SlideShare a Scribd company logo
1 of 8
Download to read offline
Tahir Mahmood
B.Sc. Electrical Engineer ( UET Lahore, Pakistan)
Registered Engineer with Pakistan Engineering Council
MME( Grade-B) Registered Engineer Qatar .
Present Address: Doha,Qatar
Mobile No : +97430346316
Total Experience 18 Years
E-mail: tahrmrizvi@gmail.com
PROFILE
A competent professional with proven expertise in Electrical Systems, with 18 years of hands on
experience including GCC Countries, Qatar UAE and Pakistan. Possess comprehensive
knowledge in Execution & Supervision, QA/QC, Testing & Commissioning, Design Review,
Planning and Site Management for the Electrical Systems involved in the Construction
Sectors. Highly motivated and possess good communication and presentation skills.
EDUCATION
B. SC. ELECTRICAL ENGINEERING (4 YEARS DEGREE) 1992-1996
University of Engineering and Technology Lahore, Pakistan
CORE COMPETENCIES AND CAREER SUMMARY
EXPERIENCE OF ELECTRICAL SYSTEMS:
Execution/ Supervision , Testing & Commissioning, Design Review, Site Management, Snag/Desnag
and Final Handover to the Client for the Following Electrical systems during diverse Contractors and
Consultants.
HV, LV SYSTEMS
• Substation Equipment’s (HV Panels, RMU’s, Transformers etc.)
• DC System, Capacitors Banks and UPS System
• LV Switchgears ( MDB, SMDB, D.B, PFC, MCC etc)
• HV Cable Distribution within the plot and Tie in Cabling
• HV Cable Trenches and Ducts
• Earthing and Lightening Protection System
• Small Power and Interior/ Exterior Lighting
• Lighting & Dimming Control Systems
• Street Lighting for Housing Societies
• LV Cable Distribution
• Electrical Wiring devices and its Accessories-
• Central Emergency Battery Backup System -
• Emergency Generators
• Cable Trays/Trunking/ Ladders, G.I, PVC Conduiting, Floor Boxes
• Electrical Bus Bar
INFRASTRUCTURE WORKS:
• Review of Services Coordination Drawings.
• Coordination of Underground Electrical Systems with Local authorities existing services and
other Mechanical services in the plot.
• Electrical Duct work for Fire Alarm, Data/Tel (Etisalat), Central Battery System and BMS
System within the plot and up to Tie in point.
• Underground HV Cable Distribution System within the Plot and Tie in with existing RMU’s
• Direct Buried Cabling for LV Systems
• Trenches for Cables.
• Feeder Pillars installation for street Lights.
• Light Poles Installation for street Lighting.
• Cabling, Poles and CCTV Camera installation within the plot.
FIRE FIGHTING SYSTEM
• Fire Fighting System( FM-200 and Sprinkler System)
HSE:
• Risk Assessment
• Work Zone Safety
• Heat Safety Protection
• Accident Investigation and Rout Cause Analysis
• Fire Extinguisher Safety
1- Employer: AECOM Middle East ,Qatar May, 2015 To Date
Designation: Senior Electrical Engineer
Project : New Orbital Highway Dukhan Highway to Alkhor Link Road Contract 4 .
Job Responsibilities:
• Reviewing and approving shop drawings and engineering material submissions.
• Responding for the electrical design contents as assigned together with its follow up
for Authority or Client̛s approval.
• Solving RFI s on daily basis providing solutions for problems on site.
• Continually ensuring that practices ,policies, strategy and services represent the
client’s best interests and that construction work is in compliance with the current
legislation, standards and codes of practices.
• Responding to contractors technical queries.
• Planning and monitoring work schedules for inspectors.
• Site inspections to ensure that work done by the contractor is per detailed design
approved and approved method statement.
• Implementing site quality assurance programmes for electrical installations.
• Serve as site representative for all matters related to construction quality assurance for
electrical works
2.Potential Engineering (Ltd) Di Khan ,Pakistan April 2014 To Oct 2014
Designation: Site Manager Electrical
Project: (132 /11kv wapda substation Gomal University)
Job Responsibilities:
Planning:
• Review of construction schedules.
• Preparing monthly and weekly progress reports.
• Attend progress meetings with Client and Contractors.
• Supervised the installation of 26/20 MVA Transformers(TEB),Current transformer, Potential
transformer, Surge arresters, capacitor banks, HT/LT and control panels and earthing system,
• Coordination with commissioning team to clear all the testing & commissioning
activities of the equipments at the project.
• Handing over of as built drawings, all test reports of functional performance of the relays of
the control and protection system and operational and maintenance manuals.
DESIGN REVIEW
• Review and approval of Shop drawings for electrical system( HV, LV)
• Review and approval of Coordination drawings
• Review and approval of Material Submittals and Method Statements for each system as per
project specification.
• Coordination with the design team for any change in design at various stages of the project.
QA/QC AND SUPERVISION:
• Review and approval of Material Submittals , ITP’s, Method statements, Checklists , QCP
and RFI’s
• Ensuring material delivered on site is as per approved MAR through MVR inspection.
• Issuing Site Instructions as required.
• Ensuring material Storage is as per requirement.
• Frequent factory visits and witness factory tests for various electrical equipment’s
• Monitoring Contractor’s Activity Commencement Notice for each electrical system
• Checking inspection requests ( IR’s) from contractors and ensuring the work done is as per
approved shop drawings, method statements and material used is the same as approved.
• Raising NCR if the work is not found as per project requirement
• To maintain record for site activities by photographs
• Solving Field Inspections Disputes as per Project documents.
• Ensuring Equipments installation as per manufacturer’s installation manuals and project
specifications
• Supervising testing and commissioning of all electrical systems as per project specifications
and manufacturer instructions
• Keeping record for the as built drawings
• Keeping record for the snagging list and ensuring creativeness.
• Attending Coordination and Progress meetings with client and Contractors.
• Electrical equipment Factory inspection carried out with Contactor at Manufactures Company.
• Strong Coordination with Mechanical, Structural and Architectural Teams on the project in
each phase of project
• correctness, completeness and that they are in-line with the specifications
3- Flowtronics Pvt (Ltd) Pakistan Duration: July 2012- Jan 2013
Designation: Project Manager
Project : 600 ton Polyester plant & 30 MW Power plant) IBRAHIM FIBRES
• Strong coordination with design, procurement and execution team
EXECUTION:
• Periodic QA/QC Meetings with the site engineers and Supervisors
• QA/QC Training of the execution team to ensure Quality of Work on site
• Raising IR’s for the Activity after internal QA/QC inspection
• Keeping Photographic records for the inspection on site
• Doing Surveillance Inspections on site to ensure work done is as per approved shop drawings,
Method statements and Material Submittals
• Keeping records of Inspection requests.
• Raising RFI’s to the Consultant.
• Issuing internal NCR’s with Corrective and Preventive Actions.
• Closing Consultant’s NCR.
• Installation of Electrical Equipments as per Manufacturer’s recommendation, local authorities
Requirements and approved shop drawings
• Performing on site tests for cables, switchgears etc.
• Installation, Testing and Commissioning of the Electrical Systems.
PROJECT HANDOVER
• Ensuring site teams to prepare As Built Drawings and Submission it to the Consultant
• Closing Consultant’s snag list for each activity
• Submission of test reports for each activity
• Submission of O & M Manuals
4- Siemens Dubai, UAE Duration: Jun 2008-Dec 2011
Designation: Site Manager Electrical
Projects: 132/11KV DLFF S/S ,132/11 ARSD S/S KV, 132/11 KV PILOT S/S DCA
Jebel Ali DWC.
Job Responsibilities:-
• Supervision of the installation of 132/11KV transformer, 11/ 0.4 KV earthing transformers, 10
MVAR Shunt Reactor, capacitor banks, power & control panels.
• Monitoring the progress and quality of the works with full concentration on keeping the
efficiency of the work as high as possible by coordinating with site engineers, sub contractors
& consultants.
• Conducting site meetings with the sub contractors & site engineers to plan the working
schedule according to the priority of the work.
• Getting approval of some modifications as per site requirements & making arrangements to
incorporate them into drawings.
• Checking the received materials according to the approved documents & verifying the
materials.
5.Potential Engineering (Ltd) Muzafargarh ,Pakistan April 2007 To May 2008
Designation: Site Manager Electrical
Project: 220/132KV Substation Muzaffargarh
Job Responsibilities:
• Review and approval of Shop drawings for electrical system( HV, LV)
• Review and approval of Coordination drawings.
• Review and approval of Material Submittals and method statements for each system as per
project specification.
• Coordination with the design team for any change in design at various stages of the project.
• Review and approval of Material Submittals , ITP’s, Method statements, Checklists , QCP
and RFI’s.
• Ensuring material delivered on site is as per approved MAR through MVR inspection.
• Issuing Site Instructions as required.
• Ensuring material Storage is as per requirement.
• Frequent factory visits and witness factory tests for various electrical equipment.
• Monitoring Contractor’s Activity Commencement Notice for each electrical system.
• Checking inspection requests ( IR’s) from contractors and ensuring the work done is as per
approved shop drawings, method statements and material used is the same as approved.
• Raising NCR if the work is not found as per project requirement.
• To maintain record for site activities by photographs.
• Solving Field Inspections Disputes as per Project documents.
• Ensuring Equipment installation as per manufacturer’s installation manuals and project
specifications.
• Supervising testing and commissioning of all electrical systems as per project specifications
and manufacturer instructions.
• Keeping record for the as built drawings.
• Keeping record for the snagging list and ensuring creativeness.
• Attending Coordination and Progress meetings with client and Contractors.
• Electrical equipment Factory inspection carried out with Contactor at Manufactures Company.
• Strong Coordination with Mechanical, Structural and Architectural Teams on the project in
each phase of project.
6.Potential Engineering (Ltd) Gazi Barotha ,Pakistan Feb 2006 To Mar 2007
Designation: Construction Manager
Project: 500/220KV substation Ghazi Boratha Power Complex.
Job Responsibilities:
• Review and approval of Material Submittals , ITP’s, Method statements, Checklists , QCP
and RFI’s
• Ensuring material delivered on site is as per approved MAR through MVR inspection.
• Issuing Site Instructions as required.
• Ensuring material Storage is as per requirement.
• Frequent factory visits and witness factory tests for various electrical equipment.
• Monitoring Contractor’s Activity Commencement Notice for each electrical system.
• Checking inspection requests ( IR’s) from contractors and ensuring the work done is as per
approved shop drawings, method statements and material used is the same as approved.
• Raising NCR if the work is not found as per project requirement.
• To maintain record for site activities by photographs.
• Solving Field Inspections Disputes as per Project documents.
• Ensuring Equipments installation is as per manufacturer’s installation manuals and project
specifications.
• Supervising testing and commissioning of all electrical systems as per project specifications
and manufacturer instructions.
• Keeping record for the as built drawings.
• Keeping record for the snagging list and ensuring creativeness.
• Attending Coordination and Progress meetings with client and Contractors.
• Factory Acceptance Test( FAT ) carried out with Contactor at Manufactures Company.
• Strong Coordination with Mechanical, Structural and Architectural Teams on the project in
each phase of project correctness, completeness and that they are in-line with the
specifications
7. Mahmood Group of Textile Industries, Pakistan March 2003 to Jan 2006
Designation: Plant Engineer
Project: 5 MW Power House kabirwala
Job Responsibilities:
• Installations, testing and commissioning of Caterpillar Gas generators (3516B).
• Worked as plant maintenance engineer.
8. Mahmood Group of Textile Industries, Pakistan Jan 2001 to Feb 2003
Designation: Electrical Engineer
Project: Massod Fabrics textile unit
Job Responsibilities:
• Worked as maintenance engineer for the 610 Air jet looms Toyota, sizing machine Hacoba
and warping machine of Germany with the target of maintaining the efficiency of the
machines at 95%.
Siemens , Pakistan Jan 1999 to December 2000
Designation: Site Electrical Engineer
Project: Parco Mid Country Oil Refinery KOT ADU
Job Responsibilities:
• Worked as site engineer for installation of cathodic protection of the pipes and tanks,
laying of power and control cables and lighting works and making daily progress
report.
ROUSCH Power Plant Pakistan Dec 1996 to Nov 1998
Designation: Site Engineer
Project: ROUSCH Power Plant 412 MW Abdul Hakim
Job Responsibilities:
• Worked as site engineer for installation of control and protection panels and
associated cable laying and preparing progress reports.
Computer Skills;
• MS Office & MS Excel & MS Power point.
Personal Profile ;
• Date of birth 6/8 1968
• Marital status married
• Passport No HK0155692
• Languages English , Urdu and Arabic in learning stage
Certificates ;
• MME Grade –B
• Qatar valid driving license

More Related Content

What's hot

CV of Kiran - Electrical Engineer 1
CV of Kiran -  Electrical Engineer 1CV of Kiran -  Electrical Engineer 1
CV of Kiran - Electrical Engineer 1Kiran Sasi
 
ELV Project Engineer
ELV Project EngineerELV Project Engineer
ELV Project EngineerFahim Mohamed
 
Electrical QA QC Engineer
Electrical QA QC EngineerElectrical QA QC Engineer
Electrical QA QC EngineerSalman Faris
 
Elv project engineer
Elv project engineerElv project engineer
Elv project engineerFahim Mohamed
 
Senior Electrical Engineer CV
Senior Electrical Engineer CVSenior Electrical Engineer CV
Senior Electrical Engineer CVHosam Elbanna
 
Shujaat Updated CV New
Shujaat Updated CV NewShujaat Updated CV New
Shujaat Updated CV NewShujaat Jan
 
ELECTRICAL DESIGN ENGINEER - RESUME
ELECTRICAL DESIGN ENGINEER -  RESUMEELECTRICAL DESIGN ENGINEER -  RESUME
ELECTRICAL DESIGN ENGINEER - RESUMEVEERABHARATHI MUNI
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultantdilish pareed
 
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016Khadar Ali Shaik, P.Eng
 
Elv project engineer
Elv project engineerElv project engineer
Elv project engineerFahim Mohamed
 
JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)jeyaraj selvaraj
 
1.arun das mep resume
1.arun das mep resume  1.arun das mep resume
1.arun das mep resume Arun Das
 

What's hot (20)

Shafiq CV
Shafiq CVShafiq CV
Shafiq CV
 
CV of Kiran - Electrical Engineer 1
CV of Kiran -  Electrical Engineer 1CV of Kiran -  Electrical Engineer 1
CV of Kiran - Electrical Engineer 1
 
ELV Project Engineer
ELV Project EngineerELV Project Engineer
ELV Project Engineer
 
E&I inspector cv
E&I inspector cvE&I inspector cv
E&I inspector cv
 
Electrical QA QC Engineer
Electrical QA QC EngineerElectrical QA QC Engineer
Electrical QA QC Engineer
 
Elv project engineer
Elv project engineerElv project engineer
Elv project engineer
 
Senior Electrical Engineer CV
Senior Electrical Engineer CVSenior Electrical Engineer CV
Senior Electrical Engineer CV
 
Shujaat Updated CV New
Shujaat Updated CV NewShujaat Updated CV New
Shujaat Updated CV New
 
ELECTRICAL DESIGN ENGINEER - RESUME
ELECTRICAL DESIGN ENGINEER -  RESUMEELECTRICAL DESIGN ENGINEER -  RESUME
ELECTRICAL DESIGN ENGINEER - RESUME
 
Ravi kumar-CV 2015
Ravi kumar-CV 2015Ravi kumar-CV 2015
Ravi kumar-CV 2015
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
 
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016
 
ELV Engineer
ELV EngineerELV Engineer
ELV Engineer
 
Electrical Supervisor
Electrical SupervisorElectrical Supervisor
Electrical Supervisor
 
Elv project engineer
Elv project engineerElv project engineer
Elv project engineer
 
JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)
 
cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
1.arun das mep resume
1.arun das mep resume  1.arun das mep resume
1.arun das mep resume
 
Electrical Engineer CV
Electrical Engineer CVElectrical Engineer CV
Electrical Engineer CV
 
CV Electrical QA QC Engineer
CV Electrical QA QC EngineerCV Electrical QA QC Engineer
CV Electrical QA QC Engineer
 

Similar to CV of Tahir Mahmood (20)

Elect Eng. Rizwan CV
Elect Eng. Rizwan CVElect Eng. Rizwan CV
Elect Eng. Rizwan CV
 
Irfan - Elec Engr
Irfan - Elec EngrIrfan - Elec Engr
Irfan - Elec Engr
 
Electrical Inspector CV
Electrical Inspector CVElectrical Inspector CV
Electrical Inspector CV
 
SHAMSHAD QAQC RESUME
SHAMSHAD QAQC RESUMESHAMSHAD QAQC RESUME
SHAMSHAD QAQC RESUME
 
Ng Eng Beng CV
Ng Eng Beng CVNg Eng Beng CV
Ng Eng Beng CV
 
Hussein Ahmad Salem-CV
Hussein Ahmad Salem-CVHussein Ahmad Salem-CV
Hussein Ahmad Salem-CV
 
CURRICULUM VITAE doc
CURRICULUM VITAE docCURRICULUM VITAE doc
CURRICULUM VITAE doc
 
Ryan P. Quilala CV
Ryan P. Quilala CVRyan P. Quilala CV
Ryan P. Quilala CV
 
1. Sharib Reza(CV)
1. Sharib Reza(CV)1. Sharib Reza(CV)
1. Sharib Reza(CV)
 
Samuel resume cv
Samuel resume cvSamuel resume cv
Samuel resume cv
 
saif.resume dxb
saif.resume dxbsaif.resume dxb
saif.resume dxb
 
Fady samir cv
Fady samir cvFady samir cv
Fady samir cv
 
update
updateupdate
update
 
RESUME-Sijin
RESUME-SijinRESUME-Sijin
RESUME-Sijin
 
CV
CVCV
CV
 
Jayabalan cv
Jayabalan  cvJayabalan  cv
Jayabalan cv
 
CV
CVCV
CV
 
Irfan-Mohammad
Irfan-MohammadIrfan-Mohammad
Irfan-Mohammad
 
vijins new-11-2016
vijins new-11-2016vijins new-11-2016
vijins new-11-2016
 
Mahesh_Y_Patil
Mahesh_Y_PatilMahesh_Y_Patil
Mahesh_Y_Patil
 

Recently uploaded

247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...Call Girls in Nagpur High Profile
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 

Recently uploaded (20)

247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 

CV of Tahir Mahmood

  • 1. Tahir Mahmood B.Sc. Electrical Engineer ( UET Lahore, Pakistan) Registered Engineer with Pakistan Engineering Council MME( Grade-B) Registered Engineer Qatar . Present Address: Doha,Qatar Mobile No : +97430346316 Total Experience 18 Years E-mail: tahrmrizvi@gmail.com PROFILE A competent professional with proven expertise in Electrical Systems, with 18 years of hands on experience including GCC Countries, Qatar UAE and Pakistan. Possess comprehensive knowledge in Execution & Supervision, QA/QC, Testing & Commissioning, Design Review, Planning and Site Management for the Electrical Systems involved in the Construction Sectors. Highly motivated and possess good communication and presentation skills. EDUCATION B. SC. ELECTRICAL ENGINEERING (4 YEARS DEGREE) 1992-1996 University of Engineering and Technology Lahore, Pakistan CORE COMPETENCIES AND CAREER SUMMARY EXPERIENCE OF ELECTRICAL SYSTEMS: Execution/ Supervision , Testing & Commissioning, Design Review, Site Management, Snag/Desnag and Final Handover to the Client for the Following Electrical systems during diverse Contractors and Consultants. HV, LV SYSTEMS • Substation Equipment’s (HV Panels, RMU’s, Transformers etc.) • DC System, Capacitors Banks and UPS System • LV Switchgears ( MDB, SMDB, D.B, PFC, MCC etc) • HV Cable Distribution within the plot and Tie in Cabling • HV Cable Trenches and Ducts • Earthing and Lightening Protection System • Small Power and Interior/ Exterior Lighting • Lighting & Dimming Control Systems • Street Lighting for Housing Societies • LV Cable Distribution • Electrical Wiring devices and its Accessories- • Central Emergency Battery Backup System - • Emergency Generators • Cable Trays/Trunking/ Ladders, G.I, PVC Conduiting, Floor Boxes • Electrical Bus Bar INFRASTRUCTURE WORKS: • Review of Services Coordination Drawings. • Coordination of Underground Electrical Systems with Local authorities existing services and other Mechanical services in the plot. • Electrical Duct work for Fire Alarm, Data/Tel (Etisalat), Central Battery System and BMS System within the plot and up to Tie in point.
  • 2. • Underground HV Cable Distribution System within the Plot and Tie in with existing RMU’s • Direct Buried Cabling for LV Systems • Trenches for Cables. • Feeder Pillars installation for street Lights. • Light Poles Installation for street Lighting. • Cabling, Poles and CCTV Camera installation within the plot. FIRE FIGHTING SYSTEM • Fire Fighting System( FM-200 and Sprinkler System) HSE: • Risk Assessment • Work Zone Safety • Heat Safety Protection • Accident Investigation and Rout Cause Analysis • Fire Extinguisher Safety 1- Employer: AECOM Middle East ,Qatar May, 2015 To Date Designation: Senior Electrical Engineer Project : New Orbital Highway Dukhan Highway to Alkhor Link Road Contract 4 . Job Responsibilities: • Reviewing and approving shop drawings and engineering material submissions. • Responding for the electrical design contents as assigned together with its follow up for Authority or Client̛s approval. • Solving RFI s on daily basis providing solutions for problems on site. • Continually ensuring that practices ,policies, strategy and services represent the client’s best interests and that construction work is in compliance with the current legislation, standards and codes of practices. • Responding to contractors technical queries. • Planning and monitoring work schedules for inspectors. • Site inspections to ensure that work done by the contractor is per detailed design approved and approved method statement. • Implementing site quality assurance programmes for electrical installations. • Serve as site representative for all matters related to construction quality assurance for electrical works
  • 3. 2.Potential Engineering (Ltd) Di Khan ,Pakistan April 2014 To Oct 2014 Designation: Site Manager Electrical Project: (132 /11kv wapda substation Gomal University) Job Responsibilities: Planning: • Review of construction schedules. • Preparing monthly and weekly progress reports. • Attend progress meetings with Client and Contractors. • Supervised the installation of 26/20 MVA Transformers(TEB),Current transformer, Potential transformer, Surge arresters, capacitor banks, HT/LT and control panels and earthing system, • Coordination with commissioning team to clear all the testing & commissioning activities of the equipments at the project. • Handing over of as built drawings, all test reports of functional performance of the relays of the control and protection system and operational and maintenance manuals. DESIGN REVIEW • Review and approval of Shop drawings for electrical system( HV, LV) • Review and approval of Coordination drawings • Review and approval of Material Submittals and Method Statements for each system as per project specification. • Coordination with the design team for any change in design at various stages of the project. QA/QC AND SUPERVISION: • Review and approval of Material Submittals , ITP’s, Method statements, Checklists , QCP and RFI’s • Ensuring material delivered on site is as per approved MAR through MVR inspection. • Issuing Site Instructions as required. • Ensuring material Storage is as per requirement. • Frequent factory visits and witness factory tests for various electrical equipment’s • Monitoring Contractor’s Activity Commencement Notice for each electrical system • Checking inspection requests ( IR’s) from contractors and ensuring the work done is as per approved shop drawings, method statements and material used is the same as approved. • Raising NCR if the work is not found as per project requirement • To maintain record for site activities by photographs • Solving Field Inspections Disputes as per Project documents. • Ensuring Equipments installation as per manufacturer’s installation manuals and project specifications • Supervising testing and commissioning of all electrical systems as per project specifications and manufacturer instructions • Keeping record for the as built drawings • Keeping record for the snagging list and ensuring creativeness. • Attending Coordination and Progress meetings with client and Contractors. • Electrical equipment Factory inspection carried out with Contactor at Manufactures Company. • Strong Coordination with Mechanical, Structural and Architectural Teams on the project in each phase of project • correctness, completeness and that they are in-line with the specifications
  • 4. 3- Flowtronics Pvt (Ltd) Pakistan Duration: July 2012- Jan 2013 Designation: Project Manager Project : 600 ton Polyester plant & 30 MW Power plant) IBRAHIM FIBRES • Strong coordination with design, procurement and execution team EXECUTION: • Periodic QA/QC Meetings with the site engineers and Supervisors • QA/QC Training of the execution team to ensure Quality of Work on site • Raising IR’s for the Activity after internal QA/QC inspection • Keeping Photographic records for the inspection on site • Doing Surveillance Inspections on site to ensure work done is as per approved shop drawings, Method statements and Material Submittals • Keeping records of Inspection requests. • Raising RFI’s to the Consultant. • Issuing internal NCR’s with Corrective and Preventive Actions. • Closing Consultant’s NCR. • Installation of Electrical Equipments as per Manufacturer’s recommendation, local authorities Requirements and approved shop drawings • Performing on site tests for cables, switchgears etc. • Installation, Testing and Commissioning of the Electrical Systems. PROJECT HANDOVER • Ensuring site teams to prepare As Built Drawings and Submission it to the Consultant • Closing Consultant’s snag list for each activity • Submission of test reports for each activity • Submission of O & M Manuals 4- Siemens Dubai, UAE Duration: Jun 2008-Dec 2011 Designation: Site Manager Electrical Projects: 132/11KV DLFF S/S ,132/11 ARSD S/S KV, 132/11 KV PILOT S/S DCA Jebel Ali DWC. Job Responsibilities:- • Supervision of the installation of 132/11KV transformer, 11/ 0.4 KV earthing transformers, 10 MVAR Shunt Reactor, capacitor banks, power & control panels. • Monitoring the progress and quality of the works with full concentration on keeping the efficiency of the work as high as possible by coordinating with site engineers, sub contractors & consultants. • Conducting site meetings with the sub contractors & site engineers to plan the working schedule according to the priority of the work. • Getting approval of some modifications as per site requirements & making arrangements to incorporate them into drawings. • Checking the received materials according to the approved documents & verifying the materials.
  • 5. 5.Potential Engineering (Ltd) Muzafargarh ,Pakistan April 2007 To May 2008 Designation: Site Manager Electrical Project: 220/132KV Substation Muzaffargarh Job Responsibilities: • Review and approval of Shop drawings for electrical system( HV, LV) • Review and approval of Coordination drawings. • Review and approval of Material Submittals and method statements for each system as per project specification. • Coordination with the design team for any change in design at various stages of the project. • Review and approval of Material Submittals , ITP’s, Method statements, Checklists , QCP and RFI’s. • Ensuring material delivered on site is as per approved MAR through MVR inspection. • Issuing Site Instructions as required. • Ensuring material Storage is as per requirement. • Frequent factory visits and witness factory tests for various electrical equipment. • Monitoring Contractor’s Activity Commencement Notice for each electrical system. • Checking inspection requests ( IR’s) from contractors and ensuring the work done is as per approved shop drawings, method statements and material used is the same as approved. • Raising NCR if the work is not found as per project requirement. • To maintain record for site activities by photographs. • Solving Field Inspections Disputes as per Project documents. • Ensuring Equipment installation as per manufacturer’s installation manuals and project specifications. • Supervising testing and commissioning of all electrical systems as per project specifications and manufacturer instructions. • Keeping record for the as built drawings. • Keeping record for the snagging list and ensuring creativeness. • Attending Coordination and Progress meetings with client and Contractors. • Electrical equipment Factory inspection carried out with Contactor at Manufactures Company. • Strong Coordination with Mechanical, Structural and Architectural Teams on the project in each phase of project.
  • 6. 6.Potential Engineering (Ltd) Gazi Barotha ,Pakistan Feb 2006 To Mar 2007 Designation: Construction Manager Project: 500/220KV substation Ghazi Boratha Power Complex. Job Responsibilities: • Review and approval of Material Submittals , ITP’s, Method statements, Checklists , QCP and RFI’s • Ensuring material delivered on site is as per approved MAR through MVR inspection. • Issuing Site Instructions as required. • Ensuring material Storage is as per requirement. • Frequent factory visits and witness factory tests for various electrical equipment. • Monitoring Contractor’s Activity Commencement Notice for each electrical system. • Checking inspection requests ( IR’s) from contractors and ensuring the work done is as per approved shop drawings, method statements and material used is the same as approved. • Raising NCR if the work is not found as per project requirement. • To maintain record for site activities by photographs. • Solving Field Inspections Disputes as per Project documents. • Ensuring Equipments installation is as per manufacturer’s installation manuals and project specifications. • Supervising testing and commissioning of all electrical systems as per project specifications and manufacturer instructions. • Keeping record for the as built drawings. • Keeping record for the snagging list and ensuring creativeness. • Attending Coordination and Progress meetings with client and Contractors. • Factory Acceptance Test( FAT ) carried out with Contactor at Manufactures Company. • Strong Coordination with Mechanical, Structural and Architectural Teams on the project in each phase of project correctness, completeness and that they are in-line with the specifications
  • 7. 7. Mahmood Group of Textile Industries, Pakistan March 2003 to Jan 2006 Designation: Plant Engineer Project: 5 MW Power House kabirwala Job Responsibilities: • Installations, testing and commissioning of Caterpillar Gas generators (3516B). • Worked as plant maintenance engineer. 8. Mahmood Group of Textile Industries, Pakistan Jan 2001 to Feb 2003 Designation: Electrical Engineer Project: Massod Fabrics textile unit Job Responsibilities: • Worked as maintenance engineer for the 610 Air jet looms Toyota, sizing machine Hacoba and warping machine of Germany with the target of maintaining the efficiency of the machines at 95%. Siemens , Pakistan Jan 1999 to December 2000 Designation: Site Electrical Engineer Project: Parco Mid Country Oil Refinery KOT ADU Job Responsibilities: • Worked as site engineer for installation of cathodic protection of the pipes and tanks, laying of power and control cables and lighting works and making daily progress report. ROUSCH Power Plant Pakistan Dec 1996 to Nov 1998 Designation: Site Engineer
  • 8. Project: ROUSCH Power Plant 412 MW Abdul Hakim Job Responsibilities: • Worked as site engineer for installation of control and protection panels and associated cable laying and preparing progress reports. Computer Skills; • MS Office & MS Excel & MS Power point. Personal Profile ; • Date of birth 6/8 1968 • Marital status married • Passport No HK0155692 • Languages English , Urdu and Arabic in learning stage Certificates ; • MME Grade –B • Qatar valid driving license