Executive Summary
Prior to delivery or final installation, clients want to ensure that their equipment or plant operates as
intended and meets all the contractual requirements. For this reason it is necessary to conduct a
Factory Acceptance Test to ensure high quality and integrity of the equipment /plant. Unfortunately,
some vendors are not always properly prepared for a Factory Acceptance Test, and the testing
procedure is sometimes rushed, in order to ship the equipment as soon as possible. A highly qualified,
independent third party can support the vendor by performing a Factory Acceptance Test, or by
witnessing its appropriate execution on behalf of the buyer.

SGS Industrial Service offers Factory Acceptance Test to determine and document whether the
equipment or plant operates as intended and meets all the contractual specifications.

The Factory Acceptance Test provided by SGS is a customized testing procedure for equipment and
plants. The test is executed before final installation or prior to delivery. Although testing is not a
requirement, it is recommended carry it out.

The Factory Acceptance Test by SGS includes a check of completeness, proof of functionality and a
verification of all important documents, such as manuals, instructions, plans, drawings, piping and
instrumentation diagrams (P&Ids)

A comprehensive Factory Acceptance Test is the most cost-effective means to ensure that the
equipment/plant operates correctly and is of high quality and integrity.

The outcome of the Factory Acceptance Test gives the client confidence that the equipment/plant
performs as expected under the full range of foreseeable conditions, including misuse and error.

More Related Content

What's hot

Equipment Qualification
Equipment QualificationEquipment Qualification
Equipment Qualification
Priyanka Kandhare
 
updated CV (2)
updated CV (2)updated CV (2)
updated CV (2)
V.C.Babu umanath
 
FACTORY ACCEPTANCE TEST
FACTORY ACCEPTANCE TEST FACTORY ACCEPTANCE TEST
Mangesh-Resume
Mangesh-ResumeMangesh-Resume
Mangesh-Resume
Mangesh Chaure
 
Lean Calibration Management
Lean Calibration ManagementLean Calibration Management
Lean Calibration Management
bossawines
 
Calibration and validation ,difference , ph meter and weigh balance calibrati...
Calibration and validation ,difference , ph meter and weigh balance calibrati...Calibration and validation ,difference , ph meter and weigh balance calibrati...
Calibration and validation ,difference , ph meter and weigh balance calibrati...
Divy Patel
 
Qualification validation ppt_171116
Qualification validation ppt_171116Qualification validation ppt_171116
Qualification validation ppt_171116
Somnath Banerjee
 
Apc 2
Apc 2Apc 2
Apc 2
norriswp
 
Calibration Singapore
Calibration SingaporeCalibration Singapore
Calibration Singapore
Dakshinamoorthy R
 
Calibration management system
Calibration management systemCalibration management system
Calibration management system
National Institute of Biologics
 
Calibration
CalibrationCalibration
Calibration
Amir Sharifi
 
Bob Price - Mechanical Engineer
Bob Price - Mechanical EngineerBob Price - Mechanical Engineer
Bob Price - Mechanical Engineer
Bob Price
 
Six sigma project
Six sigma projectSix sigma project
Six sigma project
JAPAN SHAH
 
Equipment qualification
Equipment qualificationEquipment qualification
Equipment qualification
Institute of Validation Technology
 
K+S Repair Process
K+S Repair ProcessK+S Repair Process
K+S Repair Process
Laurén Kirchner
 
Maintenance Reliability
Maintenance ReliabilityMaintenance Reliability
Maintenance Reliability
rsevenich
 
Qualification & validation concept & terminology
Qualification & validation concept & terminologyQualification & validation concept & terminology
Qualification & validation concept & terminology
Muhammad Luqman Ikram
 
FARHAD KARAMJAN1
FARHAD KARAMJAN1FARHAD KARAMJAN1
FARHAD KARAMJAN1
Farhad Karamjani
 
Mechanic Calibration Singapore
Mechanic Calibration SingaporeMechanic Calibration Singapore
Mechanic Calibration Singapore
Dakshinamoorthy R
 

What's hot (19)

Equipment Qualification
Equipment QualificationEquipment Qualification
Equipment Qualification
 
updated CV (2)
updated CV (2)updated CV (2)
updated CV (2)
 
FACTORY ACCEPTANCE TEST
FACTORY ACCEPTANCE TEST FACTORY ACCEPTANCE TEST
FACTORY ACCEPTANCE TEST
 
Mangesh-Resume
Mangesh-ResumeMangesh-Resume
Mangesh-Resume
 
Lean Calibration Management
Lean Calibration ManagementLean Calibration Management
Lean Calibration Management
 
Calibration and validation ,difference , ph meter and weigh balance calibrati...
Calibration and validation ,difference , ph meter and weigh balance calibrati...Calibration and validation ,difference , ph meter and weigh balance calibrati...
Calibration and validation ,difference , ph meter and weigh balance calibrati...
 
Qualification validation ppt_171116
Qualification validation ppt_171116Qualification validation ppt_171116
Qualification validation ppt_171116
 
Apc 2
Apc 2Apc 2
Apc 2
 
Calibration Singapore
Calibration SingaporeCalibration Singapore
Calibration Singapore
 
Calibration management system
Calibration management systemCalibration management system
Calibration management system
 
Calibration
CalibrationCalibration
Calibration
 
Bob Price - Mechanical Engineer
Bob Price - Mechanical EngineerBob Price - Mechanical Engineer
Bob Price - Mechanical Engineer
 
Six sigma project
Six sigma projectSix sigma project
Six sigma project
 
Equipment qualification
Equipment qualificationEquipment qualification
Equipment qualification
 
K+S Repair Process
K+S Repair ProcessK+S Repair Process
K+S Repair Process
 
Maintenance Reliability
Maintenance ReliabilityMaintenance Reliability
Maintenance Reliability
 
Qualification & validation concept & terminology
Qualification & validation concept & terminologyQualification & validation concept & terminology
Qualification & validation concept & terminology
 
FARHAD KARAMJAN1
FARHAD KARAMJAN1FARHAD KARAMJAN1
FARHAD KARAMJAN1
 
Mechanic Calibration Singapore
Mechanic Calibration SingaporeMechanic Calibration Singapore
Mechanic Calibration Singapore
 

Viewers also liked

Proposta governo 29jun12
Proposta governo 29jun12Proposta governo 29jun12
Proposta governo 29jun12Tarso Costa
 
Penalties& política
Penalties& políticaPenalties& política
Penalties& política
pr_afsalbergaria
 
Inteligencia emocional ensayo
Inteligencia emocional  ensayoInteligencia emocional  ensayo
Inteligencia emocional ensayo
Erika-jimenez-b
 
Rubrica de evaluacion_mat_fin
Rubrica de evaluacion_mat_finRubrica de evaluacion_mat_fin
Rubrica de evaluacion_mat_fin
carlosclavijodelc
 
¿Qué es electricidad?
¿Qué es electricidad?¿Qué es electricidad?
¿Qué es electricidad?
carlos6786
 
Hvac Instruments on SALE! - Enviro Engineering
Hvac Instruments on SALE! -  Enviro EngineeringHvac Instruments on SALE! -  Enviro Engineering
Hvac Instruments on SALE! - Enviro Engineering
Mechele Malicdem
 
Instrucciones
InstruccionesInstrucciones
Instrucciones
AOAV
 
Datos 1
Datos 1Datos 1
Examen 1ra U
Examen 1ra UExamen 1ra U
Examen 1ra U
Christian Carrera
 
Deborah Hill Graduation Certificate
Deborah Hill Graduation CertificateDeborah Hill Graduation Certificate
Deborah Hill Graduation Certificate
deborahmhill
 
Vietnam visa approval letter
Vietnam visa approval letterVietnam visa approval letter
Vietnam visa approval letter
Indochina Treks Travel Co.,Ltd
 
Slideshrae (9)
Slideshrae (9)Slideshrae (9)
Slideshrae (9)sadfmm
 
Tecnologia sistemica de entrenamiento
Tecnologia sistemica de entrenamientoTecnologia sistemica de entrenamiento
Tecnologia sistemica de entrenamiento
Quirón DPH
 
E&d sound
E&d soundE&d sound
E&d sound
Farly Castigador
 
FACE
FACEFACE
FACE
dslkfhsd
 
JPCL jz300275f McDaniel Presentation
JPCL jz300275f McDaniel PresentationJPCL jz300275f McDaniel Presentation
JPCL jz300275f McDaniel Presentation
jpcoffice
 
Seminario 2013
Seminario 2013Seminario 2013
Seminario 2013
asboy
 

Viewers also liked (19)

Proposta governo 29jun12
Proposta governo 29jun12Proposta governo 29jun12
Proposta governo 29jun12
 
Penalties& política
Penalties& políticaPenalties& política
Penalties& política
 
Inteligencia emocional ensayo
Inteligencia emocional  ensayoInteligencia emocional  ensayo
Inteligencia emocional ensayo
 
Rubrica de evaluacion_mat_fin
Rubrica de evaluacion_mat_finRubrica de evaluacion_mat_fin
Rubrica de evaluacion_mat_fin
 
¿Qué es electricidad?
¿Qué es electricidad?¿Qué es electricidad?
¿Qué es electricidad?
 
Hvac Instruments on SALE! - Enviro Engineering
Hvac Instruments on SALE! -  Enviro EngineeringHvac Instruments on SALE! -  Enviro Engineering
Hvac Instruments on SALE! - Enviro Engineering
 
Instrucciones
InstruccionesInstrucciones
Instrucciones
 
Datos 1
Datos 1Datos 1
Datos 1
 
Examen 1ra U
Examen 1ra UExamen 1ra U
Examen 1ra U
 
Deborah Hill Graduation Certificate
Deborah Hill Graduation CertificateDeborah Hill Graduation Certificate
Deborah Hill Graduation Certificate
 
Vietnam visa approval letter
Vietnam visa approval letterVietnam visa approval letter
Vietnam visa approval letter
 
Slideshrae (9)
Slideshrae (9)Slideshrae (9)
Slideshrae (9)
 
Business Degree
Business DegreeBusiness Degree
Business Degree
 
แม่อาย
แม่อายแม่อาย
แม่อาย
 
Tecnologia sistemica de entrenamiento
Tecnologia sistemica de entrenamientoTecnologia sistemica de entrenamiento
Tecnologia sistemica de entrenamiento
 
E&d sound
E&d soundE&d sound
E&d sound
 
FACE
FACEFACE
FACE
 
JPCL jz300275f McDaniel Presentation
JPCL jz300275f McDaniel PresentationJPCL jz300275f McDaniel Presentation
JPCL jz300275f McDaniel Presentation
 
Seminario 2013
Seminario 2013Seminario 2013
Seminario 2013
 

Similar to Executive summary..

URS - USER REQUIREMENT SPECIFICATIONS.pdf
URS - USER REQUIREMENT SPECIFICATIONS.pdfURS - USER REQUIREMENT SPECIFICATIONS.pdf
URS - USER REQUIREMENT SPECIFICATIONS.pdf
DiegoMonge23
 
EQUIPMENT QUALIFICATION.pptx
EQUIPMENT QUALIFICATION.pptxEQUIPMENT QUALIFICATION.pptx
EQUIPMENT QUALIFICATION.pptx
Ramkumar906213
 
EQUIPMENT QUALIFICATION.pptx
EQUIPMENT QUALIFICATION.pptxEQUIPMENT QUALIFICATION.pptx
EQUIPMENT QUALIFICATION.pptx
Ramkumar906213
 
Pharmaceutical Qualification & Validation
Pharmaceutical Qualification & ValidationPharmaceutical Qualification & Validation
Pharmaceutical Qualification & Validation
Pharmaceutical
 
Equipment qualification
Equipment qualificationEquipment qualification
Equipment qualification
Institute of Validation Technology
 
Capability initial flow control
Capability   initial flow controlCapability   initial flow control
Capability initial flow control
hqdan
 
Jayadevan_Pattali
Jayadevan_PattaliJayadevan_Pattali
Jayadevan_Pattali
jayadevan pattali
 
Saif Ali_original
Saif Ali_originalSaif Ali_original
Saif Ali_original
Saif Ali
 
validation and verification of medical device.pptx
validation and verification of medical device.pptxvalidation and verification of medical device.pptx
validation and verification of medical device.pptx
GargiVaghela
 
Qualification for validation
Qualification for validationQualification for validation
Qualification for validation
Institute Of Pharmacy, Nirma University
 
Cleanroom Qualification
Cleanroom QualificationCleanroom Qualification
Cleanroom Qualification
Anwar Munjewar
 
Pre commissioning Instrument Engineer
Pre commissioning Instrument EngineerPre commissioning Instrument Engineer
Pre commissioning Instrument Engineer
Kamran Saeed
 
E&I QC INSPECTOR RESUM AND documents.pdf
E&I QC INSPECTOR RESUM AND  documents.pdfE&I QC INSPECTOR RESUM AND  documents.pdf
E&I QC INSPECTOR RESUM AND documents.pdf
Irfan786pak
 
MAHANTESH-Resume -LSSGB,LSSBB
MAHANTESH-Resume -LSSGB,LSSBBMAHANTESH-Resume -LSSGB,LSSBB
MAHANTESH-Resume -LSSGB,LSSBB
Mahantesh sh
 
Terms defenations-abriviations
Terms defenations-abriviationsTerms defenations-abriviations
Terms defenations-abriviations
Ata Alvi
 
Introduction to validation
Introduction to validation Introduction to validation
Introduction to validation
Ankush Sule
 
Site Safety Management Guidelines.pptx
Site Safety Management Guidelines.pptxSite Safety Management Guidelines.pptx
Site Safety Management Guidelines.pptx
NasriSafwan1
 
Inspection Engineer 1
Inspection Engineer 1Inspection Engineer 1
Inspection Engineer 1
karuppa samy
 
Calibration service
Calibration serviceCalibration service
Calibration service
sigmatest21
 
SANJAY PATEL
SANJAY PATELSANJAY PATEL
SANJAY PATEL
Patel Sanjay
 

Similar to Executive summary.. (20)

URS - USER REQUIREMENT SPECIFICATIONS.pdf
URS - USER REQUIREMENT SPECIFICATIONS.pdfURS - USER REQUIREMENT SPECIFICATIONS.pdf
URS - USER REQUIREMENT SPECIFICATIONS.pdf
 
EQUIPMENT QUALIFICATION.pptx
EQUIPMENT QUALIFICATION.pptxEQUIPMENT QUALIFICATION.pptx
EQUIPMENT QUALIFICATION.pptx
 
EQUIPMENT QUALIFICATION.pptx
EQUIPMENT QUALIFICATION.pptxEQUIPMENT QUALIFICATION.pptx
EQUIPMENT QUALIFICATION.pptx
 
Pharmaceutical Qualification & Validation
Pharmaceutical Qualification & ValidationPharmaceutical Qualification & Validation
Pharmaceutical Qualification & Validation
 
Equipment qualification
Equipment qualificationEquipment qualification
Equipment qualification
 
Capability initial flow control
Capability   initial flow controlCapability   initial flow control
Capability initial flow control
 
Jayadevan_Pattali
Jayadevan_PattaliJayadevan_Pattali
Jayadevan_Pattali
 
Saif Ali_original
Saif Ali_originalSaif Ali_original
Saif Ali_original
 
validation and verification of medical device.pptx
validation and verification of medical device.pptxvalidation and verification of medical device.pptx
validation and verification of medical device.pptx
 
Qualification for validation
Qualification for validationQualification for validation
Qualification for validation
 
Cleanroom Qualification
Cleanroom QualificationCleanroom Qualification
Cleanroom Qualification
 
Pre commissioning Instrument Engineer
Pre commissioning Instrument EngineerPre commissioning Instrument Engineer
Pre commissioning Instrument Engineer
 
E&I QC INSPECTOR RESUM AND documents.pdf
E&I QC INSPECTOR RESUM AND  documents.pdfE&I QC INSPECTOR RESUM AND  documents.pdf
E&I QC INSPECTOR RESUM AND documents.pdf
 
MAHANTESH-Resume -LSSGB,LSSBB
MAHANTESH-Resume -LSSGB,LSSBBMAHANTESH-Resume -LSSGB,LSSBB
MAHANTESH-Resume -LSSGB,LSSBB
 
Terms defenations-abriviations
Terms defenations-abriviationsTerms defenations-abriviations
Terms defenations-abriviations
 
Introduction to validation
Introduction to validation Introduction to validation
Introduction to validation
 
Site Safety Management Guidelines.pptx
Site Safety Management Guidelines.pptxSite Safety Management Guidelines.pptx
Site Safety Management Guidelines.pptx
 
Inspection Engineer 1
Inspection Engineer 1Inspection Engineer 1
Inspection Engineer 1
 
Calibration service
Calibration serviceCalibration service
Calibration service
 
SANJAY PATEL
SANJAY PATELSANJAY PATEL
SANJAY PATEL
 

Recently uploaded

Mastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnapMastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnap
Norma Mushkat Gaffin
 
Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431
ecamare2
 
Part 2 Deep Dive: Navigating the 2024 Slowdown
Part 2 Deep Dive: Navigating the 2024 SlowdownPart 2 Deep Dive: Navigating the 2024 Slowdown
Part 2 Deep Dive: Navigating the 2024 Slowdown
jeffkluth1
 
Creative Web Design Company in Singapore
Creative Web Design Company in SingaporeCreative Web Design Company in Singapore
Creative Web Design Company in Singapore
techboxsqauremedia
 
Industrial Tech SW: Category Renewal and Creation
Industrial Tech SW:  Category Renewal and CreationIndustrial Tech SW:  Category Renewal and Creation
Industrial Tech SW: Category Renewal and Creation
Christian Dahlen
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
marketing317746
 
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
my Pandit
 
Authentically Social Presented by Corey Perlman
Authentically Social Presented by Corey PerlmanAuthentically Social Presented by Corey Perlman
Authentically Social Presented by Corey Perlman
Corey Perlman, Social Media Speaker and Consultant
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
agatadrynko
 
buy old yahoo accounts buy yahoo accounts
buy old yahoo accounts buy yahoo accountsbuy old yahoo accounts buy yahoo accounts
buy old yahoo accounts buy yahoo accounts
Susan Laney
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
Aurelien Domont, MBA
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
agatadrynko
 
2024-6-01-IMPACTSilver-Corp-Presentation.pdf
2024-6-01-IMPACTSilver-Corp-Presentation.pdf2024-6-01-IMPACTSilver-Corp-Presentation.pdf
2024-6-01-IMPACTSilver-Corp-Presentation.pdf
hartfordclub1
 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Lviv Startup Club
 
Best practices for project execution and delivery
Best practices for project execution and deliveryBest practices for project execution and delivery
Best practices for project execution and delivery
CLIVE MINCHIN
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
Adam Smith
 
Recruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media MasterclassRecruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media Masterclass
LuanWise
 
2022 Vintage Roman Numerals Men Rings
2022 Vintage Roman  Numerals  Men  Rings2022 Vintage Roman  Numerals  Men  Rings
2022 Vintage Roman Numerals Men Rings
aragme
 
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdfThe 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
thesiliconleaders
 

Recently uploaded (20)

Mastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnapMastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnap
 
Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431
 
Part 2 Deep Dive: Navigating the 2024 Slowdown
Part 2 Deep Dive: Navigating the 2024 SlowdownPart 2 Deep Dive: Navigating the 2024 Slowdown
Part 2 Deep Dive: Navigating the 2024 Slowdown
 
Creative Web Design Company in Singapore
Creative Web Design Company in SingaporeCreative Web Design Company in Singapore
Creative Web Design Company in Singapore
 
Industrial Tech SW: Category Renewal and Creation
Industrial Tech SW:  Category Renewal and CreationIndustrial Tech SW:  Category Renewal and Creation
Industrial Tech SW: Category Renewal and Creation
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
 
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
 
Authentically Social Presented by Corey Perlman
Authentically Social Presented by Corey PerlmanAuthentically Social Presented by Corey Perlman
Authentically Social Presented by Corey Perlman
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
 
buy old yahoo accounts buy yahoo accounts
buy old yahoo accounts buy yahoo accountsbuy old yahoo accounts buy yahoo accounts
buy old yahoo accounts buy yahoo accounts
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
 
2024-6-01-IMPACTSilver-Corp-Presentation.pdf
2024-6-01-IMPACTSilver-Corp-Presentation.pdf2024-6-01-IMPACTSilver-Corp-Presentation.pdf
2024-6-01-IMPACTSilver-Corp-Presentation.pdf
 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
 
Best practices for project execution and delivery
Best practices for project execution and deliveryBest practices for project execution and delivery
Best practices for project execution and delivery
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
 
Recruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media MasterclassRecruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media Masterclass
 
2022 Vintage Roman Numerals Men Rings
2022 Vintage Roman  Numerals  Men  Rings2022 Vintage Roman  Numerals  Men  Rings
2022 Vintage Roman Numerals Men Rings
 
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdfThe 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
 

Executive summary..

  • 1. Executive Summary Prior to delivery or final installation, clients want to ensure that their equipment or plant operates as intended and meets all the contractual requirements. For this reason it is necessary to conduct a Factory Acceptance Test to ensure high quality and integrity of the equipment /plant. Unfortunately, some vendors are not always properly prepared for a Factory Acceptance Test, and the testing procedure is sometimes rushed, in order to ship the equipment as soon as possible. A highly qualified, independent third party can support the vendor by performing a Factory Acceptance Test, or by witnessing its appropriate execution on behalf of the buyer. SGS Industrial Service offers Factory Acceptance Test to determine and document whether the equipment or plant operates as intended and meets all the contractual specifications. The Factory Acceptance Test provided by SGS is a customized testing procedure for equipment and plants. The test is executed before final installation or prior to delivery. Although testing is not a requirement, it is recommended carry it out. The Factory Acceptance Test by SGS includes a check of completeness, proof of functionality and a verification of all important documents, such as manuals, instructions, plans, drawings, piping and instrumentation diagrams (P&Ids) A comprehensive Factory Acceptance Test is the most cost-effective means to ensure that the equipment/plant operates correctly and is of high quality and integrity. The outcome of the Factory Acceptance Test gives the client confidence that the equipment/plant performs as expected under the full range of foreseeable conditions, including misuse and error.