SlideShare a Scribd company logo
Assignment front sheet
Learner name Assessor name
Date issued Completion date Submitted on
10/09/2017 05/10/2017
Qualification Unit number and title
BTEC EXTENDED CERTIFICATE IN
ENGINEERING
UNIT 10: USING COMPUTER AIDED DRAWING
TECHNIQUES IN ENGINEERING
Assignment title 10.1 Producing a circuit diagram
In this assessment you will have opportunities to provide evidence against the following criteria.
Indicate the page numbers where the evidence can be found.
Criteria
reference
To achieve the criteria the evidence must show that
the student is able to:
Task no. Page numbers
P1
start up a CAD system, produce and save a standard drawing template
and close down CAD hardware and software in the approved manner
1
P7
set up an electronic folder for the storage and retrieval of
information
2
P4 produce a circuit diagram using CAD 3
P8
store, retrieve and print/plot seven CAD-generated or
modified drawings (part)
4
M1
identify and describe four methods used to overcome problems when
starting up and closing down CAD hardware and software
5
Learner declaration
I certify that the work submitted for this assignment is my own and research sources are fully acknowledged.
Learner signature: Date:
Assignment brief
Unit number and title UNIT
Qualification BTEC EXTENDED CERTIFICATE IN ENGINEERING
Start date 10/09/2017
Deadline 05/10/2017
Assessor
Assignment title 10.1 Producing a circuit diagram
The purpose of this assignment is to:
a) start up and close down hardware and software in order to perform CAD activities
b) be able to produce a circuit diagram using CAD
Scenario
You are an employee for ‘Hi-Viz’, an electronics company, working in the CAD office.
You have been asked to produce the circuit diagram of a circuit that can be used to
flash a number of LEDs in a number of their products. A picture of the
breadboarded circuit has been given to you by one of the engineering development
team and is attached to this assignment.
Task 1
a) Write a report using diagrams and printscreens to show how you would start up the computer
system, load the CAD software and ensure the drawing environment has been set up correctly
to start a CAD drawing and a produce border and title block.
b) Write a report using diagrams and printscreens to show what steps you would take to close
down the CAD system appropriately so that work is not lost.
This provides evidence for P1
Task 2
The procedure in the Hi-Viz company is to ensure that drawings are catalogued in a way that is
user-friendly. Set up an electronic folder called ‘HI-VIZ’, enabling the drawing you produce to be
easily accessible when saved for future copies, updates and/or modifications to be made.
This provides evidence for P7
Task 3
Produce the electrical circuit diagram using the available CAD software from the information and
circuit given. Hi-Viz use the layout for a standard engineering drawing setup. The title is HI-VIZ
DRAWING 0001.
The test circuit was set up on prototype breadboard, as follows:
With the values of R1 = 1K, R2 = 68K and C = 1μF (electrolytic) as shown, the LED should flash at
around 10 Hz. The LED is protected by a 680R resistor. Pin 5 (control voltage) is connected to 0V
by a 10nF non-polarised capacitor and there is a 47 μF electrolytic capacitor connected across the
supply voltage of 9V.
This provides evidence for P4
Task 4
Store, retrieve and print off the circuit diagram by saving the file in the ‘HI-VIZ’ folder set up in task
2 with a filename corresponding to the drawing title, then setting up the printer to print off a copy of
your circuit diagram, HI-VIZ DRAWING 0001 in A3 Landscapeformat.
This provides evidence for P8
Task 5
A student engineer is going to be visiting the Hi-Viz company for a period of work experience.
Produce a simple brochure to be given to visitors such as students that describes four typical
problems that may be encountered when (a) starting up, and (b) closing down the computer
hardware and CAD software and the procedure you would use to sort them out.
This provides evidence for M1
Sources of information
This brief has been verified as being fit for purpose
Assessor
Signature Date
Internal verifier
Signature Date
Assessor's comments
Qualification
BTEC EXTENDED
CERTIFICATE IN
ENGINEERING
Assessor name
Unit number and title
UNIT 10: USING COMPUTER
AIDED DRAWING TECHNIQUES IN
ENGINEERING
Learner name
Grading criteria Achieved?
P1
start up a CAD system, produce and save a standard drawing template and close down
CAD hardware and software in the approved manner
P7 set up an electronic folder for the storage and retrieval of information
P4 produce a circuit diagram using CAD
P8 (part) store, retrieve and print/plot seven CAD-generated or modified drawings
M1
identify and describe four methods used to overcome problems when starting up and
closing down CAD hardware and software
Learner feedback
Assessor feedback
Action plan
Assessor signature Date
Learner signature Date
Observation record
Learner name
Qualification
Unit number and title
Description of activity undertaken (please be as specific as possible)
Assessment and grading criteria
How the activity meets the requirements of the assessment and grading criteria
Learner signature Date
Assessor signature Date
Assessor name
Learner name
Qualification
Unit number and title
Description of activity undertaken (please be as specific as possible)
Assessment and grading criteria
How the activity meets the requirements of the assessment and grading criteria
Learner signature Date
Assessor signature Date
Assessor name

More Related Content

What's hot

ANEES MECHANICAL ENGINEER
ANEES MECHANICAL ENGINEERANEES MECHANICAL ENGINEER
ANEES MECHANICAL ENGINEERMohamed Anees
 
Jason Moyer resume 01-25-17
Jason Moyer resume 01-25-17Jason Moyer resume 01-25-17
Jason Moyer resume 01-25-17Jason Moyer
 
Bus 630 week 5 dq 2 ranking investment alternatives new
Bus 630 week 5 dq 2 ranking investment alternatives   newBus 630 week 5 dq 2 ranking investment alternatives   new
Bus 630 week 5 dq 2 ranking investment alternatives new
ENTIRE COURSES FINAL EXAM
 
Mechanical design engineer job based in warwickshire ref 1211 19
Mechanical design engineer job based in warwickshire ref 1211 19 Mechanical design engineer job based in warwickshire ref 1211 19
Mechanical design engineer job based in warwickshire ref 1211 19 Sean Durrant
 
Pradeep Kumar C resume
Pradeep Kumar C resumePradeep Kumar C resume
Pradeep Kumar C resumePradeep C
 
Resume_Design Engineer with 4.8 Years of Exp.
Resume_Design Engineer with 4.8 Years of Exp.Resume_Design Engineer with 4.8 Years of Exp.
Resume_Design Engineer with 4.8 Years of Exp.RENUKARAJU K.B.S
 
LJH_Resume_151213
LJH_Resume_151213LJH_Resume_151213
LJH_Resume_151213Jun Hua Lum
 

What's hot (14)

Michael Brinker Resume
Michael Brinker ResumeMichael Brinker Resume
Michael Brinker Resume
 
ANEES MECHANICAL ENGINEER
ANEES MECHANICAL ENGINEERANEES MECHANICAL ENGINEER
ANEES MECHANICAL ENGINEER
 
chethan
chethanchethan
chethan
 
Jason Moyer resume 01-25-17
Jason Moyer resume 01-25-17Jason Moyer resume 01-25-17
Jason Moyer resume 01-25-17
 
Resume
ResumeResume
Resume
 
Ldink
LdinkLdink
Ldink
 
David Choi
David ChoiDavid Choi
David Choi
 
Bus 630 week 5 dq 2 ranking investment alternatives new
Bus 630 week 5 dq 2 ranking investment alternatives   newBus 630 week 5 dq 2 ranking investment alternatives   new
Bus 630 week 5 dq 2 ranking investment alternatives new
 
Ahmed_Siddig_CV
Ahmed_Siddig_CVAhmed_Siddig_CV
Ahmed_Siddig_CV
 
Mechanical design engineer job based in warwickshire ref 1211 19
Mechanical design engineer job based in warwickshire ref 1211 19 Mechanical design engineer job based in warwickshire ref 1211 19
Mechanical design engineer job based in warwickshire ref 1211 19
 
Resume
ResumeResume
Resume
 
Pradeep Kumar C resume
Pradeep Kumar C resumePradeep Kumar C resume
Pradeep Kumar C resume
 
Resume_Design Engineer with 4.8 Years of Exp.
Resume_Design Engineer with 4.8 Years of Exp.Resume_Design Engineer with 4.8 Years of Exp.
Resume_Design Engineer with 4.8 Years of Exp.
 
LJH_Resume_151213
LJH_Resume_151213LJH_Resume_151213
LJH_Resume_151213
 

Similar to Engineering Assignment

SIEWIRE - Tool To Create DCS Wiring Diagrams
SIEWIRE - Tool To Create DCS Wiring DiagramsSIEWIRE - Tool To Create DCS Wiring Diagrams
SIEWIRE - Tool To Create DCS Wiring Diagrams
Disha Bedi
 
Strayer cis-517-week-8-assignment-5-voip-part-3
Strayer cis-517-week-8-assignment-5-voip-part-3Strayer cis-517-week-8-assignment-5-voip-part-3
Strayer cis-517-week-8-assignment-5-voip-part-3
kxipvscsk02
 
Discus In-Process Inspection Planning
Discus In-Process Inspection PlanningDiscus In-Process Inspection Planning
Discus In-Process Inspection Planning
DISCUS Software
 
CIS 498 Effective Communication/tutorialrank.com
 CIS 498 Effective Communication/tutorialrank.com CIS 498 Effective Communication/tutorialrank.com
CIS 498 Effective Communication/tutorialrank.com
jonhson185
 
Cis 498 Inspiring Innovation--tutorialrank.com
Cis 498  Inspiring Innovation--tutorialrank.comCis 498  Inspiring Innovation--tutorialrank.com
Cis 498 Inspiring Innovation--tutorialrank.com
PrescottLunt371
 
CIS 498 Focus Dreams/newtonhelp.com
CIS 498 Focus Dreams/newtonhelp.comCIS 498 Focus Dreams/newtonhelp.com
CIS 498 Focus Dreams/newtonhelp.com
bellflower88
 
Technical Drafting Module 5
Technical Drafting Module 5Technical Drafting Module 5
Technical Drafting Module 5
DepEd
 
Cis 498 Extraordinary Success/newtonhelp.com
Cis 498 Extraordinary Success/newtonhelp.com  Cis 498 Extraordinary Success/newtonhelp.com
Cis 498 Extraordinary Success/newtonhelp.com
amaranthbeg149
 
CIS 498 Imagine Your Future/newtonhelp.com   
CIS 498 Imagine Your Future/newtonhelp.com   CIS 498 Imagine Your Future/newtonhelp.com   
CIS 498 Imagine Your Future/newtonhelp.com   
bellflower48
 
End of chapter problem 5
End of chapter problem 5End of chapter problem 5
End of chapter problem 5
wkhairil80
 
Strayer cis 517 week 8 assignment 5 voip part 3
Strayer cis 517 week 8 assignment 5 voip part 3Strayer cis 517 week 8 assignment 5 voip part 3
Strayer cis 517 week 8 assignment 5 voip part 3
eyavagal
 
Project report format
Project report formatProject report format
Project report format
Vatsal N Shah
 
Slides Apde2002 Enhance
Slides Apde2002 EnhanceSlides Apde2002 Enhance
Slides Apde2002 Enhance
mpereda
 
Technical Drafting Module 3
Technical Drafting Module 3Technical Drafting Module 3
Technical Drafting Module 3
DepEd
 
Technical Drafting Module 6
Technical Drafting Module 6Technical Drafting Module 6
Technical Drafting Module 6
DepEd
 
Computer graphics 9068
Computer graphics  9068Computer graphics  9068
Computer graphics 90681061992
 
Larson and toubro
Larson and toubroLarson and toubro
Larson and toubro
anoopc1998
 
CADISON world Issue-1-2013
CADISON world Issue-1-2013CADISON world Issue-1-2013
CADISON world Issue-1-2013
CADISON
 
Micrcontroller iv sem lab manual
Micrcontroller iv sem lab manualMicrcontroller iv sem lab manual
Micrcontroller iv sem lab manual
RohiniHM2
 

Similar to Engineering Assignment (20)

SIEWIRE - Tool To Create DCS Wiring Diagrams
SIEWIRE - Tool To Create DCS Wiring DiagramsSIEWIRE - Tool To Create DCS Wiring Diagrams
SIEWIRE - Tool To Create DCS Wiring Diagrams
 
Strayer cis-517-week-8-assignment-5-voip-part-3
Strayer cis-517-week-8-assignment-5-voip-part-3Strayer cis-517-week-8-assignment-5-voip-part-3
Strayer cis-517-week-8-assignment-5-voip-part-3
 
Discus In-Process Inspection Planning
Discus In-Process Inspection PlanningDiscus In-Process Inspection Planning
Discus In-Process Inspection Planning
 
CIS 498 Effective Communication/tutorialrank.com
 CIS 498 Effective Communication/tutorialrank.com CIS 498 Effective Communication/tutorialrank.com
CIS 498 Effective Communication/tutorialrank.com
 
Cis 498 Inspiring Innovation--tutorialrank.com
Cis 498  Inspiring Innovation--tutorialrank.comCis 498  Inspiring Innovation--tutorialrank.com
Cis 498 Inspiring Innovation--tutorialrank.com
 
CIS 498 Focus Dreams/newtonhelp.com
CIS 498 Focus Dreams/newtonhelp.comCIS 498 Focus Dreams/newtonhelp.com
CIS 498 Focus Dreams/newtonhelp.com
 
Technical Drafting Module 5
Technical Drafting Module 5Technical Drafting Module 5
Technical Drafting Module 5
 
Cis 498 Extraordinary Success/newtonhelp.com
Cis 498 Extraordinary Success/newtonhelp.com  Cis 498 Extraordinary Success/newtonhelp.com
Cis 498 Extraordinary Success/newtonhelp.com
 
CIS 498 Imagine Your Future/newtonhelp.com   
CIS 498 Imagine Your Future/newtonhelp.com   CIS 498 Imagine Your Future/newtonhelp.com   
CIS 498 Imagine Your Future/newtonhelp.com   
 
End of chapter problem 5
End of chapter problem 5End of chapter problem 5
End of chapter problem 5
 
Strayer cis 517 week 8 assignment 5 voip part 3
Strayer cis 517 week 8 assignment 5 voip part 3Strayer cis 517 week 8 assignment 5 voip part 3
Strayer cis 517 week 8 assignment 5 voip part 3
 
Project report format
Project report formatProject report format
Project report format
 
Slides Apde2002 Enhance
Slides Apde2002 EnhanceSlides Apde2002 Enhance
Slides Apde2002 Enhance
 
Technical Drafting Module 3
Technical Drafting Module 3Technical Drafting Module 3
Technical Drafting Module 3
 
ResumeV15
ResumeV15ResumeV15
ResumeV15
 
Technical Drafting Module 6
Technical Drafting Module 6Technical Drafting Module 6
Technical Drafting Module 6
 
Computer graphics 9068
Computer graphics  9068Computer graphics  9068
Computer graphics 9068
 
Larson and toubro
Larson and toubroLarson and toubro
Larson and toubro
 
CADISON world Issue-1-2013
CADISON world Issue-1-2013CADISON world Issue-1-2013
CADISON world Issue-1-2013
 
Micrcontroller iv sem lab manual
Micrcontroller iv sem lab manualMicrcontroller iv sem lab manual
Micrcontroller iv sem lab manual
 

More from NeilOw87

Product design---materials-feb15
Product design---materials-feb15Product design---materials-feb15
Product design---materials-feb15
NeilOw87
 
New spec-all-v2
New spec-all-v2New spec-all-v2
New spec-all-v2
NeilOw87
 
New exam
New examNew exam
New exam
NeilOw87
 
G7 watercolour
G7 watercolourG7 watercolour
G7 watercolour
NeilOw87
 
8 fine art practical progression tracker
8 fine art  practical progression tracker8 fine art  practical progression tracker
8 fine art practical progression tracker
NeilOw87
 
Year 8 fine art scheme
Year 8 fine art schemeYear 8 fine art scheme
Year 8 fine art scheme
NeilOw87
 
7 fine art practical progression tracker
7 fine art  practical progression tracker7 fine art  practical progression tracker
7 fine art practical progression tracker
NeilOw87
 
Year 7 fine art scheme
Year 7 fine art schemeYear 7 fine art scheme
Year 7 fine art scheme
NeilOw87
 
One point
One pointOne point
One point
NeilOw87
 
Landscape
LandscapeLandscape
Landscape
NeilOw87
 
Islamic art
Islamic artIslamic art
Islamic art
NeilOw87
 
Art textiles sow year 8 vle version
Art textiles sow year 8 vle versionArt textiles sow year 8 vle version
Art textiles sow year 8 vle version
NeilOw87
 
Urban calligraphy vle
Urban calligraphy vleUrban calligraphy vle
Urban calligraphy vle
NeilOw87
 
Theory powerpoint batik vle
Theory powerpoint batik vleTheory powerpoint batik vle
Theory powerpoint batik vle
NeilOw87
 
Gcse d&t revision guide 3
Gcse d&t revision guide 3Gcse d&t revision guide 3
Gcse d&t revision guide 3
NeilOw87
 
Gcse d&t revision guide 2
Gcse d&t revision guide 2Gcse d&t revision guide 2
Gcse d&t revision guide 2
NeilOw87
 
Gcse d&t revision guide 1
Gcse d&t revision guide 1Gcse d&t revision guide 1
Gcse d&t revision guide 1
NeilOw87
 
Year 9 pop art powerpoint contextual studies support
Year 9 pop art powerpoint contextual studies supportYear 9 pop art powerpoint contextual studies support
Year 9 pop art powerpoint contextual studies support
NeilOw87
 
Art textiles sow year 7 vle version
Art textiles sow year 7 vle versionArt textiles sow year 7 vle version
Art textiles sow year 7 vle version
NeilOw87
 
Year 9
Year 9Year 9
Year 9
NeilOw87
 

More from NeilOw87 (20)

Product design---materials-feb15
Product design---materials-feb15Product design---materials-feb15
Product design---materials-feb15
 
New spec-all-v2
New spec-all-v2New spec-all-v2
New spec-all-v2
 
New exam
New examNew exam
New exam
 
G7 watercolour
G7 watercolourG7 watercolour
G7 watercolour
 
8 fine art practical progression tracker
8 fine art  practical progression tracker8 fine art  practical progression tracker
8 fine art practical progression tracker
 
Year 8 fine art scheme
Year 8 fine art schemeYear 8 fine art scheme
Year 8 fine art scheme
 
7 fine art practical progression tracker
7 fine art  practical progression tracker7 fine art  practical progression tracker
7 fine art practical progression tracker
 
Year 7 fine art scheme
Year 7 fine art schemeYear 7 fine art scheme
Year 7 fine art scheme
 
One point
One pointOne point
One point
 
Landscape
LandscapeLandscape
Landscape
 
Islamic art
Islamic artIslamic art
Islamic art
 
Art textiles sow year 8 vle version
Art textiles sow year 8 vle versionArt textiles sow year 8 vle version
Art textiles sow year 8 vle version
 
Urban calligraphy vle
Urban calligraphy vleUrban calligraphy vle
Urban calligraphy vle
 
Theory powerpoint batik vle
Theory powerpoint batik vleTheory powerpoint batik vle
Theory powerpoint batik vle
 
Gcse d&t revision guide 3
Gcse d&t revision guide 3Gcse d&t revision guide 3
Gcse d&t revision guide 3
 
Gcse d&t revision guide 2
Gcse d&t revision guide 2Gcse d&t revision guide 2
Gcse d&t revision guide 2
 
Gcse d&t revision guide 1
Gcse d&t revision guide 1Gcse d&t revision guide 1
Gcse d&t revision guide 1
 
Year 9 pop art powerpoint contextual studies support
Year 9 pop art powerpoint contextual studies supportYear 9 pop art powerpoint contextual studies support
Year 9 pop art powerpoint contextual studies support
 
Art textiles sow year 7 vle version
Art textiles sow year 7 vle versionArt textiles sow year 7 vle version
Art textiles sow year 7 vle version
 
Year 9
Year 9Year 9
Year 9
 

Recently uploaded

CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
ShahidSultan24
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
Kamal Acharya
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 

Recently uploaded (20)

CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 

Engineering Assignment

  • 1. Assignment front sheet Learner name Assessor name Date issued Completion date Submitted on 10/09/2017 05/10/2017 Qualification Unit number and title BTEC EXTENDED CERTIFICATE IN ENGINEERING UNIT 10: USING COMPUTER AIDED DRAWING TECHNIQUES IN ENGINEERING Assignment title 10.1 Producing a circuit diagram In this assessment you will have opportunities to provide evidence against the following criteria. Indicate the page numbers where the evidence can be found. Criteria reference To achieve the criteria the evidence must show that the student is able to: Task no. Page numbers P1 start up a CAD system, produce and save a standard drawing template and close down CAD hardware and software in the approved manner 1 P7 set up an electronic folder for the storage and retrieval of information 2 P4 produce a circuit diagram using CAD 3 P8 store, retrieve and print/plot seven CAD-generated or modified drawings (part) 4 M1 identify and describe four methods used to overcome problems when starting up and closing down CAD hardware and software 5 Learner declaration I certify that the work submitted for this assignment is my own and research sources are fully acknowledged. Learner signature: Date: Assignment brief Unit number and title UNIT
  • 2. Qualification BTEC EXTENDED CERTIFICATE IN ENGINEERING Start date 10/09/2017 Deadline 05/10/2017 Assessor Assignment title 10.1 Producing a circuit diagram The purpose of this assignment is to: a) start up and close down hardware and software in order to perform CAD activities b) be able to produce a circuit diagram using CAD Scenario You are an employee for ‘Hi-Viz’, an electronics company, working in the CAD office. You have been asked to produce the circuit diagram of a circuit that can be used to flash a number of LEDs in a number of their products. A picture of the breadboarded circuit has been given to you by one of the engineering development team and is attached to this assignment. Task 1 a) Write a report using diagrams and printscreens to show how you would start up the computer system, load the CAD software and ensure the drawing environment has been set up correctly to start a CAD drawing and a produce border and title block. b) Write a report using diagrams and printscreens to show what steps you would take to close down the CAD system appropriately so that work is not lost. This provides evidence for P1 Task 2 The procedure in the Hi-Viz company is to ensure that drawings are catalogued in a way that is user-friendly. Set up an electronic folder called ‘HI-VIZ’, enabling the drawing you produce to be easily accessible when saved for future copies, updates and/or modifications to be made. This provides evidence for P7 Task 3 Produce the electrical circuit diagram using the available CAD software from the information and circuit given. Hi-Viz use the layout for a standard engineering drawing setup. The title is HI-VIZ DRAWING 0001. The test circuit was set up on prototype breadboard, as follows: With the values of R1 = 1K, R2 = 68K and C = 1μF (electrolytic) as shown, the LED should flash at around 10 Hz. The LED is protected by a 680R resistor. Pin 5 (control voltage) is connected to 0V by a 10nF non-polarised capacitor and there is a 47 μF electrolytic capacitor connected across the supply voltage of 9V.
  • 3. This provides evidence for P4 Task 4 Store, retrieve and print off the circuit diagram by saving the file in the ‘HI-VIZ’ folder set up in task 2 with a filename corresponding to the drawing title, then setting up the printer to print off a copy of your circuit diagram, HI-VIZ DRAWING 0001 in A3 Landscapeformat. This provides evidence for P8 Task 5 A student engineer is going to be visiting the Hi-Viz company for a period of work experience. Produce a simple brochure to be given to visitors such as students that describes four typical problems that may be encountered when (a) starting up, and (b) closing down the computer hardware and CAD software and the procedure you would use to sort them out. This provides evidence for M1 Sources of information This brief has been verified as being fit for purpose Assessor Signature Date Internal verifier Signature Date
  • 4. Assessor's comments Qualification BTEC EXTENDED CERTIFICATE IN ENGINEERING Assessor name Unit number and title UNIT 10: USING COMPUTER AIDED DRAWING TECHNIQUES IN ENGINEERING Learner name Grading criteria Achieved? P1 start up a CAD system, produce and save a standard drawing template and close down CAD hardware and software in the approved manner P7 set up an electronic folder for the storage and retrieval of information P4 produce a circuit diagram using CAD P8 (part) store, retrieve and print/plot seven CAD-generated or modified drawings M1 identify and describe four methods used to overcome problems when starting up and closing down CAD hardware and software Learner feedback Assessor feedback Action plan Assessor signature Date Learner signature Date Observation record
  • 5. Learner name Qualification Unit number and title Description of activity undertaken (please be as specific as possible) Assessment and grading criteria How the activity meets the requirements of the assessment and grading criteria Learner signature Date Assessor signature Date Assessor name
  • 6. Learner name Qualification Unit number and title Description of activity undertaken (please be as specific as possible) Assessment and grading criteria How the activity meets the requirements of the assessment and grading criteria Learner signature Date Assessor signature Date Assessor name