I am highly skilled, dynamic, innovative and competent person with DAE mechanical and 20 years experience in heatexchanger,s, vessel, columns in oil refinery, gas plant erection, commissioning and maintenance and shut downs.
And also I'm highly competitive and good orientated, initiative preparation and good oriented initiative discipline and we'll organized with excellent communication and leadership skills which make me easy to interact and communicate with different levels of management with local and international people's.
*good hse awareness and commitment.
*good written and verbal communication skills.
*safety training’s like ptw(permit to work), confined space ,work at height ,basic fire fighting,
H2s and tra(task risk assessment).
*strong leadership skills, able to build trust, values.
Drive execution and foster innovation of any team.
*particularly skilled in optimizing technicality and functional knowledge.
*development of task risk assessment for any critical activities with other related departments.
*experience with contractor and worldwide suppliers, in particular those who involved in contraction and maintenance and shutdown of oil&gas facilities.
*excellent communicate skill to demonstrate by ability to work.
*highly motivated able to effectively manage team and work well under stress.
Sir,
Please find the attachment of my resume.
Best regards
Abid hussain qaiser
pakistan +923017887781
uae +97150608922
Introduction to IEEE STANDARDS and its different types.pptx
Abid hussain qaiser
1. CURRICULUM VITAE
APPLICATIONFOR ENGINEER MECHANICAL
NAME : ABID HUSSAIN QAISER
FATHER’SNAME : JEWAN SHAH
Email : AbidHussainQasir@Yahoo.Com
SKYPE : ABID.BUKHARI48
PASPORT NO : BD4918632
BLOOD GROUP : A+VE
QUALIFICATION : ASSOCIATEENG DIPLOMA 2YEARS
PHON NO : +923017887781.+97150608922
ADDRESS : NoorSHAH TLY ROAD COLONYNAQAD
ABADWARD NO 14/B KOTADU. PAKISTAN
EXPERIENCE
20 year experience of oil refinery, gas plant power plants Erection and Maintenance.
Rotary and stationary equipment’s
Total Experience 20 Years
Safety Training Programs:
I attended much safety training programs which include training of ;
FirstAid,BehaviorSafety,IRS( incidentReportSystem)
ConfinedSpace Entry,EmergencyResponse Plan
Gas Mask & SCBA,Fire ManagementSystem
Work PermitSystems,JSA,Scaffolding
Use of Personal Protective Equipment’s ( PPE’S)
H2S training,heatstress,workat height
Breathingapparatus trolley attendant
FERTIL UAE
PRESENTLY WORKING WITH DOOSAN BABCOCK AS AREA ENGINEER FROM 28 SEP TO TILL
NOW.
TAKREER OIL REFINERY UAE.
WORK AS INCHARGE UNIT WITH QATAR CONSTRUCTION AT TAKREER OIL
REFINERY(AL RAWAIS) FROM 01 JAN 2016 2 APRIL2016.
GENCO(THERMAL POWERHOUSE).
WORKAS MECHANICAL ENGINEER WITHWAPDA(WATER ANDPOWER DEVELOPMENT AUTHORITY)AT MUZAFARGARH
FOR REPLACEMENT OF ID FAN CASING,IMPELLER,AND ALIGNMENT AND COMMISSIONINGOF FORCE DRAFTFAN FROM
29 MAY2015 TO 10 NOV 2015
.QATAR PETROLEUM(OIL REFIENERY). WORK IN QATAR PETROLEUM IN SHUTDOWN ACTIVITIES OF
HEAT EXCHANGERS AND REACTORS OF CCR(CATALYST CONTINUE REFORMER)FROM 25JAN2015 TO 13
MAY2015.
Q CHEM(RLOC) RASLAFFAN OLEFINCOMPANY
WORK IN OLEFIN (RLOC)PLANT AT RASS LAFFAN QATAR AS SUPERVIOR STATIC IN SHUTDOWN FROM NOV 11
2014 TO JAN25 2015.
2. RASGAS QATAR.
WORK AS MECHANICAL ASSISTANT MECHANICAL ENGEENIER AT RASS GAS QATAR FROM 29 FEB TO 23may
2014.
DOLPHEN ENERGY.
WORK WITH DESCON ENG QATAR L.L.C AS SUPERVISOR STATIC FROM 11 JAN 2014 TO 28FEB2014.
GENCO(THERMAL POWERHOUSE).
Work as mechanical engineer with wapda(water and power development authority) atMuzafargarh for
replacement of id fan casing,impeller,and alignmentand commissioningof forcedraft fan From 29 Oct
2013 to 10 Jan 2014.
RASS GAS QATAR.
WORK AS SUPERVISOR AT RASSGAS WITH DESCON ENGG QATAR L.L.C FROM 22 AUG2013 TO 20 OCT
2013.
QATAR PETROLEUM OIL REFINERY.
WORK AS SUPERVISOR WITH DESCON ENGG QATAR L.L.C AT QATAR PETROLEUM OIL REFINERY( MESAEED
INDUSTRIAL CITY) FROM 25 FEB2013 TO 30 MAY 2013.
DOLPHIN ENERGY (QATAR).
WORK AS SUPERVISOR WITH DESCON ENGG QATAR L.L.C AT RASS LAFFAN INDUSTRIAL CITY FROM 12 JAN
2013 TO 24 FEB 2013.
RESPONCIBLITIES.
PREPARE THE TRA (TASK RISK ASSESMENT)AND SUBMENT FOR APPROVAL OF ALL TURNAROND
EQUIPMENTS.
PREPARE OF ALL WORK PERMITS AS PER REQUIREMENT.
MAKE SURE ALL BLINDING AS PER P&ID MARK UP.
PERFORM AS OPEN INSPECTION AND ACT AS PER INSPECTION RECOMMENDED.
ATTEND THE DAILY MINUTE OF MEETING WITH CLINT AS PER JOB DISCRUPTION.
PERFORM HYDRO & PNEUMATIC TEST AS PER EQUIPMENT SPECIFICATION.
QATER GAS.
WORK AS SUPERVISOR (GENERAL) IN TRAIN 3 SHUT DOWN FROM 16 MARCH TO 15 MAY2012.
RESPONCIBLITIES
OPENING THE MANWAYS OF COLLUMNS, OPENING THE BUBBLE TRAYS AND REMOVING OF BUBBLE CAP
AND REMOVING THE RASHING RING.
INSTALLATOIN OF DEMISTERPADS, BUBBLE CAPS, AND BOX UP, DEBLIND.
QATER CHEMICAL (Q CHEM).
Work as supervisor with m/s descon at qatter chemical plant(mesaeed) from 28 jan2012 to 15 march
2012.
RESPONCIBLITIES.
Perform and arrangeall of safety arrangement as per TRA (task risk assessment)
Blindingthe equipment as per p&id.
Prepare for hydro test, witness by QA/QC department.
DOLPHIN ENERGY (QATAR).
Work as supervisor with m/s descon at dolphin energy from28 dec2011 to 25jan2012
DOLPHIN ENERGY (QATAR).
Work as supervisor with m/s descon at dolphin energy from 22 Jan 2011 to 25 Feb 2011.
RESPONCIBLITIES.
Blindingof lineas per p&id with process communication.
Removing of channel head from heat exchanger.
Hydro jetting & chemical cleaning of tube bundle as per instruction of inspection dept.
Install back tubebundles with new gaskets and prepare for hydro test.
Box up and DE blind the lines as per p&id mark up.
HUBSHAN (BAB) ABU DHABI.
Work as supervisor with m/s descon engineering at bab in shutdown activities
From 21 Sep2010 to19 DEC 2010.
3. ENGRO (DHARKI).
Work as supervisor atengro urea pant with descon eng from 12 Nov 2010 to 30 June 2011.
RASS GIRTAS(QATER).
work at RASS GIRTASS (power and water plant) PROJECT AT QATAR AS SUPERVISOR (GENERAL) from 5
June 2009 to AUG 2009
.Q CHEM(RLOC) RASS LAFFANOLEFIN COMPANY.
Work at RAS LAFFAN OLEFIN (ethylene )PROJECT AT QATAR AS SUPERVISOR (COMMISSIONING) From Aug-08
2008to June 4 -2009.
Responsibility.
Witness of hydro test, pneumatic test, lineflushing,air blowing,steamblowing, reinstatement, etc.
Surveillance of steel structures and piping during fabrication, assembly and erection to conform to the
quality procedure and specification
Witness final alignment and bolt torque for steel structures and pipe flanges
Generate RFI (Request For Inspection) for various stage inspections and hold points
Interfacingwith clientand sub-contractors for technical meetings
Conducting internal meetings for quality issues
Inspection of pipespools as per approved isometrics
Inspection and preparation of Punch listof pipingworks,defects and corrections.
Pointingout of engineering problems to the correspondingtechnical departments for the correction of
designs not followingthe standards in use.ASME, API, BSS, etc. inserted in the punch lists.
Control of advance of the repairs of the points included in the punch lists, inspection of parts and
equipment, approval of the points not satisfied with after being modified or repaired.
Identification of all thecomponents used in the tests for a correct identification duringthetest inspection.
Suggestions to the Engineering Department for the design modification in order to adapt them wi th the
standards used or for a better functioning of the component.
Review of Test Packageand identification of manifold and gauges.
Preparation of Test Pack Punch listClearancereport
Preliminary conformity to P & ID checking.
Attend weekly meeting for reporting of work accomplishment.
Prepare “Weekly Progress Report” and submit to clientfor verification.
Monitored Pipingworks based on P&IDs and approved construction IFC(ISSUEFOR CONSTRUCTION).
Attend trainings on safety as per clientrequirement.
PARCO ( PAK ARAB OIL REFINERY ).
Work as technician rotary (millwright) with EEC at Pak Arab oil refinery Form 01-01-2004 to 28-07-08.
PARCO ( PAK ARAB Oil REFIENERY ).
Work as a Supervisor in Turn Around 02 at Parco.
PARCO( PAK ARAB Oil REFIENERY ).
Work as millwrightfitter With Descon Engineering from 17-10-2000 to 31-12-2004
PARCO ( PAK ARAB OIl REFIENERY ).
Work as a supervisor in turnaround of PARCO with DESCON from 01-01-2002 to 21-10-2002.
PARCO ( PAK ARAB OIl REFIENERY ).
Work as leadman form 14-05-2000 to 17-10-2000 with DESCON jointcommission team of Marubni
Corporation and PARCO.
PARCO( PAK ARAB OIl REFIENERY ).
Work as a technician with SIEMENS form 24-09-1999 to 30-04-2000.
PARCO ( PAK ARAB OIl REFIENERY ).
Work as technician with DESCON from 20-11-1998 to 22-05-1999 PARCO Erection.
4. DESCON.
Work as Forman at AES LAL PIRpower plantin turnaround from 1-9-98to31-10-98.
HPCC CHINA.
Work as a fabricator atFauji KababirWallaPower Plantform 13-11-1997 to 10-08-1998.
CPC.D.G.KHAN.
Work as fabricator atD.G Khan Cement Factory Extension Project.
ABID HUSSAIN QASIR