SlideShare a Scribd company logo
Receiving:
All parts received for repair are removed from their packaging, logged into
our Repair Order Tracking System and photographed. Our Repair Order
Tracking System captures all part specific and customer specific information
including any operating problems noticed at your site. A Repair Order barcode is
then affixed to the parts so they can be tracked throughout the entire repair
process.
Evaluation:
Once your part is received and properly tagged, it makes its way to our evaluation and
triage area. Engineers begin the free of charge process of evaluating your part to
determine the probable cause of failure and identify the correct repair and
test procedures.
Quoting:
After the initial evaluation takes place, our dedicated team of Customer Service
Representatives will contact you with our repair quotation for your review and
approval.
Approvals:
Upon receiving your approval for repair, our automated Repair Order
Tracking System adds the repair into the work chain of the Engineer best suited
for that type of part.
Repair:
Our Repair Order Tracking System links your part to the correct repair and
test procedures as well as the associated closed loop test system. K+S
Engineers replace failed components as well as all high failure components as per
our standard repair procedure. After repair is complete, item is tested with the
associated closed loop test system for the duration specified on our test
procedure.
System / Quality Test:
Our Repair Order Tracking System links your part to the correct repair and
test procedures as well as the associated closed loop test system. K+S
Engineers replace failed components as well as all high failure components as per
our standard repair procedure. After repair is complete, item is tested with the
associated closed loop test system for the duration specified on our test procedure.
Repair & Test Reports:
Each repaired component shipped from K+S comes back to you with a Repair and Test
Report listing the following:
•What problems were identified during the evaluation process
•All parts repaired or replaced
•Whether the identified problem matches up with the reported issues while in operation
•Test details and duration
•The probable root cause of failure
•All recommended installation instructions
Shipping:
Upon completion of the repair, our automated Repair Order Tracking System notifies our
shipping department of any customer specific shipping requirements. All repairs are
packed in anti-static bags and protected by insta-pack foam to ensure your deliveries
arrive free of shipping damage each and every time.

More Related Content

What's hot

Arrow Instruments Calibration, Coimbatore, Test Sieve Calibration
Arrow Instruments Calibration, Coimbatore, Test Sieve CalibrationArrow Instruments Calibration, Coimbatore, Test Sieve Calibration
Arrow Instruments Calibration, Coimbatore, Test Sieve Calibration
IndiaMART InterMESH Limited
 
Apc trainings presentation november 2013
Apc trainings presentation november 2013Apc trainings presentation november 2013
Apc trainings presentation november 2013Walid Hmida
 
NAC 455C review show
NAC 455C review showNAC 455C review show
NAC 455C review showFathi Atari
 
ECSS-Q-ST-20C Supplier Responsibilities
ECSS-Q-ST-20C Supplier ResponsibilitiesECSS-Q-ST-20C Supplier Responsibilities
ECSS-Q-ST-20C Supplier ResponsibilitiesAndrew Whittaker
 
ECSS-Q-ST-10C Supplier vs PA Manager Responsibilities_formatted
ECSS-Q-ST-10C Supplier vs PA Manager Responsibilities_formattedECSS-Q-ST-10C Supplier vs PA Manager Responsibilities_formatted
ECSS-Q-ST-10C Supplier vs PA Manager Responsibilities_formattedAndrew Whittaker
 
Executive summary..
Executive  summary..Executive  summary..
Executive summary..Mak Embun
 
Provisional Operations 30 April 2014
Provisional Operations 30 April 2014Provisional Operations 30 April 2014
TESCO Recommendations for New ANSI C12-1 Standards for In-Service Performance
TESCO Recommendations for New ANSI C12-1 Standards for In-Service PerformanceTESCO Recommendations for New ANSI C12-1 Standards for In-Service Performance
TESCO Recommendations for New ANSI C12-1 Standards for In-Service Performance
TESCO - The Eastern Specialty Company
 
QMS Calibration Powerpoint
QMS Calibration PowerpointQMS Calibration Powerpoint
QMS Calibration PowerpointDennis J Morgan
 
Certificate_Hydraulics_NDSQ 2015 Asad Abbas
Certificate_Hydraulics_NDSQ 2015 Asad AbbasCertificate_Hydraulics_NDSQ 2015 Asad Abbas
Certificate_Hydraulics_NDSQ 2015 Asad AbbasAsad Abbas
 
Automation testing - Success Story
Automation testing - Success StoryAutomation testing - Success Story
Automation testing - Success Story
Xavient Information Systems
 
Automated Calibration
Automated CalibrationAutomated Calibration
Automated Calibration
Paul Crowhurst
 
Saturn Electronics Corp., PCB Manufacturer
Saturn Electronics Corp., PCB ManufacturerSaturn Electronics Corp., PCB Manufacturer
Saturn Electronics Corp., PCB Manufacturer
Domestic PCB Fabrication
 
Internal quality audit operational procedure
Internal quality audit operational procedureInternal quality audit operational procedure
Internal quality audit operational procedure
Tuan Anh Nguyen
 
2920 - Signalling Installation and Testing Review
2920 - Signalling Installation and Testing Review2920 - Signalling Installation and Testing Review
2920 - Signalling Installation and Testing ReviewAndy Keasley
 
Energy Assessment and Audit
Energy Assessment and AuditEnergy Assessment and Audit
Energy Assessment and Audit
Raj Shourie
 

What's hot (20)

Arrow Instruments Calibration, Coimbatore, Test Sieve Calibration
Arrow Instruments Calibration, Coimbatore, Test Sieve CalibrationArrow Instruments Calibration, Coimbatore, Test Sieve Calibration
Arrow Instruments Calibration, Coimbatore, Test Sieve Calibration
 
Apc trainings presentation november 2013
Apc trainings presentation november 2013Apc trainings presentation november 2013
Apc trainings presentation november 2013
 
NAC 455C review show
NAC 455C review showNAC 455C review show
NAC 455C review show
 
ECSS-Q-ST-20C Supplier Responsibilities
ECSS-Q-ST-20C Supplier ResponsibilitiesECSS-Q-ST-20C Supplier Responsibilities
ECSS-Q-ST-20C Supplier Responsibilities
 
ECSS-Q-ST-10C Supplier vs PA Manager Responsibilities_formatted
ECSS-Q-ST-10C Supplier vs PA Manager Responsibilities_formattedECSS-Q-ST-10C Supplier vs PA Manager Responsibilities_formatted
ECSS-Q-ST-10C Supplier vs PA Manager Responsibilities_formatted
 
RC_Services Brochure
RC_Services BrochureRC_Services Brochure
RC_Services Brochure
 
Executive summary..
Executive  summary..Executive  summary..
Executive summary..
 
Provisional Operations 30 April 2014
Provisional Operations 30 April 2014Provisional Operations 30 April 2014
Provisional Operations 30 April 2014
 
Ali CV
Ali CVAli CV
Ali CV
 
TESCO Recommendations for New ANSI C12-1 Standards for In-Service Performance
TESCO Recommendations for New ANSI C12-1 Standards for In-Service PerformanceTESCO Recommendations for New ANSI C12-1 Standards for In-Service Performance
TESCO Recommendations for New ANSI C12-1 Standards for In-Service Performance
 
QMS Calibration Powerpoint
QMS Calibration PowerpointQMS Calibration Powerpoint
QMS Calibration Powerpoint
 
Certificate_Hydraulics_NDSQ 2015 Asad Abbas
Certificate_Hydraulics_NDSQ 2015 Asad AbbasCertificate_Hydraulics_NDSQ 2015 Asad Abbas
Certificate_Hydraulics_NDSQ 2015 Asad Abbas
 
Duties
DutiesDuties
Duties
 
Automation testing - Success Story
Automation testing - Success StoryAutomation testing - Success Story
Automation testing - Success Story
 
Automated Calibration
Automated CalibrationAutomated Calibration
Automated Calibration
 
Saturn Electronics Corp., PCB Manufacturer
Saturn Electronics Corp., PCB ManufacturerSaturn Electronics Corp., PCB Manufacturer
Saturn Electronics Corp., PCB Manufacturer
 
Prdz_resume_march16
Prdz_resume_march16Prdz_resume_march16
Prdz_resume_march16
 
Internal quality audit operational procedure
Internal quality audit operational procedureInternal quality audit operational procedure
Internal quality audit operational procedure
 
2920 - Signalling Installation and Testing Review
2920 - Signalling Installation and Testing Review2920 - Signalling Installation and Testing Review
2920 - Signalling Installation and Testing Review
 
Energy Assessment and Audit
Energy Assessment and AuditEnergy Assessment and Audit
Energy Assessment and Audit
 

Viewers also liked

Trioptics spherocompact
Trioptics spherocompactTrioptics spherocompact
Trioptics spherocompact
urcadelima
 
Reglamento inpres cirsoc_103_tomo_ii
Reglamento inpres cirsoc_103_tomo_iiReglamento inpres cirsoc_103_tomo_ii
Reglamento inpres cirsoc_103_tomo_ii
Daniel Muñoz
 
Apresentao Maxxximus
Apresentao MaxxximusApresentao Maxxximus
Apresentao Maxxximus
luisvaz005
 
Masterclass: Week 3 Engagement
Masterclass: Week 3 EngagementMasterclass: Week 3 Engagement
Masterclass: Week 3 Engagement
ExactTarget APAC
 
News
NewsNews
News
samkit45
 
BNI Noord-Limburg: Group energy & renovations
BNI Noord-Limburg: Group energy & renovationsBNI Noord-Limburg: Group energy & renovations
BNI Noord-Limburg: Group energy & renovations
Wim Coemans
 
Ppt on introduction to blogging
Ppt on introduction to bloggingPpt on introduction to blogging
Ppt on introduction to blogging
Akshay Garg
 
Reading Comprehension Strategies
Reading Comprehension StrategiesReading Comprehension Strategies
Reading Comprehension Strategies
scbireley53
 
Pets
PetsPets
Pets
samkit45
 
Blog challenge
Blog challengeBlog challenge
Blog challengeHotsteve13
 
Football october 12 rankings
Football october 12 rankingsFootball october 12 rankings
Football october 12 rankings
Rich Thomaselli
 
Multiplying Student Success: Tech x Teacher Prep x Disruption
Multiplying Student Success: Tech x Teacher Prep x DisruptionMultiplying Student Success: Tech x Teacher Prep x Disruption
Multiplying Student Success: Tech x Teacher Prep x Disruption
WSSEA
 
My work is
My work isMy work is
My work is
UMB
 
Suez Canal Report - August 2015
Suez Canal Report - August 2015Suez Canal Report - August 2015
Suez Canal Report - August 2015
MediSci Esf
 
Open Source & Open Data Session report from imaGIne 2014 Conference
Open Source & Open Data Session report from imaGIne 2014 ConferenceOpen Source & Open Data Session report from imaGIne 2014 Conference
Open Source & Open Data Session report from imaGIne 2014 Conference
GSDI Association
 
David Coleman presentation at SDI Summit 2014, Calgary, Canada, 17-19 Sept 2014
David Coleman presentation at SDI Summit 2014, Calgary, Canada, 17-19 Sept 2014David Coleman presentation at SDI Summit 2014, Calgary, Canada, 17-19 Sept 2014
David Coleman presentation at SDI Summit 2014, Calgary, Canada, 17-19 Sept 2014
GSDI Association
 

Viewers also liked (16)

Trioptics spherocompact
Trioptics spherocompactTrioptics spherocompact
Trioptics spherocompact
 
Reglamento inpres cirsoc_103_tomo_ii
Reglamento inpres cirsoc_103_tomo_iiReglamento inpres cirsoc_103_tomo_ii
Reglamento inpres cirsoc_103_tomo_ii
 
Apresentao Maxxximus
Apresentao MaxxximusApresentao Maxxximus
Apresentao Maxxximus
 
Masterclass: Week 3 Engagement
Masterclass: Week 3 EngagementMasterclass: Week 3 Engagement
Masterclass: Week 3 Engagement
 
News
NewsNews
News
 
BNI Noord-Limburg: Group energy & renovations
BNI Noord-Limburg: Group energy & renovationsBNI Noord-Limburg: Group energy & renovations
BNI Noord-Limburg: Group energy & renovations
 
Ppt on introduction to blogging
Ppt on introduction to bloggingPpt on introduction to blogging
Ppt on introduction to blogging
 
Reading Comprehension Strategies
Reading Comprehension StrategiesReading Comprehension Strategies
Reading Comprehension Strategies
 
Pets
PetsPets
Pets
 
Blog challenge
Blog challengeBlog challenge
Blog challenge
 
Football october 12 rankings
Football october 12 rankingsFootball october 12 rankings
Football october 12 rankings
 
Multiplying Student Success: Tech x Teacher Prep x Disruption
Multiplying Student Success: Tech x Teacher Prep x DisruptionMultiplying Student Success: Tech x Teacher Prep x Disruption
Multiplying Student Success: Tech x Teacher Prep x Disruption
 
My work is
My work isMy work is
My work is
 
Suez Canal Report - August 2015
Suez Canal Report - August 2015Suez Canal Report - August 2015
Suez Canal Report - August 2015
 
Open Source & Open Data Session report from imaGIne 2014 Conference
Open Source & Open Data Session report from imaGIne 2014 ConferenceOpen Source & Open Data Session report from imaGIne 2014 Conference
Open Source & Open Data Session report from imaGIne 2014 Conference
 
David Coleman presentation at SDI Summit 2014, Calgary, Canada, 17-19 Sept 2014
David Coleman presentation at SDI Summit 2014, Calgary, Canada, 17-19 Sept 2014David Coleman presentation at SDI Summit 2014, Calgary, Canada, 17-19 Sept 2014
David Coleman presentation at SDI Summit 2014, Calgary, Canada, 17-19 Sept 2014
 

Similar to K+S Repair Process

Plc based inspection, packaging, storage and retrieval application
Plc based inspection, packaging, storage and  retrieval applicationPlc based inspection, packaging, storage and  retrieval application
Plc based inspection, packaging, storage and retrieval application
Nilesh parmar
 
Qualification of Dissolution Test Apparatus and Validation of Utility System
Qualification of Dissolution Test Apparatus and Validation of Utility SystemQualification of Dissolution Test Apparatus and Validation of Utility System
Qualification of Dissolution Test Apparatus and Validation of Utility System
Akshay Trivedi , Maliba Pharmacy College
 
Mt s12 test_execution
Mt s12 test_executionMt s12 test_execution
Mt s12 test_executionTestingGeeks
 
Software Project Team (YOU) JBB SoftwareCustomer Astin Martin .docx
Software Project Team (YOU) JBB SoftwareCustomer Astin Martin .docxSoftware Project Team (YOU) JBB SoftwareCustomer Astin Martin .docx
Software Project Team (YOU) JBB SoftwareCustomer Astin Martin .docx
rronald3
 
Delta Telecom O&m presentation
Delta Telecom O&m presentationDelta Telecom O&m presentation
Delta Telecom O&m presentation
engramjadislam78
 
Release Verification Team Proposal
Release Verification Team  ProposalRelease Verification Team  Proposal
Release Verification Team Proposal
Raghunath (Gautam) Soman
 
Six sigma project
Six sigma projectSix sigma project
Six sigma project
JAPAN SHAH
 
Rcs computers profical 1
Rcs computers profical 1Rcs computers profical 1
Rcs computers profical 1
RCS COMPUTERS
 
NetSure Buyers' Guide
NetSure Buyers' GuideNetSure Buyers' Guide
NetSure Buyers' Guide
Curvature
 
Software testing acceptance testing
Software testing  acceptance testingSoftware testing  acceptance testing
Software testing acceptance testing
GaneshKumarKanthiah
 
Warranty Policy
Warranty PolicyWarranty Policy
Warranty Policy
guestbe06bfeb
 
Process control trainer |Best process control trainer at best prices in India...
Process control trainer |Best process control trainer at best prices in India...Process control trainer |Best process control trainer at best prices in India...
Process control trainer |Best process control trainer at best prices in India...
Icecream48
 
Calibration and Qualification
Calibration and QualificationCalibration and Qualification
Calibration and Qualification
Priyanka Kandhare
 
ASPHALT_quality-manual.pdf
ASPHALT_quality-manual.pdfASPHALT_quality-manual.pdf
ASPHALT_quality-manual.pdf
MILRAB1
 
Mechanical Completions
Mechanical CompletionsMechanical Completions
Mechanical Completions
Andy Lang
 
Body Shop Process Overview
Body Shop Process Overview Body Shop Process Overview
Body Shop Process Overview
RANDY FERRESE
 
Acceptance testing
Acceptance testingAcceptance testing
Acceptance testing
Vaibhav Dash
 
Manual testing concepts course 1
Manual testing concepts course 1Manual testing concepts course 1
Manual testing concepts course 1Raghu Kiran
 

Similar to K+S Repair Process (20)

Plc based inspection, packaging, storage and retrieval application
Plc based inspection, packaging, storage and  retrieval applicationPlc based inspection, packaging, storage and  retrieval application
Plc based inspection, packaging, storage and retrieval application
 
Qualification of Dissolution Test Apparatus and Validation of Utility System
Qualification of Dissolution Test Apparatus and Validation of Utility SystemQualification of Dissolution Test Apparatus and Validation of Utility System
Qualification of Dissolution Test Apparatus and Validation of Utility System
 
Mt s12 test_execution
Mt s12 test_executionMt s12 test_execution
Mt s12 test_execution
 
Software Project Team (YOU) JBB SoftwareCustomer Astin Martin .docx
Software Project Team (YOU) JBB SoftwareCustomer Astin Martin .docxSoftware Project Team (YOU) JBB SoftwareCustomer Astin Martin .docx
Software Project Team (YOU) JBB SoftwareCustomer Astin Martin .docx
 
Delta Telecom O&m presentation
Delta Telecom O&m presentationDelta Telecom O&m presentation
Delta Telecom O&m presentation
 
Presentation QMC
Presentation QMCPresentation QMC
Presentation QMC
 
Release Verification Team Proposal
Release Verification Team  ProposalRelease Verification Team  Proposal
Release Verification Team Proposal
 
Six sigma project
Six sigma projectSix sigma project
Six sigma project
 
Rcs computers profical 1
Rcs computers profical 1Rcs computers profical 1
Rcs computers profical 1
 
NetSure Buyers' Guide
NetSure Buyers' GuideNetSure Buyers' Guide
NetSure Buyers' Guide
 
Software testing acceptance testing
Software testing  acceptance testingSoftware testing  acceptance testing
Software testing acceptance testing
 
Warranty Policy
Warranty PolicyWarranty Policy
Warranty Policy
 
Process control trainer |Best process control trainer at best prices in India...
Process control trainer |Best process control trainer at best prices in India...Process control trainer |Best process control trainer at best prices in India...
Process control trainer |Best process control trainer at best prices in India...
 
Calibration and Qualification
Calibration and QualificationCalibration and Qualification
Calibration and Qualification
 
ASPHALT_quality-manual.pdf
ASPHALT_quality-manual.pdfASPHALT_quality-manual.pdf
ASPHALT_quality-manual.pdf
 
Mechanical Completions
Mechanical CompletionsMechanical Completions
Mechanical Completions
 
Body Shop Process Overview
Body Shop Process Overview Body Shop Process Overview
Body Shop Process Overview
 
Acceptance testing
Acceptance testingAcceptance testing
Acceptance testing
 
Manual testing concepts course 1
Manual testing concepts course 1Manual testing concepts course 1
Manual testing concepts course 1
 
PROJECT REPORT
PROJECT REPORTPROJECT REPORT
PROJECT REPORT
 

K+S Repair Process

  • 1. Receiving: All parts received for repair are removed from their packaging, logged into our Repair Order Tracking System and photographed. Our Repair Order Tracking System captures all part specific and customer specific information including any operating problems noticed at your site. A Repair Order barcode is then affixed to the parts so they can be tracked throughout the entire repair process.
  • 2. Evaluation: Once your part is received and properly tagged, it makes its way to our evaluation and triage area. Engineers begin the free of charge process of evaluating your part to determine the probable cause of failure and identify the correct repair and test procedures.
  • 3. Quoting: After the initial evaluation takes place, our dedicated team of Customer Service Representatives will contact you with our repair quotation for your review and approval.
  • 4. Approvals: Upon receiving your approval for repair, our automated Repair Order Tracking System adds the repair into the work chain of the Engineer best suited for that type of part.
  • 5. Repair: Our Repair Order Tracking System links your part to the correct repair and test procedures as well as the associated closed loop test system. K+S Engineers replace failed components as well as all high failure components as per our standard repair procedure. After repair is complete, item is tested with the associated closed loop test system for the duration specified on our test procedure.
  • 6. System / Quality Test: Our Repair Order Tracking System links your part to the correct repair and test procedures as well as the associated closed loop test system. K+S Engineers replace failed components as well as all high failure components as per our standard repair procedure. After repair is complete, item is tested with the associated closed loop test system for the duration specified on our test procedure.
  • 7. Repair & Test Reports: Each repaired component shipped from K+S comes back to you with a Repair and Test Report listing the following: •What problems were identified during the evaluation process •All parts repaired or replaced •Whether the identified problem matches up with the reported issues while in operation •Test details and duration •The probable root cause of failure •All recommended installation instructions
  • 8. Shipping: Upon completion of the repair, our automated Repair Order Tracking System notifies our shipping department of any customer specific shipping requirements. All repairs are packed in anti-static bags and protected by insta-pack foam to ensure your deliveries arrive free of shipping damage each and every time.