Ali Mostafa Ali Shaaban is an electrical project engineer seeking a challenging position in construction. He has over 5 years of experience as an electrical site engineer for various power plant projects in Egypt and Saudi Arabia. His experience includes installing electrical equipment, pulling and testing cables, and preparing as-built drawings. He holds a Bachelor's degree in power and electrical engineering from Fayoum University.
1. Ali Mostafa Ali Shaaban
Ali Eldakrory
Jeddah – K.S.A
Mobile: 0540289837
0542934752
E-mail: eng_ali_mostafa@yahoo.com
OBJECTIVE
Seeking a challenging position where I can take my place in the future construction and
contribute relevant experience background to my working field.
CURRENT JOB
Feb. 2013 – Till Now
Employer: ORASCOM SAUDI for Construction & Industrial Company.
Client: SAUDI BINLADIN GROUP.
Job Title: Electrical project Engineer
Job Description: -Responsible for electrical work in utility tunnel.
-Responsible for installation cable ladder ,cable tray and cable trunk.
-Responsible for pulling MV cables by GREENLEETools
(www.greenlee.com) , arranged it by cable cleat.
-Responsible for termination MV cable ( at load center ,splicing ,Tee
connection and sub-station or transformer), tested it (Megger and
Highpot test).
-Responsible for pulling LV cable and tested it ( Megger).
-Responsible for installation lighting and small power systems.
-Responsible for installation LV substation , transformer.
-Responsible for installation main distribution panels and sub
distribution panels.
Project: KING ABDULAZIZ INTERNATIONAL AIRPORT
DEVELOPMENT PROJET
JEEDA – KINGDOM OF SAUDI ARABIA.
WORK EXPERIENCE
November 2012 – Feb. 2013
Employer: MEGA for construction & Industrial Company.
Client: INITEC ENERGIA
Job Title: Electrical Site Engineer
Job Description: - Responsible for installation service transformer in workshop area.
-Responsible for installation Diesel Generator 300KVA with ATS
panel in workshop area
- Responsible for installation lighting and small power systems in
workshop and site.
Project: Giza North Simple Cycle Power Plant
1000 MW Gas Turbine Project
Giza – EGYPT
2. November 2011 – August 2012
Employer: Kharafi National for Mechanical & Electrical Works, S.A.E
Client: East Delta Electricity Production Company
Job Title: Electrical Site Engineer
Job Description: -Responsible for GIS equipments installation and testing.
-Responsible for lighting & small power & data and telephone &
paging & fire alarm and lightning systems for GIS Buildings
- Responsible for receiving all Switchgear, Load Centers and MCC
panels supplied from Schneider and Hyundai and connect cables.
- Responsible for utilities works duct bank all over the plant, pulling
M.V, L.V cables and yard lighting.
- Responsible for preparing as built drawings.
Project: West Damietta Simple Cycle Power Plant
500 MW Gas Turbine Project
Damietta – EGYPT
December 2010 – November 2011 (End of project)
Employer: Kharafi National for Mechanical & Electrical Works, S.A.E
Client: East Delta Electricity Production Company
Job Title: Electrical Site Engineer
Job Description: - Responsible for the installation of all Switchgear, Load Centers and
MCC panels supplied from Schneider and GE and Hysoung.
- Responsible for the installation Diesel Generator and testing.
-Responsible for utilities works duct bank all over the plant, pulling
chambers around the turbines and yard lighting.
-Responsible for Lighting, Small power, Telephone & Data, Fire
alarm and Paging Systems in all buildings.
-Responsible for Earthing system cw welding all the pigtails going to
equipments and Lightning protection over buildings.
-Responsible for preparing as built drawings.
Project: Damietta Simple Cycle Power Plant
500 MW Gas Turbine Project
Damietta – EGYPT
July 2010 – November 2010
Employer: Kahromika (Egyptian Company for Electrical and Mechanical
Projects).
Client: Head Office at Tender Department
Job Title: Electrical Engineer
Job Description: - Responsible for study the Offers and take-off the require materials
(Cables, Cable Tray ,Conduits and Accessories) and send it to
Supplier and Compare between the supplier’s offers.
- Responsible for Revise Technical Offices Site Reports.
October 2008 – July 2010
Employer: Kahromika (Egyptian Company for Electrical and Mechanical
Projects).
Client: Alstom , CMI and INITEC ENERGIA ,
Upper Egypt Electricity Production Company(UEEPC).
Job Title: Electrical Site Engineer
Job Description: - Responsible for pulling control &LV and MV cables and tested it .
3. - Responsible for installation Load Center & MCC & Protection and
Control Panels .
- Responsible for installation Iso-Phase Bus Duct and tested it.
- Responsible for installation Fire alarm system and lighting system.
- Responsible for close Punch List with Owner .
Project: El kuruimat III combined cycle power station Project
750 MW (3*250MW).
EDUCATION
Fayoum University'2008'
o Bachelor degree in the power and electrical machine engineering:
General grade: Good
4th
year grade: Good
Project grade: Excellent
Project: Design , implementation and practical application for
programmable logic controller (PLC)
COURSES
Jelecom A.D. Panasonic company , Cairo , Egypt
PLC (programmable logic controller) advanced course (level 1)
industrial regulations company , Cairo , Egypt
SCADA & PLC & Touch screen course
Cairo University ,. Microcontroller course.
SKILLS
Computer Skills:
Excellent Knowledge of operating system Windows.
Very good Knowledge of Word, Excel, Power point, Auto-CAD, Internet, MATLAB
& MS Outlook.
Linguistic Skills:
Native language Arabic.
Very good command of both written and spoken English.
Personal Skills:
Dynamic leader and team builder, consistently motivating others towards success.
Outstanding customer service skills.
Ability to work under pressure.
PERSONAL INFORMATION
Date of Birth: 20/10/1984
Nationality: Egyptian
Marital Status: married
Military Status: Exempted