This document outlines the phases of an energy audit process. It discusses 3 phases - preparing for the audit, the facility inspection, and implementation. In phase 1, the auditor gathers data on the facility including analyzing energy bills, weather data, facility layout, operating hours and equipment. Tools and safety considerations are also addressed. Phase 2 involves an introductory meeting, interviews, an initial walkthrough tour and gathering detailed data on the facility's energy systems. Phase 3 is when recommendations are implemented.
The judicious and effective use of energy to maximize profits (minimize
costs) and enhance competitive positions”
The strategy of adjusting and optimizing energy, using systems and procedures so as to reduce energy requirements per unit of output while holding constant or reducing total costs of producing the output from these systems”
An energy audit is an inspection survey and an analysis of energy flows for energy conservation in a building. It may include a process or system to reduce the amount of energy input into the system without negatively affecting the output. In commercial and industrial real estate, an energy audit is the first step in identifying opportunities to reduce energy expense and carbon footprint.
energy audit checklist
energy audit companies near me
mass save home energy assessment
home energy audit near me
do it yourself energy audit
energy audit free
free home energy audit
eversource energy audit
eversource home energy audit ct
energy audit checklist
energy audit report sample
what is an energy auditor
energy audit for home
energy audit equipment
energy audit program
home energy audit cost
energy audit ppt
interesting civil engineering topics
seminar topics pdf
civil engineering topics for presentation
civil seminar topics ppt
best seminar topics for civil engineering
seminar topics for mechanical engineers
civil engineering ppt
latest civil engineering seminar topics
The judicious and effective use of energy to maximize profits (minimize
costs) and enhance competitive positions”
The strategy of adjusting and optimizing energy, using systems and procedures so as to reduce energy requirements per unit of output while holding constant or reducing total costs of producing the output from these systems”
An energy audit is an inspection survey and an analysis of energy flows for energy conservation in a building. It may include a process or system to reduce the amount of energy input into the system without negatively affecting the output. In commercial and industrial real estate, an energy audit is the first step in identifying opportunities to reduce energy expense and carbon footprint.
energy audit checklist
energy audit companies near me
mass save home energy assessment
home energy audit near me
do it yourself energy audit
energy audit free
free home energy audit
eversource energy audit
eversource home energy audit ct
energy audit checklist
energy audit report sample
what is an energy auditor
energy audit for home
energy audit equipment
energy audit program
home energy audit cost
energy audit ppt
interesting civil engineering topics
seminar topics pdf
civil engineering topics for presentation
civil seminar topics ppt
best seminar topics for civil engineering
seminar topics for mechanical engineers
civil engineering ppt
latest civil engineering seminar topics
Solitis Electrical Solutions Pvt. Ltd. is multi-disciplined management and engineering consultancy in Pune, Maharashtra that provides complete electrical engineering design and project management services. We are also actively involved in trading of electrical equipment and components along with consultancy.
Solitis Electrical Solutions Pvt. Ltd. is multi-disciplined management and engineering consultancy in Pune, Maharashtra that provides complete electrical engineering design and project management services. We are also actively involved in trading of electrical equipment and components along with consultancy.
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
This paper addresses the vulnerability of deep learning models, particularly convolutional neural networks
(CNN)s, to adversarial attacks and presents a proactive training technique designed to counter them. We
introduce a novel volumization algorithm, which transforms 2D images into 3D volumetric representations.
When combined with 3D convolution and deep curriculum learning optimization (CLO), itsignificantly improves
the immunity of models against localized universal attacks by up to 40%. We evaluate our proposed approach
using contemporary CNN architectures and the modified Canadian Institute for Advanced Research (CIFAR-10
and CIFAR-100) and ImageNet Large Scale Visual Recognition Challenge (ILSVRC12) datasets, showcasing
accuracy improvements over previous techniques. The results indicate that the combination of the volumetric
input and curriculum learning holds significant promise for mitigating adversarial attacks without necessitating
adversary training.
Hierarchical Digital Twin of a Naval Power SystemKerry Sado
A hierarchical digital twin of a Naval DC power system has been developed and experimentally verified. Similar to other state-of-the-art digital twins, this technology creates a digital replica of the physical system executed in real-time or faster, which can modify hardware controls. However, its advantage stems from distributing computational efforts by utilizing a hierarchical structure composed of lower-level digital twin blocks and a higher-level system digital twin. Each digital twin block is associated with a physical subsystem of the hardware and communicates with a singular system digital twin, which creates a system-level response. By extracting information from each level of the hierarchy, power system controls of the hardware were reconfigured autonomously. This hierarchical digital twin development offers several advantages over other digital twins, particularly in the field of naval power systems. The hierarchical structure allows for greater computational efficiency and scalability while the ability to autonomously reconfigure hardware controls offers increased flexibility and responsiveness. The hierarchical decomposition and models utilized were well aligned with the physical twin, as indicated by the maximum deviations between the developed digital twin hierarchy and the hardware.
Cosmetic shop management system project report.pdfKamal Acharya
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
Overview of the fundamental roles in Hydropower generation and the components involved in wider Electrical Engineering.
This paper presents the design and construction of hydroelectric dams from the hydrologist’s survey of the valley before construction, all aspects and involved disciplines, fluid dynamics, structural engineering, generation and mains frequency regulation to the very transmission of power through the network in the United Kingdom.
Author: Robbie Edward Sayers
Collaborators and co editors: Charlie Sims and Connor Healey.
(C) 2024 Robbie E. Sayers
Water scarcity is the lack of fresh water resources to meet the standard water demand. There are two type of water scarcity. One is physical. The other is economic water scarcity.
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
About
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Technical Specifications
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
Key Features
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface
• Compatible with MAFI CCR system
• Copatiable with IDM8000 CCR
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
Application
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
CFD analysis is incredibly effective at solving mysteries and improving the performance of complex systems!
Here's a great example: At a large natural gas-fired power plant, where they use waste heat to generate steam and energy, they were puzzled that their boiler wasn't producing as much steam as expected.
R&R and Tetra Engineering Group Inc. were asked to solve the issue with reduced steam production.
An inspection had shown that a significant amount of hot flue gas was bypassing the boiler tubes, where the heat was supposed to be transferred.
R&R Consult conducted a CFD analysis, which revealed that 6.3% of the flue gas was bypassing the boiler tubes without transferring heat. The analysis also showed that the flue gas was instead being directed along the sides of the boiler and between the modules that were supposed to capture the heat. This was the cause of the reduced performance.
Based on our results, Tetra Engineering installed covering plates to reduce the bypass flow. This improved the boiler's performance and increased electricity production.
It is always satisfying when we can help solve complex challenges like this. Do your systems also need a check-up or optimization? Give us a call!
Work done in cooperation with James Malloy and David Moelling from Tetra Engineering.
More examples of our work https://www.r-r-consult.dk/en/cases-en/
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
Energy Auditing.pptx
1. ME 415: Energy Management and
Planning 3(2,1)
Lectures
Course Instructor:
Dr. Muhammad Farooq
Assistant Professor
engr.farooq@uet.edu
.pk
B.Sc.
Mechanical
Engineering
2.
3.
4.
5. Energy Loss
Where and how do most of the losses occur,
how much energy is actually lost and are they
controllable or recoverable? The answers to
these questions remain well concealed in a
black box where once energy is input, we do not
know what really happens to it inside and how
much the losses are. It is only when we look into
the black box and extract these details that we
are able to ascertain the performance of the
overall or process levels and respond more
effectively to the weaknesses in energy
management.
6. Energy audit:
Energy audit is a systematic study or survey to
identify how energy is being used in a building or
plant, and identifies energy savings opportunities.
Using proper audit methods and equipment, an
energy audit provides the energy manager with
essential information on how much, where and
how energy is used within an organization
(factory or building).
7. Contents:
Phases of Energy Audit:
Phase 1….Preparing for Energy Audit
Phase 2….The Facility Inspection
Phase 3….Implementations
9. The energy audit process starts with an
examination of the historical and descriptive
energy data for the facility. Specific data that
should be gathered in this preliminary phase
contains:
Gathering Data on Facility
Tools for the Audit
Safety Considerations.
10. Gathering Data on Facility
Gathering Data on Facility includes:
Analysis of Bills
Geographic Location / Weather Data
Facility Layout
Operating Hours
Equipment List
11. Analysis of Bills
The audit must begin with a detailed analysis
of the energy bills for the previous twelve
months. This is important for several reasons:
the bills show the proportionate use of each
different energy source when compared to the
total energy bill; an examination of where
energy is used can point out previously
unknown energy wastes.
14. Geographic Location / Weather Data
The geographic location of the facility should be
noted, together with the weather data for that
location. The state energy office can provide the
average degree days for heating and cooling for that
location for the past twelve months. This degree-day
data will be very useful in analyzing the energy
needed for heating or cooling the facility. Heating
degree days (HDD) are specific to a particular
geographic location. The degree day concept
assumes that the average building has a desired
indoor temperature of 70°F,
15. Geographic Location / Weather Data
and that 5°F of this is supplied by internal heat
sources such as lights, appliances, equipment, and
people. Thus, the base for computing HDD is 65°F.
If there were a period of three days when the
outside temperature averaged 50°F each day,
then the number of HDD for this three
day period would be:
HDD = (65° – 50°) × 3 days = 45 degree days.
16. Facility Layout
Next the facility layout or plan should be obtained,
and reviewed to determine the facility size, floor plan,
and construction features such as wall and roof
material and insulation levels, as well as door and
Window sizes and construction. A set of building
plans could supply this information in sufficient
detail.
17. Operating Hours
Operating hours for the facility should also be
obtained. How many shifts does the facility run? Is
there only a single shift? Are there two? Three?
Knowing the operating hours in advance allows some
determination as to whether any loads could be
shifted to off-peak times. Adding a second shift can
often reduce energy bills because the energy costs
during second and third shifts are usually
substantially cheaper. In Chapter Three for an
explanation of on-peak and off-peak electric rates.
18. Equipment List
Finally, the auditor should get an equipment list for
the facility and review it before conducting the audit.
All large pieces of energy Consuming equipment
such as heaters, boilers, air conditioners, chillers,
water heaters, and specific process-related
equipment should be identified. This list, together
with data on operational uses of the equipment
allows the auditor to gain a good understanding of
the major energy-consuming tasks or equipment at
the facility.
19. Tools for the Audit
To obtain the best information for a successful
energy cost control program, the auditor must make
some measurements during the audit visit. The
amount of equipment needed depends on the type of
energy consuming equipment used at the facility. For
example, if waste heat recovery is being considered,
then the auditor must take substantial temperature
measurement data from potential heat sources. Tools
commonly needed for energy audits include the
following:
20. Tools for the Audit
Tape Measures
Light meter
Thermometer
Voltmeter
Wattmeter / power factor meter
Combustion Analyzer
Ultrasonic leak Detector
Air flow measurement Devises
Safety Equipment.
21. Safety Considerations
Safety is a critical part of any energy audit. The
auditor and the audit team should have a basic
knowledge of safety equipment and procedures.
Before starting the facility tour, the auditor or audit
team should be thoroughly briefed on any specialized
safety equipment and procedures for the facility.
They should never place themselves in a position
Where they could injure themselves or other people
at the facility.
22. Safety Checklist
Electrical:
• Avoid working on live circuits, if possible.
•Securely lock circuits and switches in the off
position before working on a piece of
equipment.
• Always keep one hand in your pocket while
making measurements on live circuits to help
prevent accidental electrical shocks.
Respiratory:
•When necessary, wear a full face respirator
mask with adequate filtration particle size.
23. Safety Checklist
•Use activated carbon cartridges in the mask
when working around low concentrations of
noxious gases.
•Use a self-contained breathing apparatus for
work in toxic environments.
Hearing:
•Use foam insert plugs while working around
loud machinery to reduce sound levels by
nearly 30 decibels.
25. Facility Inspection
overall audit process. Data gathered on this
The facility inspection is an important part of the
tour
,
together with an extensive analysis of this data will result
in an audit report that includes a complete description of
the time-varying energy consumption patterns of the
facility, a list of each piece of equipment that affects the
energy consumption together with an assessment of its
condition, a chronology of normal operating and
maintenance practices, and a list of recommended energy
management ideas for possible implementation.
27. Introductory Meeting
The audit leader should start the audit by meeting with
the facility manager and the maintenance supervisor. He
should briefly explain the purpose of the audit and
indicate the kind of information the team needs to obtain
during the facility tour. If possible, a facility employee
who is in a position to authorize expenditures or make
operating policy decisions should be at this initial
meeting.
28. Audit Interviews
Getting the correct information on facility equipment and
operation is important if the audit is going to be most successful
in identifying ways to save money on energy bills. The company
philosophy towards investments, the impetus behind requesting
the audit, and the expectations from the audit can be determined
by interviewing the general manager, chief operating officer, or
other executives. The facility manager or plant manager should
have access to much of the operational data on the facility, and a
file of data on facility equipment. The finance officer can provide
any necessary financial records, such as utility bills for electric,
gas, oil, other fuels, water and wastewater, expenditures for
maintenance and repair, etc.
29. Audit Interviews (cont..)
The auditor must also interview the floor supervisors and
equipment operators to understand the building and
process problems. Line or area supervisors usually have
the best information on the times their equipment is
used. The maintenance supervisor is often the primary
person to talk to about types of lighting and lamps, sizes
of motors, sizes of air conditioners and space heaters,
and electrical loads of specialized process equipment.
Finally, the maintenance staff must be interviewed to
find the equipment and performance problems.
30. Initial Walk-through Tour
An initial facility/plant tour should be conducted by the
facility/ plant manager, and should allow the auditor or
audit team to see the major operational and equipment
features of the facility. The main purpose of the initial
tour is to obtain general information, and to obtain a
general understanding of the facility’s operation. More
specific information should be obtained from the
maintenance and operational people during a second, and
more detailed data collection tour.
31. Gathering Detail Data
Following the initial facility or plant tour, the auditor or
audit team should acquire the detailed data on facility
equipment and operation that will lead to identifying the
significant Energy Management Opportunities (EMOs) that
may be appropriate for this facility. This data is gathered
by examining the nine major energy-using systems in the
facility.
As each of these systems are examined, the following
questions should be asked:
32. Gathering Detail Data
1. What function(s) does this system serve?
2. How does this system serve its function(s)?
3. What is the energy consumption of this system?
4. What are the indications that this system is probably working?
5. If this system is not working, how can it be restored to good
working
condition?
6. How can the energy cost of this system be reduced?
7. How should this system be maintained?
8. Who has direct responsibility for maintaining and improving the
operation and energy efficiency of this system?
33. Examination of Different Systems
• The building envelope
• The boiler and steam distribution system
• The heating, ventilating, and air conditioning system
• The electrical supply system.
• Lights, windows, and reflective surfaces
• The hot water distribution system
• Air compressors and the air distribution system.
• Motors
• Manufacturing processes
36. Preliminary Identification of
Energy Management Opportunities
As the audit is being conducted, the auditor should take
notes on potential EMOs that are evident. As a general
rule, the greatest effort should be devoted to analyzing
and implementing the EMOs which show the greatest
savings, and the least effort to those with the smallest
savings potential. Therefore, the largest energy and cost
activities should be examined carefully to see where
savings could be achieved.
37. Preliminary Identification of
Energy Management Opportunities
Identifying EMOs requires a good knowledge of the available
energy efficiency technologies that can accomplish the same
job with less energy and less cost. For example, over-lighting
indicates a potential lamp removal or lamp change EMO, and
inefficient lamps indicate a potential lamp technology change.
Motors with high use times are potential EMOs for high
efficiency replacements. Notes on waste heat sources should
indicate what other heating sources they might replace, and
how far away they are from the end use point. Identifying any
potential EMOs during the walk-through will make it easier later
on to analyze the data and to determine the final EMO
recommendations
38. The Energy Audit Report
The next step in the energy audit process is to prepare a
report which details the final results of the
analyses and provides energy cost
energy
saving
recommendations. The length and detail of this report will
vary depending on the type of facility audited. A
residential audit may result in a computer printout from
the utility. An industrial audit is more likely to have a
detailed explanation of the EMOs and benefit-cost
analyses.
39. Energy Audit Report Format
Executive Summary
A brief summary of the recommendations and cost savings
Table of Contents
Introduction
Purpose of the energy audit
Need for a continuing energy cost control program
Facility Description
Product or service, and materials flow
Size, construction, facility layout, and hours of operation
Equipment list, with specifications
40. Energy Audit Report Format
Energy Bill Analysis
Utility rate structures
Tables and graphs of energy consumptions and costs
Discussion of energy costs and energy bills
Energy Management Opportunities
Listing of potential EMOs
Cost and savings analysis
Economic evaluation
41. Energy Audit Report Format
Energy Action Plan
Recommended EMOs and an implementation schedule
Designation of an energy monitor and ongoing program
Conclusion
Additional comments not otherwise covered
42. The Energy Action Plan
An important part of the energy audit report is the
recommended action plan for the facility. Some companies
will have an energy audit conducted by their electric utility
or by an independent consulting firm, and will then make
changes to reduce their energy bills. They may not spend any
further effort in the energy cost control area until several
years in the future when another energy audit is conducted.
In contrast to this is the company which establishes a
permanent energy cost control program, and assigns one
person—or a team of people—to continually monitor and
improve the energy efficiency and energy productivity of the
company.
44. IMPLEMENTING THE AUDIT
RECOMMENDATIONS
The Energy Action Team:
Now that the preliminary audits have uncovered some
energy management measures that can save significant
amounts of money or can substantially improve
production, funding for the changes and employee
support are two additional critical ingredients for
success. These can best be obtained with the help of a
committee, preferably called something like the energy
action team.
45. Functions of the Energy Action
Committee
1. Create support within the company for energy
management.
2. Generate new ideas.
3. Evaluate suggestions
4. Set goals.
5. Implement the most promising ideas.
46. Monitoring
Energy management is not complete without
monitoring and its associated feedback, and
neither is the energy audit process. In an energy
audit, monitoring discloses what measures
contributed toward the company goals, what
measures were counterproductive, and whether
the goals themselves were too low or too high.