SlideShare a Scribd company logo
Assignment front sheet
Learner name Assessor name
Date issued Completion date Submitted on
19/11/2017 07/10/2017
Qualification Unit number and title
BTEC EXTENDED CERTIFICATE IN
ENGINEERING
UNIT 10: USING COMPUTER AIDED DRAWING
TECHNIQUES IN ENGINEERING
Assignment title 10.4 Produce modifications to a circuit diagram
In this assessment you will have opportunities to provide evidence against the following criteria.
Indicate the page numbers where the evidence can be found.
Criteria
reference
To achieve the criteria the evidence must show that
the student is able to:
Task no. Page numbers
P6
use CAD commands to modify two different given circuit diagram
types
1
P8
store, retrieve and print/plot seven CAD-generated or modified
drawings (part)
1
M2
describe the drawing commands used across the range of drawing
types
2
M3
describe the methods used to create relevant folder and file names
and maintain directories to aid efficient recovery of data.
3
Learner declaration
I certify that the work submitted for this assignment is my own and research sources are fully acknowledged.
Learner signature: Date:
Assignment brief
Unit number and title UNIT 10: USING COMPUTER AIDED DRAWING TECHNIQUES IN ENGINEERING
Qualification BTEC EXTENDED CERTIFICATE IN ENGINEERING
Start date 19/11/2017
Deadline 07/10/2017
Assessor
Assignment title 10.4 Produce modifications to a circuit diagram
The purpose of this assignment is to:
Be able to use drawing and editing commands to modify an existing circuit diagram
Scenario
You are an employee for Hi-Viz, an electronics company, working in the CAD office. You have
been asked to check and produce new drawings of circuit diagrams.
Task 1
1a) You have to draw the circuit diagram that is to be used in a new musical product. A sketch of
the new circuit has been given to you by the engineering development team and is shown above.
In order to create this circuit quickly, you realise that the circuit produced in assignment 10.1 can be
modified easily to suit the requirements using the notes made on the drawing by the development
team.
To enable the new circuit diagram to be available as soon as possible for checking, modify the
electrical circuit diagram using the available CAD software from the information given. The drawing
Title Is HI VIZ OCT001. Print off an A3 copy.
1b) i) Draw the pneumatic circuit HI VIZ PN001 (issue 1) shown below. ii) Check the pneumatic
circuit and redraw the circuit diagram HI VIZ PN001 (issue 2) to include the appropriate
corrections. Print off an A4 copy.
This provides evidence for P6 and part evidence for P8
Task 2
In a table (such as in the example started below), list the drawing commands (rectangular array,
copy, move, rotate, stretch, trim, etc.) used in modifying the circuit diagrams and describe how you
used each command to modify the drawings. It may be useful to copy the parts of the drawing
referred to as part of the evidence as to how the command has been used.
Drawing/Edit Command Used for
This provides evidence for M2
Task 3
Write a short report that explains the different methods you can use to create relevant folder and
file names and maintain directory ‘trees’ to enable you and others to easily access the various CAD
drawings you have produced.
This provides evidence for M3
Sources of information
This brief has been verified as being fit for purpose
Assessor TW
Signature Date
Internal verifier HW
Signature Date
Assessor's comments
Qualification
BTEC EXTENDED
CERTIFICATE IN
ENGINEERING
Assessor name
Unit number and title
UNIT10: USING COMPUTER
AIDED DRAWING TECHNIQUES
IN ENGINEERING
Learner name
Grading criteria Achieved?
P6 use CAD commands to modify two different given circuit diagram types
P8 store, retrieve and print/plot seven CAD-generated or modified drawings (part)
M2 describe the drawing commands used across the range of drawing types
M3
describe the methods used to create relevant folder and file names and maintain
directories to aid efficient recovery of data.
Learner feedback
Assessor feedback
Action plan
Assessor signature Date
Learner signature Date

More Related Content

What's hot

Assignment - Cost Plan
Assignment - Cost PlanAssignment - Cost Plan
Assignment - Cost Plan
Kai Yun Pang
 
Kameshwar Rai_Resume
Kameshwar Rai_ResumeKameshwar Rai_Resume
Kameshwar Rai_ResumeKAMESHWAR RAI
 
Pradeep Kumar C resume
Pradeep Kumar C resumePradeep Kumar C resume
Pradeep Kumar C resumePradeep C
 
Sridhar resume latest ver 1
Sridhar resume latest ver 1Sridhar resume latest ver 1
Sridhar resume latest ver 1Sridhar V
 
Assignment - Financial Analysis
Assignment - Financial AnalysisAssignment - Financial Analysis
Assignment - Financial Analysis
Kai Yun Pang
 
Resume_Design Engineer with 4.8 Years of Exp.
Resume_Design Engineer with 4.8 Years of Exp.Resume_Design Engineer with 4.8 Years of Exp.
Resume_Design Engineer with 4.8 Years of Exp.RENUKARAJU K.B.S
 
Mechanical design engineer job based in warwickshire ref 1211 19
Mechanical design engineer job based in warwickshire ref 1211 19 Mechanical design engineer job based in warwickshire ref 1211 19
Mechanical design engineer job based in warwickshire ref 1211 19 Sean Durrant
 
SMU BCA SEM 1 FALL 2016 ASSIGNMENTS
SMU BCA SEM 1 FALL 2016 ASSIGNMENTSSMU BCA SEM 1 FALL 2016 ASSIGNMENTS
SMU BCA SEM 1 FALL 2016 ASSIGNMENTS
solved_assignments
 
Dhaval resume CV
Dhaval resume CVDhaval resume CV
Dhaval resume CV
Dhaval kanakia
 

What's hot (13)

Assignment - Cost Plan
Assignment - Cost PlanAssignment - Cost Plan
Assignment - Cost Plan
 
Kameshwar Rai_Resume
Kameshwar Rai_ResumeKameshwar Rai_Resume
Kameshwar Rai_Resume
 
Pradeep Kumar C resume
Pradeep Kumar C resumePradeep Kumar C resume
Pradeep Kumar C resume
 
Sridhar resume latest ver 1
Sridhar resume latest ver 1Sridhar resume latest ver 1
Sridhar resume latest ver 1
 
Assignment - Financial Analysis
Assignment - Financial AnalysisAssignment - Financial Analysis
Assignment - Financial Analysis
 
Ldink
LdinkLdink
Ldink
 
Vignesh M
Vignesh MVignesh M
Vignesh M
 
JCR_RESUME
JCR_RESUMEJCR_RESUME
JCR_RESUME
 
Resume_Design Engineer with 4.8 Years of Exp.
Resume_Design Engineer with 4.8 Years of Exp.Resume_Design Engineer with 4.8 Years of Exp.
Resume_Design Engineer with 4.8 Years of Exp.
 
Mechanical design engineer job based in warwickshire ref 1211 19
Mechanical design engineer job based in warwickshire ref 1211 19 Mechanical design engineer job based in warwickshire ref 1211 19
Mechanical design engineer job based in warwickshire ref 1211 19
 
jijoCAE_151209
jijoCAE_151209jijoCAE_151209
jijoCAE_151209
 
SMU BCA SEM 1 FALL 2016 ASSIGNMENTS
SMU BCA SEM 1 FALL 2016 ASSIGNMENTSSMU BCA SEM 1 FALL 2016 ASSIGNMENTS
SMU BCA SEM 1 FALL 2016 ASSIGNMENTS
 
Dhaval resume CV
Dhaval resume CVDhaval resume CV
Dhaval resume CV
 

Similar to Assignment Brief 10.4

Assignment Brief 10.4
Assignment Brief 10.4Assignment Brief 10.4
Assignment Brief 10.4
NeilOw87
 
End of chapter problem 5
End of chapter problem 5End of chapter problem 5
End of chapter problem 5
wkhairil80
 
Engineering Drawing & Design_1.pdf
Engineering Drawing & Design_1.pdfEngineering Drawing & Design_1.pdf
Engineering Drawing & Design_1.pdf
GRUPON11
 
End of chapter problem 3
End of chapter problem 3End of chapter problem 3
End of chapter problem 3
wkhairil80
 
Project
ProjectProject
Project
thejas babu
 
EELE 5331 Digital ASIC DesignLab ManualDr. Yushi Zhou.docx
EELE 5331 Digital ASIC DesignLab ManualDr. Yushi Zhou.docxEELE 5331 Digital ASIC DesignLab ManualDr. Yushi Zhou.docx
EELE 5331 Digital ASIC DesignLab ManualDr. Yushi Zhou.docx
toltonkendal
 
End of chapter problem 2
End of chapter problem 2End of chapter problem 2
End of chapter problem 2
wkhairil80
 
Structural components based verification process for fea models
Structural components based verification process for fea modelsStructural components based verification process for fea models
Structural components based verification process for fea models
SDC Verifier
 
Mechanical Portfolio & Statement -PARTIAL - 2016
Mechanical Portfolio & Statement -PARTIAL - 2016Mechanical Portfolio & Statement -PARTIAL - 2016
Mechanical Portfolio & Statement -PARTIAL - 2016Glenwood Johnson Jr
 
Graphics Within Industry
Graphics Within IndustryGraphics Within Industry
Graphics Within Industrys2francetrip
 
Engineering drawing 1 UniKL LDD 10303
Engineering drawing  1 UniKL LDD 10303Engineering drawing  1 UniKL LDD 10303
Engineering drawing 1 UniKL LDD 10303
faizzubit
 
108EN Electrical and Electronic scienceDesign, Simulation .docx
108EN Electrical and Electronic scienceDesign, Simulation .docx108EN Electrical and Electronic scienceDesign, Simulation .docx
108EN Electrical and Electronic scienceDesign, Simulation .docx
paynetawnya
 
Presentation Cable Project Cad Adc
Presentation Cable Project Cad AdcPresentation Cable Project Cad Adc
Presentation Cable Project Cad Adc
glbarker
 
INTRODUCTION TO CAD,WORKSTATION & DESIGN PROCESS
INTRODUCTION TO CAD,WORKSTATION & DESIGN PROCESSINTRODUCTION TO CAD,WORKSTATION & DESIGN PROCESS
INTRODUCTION TO CAD,WORKSTATION & DESIGN PROCESSAbhilash kk
 
Discus In-Process Inspection Planning
Discus In-Process Inspection PlanningDiscus In-Process Inspection Planning
Discus In-Process Inspection Planning
DISCUS Software
 
Slides Apde2002 Enhance
Slides Apde2002 EnhanceSlides Apde2002 Enhance
Slides Apde2002 Enhance
mpereda
 
Presentation on reverse engineering
Presentation on reverse engineeringPresentation on reverse engineering
Presentation on reverse engineering
FaleSh ShaRma
 

Similar to Assignment Brief 10.4 (20)

Assignment Brief 10.4
Assignment Brief 10.4Assignment Brief 10.4
Assignment Brief 10.4
 
End of chapter problem 5
End of chapter problem 5End of chapter problem 5
End of chapter problem 5
 
Engineering Drawing & Design_1.pdf
Engineering Drawing & Design_1.pdfEngineering Drawing & Design_1.pdf
Engineering Drawing & Design_1.pdf
 
End of chapter problem 3
End of chapter problem 3End of chapter problem 3
End of chapter problem 3
 
Project
ProjectProject
Project
 
EELE 5331 Digital ASIC DesignLab ManualDr. Yushi Zhou.docx
EELE 5331 Digital ASIC DesignLab ManualDr. Yushi Zhou.docxEELE 5331 Digital ASIC DesignLab ManualDr. Yushi Zhou.docx
EELE 5331 Digital ASIC DesignLab ManualDr. Yushi Zhou.docx
 
End of chapter problem 2
End of chapter problem 2End of chapter problem 2
End of chapter problem 2
 
Structural components based verification process for fea models
Structural components based verification process for fea modelsStructural components based verification process for fea models
Structural components based verification process for fea models
 
Mechanical Portfolio & Statement -PARTIAL - 2016
Mechanical Portfolio & Statement -PARTIAL - 2016Mechanical Portfolio & Statement -PARTIAL - 2016
Mechanical Portfolio & Statement -PARTIAL - 2016
 
Graphics Within Industry
Graphics Within IndustryGraphics Within Industry
Graphics Within Industry
 
Engineering drawing 1 UniKL LDD 10303
Engineering drawing  1 UniKL LDD 10303Engineering drawing  1 UniKL LDD 10303
Engineering drawing 1 UniKL LDD 10303
 
108EN Electrical and Electronic scienceDesign, Simulation .docx
108EN Electrical and Electronic scienceDesign, Simulation .docx108EN Electrical and Electronic scienceDesign, Simulation .docx
108EN Electrical and Electronic scienceDesign, Simulation .docx
 
Presentation Cable Project Cad Adc
Presentation Cable Project Cad AdcPresentation Cable Project Cad Adc
Presentation Cable Project Cad Adc
 
INTRODUCTION TO CAD,WORKSTATION & DESIGN PROCESS
INTRODUCTION TO CAD,WORKSTATION & DESIGN PROCESSINTRODUCTION TO CAD,WORKSTATION & DESIGN PROCESS
INTRODUCTION TO CAD,WORKSTATION & DESIGN PROCESS
 
CAD
CADCAD
CAD
 
Cad notes
Cad notesCad notes
Cad notes
 
Discus In-Process Inspection Planning
Discus In-Process Inspection PlanningDiscus In-Process Inspection Planning
Discus In-Process Inspection Planning
 
Ashwin_L&T
Ashwin_L&TAshwin_L&T
Ashwin_L&T
 
Slides Apde2002 Enhance
Slides Apde2002 EnhanceSlides Apde2002 Enhance
Slides Apde2002 Enhance
 
Presentation on reverse engineering
Presentation on reverse engineeringPresentation on reverse engineering
Presentation on reverse engineering
 

More from NeilOw87

Product design---materials-feb15
Product design---materials-feb15Product design---materials-feb15
Product design---materials-feb15
NeilOw87
 
New spec-all-v2
New spec-all-v2New spec-all-v2
New spec-all-v2
NeilOw87
 
New exam
New examNew exam
New exam
NeilOw87
 
G7 watercolour
G7 watercolourG7 watercolour
G7 watercolour
NeilOw87
 
8 fine art practical progression tracker
8 fine art  practical progression tracker8 fine art  practical progression tracker
8 fine art practical progression tracker
NeilOw87
 
Year 8 fine art scheme
Year 8 fine art schemeYear 8 fine art scheme
Year 8 fine art scheme
NeilOw87
 
7 fine art practical progression tracker
7 fine art  practical progression tracker7 fine art  practical progression tracker
7 fine art practical progression tracker
NeilOw87
 
Year 7 fine art scheme
Year 7 fine art schemeYear 7 fine art scheme
Year 7 fine art scheme
NeilOw87
 
One point
One pointOne point
One point
NeilOw87
 
Landscape
LandscapeLandscape
Landscape
NeilOw87
 
Islamic art
Islamic artIslamic art
Islamic art
NeilOw87
 
Art textiles sow year 8 vle version
Art textiles sow year 8 vle versionArt textiles sow year 8 vle version
Art textiles sow year 8 vle version
NeilOw87
 
Urban calligraphy vle
Urban calligraphy vleUrban calligraphy vle
Urban calligraphy vle
NeilOw87
 
Theory powerpoint batik vle
Theory powerpoint batik vleTheory powerpoint batik vle
Theory powerpoint batik vle
NeilOw87
 
Gcse d&t revision guide 3
Gcse d&t revision guide 3Gcse d&t revision guide 3
Gcse d&t revision guide 3
NeilOw87
 
Gcse d&t revision guide 2
Gcse d&t revision guide 2Gcse d&t revision guide 2
Gcse d&t revision guide 2
NeilOw87
 
Gcse d&t revision guide 1
Gcse d&t revision guide 1Gcse d&t revision guide 1
Gcse d&t revision guide 1
NeilOw87
 
Year 9 pop art powerpoint contextual studies support
Year 9 pop art powerpoint contextual studies supportYear 9 pop art powerpoint contextual studies support
Year 9 pop art powerpoint contextual studies support
NeilOw87
 
Art textiles sow year 7 vle version
Art textiles sow year 7 vle versionArt textiles sow year 7 vle version
Art textiles sow year 7 vle version
NeilOw87
 
Year 9
Year 9Year 9
Year 9
NeilOw87
 

More from NeilOw87 (20)

Product design---materials-feb15
Product design---materials-feb15Product design---materials-feb15
Product design---materials-feb15
 
New spec-all-v2
New spec-all-v2New spec-all-v2
New spec-all-v2
 
New exam
New examNew exam
New exam
 
G7 watercolour
G7 watercolourG7 watercolour
G7 watercolour
 
8 fine art practical progression tracker
8 fine art  practical progression tracker8 fine art  practical progression tracker
8 fine art practical progression tracker
 
Year 8 fine art scheme
Year 8 fine art schemeYear 8 fine art scheme
Year 8 fine art scheme
 
7 fine art practical progression tracker
7 fine art  practical progression tracker7 fine art  practical progression tracker
7 fine art practical progression tracker
 
Year 7 fine art scheme
Year 7 fine art schemeYear 7 fine art scheme
Year 7 fine art scheme
 
One point
One pointOne point
One point
 
Landscape
LandscapeLandscape
Landscape
 
Islamic art
Islamic artIslamic art
Islamic art
 
Art textiles sow year 8 vle version
Art textiles sow year 8 vle versionArt textiles sow year 8 vle version
Art textiles sow year 8 vle version
 
Urban calligraphy vle
Urban calligraphy vleUrban calligraphy vle
Urban calligraphy vle
 
Theory powerpoint batik vle
Theory powerpoint batik vleTheory powerpoint batik vle
Theory powerpoint batik vle
 
Gcse d&t revision guide 3
Gcse d&t revision guide 3Gcse d&t revision guide 3
Gcse d&t revision guide 3
 
Gcse d&t revision guide 2
Gcse d&t revision guide 2Gcse d&t revision guide 2
Gcse d&t revision guide 2
 
Gcse d&t revision guide 1
Gcse d&t revision guide 1Gcse d&t revision guide 1
Gcse d&t revision guide 1
 
Year 9 pop art powerpoint contextual studies support
Year 9 pop art powerpoint contextual studies supportYear 9 pop art powerpoint contextual studies support
Year 9 pop art powerpoint contextual studies support
 
Art textiles sow year 7 vle version
Art textiles sow year 7 vle versionArt textiles sow year 7 vle version
Art textiles sow year 7 vle version
 
Year 9
Year 9Year 9
Year 9
 

Recently uploaded

Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 

Recently uploaded (20)

Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 

Assignment Brief 10.4

  • 1. Assignment front sheet Learner name Assessor name Date issued Completion date Submitted on 19/11/2017 07/10/2017 Qualification Unit number and title BTEC EXTENDED CERTIFICATE IN ENGINEERING UNIT 10: USING COMPUTER AIDED DRAWING TECHNIQUES IN ENGINEERING Assignment title 10.4 Produce modifications to a circuit diagram In this assessment you will have opportunities to provide evidence against the following criteria. Indicate the page numbers where the evidence can be found. Criteria reference To achieve the criteria the evidence must show that the student is able to: Task no. Page numbers P6 use CAD commands to modify two different given circuit diagram types 1 P8 store, retrieve and print/plot seven CAD-generated or modified drawings (part) 1 M2 describe the drawing commands used across the range of drawing types 2 M3 describe the methods used to create relevant folder and file names and maintain directories to aid efficient recovery of data. 3 Learner declaration I certify that the work submitted for this assignment is my own and research sources are fully acknowledged. Learner signature: Date: Assignment brief Unit number and title UNIT 10: USING COMPUTER AIDED DRAWING TECHNIQUES IN ENGINEERING
  • 2. Qualification BTEC EXTENDED CERTIFICATE IN ENGINEERING Start date 19/11/2017 Deadline 07/10/2017 Assessor Assignment title 10.4 Produce modifications to a circuit diagram The purpose of this assignment is to: Be able to use drawing and editing commands to modify an existing circuit diagram Scenario You are an employee for Hi-Viz, an electronics company, working in the CAD office. You have been asked to check and produce new drawings of circuit diagrams. Task 1 1a) You have to draw the circuit diagram that is to be used in a new musical product. A sketch of the new circuit has been given to you by the engineering development team and is shown above. In order to create this circuit quickly, you realise that the circuit produced in assignment 10.1 can be modified easily to suit the requirements using the notes made on the drawing by the development team. To enable the new circuit diagram to be available as soon as possible for checking, modify the electrical circuit diagram using the available CAD software from the information given. The drawing Title Is HI VIZ OCT001. Print off an A3 copy. 1b) i) Draw the pneumatic circuit HI VIZ PN001 (issue 1) shown below. ii) Check the pneumatic circuit and redraw the circuit diagram HI VIZ PN001 (issue 2) to include the appropriate corrections. Print off an A4 copy.
  • 3. This provides evidence for P6 and part evidence for P8 Task 2 In a table (such as in the example started below), list the drawing commands (rectangular array, copy, move, rotate, stretch, trim, etc.) used in modifying the circuit diagrams and describe how you used each command to modify the drawings. It may be useful to copy the parts of the drawing referred to as part of the evidence as to how the command has been used. Drawing/Edit Command Used for This provides evidence for M2 Task 3 Write a short report that explains the different methods you can use to create relevant folder and file names and maintain directory ‘trees’ to enable you and others to easily access the various CAD drawings you have produced. This provides evidence for M3 Sources of information This brief has been verified as being fit for purpose Assessor TW Signature Date Internal verifier HW Signature Date Assessor's comments Qualification BTEC EXTENDED CERTIFICATE IN ENGINEERING Assessor name
  • 4. Unit number and title UNIT10: USING COMPUTER AIDED DRAWING TECHNIQUES IN ENGINEERING Learner name Grading criteria Achieved? P6 use CAD commands to modify two different given circuit diagram types P8 store, retrieve and print/plot seven CAD-generated or modified drawings (part) M2 describe the drawing commands used across the range of drawing types M3 describe the methods used to create relevant folder and file names and maintain directories to aid efficient recovery of data. Learner feedback Assessor feedback Action plan Assessor signature Date Learner signature Date