SlideShare a Scribd company logo
1 of 5
PROJECT
METHOD STATEMENT FOR PIPE INTERNAL
GIRTHWELDS SHARP EDGES REMOVAL BY ABRASIVE
TOOLS & HSE REQUIREMENTS
Class 1 Rev. A Page 1of5
METHOD STATEMENTFOR PIPE INTERNAL GIRTH WELD
SHARP EDGES REMOVAL BY ABRASIVE TOOLS & HSE
REQUIREMENTS
Company : Kuwait Oil Company (K.S.C.)
Contract No. : 11050146
Project No. : EF/1772
Location : Burgan Field and South East Kuwait Fields
Job No. : 101920
A Issued for Approval Prepared Checked Reviewed Approved
METHOD STATEMENT FOR PIPE INTERNAL
GIRTHWELDS SHARP EDGES REMOVAL BY ABRASIVE
TOOLS & HSE REQUIREMENTS
Class 1 Rev. A Page 2 of 6
TABLE OF CONTENTS
1. PURPOSE ……………….……………………………………………………………………. 3
2. SCOPE …..……………………………………………………………………………………. 3
3. DEFINITIONS …………………………………………………………………………………. 3
4. REFERENCES .……………….……….……….……………………………………………. 3
4.1 ASME B31.3……………………………………………………………………… 3
4.2 Code & Standards Applicable………………………………………………….. 3
5. KEY PROJECT TEAM AND JOB DESCRIPTIONS………………………………………… 3
5.1 Site Engineer…………………………………………………………………….. 4
5.2 Work Site Supervisor…………………………………………………………… 4
5.3 HSE Engineer…………………………………………………………………… 4
6. ACTIVITY DETAILS .…………………………………………………………………………….4
7. INSPECTION……………………………………………………………………………….. 5
8. SAFETY……………………………………………………………………………………… 5
9. ATTACHMENT………………………………………………………………………………6
METHOD STATEMENT FOR PIPE INTERNAL
GIRTHWELDS SHARP EDGES REMOVAL BY ABRASIVE
TOOLS & HSE REQUIREMENTS
Class 1 Rev. A Page 3 of 6
1. PURPOSE
The purpose of this method statement is to defined, establish and maintain the documented
procedure to be adopted to carry out weld joint internal cleaning using portable grinder tool to
remove only sharp edges prior to start Fusion Bond Epoxy (FBE) internal coating.
2. SCOPE
The scope of this work instruction applies to set out minimum requirements for internal cleaning
using grinder tools to remove sharp edges of internal girth weld joint of the pipe before Fusion
Bond Epoxy coating application. The scope of works covers the pipe diameter of 24”, 30”, and
32’ and 36”. This method statement includes the HSE requirements to carry out the job in safe
manner.
3. DEFINITIONS
4. REFERENCES
4.1 ASME B31.3 Process Piping.
4.2 API RP 2009 Safe Welding. Cutting and other hot work practices
in the Petroleum and Petrochemical Industries.
4.3 Codes & Standards Applicable
5. KEY PROJECT TEAM AND JOB DESCRIPTION:
5.1 Site Engineer.
 He will report to Construction Manager and responsible for the work execution and his
maximum HSE responsibilities to carry out the task safely.
 Implementation of safe work procedure under his assignment.
 Make workers understand completely all instruction to carry out the job safely.
 Ensure that PTW system adhered.
 Ensure that all equipment to be use are approved meeting the KOC.SA
5.2 Worksite Supervisor.
 He will report to Site Engineer and his primary responsibilities is to ensure that the work
is carried out under his supervision and carried out in safe manner.
 He shall ensure that risk are identifies and assessed under his control.
 Identify HSE problems and initiate preventive control.
 Ensure that JSA prepared and discuss to workers.
 Ensure that proper PPE issued to worker.
 Ensure that tool box meeting conducted before start of work.
 Ensure that welfare facilities provided.
 Ensure that a Permit to Work is available and approved for the job.
METHOD STATEMENT FOR PIPE INTERNAL
GIRTHWELDS SHARP EDGES REMOVAL BY ABRASIVE
TOOLS & HSE REQUIREMENTS
Class 1 Rev. A Page 4 of 6
 Ensure that he will stay at work on full time basis and will assigned competent person in
case of urgent and circumstantial situation.
 Responsible for the area in highest level of housekeeping.
 Responsible for reporting all incident and near misses to HSE Manager.
 Ensure that safe work platform and access are available and in safe and good condition..
5.3 HSE Engineer.
 Support the Site Engineer and Work Site Supervisor and his HSE team.
 Responsible for application of all HSE requirements related to the job.
 Responsible for application of applicable codes & standards.
 Review Risk Assessment and JSA.
 Attend tool box meeting.
 Ensure that HSE requirements such as PPE and trainings are provided and conducted .
 Ensure that emergency and rescue plans understood by everybody including response
plans in case of untoward incidents.
 Ensure that HSE coverage during work execution available.
 Ensure that HSE related problems are coordinated and informed to project Site HSE
Manager
a) Contractor to will provide safe work access and working platform.
6. ACTIVITY DETAILS:
 To execute the Fusion Bond Epoxy coating for the field joints, and as per requested from
the painting subcontractor to make field joint free from sharp edges and spatters which
shall be removed only by abrasive grinding tools without touching weld root.
 The method of cleaning is by manual entry inside pipe at a maximum distance of 12.0
meter from the edge.
 The person will wiggled only with the aid of a crawler trolley. The wheel of trolley should
be of rubber to prevent damage on the internal surface coating of the Pipe.
 The person is tied to a rope to be utilize dray back if there unforeseen circumstances
and at the same time rope will use a means of communication between the person and
the hole watch man.
 The person will wear disposable cover all and will use face shield, eye goggle and ear
muff.
 Pneumatic grinder will be use to avoid potential electric shock and electrocution.
 An LEV local exhaust ventilator will be installed in the opposite end of the pipe to
maintain a normal and clean supply of oxygen inside the pipe.
 Portable light will be use for lighting and illumination inside.
7. INSPECTION
 The final work shall be checked by the Quality Inspector, Site Engineer/Client
Representative.
METHOD STATEMENT FOR PIPE INTERNAL
GIRTHWELDS SHARP EDGES REMOVAL BY ABRASIVE
TOOLS & HSE REQUIREMENTS
Class 1 Rev. A Page 5 of 6
 All activities shall be supervised and verified by Site Engineer/Client Representative.
 Site Engineer/Client Representative shall inspect and approve final finishing of
installation work.
 Site inspector shall advise for additional NDE in case of excess grinding up to root.
8. SAFETY
a) All employees involved shall undergo/attend HSE Induction and work at height training.
b) Work Permit will be prepared prior to start of works.
c) JSA will be prepare and discuss to workers.
d) Tool Box Meeting will be conducted daily by worksite supervisor in different languages.
e) All required PPE will be provided including high visibility vest to ensure workers safety.
f) Emergency & Rescue plan & equipment shall be prepared and involved key personnel for
implementation.
g) Safe work platforms will be provided.
h) All equipment to be use shall be in good operating condition and tested and certified by 3rd
party approved institution by company.
i) All operators must have valid driving and certificates to operate equipment involved in the
task.
j) Daily Housekeeping will be conducted.
9. ATTACHMENT:
 Risk Assessment.
 Job Safety analysis.
 Emergency Rescue Plan

More Related Content

Viewers also liked

Accident investigation presentation by stuart would
Accident investigation presentation by stuart wouldAccident investigation presentation by stuart would
Accident investigation presentation by stuart wouldMuthurv Venkatachalam
 
Corporate manslaughter and_corporate_homicide_act_2007
Corporate manslaughter and_corporate_homicide_act_2007Corporate manslaughter and_corporate_homicide_act_2007
Corporate manslaughter and_corporate_homicide_act_2007Muthurv Venkatachalam
 
Construction independant tied_scaffold
Construction independant tied_scaffoldConstruction independant tied_scaffold
Construction independant tied_scaffoldMuthurv Venkatachalam
 
Behavioural safety program_by_simon_holmes
Behavioural safety program_by_simon_holmesBehavioural safety program_by_simon_holmes
Behavioural safety program_by_simon_holmesMuthurv Venkatachalam
 
Aa asbestos training presentation version for h&s website
Aa asbestos training presentation version for h&s websiteAa asbestos training presentation version for h&s website
Aa asbestos training presentation version for h&s websiteMuthurv Venkatachalam
 
Health Total
Health TotalHealth Total
Health TotalAlisiaG
 

Viewers also liked (20)

16 info securitytoolbox1g (1)
16 info securitytoolbox1g (1)16 info securitytoolbox1g (1)
16 info securitytoolbox1g (1)
 
16 info securitytoolbox1g (1)
16 info securitytoolbox1g (1)16 info securitytoolbox1g (1)
16 info securitytoolbox1g (1)
 
Btfacultyorientation
BtfacultyorientationBtfacultyorientation
Btfacultyorientation
 
13 lone workingtoolbox1g
13 lone workingtoolbox1g13 lone workingtoolbox1g
13 lone workingtoolbox1g
 
Altered and job made tools bst
Altered and job made tools   bstAltered and job made tools   bst
Altered and job made tools bst
 
Accident investigation presentation by stuart would
Accident investigation presentation by stuart wouldAccident investigation presentation by stuart would
Accident investigation presentation by stuart would
 
15 electro staticdischarge1g
15 electro staticdischarge1g15 electro staticdischarge1g
15 electro staticdischarge1g
 
Welcome heath safety
Welcome heath safetyWelcome heath safety
Welcome heath safety
 
15 electro staticdischarge1g
15 electro staticdischarge1g15 electro staticdischarge1g
15 electro staticdischarge1g
 
Backcare5 g
Backcare5 gBackcare5 g
Backcare5 g
 
Corporate manslaughter and_corporate_homicide_act_2007
Corporate manslaughter and_corporate_homicide_act_2007Corporate manslaughter and_corporate_homicide_act_2007
Corporate manslaughter and_corporate_homicide_act_2007
 
Construction independant tied_scaffold
Construction independant tied_scaffoldConstruction independant tied_scaffold
Construction independant tied_scaffold
 
Basics hf +_ergonomics
Basics hf +_ergonomicsBasics hf +_ergonomics
Basics hf +_ergonomics
 
Construction basics
Construction basicsConstruction basics
Construction basics
 
Case law slideshow
Case law slideshowCase law slideshow
Case law slideshow
 
Behavioural safety program_by_simon_holmes
Behavioural safety program_by_simon_holmesBehavioural safety program_by_simon_holmes
Behavioural safety program_by_simon_holmes
 
Aa asbestos training presentation version for h&s website
Aa asbestos training presentation version for h&s websiteAa asbestos training presentation version for h&s website
Aa asbestos training presentation version for h&s website
 
Safe operating of forklift
Safe operating of forkliftSafe operating of forklift
Safe operating of forklift
 
Construction site induction
Construction site inductionConstruction site induction
Construction site induction
 
Health Total
Health TotalHealth Total
Health Total
 

Similar to Ms pipe internal cleaning (2)

Methodstatement welding
Methodstatement weldingMethodstatement welding
Methodstatement weldingAanand Subi
 
2 cm-ms-bld-012 - roof fan & natural ventilator
2   cm-ms-bld-012 - roof fan & natural ventilator2   cm-ms-bld-012 - roof fan & natural ventilator
2 cm-ms-bld-012 - roof fan & natural ventilatorMinh Bui Si
 
Lifting steam drum 72 ton by winch
Lifting steam drum 72 ton by winchLifting steam drum 72 ton by winch
Lifting steam drum 72 ton by winchHaGun Gunawan
 
Method of works install stator generator+strand jack + 07 july2015
Method of works install stator generator+strand jack + 07 july2015Method of works install stator generator+strand jack + 07 july2015
Method of works install stator generator+strand jack + 07 july2015HaGun Gunawan
 
A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)Ahmed Youssef
 
Job Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..docJob Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..docAtif767782
 
Health/Safety and facilities for contractor personnel under FIDIC
Health/Safety and facilities for contractor personnel under FIDICHealth/Safety and facilities for contractor personnel under FIDIC
Health/Safety and facilities for contractor personnel under FIDICnaeem khan
 
CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016Ali Issa
 
Engineers in society
Engineers in societyEngineers in society
Engineers in societyAzlin lolin
 
Advanced Building Measurement
Advanced Building MeasurementAdvanced Building Measurement
Advanced Building MeasurementSultan M Muzahir
 
Method_Statement_for_Excavation_and_Back.pdf
Method_Statement_for_Excavation_and_Back.pdfMethod_Statement_for_Excavation_and_Back.pdf
Method_Statement_for_Excavation_and_Back.pdfZaheer Ahmed
 
Piping Installation and Erection Procedure.pdf
Piping Installation and Erection Procedure.pdfPiping Installation and Erection Procedure.pdf
Piping Installation and Erection Procedure.pdfMDAbdullah621330
 

Similar to Ms pipe internal cleaning (2) (20)

Methodstatement welding
Methodstatement weldingMethodstatement welding
Methodstatement welding
 
CURRECULUM VITAE
CURRECULUM VITAECURRECULUM VITAE
CURRECULUM VITAE
 
2 cm-ms-bld-012 - roof fan & natural ventilator
2   cm-ms-bld-012 - roof fan & natural ventilator2   cm-ms-bld-012 - roof fan & natural ventilator
2 cm-ms-bld-012 - roof fan & natural ventilator
 
Lifting steam drum 72 ton by winch
Lifting steam drum 72 ton by winchLifting steam drum 72 ton by winch
Lifting steam drum 72 ton by winch
 
AHU.pdf
AHU.pdfAHU.pdf
AHU.pdf
 
Method of works install stator generator+strand jack + 07 july2015
Method of works install stator generator+strand jack + 07 july2015Method of works install stator generator+strand jack + 07 july2015
Method of works install stator generator+strand jack + 07 july2015
 
A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)
 
GTC546 HSE PPT
GTC546 HSE PPTGTC546 HSE PPT
GTC546 HSE PPT
 
Job Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..docJob Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..doc
 
ioc_2
ioc_2ioc_2
ioc_2
 
Health/Safety and facilities for contractor personnel under FIDIC
Health/Safety and facilities for contractor personnel under FIDICHealth/Safety and facilities for contractor personnel under FIDIC
Health/Safety and facilities for contractor personnel under FIDIC
 
CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016
 
Introduction
IntroductionIntroduction
Introduction
 
Engineers in society
Engineers in societyEngineers in society
Engineers in society
 
Advanced Building Measurement
Advanced Building MeasurementAdvanced Building Measurement
Advanced Building Measurement
 
Method_Statement_for_Excavation_and_Back.pdf
Method_Statement_for_Excavation_and_Back.pdfMethod_Statement_for_Excavation_and_Back.pdf
Method_Statement_for_Excavation_and_Back.pdf
 
Mdg 41 review - Gary Nauer
Mdg 41 review - Gary NauerMdg 41 review - Gary Nauer
Mdg 41 review - Gary Nauer
 
Mohamed Abu El enin CV-CM
Mohamed Abu El enin CV-CMMohamed Abu El enin CV-CM
Mohamed Abu El enin CV-CM
 
Piping Installation and Erection Procedure.pdf
Piping Installation and Erection Procedure.pdfPiping Installation and Erection Procedure.pdf
Piping Installation and Erection Procedure.pdf
 
1 11-006-06
1 11-006-061 11-006-06
1 11-006-06
 

Recently uploaded

Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 

Recently uploaded (20)

Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 

Ms pipe internal cleaning (2)

  • 1. PROJECT METHOD STATEMENT FOR PIPE INTERNAL GIRTHWELDS SHARP EDGES REMOVAL BY ABRASIVE TOOLS & HSE REQUIREMENTS Class 1 Rev. A Page 1of5 METHOD STATEMENTFOR PIPE INTERNAL GIRTH WELD SHARP EDGES REMOVAL BY ABRASIVE TOOLS & HSE REQUIREMENTS Company : Kuwait Oil Company (K.S.C.) Contract No. : 11050146 Project No. : EF/1772 Location : Burgan Field and South East Kuwait Fields Job No. : 101920 A Issued for Approval Prepared Checked Reviewed Approved
  • 2. METHOD STATEMENT FOR PIPE INTERNAL GIRTHWELDS SHARP EDGES REMOVAL BY ABRASIVE TOOLS & HSE REQUIREMENTS Class 1 Rev. A Page 2 of 6 TABLE OF CONTENTS 1. PURPOSE ……………….……………………………………………………………………. 3 2. SCOPE …..……………………………………………………………………………………. 3 3. DEFINITIONS …………………………………………………………………………………. 3 4. REFERENCES .……………….……….……….……………………………………………. 3 4.1 ASME B31.3……………………………………………………………………… 3 4.2 Code & Standards Applicable………………………………………………….. 3 5. KEY PROJECT TEAM AND JOB DESCRIPTIONS………………………………………… 3 5.1 Site Engineer…………………………………………………………………….. 4 5.2 Work Site Supervisor…………………………………………………………… 4 5.3 HSE Engineer…………………………………………………………………… 4 6. ACTIVITY DETAILS .…………………………………………………………………………….4 7. INSPECTION……………………………………………………………………………….. 5 8. SAFETY……………………………………………………………………………………… 5 9. ATTACHMENT………………………………………………………………………………6
  • 3. METHOD STATEMENT FOR PIPE INTERNAL GIRTHWELDS SHARP EDGES REMOVAL BY ABRASIVE TOOLS & HSE REQUIREMENTS Class 1 Rev. A Page 3 of 6 1. PURPOSE The purpose of this method statement is to defined, establish and maintain the documented procedure to be adopted to carry out weld joint internal cleaning using portable grinder tool to remove only sharp edges prior to start Fusion Bond Epoxy (FBE) internal coating. 2. SCOPE The scope of this work instruction applies to set out minimum requirements for internal cleaning using grinder tools to remove sharp edges of internal girth weld joint of the pipe before Fusion Bond Epoxy coating application. The scope of works covers the pipe diameter of 24”, 30”, and 32’ and 36”. This method statement includes the HSE requirements to carry out the job in safe manner. 3. DEFINITIONS 4. REFERENCES 4.1 ASME B31.3 Process Piping. 4.2 API RP 2009 Safe Welding. Cutting and other hot work practices in the Petroleum and Petrochemical Industries. 4.3 Codes & Standards Applicable 5. KEY PROJECT TEAM AND JOB DESCRIPTION: 5.1 Site Engineer.  He will report to Construction Manager and responsible for the work execution and his maximum HSE responsibilities to carry out the task safely.  Implementation of safe work procedure under his assignment.  Make workers understand completely all instruction to carry out the job safely.  Ensure that PTW system adhered.  Ensure that all equipment to be use are approved meeting the KOC.SA 5.2 Worksite Supervisor.  He will report to Site Engineer and his primary responsibilities is to ensure that the work is carried out under his supervision and carried out in safe manner.  He shall ensure that risk are identifies and assessed under his control.  Identify HSE problems and initiate preventive control.  Ensure that JSA prepared and discuss to workers.  Ensure that proper PPE issued to worker.  Ensure that tool box meeting conducted before start of work.  Ensure that welfare facilities provided.  Ensure that a Permit to Work is available and approved for the job.
  • 4. METHOD STATEMENT FOR PIPE INTERNAL GIRTHWELDS SHARP EDGES REMOVAL BY ABRASIVE TOOLS & HSE REQUIREMENTS Class 1 Rev. A Page 4 of 6  Ensure that he will stay at work on full time basis and will assigned competent person in case of urgent and circumstantial situation.  Responsible for the area in highest level of housekeeping.  Responsible for reporting all incident and near misses to HSE Manager.  Ensure that safe work platform and access are available and in safe and good condition.. 5.3 HSE Engineer.  Support the Site Engineer and Work Site Supervisor and his HSE team.  Responsible for application of all HSE requirements related to the job.  Responsible for application of applicable codes & standards.  Review Risk Assessment and JSA.  Attend tool box meeting.  Ensure that HSE requirements such as PPE and trainings are provided and conducted .  Ensure that emergency and rescue plans understood by everybody including response plans in case of untoward incidents.  Ensure that HSE coverage during work execution available.  Ensure that HSE related problems are coordinated and informed to project Site HSE Manager a) Contractor to will provide safe work access and working platform. 6. ACTIVITY DETAILS:  To execute the Fusion Bond Epoxy coating for the field joints, and as per requested from the painting subcontractor to make field joint free from sharp edges and spatters which shall be removed only by abrasive grinding tools without touching weld root.  The method of cleaning is by manual entry inside pipe at a maximum distance of 12.0 meter from the edge.  The person will wiggled only with the aid of a crawler trolley. The wheel of trolley should be of rubber to prevent damage on the internal surface coating of the Pipe.  The person is tied to a rope to be utilize dray back if there unforeseen circumstances and at the same time rope will use a means of communication between the person and the hole watch man.  The person will wear disposable cover all and will use face shield, eye goggle and ear muff.  Pneumatic grinder will be use to avoid potential electric shock and electrocution.  An LEV local exhaust ventilator will be installed in the opposite end of the pipe to maintain a normal and clean supply of oxygen inside the pipe.  Portable light will be use for lighting and illumination inside. 7. INSPECTION  The final work shall be checked by the Quality Inspector, Site Engineer/Client Representative.
  • 5. METHOD STATEMENT FOR PIPE INTERNAL GIRTHWELDS SHARP EDGES REMOVAL BY ABRASIVE TOOLS & HSE REQUIREMENTS Class 1 Rev. A Page 5 of 6  All activities shall be supervised and verified by Site Engineer/Client Representative.  Site Engineer/Client Representative shall inspect and approve final finishing of installation work.  Site inspector shall advise for additional NDE in case of excess grinding up to root. 8. SAFETY a) All employees involved shall undergo/attend HSE Induction and work at height training. b) Work Permit will be prepared prior to start of works. c) JSA will be prepare and discuss to workers. d) Tool Box Meeting will be conducted daily by worksite supervisor in different languages. e) All required PPE will be provided including high visibility vest to ensure workers safety. f) Emergency & Rescue plan & equipment shall be prepared and involved key personnel for implementation. g) Safe work platforms will be provided. h) All equipment to be use shall be in good operating condition and tested and certified by 3rd party approved institution by company. i) All operators must have valid driving and certificates to operate equipment involved in the task. j) Daily Housekeeping will be conducted. 9. ATTACHMENT:  Risk Assessment.  Job Safety analysis.  Emergency Rescue Plan