Take-off Hours 2,850.95 Materials $138,729.17 Sub- Contractors $541,194.00 Major Purchase $196,840.00
Productivity Factor 10.00% 285 Unforseen 2.00% $2,774.58 Unforseen 0.00% $0.00 Unforseen 0.00% $0.00
Hours 3,136 $9.00 $28,224.41 Impuesto Sobre Venta y Uso 11.50% $15,953.85 Impuesto Sobre Venta y Uso 0.00% $0.00 Impuesto Sobre Venta y Uso 11.50% $22,636.60
Premium Hours 192 $9.00 $1,728.00
040 Sub Total 3,328 $29,952.41 $157,457.61 $541,194.00 $219,476.60
040 Single Time FB/TAX 34.00% $9,596.30
040 Single Fondo Seguro del Estado 5.25% $1,481.78 General Conditions General Conditions General Conditions
040 Premium Time FB/TAX 10.74% $185.59 Petty Cash 0.50% $787.29 Petty Cash 0.50% $2,705.97 Petty Cash 0.50% $1,097.38
040 Premium Fondo Seguro del Estado 5.25% $90.72 Job Expenses 1.00% $1,574.58 Job Expenses 1.00% $5,411.94 Job Expenses 1.00% $2,194.77
080-Temp Allow for 040 $0.00 Equipment Rental $8,000.00 Equipment Rental $0.00 Equipment Rental $0.00
Spare $0.00 Telephone Expenses $2,000.00 Telephone Expenses $0.00 Telephone Expenses $0.00
$11,354.39 Vehicle Expenses $0.00 Vehicle Expenses $0.00 Vehicle Expenses $0.00
040 Sub-Total 3328 $41,306.79 Field Office $0.00 Field Office $0.00 Field Office $0.00
Field Warehouse $0.00 Field Warehouse $0.00 Field Warehouse $0.00
060 Payroll Hours Wage Rate Surveying $0.00 Surveying $0.00 Surveying $0.00
Driver 346.00 $7.50 $2,595.00 Inspector Office $0.00 Spare $0.00 Spare $0.00
Warehouse Keeper 0.00 $7.25 $0.00 General Conditions Total $12,361.86 General Conditions Total $8,117.91 General Conditions Total $3,292.15
Administration Assistance 173.00 $9.00 $1,557.00
Watchman 0.00 $7.25 $0.00 Savings Savings Savings
Others 0.00 $7.25 $0.00 Savings Materials $0.00 Savings Sub-Contractors $0.00 Savings Major Purchased $0.00
060 Sub Total 519.00 $4,152.00 Total Savings $0.00 Total Savings $0.00 Total Savings $0.00
060 Single Time FB/TAX 34.00% $1,411.68
060 Single Fondo Seguro del Estado 5.25% $217.98
080-Temp Allow for 060 $0.00
Spare $0.00
$1,629.66 Factors Cost Bid
060 Sub-Total 519.00 $5,781.66 Labor $22.60 $35.99
Material 1.224 1.457
064 Payroll Hours Wage Rate Sub-Contract 1.015 1.208
Foreman 1038.00 $12.00 $12,456.00 Major Purchase 1.132 1.347
Others 0.00 $11.50 $0.00
064 Sub Total 1038.00 $12,456.00 Prices Cost Bid
064 Single Time FB/TAX 34.00% $4,235.04 Labor $64,433.43 $102,594.33
064 Single Fondo Seguro del Estado 5.25% $653.94 Material $169,819.48 $202,173.81
070-Trans/Personnel Diet Allow $0.00 Sub-Contract $549,311.91 $653,967.87
080-Temp Allow for 064 $0.00 Major Purchase $222,768.75 $265,211.08
Spare $0.00 Total $1,006,333.57 $1,223,947.09
064 FB / FSE / Diet $4,888.98
064 Sub-Total 1038.00 $17,344.98 Mechanical Summary
1 Labor $64,433.43
100 Group Month Monthly Rates 2 Materials $157,457.61
Project Director 0.00 $4,500 $0.00 3 Sub-Contract $541,194.00
Project Manager 2.00 $3,500 $7,000.00 4 Major Purchase $219,476.60
Project Engineer 0.00 $2,000 $0.00 5 General Conditions $23,771.92
Superintendent 0.00 $2,500 $0.00 6 Project Administration $21,742.50
Quality Control Officer 0.00 $2,000 $0.00 7 Saving Materials $0.00
Safety Officer 3.00 $2,000 $6,000.00 8 Saving Sub-Contract $0.00
100 Group Total 5.00 $13,000.00 9 Saving Major Purchase $0.00
100 Transp & Pdiem Project Director 0.00 $1,500 $0.00 10 Over Head $82,246.09
100 Transp & Pdiem Project Manager 2.00 $1,300 $2,600.00 11 Profit $102,807.61
100 Transp & Pdiem Project Engineer 0.00 $1,000 $0.00 12 Insurances & Taxes $10,817.33
100 Transp & Pdiem Others 0.00 $800 $0.00 13 Rounding Adjustment $0.00
100 Transp & Pdiem Total $2,600.00 Total Bid $1,223,947.09
Fringe Benefits 42.00% $5,460.00
Workers Compensation Insurance 5.25% $682.50 Average Crew Tons:
Benefits, Insurances & Diets $6,142.50 Total Calendars Days 0 0
100 Sub-Total 5.00 $21,742.50 Complete in 150 Hours per 0.00
Working Days 107 Cost ($/per) $0.00
General Personnel 040 average crew 3.60 Bid ($/per) $0.00
Overhead & Profit Overhead & Profit Overhead & Profit Overhead & Profit
General Administration Overhead 8.00% $6,894.07 General Administration Overhead 8.00% $13,585.56 General Administration Overhead 8.00% $43,944.95 General Administration Overhead 8.00% $17,821.50
Profit 10.00% $8,617.59 Profit 10.00% $16,981.95 Profit 10.00% $54,931.19 Profit 10.00% $22,276.87
Overhead & Profit Total $15,511.67 Overhead & Profit Total $30,567.51 Overhead & Profit Total $98,876.14 Overhead & Profit Total $40,098.37
SUB-TOTAL $101,687.60 SUB-TOTAL $200,386.98 SUB-TOTAL $648,188.05 SUB-TOTAL $262,867.12
Insurance & Taxes P. & OHD. Insurance & Taxes P. & OHD. Insurance & Taxes P. & OHD. Insurance & Taxes P. & OHD.
Rate Comp Rate 18.00% 18.00% 18.00% 18.00%
Builder Risk 0.0000% 0.0000% $0.00 Builder Risk $0.00 Builder Risk $0.00 Builder Risk $0.00
Comprehensive General Liability 0.2500% 0.2519% $302.25 Comprehensive General Liability $595.61 Comprehensive General Liability $1,926.60 Comprehensive General Liability $781.32
Payment & Performance Bond 0.0000% 0.0000% $0.00 Payment & Performance Bond $0.00 Payment & Performance Bond $0.00 Payment & Performance Bond $0.00
Municipal Construction Tax 0.0000% 0.0000% $0.00 Municipal Construction Tax $0.00 Municipal Construction Tax $0.00 Municipal Construction Tax $0.00
Municipal Patent 0.5000% 0.5038% $604.49 Municipal Patent $1,191.22 Municipal Patent $3,853.21 Municipal Patent $1,562.64
Col. Ing. / Agrim. & IRS Stamps 0.0000% 0.0000% $0.00 Col. Ing. / Agrim. & IRS Stamps $0.00 Col. Ing. / Agrim. & IRS Stamps $0.00 Col. Ing. / Agrim. & IRS Stamps $0.00
$906.74 $1,786.83 $5,779.81 $2,343.95
Rounding Adjustment $0.00 Rounding Adjustment $0.00 Rounding Adjustment $0.00 Rounding Adjustment $0.00
Labor Total $102,594.33 Material Total $202,173.81 Sub-Contract Total $653,967.87 Major Purchase Total $265,211.08
SUB-CONTRACTS MAJOR PURCHASE
Insurance&Taxes
LABOR
040Group060Group064Group100GroupOH/Profit
MechanIcalSummary
Bid Price:
Area: Units:
0 0
0.00 0.00
$0.00 $0.00
$0.00 $0.00
MATERIALS
Merck HVAC Upgrade Project
Las Piedras

More Related Content

What's hot

Brunswick (BC) Pitch - Jonathan Chang - FINAL COPY
Brunswick (BC) Pitch - Jonathan Chang - FINAL COPYBrunswick (BC) Pitch - Jonathan Chang - FINAL COPY
Brunswick (BC) Pitch - Jonathan Chang - FINAL COPY
Jonathan Chang
 
Financial Accounting Common Sizing Analysis Report
Financial Accounting Common Sizing Analysis ReportFinancial Accounting Common Sizing Analysis Report
Financial Accounting Common Sizing Analysis Report
Nicholas Espinosa
 
Financial Annual Report Common Size
Financial Annual Report Common SizeFinancial Annual Report Common Size
Financial Annual Report Common Size
Taylor Wiley
 
C3 comp redesign 6-3-13 (2)
C3 comp redesign  6-3-13 (2)C3 comp redesign  6-3-13 (2)
C3 comp redesign 6-3-13 (2)
Mark Wolkove
 
Cost Improvement EPIC
Cost Improvement EPICCost Improvement EPIC
Cost Improvement EPIC
Jason Gallion
 
EAS_SuppSched_Q307
EAS_SuppSched_Q307EAS_SuppSched_Q307
EAS_SuppSched_Q307
finance40
 

What's hot (20)

Low-Income Housing Tax Credit Presentation
Low-Income Housing Tax Credit PresentationLow-Income Housing Tax Credit Presentation
Low-Income Housing Tax Credit Presentation
 
Inflation-Indexed Mortgage: Real vs Nominal Interest Rates
Inflation-Indexed Mortgage: Real vs Nominal Interest RatesInflation-Indexed Mortgage: Real vs Nominal Interest Rates
Inflation-Indexed Mortgage: Real vs Nominal Interest Rates
 
Brunswick (BC) Pitch - Jonathan Chang - FINAL COPY
Brunswick (BC) Pitch - Jonathan Chang - FINAL COPYBrunswick (BC) Pitch - Jonathan Chang - FINAL COPY
Brunswick (BC) Pitch - Jonathan Chang - FINAL COPY
 
Financial Forecasting
Financial ForecastingFinancial Forecasting
Financial Forecasting
 
OneStream Studio BI report package
OneStream Studio BI report packageOneStream Studio BI report package
OneStream Studio BI report package
 
Depreciation sample report
Depreciation sample reportDepreciation sample report
Depreciation sample report
 
FSAE-A Business Presentation - Redback Racing 2017
FSAE-A Business Presentation - Redback Racing 2017FSAE-A Business Presentation - Redback Racing 2017
FSAE-A Business Presentation - Redback Racing 2017
 
Anexo 2
Anexo 2Anexo 2
Anexo 2
 
Financial Accounting Common Sizing Analysis Report
Financial Accounting Common Sizing Analysis ReportFinancial Accounting Common Sizing Analysis Report
Financial Accounting Common Sizing Analysis Report
 
Dcf
DcfDcf
Dcf
 
Financial Annual Report Common Size
Financial Annual Report Common SizeFinancial Annual Report Common Size
Financial Annual Report Common Size
 
Wiper
WiperWiper
Wiper
 
C3 comp redesign 6-3-13 (2)
C3 comp redesign  6-3-13 (2)C3 comp redesign  6-3-13 (2)
C3 comp redesign 6-3-13 (2)
 
Navigating Complex Assets in Divorce with Practical Forensic Accounting Solut...
Navigating Complex Assets in Divorce with Practical Forensic Accounting Solut...Navigating Complex Assets in Divorce with Practical Forensic Accounting Solut...
Navigating Complex Assets in Divorce with Practical Forensic Accounting Solut...
 
Digital realty 2017 investor day
Digital realty 2017 investor dayDigital realty 2017 investor day
Digital realty 2017 investor day
 
Catherine fisher pwr point
Catherine fisher pwr point Catherine fisher pwr point
Catherine fisher pwr point
 
Sonoro Gold - The mineral wealth report by anthony garson and associates
Sonoro Gold - The mineral wealth report by anthony garson and associatesSonoro Gold - The mineral wealth report by anthony garson and associates
Sonoro Gold - The mineral wealth report by anthony garson and associates
 
Cost Improvement EPIC
Cost Improvement EPICCost Improvement EPIC
Cost Improvement EPIC
 
Accting Final Project
Accting Final ProjectAccting Final Project
Accting Final Project
 
EAS_SuppSched_Q307
EAS_SuppSched_Q307EAS_SuppSched_Q307
EAS_SuppSched_Q307
 

Viewers also liked (11)

Los Lobos – Elmore Magazine
Los Lobos – Elmore MagazineLos Lobos – Elmore Magazine
Los Lobos – Elmore Magazine
 
Estimating the impact of 21st century climate change on wildfire
Estimating the impact of 21st century climate change on wildfireEstimating the impact of 21st century climate change on wildfire
Estimating the impact of 21st century climate change on wildfire
 
Presentacion2
Presentacion2Presentacion2
Presentacion2
 
Reference_ MK
Reference_ MKReference_ MK
Reference_ MK
 
Ray Robertson – Lives Of The Poets (With Guitars): 13 Outsiders Who Changed M...
Ray Robertson – Lives Of The Poets (With Guitars): 13 Outsiders Who Changed M...Ray Robertson – Lives Of The Poets (With Guitars): 13 Outsiders Who Changed M...
Ray Robertson – Lives Of The Poets (With Guitars): 13 Outsiders Who Changed M...
 
Communicate with your data 20170104
Communicate with your data 20170104Communicate with your data 20170104
Communicate with your data 20170104
 
BIOMETRIC (TO PRERVE OUR IDENTY)
BIOMETRIC (TO PRERVE OUR IDENTY)BIOMETRIC (TO PRERVE OUR IDENTY)
BIOMETRIC (TO PRERVE OUR IDENTY)
 
Preposizioni con dativo e accusativo
Preposizioni con dativo e accusativoPreposizioni con dativo e accusativo
Preposizioni con dativo e accusativo
 
Verbi transitivi e intransitivi
Verbi transitivi e intransitiviVerbi transitivi e intransitivi
Verbi transitivi e intransitivi
 
Biometric technology .pptx
Biometric technology .pptxBiometric technology .pptx
Biometric technology .pptx
 
Revestimiento de canales
Revestimiento de canalesRevestimiento de canales
Revestimiento de canales
 

Similar to Estimate Summary Example

Well_Economics_Forcast_Back_In__W_I
Well_Economics_Forcast_Back_In__W_IWell_Economics_Forcast_Back_In__W_I
Well_Economics_Forcast_Back_In__W_I
Angelo Gasendo
 
helath net 98 AR
helath net 98 ARhelath net 98 AR
helath net 98 AR
finance18
 
RatioOptum & CMS Median Ratio Hospital Industry1-99 beds100-19.pdf
RatioOptum & CMS Median Ratio Hospital Industry1-99 beds100-19.pdfRatioOptum & CMS Median Ratio Hospital Industry1-99 beds100-19.pdf
RatioOptum & CMS Median Ratio Hospital Industry1-99 beds100-19.pdf
sales113
 
Actual Cost Vs Plan Projection Powerpoint Presentation Slides
Actual Cost Vs Plan Projection Powerpoint Presentation SlidesActual Cost Vs Plan Projection Powerpoint Presentation Slides
Actual Cost Vs Plan Projection Powerpoint Presentation Slides
SlideTeam
 

Similar to Estimate Summary Example (20)

Well_Economics_Forcast_Back_In__W_I
Well_Economics_Forcast_Back_In__W_IWell_Economics_Forcast_Back_In__W_I
Well_Economics_Forcast_Back_In__W_I
 
proforma sample
proforma sampleproforma sample
proforma sample
 
Wassim Zhani Kroger Value.pdf
Wassim Zhani Kroger Value.pdfWassim Zhani Kroger Value.pdf
Wassim Zhani Kroger Value.pdf
 
Sample LBO Model Template – 2
Sample LBO Model Template – 2Sample LBO Model Template – 2
Sample LBO Model Template – 2
 
Profit blueprint
Profit blueprintProfit blueprint
Profit blueprint
 
Case 2
Case 2Case 2
Case 2
 
CNR_DCF(USD)
CNR_DCF(USD)CNR_DCF(USD)
CNR_DCF(USD)
 
PV Project Development Economic Feasibility Financial Model Baseline Case
PV Project Development Economic Feasibility Financial Model Baseline CasePV Project Development Economic Feasibility Financial Model Baseline Case
PV Project Development Economic Feasibility Financial Model Baseline Case
 
RR - Technicals 1.pdf
RR - Technicals 1.pdfRR - Technicals 1.pdf
RR - Technicals 1.pdf
 
helath net 98 AR
helath net 98 ARhelath net 98 AR
helath net 98 AR
 
RatioOptum & CMS Median Ratio Hospital Industry1-99 beds100-19.pdf
RatioOptum & CMS Median Ratio Hospital Industry1-99 beds100-19.pdfRatioOptum & CMS Median Ratio Hospital Industry1-99 beds100-19.pdf
RatioOptum & CMS Median Ratio Hospital Industry1-99 beds100-19.pdf
 
Forecast Vs Actual Budget Powerpoint Presentation Slides
Forecast Vs Actual Budget Powerpoint Presentation SlidesForecast Vs Actual Budget Powerpoint Presentation Slides
Forecast Vs Actual Budget Powerpoint Presentation Slides
 
Forecast Vs Actual Budget PowerPoint Presentation Slides
Forecast Vs Actual Budget PowerPoint Presentation Slides Forecast Vs Actual Budget PowerPoint Presentation Slides
Forecast Vs Actual Budget PowerPoint Presentation Slides
 
Plan Vs Forecast PowerPoint Presentation Slides
Plan Vs Forecast PowerPoint Presentation SlidesPlan Vs Forecast PowerPoint Presentation Slides
Plan Vs Forecast PowerPoint Presentation Slides
 
Financial Analysis with Microsoft Excel 7th Edition Mayes Solutions Manual
Financial Analysis with Microsoft Excel 7th Edition Mayes Solutions ManualFinancial Analysis with Microsoft Excel 7th Edition Mayes Solutions Manual
Financial Analysis with Microsoft Excel 7th Edition Mayes Solutions Manual
 
Actual Cost Vs Plan Projection Powerpoint Presentation Slides
Actual Cost Vs Plan Projection Powerpoint Presentation SlidesActual Cost Vs Plan Projection Powerpoint Presentation Slides
Actual Cost Vs Plan Projection Powerpoint Presentation Slides
 
Pepsi & Coca Cola Financial Analysis
Pepsi & Coca Cola Financial AnalysisPepsi & Coca Cola Financial Analysis
Pepsi & Coca Cola Financial Analysis
 
Reporting to management
Reporting to managementReporting to management
Reporting to management
 
Tata chemicals
Tata chemicalsTata chemicals
Tata chemicals
 
Financial Statement Analysis Assignment Help
Financial Statement Analysis Assignment HelpFinancial Statement Analysis Assignment Help
Financial Statement Analysis Assignment Help
 

More from Oscar L. Garcia Agosto (17)

Introduction to Water Balance Systems
Introduction to Water Balance SystemsIntroduction to Water Balance Systems
Introduction to Water Balance Systems
 
Firetube Level 1 Training Program Certificate
Firetube Level 1 Training Program CertificateFiretube Level 1 Training Program Certificate
Firetube Level 1 Training Program Certificate
 
Smart Solutions for Pump Applications
Smart Solutions for Pump ApplicationsSmart Solutions for Pump Applications
Smart Solutions for Pump Applications
 
Analytical Intrumentation Certificate
Analytical Intrumentation CertificateAnalytical Intrumentation Certificate
Analytical Intrumentation Certificate
 
Advances in Flow Process Instrumentation Certificate
Advances in Flow Process Instrumentation CertificateAdvances in Flow Process Instrumentation Certificate
Advances in Flow Process Instrumentation Certificate
 
Basic Flow Certificate
Basic Flow CertificateBasic Flow Certificate
Basic Flow Certificate
 
OSHA 10 hrs
OSHA 10 hrsOSHA 10 hrs
OSHA 10 hrs
 
PROCORE
PROCOREPROCORE
PROCORE
 
Project Award by Merck Sharp & Dohme
Project Award by Merck Sharp & DohmeProject Award by Merck Sharp & Dohme
Project Award by Merck Sharp & Dohme
 
Drafter & Electrician Helper License
Drafter & Electrician Helper LicenseDrafter & Electrician Helper License
Drafter & Electrician Helper License
 
Degree of Architectural Draftsman
Degree of Architectural DraftsmanDegree of Architectural Draftsman
Degree of Architectural Draftsman
 
Drafter & Electrician Helper License
Drafter & Electrician Helper LicenseDrafter & Electrician Helper License
Drafter & Electrician Helper License
 
Degree of Electrician
Degree of ElectricianDegree of Electrician
Degree of Electrician
 
Degree of BSME
Degree of BSMEDegree of BSME
Degree of BSME
 
Estimate Summary Example
Estimate Summary ExampleEstimate Summary Example
Estimate Summary Example
 
MANIFOLD ITEMS FURNISHED BY UBM.PDF
MANIFOLD ITEMS FURNISHED BY UBM.PDFMANIFOLD ITEMS FURNISHED BY UBM.PDF
MANIFOLD ITEMS FURNISHED BY UBM.PDF
 
Complete Assembly
Complete AssemblyComplete Assembly
Complete Assembly
 

Estimate Summary Example

  • 1. Take-off Hours 2,850.95 Materials $138,729.17 Sub- Contractors $541,194.00 Major Purchase $196,840.00 Productivity Factor 10.00% 285 Unforseen 2.00% $2,774.58 Unforseen 0.00% $0.00 Unforseen 0.00% $0.00 Hours 3,136 $9.00 $28,224.41 Impuesto Sobre Venta y Uso 11.50% $15,953.85 Impuesto Sobre Venta y Uso 0.00% $0.00 Impuesto Sobre Venta y Uso 11.50% $22,636.60 Premium Hours 192 $9.00 $1,728.00 040 Sub Total 3,328 $29,952.41 $157,457.61 $541,194.00 $219,476.60 040 Single Time FB/TAX 34.00% $9,596.30 040 Single Fondo Seguro del Estado 5.25% $1,481.78 General Conditions General Conditions General Conditions 040 Premium Time FB/TAX 10.74% $185.59 Petty Cash 0.50% $787.29 Petty Cash 0.50% $2,705.97 Petty Cash 0.50% $1,097.38 040 Premium Fondo Seguro del Estado 5.25% $90.72 Job Expenses 1.00% $1,574.58 Job Expenses 1.00% $5,411.94 Job Expenses 1.00% $2,194.77 080-Temp Allow for 040 $0.00 Equipment Rental $8,000.00 Equipment Rental $0.00 Equipment Rental $0.00 Spare $0.00 Telephone Expenses $2,000.00 Telephone Expenses $0.00 Telephone Expenses $0.00 $11,354.39 Vehicle Expenses $0.00 Vehicle Expenses $0.00 Vehicle Expenses $0.00 040 Sub-Total 3328 $41,306.79 Field Office $0.00 Field Office $0.00 Field Office $0.00 Field Warehouse $0.00 Field Warehouse $0.00 Field Warehouse $0.00 060 Payroll Hours Wage Rate Surveying $0.00 Surveying $0.00 Surveying $0.00 Driver 346.00 $7.50 $2,595.00 Inspector Office $0.00 Spare $0.00 Spare $0.00 Warehouse Keeper 0.00 $7.25 $0.00 General Conditions Total $12,361.86 General Conditions Total $8,117.91 General Conditions Total $3,292.15 Administration Assistance 173.00 $9.00 $1,557.00 Watchman 0.00 $7.25 $0.00 Savings Savings Savings Others 0.00 $7.25 $0.00 Savings Materials $0.00 Savings Sub-Contractors $0.00 Savings Major Purchased $0.00 060 Sub Total 519.00 $4,152.00 Total Savings $0.00 Total Savings $0.00 Total Savings $0.00 060 Single Time FB/TAX 34.00% $1,411.68 060 Single Fondo Seguro del Estado 5.25% $217.98 080-Temp Allow for 060 $0.00 Spare $0.00 $1,629.66 Factors Cost Bid 060 Sub-Total 519.00 $5,781.66 Labor $22.60 $35.99 Material 1.224 1.457 064 Payroll Hours Wage Rate Sub-Contract 1.015 1.208 Foreman 1038.00 $12.00 $12,456.00 Major Purchase 1.132 1.347 Others 0.00 $11.50 $0.00 064 Sub Total 1038.00 $12,456.00 Prices Cost Bid 064 Single Time FB/TAX 34.00% $4,235.04 Labor $64,433.43 $102,594.33 064 Single Fondo Seguro del Estado 5.25% $653.94 Material $169,819.48 $202,173.81 070-Trans/Personnel Diet Allow $0.00 Sub-Contract $549,311.91 $653,967.87 080-Temp Allow for 064 $0.00 Major Purchase $222,768.75 $265,211.08 Spare $0.00 Total $1,006,333.57 $1,223,947.09 064 FB / FSE / Diet $4,888.98 064 Sub-Total 1038.00 $17,344.98 Mechanical Summary 1 Labor $64,433.43 100 Group Month Monthly Rates 2 Materials $157,457.61 Project Director 0.00 $4,500 $0.00 3 Sub-Contract $541,194.00 Project Manager 2.00 $3,500 $7,000.00 4 Major Purchase $219,476.60 Project Engineer 0.00 $2,000 $0.00 5 General Conditions $23,771.92 Superintendent 0.00 $2,500 $0.00 6 Project Administration $21,742.50 Quality Control Officer 0.00 $2,000 $0.00 7 Saving Materials $0.00 Safety Officer 3.00 $2,000 $6,000.00 8 Saving Sub-Contract $0.00 100 Group Total 5.00 $13,000.00 9 Saving Major Purchase $0.00 100 Transp & Pdiem Project Director 0.00 $1,500 $0.00 10 Over Head $82,246.09 100 Transp & Pdiem Project Manager 2.00 $1,300 $2,600.00 11 Profit $102,807.61 100 Transp & Pdiem Project Engineer 0.00 $1,000 $0.00 12 Insurances & Taxes $10,817.33 100 Transp & Pdiem Others 0.00 $800 $0.00 13 Rounding Adjustment $0.00 100 Transp & Pdiem Total $2,600.00 Total Bid $1,223,947.09 Fringe Benefits 42.00% $5,460.00 Workers Compensation Insurance 5.25% $682.50 Average Crew Tons: Benefits, Insurances & Diets $6,142.50 Total Calendars Days 0 0 100 Sub-Total 5.00 $21,742.50 Complete in 150 Hours per 0.00 Working Days 107 Cost ($/per) $0.00 General Personnel 040 average crew 3.60 Bid ($/per) $0.00 Overhead & Profit Overhead & Profit Overhead & Profit Overhead & Profit General Administration Overhead 8.00% $6,894.07 General Administration Overhead 8.00% $13,585.56 General Administration Overhead 8.00% $43,944.95 General Administration Overhead 8.00% $17,821.50 Profit 10.00% $8,617.59 Profit 10.00% $16,981.95 Profit 10.00% $54,931.19 Profit 10.00% $22,276.87 Overhead & Profit Total $15,511.67 Overhead & Profit Total $30,567.51 Overhead & Profit Total $98,876.14 Overhead & Profit Total $40,098.37 SUB-TOTAL $101,687.60 SUB-TOTAL $200,386.98 SUB-TOTAL $648,188.05 SUB-TOTAL $262,867.12 Insurance & Taxes P. & OHD. Insurance & Taxes P. & OHD. Insurance & Taxes P. & OHD. Insurance & Taxes P. & OHD. Rate Comp Rate 18.00% 18.00% 18.00% 18.00% Builder Risk 0.0000% 0.0000% $0.00 Builder Risk $0.00 Builder Risk $0.00 Builder Risk $0.00 Comprehensive General Liability 0.2500% 0.2519% $302.25 Comprehensive General Liability $595.61 Comprehensive General Liability $1,926.60 Comprehensive General Liability $781.32 Payment & Performance Bond 0.0000% 0.0000% $0.00 Payment & Performance Bond $0.00 Payment & Performance Bond $0.00 Payment & Performance Bond $0.00 Municipal Construction Tax 0.0000% 0.0000% $0.00 Municipal Construction Tax $0.00 Municipal Construction Tax $0.00 Municipal Construction Tax $0.00 Municipal Patent 0.5000% 0.5038% $604.49 Municipal Patent $1,191.22 Municipal Patent $3,853.21 Municipal Patent $1,562.64 Col. Ing. / Agrim. & IRS Stamps 0.0000% 0.0000% $0.00 Col. Ing. / Agrim. & IRS Stamps $0.00 Col. Ing. / Agrim. & IRS Stamps $0.00 Col. Ing. / Agrim. & IRS Stamps $0.00 $906.74 $1,786.83 $5,779.81 $2,343.95 Rounding Adjustment $0.00 Rounding Adjustment $0.00 Rounding Adjustment $0.00 Rounding Adjustment $0.00 Labor Total $102,594.33 Material Total $202,173.81 Sub-Contract Total $653,967.87 Major Purchase Total $265,211.08 SUB-CONTRACTS MAJOR PURCHASE Insurance&Taxes LABOR 040Group060Group064Group100GroupOH/Profit MechanIcalSummary Bid Price: Area: Units: 0 0 0.00 0.00 $0.00 $0.00 $0.00 $0.00 MATERIALS Merck HVAC Upgrade Project Las Piedras