Hard Rock Directional Drilling is a leading provider of horizontal directional drilling and field services with over 11 years of experience. It has a seasoned management team and over 100 employees supporting operations across multiple Texas locations. Hard Rock prides itself on its safety record and turn-key operations supported by in-house maintenance, fabrication, and extensive equipment. It has successfully completed over 2 million feet of installations for utility and energy customers.
3. Safety issues are the most important responsibility of our
company and our resulting safety track record proves
successful implementation
Operated by a seasoned management team and drilling
professionals fully trained in the complex HDD process
Adhere to a strict training program
Internal development and promotion program ensures
Hard Rock is above and beyond the competition
Comprehensive, new drilling and support fleet
Provide a true Turn-Key Service:
• Field Operations are supported by: In-house
Maintenance, Fabrication Department, Extensive
Support Equipment, Internal Survey, Pre- and Post-
Profile, and Potholling Capabilities;
• Hard Rock’s Turn-Key Service results in:
– Reduced downtime, delays, and/or calls on the
customer’s equipment
– High reliability and on-time delivery
– Negates the need to rely on 3rd party contractors or
our customers for any back-up services
Leading provider of Horizontal Directional Drilling (HDD)
and field services
Headquartered in San Antonio, TX with additional
operating locations in Pearsall, Edinburg, San Angelo, and
Monahans
Operates a comprehensive, new drilling and support fleet
11 years in business and over 100 years of combined
experience
Over 50+ MSA’s with “Blue Chip” & broad customer base
Provide a comprehensive range of services including:
• Engineering & Bore design
• Total turn-key HDD installation
• Utility infrastructure installation
• Field services
Since inception in 2003, Hard Rock has successfully
installed over 2 million ft. of pipe, with sizes ranging from
2”–42”
In 2014, Hard Rock successfully performed over 440
thousand boring feet for its customers
l
About Us
3
Company Profile
Key Differentiators
4. 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
4
Company History
Founded in July 2003
1 drilling rig
Mainly served Utility &
Telecommunication industries
First full-year of operation
1 drilling rig
3 employees
2 drilling rigs
7 employees
3 drilling rigs
9 employees
4 drilling rigs
15 employees
5 drilling rigs
25 employees
Customer base expanded
to Oil & Gas industry
Added in-house tool
fabrication
Acquired Pearsall
property to capitalize on
Eagle Ford play
96,496 feet of production
7 drilling rigs
50 employees
Majority of revenue
from oil & gas
273,867 feet of
production
11 drilling rigs
73 employees
Opened Pearsall
office /
maintenance
facility
Acquired Valley
Boring
435,969 feet of
production
Acquired San Antonio
Facilty
Added yard in
Edinburg
Opening West
Texas yard
85 employees
16 drilling rigs
20 drilling rigs
135 employees
New yard in
Monahans, TX
5. CEO
Corporate
Operations
Business
Development
Safety Financial Field Operations
5
Seasoned Management Team and Deep
Infrastructure (I)
• Corporate and
field operations
development staff
• Fully staffed
corporate
infrastructure
department
• Dedicated staff
members assigned
to ensure internal
safety procedures
are followed
• CFO
• Controller
• Fully staffed
internal
accounting
department
• Annual audits by
outside CPA firm
• Next slide details
our Field structure
6. 6
Seasoned Management Team and Deep
Infrastructure (II)
Drilling Operations are supported by both Superintendents and Crew Leaders
Field Operations
General
Superintendent
Superintendent
Crew
Leader
Crew
Crew
Leader
Crew
Superintendent
Crew
Leader
Crew
Crew
Leader
Crew
Crew
Leader
Crew
Superintendent
Crew
Leader
Crew
Crew
Leader
Crew
Crew
Leader
Crew
Superintendent
Crew
Leader
Crew
Crew
Leader
Crew
Crew
Leader
Crew
Superintendent
Crew
Leader
Crew
Crew
Leader
Crew
Crew
Leader
Crew
Superintendent
Crew
Leader
Subcontractors
7. Hard Rock is a member in good standing with and compliant with the
standards of:
• IS Networld
• Veriforce
• SafeLand
• NCCER
• PEC Premier
• Houston Area Safety Council
• NCMS
• PHMSA
Hard Rock allocates extensive resources and has an assigned staff
that is dedicated to insure that the company remains an industry
leader in safety
Fully compliant with all necessary safety requirements
Hard Rock is insured by AFHIC, Winchester Fire Insurance Company,
and Texas Mutual Insurance with coverage that includes commercial
general liability, any auto, hired auto, non-owner auto, and umbrella
liability (Noth River Insurance)
Safety policy:
• Projects are subject to regular safety audits
• Daily crews are required to follow the job safety analysis (JSA)
procedure which Hard Rock has expanded to total job analysis
and is reviewed each day with the crews on-site
• Supervisors are evaluated based on their safety records and
the safety records of the employees they supervise
• Require employees to actively participate in internal training
and service programs relevant to their employment and
complete any training programs required by law or relevant to
the specific project
• Adhere to a strict drug policy where employees are subject to
pre-employment and random drug screens
Internal
7
Impeccable Safety Record
External
Hard Rock has a strong safety record over its 11 year history that is superior to the industry average
8. Engineering & Bore Design
• Atlas Bore Planner
• Autocad
• DCE Datalog
• GPS surveying equipment
• Gyro locating system
• Tensor tool
• 2 Paratrack downhole wireline guidance systems
• Access to bore profiles via website
Extensive Support Equipment
• Dedicated Fleet Manager
• Track hoes
• Trailers/haul trucks
• Mud/water trucks
• Vacuum trucks
• Field Servicing trucks
• Hydro excavation – also have air capabilities
• Wireline
Dedicated Fabrication Department
• Can customize tools required for any job
• Can build cooling/heating & trash trailers
• CAD Machine
Pearsall Yard
• On-site mechanics & service trucks
• Storage
• Admin support/ in addition to San Antonio
• Employee housing facilities
Valley Boring Acquisition & Yard
• Additional drilling rigs
• 1 dry machine – American Auger 48”/52”
• 2 additional Super Vac trucks
• Storage
West Texas Yards (San Angelo & Monahans)
• Support equipment
• Storage
• Employee housing facilities
8
True Turn-Key Operations
Hard Rock’s field operations are supported by:
True Turn-Key service negates the need to rely on 3rd party contractors or the customer for any back-up services
9. Potholing Services
Hard Rock offers safe, precise, cost-effective, and environmentally friendly
hydro and air excavation services to its clients with its fleet of 6 vacuum
trucks
Hard Rock’s vac services are used for visual inspection to verify existing
infrastructure without damaging the product
Vacuum Trucks
– 2 Peterbilt w/Vermeer Vactron Units
– 2 Kenworth w/Vactor HXX PD Units
– 2 Kenworth w/Vactor HXX Units
Advantages of Vac Services
– Reduces risk of injury to personnel
– Reduces risk of damage to underground infrastructure
– Reduces delays, costly repairs, liability, and service interruption due to
damage of underground infrastructure
9
Utilities damaged by a backhoe
Utilities excavated by hydro vac
10. Additional Field Services
10
Site Construction
– Drill site
– Pads
– Entrances
– Right of way work
– Soil excavation
– Site remediation
Utility, Admin, and Civil
– Directional boring utility lines (fiber & gas)
– Roads
– Paving
– Parking lots
Miscellaneous
– Surveying
– Maintenance
– Drainage
In addition to its vac services, Hard Rock has an array of equipment (e.g., backhoes, excavators, maintainers, dozers,
etc.) that allows the Company to offer a number of additional field services including:
11. Hard Rock Facts
11
250 Total pieces of equipment
Key Operating Assets
– 1 Vermeer 40 x 40
– 4 Vermeer 36 x 50 drills
– 3 Vermeer 36 x 50 DR (rock drills)
– 5 Vermeer 60 x 90 drills
– 2 Vermeer 100 x 120 drills
– 1 Vermeer 100 x 140 drill
– 1 Universal 250 x 400 drill
– 1 Vermeer 330 x 500 drill
– 1 Vermeer 500 x 500 drill
– 1 American Augers 440T
– 1 American Auger 48/54”
– 6 High-Volume Super Vac Trucks
Comprehensive, New Drilling and Support
Fleet
12. Drilling Fleet
12
Drilling Rig Number of Rigs Thrust/Pullback Torque
Vermeer 40 x 40 1 40,000 lbs (178 kN) 4,000 ft-lb (5,423 Nm)
Vermeer 36 x 50 4 36,000 lbs (160 kN) 4,995 ft-lb (6,772 Nm)
Vermeer 36 x 50 DR 3 38,000 lbs (169 kN) 6,000 ft-lb (8,135 Nm)
Vermeer 60 x 90 5 60,000 lbs (267 kN) 9,000 ft-lb (12,202 Nm)
Vermeer 100 x 120 2 100,000 lbs (445 kN) 12,000 ft-lb (16,270 Nm)
Vermeer 100 x 140 1 100,000 lbs (445 kN) 14,000 ft-lb (18,982 Nm)
Universal 250 x 400 1 250,000 lbs (1,112 kN) 40,000 ft-lb (54,237 Nm)
Vermeer 500 x 500 1 500,000 lbs (2,224 kN) 50,000 ft-lb (67,791 Nm)
American Augers 440T 1 440,000 lbs (1,957 kN) 60,000 ft-lb (81,349 Nm)
American Auger 48/54 1 900,000 lbs (4,003 kN) 136,551 ft-lb (185,138 Nm)
Hard Rock operates an extensive drilling fleet that is capable of handling any pipe size and distance required
13. 13
Drill Rod Specs
Size Lgth. Wght. Bend Radius
Ft. of Rod to
Bend 90
degrees
Max. Angle
in
degrees/Rod
Max. %
Slope
%/Rod
Torque Rating
D 36 x 50
2.625" (6.7 cm) X.40" (1 cm) wall
thickness with 3.1" (7.9 cm) upset
15'
(4.6 )
165 lb/stem
(74.8 kg)
145' (44 m)
228'
(69.4m)
5.9 10.3
5,000 ft-lb
(6779.1 Nm)
D 36 x 50 DR
2.625" (6.7 cm) OD x .281" (.7cm) wall
thickness with 3.31" (8.4 cm) upset
10'
(3 m)
86 lb/stem
(39.0k)
169' (52m)
265'
(80.8 m)
3.4 5.9
6,000 ft-lb
(16779.09 Nm)
D60 x 90
3.5" (8.9 cm) OD X .449" (1.14 cm)
wall thickness with 3.625" (9.2 cm)
upset
15'
(4.6 )
250 lb/stem
(113.4 kg)
197.4' (60.2 m)
310'
(94.5m)
4.3 7.5
10,000 ft-lb
(13,558.2 Nm)
D100 x 200
3.5" (8.9 cm) OD x .476" (1.2 cm) wall
thickness with 4.375" (11.1 cm) upset
20'
(6.1 cm)
374 lb/stem
(169.6 kg)
197.4' (60 m)
310'
(94.5m)
5.8 10.2
15,000 ft-lb
(20,337.3 Nm)
D250
5” .362 wall thickness
20’ 550 lb/stem
500’
4.2 38,044
D440 x 500
5.5” .415 wall thickness
31’ 858 lbs../stem 458 3.6
12.5°
73,20
14. To edit footnote click on Insert / Header & Footer1414
Work Space
Work Space Requirements
Machine Size
Minimum Work
Space
Requirements
36 x 50 50’ x 50’
60 x 90 100’ x 100’
100 x 120 150’ x 120’
250, 440, 500 150’ x 150’
18. Why Hard Rock?
18
Provides superior service to its customers and ensures that each job is completed
efficiently while adhering to the strictest safety protocols
Proven success with over 2+ million feet of pipe installed
A broad operator with the sophistication and capabilities to serve the most demanding
customers and provides a “one-stop shop” for both customers’ small and larger projects
Considerable experience in field services via its turn-key approach for its HDD operations
Has the MSA’s, insurance coverage, safety record, working capital, infrastructure, and
employee training to support the large projects demanded by the industry
Operates a sizable fleet of equipment and has multiple locations that allows it to
respond quickly to breakdowns/interruptions, thereby reducing delays and cost
overruns