Cadastral Surveying and Mapping Level II
Organize and Maintain Equipment and
Supplies/Accessories
EIS CSM2 02 923
Behailu Z.
Learning Objectives/Out comes
At the end of this course the trainees will be able to:
LO1:Select equipment and Supplies/Accessories
 1.1 Checking specifications of equipment and supplies/accessories
 1.2 Select appropriate tools, equipment and Accessories
 1.3 Contingencies planning and risk management processes
 1.4 Checking safe working order of the equipment
 1.5 Allocating appropriate persons, equipment and accessories
 1.6 Monitoring and supervising the work
 1.7 Arranging equipment’s and accessories for transportation
 1.8 Personal protective equipment
 1.9 Updating equipment changes
3/9/2024 1
Cont’d………….
LO2: Outlay equipment and Supplies/ Accessories to be
used
 2.1 Allocating work for team members
 2.2 Operating equipment according to manufacturer
specifications and user manual.
 2.3 Equipment Adjustment, calibration and maintenance
LO3:Maintain and organize equipment for field work.
 3.1 Identifying unsafe or faulty equipment for maintenance
 3.2 Organizing unsafe or faulty equipment for repair according to
organizational guidelines
 3.3 Storing Tools, equipment and batteries properly according to
manufacturer’s specifications
3/9/2024 2
An Overview
Before starting any survey work/ activities:
 organize and maintain equipment and supplies or accessories
according to the specifications and organizational guidelines.
 make equipment ready for survey work.
 Check the equipment to ensure as it is in safe working condition.
 Arrange equipment and supplies or accessories for safe
transportation.
 Do not miss any item of equipment and supplies or accessories
to avoid loss of time and money.
3/9/2024 3
Cont’d.…………
 Prepare the following items:
• Tripod
• Battery Pack
• Tribrach
• Survey Controller
• Total Station
• Stake with nail
• Survey marker
• Power Cable
• Communication Cable
• Hammer and etc.
3/9/2024 4
Cont’d...........
• operate equipment according to manufacturer specifications and
user manual.
• Arrange adjustment, calibration and maintenance of equipment .
• Identify & arrange unsafe or faulty equipment in place for
maintenance.
• Organize repair work for unsafe or faulty equipment under
direction of relevant personnel and according to organizational
guidelines.
• store tools, equipment and batteries safely in an appropriate
location and according to manufacturer’s specifications.
3/9/2024 5
Cont’d……….
LO1: Select Equipment and Supplies or Accessories
1.1 Checking specifications of equipment and supplies/accessories
• Before using an instrument, make a visual inspection for
any damages.
• Check for any exposed machine surfaces including the
polished faces of lenses.
• The instrument motions should be checked to ensure they
have a smooth operation.
• The interior of the instrument should be cleaned regularly
in accordance with the specifications given by the
manufacturer.
3/9/2024 7
1.2 Select appropriate tools, equipment and
Accessories
3/9/2024 8
Cont’d……….
• If the dirt in the instrument is left to accumulate, it may
lead to uneven motion in the horizontal and vertical
movements.
• Use a camel’s-hair brush and clean soiled non-optical parts
with a soft cloth or with a clean chamois to remove the
dirt.
• The external lens surface should also be cleaned using a
lens tissue using liquids such as pure alcohol.
• Take care not to scratch lenses or their coating.
• Never touch optical glass with your fingers.
3/9/2024 9
Cont’d…………
• Do regular adjustment to the equipment to ensure it is
properly functioning and that accuracy of work is maintained.
 The following are good practices while using the surveying
instruments:
• The instrument should be removed and returned to its box
carefully.
• Tape should be straight when used and avoid stepping on it.
• The instruments with mechanical parts should be protected
from vibration and impact.
• The dirt and dust should be regularly cleaned from movable
parts of the instrument.
3/9/2024 10
Cont’d…………
• The clamping and adjusting screws should not be
tightened far more than necessary.
• The objective and eye piece lens should not be touched
with fingers.
• Raise the magnetic needle off the pivot of the instrument
when not in use.
• Recharge the battery after its use in the field. Also, carry a
spare battery for field work.
• Shelter total station against harsh weather elements using
an umbrella.
3/9/2024 11
Cont’d………..
• Charge the GPS station after a day’s work.
• When transporting a total station or theodolite
for long distances, return carefully into casing box.
• For medium distances release from tribes clamp
and carry from top handle.
• For short distances move it holding it vertically
upright.
3/9/2024 12
Cont’d………..
Total station
leveling equipment
3/9/2024 13
Cont’d………..
• Select instrument stations that won’t put instrument
man, instrument or team at danger during field work.
• Conduct daily inspection on the equipment used.
• Never leave the instruments unattended.
• Never point the total station or theodolite directly at
the Sun.
• Keep the shoes of the tripods clean and dirt free.
3/9/2024 14
1.3 Contingencies planning and risk management
processes
• Survey equipment should be taken care of with utmost
caution and in the correct manner.
• The chief party is responsible for his party’s equipment.
• Care must be taken against some of the following
potential risks that may affect the equipment adversely:
• Adverse weather conditions
e.g. rain, strong winds and high temperatures
• Wrong use of the equipment,
e.g. sitting on the equipment cover case
3/9/2024 15
Cont’d………..
• Setting up the equipment at dangerous
positions
e.g. near the edge of a valley, river bank or next
to a busy road.
• Leaving equipment in an unsecured location.
• Transporting the equipment in the wrong way.
• Lack of routine care practices
e.g. inspecting, cleaning and safely storing the
equipment.
3/9/2024 16
1.4 Checking safe working order of the equipment
Prepare checklist before embarking on further field
work procedures containing the following items:
• Date and time of picking the item
• Return date and time of the item
• Name of team party leader in charge of the
equipment
• Equipment name and number of items collected from
storage
• Officer in charge of the storage room
• Condition of the item taken
3/9/2024 17
1.5 Allocating appropriate persons to
equipment's and accessories
Identifying Professional Code of Ethics
Necessary requirements of Professional Land Surveyors:
• hold the safety, health and welfare of the public.
• perform services only in the areas of their competence/area of
specialization.
• public statements should be only in an objective and truthful
manner.
• act in professional manner to be faithful or trustees and avoid
conflicts of interest.
3/9/2024 18
Cont’d………..
• build professional reputations (prominence/being famous) on
the merit of the services that they deliver.
• act in a manner to uphold and enhance the honor, integrity,
and dignity of their profession.
• continue developing their profession throughout their
careers/job category.
• provide opportunities for developing the profession of those
under their supervision.
3/9/2024 19
1.6 Monitoring and supervising the work
Q1. What is monitoring and what is supervising?
Q2. what is the similarity and difference between
the words monitoring and supervising?
• We will discuss about monitoring in detail in the next PPT.
But now let’s see about supervising…….
• Supervising is a process of guiding and assisting staffs to
continuously improve their own work performance.
• Supervising means overseeing, watching over, and
providing direction for peoples doing some work.
Example,
 a manager supervise an employee who is working in an
ongoing process or a project.
 parents supervise their children's to keep them grow
fulfilling common decency and ethical considerations,
social norms, cultural and religious beliefs.
3/9/2024 20
Cont’d………..
Similarity and difference between supervising and monitoring
 Similarity:
• Both are problem solving techniques.
• Both are conducted to ensure efficiency, performance,
effectiveness, capability, capacity, productivity, competency
and so on in a certain organization.
 Difference:
Supervising
• it is a process of guiding and assisting staff to continuously
improve their own work performance.
• It is carried out in a respectful and non-authoritarian way to
improve the knowledge and skills of health staff.
3/9/2024 21
Cont’d………..
• It encourages open, two-way communication and builds
team approaches that facilitate problem solving.
• It can be a short or long term process, depending on the
duration of the activity, carried out randomly in an
organization.
• Is conducted only on the area of specialization through
professionally.
• Is not performed in a systematic way and no need of data
gathering and analyzing to judge productivity.
Monitoring
• It is a process involves regular collection and analysis of
data on various aspects of activities.
3/9/2024 22
Cont’d………..
• It can be done through desk review of reports and providing
feedback on phone or e-mail/letter during the review
meetings as well as during supervisory visits.
• It may be conducted in an authoritarian way to improve the
efficiency and effectiveness of the output of a
project/program/organization.
• It might be carried out in an open/closed communication
form as the case permits to solve a certain problem.
• It is an ongoing process throughout the project period and
does not terminate at some time.
• It is long term process carried out deliberately in a routine
basis.
• May not need area of specialization / professionalism.
3/9/2024 23
What is monitoring?
• Is the systematic and routine collection and analysis of
data/information, regarding the workplace operation
under consideration, to continuously assess the
progress of an item/activities of the operation and to
increase or improve the efficiency and effectiveness of
that workplace operation in an organization or in a
project over time.
• Is the process of systematically reviewing, observing
and checking the progress or quality of a project over
a period of time.
3/9/2024 24
Cont’d………..
The word monitoring has equivalent meaning with the
following terms:
• Checking
• Watching
• Observing
• Supervising
• Examining
• Screening
3/9/2024 25
Cont’d………..
Steps to monitor work place operations:
• Step 1: Create specific forms of measurement to
determine the productivity level of employees when
performing an activity in a given day, week or month.
 For example, you may judge productivity on sales
figures, product production or customers served.
• Step 2: Develop a system for monitoring operational
progress on a daily, weekly or monthly basis.
 For example, You can use time sheets, flow charts or
departmental progress reports to track statistical
progress.
3/9/2024 26
Cont’d………..
• Step 3: Create an accountability system in which
employees document their time usage during a given
time period.
• Step 4: Compare the employee time documentation
with information gathered from your operational
monitoring process.
• Step 5: Create an open/transparent work environment.
• Step 6: Hire additional staff, pay an additional salary,
offer incentives, provide letter of appreciations.
• Step 7: Invest in new technologies and train new hires
to create awareness on their job area and to ensure
productivity.
3/9/2024 27
Cont’d………..
 For example, new computers, new
equipment's/devices/tools , new telephone systems
etc. that are compatible to your organization services.
• Step 8: Motivate well performing employees in
accordance with production goals set, to inspire them
continue serving well.
 For example,
understanding and meeting their needs/demands.
Try to have good and effective communication and
relation with all the employees.
3/9/2024 28
Cont’d………..
3/9/2024 29
• Note…
Therefore, from the above point of view we understand
that:
• “Monitoring” in anywhere is an ongoing process
throughout the workplace operation to ensure efficiency,
performance, capacity, capability, effectiveness,
productivity and etc.
• Monitoring must not terminate at some time of the
workplace operation without ensuring the required goal.
• “The final out come of effective monitoring is being
more productive in delivering service, producing
product, administering an organization and etc.”.
1.7 Arranging equipment’s and accessories
for transportation
• Arranging equipment means putting the equipment in a neat, attractive, or
required order that is suitable for transporting it.
• Transporting equipment refers to moving the equipment from its place of
storage to work area and vice versa, manually or by means of vehicle,
depending on the distance of movement by keeping its safety and health.
How to arrange equipment's and accessories for transportation
• Always keep the survey instrument in clean and dry conditions as possible.
• List the equipment you need to carryout the activity.
• Identify the necessary accessory that best fit with the equipment .
• Use an efficient storage case for the equipment and accessory.
• Estimate the distance that the equipment is to be transported and decide
whether to move manually or by the use of vehicle.
• Provide compartment within the vehicle ,if any to keep the equipment and
the related supplies separated.
3/9/2024 30
1.8 Using Personal Protective Equipment
• Personal protective equipment's (PPE) are tools
used to protect and keep the persons safety from
some hazards/risks, accidents and/or incidents that
may cause body injury or internal infection, and that
may damage or harm the persons health.
Here are some Personal protective Equipment's (PPE)
• Protective clothing, . Head set/earphone
• Helmets . Safety shoes/bot
• Eye Goggles . Hand gloves
• Garments . Safety belts and etc.
3/9/2024 31
Cont’d………..
3/9/2024 32
PPE is mandatory on many job-sites and under many conditions.
1.9 Updating equipment changes
• Equipment Updating means changing or modifying internal or
external part of any delivered equipment to bring it to the latest
version due to the emerging technology or to fix or otherwise
correct faults, design shortcomings or shortcomings in meeting
the Specifications, correct bugs or defects to enhance safety.
How to update equipment changes
• Check/test the equipment with its accessory whether its Serving the
intended purpose or not.
• Identify the faulty part including software.
• Search for the new accessory to be substituted or installed if software.
• Troubleshoot the problem observed
• Calibrate Regularly
• Safely and carefully casing and uncasing
• Transporting in carrying cases
• Regular cleaning with soap and water or alcohol wipes
• Precautions against Job Conditions
3/9/2024 33
LO2: Outlay equipment and Supplies/ Accessories
2.1 Allocating work for team members
2.2 Operating equipment according to manufacturer
specifications and user manual.
2.3 Equipment Adjustment, calibration and maintenance
LO3:Maintain and organize equipment for field work.
3.1 Identifying unsafe or faulty equipment for maintenance
3.2 Organizing unsafe or faulty equipment for repair according to
organizational guidelines
3.3 Storing Tools, equipment and batteries properly according to
manufacturer’s specifications
3/9/2024 34
Surveying Equipment
Includes:
• Theodolites
• Levels
• Total stations
• Electronic Measuring Devices
• GPS receivers
• Tapes
• Odometer
3/9/2024 35
Casing and Uncasing
• Before removing an instrument, study the way it is
placed and secured in the case.
• The instrument must be replaced in the same position
when returned to the case.
• In removing the instrument from the case, carefully
grip it with both hands, but do not grip the vertical
circle standard or where pressure will be exerted on
tubular or circular level vials.
3/9/2024 36
Care During Instrument Setups
• select instrument stations where operation is not
dangerous to the instrument operator, the crew, or the
instrument.
• Select stable ground for the tripod feet.
• Do not set an instrument closely in front of, or behind, a
vehicle or equipment which is likely to move.
• Take a safe route to all setups.
• At the site, firmly plant the tripod with its legs widespread.
Push along the legs, not vertically, downward.
3/9/2024 37
Angular Measuring Instruments
• Theodolites and mainly total stations are today’s primary
angle measuring instruments, particularly on all baseline
and control surveys.
• Angular measurements by a theodolite or a total station
are done essentially following the same procedure.
• The main difference between them is that a total station
has battery operated electronic devices to display the
measured angles, measure distances and perform on board
computation.
3/9/2024 38
Care of Theodolites and Total Stations
• careless or rough use and unnecessary exposure to the elements can
seriously damage .
• Some general guidelines for the care of instruments are:
A. Lifting - Instruments should be removed from the case with both
hands, gripping the micrometer knob standard and base on the older
instruments.
B. Carrying a Tripod - the instrument should be removed and re-cased
for transportation to a new point.
C. Adjusting Collimation - The collimation error of theodolites and total
stations is determined by following the procedure outlined in the
user’s manual.
3/9/2024 39
Distance Measuring Instruments
• all distance measurements are made today with
an electronic instrument such as an EDM or GPS.
• Tapes are used only when very short distances
have to be measured (i.e. on a construction site).
Total Stations and EDM’s
• Most electronic distance measuring instruments
(EDM’s) are used in combination with a total
station.
• The EDM is either integrated into a total station
or mounted on top of it.
• Some theodolites have special brackets for
mounting an EDM on top of them as well.
3/9/2024 40
Tapes
• Surveyor's tapes are available in various lengths, of
different materials, and with many methods of
graduations.
• Although EDM’s have replaced tapes for longer
measurement,
• every crew should have both metallic and non-metallic
tapes available.
• Tape reels for metallic or fiberglass tapes save time and
help prevent damage to the tape, particularly if used in
construction or heavy traffic areas.
3/9/2024 41
Surveying equipment Accessories
• Tribrachs
A tribrach is the detachable base of all theodolites,
total stations, forced centering targets, and most
EDM’s.
• Staffs
Are tools used for taking vertical readings to determine
reduced level of a ground surface.
• Range pole
Red and white painted metalic pole used for easily
getting the point where a measurement is to be taken.
3/9/2024 42
Cont’d ………
Tripods
• provide a fixed base for all types of surveying
instruments and sighting equipment.
Types of Tripods
• Tripods are made of either metal or wood.
• Wooden tripods are recommended for precision
surveys to minimize errors because of expansion
and contraction due to heat and cold.
3/9/2024 43
Cont’d ……… Plumb Bob
Plumb bob
• The plumb bob string with Gammon reel is the
old standard short distance sighting method,
particularly for establishing temporary points.
• Steadiness of the holder can be enhanced by the
use of braces or any type of framework.
• Various types of inexpensive string line targets
are also available.
3/9/2024 44
Parts of Leveling Instruments
• Most surveyors maintain a hand level as part of their
personal equipment.
• Hand levels are useful in level "runs" for quick location
of turn and instrument points and to determine
differences in elevation when chaining.
• They are also quite useful for rough elevation checks
during grading operations.
• As with any other level, the level bubble can become
out of adjustment and should be checked periodically.
• A quick check can be made against a good carpenter's
level and adjusted similar to a regular level instrument.
3/9/2024 45
Parts of theodolite Instruments
3/9/2024 46
Parts of total station Instruments
3/9/2024 47
Cont’d ………
3/9/2024 48
Analyzing Errors
• All measurements, no matter how carefully
executed, will contain error, and so the true
value of a measurement is never known. It
follows from this that if the true value is never
known, the true error can never be known
and the position of a point known only with a
certain level of uncertainty.
• The sources of error fall into three broad
categories, namely:
3/9/2024 49
Cont.
(1) Natural errors caused by variation in or adverse
weather conditions, refraction, unmolded gravity effects,
etc.
(2) Instrumental errors caused by imperfect construction
and adjustment of the surveying instruments used.
(3) Personal errors caused by the inability of the
individual to make exact observations due to the
limitations of human sight, touch and hearing.
3/9/2024 50
Classification of errors
(1) Mistakes are sometimes called gross errors,
but should not be classified as errors at all.
They are blunders, often resulting from fatigue
or the inexperience of the surveyor.
(2) Systematic errors can be constant or variable
throughout an operation and are generally
attributable to known circumstances.
• Systematic errors, conform to mathematical and
physical laws; thus, it is argued that appropriate
corrections can be computed and applied to
reduce their effect.
• Careful calibration of all equipment is an essential
part of controlling systematic error.
3/9/2024 51
Cont’d……..
(3) Random errors;- are those varieties which remain
after all other errors have been removed.
 They are beyond the control of the observer and result
from the human inability of the observer to make exact
measurements, for reasons already indicated above.
 Random errors should be small and there is no
procedure that will compensate for or reduce any one
single error.
 The size and sign of any random error is quite
unpredictable.
3/9/2024 52
Accuracy and Precision
• Accuracy refers to the correctness of a measurement
or prediction .
• The results can vary a lot, but what matters is the
difference between the measurements or predictions
to what is considered to be the real or accepted
value.
• Precision is often contrasted with accuracy by
emphasizing the repeatability meaning of the word.
• This is most applicable to measurements, but can be
applied to modeling too (e.g., stochastic models).
3/9/2024 53
Cont’d……….
3/9/2024 54
Reading, Recording Data and Writing Technical
Report
• Field notes are the written records of the survey field
work.
• Modern survey equipment record data in digital data
files and allow for easy storage and retrieval of survey
data.
Necessary requirements of field notes:
• Legible i.e. visible and readable
• Accurate. Data recorded should be accurate with
correct precision.
• Integrity. Notes should be complete in all respect before
leaving the site.
• Clarity. Records should be clear and readable.
3/9/2024 55
3/9/2024 56
3/9/2024 57

More Related Content

Similar to All Organize and Maintain Equipment and Supplies-Accessories - Copy.pptx

Construction Engineering Management Entrepreneur.pptx
Construction Engineering Management Entrepreneur.pptxConstruction Engineering Management Entrepreneur.pptx
Construction Engineering Management Entrepreneur.pptxHIRA466344
 
CBC UC 1 (HYDRAULIC EXCAVATOR) final output.docx
CBC UC 1 (HYDRAULIC EXCAVATOR) final output.docxCBC UC 1 (HYDRAULIC EXCAVATOR) final output.docx
CBC UC 1 (HYDRAULIC EXCAVATOR) final output.docxFreddbelCubillas
 
Practical assessment 3 - Identify construction work hazards and select risk c...
Practical assessment 3 - Identify construction work hazards and select risk c...Practical assessment 3 - Identify construction work hazards and select risk c...
Practical assessment 3 - Identify construction work hazards and select risk c...Canberra Institute of technology
 
Industrial Safety Unit -III- Safety activities.pptx
Industrial Safety Unit -III- Safety activities.pptxIndustrial Safety Unit -III- Safety activities.pptx
Industrial Safety Unit -III- Safety activities.pptxNarmatha D
 
Practical assessment 4 - Identify construction work hazards and select risk c...
Practical assessment 4 - Identify construction work hazards and select risk c...Practical assessment 4 - Identify construction work hazards and select risk c...
Practical assessment 4 - Identify construction work hazards and select risk c...Canberra Institute of technology
 
Construction accidents and safety management
Construction accidents and safety managementConstruction accidents and safety management
Construction accidents and safety managementSwarna Rajan
 
Predictive Maintenance with Machine Learning.pptx
Predictive Maintenance with Machine Learning.pptxPredictive Maintenance with Machine Learning.pptx
Predictive Maintenance with Machine Learning.pptxrahulkuduthini
 
HEAVY EQUIPMENT NC II - CBLM
HEAVY EQUIPMENT NC II - CBLMHEAVY EQUIPMENT NC II - CBLM
HEAVY EQUIPMENT NC II - CBLMEric Talamisan
 
117921179 saudi-aramco-safety-handbook
117921179 saudi-aramco-safety-handbook117921179 saudi-aramco-safety-handbook
117921179 saudi-aramco-safety-handbookkhalil maroun
 
Safety handbook Saudi Aramco BY Muhammad Fahad Ansari 12IEEM14
Safety handbook Saudi Aramco  BY Muhammad Fahad Ansari  12IEEM14Safety handbook Saudi Aramco  BY Muhammad Fahad Ansari  12IEEM14
Safety handbook Saudi Aramco BY Muhammad Fahad Ansari 12IEEM14fahadansari131
 

Similar to All Organize and Maintain Equipment and Supplies-Accessories - Copy.pptx (20)

Unit 17
Unit 17Unit 17
Unit 17
 
Unit 17
Unit 17Unit 17
Unit 17
 
Content standard 1.3
Content standard 1.3Content standard 1.3
Content standard 1.3
 
Construction Engineering Management Entrepreneur.pptx
Construction Engineering Management Entrepreneur.pptxConstruction Engineering Management Entrepreneur.pptx
Construction Engineering Management Entrepreneur.pptx
 
3. Assessment Practical.docx
3. Assessment Practical.docx3. Assessment Practical.docx
3. Assessment Practical.docx
 
CBC UC 1 (HYDRAULIC EXCAVATOR) final output.docx
CBC UC 1 (HYDRAULIC EXCAVATOR) final output.docxCBC UC 1 (HYDRAULIC EXCAVATOR) final output.docx
CBC UC 1 (HYDRAULIC EXCAVATOR) final output.docx
 
4. Assessment Practical.docx
4. Assessment Practical.docx4. Assessment Practical.docx
4. Assessment Practical.docx
 
Practical assessment 3 - Identify construction work hazards and select risk c...
Practical assessment 3 - Identify construction work hazards and select risk c...Practical assessment 3 - Identify construction work hazards and select risk c...
Practical assessment 3 - Identify construction work hazards and select risk c...
 
Total golden rules
Total golden rulesTotal golden rules
Total golden rules
 
Industrial Safety Unit -III- Safety activities.pptx
Industrial Safety Unit -III- Safety activities.pptxIndustrial Safety Unit -III- Safety activities.pptx
Industrial Safety Unit -III- Safety activities.pptx
 
Practical assessment 4 - Identify construction work hazards and select risk c...
Practical assessment 4 - Identify construction work hazards and select risk c...Practical assessment 4 - Identify construction work hazards and select risk c...
Practical assessment 4 - Identify construction work hazards and select risk c...
 
Construction accidents and safety management
Construction accidents and safety managementConstruction accidents and safety management
Construction accidents and safety management
 
Predictive Maintenance with Machine Learning.pptx
Predictive Maintenance with Machine Learning.pptxPredictive Maintenance with Machine Learning.pptx
Predictive Maintenance with Machine Learning.pptx
 
HEAVY EQUIPMENT NC II - CBLM
HEAVY EQUIPMENT NC II - CBLMHEAVY EQUIPMENT NC II - CBLM
HEAVY EQUIPMENT NC II - CBLM
 
WHS practical.docx
WHS practical.docxWHS practical.docx
WHS practical.docx
 
Safety plan
Safety planSafety plan
Safety plan
 
117921179 saudi-aramco-safety-handbook
117921179 saudi-aramco-safety-handbook117921179 saudi-aramco-safety-handbook
117921179 saudi-aramco-safety-handbook
 
Safety handbook Saudi Aramco BY Muhammad Fahad Ansari 12IEEM14
Safety handbook Saudi Aramco  BY Muhammad Fahad Ansari  12IEEM14Safety handbook Saudi Aramco  BY Muhammad Fahad Ansari  12IEEM14
Safety handbook Saudi Aramco BY Muhammad Fahad Ansari 12IEEM14
 
Presentation on safety
Presentation on safetyPresentation on safety
Presentation on safety
 
Resume
ResumeResume
Resume
 

Recently uploaded

psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docxPoojaSen20
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxVishalSingh1417
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...ZurliaSoop
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfSherif Taha
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.pptRamjanShidvankar
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxnegromaestrong
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and ModificationsMJDuyan
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docxPoojaSen20
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...Nguyen Thanh Tu Collection
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17Celine George
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptxMaritesTamaniVerdade
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibitjbellavia9
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Association for Project Management
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...Poonam Aher Patil
 

Recently uploaded (20)

psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 

All Organize and Maintain Equipment and Supplies-Accessories - Copy.pptx

  • 1. 3/9/2024 1 Cadastral Surveying and Mapping Level II Organize and Maintain Equipment and Supplies/Accessories EIS CSM2 02 923 Behailu Z.
  • 2. Learning Objectives/Out comes At the end of this course the trainees will be able to: LO1:Select equipment and Supplies/Accessories  1.1 Checking specifications of equipment and supplies/accessories  1.2 Select appropriate tools, equipment and Accessories  1.3 Contingencies planning and risk management processes  1.4 Checking safe working order of the equipment  1.5 Allocating appropriate persons, equipment and accessories  1.6 Monitoring and supervising the work  1.7 Arranging equipment’s and accessories for transportation  1.8 Personal protective equipment  1.9 Updating equipment changes 3/9/2024 1
  • 3. Cont’d…………. LO2: Outlay equipment and Supplies/ Accessories to be used  2.1 Allocating work for team members  2.2 Operating equipment according to manufacturer specifications and user manual.  2.3 Equipment Adjustment, calibration and maintenance LO3:Maintain and organize equipment for field work.  3.1 Identifying unsafe or faulty equipment for maintenance  3.2 Organizing unsafe or faulty equipment for repair according to organizational guidelines  3.3 Storing Tools, equipment and batteries properly according to manufacturer’s specifications 3/9/2024 2
  • 4. An Overview Before starting any survey work/ activities:  organize and maintain equipment and supplies or accessories according to the specifications and organizational guidelines.  make equipment ready for survey work.  Check the equipment to ensure as it is in safe working condition.  Arrange equipment and supplies or accessories for safe transportation.  Do not miss any item of equipment and supplies or accessories to avoid loss of time and money. 3/9/2024 3
  • 5. Cont’d.…………  Prepare the following items: • Tripod • Battery Pack • Tribrach • Survey Controller • Total Station • Stake with nail • Survey marker • Power Cable • Communication Cable • Hammer and etc. 3/9/2024 4
  • 6. Cont’d........... • operate equipment according to manufacturer specifications and user manual. • Arrange adjustment, calibration and maintenance of equipment . • Identify & arrange unsafe or faulty equipment in place for maintenance. • Organize repair work for unsafe or faulty equipment under direction of relevant personnel and according to organizational guidelines. • store tools, equipment and batteries safely in an appropriate location and according to manufacturer’s specifications. 3/9/2024 5
  • 7. Cont’d………. LO1: Select Equipment and Supplies or Accessories 1.1 Checking specifications of equipment and supplies/accessories • Before using an instrument, make a visual inspection for any damages. • Check for any exposed machine surfaces including the polished faces of lenses. • The instrument motions should be checked to ensure they have a smooth operation. • The interior of the instrument should be cleaned regularly in accordance with the specifications given by the manufacturer. 3/9/2024 7
  • 8. 1.2 Select appropriate tools, equipment and Accessories 3/9/2024 8
  • 9. Cont’d………. • If the dirt in the instrument is left to accumulate, it may lead to uneven motion in the horizontal and vertical movements. • Use a camel’s-hair brush and clean soiled non-optical parts with a soft cloth or with a clean chamois to remove the dirt. • The external lens surface should also be cleaned using a lens tissue using liquids such as pure alcohol. • Take care not to scratch lenses or their coating. • Never touch optical glass with your fingers. 3/9/2024 9
  • 10. Cont’d………… • Do regular adjustment to the equipment to ensure it is properly functioning and that accuracy of work is maintained.  The following are good practices while using the surveying instruments: • The instrument should be removed and returned to its box carefully. • Tape should be straight when used and avoid stepping on it. • The instruments with mechanical parts should be protected from vibration and impact. • The dirt and dust should be regularly cleaned from movable parts of the instrument. 3/9/2024 10
  • 11. Cont’d………… • The clamping and adjusting screws should not be tightened far more than necessary. • The objective and eye piece lens should not be touched with fingers. • Raise the magnetic needle off the pivot of the instrument when not in use. • Recharge the battery after its use in the field. Also, carry a spare battery for field work. • Shelter total station against harsh weather elements using an umbrella. 3/9/2024 11
  • 12. Cont’d……….. • Charge the GPS station after a day’s work. • When transporting a total station or theodolite for long distances, return carefully into casing box. • For medium distances release from tribes clamp and carry from top handle. • For short distances move it holding it vertically upright. 3/9/2024 12
  • 14. Cont’d……….. • Select instrument stations that won’t put instrument man, instrument or team at danger during field work. • Conduct daily inspection on the equipment used. • Never leave the instruments unattended. • Never point the total station or theodolite directly at the Sun. • Keep the shoes of the tripods clean and dirt free. 3/9/2024 14
  • 15. 1.3 Contingencies planning and risk management processes • Survey equipment should be taken care of with utmost caution and in the correct manner. • The chief party is responsible for his party’s equipment. • Care must be taken against some of the following potential risks that may affect the equipment adversely: • Adverse weather conditions e.g. rain, strong winds and high temperatures • Wrong use of the equipment, e.g. sitting on the equipment cover case 3/9/2024 15
  • 16. Cont’d……….. • Setting up the equipment at dangerous positions e.g. near the edge of a valley, river bank or next to a busy road. • Leaving equipment in an unsecured location. • Transporting the equipment in the wrong way. • Lack of routine care practices e.g. inspecting, cleaning and safely storing the equipment. 3/9/2024 16
  • 17. 1.4 Checking safe working order of the equipment Prepare checklist before embarking on further field work procedures containing the following items: • Date and time of picking the item • Return date and time of the item • Name of team party leader in charge of the equipment • Equipment name and number of items collected from storage • Officer in charge of the storage room • Condition of the item taken 3/9/2024 17
  • 18. 1.5 Allocating appropriate persons to equipment's and accessories Identifying Professional Code of Ethics Necessary requirements of Professional Land Surveyors: • hold the safety, health and welfare of the public. • perform services only in the areas of their competence/area of specialization. • public statements should be only in an objective and truthful manner. • act in professional manner to be faithful or trustees and avoid conflicts of interest. 3/9/2024 18
  • 19. Cont’d……….. • build professional reputations (prominence/being famous) on the merit of the services that they deliver. • act in a manner to uphold and enhance the honor, integrity, and dignity of their profession. • continue developing their profession throughout their careers/job category. • provide opportunities for developing the profession of those under their supervision. 3/9/2024 19
  • 20. 1.6 Monitoring and supervising the work Q1. What is monitoring and what is supervising? Q2. what is the similarity and difference between the words monitoring and supervising? • We will discuss about monitoring in detail in the next PPT. But now let’s see about supervising……. • Supervising is a process of guiding and assisting staffs to continuously improve their own work performance. • Supervising means overseeing, watching over, and providing direction for peoples doing some work. Example,  a manager supervise an employee who is working in an ongoing process or a project.  parents supervise their children's to keep them grow fulfilling common decency and ethical considerations, social norms, cultural and religious beliefs. 3/9/2024 20
  • 21. Cont’d……….. Similarity and difference between supervising and monitoring  Similarity: • Both are problem solving techniques. • Both are conducted to ensure efficiency, performance, effectiveness, capability, capacity, productivity, competency and so on in a certain organization.  Difference: Supervising • it is a process of guiding and assisting staff to continuously improve their own work performance. • It is carried out in a respectful and non-authoritarian way to improve the knowledge and skills of health staff. 3/9/2024 21
  • 22. Cont’d……….. • It encourages open, two-way communication and builds team approaches that facilitate problem solving. • It can be a short or long term process, depending on the duration of the activity, carried out randomly in an organization. • Is conducted only on the area of specialization through professionally. • Is not performed in a systematic way and no need of data gathering and analyzing to judge productivity. Monitoring • It is a process involves regular collection and analysis of data on various aspects of activities. 3/9/2024 22
  • 23. Cont’d……….. • It can be done through desk review of reports and providing feedback on phone or e-mail/letter during the review meetings as well as during supervisory visits. • It may be conducted in an authoritarian way to improve the efficiency and effectiveness of the output of a project/program/organization. • It might be carried out in an open/closed communication form as the case permits to solve a certain problem. • It is an ongoing process throughout the project period and does not terminate at some time. • It is long term process carried out deliberately in a routine basis. • May not need area of specialization / professionalism. 3/9/2024 23
  • 24. What is monitoring? • Is the systematic and routine collection and analysis of data/information, regarding the workplace operation under consideration, to continuously assess the progress of an item/activities of the operation and to increase or improve the efficiency and effectiveness of that workplace operation in an organization or in a project over time. • Is the process of systematically reviewing, observing and checking the progress or quality of a project over a period of time. 3/9/2024 24
  • 25. Cont’d……….. The word monitoring has equivalent meaning with the following terms: • Checking • Watching • Observing • Supervising • Examining • Screening 3/9/2024 25
  • 26. Cont’d……….. Steps to monitor work place operations: • Step 1: Create specific forms of measurement to determine the productivity level of employees when performing an activity in a given day, week or month.  For example, you may judge productivity on sales figures, product production or customers served. • Step 2: Develop a system for monitoring operational progress on a daily, weekly or monthly basis.  For example, You can use time sheets, flow charts or departmental progress reports to track statistical progress. 3/9/2024 26
  • 27. Cont’d……….. • Step 3: Create an accountability system in which employees document their time usage during a given time period. • Step 4: Compare the employee time documentation with information gathered from your operational monitoring process. • Step 5: Create an open/transparent work environment. • Step 6: Hire additional staff, pay an additional salary, offer incentives, provide letter of appreciations. • Step 7: Invest in new technologies and train new hires to create awareness on their job area and to ensure productivity. 3/9/2024 27
  • 28. Cont’d………..  For example, new computers, new equipment's/devices/tools , new telephone systems etc. that are compatible to your organization services. • Step 8: Motivate well performing employees in accordance with production goals set, to inspire them continue serving well.  For example, understanding and meeting their needs/demands. Try to have good and effective communication and relation with all the employees. 3/9/2024 28
  • 29. Cont’d……….. 3/9/2024 29 • Note… Therefore, from the above point of view we understand that: • “Monitoring” in anywhere is an ongoing process throughout the workplace operation to ensure efficiency, performance, capacity, capability, effectiveness, productivity and etc. • Monitoring must not terminate at some time of the workplace operation without ensuring the required goal. • “The final out come of effective monitoring is being more productive in delivering service, producing product, administering an organization and etc.”.
  • 30. 1.7 Arranging equipment’s and accessories for transportation • Arranging equipment means putting the equipment in a neat, attractive, or required order that is suitable for transporting it. • Transporting equipment refers to moving the equipment from its place of storage to work area and vice versa, manually or by means of vehicle, depending on the distance of movement by keeping its safety and health. How to arrange equipment's and accessories for transportation • Always keep the survey instrument in clean and dry conditions as possible. • List the equipment you need to carryout the activity. • Identify the necessary accessory that best fit with the equipment . • Use an efficient storage case for the equipment and accessory. • Estimate the distance that the equipment is to be transported and decide whether to move manually or by the use of vehicle. • Provide compartment within the vehicle ,if any to keep the equipment and the related supplies separated. 3/9/2024 30
  • 31. 1.8 Using Personal Protective Equipment • Personal protective equipment's (PPE) are tools used to protect and keep the persons safety from some hazards/risks, accidents and/or incidents that may cause body injury or internal infection, and that may damage or harm the persons health. Here are some Personal protective Equipment's (PPE) • Protective clothing, . Head set/earphone • Helmets . Safety shoes/bot • Eye Goggles . Hand gloves • Garments . Safety belts and etc. 3/9/2024 31
  • 32. Cont’d……….. 3/9/2024 32 PPE is mandatory on many job-sites and under many conditions.
  • 33. 1.9 Updating equipment changes • Equipment Updating means changing or modifying internal or external part of any delivered equipment to bring it to the latest version due to the emerging technology or to fix or otherwise correct faults, design shortcomings or shortcomings in meeting the Specifications, correct bugs or defects to enhance safety. How to update equipment changes • Check/test the equipment with its accessory whether its Serving the intended purpose or not. • Identify the faulty part including software. • Search for the new accessory to be substituted or installed if software. • Troubleshoot the problem observed • Calibrate Regularly • Safely and carefully casing and uncasing • Transporting in carrying cases • Regular cleaning with soap and water or alcohol wipes • Precautions against Job Conditions 3/9/2024 33
  • 34. LO2: Outlay equipment and Supplies/ Accessories 2.1 Allocating work for team members 2.2 Operating equipment according to manufacturer specifications and user manual. 2.3 Equipment Adjustment, calibration and maintenance LO3:Maintain and organize equipment for field work. 3.1 Identifying unsafe or faulty equipment for maintenance 3.2 Organizing unsafe or faulty equipment for repair according to organizational guidelines 3.3 Storing Tools, equipment and batteries properly according to manufacturer’s specifications 3/9/2024 34
  • 35. Surveying Equipment Includes: • Theodolites • Levels • Total stations • Electronic Measuring Devices • GPS receivers • Tapes • Odometer 3/9/2024 35
  • 36. Casing and Uncasing • Before removing an instrument, study the way it is placed and secured in the case. • The instrument must be replaced in the same position when returned to the case. • In removing the instrument from the case, carefully grip it with both hands, but do not grip the vertical circle standard or where pressure will be exerted on tubular or circular level vials. 3/9/2024 36
  • 37. Care During Instrument Setups • select instrument stations where operation is not dangerous to the instrument operator, the crew, or the instrument. • Select stable ground for the tripod feet. • Do not set an instrument closely in front of, or behind, a vehicle or equipment which is likely to move. • Take a safe route to all setups. • At the site, firmly plant the tripod with its legs widespread. Push along the legs, not vertically, downward. 3/9/2024 37
  • 38. Angular Measuring Instruments • Theodolites and mainly total stations are today’s primary angle measuring instruments, particularly on all baseline and control surveys. • Angular measurements by a theodolite or a total station are done essentially following the same procedure. • The main difference between them is that a total station has battery operated electronic devices to display the measured angles, measure distances and perform on board computation. 3/9/2024 38
  • 39. Care of Theodolites and Total Stations • careless or rough use and unnecessary exposure to the elements can seriously damage . • Some general guidelines for the care of instruments are: A. Lifting - Instruments should be removed from the case with both hands, gripping the micrometer knob standard and base on the older instruments. B. Carrying a Tripod - the instrument should be removed and re-cased for transportation to a new point. C. Adjusting Collimation - The collimation error of theodolites and total stations is determined by following the procedure outlined in the user’s manual. 3/9/2024 39
  • 40. Distance Measuring Instruments • all distance measurements are made today with an electronic instrument such as an EDM or GPS. • Tapes are used only when very short distances have to be measured (i.e. on a construction site). Total Stations and EDM’s • Most electronic distance measuring instruments (EDM’s) are used in combination with a total station. • The EDM is either integrated into a total station or mounted on top of it. • Some theodolites have special brackets for mounting an EDM on top of them as well. 3/9/2024 40
  • 41. Tapes • Surveyor's tapes are available in various lengths, of different materials, and with many methods of graduations. • Although EDM’s have replaced tapes for longer measurement, • every crew should have both metallic and non-metallic tapes available. • Tape reels for metallic or fiberglass tapes save time and help prevent damage to the tape, particularly if used in construction or heavy traffic areas. 3/9/2024 41
  • 42. Surveying equipment Accessories • Tribrachs A tribrach is the detachable base of all theodolites, total stations, forced centering targets, and most EDM’s. • Staffs Are tools used for taking vertical readings to determine reduced level of a ground surface. • Range pole Red and white painted metalic pole used for easily getting the point where a measurement is to be taken. 3/9/2024 42
  • 43. Cont’d ……… Tripods • provide a fixed base for all types of surveying instruments and sighting equipment. Types of Tripods • Tripods are made of either metal or wood. • Wooden tripods are recommended for precision surveys to minimize errors because of expansion and contraction due to heat and cold. 3/9/2024 43
  • 44. Cont’d ……… Plumb Bob Plumb bob • The plumb bob string with Gammon reel is the old standard short distance sighting method, particularly for establishing temporary points. • Steadiness of the holder can be enhanced by the use of braces or any type of framework. • Various types of inexpensive string line targets are also available. 3/9/2024 44
  • 45. Parts of Leveling Instruments • Most surveyors maintain a hand level as part of their personal equipment. • Hand levels are useful in level "runs" for quick location of turn and instrument points and to determine differences in elevation when chaining. • They are also quite useful for rough elevation checks during grading operations. • As with any other level, the level bubble can become out of adjustment and should be checked periodically. • A quick check can be made against a good carpenter's level and adjusted similar to a regular level instrument. 3/9/2024 45
  • 46. Parts of theodolite Instruments 3/9/2024 46
  • 47. Parts of total station Instruments 3/9/2024 47
  • 49. Analyzing Errors • All measurements, no matter how carefully executed, will contain error, and so the true value of a measurement is never known. It follows from this that if the true value is never known, the true error can never be known and the position of a point known only with a certain level of uncertainty. • The sources of error fall into three broad categories, namely: 3/9/2024 49
  • 50. Cont. (1) Natural errors caused by variation in or adverse weather conditions, refraction, unmolded gravity effects, etc. (2) Instrumental errors caused by imperfect construction and adjustment of the surveying instruments used. (3) Personal errors caused by the inability of the individual to make exact observations due to the limitations of human sight, touch and hearing. 3/9/2024 50
  • 51. Classification of errors (1) Mistakes are sometimes called gross errors, but should not be classified as errors at all. They are blunders, often resulting from fatigue or the inexperience of the surveyor. (2) Systematic errors can be constant or variable throughout an operation and are generally attributable to known circumstances. • Systematic errors, conform to mathematical and physical laws; thus, it is argued that appropriate corrections can be computed and applied to reduce their effect. • Careful calibration of all equipment is an essential part of controlling systematic error. 3/9/2024 51
  • 52. Cont’d…….. (3) Random errors;- are those varieties which remain after all other errors have been removed.  They are beyond the control of the observer and result from the human inability of the observer to make exact measurements, for reasons already indicated above.  Random errors should be small and there is no procedure that will compensate for or reduce any one single error.  The size and sign of any random error is quite unpredictable. 3/9/2024 52
  • 53. Accuracy and Precision • Accuracy refers to the correctness of a measurement or prediction . • The results can vary a lot, but what matters is the difference between the measurements or predictions to what is considered to be the real or accepted value. • Precision is often contrasted with accuracy by emphasizing the repeatability meaning of the word. • This is most applicable to measurements, but can be applied to modeling too (e.g., stochastic models). 3/9/2024 53
  • 55. Reading, Recording Data and Writing Technical Report • Field notes are the written records of the survey field work. • Modern survey equipment record data in digital data files and allow for easy storage and retrieval of survey data. Necessary requirements of field notes: • Legible i.e. visible and readable • Accurate. Data recorded should be accurate with correct precision. • Integrity. Notes should be complete in all respect before leaving the site. • Clarity. Records should be clear and readable. 3/9/2024 55