Electrical Project Engineer, PMP Certified with over than 7 years of experience in electrical construction,
contracting, management work. I am looking for a career that both challenging and reward.
EXPERIENCE DETAILS
Dar Al Omran (Amman – Jordan )
Job Title: Project Engineer / Electrical Coordinator
May 2015 – Present
Project: Upgrading Zarqa/Sukhneh Road And Wadi
Shomer Bridge
Zarqa – Jordan
Budget: (13 Million $)
 Responsibilities:
 Acts as the primary on-site representative for the execution of all electrical work on the project.
 Acts as the key representative of Dar Al Omran for all interactions with client and contractors act diligently in the best
interests of the Company.
 Reviewing and approving Electrical drawings (construction, shop drawings and as-built)
 Ensures that assigned projects are done accurately, on-time, billed, within budget and within scope of the contract.
 Reviewing and approving electrical materials delivered to site to be as per project specs and standards (electrical
equipment and systems, panels, cables and wiring accessories).
 Coordinating Electrical site works with Civil works in order to prevent clashing of items together and solving any conflict
on the spot.
 Coordinating with Jordan Electrical Power Company to facilitate connection and power supply to the project.
 Responsible for generating invoices for work done for interim billing and accounting purpose.
 Responsible for accurate reporting to management and clients.
Dar Al Handasah (Shair and Partners )
(Riyadh – KSA )
Job Title: Project Engineer / Operation and
Maintenance Consultant / Electrical Coordinator
May 2013 – May 2015
Project: Princess Nora Bint Abdul Rahman University
PNU
Riyadh – KSA
Budget: (11 Billion $)
 Responsibilities (As Project Engineer):
 Site supervision for all electrical works of industrial and residential facilities i.e. (Metro stations , Rails , generator plant,
electrical distributers, Staff and Student Housing, utility tunnel….) as per specifications and standards.
 Acts as the key representative of Dar Al Handasah for all interactions with client and contractors act diligently in the
best interests of the Company.
 Responsible for accurate reporting to management and clients.
 Manages sub-contractors throughout project construction for compliance with specifications.
 Reviewing and approving Electrical drawings (construction, shop drawings and as-built).
 Supervising Electrical works for Metro Station and 15KM Rail inside the university.
 Inspecting and approving all electrical works and equipment onsite (first fix, second fix, installation).
 Responsible for all external lightings, roads, landscape, irrigation, fountains, substations, feeder-pillars, cables
installation.
 Reviewing and approving electrical materials delivered to site to be as per project specs and standards (electrical
equipment and systems, panels, cables and wiring accessories).
 Responsibilities (As Operation and Maintenance Consultant & Electrical Coordinator):
 Supervising all electrical works for all O&M contractors.
 Responsible for accurate reporting to management and clients.
 Responsible for review of sub-contractor invoices and processing payments thru the client.
 Providing Technical Support and recommendations for O&M Contractors.
 Evaluating the performance of the O&M contractors by preparing monthly KPI (Key Performance Index).
 Preparing weekly and monthly reports for all Electrical Preventive and Corrective maintenance activities.
 Following up performance and maintenance through MAXIMO system by generating service requests and Tracking the
generated service requests and work orders.
Panorama Construction and Contracting
Company (Amman-Jordan)
Sub-Contractor Under Mid Contracting Company
Job Title: Electrical Engineer / Site Engineer
November 2010 – March 2013
Project: National Center for Security and Crisis
Management
Amman – Jordan
Budget: (60 million $)
Electromechanical value of (35 million $)
 Responsibilities:
 Supervising all electrical work and following up on Dimmer system, BMS, Fire Alarm , Voice Evacuation , Mechanical
rooms , AV system , CCTV , SMATV , Communication System , IP Telephony and Data system and high secure security
systems.
 Quality assurance and control during and after the completion of any stage of electrical work and comparing site
applications with the issued for construction drawings.
 Handing over of finishing items to the consultant for approval and responsible for inspection requests, making sure all
items are handed in (according to the method statement stages) and approved; whereas, all rejected requests are to be
re-written and approved.
 The organization of Electrical site works with Civil and Mechanical site works in order to prevent clashing of items
together and solving any conflict on the spot.
Alpha Electromechanical Contracting &
Air Conditioning Est.
(Amman-Jordan)
Job Title: Electrical Site Engineer/Project Engineer
November 2009 – November 2010
 Responsibilities:
 Team Leader for electrical works in Modern Company for Medical Syringe Factory (Al Qastal).
 Project engineer and responsible for shop drawings and procurement works.
 Develops project schedules and executes according to plan for assigned projects.
 Performs associated cost estimates, prepares proposals and negotiates final settlement price and customer acceptance.
ACADEMIC BACKGROUND
Project Management Professional
 PMP Number: 1816757
Project Management Institution ,
USA
Year Completed: May 2015
Bachelor Degree in Electrical Power
Engineering
Yarmouk University Year Completed: 2009
General Certificate of Secondary
Education
Al Bayan Private School Year Completed : 2004
TRAININGS AND CERTIFICATIONS
Maintenance Planning ,
Management And Control
Projacs Academy,KSA 16/11/2014 – 20/ 11/2014 35 hours
Energy Management
Energy Saving
Dar Al Handasah
Riyadh,KSA
3/8/2014 – 17/ 8/2014 60 hours
Project Management
Professional
Orbits High Institute,KSA 6/2/2014 – 23/ 2/2014 35 hours
Primavera P6 training
Course
Orbits High Institute,KSA 24/2/2014 – 7/ 3/2014 15 hours
Maximo CMMS (O&M)
Course
IEEE,KSA 4/1/2014 – 9/ 1/2014 35 hours
Power Electrical Systems
 AC Motor control.
 Automatic control for
generating substation.
 Protection system and
protective relays.
 Underground cable design.
 Automatic power plant
control
 Electrical installation.
 Voltage laboratory and
simulator.
National Electric Power
CO. (NEPCO) Amman-
Jordan
20/2/2009-20/6/2009 4 months
Electrical Design Training Hamdan And Sarahneh CO.
(Electrical & Mechanical
Consultations )
21/6/2009-20/8/2009 2 months
COMPUTER SKILLS
 MAXIMO (CMMS): Maximo is intuitive Software offering from Projetech, leading in the development of the next
generation on-demand solutions for maintenance and asset management.
 DMS/QMS : Document Management System , Quality Management Program
 Primavera P6
 AutoCAD
 Microsoft Office Programs : Excel, Word, Power point , Outlook
LANGUAGES
 Arabic: native language.
 English: excellent (written and spoken).
REFERENCE
 Available upon request

AMER M.KAMAL ABBAS (Project Engineering)

  • 1.
    Address: Amman, Jordan Mobile:+962 79 7445776 E-mail: Amer.Abbass@hotmail.com Marital Status: Married Gender: Male AMER M.KAMAL ABBAS 18th Oct 1986 , JORDAN Electrical Project Engineer, PMP Certified with over than 7 years of experience in electrical construction, contracting, management work. I am looking for a career that both challenging and reward. EXPERIENCE DETAILS Dar Al Omran (Amman – Jordan ) Job Title: Project Engineer / Electrical Coordinator May 2015 – Present Project: Upgrading Zarqa/Sukhneh Road And Wadi Shomer Bridge Zarqa – Jordan Budget: (13 Million $)  Responsibilities:  Acts as the primary on-site representative for the execution of all electrical work on the project.  Acts as the key representative of Dar Al Omran for all interactions with client and contractors act diligently in the best interests of the Company.  Reviewing and approving Electrical drawings (construction, shop drawings and as-built)  Ensures that assigned projects are done accurately, on-time, billed, within budget and within scope of the contract.  Reviewing and approving electrical materials delivered to site to be as per project specs and standards (electrical equipment and systems, panels, cables and wiring accessories).  Coordinating Electrical site works with Civil works in order to prevent clashing of items together and solving any conflict on the spot.  Coordinating with Jordan Electrical Power Company to facilitate connection and power supply to the project.  Responsible for generating invoices for work done for interim billing and accounting purpose.  Responsible for accurate reporting to management and clients. Dar Al Handasah (Shair and Partners ) (Riyadh – KSA ) Job Title: Project Engineer / Operation and Maintenance Consultant / Electrical Coordinator May 2013 – May 2015 Project: Princess Nora Bint Abdul Rahman University PNU Riyadh – KSA Budget: (11 Billion $)  Responsibilities (As Project Engineer):  Site supervision for all electrical works of industrial and residential facilities i.e. (Metro stations , Rails , generator plant, electrical distributers, Staff and Student Housing, utility tunnel….) as per specifications and standards.  Acts as the key representative of Dar Al Handasah for all interactions with client and contractors act diligently in the best interests of the Company.  Responsible for accurate reporting to management and clients.  Manages sub-contractors throughout project construction for compliance with specifications.  Reviewing and approving Electrical drawings (construction, shop drawings and as-built).  Supervising Electrical works for Metro Station and 15KM Rail inside the university.
  • 2.
     Inspecting andapproving all electrical works and equipment onsite (first fix, second fix, installation).  Responsible for all external lightings, roads, landscape, irrigation, fountains, substations, feeder-pillars, cables installation.  Reviewing and approving electrical materials delivered to site to be as per project specs and standards (electrical equipment and systems, panels, cables and wiring accessories).  Responsibilities (As Operation and Maintenance Consultant & Electrical Coordinator):  Supervising all electrical works for all O&M contractors.  Responsible for accurate reporting to management and clients.  Responsible for review of sub-contractor invoices and processing payments thru the client.  Providing Technical Support and recommendations for O&M Contractors.  Evaluating the performance of the O&M contractors by preparing monthly KPI (Key Performance Index).  Preparing weekly and monthly reports for all Electrical Preventive and Corrective maintenance activities.  Following up performance and maintenance through MAXIMO system by generating service requests and Tracking the generated service requests and work orders. Panorama Construction and Contracting Company (Amman-Jordan) Sub-Contractor Under Mid Contracting Company Job Title: Electrical Engineer / Site Engineer November 2010 – March 2013 Project: National Center for Security and Crisis Management Amman – Jordan Budget: (60 million $) Electromechanical value of (35 million $)  Responsibilities:  Supervising all electrical work and following up on Dimmer system, BMS, Fire Alarm , Voice Evacuation , Mechanical rooms , AV system , CCTV , SMATV , Communication System , IP Telephony and Data system and high secure security systems.  Quality assurance and control during and after the completion of any stage of electrical work and comparing site applications with the issued for construction drawings.  Handing over of finishing items to the consultant for approval and responsible for inspection requests, making sure all items are handed in (according to the method statement stages) and approved; whereas, all rejected requests are to be re-written and approved.  The organization of Electrical site works with Civil and Mechanical site works in order to prevent clashing of items together and solving any conflict on the spot. Alpha Electromechanical Contracting & Air Conditioning Est. (Amman-Jordan) Job Title: Electrical Site Engineer/Project Engineer November 2009 – November 2010  Responsibilities:  Team Leader for electrical works in Modern Company for Medical Syringe Factory (Al Qastal).  Project engineer and responsible for shop drawings and procurement works.  Develops project schedules and executes according to plan for assigned projects.  Performs associated cost estimates, prepares proposals and negotiates final settlement price and customer acceptance.
  • 3.
    ACADEMIC BACKGROUND Project ManagementProfessional  PMP Number: 1816757 Project Management Institution , USA Year Completed: May 2015 Bachelor Degree in Electrical Power Engineering Yarmouk University Year Completed: 2009 General Certificate of Secondary Education Al Bayan Private School Year Completed : 2004 TRAININGS AND CERTIFICATIONS Maintenance Planning , Management And Control Projacs Academy,KSA 16/11/2014 – 20/ 11/2014 35 hours Energy Management Energy Saving Dar Al Handasah Riyadh,KSA 3/8/2014 – 17/ 8/2014 60 hours Project Management Professional Orbits High Institute,KSA 6/2/2014 – 23/ 2/2014 35 hours Primavera P6 training Course Orbits High Institute,KSA 24/2/2014 – 7/ 3/2014 15 hours Maximo CMMS (O&M) Course IEEE,KSA 4/1/2014 – 9/ 1/2014 35 hours Power Electrical Systems  AC Motor control.  Automatic control for generating substation.  Protection system and protective relays.  Underground cable design.  Automatic power plant control  Electrical installation.  Voltage laboratory and simulator. National Electric Power CO. (NEPCO) Amman- Jordan 20/2/2009-20/6/2009 4 months Electrical Design Training Hamdan And Sarahneh CO. (Electrical & Mechanical Consultations ) 21/6/2009-20/8/2009 2 months COMPUTER SKILLS  MAXIMO (CMMS): Maximo is intuitive Software offering from Projetech, leading in the development of the next generation on-demand solutions for maintenance and asset management.  DMS/QMS : Document Management System , Quality Management Program  Primavera P6  AutoCAD  Microsoft Office Programs : Excel, Word, Power point , Outlook
  • 4.
    LANGUAGES  Arabic: nativelanguage.  English: excellent (written and spoken). REFERENCE  Available upon request