gaskets, mounting plate, fittings and hardware.
3. Fuel pipes connecting the tank, filter, pump, and other components, with clamps, bearings, and a limitation valve.
Claas xerion 3800 and 3300 tractor parts catalogue manual (sn e5209011 e5209999)dujfjjksekmmd
This document provides a parts list and descriptions for fuel system components for Xerion 3800/3300 machines, including:
1. A fuel tank assembly with level indicator, lockable cap, filter, mounting hardware, and sealing components.
2. A fuel delivery pump with mounting hardware and gaskets.
3. Fuel pipes connecting the tank, filter, pump, and other components, with clamps, bearings, and a limitation valve.
CASE 721F TIER 4 WHEEL LOADER Service Repair Manualjksemd dysjekmdm
This is the Highly Detailed factory service repair manual for theCASE 721F TIER 4 WHEEL LOADER, this Service Manual has detailed illustrations as well as step by step instructions,It is 100 percents complete and intact. they are specifically written for the do-it-yourself-er as well as the experienced mechanic.CASE 721F TIER 4 WHEEL LOADER Service Repair Workshop Manual provides step-by-step instructions based on the complete dis-assembly of the machine. It is this level of detail, along with hundreds of photos and illustrations, that guide the reader through each service and repair procedure. Complete download comes in pdf format which can work under all PC based windows operating system and Mac also, All pages are printable. Using this repair manual is an inexpensive way to keep your vehicle working properly.
Service Repair Manual Covers:
Introduction
Engine
Transmission
Four-Wheel Drive (4WD) System
Front Axle System
Rear Axle System
Brakes and Controls
Hydraulic Systems
Steering
Wheels
Cab Climate Control
Electrical System
Platform, Cab, Bodywork, and Decals
Special Tool Index
Electrical Schematic
Hydraulic Schematic – 621F
Hydraulic Schematic – 721F
File Format: PDF
Compatible: All Versions of Windows & Mac
Language: English
Requirements: Adobe PDF Reader
NO waiting, Buy from responsible seller and get INSTANT DOWNLOAD, Without wasting your hard-owned money on uncertainty or surprise! All pages are is great to haveCASE 721F TIER 4 WHEEL LOADER Service Repair Workshop Manual.
Looking for some other Service Repair Manual,please check:
https://www.aservicemanualpdf.com/
Thanks for visiting!
This document provides specifications for a motorcycle including:
- Dimensions, weight, engine specifications, lubrication system details, carburetor information, ignition system, battery, and charging system specifications.
- Maintenance specifications including engine oil capacities, recommended lubricants, valve and cam specifications, cylinder and piston details, crankshaft and connecting rod specifications, clutch and transmission specifications.
- Torque specifications for engine, transmission, and chassis components.
New holland w170 c wheel loader service repair manualufjjdkksmeme
This section provides instructions for removing and installing the engine and radiator on a W170C Wheel Loader. The engine removal process involves disconnecting battery cables, draining fluids, removing mounted components, and using an overhead hoist to lift the engine from the machine. Installation is largely the reverse process. Radiator removal involves draining coolant and removing mounting hardware, while installation reconnects hoses and mounts the radiator back in place.
The document provides instructions for inspecting and repairing a starter system. It describes removing and disassembling a conventional starter and a reduction starter. It includes checking components like the armature, commutator, brushes, springs, and gears for faults. Tests are outlined to check the magnetic switch and starter performance. Reassembly and installation procedures are also provided.
Case ck25 crawler excavator service repair manualfsjefjskekmm
The document provides instructions for removing and installing the engine on CK25-CK28 Crawler Excavators. It outlines 7 steps, including disconnecting the battery, removing the cab/canopy, hydraulic oil reservoir, draining coolant, and removing hood mounting bolts. Reinstallation follows the removal steps in reverse order.
This document provides instructions for servicing a manual transaxle. It describes removing old packing material from sealing surfaces and cleaning components. It also outlines the transaxle types, gear engagements, preparation steps like using special service tools, and removal and installation of the transaxle and various components. Troubleshooting tips are provided in a table listing potential issues and likely causes.
New holland w190 c wheel loader service repair manualujdjjkkskmme
This section of the service manual provides instructions for removing and installing the engine and radiator on a W190C Wheel Loader. The engine removal process involves disconnecting battery cables, draining fluids, removing mounting brackets and hoses. Engine installation is the reverse of removal. Radiator removal involves draining coolant and removing mounting brackets, and installation is the reverse of removal.
The document provides instructions for troubleshooting and repairing steering issues. It describes how to check for issues with various steering system components like the steering column, steering gear housing, and tie rod ends. The steps include how to disassemble, inspect, and replace parts as needed. Proper tooling is listed to facilitate repairs. Care must be taken when working on steering components as it affects vehicle handling.
Caterpillar cat 140 g motor grader (prefix 72v) service repair manual (72v000...fusefjskekkmem
The document provides instructions for disassembling and assembling a transmission for a 140G motor grader. The key steps include:
1) Removing the transmission by draining fluids, disconnecting lines and hoses, and lifting it out of the machine.
2) Disassembling the transmission further by removing covers, links, plates and sleeves to access the internal components.
3) Reassembling the transmission involves installing components in reverse order and refilling fluids. Precise torques and clearances are specified.
Caterpillar cat 345 d l excavator (prefix mlk) service repair manual (mlk0000...hhfjksekmm
This document provides instructions for installing a travel motor. It outlines 33 steps for assembling components like seals, pistons, plates, and valves. Measurements are checked at several points to ensure proper assembly. The motor is filled with oil after installation to prevent damage during operation.
This document provides specifications and dimensions for "NEF" diesel engines, including 3 and 4 cylinder models. It describes the engine systems such as lubrication, cooling, turbocharging, and dimensions of components. The lubrication system uses a lobe oil pump to circulate oil through the crankshaft, camshaft, cylinder head and oil cooler. The cooling system has a radiator, visco-static fan, water pump, thermostat and oil cooler. Turbocharged models include an air filter and exhaust-driven turbocharger. Detailed dimensions are provided for build clearances, engine block components, cylinder head and valves. Torque specifications are also listed.
John deere 6200 l tractors service repair technical manual (tm4523)ufjjdjkkskemmd
The document provides instructions for assembling and repairing the creeper transmission for tm4523 tractors. It details installing components like connecting rings, snap rings, gears, bearings, and shift collars. Specifications are provided for measurements and torque values. The final section covers general repair procedures for the range transmission, emphasizing cleanliness and care when handling precision machined parts.
The document provides specifications and tightening torques for many components of the 2003 Saturn L Series 3.0L L81 engine. It lists over 100 different engine, transmission, and mounting components along with the correct tightening specification in both metric and imperial units. It also provides specifications for various engine dimensions, clearances, and performance parameters to aid in inspection and repair of the engine.
This document provides an overview of vibration analysis theory and techniques. It discusses the goals of vibration monitoring including determining machine condition, scheduling maintenance, and identifying faults. Common machine problems that cause vibration such as misalignment, imbalance, and bearing defects are outlined. Vibration measurement concepts like amplitude, frequency, and phase are defined. Proper vibration data collection procedures and the selection of measurement locations and units are covered. Finally, examples of calculating forcing frequencies from machine component specifications are presented.
Kuvam Technologies Angle Head for VMC is fixed with a 90° spindle angle combining vertical & horizontal operation on a single machine. They basically boost productivity with easily changing angle of the cutter while using the original workpiece setup. Also, the best way to improve overall accuracy & eliminates potential error created by multiple setups.
Caterpillar cat 140 m motor grader (prefix b9m) service repair manual (b9m000...jfjkskemem
1) The document provides installation instructions for installing a circle assembly on a 140M Motor Grader. It details 26 steps for the installation, including installing bearings and wear strips, adjusting clearances, and ensuring free rotation of the circle.
2) Safety notices are included, such as releasing hydraulic pressure before working on components and using proper lifting equipment due to component weights.
3) Required tools are listed in a table, including pullers, stands, and lifting groups needed for the installation.
Internship at HONDA MOTOR CYCLE SCOOTER INDIA LIMITEDsgrsoni45
The document discusses the benefits of a co-op education model for students, industries, and institutions. It provides details about a training program for a student named Sagar Soni at Honda Motorcycles And Scooter India Limited. The training involves learning about various production processes and machine shop layouts. It also discusses parameters for crank shafts and their effects, preventative maintenance of gauges, and ways to reduce rejections and engine noise.
- This document provides service information for repairs to the chassis and body of the Toyota Avensis/Corona models that underwent changes in July 2000.
- It includes removal and installation instructions for the manual transaxle unit, with troubleshooting information to identify causes of noises, leaks, shifting issues, and other problems.
- Technicians are instructed to refer to other manuals for additional specifications and procedures not covered in this supplement.
Caterpillar cat 140 m motor grader (prefix b9m) service repair manual (b9m000...fiksfejjsekkmme
1. The document provides installation instructions for installing a circle assembly on a 140M Motor Grader. It lists required tools and parts and provides detailed steps and illustrations for installing bearings, wear strips, plates, brackets and other components.
2. Safety notices are included, advising technicians to relieve pressure from hydraulic systems before working on components and ensure all fluids are contained.
3. The procedure has 26 steps for installing the circle assembly and adjusting clearances and measurements to ensure proper installation.
Caterpillar cat 140 m motor grader (prefix b9m) service repair manual (b9m000...ufdjskeksmemzx
1. The document provides installation instructions for installing a circle assembly on a 140M Motor Grader. It lists required tools and parts and provides detailed steps and illustrations for installing bearings, wear strips, plates, brackets and other components.
2. Safety notices are included, advising technicians to relieve pressure from hydraulic systems before working on components and ensure all fluids are contained.
3. The procedure provides over 25 individual steps for installing the circle assembly, including lowering temperatures of bearings, installing pins and sleeves, adjusting clearances and testing operation.
Caterpillar cat 330 d2 l excavator (prefix her) service repair manual (her000...jfdjskmdmme
This document provides instructions for disassembling and assembling the final drive of a 330D2 excavator. The disassembly process involves using various tools to remove 37 individual parts from the final drive assembly. The assembly process similarly uses tools to reinstall the parts in the reverse order, ensuring proper installation of seals and adjusting bearing preload through precise shimming.
This document provides instructions for disassembling and assembling the final drive of a 330D2 excavator. The disassembly process involves removing 37 individual parts in a specific sequence using various tools. The assembly process reverses the disassembly steps and provides additional details on setting the bearing preload and installing seals correctly.
Caterpillar cat 330 d2 l excavator (prefix her) service repair manual (her000...cdfzxs
This document provides instructions for disassembling and assembling the final drive of a 330D2 excavator. The disassembly process involves using various tools to remove over 30 individual parts in a specific sequence. The assembly process similarly involves installing the parts in reverse order, applying anti-seize compound, thread lock, and sealant as needed and adjusting bearing preload using shims to achieve the proper clearance. Special tools are required to install dual-cone seals on the sprocket housing and motor housing.
This document provides instructions for disassembling and assembling the final drive of a 330D2 excavator. The disassembly process involves 37 steps to remove all components of the final drive. Key steps include removing the final drive cover, gears, carrier assembly, planetary gears, and sprocket housing. The assembly process has 35 steps and involves installing components in reverse order while applying anti-seize compound and ensuring proper bearing preload using shims.
Caterpillar cat 330 d2 l excavator (prefix her) service repair manual (her000...fjjsekkksmeik
This document provides instructions for disassembling and assembling the final drive of a 330D2 excavator. The disassembly process involves 37 steps to remove all components of the final drive. Key steps include removing the final drive cover, gears, carrier assembly, planetary gears, and sprocket housing. The assembly process has 36 steps and involves installing components in reverse order while applying anti-seize compound and ensuring proper bearing preload using shims.
This document provides instructions for disassembling and assembling the final drive of a 330D2 excavator. The disassembly process involves using various tools to remove 37 individual parts from the final drive assembly. The assembly process similarly uses tools to reinstall the parts in the reverse order, ensuring proper installation of seals and adjusting bearing preload through precise shimming.
This document provides instructions for disassembling and assembling the final drive of a 330D2 excavator. The disassembly process involves using various tools to remove 37 individual parts from the final drive assembly. The assembly process similarly uses tools to reinstall the parts in the reverse order, ensuring proper installation of seals and adjusting bearing preload through precise shimming.
This document provides instructions for disassembling and assembling the final drive of a 330D2 excavator. The disassembly process involves 37 steps to remove all components of the final drive. Key steps include removing the final drive cover, gears, carrier assembly, planetary gears, and sprocket housing. The assembly process has 35 steps and involves installing components in reverse order while applying anti-seize compound and ensuring proper bearing preload using shims.
New holland w190 c wheel loader service repair manualujdjjkkskmme
This section of the service manual provides instructions for removing and installing the engine and radiator on a W190C Wheel Loader. The engine removal process involves disconnecting battery cables, draining fluids, removing mounting brackets and hoses. Engine installation is the reverse of removal. Radiator removal involves draining coolant and removing mounting brackets, and installation is the reverse of removal.
The document provides instructions for troubleshooting and repairing steering issues. It describes how to check for issues with various steering system components like the steering column, steering gear housing, and tie rod ends. The steps include how to disassemble, inspect, and replace parts as needed. Proper tooling is listed to facilitate repairs. Care must be taken when working on steering components as it affects vehicle handling.
Caterpillar cat 140 g motor grader (prefix 72v) service repair manual (72v000...fusefjskekkmem
The document provides instructions for disassembling and assembling a transmission for a 140G motor grader. The key steps include:
1) Removing the transmission by draining fluids, disconnecting lines and hoses, and lifting it out of the machine.
2) Disassembling the transmission further by removing covers, links, plates and sleeves to access the internal components.
3) Reassembling the transmission involves installing components in reverse order and refilling fluids. Precise torques and clearances are specified.
Caterpillar cat 345 d l excavator (prefix mlk) service repair manual (mlk0000...hhfjksekmm
This document provides instructions for installing a travel motor. It outlines 33 steps for assembling components like seals, pistons, plates, and valves. Measurements are checked at several points to ensure proper assembly. The motor is filled with oil after installation to prevent damage during operation.
This document provides specifications and dimensions for "NEF" diesel engines, including 3 and 4 cylinder models. It describes the engine systems such as lubrication, cooling, turbocharging, and dimensions of components. The lubrication system uses a lobe oil pump to circulate oil through the crankshaft, camshaft, cylinder head and oil cooler. The cooling system has a radiator, visco-static fan, water pump, thermostat and oil cooler. Turbocharged models include an air filter and exhaust-driven turbocharger. Detailed dimensions are provided for build clearances, engine block components, cylinder head and valves. Torque specifications are also listed.
John deere 6200 l tractors service repair technical manual (tm4523)ufjjdjkkskemmd
The document provides instructions for assembling and repairing the creeper transmission for tm4523 tractors. It details installing components like connecting rings, snap rings, gears, bearings, and shift collars. Specifications are provided for measurements and torque values. The final section covers general repair procedures for the range transmission, emphasizing cleanliness and care when handling precision machined parts.
The document provides specifications and tightening torques for many components of the 2003 Saturn L Series 3.0L L81 engine. It lists over 100 different engine, transmission, and mounting components along with the correct tightening specification in both metric and imperial units. It also provides specifications for various engine dimensions, clearances, and performance parameters to aid in inspection and repair of the engine.
This document provides an overview of vibration analysis theory and techniques. It discusses the goals of vibration monitoring including determining machine condition, scheduling maintenance, and identifying faults. Common machine problems that cause vibration such as misalignment, imbalance, and bearing defects are outlined. Vibration measurement concepts like amplitude, frequency, and phase are defined. Proper vibration data collection procedures and the selection of measurement locations and units are covered. Finally, examples of calculating forcing frequencies from machine component specifications are presented.
Kuvam Technologies Angle Head for VMC is fixed with a 90° spindle angle combining vertical & horizontal operation on a single machine. They basically boost productivity with easily changing angle of the cutter while using the original workpiece setup. Also, the best way to improve overall accuracy & eliminates potential error created by multiple setups.
Caterpillar cat 140 m motor grader (prefix b9m) service repair manual (b9m000...jfjkskemem
1) The document provides installation instructions for installing a circle assembly on a 140M Motor Grader. It details 26 steps for the installation, including installing bearings and wear strips, adjusting clearances, and ensuring free rotation of the circle.
2) Safety notices are included, such as releasing hydraulic pressure before working on components and using proper lifting equipment due to component weights.
3) Required tools are listed in a table, including pullers, stands, and lifting groups needed for the installation.
Internship at HONDA MOTOR CYCLE SCOOTER INDIA LIMITEDsgrsoni45
The document discusses the benefits of a co-op education model for students, industries, and institutions. It provides details about a training program for a student named Sagar Soni at Honda Motorcycles And Scooter India Limited. The training involves learning about various production processes and machine shop layouts. It also discusses parameters for crank shafts and their effects, preventative maintenance of gauges, and ways to reduce rejections and engine noise.
- This document provides service information for repairs to the chassis and body of the Toyota Avensis/Corona models that underwent changes in July 2000.
- It includes removal and installation instructions for the manual transaxle unit, with troubleshooting information to identify causes of noises, leaks, shifting issues, and other problems.
- Technicians are instructed to refer to other manuals for additional specifications and procedures not covered in this supplement.
Caterpillar cat 140 m motor grader (prefix b9m) service repair manual (b9m000...fiksfejjsekkmme
1. The document provides installation instructions for installing a circle assembly on a 140M Motor Grader. It lists required tools and parts and provides detailed steps and illustrations for installing bearings, wear strips, plates, brackets and other components.
2. Safety notices are included, advising technicians to relieve pressure from hydraulic systems before working on components and ensure all fluids are contained.
3. The procedure has 26 steps for installing the circle assembly and adjusting clearances and measurements to ensure proper installation.
Caterpillar cat 140 m motor grader (prefix b9m) service repair manual (b9m000...ufdjskeksmemzx
1. The document provides installation instructions for installing a circle assembly on a 140M Motor Grader. It lists required tools and parts and provides detailed steps and illustrations for installing bearings, wear strips, plates, brackets and other components.
2. Safety notices are included, advising technicians to relieve pressure from hydraulic systems before working on components and ensure all fluids are contained.
3. The procedure provides over 25 individual steps for installing the circle assembly, including lowering temperatures of bearings, installing pins and sleeves, adjusting clearances and testing operation.
Caterpillar cat 330 d2 l excavator (prefix her) service repair manual (her000...jfdjskmdmme
This document provides instructions for disassembling and assembling the final drive of a 330D2 excavator. The disassembly process involves using various tools to remove 37 individual parts from the final drive assembly. The assembly process similarly uses tools to reinstall the parts in the reverse order, ensuring proper installation of seals and adjusting bearing preload through precise shimming.
This document provides instructions for disassembling and assembling the final drive of a 330D2 excavator. The disassembly process involves removing 37 individual parts in a specific sequence using various tools. The assembly process reverses the disassembly steps and provides additional details on setting the bearing preload and installing seals correctly.
Caterpillar cat 330 d2 l excavator (prefix her) service repair manual (her000...cdfzxs
This document provides instructions for disassembling and assembling the final drive of a 330D2 excavator. The disassembly process involves using various tools to remove over 30 individual parts in a specific sequence. The assembly process similarly involves installing the parts in reverse order, applying anti-seize compound, thread lock, and sealant as needed and adjusting bearing preload using shims to achieve the proper clearance. Special tools are required to install dual-cone seals on the sprocket housing and motor housing.
This document provides instructions for disassembling and assembling the final drive of a 330D2 excavator. The disassembly process involves 37 steps to remove all components of the final drive. Key steps include removing the final drive cover, gears, carrier assembly, planetary gears, and sprocket housing. The assembly process has 35 steps and involves installing components in reverse order while applying anti-seize compound and ensuring proper bearing preload using shims.
Caterpillar cat 330 d2 l excavator (prefix her) service repair manual (her000...fjjsekkksmeik
This document provides instructions for disassembling and assembling the final drive of a 330D2 excavator. The disassembly process involves 37 steps to remove all components of the final drive. Key steps include removing the final drive cover, gears, carrier assembly, planetary gears, and sprocket housing. The assembly process has 36 steps and involves installing components in reverse order while applying anti-seize compound and ensuring proper bearing preload using shims.
This document provides instructions for disassembling and assembling the final drive of a 330D2 excavator. The disassembly process involves using various tools to remove 37 individual parts from the final drive assembly. The assembly process similarly uses tools to reinstall the parts in the reverse order, ensuring proper installation of seals and adjusting bearing preload through precise shimming.
This document provides instructions for disassembling and assembling the final drive of a 330D2 excavator. The disassembly process involves using various tools to remove 37 individual parts from the final drive assembly. The assembly process similarly uses tools to reinstall the parts in the reverse order, ensuring proper installation of seals and adjusting bearing preload through precise shimming.
This document provides instructions for disassembling and assembling the final drive of a 330D2 excavator. The disassembly process involves 37 steps to remove all components of the final drive. Key steps include removing the final drive cover, gears, carrier assembly, planetary gears, and sprocket housing. The assembly process has 35 steps and involves installing components in reverse order while applying anti-seize compound and ensuring proper bearing preload using shims.
Caterpillar cat 330 d2 l excavator (prefix her) service repair manual (her000...hhjsekmdmm
This document provides instructions for disassembling and assembling the final drive of a 330D2 excavator. The disassembly process involves using various tools to remove 37 individual parts from the final drive assembly. The assembly process describes installing the parts in reverse order and adjusting the bearing preload using shims to achieve the proper clearance between components. Proper cleaning and application of lubricants is emphasized throughout.
Caterpillar cat 330 d2 l excavator (prefix her) service repair manual (her000...cdsaas
This document provides instructions for disassembling and assembling the final drive of a 330D2 excavator. The disassembly process involves 37 steps to remove all components of the final drive. Key steps include removing the final drive cover, gears, carrier assembly, planetary gears, and sprocket housing. The assembly process has 35 steps and involves installing components in reverse order while applying anti-seize compound and ensuring proper bearing preload using shims.
This document provides instructions for disassembling and assembling the final drive of a 330D2 excavator. The disassembly process involves using various tools to remove over 30 individual parts in a specific sequence. The assembly process similarly involves installing the parts in reverse order, applying anti-seize compound, thread lock, and sealant as needed and adjusting bearing preload using shims to achieve the proper clearance. Special tools are required to install dual-cone seals on the sprocket housing and motor housing.
This document provides instructions for disassembling and assembling the final drive of a 330D2 excavator. The disassembly process involves 37 steps to remove all components of the final drive. Key steps include removing the final drive cover, gears, carrier assembly, planetary gears, and sprocket housing. The assembly process has 36 steps and involves installing components in reverse order while applying anti-seize compound and ensuring proper bearing preload using shims.
The document discusses the benefits of exercise for mental health. Regular physical activity can help reduce anxiety and depression and improve mood and cognitive function. Exercise causes chemical changes in the brain that may help protect against mental illness and improve symptoms for those who already suffer from conditions like anxiety and depression.
How to develop and sell your new electronic hardware productRa'uf Tailony
This document provides guidance on developing and selling a new electronic hardware product. It discusses important upfront work like market research and product validation. It then covers various product development strategies such as developing it yourself, bringing on technical co-founders, or outsourcing. The document delves into the electronics development process including creating preliminary designs, schematics, printed circuit boards, and certification. It also discusses developing the product enclosure. The overall guide aims to help readers understand the full process to bring a new electronic product to market.
Design Review Based on Failure Mode (DRBFM) CourseRa'uf Tailony
The document outlines Design Review Based on Failure Mode (DRBFM), a process for proactively identifying potential failures from design changes. It discusses (1) visualizing changes between old and new designs, (2) identifying functions and change points, (3) discovering potential concerns through a change matrix, (4) conducting root cause analysis, and (5) reflecting preventative measures in design. The goal is robust design through collaborative problem finding and solving to predict risks from changes before issues occur.
- The document describes how to model Apple's Magic Mouse in SolidWorks. It provides step-by-step instructions to create 2D sketches on different planes and reference geometry to model the shape of the mouse. 5 sketches are made on different planes and surfaces to construct curves and arcs representing the silhouette of the mouse. Dimensioning and geometric relations are applied to fully define the sketches.
Hyundai sonata 2011 se rear camera mounting stepsRa'uf Tailony
The document discusses the benefits of exercise for mental health. Regular physical activity can help reduce anxiety and depression and improve mood and cognitive functioning. Exercise boosts blood flow, releases endorphins, and promotes changes in the brain which help regulate emotions and stress levels.
Structural reliability of a marine diesel engine propulsion shafting system Ra'uf Tailony
This document appears to be blank or missing content. In 3 sentences or less, there is no essential information to summarize as the document provided is empty.
1. The document provides a quick guide for using SOLIDWORKS to analyze fluid-filled cavities in parts. It outlines selecting reference planes, intersecting surfaces to define cavities, and using mass properties tools to obtain volume, mass, and center of gravity measurements of individual cavities.
2. Additional steps include closing holes, eliminating extra regions, and selecting individual cavities for analysis when multiple exist.
3. The technique assumes static, incompressible fluid at ambient pressure and temperature; dynamic volume or flow simulations require computational fluid dynamics modeling beyond the scope of this guide.
1. The document analyzes cavity measurements and volume calculations for various engine components, including intake and exhaust cavities.
2. It finds that the current volumes do not meet the goal of 85% or higher volume percentage for the exhaust and intake cavities.
3. It provides proposed corrections to reduce the port and transfer channel volumes, including shortening the length or reducing the radius of the channels. The corrected dimensions are estimated to meet the 85% target volume percentage.
Cold test nodal and distorsion analysisRa'uf Tailony
This document summarizes a torsional distortion analysis of a new solid tip on an 1806 RPOA cold test. It describes the original driveline design and modeling assumptions. Nodal, frequency, and Campbell analyses were conducted. Key findings include critical speeds of 1500 rpm, critical frequencies of 230-280 Hz, and coincidence of the 12th order engine and electric motor excitations. Modes 1, 2 and 3 were identified as critical. The analysis considered cases both with and without the electric motor bearing to identify its effects.
This document outlines the general requirements for modeling a driveline system connecting an engine to a machine. It lists tools and software needed like MATLAB and CAD software. It also lists engineering specifications required like the engine and driveline designs, material properties, operating speeds, and torque variation methods. Manufacturing requirements include assembly alignment verification. The expected outcomes are a report locating the system's natural frequencies and critical speeds, and identifying vibration nodes and structural failure modes.
This document analyzes a factory's production capacity at various annual output goals. It finds that at 30,000 units/year, the factory runs with no issues but has optimization opportunities. At 50,000 units, all loops are capable except stations 860A and 860B, which need 30% reduced cycle times. Achieving 60,000 units requires clearing blockages on the TBU loop by reducing stations 860A and 860B cycle times 40%. A 70,000 unit goal would cause blockages on the TBU loop and stations exceeding takt time on the Main Assy loop.
This document provides an overview of variable valve lift technology. It discusses how variable valve lift can improve engine performance, fuel economy, and emissions by varying valve timing and lift to optimize for different operating conditions. It describes several types of current variable valve lift systems including Fiat/Chrysler Multiair, Honda V-Tec, BMW Valvetronic, and Mercedes Benz Camtronic which vary lift through electrohydraulic, electromechanical or cam-based actuators. The document also covers camshaft terminology, factors that influence volumetric efficiency, and the goal of maintaining a valve Mach number below 0.6 for best efficiency.
Dynometer project data acquisition filteringRa'uf Tailony
This document describes a dynamometer project involving data acquisition and filtering of force data measured by a load cell. The load cell measures the force applied by an alternator connected to an engine. Software filters are used to filter noise from the load cell data. A Butterworth low-pass filter with a 25Hz cutoff frequency and order of 5 is used. The filtered and unfiltered force data are presented on graph indicators to compare the results and evaluate engine torque.
Embedded machine learning-based road conditions and driving behavior monitoringIJECEIAES
Car accident rates have increased in recent years, resulting in losses in human lives, properties, and other financial costs. An embedded machine learning-based system is developed to address this critical issue. The system can monitor road conditions, detect driving patterns, and identify aggressive driving behaviors. The system is based on neural networks trained on a comprehensive dataset of driving events, driving styles, and road conditions. The system effectively detects potential risks and helps mitigate the frequency and impact of accidents. The primary goal is to ensure the safety of drivers and vehicles. Collecting data involved gathering information on three key road events: normal street and normal drive, speed bumps, circular yellow speed bumps, and three aggressive driving actions: sudden start, sudden stop, and sudden entry. The gathered data is processed and analyzed using a machine learning system designed for limited power and memory devices. The developed system resulted in 91.9% accuracy, 93.6% precision, and 92% recall. The achieved inference time on an Arduino Nano 33 BLE Sense with a 32-bit CPU running at 64 MHz is 34 ms and requires 2.6 kB peak RAM and 139.9 kB program flash memory, making it suitable for resource-constrained embedded systems.
Introduction- e - waste – definition - sources of e-waste– hazardous substances in e-waste - effects of e-waste on environment and human health- need for e-waste management– e-waste handling rules - waste minimization techniques for managing e-waste – recycling of e-waste - disposal treatment methods of e- waste – mechanism of extraction of precious metal from leaching solution-global Scenario of E-waste – E-waste in India- case studies.
Advanced control scheme of doubly fed induction generator for wind turbine us...IJECEIAES
This paper describes a speed control device for generating electrical energy on an electricity network based on the doubly fed induction generator (DFIG) used for wind power conversion systems. At first, a double-fed induction generator model was constructed. A control law is formulated to govern the flow of energy between the stator of a DFIG and the energy network using three types of controllers: proportional integral (PI), sliding mode controller (SMC) and second order sliding mode controller (SOSMC). Their different results in terms of power reference tracking, reaction to unexpected speed fluctuations, sensitivity to perturbations, and resilience against machine parameter alterations are compared. MATLAB/Simulink was used to conduct the simulations for the preceding study. Multiple simulations have shown very satisfying results, and the investigations demonstrate the efficacy and power-enhancing capabilities of the suggested control system.
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...IJECEIAES
Climate change's impact on the planet forced the United Nations and governments to promote green energies and electric transportation. The deployments of photovoltaic (PV) and electric vehicle (EV) systems gained stronger momentum due to their numerous advantages over fossil fuel types. The advantages go beyond sustainability to reach financial support and stability. The work in this paper introduces the hybrid system between PV and EV to support industrial and commercial plants. This paper covers the theoretical framework of the proposed hybrid system including the required equation to complete the cost analysis when PV and EV are present. In addition, the proposed design diagram which sets the priorities and requirements of the system is presented. The proposed approach allows setup to advance their power stability, especially during power outages. The presented information supports researchers and plant owners to complete the necessary analysis while promoting the deployment of clean energy. The result of a case study that represents a dairy milk farmer supports the theoretical works and highlights its advanced benefits to existing plants. The short return on investment of the proposed approach supports the paper's novelty approach for the sustainable electrical system. In addition, the proposed system allows for an isolated power setup without the need for a transmission line which enhances the safety of the electrical network
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesChristina Lin
Traditionally, dealing with real-time data pipelines has involved significant overhead, even for straightforward tasks like data transformation or masking. However, in this talk, we’ll venture into the dynamic realm of WebAssembly (WASM) and discover how it can revolutionize the creation of stateless streaming pipelines within a Kafka (Redpanda) broker. These pipelines are adept at managing low-latency, high-data-volume scenarios.
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...shadow0702a
This document serves as a comprehensive step-by-step guide on how to effectively use PyCharm for remote debugging of the Windows Subsystem for Linux (WSL) on a local Windows machine. It meticulously outlines several critical steps in the process, starting with the crucial task of enabling permissions, followed by the installation and configuration of WSL.
The guide then proceeds to explain how to set up the SSH service within the WSL environment, an integral part of the process. Alongside this, it also provides detailed instructions on how to modify the inbound rules of the Windows firewall to facilitate the process, ensuring that there are no connectivity issues that could potentially hinder the debugging process.
The document further emphasizes on the importance of checking the connection between the Windows and WSL environments, providing instructions on how to ensure that the connection is optimal and ready for remote debugging.
It also offers an in-depth guide on how to configure the WSL interpreter and files within the PyCharm environment. This is essential for ensuring that the debugging process is set up correctly and that the program can be run effectively within the WSL terminal.
Additionally, the document provides guidance on how to set up breakpoints for debugging, a fundamental aspect of the debugging process which allows the developer to stop the execution of their code at certain points and inspect their program at those stages.
Finally, the document concludes by providing a link to a reference blog. This blog offers additional information and guidance on configuring the remote Python interpreter in PyCharm, providing the reader with a well-rounded understanding of the process.
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELgerogepatton
As digital technology becomes more deeply embedded in power systems, protecting the communication
networks of Smart Grids (SG) has emerged as a critical concern. Distributed Network Protocol 3 (DNP3)
represents a multi-tiered application layer protocol extensively utilized in Supervisory Control and Data
Acquisition (SCADA)-based smart grids to facilitate real-time data gathering and control functionalities.
Robust Intrusion Detection Systems (IDS) are necessary for early threat detection and mitigation because
of the interconnection of these networks, which makes them vulnerable to a variety of cyberattacks. To
solve this issue, this paper develops a hybrid Deep Learning (DL) model specifically designed for intrusion
detection in smart grids. The proposed approach is a combination of the Convolutional Neural Network
(CNN) and the Long-Short-Term Memory algorithms (LSTM). We employed a recent intrusion detection
dataset (DNP3), which focuses on unauthorized commands and Denial of Service (DoS) cyberattacks, to
train and test our model. The results of our experiments show that our CNN-LSTM method is much better
at finding smart grid intrusions than other deep learning algorithms used for classification. In addition,
our proposed approach improves accuracy, precision, recall, and F1 score, achieving a high detection
accuracy rate of 99.50%.
3. 2
1821 Main Line Loop A
Job Item OP
Station
Type
Station Description
Cycle Time -
200K
Cycle Time -
Expanded
Category
MTTR
(Min)
MTBF
(Min)
Reject
Rate
1821 149 10 M Press Install Gear Shift Components & Oil Seal (Offline Station) 46.00 46.00 4 10 50000 0.10%
1821 003 20 S Press Diff Cup, I-Shaft Cup, Diff Seal 27.00 27.00 2 15 25000 0.20%
1821 004 30 M Load Case to Pallet and Install Lubrication Nozzle 30.00 30.00 4 10 50000 0.10%
1821 014 40 M Install Remaining Gear Shift Components 57.00 57.00 4 10 50000 0.10%
1821 016 50 M Install Pulley Cover Dowel Pins and Primary Pulley Bearing 80.00 40.00 4 10 50000 0.10%
1821 XXX 55 M Install Pulley Cover Dowel Pins and Primary Pulley Bearing (2) 40.00 4 10 50000 0.10%
1821 017 60 A RTV Middle Case Pulley Cover Surface 33.00 33.00 1 15 15000 0.20%
1821 019 70 M Install Cover and Pulley assembly to Case 61.00 61.00 4 10 50000 0.10%
1821 022 80 M Hand Start and Zero Torque Pulley Cover Bolts 80.00 40.00 4 10 50000 0.10%
1821 XXX 85 M Hand Start and Zero Torque Pulley Cover Bolts (2) 40.00 4 10 50000 0.10%
1821 021 90 A Auto torque twenty one Pulley Cover Bolts 29.00 29.00 3 10 35000 0.20%
For Torque
Stations 3 Retry
Attempts Prior
to Rejecting
1821 023 100 M Back-up - Manually Torque Case Bolts (Was install/torque speed sensors) 52.00 52.00 4 10 50000 0.10%
1821 024 110 A Rollover Station 45.00 45.00 1 15 15000 0.10%
1821 005 120 S
Semi-Auto Vacuum and Lube Case, And Press Reverse Clutch Piston, Dam, Spring, and
Snap Ring.Assemble Clutch Stack Offline & Verify, Install Clutch Stack
80.00 80.00 2 15 25000 0.20%
1821 009 130 A Gage Reverse Clutch Stack 43.00 43.00 1 30 15000 0.10%
1821 150 140 M Select Snap Ring and verify.Install Snap Ring & Verify Snap Ring Seated 69.50 69.50 4 10 50000 0.10%
1821 007 150 A Piston Travel Check and Leak Test 53.50 53.50 1 30 15000 0.20%
1821 008 156 R Repair Station (For Repairs ONLY) NA NA 4 10 50000 50.00%
1821 010 160 M Install Oil Guide Boss 55.00 38.00 4 10 50000 0.10%
1821 152 170 M Install BRG, Planet Carrier, BRG, & FWD Clutch 53.00 38.00 4 10 50000 0.10%
1821 XXX 175 M Install BRG, Planet Carrier, BRG, & FWD Clutch (2) 32.00 4 10 50000 0.10%
1821 025 180 A Gage Input Shaft 37.00 37.00 1 30 15000 0.10%
1821 153 190 S Gage Oil Plate (Offline), Select Verify and Install Shim, & Install Oil Plate 53.00 53.00 1 30 15000 0.10%
1821 026 200 M Hand start and final Torque (12) Oil Plate Bolts 80.00 55.00 4 10 50000 0.10%
1821 XXX 205 M Hand start and final Torque (12) Oil Plate Bolts (2) 53.50 4 10 50000 0.10%
1821 028 210 M Install Oil Pump and Install Oil Baffle Board 83.50 55.00 4 10 50000 0.10%
1821 032 220 M Install I-Shaft and Diff, TC Hsg Dowel Pins, TC Hsg Lineup Pins 32.00 32.00 4 10 50000 0.10%
1821 031 230 M Install Chain Sprocket Thrust Washer, Snap Ring, and Check Chain Tension 37.50 37.50 4 10 50000 0.10%
1821 033 240 A Gage Bearing Surface of Intermediate and Differential Shaft 48.00 48.00 1 30 15000 0.10%
1821 034 250 A Auto RTV Middle Case Torque Convertor Joint Face 33.00 33.00 1 15 15000 0.20%
1821 100 10 S
(OFFLINE STATION) SEMI-AUTO PRESS DIFF AND T/C SEALS TO TORQUE CONVERTER
HOUSING
22.00 22.00 2 15 25000 0.20%
1821 101 20 S (OFFLINE STATION) Gage Torque Convertor (Offline Station) 35.00 35.00 1 30 15000 0.10%
1821 102 30 S
(OFFLINE STATION) Semi-Auto Shim Selection Install and Press Diff and I-Shaft
Bearings. Install and Fasten Dam Board
77.00 77.00 2 15 25000 0.20%
1821 154 260 M Load Torque Convertor Housing to Case 22.00 22.00 4 10 50000 0.10%
1821 035 270 M Zero Torque Twenty-Two Torque Convertor Housing Bolts 97.00 48.50 4 10 50000 0.10%
1821 XXX 275 M Zero Torque Twenty-Two Torque Convertor Housing Bolts (2) 48.50 4 10 50000 0.10%
1821 036 280 A Final Torque Twenty-Two Torque Convertor Housing Bolts 35.00 35.00 3 10 35000 0.20%
For Torque
Stations 3 Retry
Attempts Prior
to Rejecting
1821 053 290 M Load TC Install TC Holding Bar 54.00 34.00 4 10 50000 0.10%
1821 XXX 295 M Load TC Install TC Holding Bar (2) 20.00 4 10 50000 0.10%
1821 039 296 R Repair Station (For Repairs ONLY) NA NA 4 10 50000 50.00%
1822 042 300 M Unload CVT To Loop B (Included in Loop B OP 10 Cycle Time) NA NA 4 10 50000 0.10%
104.80% 4.80%
4. 3
1822 Main Line Loop B
1823 Test Loop
Job Item OP
Station
Type
Station Description
Cycle Time -
200K
Cycle Time -
Expanded
Category
MTTR
(Min)
MTBF
(Min)
Reject
Rate
1822 042 10 M Manually Load Transmission to Loop "B" 61.00 61.00 4 10 50000 0.10%
1822 044 20 M Load Valve Body Install Wiring Harness 80.00 55.00 4 10 50000 0.10%
1822 XXX 25 M Load Valve Body Install Wiring Harness (2) 50.00 4 10 50000 0.10%
1822 045 30 M Install Valve Body 80.00 55.00 4 10 50000 0.10%
1822 046 40 A Auto Torque (14) Valve Body Bolts 55.00 55.00 3 10 35000 0.20%
For Torque
Stations 3 Retry
Attempts Prior to
Rejecting
1822 048 50 M Manually Install Valve Oil Filter, Manual ShiftLever and Spring Pin 43.00 43.00 4 10 50000 0.10%
1822 049 60 A RTV Oil Pan surface 37.50 37.50 1 15 15000 0.20%
1822 050 70 M Manually Install Oil Pan and Zero Torque (19) Oil Pan Bolts 111.00 55.50 4 10 50000 0.10%
1822 XXX 75 M Manually Install Oil Pan and Zero Torque (19) Oil Pan Bolts (2) 55.50 4 10 50000 0.10%
1822 051 80 A Auto Torque Oil Pan 29.00 29.00 3 10 35000 0.20%
For Torque
Stations 3 Retry
Attempts Prior to
Rejecting
1822 XXX 90 M Manually Install (3) Speed Sensors and Final Torque 95.00 60.00 4 10 50000 0.10%
1822 043 100 M Install Oil Filter, Oil Cooler and Oil Level 89.50 60.00 4 10 50000 0.10%
1822 XXX 105 M Install Oil Filter, Oil Cooler and Oil Level (2) 64.50 4 10 50000 0.10%
1822 054 106 R Repair Station (For Repairs ONLY) NA NA 4 10 50000 50.00%
1822 157 110 M Manually Load Transmission to Test Loop (Included in Test Loop OP 10 Cycle Time) NA NA 4 10 50000 0.10%
52% 2%
Job Item OP
Station
Type
Station Description
Cycle Time -
200K
Cycle Time -
Expanded
Category
MTTR
(Min)
MTBF
(Min)
Reject
Rate
1823 57 10 M Load CVT to Test Loop 63.00 63.00 4 10 50000 0.10%
1823 060 20 M Leak Test + Plug 6 Ports 80.00 80.00 3 10 35000 0.20%
1823 XXX 25 M Leak Test + Plug 6 Ports (2) Parallel Process 80.00 3 10 35000 0.10%
1823 061 30 M Oil Fill CVT Transmission 17.00 17.00 4 10 50000 0.10%
1823 062 40 M Rig Station to Install Hoses and Harness 74.00 37.00 4 10 50000 0.10%
1823 XXX 45 M Rig Station to Install Hoses and Harness (2) 37.00 4 10 50000 0.10%
1829 XXX 50 A EOL Test Stand # 1 201.00 201.00 1 30 15000 0.20%
1829 XXX 60 A EOL Test Stand # 2 201.00 201.00 1 30 15000 0.20%
1829 XXX 70 A EOL Test Stand # 3 201.00 201.00 1 30 15000 0.20%
1829 XXX 75 A EOL Test Stand # 4 201.00 201.00 1 30 15000 0.20%
1823 063 66 R Repair Station (For Repairs ONLY) NA NA 4 10 50000 50.00%
1823 064 80 M Manual Derigging and Oil Drain 90.00 45.00 4 10 50000 0.20%
1823 XXX 85 M Manual Derigging (2) 45.00 4 10 50000 0.10%
1823 065 90 M Fasten TC Bracket, Install Axle Seals and Noise Insulator 69.00 34.50 4 10 50000 0.10%
1823 XXX 95 M Fasten TC Bracket, Install Axle Seals and Noise Insulator (2) 34.50 4 10 50000 0.10%
1823 067 96 R Repair Station (For Repairs ONLY) NA NA 4 10 50000 50.00%
1823 066 100 M Unload 76.00 76.00 4 10 50000 0.10%
102.10% 2.10%
5. 4
1824 Pulley Loop 1 Subassembly
1824 Pulley Loop 2 Subassembly
1825 Forward Clutch Subassembly
Job Item OP
Station
Type
Station Description
Cycle Time -
200K
Cycle Time -
Expanded
Category
MTTR
(Min)
MTBF
(Min)
Reject
Rate
1824 070 10 S Off Line Press, Bushing and Bearing on Primary Shaft in Press, Press Bushing into Primary 59.00 59.00 2 15 25000 0.20%
1824 042 20 M Install Bottom Circlip in Primary and Secondary Sheave, Install Sheave on Pulleys 72.50 37.00 4 10 50000 0.10%
1824 XXX 25 M Install Bottom Circlip in Primary and Secondary Sheave, Install Sheave on Pulleys (2) 36.00 4 10 50000 0.10%
1824 XXX 30 A Marposs Gage Roller Groove - Customer Supplied 45.00 45.00 1 30 15000 0.10%
1824 XXX 40 S Marposs Press Roller Bearing - Customer Supplied 58.00 58.00 1 30 15000 0.10%
1824 XXX 50 A Marposs Gage Tangential Play and Slide Force - Customer Supplied 60.00 60.00 1 30 15000 0.10%
1824 075 56 R Repair Station (For Repairs ONLY) NA NA 4 10 50000 50.00%
1824 076 60 M Install Top Circlip in Primary and Secondary Sheave, Vision Verification 59.00 29.50 4 10 50000 0.10%
1824 XXX 65 M Install Top Circlip in Primary and Secondary Sheave, Vision Verification 29.50 4 10 50000 0.10%
1824 077 70 S Press Seal to Primary Piston 34.00 34.00 2 15 25000 0.20%
1824 080 80 S Install Spring, Press Secondary Pulley Piston 34.00 34.00 2 15 25000 0.20%
1824 079 90 M Install Secondary Pulley Piston Cover and Snap Ring 31.00 31.00 4 10 50000 0.10%
1824 080 100 S Install Retainer and Press Bearing on Primary Shaft, Press Bearing and Gear on Secondary 54.00 54.00 2 15 25000 0.20%
1824 081 110 S Install and Torque Nuts (Offline Station) 45.00 45.00 3 10 35000 0.20%
For Torque Stations 3 Retry
Attempts Prior to Rejecting
1824 161 116 R Repair Station (For Repairs ONLY) NA NA 4 10 50000 50.00%
101.80% 1.80%
Job Item OP
Station
Type
Station Description
Cycle Time -
200K
Cycle Time -
Expanded
Category
MTTR
(Min)
MTBF
(Min)
Reject
Rate
1824 089 130 M Load Shaft to Loop 2 37.00 37.00 4 10 50000 0.10%
1824 084 140 A Measure Shaft Gap 36.00 36.00 1 30 15000 0.10%
1824 XXX 145 S Install Wheel Belt (2) (Parallel Process) 69.00 1 30 15000 0.20%
1824 085 150 S Install Wheel Belt 69.00 69.00 1 30 15000 0.20%
1824 160 145 M (OFFLINE STATION) Press Oil Nozzle & Install Park Mechanism, Gage Case Offline 35.00 35.00 4 10 50000 0.10%
1824 159 150 M Install Shim and Rear Cover, Hand Start and Zero Torque Bolts 41.00 41.00 4 10 50000 0.10%
1824 087 170 A Auto Torque 6 Cover Bolts 18.00 18.00 3 10 35000 0.20%
For Torque Stations 3 Retry
Attempts Prior to Rejecting
1824 162 180 M Unload to Mainline 27.00 27.00 4 10 50000 0.10%
1824 088 186 R Repair Station (For Repairs ONLY) NA NA 4 10 50000 50.00%
51.10% 1.10%
Job Item OP
Station
Type
Station Description Cycle Time Category
MTTR
(Min)
MTBF
(Min)
Reject
Rate
1825 093 10 S Install Forward Clutch Piston 53.00 2 15 25000 0.20%
1825 097 20 M Install Sun Gear, Clutch Stack and Gear Ring 39.00 4 10 50000 0.10%
1825 096 30 A Auto Gage Clutch Stack 45.00 1 30 15000 0.20%
1825 098 40 M Select and Install Snap Rings 53.00 4 10 50000 0.10%
1825 095 50 A Auto Leak Test and Travel Check 30.50 1 30 15000 0.20%
1825 092 60 M Install Input Shaft Seals, Install Shaft Clutch 51.00 4 10 50000 0.10%
1825 099 66 R Repair Station (For Repairs ONLY) NA 4 10 50000 50.00%
51% 1%
6. 5
1826 Differential Subassembly
1828 Valve Body Subassembly
Job Item OP
Station
Type
Station Description
Cycle Time -
200K
Cycle Time -
Expanded
Category
MTTR
(Min)
MTBF
(Min)
Reject
Rate
1826 106 10 M Manual Install Gear, Shaft Axle Gear 47.00 47.00 4 10 50000 0.10%
1826 107 20 A Gage Gear Clearance 39.00 39.00 1 30 15000 0.10%
1826 108 30 M Manual Install Shims 67.00 33.50 4 10 50000 0.10%
1826 XXX 35 M Manual Install Shims (2) 33.50 4 10 50000 0.10%
1826 109 40 A Final Measure Gear Clearance 39.00 39.00 1 30 15000 0.20%
1826 110 50 S Instal Gear Ring and Zero Torque (10) Bolts, Hand Start (2) Other Bolts 77.50 38.50 2 15 25000 0.20%
1826 XXX 55 M Zero Torque (10) Bolts, Hand Start (2) Other Bolts (2) 38.50 4 10 50000 0.10%
1826 111 60 A Fasten the Gear Ring 46.50 46.50 3 10 35000 0.20%
For Torque
Stations 3 Retry
Attempts Prior to
Rejecting
1826 112 70 S Press Bearing and Unload Differential and Intermediate Shaft 61.00 61.00 2 15 25000 0.20%
1826 113 76 R Repair Station (For Repairs ONLY) NA NA 4 10 50000 50.00%
51% 1%
Job Item OP
Station
Type
Station Description
Cycle Time -
200K
Cycle Time -
Expanded
Category
MTTR
(Min)
MTBF
(Min)
Reject
Rate
1828 117 10 M (OFFLINE BUILD) Load Solenoid Body to Pallet, Install (2) Solenoid Body Valves, Install Shift Spool 42.00 42.00 4 10 50000 0.10%
1828 118 20 M (OFFLINE BUILD) Install 5 SB Solenoids 64.00 32.00 4 10 50000 0.10%
1828 XXX 25 M (OFFLINE BUILD) Install 5 SB Solenoids 32.00 4 10 50000 0.10%
1828 119 30 M (OFFLINE BUILD) Load Valve Body to Pallet, Install (4) "Valve Body" Valves 80.00 40.00 4 10 50000 0.10%
1828 XXX 35 M (OFFLINE BUILD) Load Valve Body to Pallet, Install (4) "Valve Body" Valves 40.00 4 10 50000 0.10%
1828 122 40 M (OFFLINE BUILD) Load Solenoid to Pallet, Install (4) Valve Retainers, Install (2) Sensors 28.00 28.00 4 10 50000 0.10%
1828 122 45 M Load Solenoid Body to Pallet, Install (4) Valve Retainers, Install (2) Sensors 28.00 28.00 4 10 50000 0.10%
1828 123 50 M Install the Springs/ Accumulator/ Ball Valve / Filter onto Solenoid Valve 55.00 55.00 4 10 50000 0.10%
1828 124 60 M Install Valve Plate with Bolts 78.50 45.00 4 10 50000 0.10%
1828 XXX 65 M Flex Station 48.50 4 10 50000 0.10%
1828 127 70 M Load SB onto the Valve Body and Pre Fasten 24 Bolts 61.00 46.00 4 10 50000 0.10%
1828 125 80 A Fasten Solenoid Body Bolts (10) 32.00 32.00 3 10 35000 0.20%
For Torque Stations 3
Retry Attempts Prior
to Rejecting
1828 128 85 A Fasten Solenoid Body Bolts (10) 33.00 33.00 3 10 35000 0.20%
For Torque Stations 3
Retry Attempts Prior
to Rejecting
1828 131 96 R Repair Station (For Repairs ONLY) NA NA 4 10 50000 50.00%
1828 172 90 M Unload Valve Body from the Loop 43.00 43.00 4 10 50000 0.10%
1830 XXX 100 A Valve Body Test Stand 80.00 80.00 1 30 15000 0.20%
51.80% 1.80%
7. 6
Model Assumptions
■ Factory Capacity = 250,000 CVT annually (1000 CVT/day).
■ Factory is up 21.5 hrs/day.
■ Factory is up 250 days/year.
■ Takt Time= 1.29 minutes.
■ No translational motion for operators.
■ Stations sequences are Asynchronous.
■ Machine setup time is zero.
■ Minimum quantity produced/station = 1.
■ All stations are processing in sequence.
■ Up Time = 95%.