Emergency Plan
• An Emergency is an unexpected and difficult or dangerous situation,
especially an accident, which happens suddenly, and which requires
quick action to deal with it.
• Emergency Plan means a description of the objectives, policy and
concept of operations for the response to an emergency and of the
structure, authorities and responsibilities for a systematic, coordinated
and effective response.
9/11/2022 2
Objectives of Emergency Plan
• The objective is to be prepared to:
• Prevent fatalities and injuries
• Reduce damage to buildings, stock, and equipment
• Protect the environment and the community
• Accelerate the resumption of normal operations
9/11/2022 3
How to develop an emergency dealing plan
• Development of the plan should include following considerations:
• Hazard identification/assessment
• Emergency resources
• Communication systems
• Administration of the plan
• Emergency response procedure
• Communication of the procedure
• Debriefing and post-traumatic stress procedure
9/11/2022 4
Hazard Identification / Assessment
• The process of hazard identification and assessment involves a thorough
review that should include, but not be limited to, the following points:
• Transportation, materials handling, equipment installation, temporary structures,
material storage, start-up, and commissioning activities
• environmental concerns
• resources such as material safety data sheets (MSDSs) to determine potential
hazards from on-site materials
• proximity to traffic and public ways
• For each hazard identified, ask:
• What can go wrong?
• What are the consequences?
9/11/2022 5
Emergency Resources
• It is important to identify which resources are available and have
contingency plans in place to make up for any deficiencies.
• On-site resources such as fire extinguishers, spills containment
equipment, and first aid kits must be maintained and clearly
identified.
• Personnel, especially on-site medical staff or workers trained in first
aid, should be included in the plan.
• Resources may have to be obtained and kept on site which may
include fire protection or ambulance/medical resources in remote
areas
9/11/2022 6
Communication System
• The type and location of emergency communication systems must be
posted on the project.
• Location of telephones, a list of site personnel with cellular phones or two-
way radios, and any other equipment available.
• Emergency phone numbers and the site address/location should be
posted beside all site phones.
9/11/2022 7
Administration of the Plan
• The person who has the task of administering and organizing the plan
is the person in charge of the emergency response.
• It is their task to ensure
• that everyone clearly understands their roles and responsibilities within the
emergency response plan (a chart may be helpful in this regard)
• that emergency resources, whether people or equipment, are kept at
adequate levels in step with the progress of the project.
• It is very important to review the emergency plan on a regular basis
and especially after an emergency has occurred.
9/11/2022 8
Emergency Response Procedure
• The following list covers basic actions to take in an emergency
• Stay calm
• Assess the situation
• Take command
• Provide protection
• Aid and manage
• Maintain contacts
• Guide emergency services
9/11/2022 9
Communication of the procedure
• Communicate the procedure to all site personnel
• Review the procedure
• with site subcontractors and new workers
• with suppliers
• Review new work areas in operating plants with owner/client
• Review the procedure with the Health and Safety Representative on a regular
basis to address new hazards or significant changes in site conditions
• Post the procedure in a clearly visible location
• The procedure for a construction project must continually undergo
review and revision to meet changing conditions.
9/11/2022 10
Debriefing and Post-Traumatic Stress
Procedure
• Once the emergency is over, the attitude should not be “Okay, let’s
get back to work” or “Let’s go home.”
• Some of the people involved may need assistance in order to recover.
• In some cases, professional counselling may be needed.
• Construction companies should have measures in place to deal with
post-traumatic stress.
• Debriefing is necessary to review how well the plan worked in the
emergency and to correct any deficiencies that were identified.
9/11/2022 11
Thank you
9/11/2022 12

More Related Content

Similar to Emergency Dealing Plan

Copy of exo sylvan
Copy of exo sylvanCopy of exo sylvan
Copy of exo sylvan
Dave Ronca
 
Lone Working Policy
Lone Working Policy Lone Working Policy
Lone Working Policy
The Pathway Group
 
Building evacuations & emergencies
Building evacuations & emergenciesBuilding evacuations & emergencies
Building evacuations & emergencies
Terry Masse
 
Disaster Shield Power Point Current 9 7 11
Disaster Shield Power Point Current 9 7 11Disaster Shield Power Point Current 9 7 11
Disaster Shield Power Point Current 9 7 11
timothyford
 
EMERGENCY PREPAREDNESS & RESPONSE.pptx
EMERGENCY PREPAREDNESS & RESPONSE.pptxEMERGENCY PREPAREDNESS & RESPONSE.pptx
EMERGENCY PREPAREDNESS & RESPONSE.pptx
EmmanuelAlajemba
 
Lone Working Policy
Lone Working PolicyLone Working Policy
Lone Working Policy
The Pathway Group
 
Business Continuity for VOAD's
Business Continuity for VOAD'sBusiness Continuity for VOAD's
Business Continuity for VOAD's
Bonnie Canal
 
Underground Cable Strikes - Best Practice Guidelines For Construction Compani...
Underground Cable Strikes - Best Practice Guidelines For Construction Compani...Underground Cable Strikes - Best Practice Guidelines For Construction Compani...
Underground Cable Strikes - Best Practice Guidelines For Construction Compani...
Thorne & Derrick International
 
Disaster Recovery Policy
Disaster Recovery PolicyDisaster Recovery Policy
Disaster Recovery Policy
Continuity Control
 
510 safety and health programs 2015
510 safety and health programs 2015510 safety and health programs 2015
510 safety and health programs 2015
John Newquist
 
EMERGENCY_RESPONSE_AND_PREPAREDNESS[1].pptx
EMERGENCY_RESPONSE_AND_PREPAREDNESS[1].pptxEMERGENCY_RESPONSE_AND_PREPAREDNESS[1].pptx
EMERGENCY_RESPONSE_AND_PREPAREDNESS[1].pptx
EmmanuelAlajemba
 
DOC-20230308-WA0008.................pptx
DOC-20230308-WA0008.................pptxDOC-20230308-WA0008.................pptx
DOC-20230308-WA0008.................pptx
DebdattaMandal5
 
Contingency Planning.pptx
Contingency Planning.pptxContingency Planning.pptx
Contingency Planning.pptx
RinconadaNatlTecVocS
 
under construction unit 4
under construction unit 4under construction unit 4
under construction unit 4
LYRASIS
 
building economics.PPT LAESE, BUDGET MANAGEMENT
building economics.PPT LAESE, BUDGET MANAGEMENTbuilding economics.PPT LAESE, BUDGET MANAGEMENT
building economics.PPT LAESE, BUDGET MANAGEMENT
RiyaVerma238431
 
Contingency action plan - (Disaster Management)
Contingency action plan - (Disaster Management)Contingency action plan - (Disaster Management)
Contingency action plan - (Disaster Management)
Numaan Tole
 
Contingency action plan in disaster managment
Contingency action plan in disaster managmentContingency action plan in disaster managment
Contingency action plan in disaster managment
Samraiz Tejani
 
All Organize and Maintain Equipment and Supplies-Accessories - Copy.pptx
All Organize and Maintain Equipment and Supplies-Accessories - Copy.pptxAll Organize and Maintain Equipment and Supplies-Accessories - Copy.pptx
All Organize and Maintain Equipment and Supplies-Accessories - Copy.pptx
Behailuzenebe1
 
Key Elements of CMS Emergency Preparedness Regulations
Key Elements of CMS Emergency Preparedness RegulationsKey Elements of CMS Emergency Preparedness Regulations
Key Elements of CMS Emergency Preparedness Regulations
Conference Panel
 
FINAL BUILDING LIFECYCLE.pdf
FINAL BUILDING LIFECYCLE.pdfFINAL BUILDING LIFECYCLE.pdf
FINAL BUILDING LIFECYCLE.pdf
RiyaVerma969022
 

Similar to Emergency Dealing Plan (20)

Copy of exo sylvan
Copy of exo sylvanCopy of exo sylvan
Copy of exo sylvan
 
Lone Working Policy
Lone Working Policy Lone Working Policy
Lone Working Policy
 
Building evacuations & emergencies
Building evacuations & emergenciesBuilding evacuations & emergencies
Building evacuations & emergencies
 
Disaster Shield Power Point Current 9 7 11
Disaster Shield Power Point Current 9 7 11Disaster Shield Power Point Current 9 7 11
Disaster Shield Power Point Current 9 7 11
 
EMERGENCY PREPAREDNESS & RESPONSE.pptx
EMERGENCY PREPAREDNESS & RESPONSE.pptxEMERGENCY PREPAREDNESS & RESPONSE.pptx
EMERGENCY PREPAREDNESS & RESPONSE.pptx
 
Lone Working Policy
Lone Working PolicyLone Working Policy
Lone Working Policy
 
Business Continuity for VOAD's
Business Continuity for VOAD'sBusiness Continuity for VOAD's
Business Continuity for VOAD's
 
Underground Cable Strikes - Best Practice Guidelines For Construction Compani...
Underground Cable Strikes - Best Practice Guidelines For Construction Compani...Underground Cable Strikes - Best Practice Guidelines For Construction Compani...
Underground Cable Strikes - Best Practice Guidelines For Construction Compani...
 
Disaster Recovery Policy
Disaster Recovery PolicyDisaster Recovery Policy
Disaster Recovery Policy
 
510 safety and health programs 2015
510 safety and health programs 2015510 safety and health programs 2015
510 safety and health programs 2015
 
EMERGENCY_RESPONSE_AND_PREPAREDNESS[1].pptx
EMERGENCY_RESPONSE_AND_PREPAREDNESS[1].pptxEMERGENCY_RESPONSE_AND_PREPAREDNESS[1].pptx
EMERGENCY_RESPONSE_AND_PREPAREDNESS[1].pptx
 
DOC-20230308-WA0008.................pptx
DOC-20230308-WA0008.................pptxDOC-20230308-WA0008.................pptx
DOC-20230308-WA0008.................pptx
 
Contingency Planning.pptx
Contingency Planning.pptxContingency Planning.pptx
Contingency Planning.pptx
 
under construction unit 4
under construction unit 4under construction unit 4
under construction unit 4
 
building economics.PPT LAESE, BUDGET MANAGEMENT
building economics.PPT LAESE, BUDGET MANAGEMENTbuilding economics.PPT LAESE, BUDGET MANAGEMENT
building economics.PPT LAESE, BUDGET MANAGEMENT
 
Contingency action plan - (Disaster Management)
Contingency action plan - (Disaster Management)Contingency action plan - (Disaster Management)
Contingency action plan - (Disaster Management)
 
Contingency action plan in disaster managment
Contingency action plan in disaster managmentContingency action plan in disaster managment
Contingency action plan in disaster managment
 
All Organize and Maintain Equipment and Supplies-Accessories - Copy.pptx
All Organize and Maintain Equipment and Supplies-Accessories - Copy.pptxAll Organize and Maintain Equipment and Supplies-Accessories - Copy.pptx
All Organize and Maintain Equipment and Supplies-Accessories - Copy.pptx
 
Key Elements of CMS Emergency Preparedness Regulations
Key Elements of CMS Emergency Preparedness RegulationsKey Elements of CMS Emergency Preparedness Regulations
Key Elements of CMS Emergency Preparedness Regulations
 
FINAL BUILDING LIFECYCLE.pdf
FINAL BUILDING LIFECYCLE.pdfFINAL BUILDING LIFECYCLE.pdf
FINAL BUILDING LIFECYCLE.pdf
 

Recently uploaded

A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
IJNSA Journal
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
drwaing
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
rpskprasana
 
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
Mukeshwaran Balu
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
Hitesh Mohapatra
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
SUTEJAS
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
gerogepatton
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
University of Maribor
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
ihlasbinance2003
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
Wearable antenna for antenna applications
Wearable antenna for antenna applicationsWearable antenna for antenna applications
Wearable antenna for antenna applications
Madhumitha Jayaram
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 

Recently uploaded (20)

A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
 
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
Wearable antenna for antenna applications
Wearable antenna for antenna applicationsWearable antenna for antenna applications
Wearable antenna for antenna applications
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 

Emergency Dealing Plan

  • 1. 9/11/2022 1 Emergency Dealing Plan Presented by: Raj Acharya 11th Sept 2022
  • 2. Emergency Plan • An Emergency is an unexpected and difficult or dangerous situation, especially an accident, which happens suddenly, and which requires quick action to deal with it. • Emergency Plan means a description of the objectives, policy and concept of operations for the response to an emergency and of the structure, authorities and responsibilities for a systematic, coordinated and effective response. 9/11/2022 2
  • 3. Objectives of Emergency Plan • The objective is to be prepared to: • Prevent fatalities and injuries • Reduce damage to buildings, stock, and equipment • Protect the environment and the community • Accelerate the resumption of normal operations 9/11/2022 3
  • 4. How to develop an emergency dealing plan • Development of the plan should include following considerations: • Hazard identification/assessment • Emergency resources • Communication systems • Administration of the plan • Emergency response procedure • Communication of the procedure • Debriefing and post-traumatic stress procedure 9/11/2022 4
  • 5. Hazard Identification / Assessment • The process of hazard identification and assessment involves a thorough review that should include, but not be limited to, the following points: • Transportation, materials handling, equipment installation, temporary structures, material storage, start-up, and commissioning activities • environmental concerns • resources such as material safety data sheets (MSDSs) to determine potential hazards from on-site materials • proximity to traffic and public ways • For each hazard identified, ask: • What can go wrong? • What are the consequences? 9/11/2022 5
  • 6. Emergency Resources • It is important to identify which resources are available and have contingency plans in place to make up for any deficiencies. • On-site resources such as fire extinguishers, spills containment equipment, and first aid kits must be maintained and clearly identified. • Personnel, especially on-site medical staff or workers trained in first aid, should be included in the plan. • Resources may have to be obtained and kept on site which may include fire protection or ambulance/medical resources in remote areas 9/11/2022 6
  • 7. Communication System • The type and location of emergency communication systems must be posted on the project. • Location of telephones, a list of site personnel with cellular phones or two- way radios, and any other equipment available. • Emergency phone numbers and the site address/location should be posted beside all site phones. 9/11/2022 7
  • 8. Administration of the Plan • The person who has the task of administering and organizing the plan is the person in charge of the emergency response. • It is their task to ensure • that everyone clearly understands their roles and responsibilities within the emergency response plan (a chart may be helpful in this regard) • that emergency resources, whether people or equipment, are kept at adequate levels in step with the progress of the project. • It is very important to review the emergency plan on a regular basis and especially after an emergency has occurred. 9/11/2022 8
  • 9. Emergency Response Procedure • The following list covers basic actions to take in an emergency • Stay calm • Assess the situation • Take command • Provide protection • Aid and manage • Maintain contacts • Guide emergency services 9/11/2022 9
  • 10. Communication of the procedure • Communicate the procedure to all site personnel • Review the procedure • with site subcontractors and new workers • with suppliers • Review new work areas in operating plants with owner/client • Review the procedure with the Health and Safety Representative on a regular basis to address new hazards or significant changes in site conditions • Post the procedure in a clearly visible location • The procedure for a construction project must continually undergo review and revision to meet changing conditions. 9/11/2022 10
  • 11. Debriefing and Post-Traumatic Stress Procedure • Once the emergency is over, the attitude should not be “Okay, let’s get back to work” or “Let’s go home.” • Some of the people involved may need assistance in order to recover. • In some cases, professional counselling may be needed. • Construction companies should have measures in place to deal with post-traumatic stress. • Debriefing is necessary to review how well the plan worked in the emergency and to correct any deficiencies that were identified. 9/11/2022 11