SlideShare a Scribd company logo
Dedicated electrical engineer with more than six years’ experience in
implementing & maintaining building MEP systems and managing all
aspects of projects’ life cycle & Hospitality, offering the following core
competencies:-
• Leading engineering to maintaining services building with hospitality and life
style facilities.
• Background in the principles and practices of MEP implementation projects,
engineering design and construction.
• Able to run engineering projects from inception to success.
• Excellent supervisory experience, including setting goals and objectives, project
development, planning and organization, budget monitoring and cost control.
 B.sc. in Electrical and Electronic Engineering - University of Technology - Department of
Electronics and Communications.
 IOSH Certificate for the Engineers, it is a British Co. for an international health and
safety training works at site and how to manage the Hazard.
 Fire alarm, Firefighting, Evacuation & LPG system trainings (operating &
maintenance).
 BMS, RMS, Dimmer light systems Trainings (operating & maintenance).
 Swimming pool & fountain systems trainings (operating & maintenance).
 I took a training (11-17/ 9 /2012) by Ericsson Company for TN (Traffic Node) it was
advanced training about the modems, installation, configuration and connection for
(NPU, MMU’s, LTU’s, ETU’s…etc.) and Alarms and the problem that we faced in the site
also adscription for DCN network.
CV
Qahtan Adnan Al obaidi
Mobile: 00964-770-534-5874
E-mail / qahtan.adnan@outlook.com
/ kahtanma@gmail.com
Achievement Certificate and training
Qualifications Summary
 Certificate from NSN (Nokia Siemens Network) for a training (22-26/12/2011) in the
transmission Equipment (installation Microwave, configuration and do the alignment,
upgrade) for flexi Packet first mile 200, FM 200 SVR 2.0 and HUB 800 SVR 2.0 models.
 I took training (5-12/ 6 /2011) in Korek sulaymaniyah by Ericsson Iraq on the RBS (radio
base station) that’s Model (6102, 6201), installation and the function of all equipment and
how to connected with it, and do the configuration and make it on air ...etc.
 Certificate from (ICTC) 11/5/2010 Information and Communication Technology Center,
sponsored by University of Technology to my participation in computation for the gift
project and my project one of them.
 Certificate of participation in Computer software’s training in May 2009, from University
of Technology, (computer center).
 Certificate of Preparing leaders (8/July to 22/Sep./2008), it is a practical and theoretical
information and training in (leadership ART, general relation public speaking and
debates, personality training, protocol, democratic culture, modern communication skills,
secretary, internet, And English language).
* Regarding to my MEP works of Implementation, Finishing, Pre-opening and
Operating Maintenance for a:-
1- 36 floor, +five star hotel, 256 rooms & full facilities.
(Grand Millennium Sulaimani Hotel)
2- 24,000 Square Meter Five star hotel, 135 rooms & facilities.
(Kurdistan Millennium Hotel)
3- 20,000 Square Meter Villa’s with full facilities.
4- Six floors, 165 rooms/ Accommodation building.
5- Fifth floor building / Plant room for a hospital FMC.
6- Flat 500 (square Meter) /with full luxury facilities.
My briefly duties were through these six years:-
• Handling all aspects of pre-opening and opening processes i.e. installation of like Chillers,
Fire Fighting, BMS, Water Treatment Plant (RO Plant), Plumbing works, Electrical (HL-
LV Transformers, switch gear, MDB) ……etc, And all as build handover documents .
FIELD OF EXPERTISE:-
• Give assistant to General Manager to supervise the contracting companies like interior
designing work , rooms and public areas furnishing peoples and to give assistant for
manpower hiring etc.
• Preparing reports, memorandums, and letters, performing independent research and
preparing information for special projects, organizing and expediting the flow of work
through the department, maintaining department files and records, and performing other
duties as required.
• Troubleshooting field problems & Providing technical consultations.
• Encourage cross training in the department so as to wish the knowledge and prepare for
any situation.
• Conduct fire fighting training in conjunction with the civil defense department for the uses
of all kinds of extinguishers and evacuation plan and drill.
• Conduct regular inspection of maintenance and preventive maintenance set up schedules.
• Managing designs, researches, and analysis on a project by project and advice for the best
to be implemented and maintain for future time.
• Prepare all drawings on site according to specifications.
• Proposal all the suggestion to make the project plan in easiest way to implemented.
• Study and planning to estimated costs for the projects.
• Managing project schedules and budgets, and following obtain permits for operations.
• Following up engineering calculations connection with field and office assignments.
• Investigate & follow up all problems and recommend the best solutions to be applied.
• Prepared and reviewed engineering plans, specifications required, project schedules time,
designs, circuit diagrams, and estimates for construction and maintenance of projects
Gradually with the sequence of the project.
• Daily provided technical support for system operations and maintenance.
• Maintained connection effective working relationships with field crews, contractors,
vendors, outside agencies, the staff members.
• Prepare requests of proposals and evaluate tenders.
• Ensure that safety requirements and standards procedures are implemented.
• Following up all payment with venders.
* I have knowledge and high experience in installation, configuration and maintenance for
Ericsson equipment BTS [RBS2000’s version. And 6000’s version].that’s use
OMT(Operation and Maintenance Terminal) software. Also AMM (Access Module
Magazine) (2p,6p,20p) that’s use Traffic node mini link craft and also have experience to
solve the problems and alarms for this equipment’s....etc. ; also experience in NSN
transmission equipment (FM 200 and HUB 800) and NEC equipment Panasonic and (I
Panasonic).
* I have experience in PLC (programmable logic control, Deep Sea brand) and electrical
panels of the Generators.
* Using Internet, Emails, Good communication in work, also I am good in networks & IT
installation just like Nano station, Routers , LAN network, wireless network, DCN
network HUB….etc.
* I am very good in some of software’s jest like AutoCAD, Plan Swift, Microsoft, Workbench,
Math lap, SPSS, visual basic, C++…..Etc.
 A) From 2011 till Now I working with Faruk Group (Zarya construction company.) it is
an construction company they have a lot of projects so I was responsible of working in
3 building below:-
1- FMC hotel (Millennium Kurdistan, Hotel & Spa) 135 rooms.
(https://www.tripadvisor.com/Hotel_Review-
g659508-d5310306-Reviews-
Millennium_Kurdistan_Hotel_Spa-
Sulaymaniyah_Sulaymaniyah_Province.html)
2- Six floor Accommodation building.
3- Five floor plant room building.
As an MEP Engineer my work as a supervisor at all MEP works and implementation
on required specifications and designs with contractor who was Turkish company
DATAILS OF MY WORKS
(AKTIF CO.) http://www.aktifelk.com.tr/ and the client was the (Millennium hotels
company) www.millenniumhotels.com.
After that we did the preopening and handover for whole hotel with one year
maintenance works for all the area.
B) In the same while Time that works in 2013 I had to make Finishing, Preopening,
and Handover & Operation Maintenance works for a:-
* 36 floors tower five star hotel 256 rooms (Grand millennium Hotel).
(https://www.millenniumhotels.com/en/sulaimani/grand-millennium-hotel-
sulaimani/)
Ps. Till now operation maintenance works is on
us.
C) At the same time I work to Implementation,
Finishing, Hand over 20,000 square meter special
Villa’s with full of luxury facilities.
Note: - The Villa was done and now I’m the responsible to manage
operating and maintenance of the villa and millennium Kurdistan hotel As a
Chief Engineer.
D) From 2014 till 2016 Also I finalize MEP work for a Flat 500 (square Meter) with
full of luxury facilities Implementation, Finishing and hand over.
All the Buildings above contain:-
Revolving restaurants, auditorium, concert hall, theater, 9 meeting rooms, bars and
shops.
And all the systems:-
1- Medium voltage & Low Voltage Generators.
2- HV-LV transformers.
3- HV - LV Switch gear.
4- Chiller 400 KW.
5- Gas, LPG & electric Boilers.
6- Low Currant systems (CCTV, Sound system, SMATV, Network, internet…..etc)
7- Fire alarm system.
8- LPG system.
9- BMS (building management system).
10- RMS.
11- UPS system, Emergency system.
------------------------------------------------------------------------------------------------
 From 2010 until 2011 I worked in EMEK GROUP Company for communications in
Sulaymanyiah. Which took the implementation of 165 GSM sites from Korek company
(Ericsson equipment) for installation the towers sites from the beginning (35 site in
Kirkuk and 165 sites in sulaymaniah) so I have a high experience in Telecom and
power works, even in civil works. I worked as a supervisor on the contractors to do all
the installation works and design layout for all implementation work :-
A) For power (ATS,MDB,AC panel ,split installation, cable trays and Earthling system
deltas and wiring)
B) for Telecom (RBS, BBS, Alarms, DDF, GSM, AMM (2p, 6p, 20p) …etc) So I do
configuration and alignment for MW (microwave) and routing E1’s on Mini link
craft software; and make the sites on-air on OMT program [in Kirkuk make about
20 on-air for ver. 2216, 2116 cabin, in sulaymaniah make more than 50 site on air
for ver. 6102, 6201 Cabin] after that do the acceptance with Korek teams with
Telecom department.
 In 2010 worked in al Shaty CO. in Baghdad that takes 15 sites from korek so I work as
site engineer with contractors to do the installation for power and Telecom work so I do
configuration and alignment for MW and routing E1’s and make the sites on air for ver.
2000’s cabin.
 I worked in Unicef organization as leader and researcher. (In holiday between studying
time).
 Worked at the 4points company as data entry on (SPSS) system. (In holiday between
studying time)
 Worked in Al Sharq -Center Company as a researcher for Media and national and
human rights Research. (In holiday between studying time)
 Worked in a private office for the repair and maintenance of computers and mobiles. (In
holiday between studying.
Name: Qahtan Adnan Jawad
Marital status: Married
Birth: 26/ 6 /1988
Language: Arabic is the mother language; English spoken and written are Excellent and Kurdish is
very good.
Mobile: - 009647705345874
Address: Now Living at Iraq – AS Sulaymaniayh – Kordsat ;
E-mail: qahtan.adnan@outlook.com; & kahtanma@gmail.com
Profile
Projects that we done and ongoing

More Related Content

What's hot

Kerry Ow Buland - Curriculum Vitae
Kerry Ow Buland - Curriculum VitaeKerry Ow Buland - Curriculum Vitae
Kerry Ow Buland - Curriculum VitaeKerry Ow Buland
 
Main resume edited copy
Main resume edited  copyMain resume edited  copy
Main resume edited copy
Moe El Turkey
 
cv.Harry Khokhar .Rajwinder 2017
cv.Harry Khokhar .Rajwinder 2017cv.Harry Khokhar .Rajwinder 2017
cv.Harry Khokhar .Rajwinder 2017Rajwinder Khokhar
 
anil goswami 2016 cv
anil goswami 2016 cvanil goswami 2016 cv
anil goswami 2016 cvanil goswami
 
sherif Gharib Dec 2016 CV ver 1P
sherif Gharib Dec 2016 CV  ver 1Psherif Gharib Dec 2016 CV  ver 1P
sherif Gharib Dec 2016 CV ver 1PSherif Gharib, MBA
 
Resume j
Resume jResume j
Resume j
Vaman Joshi
 
mohamed fawzy cv 2712016
mohamed fawzy cv 2712016mohamed fawzy cv 2712016
mohamed fawzy cv 2712016Mohamed Fawzy
 
Adnan c v.re
Adnan c v.reAdnan c v.re
Adnan c v.re
Adnan Aleid
 
Salah Mansour's CV-Electrical Engineer 1
Salah Mansour's CV-Electrical Engineer 1Salah Mansour's CV-Electrical Engineer 1
Salah Mansour's CV-Electrical Engineer 1Salah Mansour
 
Rev2 Indetails LC EhabSaad
Rev2 Indetails  LC EhabSaad Rev2 Indetails  LC EhabSaad
Rev2 Indetails LC EhabSaad Ehab Saad
 
hamed_barakat_CV_New
hamed_barakat_CV_Newhamed_barakat_CV_New
hamed_barakat_CV_NewHamed Elawady
 
‫Ammar harbi acting supervisor o&m+implementation+project management - نسخة
‫Ammar harbi acting supervisor o&m+implementation+project management - نسخة‫Ammar harbi acting supervisor o&m+implementation+project management - نسخة
‫Ammar harbi acting supervisor o&m+implementation+project management - نسخةAmmar Aldaqen
 
Mohamed Ahmed Zeyada, Dec. 2015
Mohamed Ahmed Zeyada, Dec. 2015Mohamed Ahmed Zeyada, Dec. 2015
Mohamed Ahmed Zeyada, Dec. 2015???? ?????
 
Ravi Resume new (1) (3)
Ravi Resume new (1) (3)Ravi Resume new (1) (3)
Ravi Resume new (1) (3)Malempati Ravi
 

What's hot (19)

Kerry Ow Buland - Curriculum Vitae
Kerry Ow Buland - Curriculum VitaeKerry Ow Buland - Curriculum Vitae
Kerry Ow Buland - Curriculum Vitae
 
Main resume edited copy
Main resume edited  copyMain resume edited  copy
Main resume edited copy
 
cv.Harry Khokhar .Rajwinder 2017
cv.Harry Khokhar .Rajwinder 2017cv.Harry Khokhar .Rajwinder 2017
cv.Harry Khokhar .Rajwinder 2017
 
anil goswami 2016 cv
anil goswami 2016 cvanil goswami 2016 cv
anil goswami 2016 cv
 
sherif Gharib Dec 2016 CV ver 1P
sherif Gharib Dec 2016 CV  ver 1Psherif Gharib Dec 2016 CV  ver 1P
sherif Gharib Dec 2016 CV ver 1P
 
Sooraj Padman CV
Sooraj Padman CVSooraj Padman CV
Sooraj Padman CV
 
CV-M.Hamza-KSA..
CV-M.Hamza-KSA.. CV-M.Hamza-KSA..
CV-M.Hamza-KSA..
 
Ahmed Zahran C.V
Ahmed Zahran C.VAhmed Zahran C.V
Ahmed Zahran C.V
 
Resume j
Resume jResume j
Resume j
 
mohamed fawzy cv 2712016
mohamed fawzy cv 2712016mohamed fawzy cv 2712016
mohamed fawzy cv 2712016
 
Adnan c v.re
Adnan c v.reAdnan c v.re
Adnan c v.re
 
Ahmed Amin CV
Ahmed Amin CVAhmed Amin CV
Ahmed Amin CV
 
Salah Mansour's CV-Electrical Engineer 1
Salah Mansour's CV-Electrical Engineer 1Salah Mansour's CV-Electrical Engineer 1
Salah Mansour's CV-Electrical Engineer 1
 
Rev2 Indetails LC EhabSaad
Rev2 Indetails  LC EhabSaad Rev2 Indetails  LC EhabSaad
Rev2 Indetails LC EhabSaad
 
hamed_barakat_CV_New
hamed_barakat_CV_Newhamed_barakat_CV_New
hamed_barakat_CV_New
 
‫Ammar harbi acting supervisor o&m+implementation+project management - نسخة
‫Ammar harbi acting supervisor o&m+implementation+project management - نسخة‫Ammar harbi acting supervisor o&m+implementation+project management - نسخة
‫Ammar harbi acting supervisor o&m+implementation+project management - نسخة
 
Mohamed Ahmed Zeyada, Dec. 2015
Mohamed Ahmed Zeyada, Dec. 2015Mohamed Ahmed Zeyada, Dec. 2015
Mohamed Ahmed Zeyada, Dec. 2015
 
FPL RESUME1115
FPL RESUME1115FPL RESUME1115
FPL RESUME1115
 
Ravi Resume new (1) (3)
Ravi Resume new (1) (3)Ravi Resume new (1) (3)
Ravi Resume new (1) (3)
 

Similar to Chief engineer Qahtan adnan CV 20-8-2016

Anwar Morsi _________July 2015
Anwar Morsi _________July 2015Anwar Morsi _________July 2015
Anwar Morsi _________July 2015Anwar El-Sanafawey
 
mohamed fawzy cv 2712016
mohamed fawzy cv 2712016mohamed fawzy cv 2712016
mohamed fawzy cv 2712016Mohamed Fawzy
 
bishoy-nabil-adly-aziz_(1)[1]
bishoy-nabil-adly-aziz_(1)[1]bishoy-nabil-adly-aziz_(1)[1]
bishoy-nabil-adly-aziz_(1)[1]Bishoy nabil
 
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Ali Omar
 
Rev2 Indetails LC EhabSaad
Rev2 Indetails  LC EhabSaad Rev2 Indetails  LC EhabSaad
Rev2 Indetails LC EhabSaad Ehab Saad
 
MUSA SAKIN
MUSA SAKINMUSA SAKIN
MUSA SAKIN
Musa SAKIN
 
Samuel resume cv
Samuel resume cvSamuel resume cv
Samuel resume cv
Samuel Michel
 
Profile (1).pdf
Profile (1).pdfProfile (1).pdf
Profile (1).pdf
Hani Albreem
 
Mohammed Suliman CV Intensive Version 1
Mohammed Suliman CV Intensive Version 1Mohammed Suliman CV Intensive Version 1
Mohammed Suliman CV Intensive Version 1Mohd Suliman
 
Electrical engineer c.v.
Electrical engineer c.v.Electrical engineer c.v.
Electrical engineer c.v.
Mahmoud Hegazy
 
___CV of Senior ELV%2c Special & Electrical Systems Engineer (Amr Gamal) (1) (2)
___CV of Senior ELV%2c Special & Electrical Systems Engineer (Amr Gamal) (1) (2)___CV of Senior ELV%2c Special & Electrical Systems Engineer (Amr Gamal) (1) (2)
___CV of Senior ELV%2c Special & Electrical Systems Engineer (Amr Gamal) (1) (2)amr gamal
 
M.athar malik
M.athar malikM.athar malik
M.athar malik
Mohammed Athar Malik
 
Mohammed seddik-cv
Mohammed seddik-cvMohammed seddik-cv
Mohammed seddik-cv
Mohammed Seddik
 
mark Abi Habib CV rev3
mark Abi Habib CV rev3mark Abi Habib CV rev3
mark Abi Habib CV rev3Mark Abi Habib
 
telecom engineer cv-1
telecom engineer cv-1telecom engineer cv-1
telecom engineer cv-1mohamed ccf
 

Similar to Chief engineer Qahtan adnan CV 20-8-2016 (20)

Anwar Morsi _________July 2015
Anwar Morsi _________July 2015Anwar Morsi _________July 2015
Anwar Morsi _________July 2015
 
mohamed fawzy cv 2712016
mohamed fawzy cv 2712016mohamed fawzy cv 2712016
mohamed fawzy cv 2712016
 
cv resume
cv resumecv resume
cv resume
 
bishoy-nabil-adly-aziz_(1)[1]
bishoy-nabil-adly-aziz_(1)[1]bishoy-nabil-adly-aziz_(1)[1]
bishoy-nabil-adly-aziz_(1)[1]
 
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
 
Rev2 Indetails LC EhabSaad
Rev2 Indetails  LC EhabSaad Rev2 Indetails  LC EhabSaad
Rev2 Indetails LC EhabSaad
 
MUSA SAKIN
MUSA SAKINMUSA SAKIN
MUSA SAKIN
 
Samuel resume cv
Samuel resume cvSamuel resume cv
Samuel resume cv
 
Profile (1).pdf
Profile (1).pdfProfile (1).pdf
Profile (1).pdf
 
Mohammed Suliman CV Intensive Version 1
Mohammed Suliman CV Intensive Version 1Mohammed Suliman CV Intensive Version 1
Mohammed Suliman CV Intensive Version 1
 
Electrical engineer c.v.
Electrical engineer c.v.Electrical engineer c.v.
Electrical engineer c.v.
 
up dated C.V
up dated C.Vup dated C.V
up dated C.V
 
___CV of Senior ELV%2c Special & Electrical Systems Engineer (Amr Gamal) (1) (2)
___CV of Senior ELV%2c Special & Electrical Systems Engineer (Amr Gamal) (1) (2)___CV of Senior ELV%2c Special & Electrical Systems Engineer (Amr Gamal) (1) (2)
___CV of Senior ELV%2c Special & Electrical Systems Engineer (Amr Gamal) (1) (2)
 
M.athar malik
M.athar malikM.athar malik
M.athar malik
 
Mohammed seddik-cv
Mohammed seddik-cvMohammed seddik-cv
Mohammed seddik-cv
 
mark Abi Habib CV rev3
mark Abi Habib CV rev3mark Abi Habib CV rev3
mark Abi Habib CV rev3
 
ADEEL SHAHZAD Resume
ADEEL SHAHZAD ResumeADEEL SHAHZAD Resume
ADEEL SHAHZAD Resume
 
telecom engineer cv-1
telecom engineer cv-1telecom engineer cv-1
telecom engineer cv-1
 
CV 10-5-2014
CV 10-5-2014CV 10-5-2014
CV 10-5-2014
 
Resume_Justin
Resume_JustinResume_Justin
Resume_Justin
 

Chief engineer Qahtan adnan CV 20-8-2016

  • 1. Dedicated electrical engineer with more than six years’ experience in implementing & maintaining building MEP systems and managing all aspects of projects’ life cycle & Hospitality, offering the following core competencies:- • Leading engineering to maintaining services building with hospitality and life style facilities. • Background in the principles and practices of MEP implementation projects, engineering design and construction. • Able to run engineering projects from inception to success. • Excellent supervisory experience, including setting goals and objectives, project development, planning and organization, budget monitoring and cost control.  B.sc. in Electrical and Electronic Engineering - University of Technology - Department of Electronics and Communications.  IOSH Certificate for the Engineers, it is a British Co. for an international health and safety training works at site and how to manage the Hazard.  Fire alarm, Firefighting, Evacuation & LPG system trainings (operating & maintenance).  BMS, RMS, Dimmer light systems Trainings (operating & maintenance).  Swimming pool & fountain systems trainings (operating & maintenance).  I took a training (11-17/ 9 /2012) by Ericsson Company for TN (Traffic Node) it was advanced training about the modems, installation, configuration and connection for (NPU, MMU’s, LTU’s, ETU’s…etc.) and Alarms and the problem that we faced in the site also adscription for DCN network. CV Qahtan Adnan Al obaidi Mobile: 00964-770-534-5874 E-mail / qahtan.adnan@outlook.com / kahtanma@gmail.com Achievement Certificate and training Qualifications Summary
  • 2.  Certificate from NSN (Nokia Siemens Network) for a training (22-26/12/2011) in the transmission Equipment (installation Microwave, configuration and do the alignment, upgrade) for flexi Packet first mile 200, FM 200 SVR 2.0 and HUB 800 SVR 2.0 models.  I took training (5-12/ 6 /2011) in Korek sulaymaniyah by Ericsson Iraq on the RBS (radio base station) that’s Model (6102, 6201), installation and the function of all equipment and how to connected with it, and do the configuration and make it on air ...etc.  Certificate from (ICTC) 11/5/2010 Information and Communication Technology Center, sponsored by University of Technology to my participation in computation for the gift project and my project one of them.  Certificate of participation in Computer software’s training in May 2009, from University of Technology, (computer center).  Certificate of Preparing leaders (8/July to 22/Sep./2008), it is a practical and theoretical information and training in (leadership ART, general relation public speaking and debates, personality training, protocol, democratic culture, modern communication skills, secretary, internet, And English language). * Regarding to my MEP works of Implementation, Finishing, Pre-opening and Operating Maintenance for a:- 1- 36 floor, +five star hotel, 256 rooms & full facilities. (Grand Millennium Sulaimani Hotel) 2- 24,000 Square Meter Five star hotel, 135 rooms & facilities. (Kurdistan Millennium Hotel) 3- 20,000 Square Meter Villa’s with full facilities. 4- Six floors, 165 rooms/ Accommodation building. 5- Fifth floor building / Plant room for a hospital FMC. 6- Flat 500 (square Meter) /with full luxury facilities. My briefly duties were through these six years:- • Handling all aspects of pre-opening and opening processes i.e. installation of like Chillers, Fire Fighting, BMS, Water Treatment Plant (RO Plant), Plumbing works, Electrical (HL- LV Transformers, switch gear, MDB) ……etc, And all as build handover documents . FIELD OF EXPERTISE:-
  • 3. • Give assistant to General Manager to supervise the contracting companies like interior designing work , rooms and public areas furnishing peoples and to give assistant for manpower hiring etc. • Preparing reports, memorandums, and letters, performing independent research and preparing information for special projects, organizing and expediting the flow of work through the department, maintaining department files and records, and performing other duties as required. • Troubleshooting field problems & Providing technical consultations. • Encourage cross training in the department so as to wish the knowledge and prepare for any situation. • Conduct fire fighting training in conjunction with the civil defense department for the uses of all kinds of extinguishers and evacuation plan and drill. • Conduct regular inspection of maintenance and preventive maintenance set up schedules. • Managing designs, researches, and analysis on a project by project and advice for the best to be implemented and maintain for future time. • Prepare all drawings on site according to specifications. • Proposal all the suggestion to make the project plan in easiest way to implemented. • Study and planning to estimated costs for the projects. • Managing project schedules and budgets, and following obtain permits for operations. • Following up engineering calculations connection with field and office assignments. • Investigate & follow up all problems and recommend the best solutions to be applied. • Prepared and reviewed engineering plans, specifications required, project schedules time, designs, circuit diagrams, and estimates for construction and maintenance of projects Gradually with the sequence of the project. • Daily provided technical support for system operations and maintenance. • Maintained connection effective working relationships with field crews, contractors, vendors, outside agencies, the staff members. • Prepare requests of proposals and evaluate tenders.
  • 4. • Ensure that safety requirements and standards procedures are implemented. • Following up all payment with venders. * I have knowledge and high experience in installation, configuration and maintenance for Ericsson equipment BTS [RBS2000’s version. And 6000’s version].that’s use OMT(Operation and Maintenance Terminal) software. Also AMM (Access Module Magazine) (2p,6p,20p) that’s use Traffic node mini link craft and also have experience to solve the problems and alarms for this equipment’s....etc. ; also experience in NSN transmission equipment (FM 200 and HUB 800) and NEC equipment Panasonic and (I Panasonic). * I have experience in PLC (programmable logic control, Deep Sea brand) and electrical panels of the Generators. * Using Internet, Emails, Good communication in work, also I am good in networks & IT installation just like Nano station, Routers , LAN network, wireless network, DCN network HUB….etc. * I am very good in some of software’s jest like AutoCAD, Plan Swift, Microsoft, Workbench, Math lap, SPSS, visual basic, C++…..Etc.  A) From 2011 till Now I working with Faruk Group (Zarya construction company.) it is an construction company they have a lot of projects so I was responsible of working in 3 building below:- 1- FMC hotel (Millennium Kurdistan, Hotel & Spa) 135 rooms. (https://www.tripadvisor.com/Hotel_Review- g659508-d5310306-Reviews- Millennium_Kurdistan_Hotel_Spa- Sulaymaniyah_Sulaymaniyah_Province.html) 2- Six floor Accommodation building. 3- Five floor plant room building. As an MEP Engineer my work as a supervisor at all MEP works and implementation on required specifications and designs with contractor who was Turkish company DATAILS OF MY WORKS
  • 5. (AKTIF CO.) http://www.aktifelk.com.tr/ and the client was the (Millennium hotels company) www.millenniumhotels.com. After that we did the preopening and handover for whole hotel with one year maintenance works for all the area. B) In the same while Time that works in 2013 I had to make Finishing, Preopening, and Handover & Operation Maintenance works for a:- * 36 floors tower five star hotel 256 rooms (Grand millennium Hotel). (https://www.millenniumhotels.com/en/sulaimani/grand-millennium-hotel- sulaimani/) Ps. Till now operation maintenance works is on us. C) At the same time I work to Implementation, Finishing, Hand over 20,000 square meter special Villa’s with full of luxury facilities. Note: - The Villa was done and now I’m the responsible to manage operating and maintenance of the villa and millennium Kurdistan hotel As a Chief Engineer. D) From 2014 till 2016 Also I finalize MEP work for a Flat 500 (square Meter) with full of luxury facilities Implementation, Finishing and hand over.
  • 6. All the Buildings above contain:- Revolving restaurants, auditorium, concert hall, theater, 9 meeting rooms, bars and shops. And all the systems:- 1- Medium voltage & Low Voltage Generators. 2- HV-LV transformers. 3- HV - LV Switch gear. 4- Chiller 400 KW. 5- Gas, LPG & electric Boilers. 6- Low Currant systems (CCTV, Sound system, SMATV, Network, internet…..etc) 7- Fire alarm system. 8- LPG system. 9- BMS (building management system). 10- RMS. 11- UPS system, Emergency system. ------------------------------------------------------------------------------------------------  From 2010 until 2011 I worked in EMEK GROUP Company for communications in Sulaymanyiah. Which took the implementation of 165 GSM sites from Korek company (Ericsson equipment) for installation the towers sites from the beginning (35 site in Kirkuk and 165 sites in sulaymaniah) so I have a high experience in Telecom and power works, even in civil works. I worked as a supervisor on the contractors to do all the installation works and design layout for all implementation work :- A) For power (ATS,MDB,AC panel ,split installation, cable trays and Earthling system deltas and wiring) B) for Telecom (RBS, BBS, Alarms, DDF, GSM, AMM (2p, 6p, 20p) …etc) So I do configuration and alignment for MW (microwave) and routing E1’s on Mini link craft software; and make the sites on-air on OMT program [in Kirkuk make about 20 on-air for ver. 2216, 2116 cabin, in sulaymaniah make more than 50 site on air for ver. 6102, 6201 Cabin] after that do the acceptance with Korek teams with Telecom department.  In 2010 worked in al Shaty CO. in Baghdad that takes 15 sites from korek so I work as site engineer with contractors to do the installation for power and Telecom work so I do configuration and alignment for MW and routing E1’s and make the sites on air for ver. 2000’s cabin.  I worked in Unicef organization as leader and researcher. (In holiday between studying time).
  • 7.  Worked at the 4points company as data entry on (SPSS) system. (In holiday between studying time)  Worked in Al Sharq -Center Company as a researcher for Media and national and human rights Research. (In holiday between studying time)  Worked in a private office for the repair and maintenance of computers and mobiles. (In holiday between studying. Name: Qahtan Adnan Jawad Marital status: Married Birth: 26/ 6 /1988 Language: Arabic is the mother language; English spoken and written are Excellent and Kurdish is very good. Mobile: - 009647705345874 Address: Now Living at Iraq – AS Sulaymaniayh – Kordsat ; E-mail: qahtan.adnan@outlook.com; & kahtanma@gmail.com Profile Projects that we done and ongoing