SlideShare a Scribd company logo
1 of 4
NESTOR S. DUNGCA
20-32 Rosa St. Timog Park Subdivision
Angeles City, Pampanga, Philippines, C 2009
E-mail: nestordungca070653@yahoo.com
Cellphone (Philippines) #: +63-9166462252
Personal Data:
Date of Birth: July 6, 1955
Marital Status: Married
Citizenship: Filipino
Education: Bachelor of Science in Electrical Engineering
Graduated: March 25, 1979
Board Exam: (passed)
Electrical Engineering Organization:
Member of Engineering Societyof Engineers Dubai – 2009
Member of Philippine Societyof Electrical Engineers – 1985
Member for the Association ofSafety Engineers ofthe Philippines -1986
Member of Rotary Club Angeles City, Pampanga Chapter - 1989
Objective:
Ability to analyze complexelectrical engineering problems to evaluate and recommend alternatives and
communicates recommendations effectively. Knowledge & ability for general building services supervision,
final assessment & review/ approval of all electrical design drawings,specifications and project contractprior
for tendering and awarding/construction.Seeking fulltime position with engineering & consultancy&
Construction Companylocal & overseas
Summary of Qualifications:
Wide experience in all aspects ofgeneral electrical services supervision,& inspections and other related
electrical engineering works activities to include mechanical works in the Construction & Development of
the luxurious resorthotel,mixed-use towers,commercial, & industrial, hospital,airport & MRT/ Dubai
facilities school building,amusement park & other related electrical engineering projects in overseas.
Knowledge in design / drawings review/approved & other projectdocuments involved in the projects such
as monitoring & inspections ofvarious general installation of(Low & & High Voltage) to include ELV’s
systems.
Liaising, coordinating,& meetings with MEP.s contractor’s/sub contractor’s,suppliers/manufacturers,
consultants & clientrepresentatives, local authority& others involved in the projects.
Ability & knowledgeable & experience to interpretthe contents of mechanical & architectural construction
drawings within specifications requirementin relation with the electrical drawings & specifications
requirement to be utilized in the projects.
Knowledge to coordinate with all local authorities for final approval of all LV/HV equipment prior for actual
site installations of all electrical (LV/ HV & ELV’s) base on approved construction drawings for
commencementofsite works in the project.
Well verse & knowledge in all type of general electrical engineering’s design & specifications,project
planning and other administrative works for the construction & Development ofJumeirah Beach Hotel,
mixed-use Towers Airport,MRT, (Dubai) & motor race track facilities,hospital & school building in relation
of all general engineering works to include testing .
Knowledge in hotel / water park supervision & electrical maintenance works to include mechanical/HVAC/
Plumbing & ELV’s/ electronic system. PPM of of all electrical equipment in hotel/water park in overseas.
Employment History:
From 1981 to mid of1992,joined 13thUS Air Project Management Office at Clark Air Base,
Angeles City, Philippines as an Electrical Engineering Inspector (general)- Responsible & overall
in-charge for all various inspections for all aspects of electrical (LV/HV) & ELV’s system
installations.To review/ approved all contractors electrical drawings,brochures and samples and
other documents involved in the projects. Checking all contractor’s commissioning testing
activities for the improvement & development/ refurbishmentof 13th
US Air force airportdeparture &
arrival building to include facilities and the high voltage underground cabling from power generation
plant. Erect Underground HVcabling o for 750KVA/1000/KVA/ 1500KVA power transformers by
the electrical contractors for the Developmentof 13th US Air Force hospital,Clark Airport &
Chamber Hall building,& primaryschool and Air Force Quarter Buildings & recreation building
facilities and other infrastructure inside American Base,Clark,Angeles City, Pampanga,
Philippines.
After removal of American in US base in the Philippines in 1992,then in the end of 1992, I hired
by Turner & Steiner International, New York City in Manila, Philippines as an Electrical
Building Services Engineer- (1992 to 1994) for the SunsetBeach Resort Development, which is
own and operated by FAMA Holding Company,Riyadh,Saudi Arabia.
Then in July 1994 till 1999,joined & worked in W/S Atkins and Partners Overseas, Dubai, an
engineering ,design & consultancyfirm as Senior Electrical Engineer (site operation) to oversee &
overall manage/monitoring & inspectall the aspects of the contractors electrical installations to
include electrical testing & commissioning,(LV/HV & ELV system’s) for BURJ Al ARAB Hotel, Wild
Wadi Water Park, Dubai.
After completion ofthe projects in 1999,assigned & to manage & monitor electrical works activities
by the electrical contractor’s involved for the Construction ofWild Wadi Water Park and 19 Units
Chalets
In mid-1999,Jumeirah International LLC,Dubai borrowed myservice to my consulting companyto
manage and oversees all aspects ofelectrical maintenance services in Wild Wadi Water Park.
In August2001, WS Atkins & Partners Overseas,Dubai,recall my service for a new appointment,
to manage the Construction of JESS School,Dubai & other projects in Dubai.
After completion ofthe school projectin end of 2010, I transfer in various mixed-use tower project’s
in Jumeirah Lake Towers,Dubai,till completion 20011 then,moved in Abu Dhabi,UAE for other
two (2) - new mixed-use tower projects,ad resigned in mid of2011 for good.
End of 2012 to 2015,I was recruited by the local construction & engineering companyas Electrical
Project Manager- Responsible for the overall site management& the accomplishment for entire
electrical work activities ( LV/ HV & ELV’s) installations & testing to include and electronic
equipment& cabling installations in the developmentof WIDUS Hotel & casino building facilities .
Involved and coordinate to the local authorities for obtaining electrical power connection to include
internetconnection in the building prior for handing over to the clientand usage.
Work Experience :- (1981 to 2015):
1.). Voltas Construction & Engineering Company, Philippines- Electrical Project Manager- Nov.
5, 2012 – Nov. 30, 2015
3rd floor, Room 305 & 304, Sarmiento Building,
Ayala, Makati City, Metro Manila Philippines
Tel. no. +63 9166462262
a). Overall in-charge for all aspects ofthe general electrical site activities (HV/ LV/ELV) of the Developmentof
WIDUS Hotel& Casino,Clark free port zone, Philippines from installations, Testing & Commissioning and handing
over of the projecton date completion to the client.Working for proper liaising & coordinating & reportto Project
Director of VEC Co. in bi-weekly/ monthly. Liaise with the consultantfor projectrequirements.
2) .Turner & Steiner International, Saudi - Electrical Building Services Engineer - May 15,1992 –
June 1, 1994
PO Box 52352,Aziziyah Rd. Al Khobar Saudi Arabia
Tel. no. +92565629
a). To oversees all aspects ofthe general electrical building services activities of electrical project from bidding to
construction implementation base on the clientapproved budget.Liaise/coordinate to the engineering consultant/ 7
Clientfor any problem arise during construction.Final review all electrical contractor monthly progress billing and
approved for payment.
Coordinate with clientrepresentative for any change required by the clientrequirement.Monthly walk aboutwith th e
site projectconsultant,contractor engineers & client,engineers to ensure that all installations are carried outas per
standard and projectdrawings requirements.
3.). WS Atkin’s Partners Overseas- General Electrical Engineering Inspector - July 7,1994 –
November 7, 1998
Duties:
Responsible to review/ approved of all the electrical contractor construction drawings, technical
brochures, samples, Programme of Works, SOW and other documents used in the projects.
Liaise and coordinate to the local authority for obtaining power and other services in the projects.
Oversees & inspect & comments of all installed electricals containments, t, cable, LV bus bar trucking, LV
panels, SMDBs, DBs Capacitors & other electrical equipment utilized in the projects. Liaise with the
electrical contractors/ sub- contractors for actual Testing & Commissioning of all installed electrical
services and provide record for approval prior for request of inspection to the authority in obtain
electrical power ‘ON’ Attended coordination & progress meetings in weekly basis with the client,
contractors, sub-contractors, suppliers & other involved in the projects. Provide weekly/ bi monthly reports
for the Senior Resident Engineer.
Review all Contractors technical queries and suggest comments and to be submitted to the electrical
designed for review and final comments. & ETC.
Act as safety engineer on site.
4). Jumeirah Beach Hotel/ Water Park, Dubai) – Assistant Chief Engineer August 5, 1998 - August
16, 2001
PO Box 28, Jumeirah Road,Dubai.UAE
Duties:
a). Responsible for proper implementation ofoperation/maintenance & provide monthly PPM of all electro-
mechanical equipment& building services to ensure thatall work carried out are within Operation & Manual of the
hotel/ water park.
5). WS Atkins Partner’s & Overseas, Dubai- Senior Electrical Engineer (General) - September 8,
2001 – June 9, 2011
PO Box 5620 Dubai,UAE
Tel. No. 091 -4-4059300
Website:atkins.global.com
Duties:
A). Responsible to manage/ oversees & inspects all the electrical, mechanical contractors performance ofwork
activities on site installation regarding work standard & regulation for the compliance with the approved construction
drawings,specifications,Scope ofWork & Program of Work of the projects,such as: JESS school Autodrome,(motor
sport) Jumeirah Lake Towers & Gulf News Building Facilities, Dubai to include mixed-use tower in Abu Dhabi.
Assigned electrical site engineers,inspectors and other staffpersonnel to the designated projectin daily basis till
completion.Liaise/coordinate to the local authorities in relation ofElectrical power,Fire Alarm Detection System
inspection,Convergence Structured Cabling system connection and other works necessaryto complete the projects.
Liaise/coordinate with client& other involved in the projects delay& due some site changes bythe contractors &
date completion & usage….& ETC.
6.). 13th US Air Force Project Management Office- Electrical Engineering Inspector – March 30, 1982
February 8, 1992
Room 206,2nd
Floor US Airforce PMO
2nd
Floor, Contracting Center Building,
Marat Highway, Clark Air Base
Angeles City, Pampanga,Philippines
Duties:
a). Responsible to oversees ofall the general electrical inspection ofcontractor installation to include
Testing & Commissioning ofall low voltage & medium voltage equipment& cabling within the assigned
projects inside Clark Air Base,Phil. Review/ Approved all electrical contractors drawings,samples,Scope of
Works & Program & other documents as per projectspecifications & contractrequirement.Prepare/submit
progress report with the Senior Project Manager for any site developmentand weight(%) accomplishment
and other electrical contractors issue & other related problem involved on site,
Meeting with the Contractors,sub- contractors, supplier’s client& other involved in the projectregarding
progress and site projectissue.Attended all weekly/ monthlycoordination & progress meetings with the
consultant& stock holders & main contractors & sub -contractors
# Competed Projects: (General Electrical Engineering Works)
Local Projects: (Inside Clark Air Base,Phil.): 1981 to 1992
1). MAC Terminal Building Facilities,(departure & arrival bldg.)
2). 100 Units – Developmentof Junior & Senior Officer Residential Quarters,Clark
3). Refurbishments of7th
floor - US 13th
Air Force Medical Center. Clark
4 Refurbishment’s ofUS Air Force Chamber Hall,Clark
5). Underground HV Cablings,Clark
6). Development of WIDUS Hotel & Casino,Clark free fort Zone, Phil.
Overseas Projects: (General Electrical Engineering)- 1992 to 2011)
1) Jumeirah Beach Resort,Dubai
2). Burj Al Arab Hotel, Dubai
3). 10 units of 2 &3 Bedroom Chalets,Dubai
4). Wild Wadi Water Park, Dubai
5). Jumeirah English Speaking School,and manyother sportfacilities,Dubai
6). Autodrome – motor Race Track and building facilities,Dubai
7) JESS English Speaking School Building Facilities,Dubai
8). Jumeirah Lake Towers,Dubai
9). Dubai MRT - U/G Building Stations Facilities,Dubai
10). Dubai Airport Departure & Arrival Building Facilities and others
11). GULF NEWS Building Facilities,Dubai and others
Last page:
-

More Related Content

What's hot

ELECTRICAL DESIGN ENGINEER - RESUME
ELECTRICAL DESIGN ENGINEER -  RESUMEELECTRICAL DESIGN ENGINEER -  RESUME
ELECTRICAL DESIGN ENGINEER - RESUME
VEERABHARATHI MUNI
 
Resume TERENCE ANDERSON Sr. Electrical Engineer & Project Manager
Resume TERENCE ANDERSON Sr. Electrical Engineer & Project ManagerResume TERENCE ANDERSON Sr. Electrical Engineer & Project Manager
Resume TERENCE ANDERSON Sr. Electrical Engineer & Project Manager
Terence Anderson (BSEE & MBA)
 
ELECTRICAL ENGINEER CV M
ELECTRICAL ENGINEER CV MELECTRICAL ENGINEER CV M
ELECTRICAL ENGINEER CV M
usama gamal
 
Shujaat Updated CV New
Shujaat Updated CV NewShujaat Updated CV New
Shujaat Updated CV New
Shujaat Jan
 
Alwin CV 032016_neW.
Alwin CV 032016_neW.Alwin CV 032016_neW.
Alwin CV 032016_neW.
Alwin Jose
 
AMER M.KAMAL ABBAS (Project Engineering)
AMER M.KAMAL ABBAS (Project Engineering)AMER M.KAMAL ABBAS (Project Engineering)
AMER M.KAMAL ABBAS (Project Engineering)
Amer Abbas
 
Eng Samer Ali CV
Eng Samer Ali CVEng Samer Ali CV
Eng Samer Ali CV
Samer Ali
 
Ahmed_Mohammed
Ahmed_MohammedAhmed_Mohammed
Ahmed_Mohammed
ahmed ali
 
AHMED MAAMOUN CV 4-2016
AHMED MAAMOUN CV 4-2016AHMED MAAMOUN CV 4-2016
AHMED MAAMOUN CV 4-2016
Ahmed Maamoun
 
ELECTRICAL FOREMAN CV 10042016
ELECTRICAL FOREMAN CV 10042016ELECTRICAL FOREMAN CV 10042016
ELECTRICAL FOREMAN CV 10042016
RUKNUDDIN ALI
 
experienced electerical engineer c.v
experienced electerical engineer  c.vexperienced electerical engineer  c.v
experienced electerical engineer c.v
hamada mahmoud
 

What's hot (20)

ELECTRICAL DESIGN ENGINEER - RESUME
ELECTRICAL DESIGN ENGINEER -  RESUMEELECTRICAL DESIGN ENGINEER -  RESUME
ELECTRICAL DESIGN ENGINEER - RESUME
 
Electrical Engineer Resume
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer Resume
 
Resume TERENCE ANDERSON Sr. Electrical Engineer & Project Manager
Resume TERENCE ANDERSON Sr. Electrical Engineer & Project ManagerResume TERENCE ANDERSON Sr. Electrical Engineer & Project Manager
Resume TERENCE ANDERSON Sr. Electrical Engineer & Project Manager
 
ELECTRICAL ENGINEER CV M
ELECTRICAL ENGINEER CV MELECTRICAL ENGINEER CV M
ELECTRICAL ENGINEER CV M
 
Shujaat Updated CV New
Shujaat Updated CV NewShujaat Updated CV New
Shujaat Updated CV New
 
Resume electrical design and site engineer(mep) 9+ years of exp
Resume   electrical design and site engineer(mep) 9+ years of expResume   electrical design and site engineer(mep) 9+ years of exp
Resume electrical design and site engineer(mep) 9+ years of exp
 
Alwin CV 032016_neW.
Alwin CV 032016_neW.Alwin CV 032016_neW.
Alwin CV 032016_neW.
 
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CVELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
 
Abdelrahman Elsayed CV
Abdelrahman Elsayed CVAbdelrahman Elsayed CV
Abdelrahman Elsayed CV
 
HASSAN CV
HASSAN CVHASSAN CV
HASSAN CV
 
AMER M.KAMAL ABBAS (Project Engineering)
AMER M.KAMAL ABBAS (Project Engineering)AMER M.KAMAL ABBAS (Project Engineering)
AMER M.KAMAL ABBAS (Project Engineering)
 
Eng Samer Ali CV
Eng Samer Ali CVEng Samer Ali CV
Eng Samer Ali CV
 
Ahmed_Mohammed
Ahmed_MohammedAhmed_Mohammed
Ahmed_Mohammed
 
EJP CV_January2016
EJP CV_January2016EJP CV_January2016
EJP CV_January2016
 
Abhilash CV
Abhilash CVAbhilash CV
Abhilash CV
 
AHMED MAAMOUN CV 4-2016
AHMED MAAMOUN CV 4-2016AHMED MAAMOUN CV 4-2016
AHMED MAAMOUN CV 4-2016
 
ELECTRICAL FOREMAN CV 10042016
ELECTRICAL FOREMAN CV 10042016ELECTRICAL FOREMAN CV 10042016
ELECTRICAL FOREMAN CV 10042016
 
Electrical site Engineer
Electrical site EngineerElectrical site Engineer
Electrical site Engineer
 
experienced electerical engineer c.v
experienced electerical engineer  c.vexperienced electerical engineer  c.v
experienced electerical engineer c.v
 
Cv, electrical engineer, ahmad saqqa
Cv, electrical engineer, ahmad saqqaCv, electrical engineer, ahmad saqqa
Cv, electrical engineer, ahmad saqqa
 

Viewers also liked

Diapositiva final de irda de la evaluacion de los aprendizajes.pptx (1)
Diapositiva final de irda  de la evaluacion de los aprendizajes.pptx (1)Diapositiva final de irda  de la evaluacion de los aprendizajes.pptx (1)
Diapositiva final de irda de la evaluacion de los aprendizajes.pptx (1)
heidypr
 
ScienceShare.co.uk Shared Resource
ScienceShare.co.uk Shared ResourceScienceShare.co.uk Shared Resource
ScienceShare.co.uk Shared Resource
ScienceShare.co.uk
 
Project Management Experience - Rossouw van Schalkwyk
Project Management Experience - Rossouw van SchalkwykProject Management Experience - Rossouw van Schalkwyk
Project Management Experience - Rossouw van Schalkwyk
Rossouw Van Schalkwyk
 

Viewers also liked (16)

Developing digital literacy
Developing digital literacyDeveloping digital literacy
Developing digital literacy
 
Diapositiva final de irda de la evaluacion de los aprendizajes.pptx (1)
Diapositiva final de irda  de la evaluacion de los aprendizajes.pptx (1)Diapositiva final de irda  de la evaluacion de los aprendizajes.pptx (1)
Diapositiva final de irda de la evaluacion de los aprendizajes.pptx (1)
 
MatrizFODA
MatrizFODAMatrizFODA
MatrizFODA
 
MY CV IAldosaimani
MY CV IAldosaimaniMY CV IAldosaimani
MY CV IAldosaimani
 
ScienceShare.co.uk Shared Resource
ScienceShare.co.uk Shared ResourceScienceShare.co.uk Shared Resource
ScienceShare.co.uk Shared Resource
 
20160317143451533
2016031714345153320160317143451533
20160317143451533
 
Patallazo
PatallazoPatallazo
Patallazo
 
shashi c.v.1
shashi c.v.1shashi c.v.1
shashi c.v.1
 
iDIN-burodevelopment
iDIN-burodevelopmentiDIN-burodevelopment
iDIN-burodevelopment
 
Project Management Experience - Rossouw van Schalkwyk
Project Management Experience - Rossouw van SchalkwykProject Management Experience - Rossouw van Schalkwyk
Project Management Experience - Rossouw van Schalkwyk
 
INTRODUCCION Y CONCLUSION DE PSICOLOGIA SOCIAL
INTRODUCCION  Y CONCLUSION DE PSICOLOGIA SOCIALINTRODUCCION  Y CONCLUSION DE PSICOLOGIA SOCIAL
INTRODUCCION Y CONCLUSION DE PSICOLOGIA SOCIAL
 
biipmi.com - Guide to Creating Your First Job Posting
biipmi.com - Guide to Creating Your First Job Postingbiipmi.com - Guide to Creating Your First Job Posting
biipmi.com - Guide to Creating Your First Job Posting
 
Presentación Hikikomori
Presentación Hikikomori Presentación Hikikomori
Presentación Hikikomori
 
Adviento 16
Adviento 16Adviento 16
Adviento 16
 
Linkedin CV
Linkedin CVLinkedin CV
Linkedin CV
 
Verb Review - Irregular Verbs
Verb Review - Irregular VerbsVerb Review - Irregular Verbs
Verb Review - Irregular Verbs
 

Similar to nestor (20)

nestor
nestornestor
nestor
 
JOHN- Senior Electrical engineer
JOHN- Senior Electrical engineerJOHN- Senior Electrical engineer
JOHN- Senior Electrical engineer
 
Nadeem CV
Nadeem CVNadeem CV
Nadeem CV
 
Nawaz CV as of 10-Jan- 16
Nawaz CV as of 10-Jan- 16Nawaz CV as of 10-Jan- 16
Nawaz CV as of 10-Jan- 16
 
CV_WALEED
CV_WALEEDCV_WALEED
CV_WALEED
 
Resume Sivakumar SKTJ
Resume Sivakumar SKTJResume Sivakumar SKTJ
Resume Sivakumar SKTJ
 
F. CV
F. CVF. CV
F. CV
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
 
CV Power Plant
CV Power PlantCV Power Plant
CV Power Plant
 
RAMESH_VOLTAS_CV
RAMESH_VOLTAS_CVRAMESH_VOLTAS_CV
RAMESH_VOLTAS_CV
 
Ali Khater's Resume
Ali Khater's ResumeAli Khater's Resume
Ali Khater's Resume
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Glad CV
Glad CVGlad CV
Glad CV
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAE
 
Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15
 
Mahmoud
MahmoudMahmoud
Mahmoud
 
D naiyer resume
D naiyer resumeD naiyer resume
D naiyer resume
 
abdallah_ghonaimat_CV
abdallah_ghonaimat_CVabdallah_ghonaimat_CV
abdallah_ghonaimat_CV
 

nestor

  • 1. NESTOR S. DUNGCA 20-32 Rosa St. Timog Park Subdivision Angeles City, Pampanga, Philippines, C 2009 E-mail: nestordungca070653@yahoo.com Cellphone (Philippines) #: +63-9166462252 Personal Data: Date of Birth: July 6, 1955 Marital Status: Married Citizenship: Filipino Education: Bachelor of Science in Electrical Engineering Graduated: March 25, 1979 Board Exam: (passed) Electrical Engineering Organization: Member of Engineering Societyof Engineers Dubai – 2009 Member of Philippine Societyof Electrical Engineers – 1985 Member for the Association ofSafety Engineers ofthe Philippines -1986 Member of Rotary Club Angeles City, Pampanga Chapter - 1989 Objective: Ability to analyze complexelectrical engineering problems to evaluate and recommend alternatives and communicates recommendations effectively. Knowledge & ability for general building services supervision, final assessment & review/ approval of all electrical design drawings,specifications and project contractprior for tendering and awarding/construction.Seeking fulltime position with engineering & consultancy& Construction Companylocal & overseas Summary of Qualifications: Wide experience in all aspects ofgeneral electrical services supervision,& inspections and other related electrical engineering works activities to include mechanical works in the Construction & Development of the luxurious resorthotel,mixed-use towers,commercial, & industrial, hospital,airport & MRT/ Dubai facilities school building,amusement park & other related electrical engineering projects in overseas. Knowledge in design / drawings review/approved & other projectdocuments involved in the projects such as monitoring & inspections ofvarious general installation of(Low & & High Voltage) to include ELV’s systems. Liaising, coordinating,& meetings with MEP.s contractor’s/sub contractor’s,suppliers/manufacturers, consultants & clientrepresentatives, local authority& others involved in the projects. Ability & knowledgeable & experience to interpretthe contents of mechanical & architectural construction drawings within specifications requirementin relation with the electrical drawings & specifications requirement to be utilized in the projects. Knowledge to coordinate with all local authorities for final approval of all LV/HV equipment prior for actual site installations of all electrical (LV/ HV & ELV’s) base on approved construction drawings for commencementofsite works in the project. Well verse & knowledge in all type of general electrical engineering’s design & specifications,project planning and other administrative works for the construction & Development ofJumeirah Beach Hotel, mixed-use Towers Airport,MRT, (Dubai) & motor race track facilities,hospital & school building in relation of all general engineering works to include testing . Knowledge in hotel / water park supervision & electrical maintenance works to include mechanical/HVAC/ Plumbing & ELV’s/ electronic system. PPM of of all electrical equipment in hotel/water park in overseas. Employment History: From 1981 to mid of1992,joined 13thUS Air Project Management Office at Clark Air Base, Angeles City, Philippines as an Electrical Engineering Inspector (general)- Responsible & overall in-charge for all various inspections for all aspects of electrical (LV/HV) & ELV’s system
  • 2. installations.To review/ approved all contractors electrical drawings,brochures and samples and other documents involved in the projects. Checking all contractor’s commissioning testing activities for the improvement & development/ refurbishmentof 13th US Air force airportdeparture & arrival building to include facilities and the high voltage underground cabling from power generation plant. Erect Underground HVcabling o for 750KVA/1000/KVA/ 1500KVA power transformers by the electrical contractors for the Developmentof 13th US Air Force hospital,Clark Airport & Chamber Hall building,& primaryschool and Air Force Quarter Buildings & recreation building facilities and other infrastructure inside American Base,Clark,Angeles City, Pampanga, Philippines. After removal of American in US base in the Philippines in 1992,then in the end of 1992, I hired by Turner & Steiner International, New York City in Manila, Philippines as an Electrical Building Services Engineer- (1992 to 1994) for the SunsetBeach Resort Development, which is own and operated by FAMA Holding Company,Riyadh,Saudi Arabia. Then in July 1994 till 1999,joined & worked in W/S Atkins and Partners Overseas, Dubai, an engineering ,design & consultancyfirm as Senior Electrical Engineer (site operation) to oversee & overall manage/monitoring & inspectall the aspects of the contractors electrical installations to include electrical testing & commissioning,(LV/HV & ELV system’s) for BURJ Al ARAB Hotel, Wild Wadi Water Park, Dubai. After completion ofthe projects in 1999,assigned & to manage & monitor electrical works activities by the electrical contractor’s involved for the Construction ofWild Wadi Water Park and 19 Units Chalets In mid-1999,Jumeirah International LLC,Dubai borrowed myservice to my consulting companyto manage and oversees all aspects ofelectrical maintenance services in Wild Wadi Water Park. In August2001, WS Atkins & Partners Overseas,Dubai,recall my service for a new appointment, to manage the Construction of JESS School,Dubai & other projects in Dubai. After completion ofthe school projectin end of 2010, I transfer in various mixed-use tower project’s in Jumeirah Lake Towers,Dubai,till completion 20011 then,moved in Abu Dhabi,UAE for other two (2) - new mixed-use tower projects,ad resigned in mid of2011 for good. End of 2012 to 2015,I was recruited by the local construction & engineering companyas Electrical Project Manager- Responsible for the overall site management& the accomplishment for entire electrical work activities ( LV/ HV & ELV’s) installations & testing to include and electronic equipment& cabling installations in the developmentof WIDUS Hotel & casino building facilities . Involved and coordinate to the local authorities for obtaining electrical power connection to include internetconnection in the building prior for handing over to the clientand usage. Work Experience :- (1981 to 2015): 1.). Voltas Construction & Engineering Company, Philippines- Electrical Project Manager- Nov. 5, 2012 – Nov. 30, 2015 3rd floor, Room 305 & 304, Sarmiento Building, Ayala, Makati City, Metro Manila Philippines Tel. no. +63 9166462262 a). Overall in-charge for all aspects ofthe general electrical site activities (HV/ LV/ELV) of the Developmentof WIDUS Hotel& Casino,Clark free port zone, Philippines from installations, Testing & Commissioning and handing over of the projecton date completion to the client.Working for proper liaising & coordinating & reportto Project Director of VEC Co. in bi-weekly/ monthly. Liaise with the consultantfor projectrequirements. 2) .Turner & Steiner International, Saudi - Electrical Building Services Engineer - May 15,1992 – June 1, 1994 PO Box 52352,Aziziyah Rd. Al Khobar Saudi Arabia Tel. no. +92565629 a). To oversees all aspects ofthe general electrical building services activities of electrical project from bidding to construction implementation base on the clientapproved budget.Liaise/coordinate to the engineering consultant/ 7 Clientfor any problem arise during construction.Final review all electrical contractor monthly progress billing and approved for payment.
  • 3. Coordinate with clientrepresentative for any change required by the clientrequirement.Monthly walk aboutwith th e site projectconsultant,contractor engineers & client,engineers to ensure that all installations are carried outas per standard and projectdrawings requirements. 3.). WS Atkin’s Partners Overseas- General Electrical Engineering Inspector - July 7,1994 – November 7, 1998 Duties: Responsible to review/ approved of all the electrical contractor construction drawings, technical brochures, samples, Programme of Works, SOW and other documents used in the projects. Liaise and coordinate to the local authority for obtaining power and other services in the projects. Oversees & inspect & comments of all installed electricals containments, t, cable, LV bus bar trucking, LV panels, SMDBs, DBs Capacitors & other electrical equipment utilized in the projects. Liaise with the electrical contractors/ sub- contractors for actual Testing & Commissioning of all installed electrical services and provide record for approval prior for request of inspection to the authority in obtain electrical power ‘ON’ Attended coordination & progress meetings in weekly basis with the client, contractors, sub-contractors, suppliers & other involved in the projects. Provide weekly/ bi monthly reports for the Senior Resident Engineer. Review all Contractors technical queries and suggest comments and to be submitted to the electrical designed for review and final comments. & ETC. Act as safety engineer on site. 4). Jumeirah Beach Hotel/ Water Park, Dubai) – Assistant Chief Engineer August 5, 1998 - August 16, 2001 PO Box 28, Jumeirah Road,Dubai.UAE Duties: a). Responsible for proper implementation ofoperation/maintenance & provide monthly PPM of all electro- mechanical equipment& building services to ensure thatall work carried out are within Operation & Manual of the hotel/ water park. 5). WS Atkins Partner’s & Overseas, Dubai- Senior Electrical Engineer (General) - September 8, 2001 – June 9, 2011 PO Box 5620 Dubai,UAE Tel. No. 091 -4-4059300 Website:atkins.global.com Duties: A). Responsible to manage/ oversees & inspects all the electrical, mechanical contractors performance ofwork activities on site installation regarding work standard & regulation for the compliance with the approved construction drawings,specifications,Scope ofWork & Program of Work of the projects,such as: JESS school Autodrome,(motor sport) Jumeirah Lake Towers & Gulf News Building Facilities, Dubai to include mixed-use tower in Abu Dhabi. Assigned electrical site engineers,inspectors and other staffpersonnel to the designated projectin daily basis till completion.Liaise/coordinate to the local authorities in relation ofElectrical power,Fire Alarm Detection System inspection,Convergence Structured Cabling system connection and other works necessaryto complete the projects. Liaise/coordinate with client& other involved in the projects delay& due some site changes bythe contractors & date completion & usage….& ETC. 6.). 13th US Air Force Project Management Office- Electrical Engineering Inspector – March 30, 1982 February 8, 1992 Room 206,2nd Floor US Airforce PMO 2nd Floor, Contracting Center Building, Marat Highway, Clark Air Base Angeles City, Pampanga,Philippines
  • 4. Duties: a). Responsible to oversees ofall the general electrical inspection ofcontractor installation to include Testing & Commissioning ofall low voltage & medium voltage equipment& cabling within the assigned projects inside Clark Air Base,Phil. Review/ Approved all electrical contractors drawings,samples,Scope of Works & Program & other documents as per projectspecifications & contractrequirement.Prepare/submit progress report with the Senior Project Manager for any site developmentand weight(%) accomplishment and other electrical contractors issue & other related problem involved on site, Meeting with the Contractors,sub- contractors, supplier’s client& other involved in the projectregarding progress and site projectissue.Attended all weekly/ monthlycoordination & progress meetings with the consultant& stock holders & main contractors & sub -contractors # Competed Projects: (General Electrical Engineering Works) Local Projects: (Inside Clark Air Base,Phil.): 1981 to 1992 1). MAC Terminal Building Facilities,(departure & arrival bldg.) 2). 100 Units – Developmentof Junior & Senior Officer Residential Quarters,Clark 3). Refurbishments of7th floor - US 13th Air Force Medical Center. Clark 4 Refurbishment’s ofUS Air Force Chamber Hall,Clark 5). Underground HV Cablings,Clark 6). Development of WIDUS Hotel & Casino,Clark free fort Zone, Phil. Overseas Projects: (General Electrical Engineering)- 1992 to 2011) 1) Jumeirah Beach Resort,Dubai 2). Burj Al Arab Hotel, Dubai 3). 10 units of 2 &3 Bedroom Chalets,Dubai 4). Wild Wadi Water Park, Dubai 5). Jumeirah English Speaking School,and manyother sportfacilities,Dubai 6). Autodrome – motor Race Track and building facilities,Dubai 7) JESS English Speaking School Building Facilities,Dubai 8). Jumeirah Lake Towers,Dubai 9). Dubai MRT - U/G Building Stations Facilities,Dubai 10). Dubai Airport Departure & Arrival Building Facilities and others 11). GULF NEWS Building Facilities,Dubai and others Last page: -