Client Name Project Description Location Status
Saline Water
Conversion
Corporation (SWCC)
Consortium of Al-Arrab
Contracting Co &
Sepco III
Mechanical Equipment Installation, Piping, Electrical and I & C Works of complete
Natural Gas System and Backup Fuel Oil System for 2400 MW Ras Al-Khair
Combined Cycle Power Plant.
Ras Al-Khair,
KSA
In Progress
General Electric
Operation and Maintenance Management of 220 MW GTS based Combined Cycle
Power Plant
Muridke,
Pakistan
Long Term
Contract
General Electric Call out Services for Equipment for all GE Power Plants in Pakistan
Sahiwal,
Muridke, Balloki,
Bhikki, Pakistan
Long Term
Contract
General Electric
Operation and Maintenance Management of 220 MW GTS based Combined Cycle
Power Plant
Sahiwal,
Pakistan In Progress
Pakistan Atomic
Energy Commission
300 MW Chashma Nuclear Power Plants I & II 5 Year Running Annual
Maintenance Contract Awarded
Chashma,
Pakistan
Long Term
Contract
Japan Power EPC Work for Combine Cycle Retrofit Enhancing plant capacity to 182 MW
Lahore,
Pakistan
On Hold by
Client
Qatar Petroleum
Turnkey set up of new LGO storage tank of capacity 48,984 m3 for LGO service at
QP Refinery
Mesaieed,
Qatar
In Progress
Etimaad projectslist
Client Name Project Description Location Status
Nazaria-e-Pakistan
Trust Construction of Awan-e-Quid-e-Azam Lahore,
Pakistan
In Progress
Novartis Pharma,
Pakistan Limited
Construction of 5 Story Novartis Corporate Office Building Karachi,
Pakistan
In Progress
Riasat ul Haramain MEP works of Zone-4 in Haram, Makkah Makkah, KSA In Progress
Riasat ul Haramain MEP works for Ajiad AC Plant for Haram, Makkah Makkah, KSA Completed
Riasat ul Haramain Design built MEP construction of 22 story Security Building, Makkah Makkah, KSA In Progress
Riasat ul Haramain Design built MEP works for First Ring Road, Makkah Makkah, KSA In Progress
Riasat ul Haramain MEP works for Pedestrian Tunnel in Haram, Makkah Makkah, KSA In Progress
Etimaad projectslist
Client Name Project Description Location Status
Wartsila 160 MW Attock Gen Power Plant Mechanical and Civil Works Rawalpindi,
Pakistan
Commissioned
Skoda Export 220 MW Power Plant Electrical and Mechanical Works Balloki,
Pakistan
Commissioned
Wartsila
Civil and Mechanical Works for 200 MW Combined Cycle Nishat Power HFO
Based Power Plant
Chunian,
Pakistan
Commissioned
Wartsila 200 MW Mechanical Erection Works at Combined Cycle Nishat Chunian Chunian,
Pakistan
Commissioned
Pakistan Atomic
Energy Commission
300 MW Chashma Nuclear Power Plant 6th Annual Maintenance Contract
Chashma,
Pakistan
Completed
AES Ras Laffan
Operating Company
Shutdown Maintenance Works at 740 MW Combined Cycle Power Plant
Ras Laffan,
Qatar
Completed
AES Ras Laffan
Operating Company
Shutdown Maintenance Works for 36” Pipeline at 740 MW Combined Cycle
Power Plant
Ras Laffan,
Qatar
Completed
AES Ras Laffan
Operating Company
Turnkey supply of GT rotor extraction skid along with mounting trolleys and
Quality Control and Management Services for rehabilitation of potable water
tanks at 740 MW Combined Cycle Power Plant
RasLaffan,
Qatar
Completed
Iberdrola Middle Eas
Mesaieed Power
Company
Technical Services for mechanical construction, piping erection, testing and
commissioning at 2000 MW Power Plant
Mesaieed,
Qatar
Completed
AES Ras Laffan Shutdown activities involving the following:
36” Pipeline Pressure Reducing Assembly
De-Aerator Installation of Supports
Other Assorted Works
Ras Laffan,
Qatar
Completed
AES Ras Laffan
Engineering, Procurement, Excavation, Backfilling, Dewatering,
Shoring/Scaffolding, Thrust Boring, Fabrication, Installation, Sand Blasting,
Coating, Wrapping, Cathodic Protection, NDT, Commissioning
Ras Laffan,
Qatar
Completed
Etimaad projectslist
Client Name Project Description Location Status
Pakistan Army Engineering Consultancy for 9 MW Co-Gen Power Plant
Rawalpindi,
Pakistan
Completed
SEPCO III Electric
Power Construction
Corporation/
Rabigh Electric
Company
Installation of ESP Equipment, ID Fan, FGD installation, GHH System Inc Fuel Oil
System piping & associated equipment luding Booster Pumps, Aeration Pumps
Pre-fabrication of Piping, Pipe Supports, Installation Work, Painting, Hydro Test
& Commissioning for 2X660 MW Power Plant.
Rabigh, KSA Completed
Ras Laffan Power
Company / Ras Laffan
Industrial City, Qatar
Installation of FRP internal of Desal 21 & 24 , during RLPC plant Outage
Ras Laffan
Industrial City,
Qatar
Completed
I Ways Project Management Consultancy Services, Kotli Hydro Power Project Kotli, Azad Kashmir Completed
Associated Group Bhikki Power Plant Civil Works Lahore Completed
Qatar Petroleum Engineering, Procurement,
Installation and Commissioning of 24” Pipeline
Dukhan,
Qatar
Completed
Qatar Fertilizer
Company (QAFCO)
Piping fabrication and erection, NDT, painting, insulation, scaffolding, hydro
testing, Pneumatic testing, air blowing, steel structure fabrication and erection,
PWHT, Civil Foundations, Equipment erection, equipment internal works, Bolt
tensioning, cold tapping
Mesaieed,
Qatar
Completed
Technip Middle East
Piping fabrication and erection, NDT, painting, insulation, scaffolding, hydro
testing, Pneumatic testing, air blowing, steel structure fabrication and erection,
Civil Foundations, Vortex breaker removal.
Doha ,
Qatar
Completed
Qatar Petroleum
Settlement Survey of Crude Oil Storage Tanks in Tank Farm; Settlement Survey
of Product Storage Tanks in NGL Plant
Doha,
Qatar
Completed
Hyundai Heavy
Industries/Das Oil End
Underground Piping works at Das Island , Abu Dhabi
Abu Dhabi,
UAE
Completed
Etimaad projectslist
Client Name Project Description Location Status
Qatar Fertilizer
Company (QAFCO)
Construction, Installation, Testing, Pre-Commissioning and Commissioning
of collection, storage and transfer of waste water system including Civil
Design/Engineering, Procurement and Supply of Civil/Structural,
Instrumentation, Piping, GRP piping, Rotary equipment installation, Electrical
& other associated items
Mesaieed,
Qatar
Completed
Qatar Petroleum Dismantling and Installation of Normal/Acid Flare Tips at QP Refinery Doha Qatar Completed
Qatar Fertilizer
Piping fabrication and erection, NDT, painting, insulation, scaffolding, hydro
testing, Pneumatic testing, air blowing, steel structure fabrication and
erection.
Mesaieed, Qatar Completed
Qatar Fertilizer
Company
Electrical and Instrumentation works Mesaieed, Qatar Completed
Ras Laffan Power
Company
Dearator Internal repair by removal of pall rings, cutting / grinding, welding,
pickling and passivation and installation of FRP internal of Desal 21 & 24 ,
during RLPC plant outage scheduled for March 2012
Ras Laffan
Industrial City,
Qatar
Completed
Dolphin Energy
Limited
Secure Horizontal Section of LP Stream line to MP Flare-Stream-2
Ras Laffan,
Qatar
Completed
Qatar Gas Operating
Company Limited
Procurement, Survey, Excavation, Cable laying, Backfilling, Termination,
Testing and Commissioning
Ras Laffan,
Qatar
Completed
Butec-Degremont JV Electrical and Instrumentation works
Barva City,
Qatar
Completed
Butec-Degremont JV
Stainless Steel pipe fabrication( 15,000 Dia Inches)
Carbon Steel Pipe Fabrication (10 Tons)
Barva City,
Qatar
Completed
Dolphin Energy
Limited
Stabilization of LP steam line (live line) up to 65 meters.
Ras Laffan,
Qatar
Completed
Etimaad projectslist
Client Name Project Description Location Status
Qatar Fertilizer
Construction, Installation, Testing, Pre-Commissioning & Commissioning of
QAFCO supplied Bulk Flow Coolers and other Auxiliaries including Civil
Design/Engineering, Procurement & Supply of Civil/Structural, Instrumentation,
Electrical & other associated items
Mesaieed,
Qatar
Completed
Oryx GTL Ltd
Engineering, Procurement, Excavation, Backfilling, Dewatering,
Shoring/Scaffolding, Thrust Boring, Fabrication, Installation, Sand Blasting,
Coating, Wrapping, Cathodic Protection, NDT, Commissioning
Ras Laffan,
Qatar
Completed
Chiyoda Corporation
Modification of existing pipe supports in different construction areas on Pearl
GTL – FEED Gas Preparation (C4) Area
Ras Laffan,
Qatar
Completed
Oryx GTL Ltd. Shutdown activities with manpower of 20 people
Ras Laffan,
Qatar
Completed
Technip Middle East
Excavation, Backfilling, Dismantling of existing cable tray, Cable laying,
Concreting
Ras Laffan,
Qatar
Completed
Technip Middle East
Excavation, Backfilling, Scaffolding, Internal/External Coating, Concreting,
Fabrication, Installation, Coating, Wrapping, Cathodic Protection, NDT
Ras Laffan,
Qatar
Completed
Chiyoda-Hyundai
Consortium
Field Pipe Fabrication, Erection, Pressure Testing and Reinstatement
Ras Laffan,
Qatar
Completed
Iberdrola Middle East
Technical Services for Mechanical Construction, Manpower Supply for Piping
Erection, Testing and Commissioning Works
Ras Laffan,
Qatar
Completed
Government of KSA MEP Construction Work
Makkah,
KSA
Completed
TAISEI-TAV MEP works at New Doha International Airport
Doha,
Qatar
Completed
Etimaad projectslist
Client Name Project Description Location Status
JGC Middle East Support & Pipe Welding
Ras Laffan,
Qatar
Completed
AES Ras Laffan
Operating Co. WLL
Design, Supply, Fabrication, Painting, Transportation and Installation of Gas
Turbine Generator Rotor Extraction Skid with Two Trolleys
Ras Laffan,
Qatar
Completed
Technip Middle East Heavy Lifting, Erection and Installation, E&I Works
Ras Laffan,
Qatar
Completed
AES Ras Laffan
Operating Co. WLL
Fabrication, Welding, Heat Treatment, NDE, Repairs, Hardness Test, Pressure
Testing, Shutdown Activities with manpower of 50 people
Ras Laffan,
Qatar
Completed
AES Ras Laffan
Operating Co. WLL
Services for Rehabilitation of Potable Water Tanks
Ras Laffan,
Qatar Completed
Punj Lloyd Ltd. Construction Manpower Supply
Ras Laffan,
Qatar
Completed
AES Ras Laffan
Operating Co. WLL
Provision of Quality Control and Management Services through management
personnel
Ras Laffan,
Qatar
Completed
Dodsal Engineering
and Construction Pte.
Ltd.
Installation of Mechanical Cleaning Equipment, Erection of Static & Rotary
Equipment
Ras Laffan,
Qatar
Completed
GAMA Qatar Co. WLL Provision of Technical Manpower for Civil Works
Ras Laffan,
Qatar
Completed
GAMA Qatar Co. WLL Fabrication and Installation of pressure piping and pipe supports
Ras Laffan,
Qatar
Completed
Etimaad projectslist
Client Name Project Description Location Status
Pakistan Air Force Civil, Electrical and HVAC works for Shahbaz Air Base Jacobabad,
Pakistan
Completed
Engro Foods Supply
Chain (Private)
Limited
Civil and Mechanical Construction of Integrated Rice Processing Complex Muridke,
Pakistan
Completed
MOL Pakistan Design, Manufacturing, Fabrication, Supply of Gas Vent Knock Out Drum–
ASME U Stamp
Mamikhel,
Pakistan
Completed
British Petroleum
now United Energy
Pakistan Limited
Turnaround Strategy documents for TURK Facilities Amine System Mirpur Khas,
Pakistan
Completed
Fauji Fertilizer
Company Ltd
Fauji Fertilizer Company Ltd. Bin Qasim - Annual Turnaround Bin Qasim,
Pakistan
Completed
Pakistan Air Force Design, Procurement, Fabrication of Exhaust Duct Work for Shahbaz Air
Base,
Jaccobabad,
Pakistan
Completed
Oil & Gas
Development
Corporation Limited
Uch Gas Field Annual Turnaround Sohbatpur,
Pakistan Completed
Pak Arab Refinery
Limited
EPC & Commissioning of Kero Merox Unit at Mid Country Refinery Mahmood Kot,
Pakistan Completed
Weatherford Oil
Tools M.E. Limited
Electrical, Mechanical and Instrumentation Works at Adam X-1 Hala early
Production4Facility
Sanghar,
Pakistan
Completed
OMV Pakistan
Exploration Ltd.
HAZOP Study of OMV’s Kadanwari Modification and Enhancement Projects Kadanwari,
Pakistan Completed
Dawood Hercules
Chemicals Limited
Turnkey supply & Commissioning of 4000 Tons Ammonia Storage Tank Sheikhupura
Completed
Pak American
Fertilizer Limited
Fabrication & Supply of Tube Bundles – 2 Nos. of heat exchangers. Mianwali
Completed
Etimaad projectslist
Etimaad projectslist
Client Name Project Description Location Status
Al-Tawairqi Steel
Mills Ltd.
Project Management Support Services Karachi,
Pakistan
Completed
Fatima Fertilizer
Limited
Overhauling through Hydro Jetting of 117 Heat Exchangers, 100 Pressure
Safety Valves and Lapping of 6 Valves During Annual Turnaround 2013
Mukhtar Garh,
Pakistan
Completed
Dawood Fertilizer
Limited
EPC Construction of 4000 Tons Double Walled Anhydrous Ammonia
Storage Tank
Sheikhupura,
Pakistan Completed
Dawood Fertilizer
Limited
EPC Construction of 2500 Tons Caustic Soda StorageTank and Decanting
Facility
Sheikhupura,
Pakistan Completed
Procter & Gamble
Pakistan
Complete Construction and Equipment Installation of Aerial Dry Powder
Detergent Plant
Port Bin Qasim,
Pakistan
Completed
SEPCO III Field installation of fuel oil system at 1260 MW Power Plant
Rabigh,
KSA
Completed
SEPCO III
Erection of Electrostatic Precipitator and Flue Gas Desulphurization at 1260
MW Power Plant
Rabigh,
KSA
Completed
Pall Corporation
Pipe prefabrication and field installation, equipment & steel structure
installation, E & I works of Black Powder Filter Station
Ma’aden,
KSA
Completed
Technip Pipe Erection of approximately 50,000 dia inches of piping works
Jubail,
KSA
Completed
JGC Erection of 4000 meters SS Steam Tracing Line
Jubail,
KSA
Completed
SULZER Column Nozzle Modification during Annual Turnaround
Jubail,
KSA
Completed
SULZER Retrofit and Turnaround in November 2013
Yanbu,
KSA
Completed
Fives Solios Fabrication of Injection Ducts
Ras Al Khair,
KSA
Completed
Fives Solios Pre-assembly of Equipment for Gas Treatment Centers 3 & 4
Ras Al Khair,
KSA
Completed
Client Name Project Description Location Status
Juffali Chemicals
Engineering, Procurement, Construction & Commissioning of Polyurethane
System Housing Project
Jeddah,
KSA
Completed
Arabian Chemical
Company Limited
(Latex)
Engineering, Procurement, Construction & Commissioning of styrene monomer
8 Km pipeline from Jubail Chevron Phillips Plant to ACCL premises through
Royal Commission Corridor
Jubail,
KSA
Completed
Jubail Chevron Phillips
Company
Design, procurement & Construction (Civil, Mechanical & E&I) including
commissioning of insulated Styrene Pipeline from Tank form to Royal
Commission Corridor
Jubail,
KSA
Completed
Daelim
Piping (2”-24”) Fabrication Work s at Site, covering CS, SS and Alloy Steel Pipe
(48,000 dia inches)
Jubail,
KSA
Completed
Arabian Chemical
Company Limited
(LATEX)
Painting, inspection & Revalidation of Butadiene Pipe Line
Jubail,
KSA
Completed
CTCI Manufacturing and Supply of 23 Nos. of Stainless Steel Storage Tanks.
Jubail,
KSA
Completed
Technip / Nesma Field installation of 3 Nos. Carbon Steel Acid Tanks
Jubail,
KSA
Completed
Westech Engineering Supply, Fabrication & Installation of Bio Sludge Treatment Plant
Jubail,
KSA
Completed
Fives Solios
Manufacturing of 4 Nos. Stacks with diameter of 7.8m, height 52m and weight
600 tons for Ras Az Zawr Aluminum Smelter Project.
Ras Al Khair,
KSA
Completed
Etimaad projectslist
Client Name Project Description Location Status
GE Oil & Gas, Italy
Replacement of UCPS And Upgrading Of F & G System At Sui Gas Field At Unit-
C, D, E and F for Compressor Station (PPL) Pakistan
Sui, Balochistan Completed
CNPP, PAEC Annual Turnaround at CNPP Unit 1 & 2 CNPP, Mianwali Completed
Etimaad projectslist

More Related Content

What's hot

Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012Richard Turnbull
 
OCS CV Field Engr_Aaron Lian Kian Hoe_April 15
OCS CV Field Engr_Aaron Lian Kian Hoe_April 15OCS CV Field Engr_Aaron Lian Kian Hoe_April 15
OCS CV Field Engr_Aaron Lian Kian Hoe_April 15Aaron Lian Kian Hoe
 
UP DATED WORD FILE CV. Master copy
UP DATED WORD FILE CV. Master copy UP DATED WORD FILE CV. Master copy
UP DATED WORD FILE CV. Master copy sai ram
 
RAJEEV GANDHI JANUARY 2016 RESUME
RAJEEV GANDHI JANUARY 2016 RESUMERAJEEV GANDHI JANUARY 2016 RESUME
RAJEEV GANDHI JANUARY 2016 RESUMERajeev Gandhi
 
LATEST CV_Ram kumar
LATEST CV_Ram kumarLATEST CV_Ram kumar
LATEST CV_Ram kumarRam Kumar
 
AZMET-Newsletter 2016 (English)
AZMET-Newsletter 2016 (English)AZMET-Newsletter 2016 (English)
AZMET-Newsletter 2016 (English)Braam Smit
 
CV Yoseph Prakosa Senior Elec Eng
CV Yoseph Prakosa Senior Elec EngCV Yoseph Prakosa Senior Elec Eng
CV Yoseph Prakosa Senior Elec Engyoseph prakosa S
 
Welcome to our company
Welcome to our companyWelcome to our company
Welcome to our companysetco
 
DCM Group - Technical Brochure 2016
DCM Group - Technical Brochure 2016DCM Group - Technical Brochure 2016
DCM Group - Technical Brochure 2016Pierre Racine
 
Yokogawa in the LNG supply chain | VigilantPlant
Yokogawa in the LNG supply chain | VigilantPlantYokogawa in the LNG supply chain | VigilantPlant
Yokogawa in the LNG supply chain | VigilantPlantYokogawa
 
PDL World your Engineering, Procurement and Maintenance service provider from...
PDL World your Engineering, Procurement and Maintenance service provider from...PDL World your Engineering, Procurement and Maintenance service provider from...
PDL World your Engineering, Procurement and Maintenance service provider from...PDL World
 

What's hot (18)

Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012
 
OCS CV Field Engr_Aaron Lian Kian Hoe_April 15
OCS CV Field Engr_Aaron Lian Kian Hoe_April 15OCS CV Field Engr_Aaron Lian Kian Hoe_April 15
OCS CV Field Engr_Aaron Lian Kian Hoe_April 15
 
Resume-Murugan
Resume-MuruganResume-Murugan
Resume-Murugan
 
UP DATED WORD FILE CV. Master copy
UP DATED WORD FILE CV. Master copy UP DATED WORD FILE CV. Master copy
UP DATED WORD FILE CV. Master copy
 
RAJEEV GANDHI JANUARY 2016 RESUME
RAJEEV GANDHI JANUARY 2016 RESUMERAJEEV GANDHI JANUARY 2016 RESUME
RAJEEV GANDHI JANUARY 2016 RESUME
 
Sripadasagar project
Sripadasagar projectSripadasagar project
Sripadasagar project
 
LATEST CV_Ram kumar
LATEST CV_Ram kumarLATEST CV_Ram kumar
LATEST CV_Ram kumar
 
DVR CV NEW12
DVR CV NEW12DVR CV NEW12
DVR CV NEW12
 
AZMET-Newsletter 2016 (English)
AZMET-Newsletter 2016 (English)AZMET-Newsletter 2016 (English)
AZMET-Newsletter 2016 (English)
 
CV Yoseph Prakosa Senior Elec Eng
CV Yoseph Prakosa Senior Elec EngCV Yoseph Prakosa Senior Elec Eng
CV Yoseph Prakosa Senior Elec Eng
 
BDSResume1
BDSResume1BDSResume1
BDSResume1
 
SISCO - Presentation
SISCO - PresentationSISCO - Presentation
SISCO - Presentation
 
BDSResume1
BDSResume1BDSResume1
BDSResume1
 
Welcome to our company
Welcome to our companyWelcome to our company
Welcome to our company
 
DCM Group - Technical Brochure 2016
DCM Group - Technical Brochure 2016DCM Group - Technical Brochure 2016
DCM Group - Technical Brochure 2016
 
Yokogawa in the LNG supply chain | VigilantPlant
Yokogawa in the LNG supply chain | VigilantPlantYokogawa in the LNG supply chain | VigilantPlant
Yokogawa in the LNG supply chain | VigilantPlant
 
chris's CV
chris's CVchris's CV
chris's CV
 
PDL World your Engineering, Procurement and Maintenance service provider from...
PDL World your Engineering, Procurement and Maintenance service provider from...PDL World your Engineering, Procurement and Maintenance service provider from...
PDL World your Engineering, Procurement and Maintenance service provider from...
 

Viewers also liked

Fwb Electrical Deliverables Interdisciplinary Interfaces
Fwb Electrical Deliverables   Interdisciplinary InterfacesFwb Electrical Deliverables   Interdisciplinary Interfaces
Fwb Electrical Deliverables Interdisciplinary Interfacesbiiswashruta
 
Introduction To Electromagnetic Compatibility
Introduction To Electromagnetic CompatibilityIntroduction To Electromagnetic Compatibility
Introduction To Electromagnetic CompatibilityJim Jenkins
 
CIVIL CONSTRUCTION IN FATIMA FERTILIZER COMPANY LIMITED
CIVIL CONSTRUCTION INFATIMA FERTILIZER COMPANY LIMITEDCIVIL CONSTRUCTION INFATIMA FERTILIZER COMPANY LIMITED
CIVIL CONSTRUCTION IN FATIMA FERTILIZER COMPANY LIMITEDWater Birds (Ali)
 
prilling tower and granulation
prilling tower and granulationprilling tower and granulation
prilling tower and granulationKhalid Nawaz
 
L&t industrial marketing ppt
L&t industrial marketing pptL&t industrial marketing ppt
L&t industrial marketing pptMohit Malviya
 
Power Cables, Electrical Power & Industrial Cable, Electrical Wire, PVC Wire ...
Power Cables, Electrical Power & Industrial Cable, Electrical Wire, PVC Wire ...Power Cables, Electrical Power & Industrial Cable, Electrical Wire, PVC Wire ...
Power Cables, Electrical Power & Industrial Cable, Electrical Wire, PVC Wire ...Ajjay Kumar Gupta
 
Electromagnetic Interference & Electromagnetic Compatibility
Electromagnetic Interference  & Electromagnetic CompatibilityElectromagnetic Interference  & Electromagnetic Compatibility
Electromagnetic Interference & Electromagnetic CompatibilitySabeel Irshad
 

Viewers also liked (8)

Qatar petroleum presentation
Qatar petroleum presentationQatar petroleum presentation
Qatar petroleum presentation
 
Fwb Electrical Deliverables Interdisciplinary Interfaces
Fwb Electrical Deliverables   Interdisciplinary InterfacesFwb Electrical Deliverables   Interdisciplinary Interfaces
Fwb Electrical Deliverables Interdisciplinary Interfaces
 
Introduction To Electromagnetic Compatibility
Introduction To Electromagnetic CompatibilityIntroduction To Electromagnetic Compatibility
Introduction To Electromagnetic Compatibility
 
CIVIL CONSTRUCTION IN FATIMA FERTILIZER COMPANY LIMITED
CIVIL CONSTRUCTION INFATIMA FERTILIZER COMPANY LIMITEDCIVIL CONSTRUCTION INFATIMA FERTILIZER COMPANY LIMITED
CIVIL CONSTRUCTION IN FATIMA FERTILIZER COMPANY LIMITED
 
prilling tower and granulation
prilling tower and granulationprilling tower and granulation
prilling tower and granulation
 
L&t industrial marketing ppt
L&t industrial marketing pptL&t industrial marketing ppt
L&t industrial marketing ppt
 
Power Cables, Electrical Power & Industrial Cable, Electrical Wire, PVC Wire ...
Power Cables, Electrical Power & Industrial Cable, Electrical Wire, PVC Wire ...Power Cables, Electrical Power & Industrial Cable, Electrical Wire, PVC Wire ...
Power Cables, Electrical Power & Industrial Cable, Electrical Wire, PVC Wire ...
 
Electromagnetic Interference & Electromagnetic Compatibility
Electromagnetic Interference  & Electromagnetic CompatibilityElectromagnetic Interference  & Electromagnetic Compatibility
Electromagnetic Interference & Electromagnetic Compatibility
 

Similar to Etimaad Presentation (February 2015) - Project Info

Similar to Etimaad Presentation (February 2015) - Project Info (20)

Rejith complete cv
Rejith complete cvRejith complete cv
Rejith complete cv
 
k4_Engg_profile_New
k4_Engg_profile_Newk4_Engg_profile_New
k4_Engg_profile_New
 
Rana Maqsood Alam Resume, (E&I) P&S ..docx
Rana Maqsood Alam  Resume, (E&I) P&S ..docxRana Maqsood Alam  Resume, (E&I) P&S ..docx
Rana Maqsood Alam Resume, (E&I) P&S ..docx
 
Nizami_CV
Nizami_CVNizami_CV
Nizami_CV
 
CV NAEEM QURESHI 2014
CV NAEEM QURESHI 2014CV NAEEM QURESHI 2014
CV NAEEM QURESHI 2014
 
Resume Waqas Farooq (Project Engineer)
Resume Waqas Farooq (Project Engineer)Resume Waqas Farooq (Project Engineer)
Resume Waqas Farooq (Project Engineer)
 
pipeline foreman
pipeline foremanpipeline foreman
pipeline foreman
 
Resume UAE
Resume UAEResume UAE
Resume UAE
 
Satyavir-Resume_01
Satyavir-Resume_01Satyavir-Resume_01
Satyavir-Resume_01
 
Inspection CV Sasi
Inspection CV SasiInspection CV Sasi
Inspection CV Sasi
 
famous construction companies in pakistan
famous construction companies in pakistanfamous construction companies in pakistan
famous construction companies in pakistan
 
FARSANA-CV
FARSANA-CVFARSANA-CV
FARSANA-CV
 
CV - Senior QAQC Engineer-Civil
CV - Senior QAQC Engineer-CivilCV - Senior QAQC Engineer-Civil
CV - Senior QAQC Engineer-Civil
 
updated Cv 04-01-2017 (1)
updated Cv 04-01-2017 (1)updated Cv 04-01-2017 (1)
updated Cv 04-01-2017 (1)
 
Arun Resume .
Arun Resume .Arun Resume .
Arun Resume .
 
final resume
final resumefinal resume
final resume
 
E&I Farukh
E&I FarukhE&I Farukh
E&I Farukh
 
QATAR GAS
QATAR GASQATAR GAS
QATAR GAS
 
Surajit cv.doc
Surajit cv.docSurajit cv.doc
Surajit cv.doc
 
TPL Corporate Presentation
TPL Corporate PresentationTPL Corporate Presentation
TPL Corporate Presentation
 

Etimaad Presentation (February 2015) - Project Info

  • 1.
  • 2. Client Name Project Description Location Status Saline Water Conversion Corporation (SWCC) Consortium of Al-Arrab Contracting Co & Sepco III Mechanical Equipment Installation, Piping, Electrical and I & C Works of complete Natural Gas System and Backup Fuel Oil System for 2400 MW Ras Al-Khair Combined Cycle Power Plant. Ras Al-Khair, KSA In Progress General Electric Operation and Maintenance Management of 220 MW GTS based Combined Cycle Power Plant Muridke, Pakistan Long Term Contract General Electric Call out Services for Equipment for all GE Power Plants in Pakistan Sahiwal, Muridke, Balloki, Bhikki, Pakistan Long Term Contract General Electric Operation and Maintenance Management of 220 MW GTS based Combined Cycle Power Plant Sahiwal, Pakistan In Progress Pakistan Atomic Energy Commission 300 MW Chashma Nuclear Power Plants I & II 5 Year Running Annual Maintenance Contract Awarded Chashma, Pakistan Long Term Contract Japan Power EPC Work for Combine Cycle Retrofit Enhancing plant capacity to 182 MW Lahore, Pakistan On Hold by Client Qatar Petroleum Turnkey set up of new LGO storage tank of capacity 48,984 m3 for LGO service at QP Refinery Mesaieed, Qatar In Progress Etimaad projectslist
  • 3. Client Name Project Description Location Status Nazaria-e-Pakistan Trust Construction of Awan-e-Quid-e-Azam Lahore, Pakistan In Progress Novartis Pharma, Pakistan Limited Construction of 5 Story Novartis Corporate Office Building Karachi, Pakistan In Progress Riasat ul Haramain MEP works of Zone-4 in Haram, Makkah Makkah, KSA In Progress Riasat ul Haramain MEP works for Ajiad AC Plant for Haram, Makkah Makkah, KSA Completed Riasat ul Haramain Design built MEP construction of 22 story Security Building, Makkah Makkah, KSA In Progress Riasat ul Haramain Design built MEP works for First Ring Road, Makkah Makkah, KSA In Progress Riasat ul Haramain MEP works for Pedestrian Tunnel in Haram, Makkah Makkah, KSA In Progress Etimaad projectslist
  • 4. Client Name Project Description Location Status Wartsila 160 MW Attock Gen Power Plant Mechanical and Civil Works Rawalpindi, Pakistan Commissioned Skoda Export 220 MW Power Plant Electrical and Mechanical Works Balloki, Pakistan Commissioned Wartsila Civil and Mechanical Works for 200 MW Combined Cycle Nishat Power HFO Based Power Plant Chunian, Pakistan Commissioned Wartsila 200 MW Mechanical Erection Works at Combined Cycle Nishat Chunian Chunian, Pakistan Commissioned Pakistan Atomic Energy Commission 300 MW Chashma Nuclear Power Plant 6th Annual Maintenance Contract Chashma, Pakistan Completed AES Ras Laffan Operating Company Shutdown Maintenance Works at 740 MW Combined Cycle Power Plant Ras Laffan, Qatar Completed AES Ras Laffan Operating Company Shutdown Maintenance Works for 36” Pipeline at 740 MW Combined Cycle Power Plant Ras Laffan, Qatar Completed AES Ras Laffan Operating Company Turnkey supply of GT rotor extraction skid along with mounting trolleys and Quality Control and Management Services for rehabilitation of potable water tanks at 740 MW Combined Cycle Power Plant RasLaffan, Qatar Completed Iberdrola Middle Eas Mesaieed Power Company Technical Services for mechanical construction, piping erection, testing and commissioning at 2000 MW Power Plant Mesaieed, Qatar Completed AES Ras Laffan Shutdown activities involving the following: 36” Pipeline Pressure Reducing Assembly De-Aerator Installation of Supports Other Assorted Works Ras Laffan, Qatar Completed AES Ras Laffan Engineering, Procurement, Excavation, Backfilling, Dewatering, Shoring/Scaffolding, Thrust Boring, Fabrication, Installation, Sand Blasting, Coating, Wrapping, Cathodic Protection, NDT, Commissioning Ras Laffan, Qatar Completed Etimaad projectslist
  • 5. Client Name Project Description Location Status Pakistan Army Engineering Consultancy for 9 MW Co-Gen Power Plant Rawalpindi, Pakistan Completed SEPCO III Electric Power Construction Corporation/ Rabigh Electric Company Installation of ESP Equipment, ID Fan, FGD installation, GHH System Inc Fuel Oil System piping & associated equipment luding Booster Pumps, Aeration Pumps Pre-fabrication of Piping, Pipe Supports, Installation Work, Painting, Hydro Test & Commissioning for 2X660 MW Power Plant. Rabigh, KSA Completed Ras Laffan Power Company / Ras Laffan Industrial City, Qatar Installation of FRP internal of Desal 21 & 24 , during RLPC plant Outage Ras Laffan Industrial City, Qatar Completed I Ways Project Management Consultancy Services, Kotli Hydro Power Project Kotli, Azad Kashmir Completed Associated Group Bhikki Power Plant Civil Works Lahore Completed Qatar Petroleum Engineering, Procurement, Installation and Commissioning of 24” Pipeline Dukhan, Qatar Completed Qatar Fertilizer Company (QAFCO) Piping fabrication and erection, NDT, painting, insulation, scaffolding, hydro testing, Pneumatic testing, air blowing, steel structure fabrication and erection, PWHT, Civil Foundations, Equipment erection, equipment internal works, Bolt tensioning, cold tapping Mesaieed, Qatar Completed Technip Middle East Piping fabrication and erection, NDT, painting, insulation, scaffolding, hydro testing, Pneumatic testing, air blowing, steel structure fabrication and erection, Civil Foundations, Vortex breaker removal. Doha , Qatar Completed Qatar Petroleum Settlement Survey of Crude Oil Storage Tanks in Tank Farm; Settlement Survey of Product Storage Tanks in NGL Plant Doha, Qatar Completed Hyundai Heavy Industries/Das Oil End Underground Piping works at Das Island , Abu Dhabi Abu Dhabi, UAE Completed Etimaad projectslist
  • 6. Client Name Project Description Location Status Qatar Fertilizer Company (QAFCO) Construction, Installation, Testing, Pre-Commissioning and Commissioning of collection, storage and transfer of waste water system including Civil Design/Engineering, Procurement and Supply of Civil/Structural, Instrumentation, Piping, GRP piping, Rotary equipment installation, Electrical & other associated items Mesaieed, Qatar Completed Qatar Petroleum Dismantling and Installation of Normal/Acid Flare Tips at QP Refinery Doha Qatar Completed Qatar Fertilizer Piping fabrication and erection, NDT, painting, insulation, scaffolding, hydro testing, Pneumatic testing, air blowing, steel structure fabrication and erection. Mesaieed, Qatar Completed Qatar Fertilizer Company Electrical and Instrumentation works Mesaieed, Qatar Completed Ras Laffan Power Company Dearator Internal repair by removal of pall rings, cutting / grinding, welding, pickling and passivation and installation of FRP internal of Desal 21 & 24 , during RLPC plant outage scheduled for March 2012 Ras Laffan Industrial City, Qatar Completed Dolphin Energy Limited Secure Horizontal Section of LP Stream line to MP Flare-Stream-2 Ras Laffan, Qatar Completed Qatar Gas Operating Company Limited Procurement, Survey, Excavation, Cable laying, Backfilling, Termination, Testing and Commissioning Ras Laffan, Qatar Completed Butec-Degremont JV Electrical and Instrumentation works Barva City, Qatar Completed Butec-Degremont JV Stainless Steel pipe fabrication( 15,000 Dia Inches) Carbon Steel Pipe Fabrication (10 Tons) Barva City, Qatar Completed Dolphin Energy Limited Stabilization of LP steam line (live line) up to 65 meters. Ras Laffan, Qatar Completed Etimaad projectslist
  • 7. Client Name Project Description Location Status Qatar Fertilizer Construction, Installation, Testing, Pre-Commissioning & Commissioning of QAFCO supplied Bulk Flow Coolers and other Auxiliaries including Civil Design/Engineering, Procurement & Supply of Civil/Structural, Instrumentation, Electrical & other associated items Mesaieed, Qatar Completed Oryx GTL Ltd Engineering, Procurement, Excavation, Backfilling, Dewatering, Shoring/Scaffolding, Thrust Boring, Fabrication, Installation, Sand Blasting, Coating, Wrapping, Cathodic Protection, NDT, Commissioning Ras Laffan, Qatar Completed Chiyoda Corporation Modification of existing pipe supports in different construction areas on Pearl GTL – FEED Gas Preparation (C4) Area Ras Laffan, Qatar Completed Oryx GTL Ltd. Shutdown activities with manpower of 20 people Ras Laffan, Qatar Completed Technip Middle East Excavation, Backfilling, Dismantling of existing cable tray, Cable laying, Concreting Ras Laffan, Qatar Completed Technip Middle East Excavation, Backfilling, Scaffolding, Internal/External Coating, Concreting, Fabrication, Installation, Coating, Wrapping, Cathodic Protection, NDT Ras Laffan, Qatar Completed Chiyoda-Hyundai Consortium Field Pipe Fabrication, Erection, Pressure Testing and Reinstatement Ras Laffan, Qatar Completed Iberdrola Middle East Technical Services for Mechanical Construction, Manpower Supply for Piping Erection, Testing and Commissioning Works Ras Laffan, Qatar Completed Government of KSA MEP Construction Work Makkah, KSA Completed TAISEI-TAV MEP works at New Doha International Airport Doha, Qatar Completed Etimaad projectslist
  • 8. Client Name Project Description Location Status JGC Middle East Support & Pipe Welding Ras Laffan, Qatar Completed AES Ras Laffan Operating Co. WLL Design, Supply, Fabrication, Painting, Transportation and Installation of Gas Turbine Generator Rotor Extraction Skid with Two Trolleys Ras Laffan, Qatar Completed Technip Middle East Heavy Lifting, Erection and Installation, E&I Works Ras Laffan, Qatar Completed AES Ras Laffan Operating Co. WLL Fabrication, Welding, Heat Treatment, NDE, Repairs, Hardness Test, Pressure Testing, Shutdown Activities with manpower of 50 people Ras Laffan, Qatar Completed AES Ras Laffan Operating Co. WLL Services for Rehabilitation of Potable Water Tanks Ras Laffan, Qatar Completed Punj Lloyd Ltd. Construction Manpower Supply Ras Laffan, Qatar Completed AES Ras Laffan Operating Co. WLL Provision of Quality Control and Management Services through management personnel Ras Laffan, Qatar Completed Dodsal Engineering and Construction Pte. Ltd. Installation of Mechanical Cleaning Equipment, Erection of Static & Rotary Equipment Ras Laffan, Qatar Completed GAMA Qatar Co. WLL Provision of Technical Manpower for Civil Works Ras Laffan, Qatar Completed GAMA Qatar Co. WLL Fabrication and Installation of pressure piping and pipe supports Ras Laffan, Qatar Completed Etimaad projectslist
  • 9. Client Name Project Description Location Status Pakistan Air Force Civil, Electrical and HVAC works for Shahbaz Air Base Jacobabad, Pakistan Completed Engro Foods Supply Chain (Private) Limited Civil and Mechanical Construction of Integrated Rice Processing Complex Muridke, Pakistan Completed MOL Pakistan Design, Manufacturing, Fabrication, Supply of Gas Vent Knock Out Drum– ASME U Stamp Mamikhel, Pakistan Completed British Petroleum now United Energy Pakistan Limited Turnaround Strategy documents for TURK Facilities Amine System Mirpur Khas, Pakistan Completed Fauji Fertilizer Company Ltd Fauji Fertilizer Company Ltd. Bin Qasim - Annual Turnaround Bin Qasim, Pakistan Completed Pakistan Air Force Design, Procurement, Fabrication of Exhaust Duct Work for Shahbaz Air Base, Jaccobabad, Pakistan Completed Oil & Gas Development Corporation Limited Uch Gas Field Annual Turnaround Sohbatpur, Pakistan Completed Pak Arab Refinery Limited EPC & Commissioning of Kero Merox Unit at Mid Country Refinery Mahmood Kot, Pakistan Completed Weatherford Oil Tools M.E. Limited Electrical, Mechanical and Instrumentation Works at Adam X-1 Hala early Production4Facility Sanghar, Pakistan Completed OMV Pakistan Exploration Ltd. HAZOP Study of OMV’s Kadanwari Modification and Enhancement Projects Kadanwari, Pakistan Completed Dawood Hercules Chemicals Limited Turnkey supply & Commissioning of 4000 Tons Ammonia Storage Tank Sheikhupura Completed Pak American Fertilizer Limited Fabrication & Supply of Tube Bundles – 2 Nos. of heat exchangers. Mianwali Completed Etimaad projectslist
  • 10. Etimaad projectslist Client Name Project Description Location Status Al-Tawairqi Steel Mills Ltd. Project Management Support Services Karachi, Pakistan Completed Fatima Fertilizer Limited Overhauling through Hydro Jetting of 117 Heat Exchangers, 100 Pressure Safety Valves and Lapping of 6 Valves During Annual Turnaround 2013 Mukhtar Garh, Pakistan Completed Dawood Fertilizer Limited EPC Construction of 4000 Tons Double Walled Anhydrous Ammonia Storage Tank Sheikhupura, Pakistan Completed Dawood Fertilizer Limited EPC Construction of 2500 Tons Caustic Soda StorageTank and Decanting Facility Sheikhupura, Pakistan Completed Procter & Gamble Pakistan Complete Construction and Equipment Installation of Aerial Dry Powder Detergent Plant Port Bin Qasim, Pakistan Completed SEPCO III Field installation of fuel oil system at 1260 MW Power Plant Rabigh, KSA Completed SEPCO III Erection of Electrostatic Precipitator and Flue Gas Desulphurization at 1260 MW Power Plant Rabigh, KSA Completed Pall Corporation Pipe prefabrication and field installation, equipment & steel structure installation, E & I works of Black Powder Filter Station Ma’aden, KSA Completed Technip Pipe Erection of approximately 50,000 dia inches of piping works Jubail, KSA Completed JGC Erection of 4000 meters SS Steam Tracing Line Jubail, KSA Completed SULZER Column Nozzle Modification during Annual Turnaround Jubail, KSA Completed SULZER Retrofit and Turnaround in November 2013 Yanbu, KSA Completed Fives Solios Fabrication of Injection Ducts Ras Al Khair, KSA Completed Fives Solios Pre-assembly of Equipment for Gas Treatment Centers 3 & 4 Ras Al Khair, KSA Completed
  • 11. Client Name Project Description Location Status Juffali Chemicals Engineering, Procurement, Construction & Commissioning of Polyurethane System Housing Project Jeddah, KSA Completed Arabian Chemical Company Limited (Latex) Engineering, Procurement, Construction & Commissioning of styrene monomer 8 Km pipeline from Jubail Chevron Phillips Plant to ACCL premises through Royal Commission Corridor Jubail, KSA Completed Jubail Chevron Phillips Company Design, procurement & Construction (Civil, Mechanical & E&I) including commissioning of insulated Styrene Pipeline from Tank form to Royal Commission Corridor Jubail, KSA Completed Daelim Piping (2”-24”) Fabrication Work s at Site, covering CS, SS and Alloy Steel Pipe (48,000 dia inches) Jubail, KSA Completed Arabian Chemical Company Limited (LATEX) Painting, inspection & Revalidation of Butadiene Pipe Line Jubail, KSA Completed CTCI Manufacturing and Supply of 23 Nos. of Stainless Steel Storage Tanks. Jubail, KSA Completed Technip / Nesma Field installation of 3 Nos. Carbon Steel Acid Tanks Jubail, KSA Completed Westech Engineering Supply, Fabrication & Installation of Bio Sludge Treatment Plant Jubail, KSA Completed Fives Solios Manufacturing of 4 Nos. Stacks with diameter of 7.8m, height 52m and weight 600 tons for Ras Az Zawr Aluminum Smelter Project. Ras Al Khair, KSA Completed Etimaad projectslist
  • 12. Client Name Project Description Location Status GE Oil & Gas, Italy Replacement of UCPS And Upgrading Of F & G System At Sui Gas Field At Unit- C, D, E and F for Compressor Station (PPL) Pakistan Sui, Balochistan Completed CNPP, PAEC Annual Turnaround at CNPP Unit 1 & 2 CNPP, Mianwali Completed Etimaad projectslist