Egger Stammhaus
We always knew more was possible.
Now we have the proof.
2
EGGER Stammhaus	4
Where do we come from?	
Changes to earlier buildings	
Wood construction –
Modular construction method	8
Components wall & ceiling	
The atrium	
Fire protection	12
Fire alarm and sprinkler system	
Ceiling above the ground floor	
Details	14
Air conditioning
Lighting
Interior design	
Our products in use	16
Executing companies	19
1
2
3
4
5
6
The atrium of the EGGER Stammhaus in St. Johann in Tirol
3
Fritz Egger Senior built the first raw chipboard plant at the
headquarters in St. Johann in 1961, thus launching today's
EGGER Holzwerkstoffe family business. EGGER currently
operates 17 plants in 5 European countries, Russia and
Turkey, and, with a total of 7,400 employees, is one of the
leading manufacturers of wood-based materials. The company
headquarters remain in St. Johann in Tirol.
The ground-breaking ceremony for the construction of a new
administrative building – the EGGER Stammhaus – took
place in early 2014. Naturally, wood played a key role in the
construction. It was particularly important to make sure all
wood-based materials came from own production.
The new Stammhaus is a four-storey wooden construction,
offering room for a total of more than 250 work and 48 training
stations. A 220 seater employee restaurant with fresh food is
also part of the building.
EGGER
Stammhaus
The new EGGER Stammhaus locks in
approximately 3000 t CO2 –
as much as is needed for three flights
to New York.
Start of construction: 7 March 2014 Start installation wood
construction: 19 May 2014 Completion: 13 March 2015 Total floor
space: 8,924 m² Gross floor area: 10,440 m² Cubic area: 45,502 m³
→
4
Building height
without basement
15 m
Dimensions of
building components
on floor plan each 15 m × 58 m
including the mechanical
equipment room on the roof
5
Everything started in 2008 with an architecture competition
launched by EGGER. The call for submissions focused on
developing a modular and sustainable building which allows
centralised execution and complies with the requirements of
the various locations. The architect Bruno Moser from Breiten-
bach won with his idea for an innovative, modular system.
The OSB 4 TOP board with the maximum format 11.40 ×2.80 m
is central to it. The EGGER Stammhaus is already the fourth
building constructed with this method.
Modular design possibilities
Where do we
come from?
1.	 Administrative building
	 in Rădăuți, Romania
2.	 TechCenter in Unterradl-		
	 berg, Austria
3.	 Administrative building in 	
	 Brilon, Germany
4.	 Headquarters in St. 		
	 Johann in Tirol, Austria
6
Changes to
earlier
buildings
Bruno Moser's idea of a modular system
was refined with every new building
project. The administrative building in
Rădăuți (RO) still used 11.40 m steel
frames for reinforcement. This type of
structure was selected due to increased
earthquake exposure.
The subsequent project, the TechCenter
in Unterradlberg (AT), replaced the
steel frames with solid wood disks.
The ceiling components were struc-
tured so that the load of the ceiling
is distributed across four points. The
building structure of the TechCenter
was also used for the administrative
building in Brilon (DE). The only change
concerns the heating and cooling. A
heating and cooling ceiling was placed
in the entrance area, while the rest of
the building received floor convectors.
They react faster to differences in room
temperature.
The construction phase - the building complex was erected in a year
All technical achievements from Brilon
were implemented in the Stammhaus
in St. Johann in Tirol (AT). But there are
three distinct changes: the atrium, the
circular balconies, and the wooden
façade. The Stammhaus received a
wooden façade with balcony instead
of a copper façade, as was the case
for earlier constructions. A chessboard
pattern is achieved through the config-
uration of larch lamellas in the façade.
They also act as privacy screens. They
are set closer for modules containing
a coffee kitchen or toilets, and wider
for modules with offices. The circular
balcony protects first of all against fire
spreading. It also makes it easier to
clean the glass and protects the wood-
en façade from the effects of weather.
The balconies also prolong and open
the room towards the outside.
7
The four-storey timber frame construction, together with
an innovative fire protection concept is unique in Tirol and
represents a special structural challenge.
Holzbau Saurer manufactured individual wood construction
components and delivered them to St. Johann in Tirol. Com-
ponents measuring 11.40 × 2.80 m include OSB 4 TOP boards
from the EGGER plant in Wismar. Therefore, both buildings
reach a total length of approximately 58 m and a width of
approximately 15 m.
The building is constructed by module according to a certain
raster, where the size of the large-format OSB 4 TOP board
dictates the basic raster. The floor plan shows one module
consists of five components. Five modules aligned with each
other create a building component. The width of the atrium
is of four such components. The changing configuration of
modules creates the chessboard pattern characteristic for
the EGGER company architecture. It is clearly visible from the
outside through the larch lamellas.
One component is closed in each module, and four are open.
Every level represents an independent unit, with ventilation,
heating circuit, measuring, control and regulation technology,
as well as electricity distribution. All ventilation, heating,
exhaust air and cooling lines are led through the hollow box
component. The lines in the ceiling component are laid into
special grooves. One remarkable aspect is that loads are only
carried via the corners of the components. In addition, all
ceiling components are stretched longitudinally.
The underground garage with 36 parking spaces is a solid
construction with reinforced concrete, where clamped pillars
made of reinforced concrete reaching from the ground floor
to the basement ensure secure static. Starting from the
basement ceiling, the building is a pure wooden construction.
Interior walls were erected with the dry construction method.
Wood construction –
Modular construction method
Except for the underground car park made of concrete, the entire
four-storey building with timber frame structure consists mainly
of OSB 4 Top boards, timber and glass.
Products used
1,150 m3 	 EGGER OSB 4 TOP
185 m3 	 softboards
30 m3 	 MDF
95 m3 	 Larch
1,480 m3	Glulam
175 m3 	 Solid wood
			 (battens, duo, solid 	
			 structural timber)
8
S C H W E
Schwebius Gestaltung
Firma
Projekt
Plan
Plan Nr.
Masstab
Maßeinheit
Datum
Änderung
Eg
EBP
EBP
243
1:2
20
Maße sind bauseits zu
mm
31.
Tel 08051 96 34 034 I F
Balcony
Slatted frame larch
1.8 mm sealing
30 mm EGGER OSB 4 TOP
360 mm glued-laminated
timber support
30 mm EGGER OSB 4 TOP
Wall structure
Larch formwork
Vapour barrier
30 mm softboard
280 mm bar layer
22 mm EGGER OSB 4 TOP white glazed
Ceiling structure
EGGER laminate flooring
Impact sound insulating underlay
18 mm EGGER OSB 4 TOP
with tongue and groove profile
30 mm softboard
30 mm EGGER OSB 4 TOP
520 mm ceiling ribs
(in between approx. 60 mm chippings)
30 mm EGGER OSB 4 TOP white glazed
9
Due to their process technology and product features, OSB 4
TOP boards with building permit fulfil key wood construction
requirements. The defined high raw density of more than
600 kg/m3 leads to very good airtightness of the board, which
means that solid and reliable constructions are possible
without the additional use of vapour barriers. In addition,
the visibly polished and surface-processed board provides
interiors with a harmonious appearance. The boards are
glazed white to prevent darkening.
The exterior wall components consist of 28 cm thick insulated
solid structural timber posts, planked with OSB 4 TOP 22 mm
inside and a soft underlay board of 30 mm.
The ceilings are hollow box components made of glue-lami-
nated timber, which are statically secure and can handle high
loads. The load is transferred to the component's corners.
The maximum format of the board allows for a span width
of 11.40 m, the double span width of when using solid wood
boards.
The static load bearing OSB 4 TOP board was also used for the
ceiling components. The grit on the board, which is filled into
the component via holes on site, ensures noise protection.
The cables for building technology were installed in the layer
above.
Components
Wall and
ceiling
10
The special thing about the
Stammhaus is the atrium,
which links both sections
of the building. The roof
construction is made of
glue-laminated timber and
lamellas of OSB boards.
The structure was intention-
ally built so as to create a
separate space. The design
with the concrete floor and
the greenery is intended to
remind one of a piazza or a
public space, where employ-
ees and customers meet and
exchange thoughts.
The reception area is also
located in the atrium, and
the employee restaurant,
seminar, and training rooms
can be reached from it. The
staircase and the elevator
shaft made of OSB 4 TOP
boards are the core of the
atrium. The staircase is
right by the elevator, which
reaches all the way to the
basement. Seven glued OSB
4 TOP boards carry the load
of the staircase and the ele-
vator. Separately approved
connection devices are used
for fastening.
The atrium
11
The Stammhaus was built with the fire protection concept of
Dehne und Kruse. To this end, the building was divided into
several, separate fire sections – the basement, the ground
floor with the atrium, and the remaining three floors. The con-
cept consists of 2 exterior staircases made of incombustible
steel, as well as the staircase in the atrium as escape route.
Furthermore, the entire administrative building was equipped
with a fire alarm system and façade sprinklers in the atrium.
The fire protection doors towards the outside are steel and/or
aluminium structures with safety fire protection glass.
The office glass, as well as a maximum height of furniture
provides a good overview. Thus, employees are able to see a
fire already in its initial phase, or recognise it by its smell or
fire sounds.
Fire protection
A well-thought fire protection concept turns the Stammhaus
into a safe place. From the underground parking lot all the
way to the roof.
The following escape
routes are available in the
case of fire
•	the middle bridge, which 	
	 leads to another fire
	 compartment, and onto 	
	 escaping to the staircase
•	the two external stair 	
	towers
•	eight direct exits on the 	
	 ground floor
•	an emergency exit in the 	
	kitchen
12
The circular balcony with a width of
1.40 m prevents fire from spreading
from the ground floor to the upper floor.
Given the low fire load equipment of
the atrium, a fire spreading to both
administrative sections is almost
impossible, especially in connection
with the bilaterally compacted
sprinkling system. In addition, the
central, open staircase system including
the connection bridges is part of the
sprinkler protection. The building
is equipped with a full-surface fire
alarm system in line with the Austrian
standard EN 54 with automatic and
non-automatic alarms. This means that
fire detection and communication with
the fire department is already ensured
in the early stages of the fire.
The suspended ceiling between the
ground floor and the first upper level
has a fire resistance of 90 minutes
(REI90). The ceiling is built so that fire
penetration is isolated in a ceiling cavity
for 90 minutes. There are no ignition
sources in the cavities. Regarding fire
resistance, the full ceiling corresponds
to a reinforced concrete ceiling.
Fire alarm and
sprinkler system
Ceiling above the
ground floor
13
The building fulfils the low-energy-house standard and is
supplied with district heating and groundwater cooling. The
heating energy is gained in this case from the waste heat
generated by the St. Johann plant. The energy is then led into
the office via floor convectors (via 4 control systems). This
means that one office can be heated and the other cooled.
The offices are ventilated mechanically, and the exchange of
air is of 35 m³ per person per hour. The waste air is always led
outside, while there is also the option of natural ventilation
by tilting the windows. Constant four-fold exchange of air is
in place throughout the day for the locker rooms and shower
areas in the basement.
The natural lighting of the workstations is ensured via suffi-
cient window areas and transparent glass ceilings. The floor to
ceiling windows and doors made of wood and aluminium are
triple-glazed, just like the façade elements. Every workstation
has its own integrated LED lighting, which can be controlled
by the employee directly.
EGGER materials are also used inside, such as melamine-
faced boards, laminates, compact laminates, Eurolight light-
weight boards, edges and laminate flooring. Acoustic boards
made of EGGER products were installed to ensure ideal room
acoustics in office and training rooms. The layout provides
such good overview that it is possible to have unrestricted
views from central areas into individual offices and vice-versa.
Thus, furniture and space separators are not higher than
approx. 1.50 m. Higher built-in elements (e.g., filing cabinets)
are placed by exterior walls. Door panels of interior doors
are part of the inside wall cladding and thus also clad with
OSB 4 TOP boards. There are communication areas in each
department: conference rooms, video conference rooms, and
a tea kitchen with seating as retreat area.
Details
Many details were taken into account when designing the
interior – fresh air, lighting, furniture and co.
Air
conditioning
Lighting
Interior
design
14
The entire building, starting with the ground floor, has dry
screed and EGGER laminate flooring. The only exception is the
ground floor (kitchen area) with concrete screed with epoxy
resin coating, and the atrium flooring with concrete pitching.
Auxiliary rooms in the basement have a laminated concrete
screed.
LED
lighting
100%
15
Our products
in use
The Stammhaus "deserves" its name! It is the flagship of the EGGER Group
headquartered in St. Johann in Tirol – but also the materials used mainly
come from own production.
Construction
products
Exposed ceilings, walls,
balconies OSB 4 TOP 30 mm,
22 mm and 18 mm
Floor structure OSB 4 TOP with
tongue and groove profile 18 mm
OSB 4 TOP
OSB 4 TOP
16
Furniture
and interior
design
Reception Counter, wall and
ceiling cladding W1000 ST9
Premium White, H3344 ST36
Highline Oak EGGER logo H1334 ST9
Light Ferrara Oak
Foyer Wall cladding U732 ST9
Dust Grey Half-shell MDF clad,
edges natural/inserted U321 China
Red Counter EGGER digital print
décor Heartwood Ash as laminate,
U961 ST9 Graphite (interior sides,
insides of drawers) Wall cladding,
doors and wardrobe U702 ST9,
H3078 ST22 Hacienda white History
Compact laminate 8 mm U732 ST9
Dust Grey with dark core
EGGER POS W1000 ST9 Premium
White, U961 ST9 Graphite, H3344
ST36 Highline Oak
H3344 ST36
H3344 ST36
H1334 ST9
U732 ST9
U321 ST9
U961 ST9
W1000 ST9
W1000 ST9
U961 ST9
17
Laminate
floors
GF including employee restaurant
H1003 Valley Oak mocca, ST65,
Large, WV4, aqua+, 8 mm, CL32
1st
floor H1055 Bardolino Oak,
ST56, Classic, WV4, aqua+, 8+2 mm
Silenzio, CL32, synchronised pore
2nd
floor H1026 Vintage Knoxville
Oak grey, ST43, Large, WV4, aqua+,
8 mm, CL32 3rd
floor H1001 Valley
Oak, ST65, Large, WV4, aqua+, 8 mm,
CL32, synchronised pore
Furniture Acoustic walls GF H3078
ST22 Hacienda White, H3081 ST22
Hacienda Black Tables Compact
laminate 13 mm U702 ST9 with
dark core, OSB Combiline U961
ST9 Graphite Sideboards U702 ST9
Cashmere Lecterns U732 ST15 Dust
Grey, W1000 ST9 Premium White
Wardrobes with drill holes (3rd
floor):
Compact laminate 13 mm with drill
holes of approx. Ø 25 mm, U963
ST15 Diamond Grey White shelf (3rd
floor) Compact laminate W1000
ST9 Premium White with white core
Furniture and desks W980 ST9 and
ST15 Platinum white, ProAkustik
partition walls W980 ST9 Platinum
white
Furniture
and interior
design
W1000 ST9
H3081 ST22
H3078 ST22
U702 ST9
W980 ST9/ST15
H1003 ST65
18
FRITZ EGGER GmbH & Co OG
St. Johann in Tirol (AT)
www.egger.com
architekturWERKSTATT Bruno Moser
Breitenbach (AT)
www.archimos.at
SCHWEBIUS GESTALTUNG Michael Schwebius
Prien am Chiemsee (DE)
www.schwebius.de
Johanna Egger Innenarchitektur
Munich (DE)
www.johanna-egger.de
Holzbau Saurer
Höfen (AT)
www.holzbau-saurer.com
Barth Innenausbau
Brixen (IT)
www.barth.it
Tischlerei und Möbelhandel Sepp Hofer
Oberndorf (AT)
www.sepp-hofer.com
Schreinerei Daxenberger
Seeon (DE)
www.schreinerei-daxenberger.de
conceptlicht.at
Mils (AT)
www.conceptlicht.at
Executing
companies
Such a large building project can only be executed so smoothly if
everyone pulls together. Planning and implementation go hand in hand.
The Stammhaus is the best example of good cooperation.
Customer / builder
Architect
Interior designers
Lighting design
Fabricator
Wood construction
Atrium and management
offices
Restaurant and meeting areas
Furniture and offices
Photography:©ChristianVorhofer(Innsbruck)
19
Technical hotline
t +49 3841 301 - 21260 · f +49 3841 301 - 61260
buildingproducts@egger.com
www.egger.com/buildingproducts
Would you like to know more
about our building products?
Simply scan here for detailed
information.
EN_1162789_02/16
Subjecttotechnicalmodificationsandprintingerrors.
Alldecorsspecifiedandshownarereproductions.Duetovariablesintheprintingprocess,coloursmayvaryfromtheactualproduct.

More Related Content

What's hot

Pyrostyle Sales Brochure
Pyrostyle Sales BrochurePyrostyle Sales Brochure
Pyrostyle Sales Brochure
Gavin Evans
 
LiamBaines_Construction_FACADES
LiamBaines_Construction_FACADESLiamBaines_Construction_FACADES
LiamBaines_Construction_FACADES
Liam Baines
 
Door and window fenestration system
Door and window fenestration systemDoor and window fenestration system
Door and window fenestration system
EyobAlene1
 
Stadthaus, murray grove case study presentation
Stadthaus, murray grove case study presentationStadthaus, murray grove case study presentation
Stadthaus, murray grove case study presentation
Toronto 2030 District
 
Clt mtb seminar_presentation_seven
Clt mtb seminar_presentation_sevenClt mtb seminar_presentation_seven
Clt mtb seminar_presentation_seven
FWPA
 
False Ceiling Information and Joinary Details
False Ceiling Information and Joinary DetailsFalse Ceiling Information and Joinary Details
False Ceiling Information and Joinary Details
MihirPawar5
 
Clt mtb seminar_presentation_two
Clt mtb seminar_presentation_twoClt mtb seminar_presentation_two
Clt mtb seminar_presentation_two
FWPA
 
INTERNORM
INTERNORMINTERNORM
INTERNORM
Imre Mate
 
Palagio Engineering who We are...
Palagio Engineering who We are...Palagio Engineering who We are...
Palagio Engineering who We are...
Palagio Engineering
 
False Ceiling in Interior Works
False Ceiling in Interior WorksFalse Ceiling in Interior Works
False Ceiling in Interior Works
gaikwadrajesh9
 
HF 410
HF 410HF 410
HF 410
Imre Mate
 
McNally Joinery Products
McNally Joinery ProductsMcNally Joinery Products
McNally Joinery Products
Bernie McNally
 
How to install false ceiling
How to install false ceilingHow to install false ceiling
How to install false ceiling
cristinadc112730
 
Forms of aluminium
Forms of aluminiumForms of aluminium
Forms of aluminium
pam_21
 
Aluminum partition wall
Aluminum partition wallAluminum partition wall
Aluminum partition wall
Zuber Memon
 
Fire resistive construction
Fire resistive constructionFire resistive construction
Fire resistive construction
GOVERNMENT ENGINEERING COLLAGE DAHOD
 
False ceiling
False ceilingFalse ceiling
False ceiling
Abhishek kumar maurya
 
False Ceiling
False CeilingFalse Ceiling
False Ceiling
Sadaf Siddiqui
 
False ceiling
False ceiling False ceiling
False ceiling
purvi golecha
 
false ceiling
false ceilingfalse ceiling
false ceiling
ravirajpal1
 

What's hot (20)

Pyrostyle Sales Brochure
Pyrostyle Sales BrochurePyrostyle Sales Brochure
Pyrostyle Sales Brochure
 
LiamBaines_Construction_FACADES
LiamBaines_Construction_FACADESLiamBaines_Construction_FACADES
LiamBaines_Construction_FACADES
 
Door and window fenestration system
Door and window fenestration systemDoor and window fenestration system
Door and window fenestration system
 
Stadthaus, murray grove case study presentation
Stadthaus, murray grove case study presentationStadthaus, murray grove case study presentation
Stadthaus, murray grove case study presentation
 
Clt mtb seminar_presentation_seven
Clt mtb seminar_presentation_sevenClt mtb seminar_presentation_seven
Clt mtb seminar_presentation_seven
 
False Ceiling Information and Joinary Details
False Ceiling Information and Joinary DetailsFalse Ceiling Information and Joinary Details
False Ceiling Information and Joinary Details
 
Clt mtb seminar_presentation_two
Clt mtb seminar_presentation_twoClt mtb seminar_presentation_two
Clt mtb seminar_presentation_two
 
INTERNORM
INTERNORMINTERNORM
INTERNORM
 
Palagio Engineering who We are...
Palagio Engineering who We are...Palagio Engineering who We are...
Palagio Engineering who We are...
 
False Ceiling in Interior Works
False Ceiling in Interior WorksFalse Ceiling in Interior Works
False Ceiling in Interior Works
 
HF 410
HF 410HF 410
HF 410
 
McNally Joinery Products
McNally Joinery ProductsMcNally Joinery Products
McNally Joinery Products
 
How to install false ceiling
How to install false ceilingHow to install false ceiling
How to install false ceiling
 
Forms of aluminium
Forms of aluminiumForms of aluminium
Forms of aluminium
 
Aluminum partition wall
Aluminum partition wallAluminum partition wall
Aluminum partition wall
 
Fire resistive construction
Fire resistive constructionFire resistive construction
Fire resistive construction
 
False ceiling
False ceilingFalse ceiling
False ceiling
 
False Ceiling
False CeilingFalse Ceiling
False Ceiling
 
False ceiling
False ceiling False ceiling
False ceiling
 
false ceiling
false ceilingfalse ceiling
false ceiling
 

Viewers also liked

Proyecto educativo lectura y tic
Proyecto educativo lectura y ticProyecto educativo lectura y tic
Proyecto educativo lectura y tic
jackelin chincha
 
Flyr PHP micro-framework
Flyr PHP micro-frameworkFlyr PHP micro-framework
Flyr PHP micro-framework
Siro Díaz Palazón
 
Fortum in India
Fortum in IndiaFortum in India
Fortum in India
Business Finland
 
Fluid - Templating for professionals - T3CON09
Fluid - Templating for professionals - T3CON09Fluid - Templating for professionals - T3CON09
Fluid - Templating for professionals - T3CON09
Sebastian Kurfürst
 
Presentacion croquis
Presentacion croquisPresentacion croquis
Presentacion croquis
David Calderon
 
el Punto SIGRE
el Punto SIGREel Punto SIGRE
Red Logica
Red LogicaRed Logica
Red Logica
guest83a177f
 
Liceo Pedagógico Maria Reina de la Paz
Liceo Pedagógico Maria Reina de la PazLiceo Pedagógico Maria Reina de la Paz
Liceo Pedagógico Maria Reina de la Paz
Sniper Ltda.
 
Avatar Minihompy Proposal
Avatar Minihompy ProposalAvatar Minihompy Proposal
Avatar Minihompy Proposal
Jeongha Lee
 
Kotler pom 15e_inppt_09
Kotler pom 15e_inppt_09Kotler pom 15e_inppt_09
Kotler pom 15e_inppt_09
Deden As-Syafei
 
Lineamientos para el uso y aplicacion de los recursos educativos digitales
Lineamientos para el uso y aplicacion de los recursos educativos digitalesLineamientos para el uso y aplicacion de los recursos educativos digitales
Lineamientos para el uso y aplicacion de los recursos educativos digitales
Carlos Alzate
 
36th auction for old stocks ands bonds / Scripophily / Historische Wertpapier...
36th auction for old stocks ands bonds / Scripophily / Historische Wertpapier...36th auction for old stocks ands bonds / Scripophily / Historische Wertpapier...
36th auction for old stocks ands bonds / Scripophily / Historische Wertpapier...
Matthias Schmitt
 
2013 july gac webinar for tom
2013 july gac webinar for tom2013 july gac webinar for tom
2013 july gac webinar for tom
DNS Entrepreneurship Center
 
Apnea pulmon
Apnea pulmonApnea pulmon
Marketing de atracción 2.0 (Inbound Marketing) - Oscar del Santo y Daniel Álv...
Marketing de atracción 2.0 (Inbound Marketing) - Oscar del Santo y Daniel Álv...Marketing de atracción 2.0 (Inbound Marketing) - Oscar del Santo y Daniel Álv...
Marketing de atracción 2.0 (Inbound Marketing) - Oscar del Santo y Daniel Álv...
Juan Carlos Mejía Llano
 
Pelan Hebat Produk Hebat e-naco
Pelan Hebat Produk Hebat e-nacoPelan Hebat Produk Hebat e-naco
Pelan Hebat Produk Hebat e-naco
Success Profile
 
Modelos de investigación cualitativa y cuantitativa
Modelos de investigación cualitativa y cuantitativaModelos de investigación cualitativa y cuantitativa
Modelos de investigación cualitativa y cuantitativa
Raah Yhwh
 
96084535 informe-final-serums
96084535 informe-final-serums96084535 informe-final-serums
96084535 informe-final-serums
roxana diaz cisneros
 
Gymkana los derechos del niño
Gymkana los derechos del niñoGymkana los derechos del niño
Gymkana los derechos del niño
Alfonso Peña Sánchez
 
Funciones mentales superiores 4 to trimestre psicologia
Funciones mentales superiores 4 to trimestre psicologiaFunciones mentales superiores 4 to trimestre psicologia
Funciones mentales superiores 4 to trimestre psicologia
UBA
 

Viewers also liked (20)

Proyecto educativo lectura y tic
Proyecto educativo lectura y ticProyecto educativo lectura y tic
Proyecto educativo lectura y tic
 
Flyr PHP micro-framework
Flyr PHP micro-frameworkFlyr PHP micro-framework
Flyr PHP micro-framework
 
Fortum in India
Fortum in IndiaFortum in India
Fortum in India
 
Fluid - Templating for professionals - T3CON09
Fluid - Templating for professionals - T3CON09Fluid - Templating for professionals - T3CON09
Fluid - Templating for professionals - T3CON09
 
Presentacion croquis
Presentacion croquisPresentacion croquis
Presentacion croquis
 
el Punto SIGRE
el Punto SIGREel Punto SIGRE
el Punto SIGRE
 
Red Logica
Red LogicaRed Logica
Red Logica
 
Liceo Pedagógico Maria Reina de la Paz
Liceo Pedagógico Maria Reina de la PazLiceo Pedagógico Maria Reina de la Paz
Liceo Pedagógico Maria Reina de la Paz
 
Avatar Minihompy Proposal
Avatar Minihompy ProposalAvatar Minihompy Proposal
Avatar Minihompy Proposal
 
Kotler pom 15e_inppt_09
Kotler pom 15e_inppt_09Kotler pom 15e_inppt_09
Kotler pom 15e_inppt_09
 
Lineamientos para el uso y aplicacion de los recursos educativos digitales
Lineamientos para el uso y aplicacion de los recursos educativos digitalesLineamientos para el uso y aplicacion de los recursos educativos digitales
Lineamientos para el uso y aplicacion de los recursos educativos digitales
 
36th auction for old stocks ands bonds / Scripophily / Historische Wertpapier...
36th auction for old stocks ands bonds / Scripophily / Historische Wertpapier...36th auction for old stocks ands bonds / Scripophily / Historische Wertpapier...
36th auction for old stocks ands bonds / Scripophily / Historische Wertpapier...
 
2013 july gac webinar for tom
2013 july gac webinar for tom2013 july gac webinar for tom
2013 july gac webinar for tom
 
Apnea pulmon
Apnea pulmonApnea pulmon
Apnea pulmon
 
Marketing de atracción 2.0 (Inbound Marketing) - Oscar del Santo y Daniel Álv...
Marketing de atracción 2.0 (Inbound Marketing) - Oscar del Santo y Daniel Álv...Marketing de atracción 2.0 (Inbound Marketing) - Oscar del Santo y Daniel Álv...
Marketing de atracción 2.0 (Inbound Marketing) - Oscar del Santo y Daniel Álv...
 
Pelan Hebat Produk Hebat e-naco
Pelan Hebat Produk Hebat e-nacoPelan Hebat Produk Hebat e-naco
Pelan Hebat Produk Hebat e-naco
 
Modelos de investigación cualitativa y cuantitativa
Modelos de investigación cualitativa y cuantitativaModelos de investigación cualitativa y cuantitativa
Modelos de investigación cualitativa y cuantitativa
 
96084535 informe-final-serums
96084535 informe-final-serums96084535 informe-final-serums
96084535 informe-final-serums
 
Gymkana los derechos del niño
Gymkana los derechos del niñoGymkana los derechos del niño
Gymkana los derechos del niño
 
Funciones mentales superiores 4 to trimestre psicologia
Funciones mentales superiores 4 to trimestre psicologiaFunciones mentales superiores 4 to trimestre psicologia
Funciones mentales superiores 4 to trimestre psicologia
 

Similar to EGGER Stammhaus (Head Office) Case Study

Presentation Design Drawing for Architectural Drawing
Presentation Design Drawing for Architectural DrawingPresentation Design Drawing for Architectural Drawing
Presentation Design Drawing for Architectural Drawing
Shane Madden
 
Building Industry catalague 2015
Building Industry catalague 2015Building Industry catalague 2015
Building Industry catalague 2015
Lesley Lloyd
 
University of exeter, forum building
University of exeter, forum  buildingUniversity of exeter, forum  building
University of exeter, forum building
Mehari Melaku
 
Fuschlberger
FuschlbergerFuschlberger
Fuschlberger
Patrick Kogler
 
Icf presentation english - august 2010
Icf   presentation english - august 2010Icf   presentation english - august 2010
Icf presentation english - august 2010
SERIGNE DIENG
 
EGGER Corporate Brochure
EGGER Corporate BrochureEGGER Corporate Brochure
EGGER Corporate Brochure
EGGER UK
 
Bréhan en
Bréhan   enBréhan   en
Bréhan en
libnam
 
Brochure_GtoCeilings_UK
Brochure_GtoCeilings_UKBrochure_GtoCeilings_UK
Brochure_GtoCeilings_UK
juliette halliday
 
A4 Portfolio Sample edited 2 .compressed
A4 Portfolio Sample edited 2 .compressedA4 Portfolio Sample edited 2 .compressed
A4 Portfolio Sample edited 2 .compressed
Indraj Bhachu
 
Research On Building Projects In Structural Glazing(Three Projects In The Fie...
Research On Building Projects In Structural Glazing(Three Projects In The Fie...Research On Building Projects In Structural Glazing(Three Projects In The Fie...
Research On Building Projects In Structural Glazing(Three Projects In The Fie...
Mrinal -
 
Panel Built Catalog
Panel Built CatalogPanel Built Catalog
Panel Built Catalog
Panel Built
 
PROJECT SHOWCASE Materialisation & Visuals
PROJECT SHOWCASE Materialisation & VisualsPROJECT SHOWCASE Materialisation & Visuals
PROJECT SHOWCASE Materialisation & Visuals
Leyana Clarke
 
ARCHITECTS OFFICE: architectural firm- between spaces, bangalore.
ARCHITECTS OFFICE: architectural firm- between spaces, bangalore.ARCHITECTS OFFICE: architectural firm- between spaces, bangalore.
ARCHITECTS OFFICE: architectural firm- between spaces, bangalore.
SOUNDARYACHOTHE
 
Bristol drive
Bristol driveBristol drive
Bristol drive
lapp0212
 
Case study on Leadenhall Building KUET BECM 2k15
Case study on Leadenhall Building KUET BECM 2k15Case study on Leadenhall Building KUET BECM 2k15
Case study on Leadenhall Building KUET BECM 2k15
Arafat Akash
 
Architect Norman Foster’s Chesa Futura
Architect Norman Foster’s Chesa FuturaArchitect Norman Foster’s Chesa Futura
Architect Norman Foster’s Chesa Futura
Fatima Junaid
 
Domberg eng
Domberg engDomberg eng
Domberg eng
Nikolay Stasiuk
 
Commercial fit outs
Commercial fit outsCommercial fit outs
Commercial fit outs
Richard Filkuka
 
Building Technology project 02
Building Technology project 02Building Technology project 02
Building Technology project 02
Jy Chong
 
Evalon Waterproofing Case Study - ICB
Evalon Waterproofing Case Study - ICBEvalon Waterproofing Case Study - ICB
Evalon Waterproofing Case Study - ICB
ICB
 

Similar to EGGER Stammhaus (Head Office) Case Study (20)

Presentation Design Drawing for Architectural Drawing
Presentation Design Drawing for Architectural DrawingPresentation Design Drawing for Architectural Drawing
Presentation Design Drawing for Architectural Drawing
 
Building Industry catalague 2015
Building Industry catalague 2015Building Industry catalague 2015
Building Industry catalague 2015
 
University of exeter, forum building
University of exeter, forum  buildingUniversity of exeter, forum  building
University of exeter, forum building
 
Fuschlberger
FuschlbergerFuschlberger
Fuschlberger
 
Icf presentation english - august 2010
Icf   presentation english - august 2010Icf   presentation english - august 2010
Icf presentation english - august 2010
 
EGGER Corporate Brochure
EGGER Corporate BrochureEGGER Corporate Brochure
EGGER Corporate Brochure
 
Bréhan en
Bréhan   enBréhan   en
Bréhan en
 
Brochure_GtoCeilings_UK
Brochure_GtoCeilings_UKBrochure_GtoCeilings_UK
Brochure_GtoCeilings_UK
 
A4 Portfolio Sample edited 2 .compressed
A4 Portfolio Sample edited 2 .compressedA4 Portfolio Sample edited 2 .compressed
A4 Portfolio Sample edited 2 .compressed
 
Research On Building Projects In Structural Glazing(Three Projects In The Fie...
Research On Building Projects In Structural Glazing(Three Projects In The Fie...Research On Building Projects In Structural Glazing(Three Projects In The Fie...
Research On Building Projects In Structural Glazing(Three Projects In The Fie...
 
Panel Built Catalog
Panel Built CatalogPanel Built Catalog
Panel Built Catalog
 
PROJECT SHOWCASE Materialisation & Visuals
PROJECT SHOWCASE Materialisation & VisualsPROJECT SHOWCASE Materialisation & Visuals
PROJECT SHOWCASE Materialisation & Visuals
 
ARCHITECTS OFFICE: architectural firm- between spaces, bangalore.
ARCHITECTS OFFICE: architectural firm- between spaces, bangalore.ARCHITECTS OFFICE: architectural firm- between spaces, bangalore.
ARCHITECTS OFFICE: architectural firm- between spaces, bangalore.
 
Bristol drive
Bristol driveBristol drive
Bristol drive
 
Case study on Leadenhall Building KUET BECM 2k15
Case study on Leadenhall Building KUET BECM 2k15Case study on Leadenhall Building KUET BECM 2k15
Case study on Leadenhall Building KUET BECM 2k15
 
Architect Norman Foster’s Chesa Futura
Architect Norman Foster’s Chesa FuturaArchitect Norman Foster’s Chesa Futura
Architect Norman Foster’s Chesa Futura
 
Domberg eng
Domberg engDomberg eng
Domberg eng
 
Commercial fit outs
Commercial fit outsCommercial fit outs
Commercial fit outs
 
Building Technology project 02
Building Technology project 02Building Technology project 02
Building Technology project 02
 
Evalon Waterproofing Case Study - ICB
Evalon Waterproofing Case Study - ICBEvalon Waterproofing Case Study - ICB
Evalon Waterproofing Case Study - ICB
 

More from EGGER UK

LivingKitchen 2017 Trend Report
LivingKitchen 2017 Trend ReportLivingKitchen 2017 Trend Report
LivingKitchen 2017 Trend Report
EGGER UK
 
The new UK & Ireland Furniture Manufacturing Collection 2017-2019 Brochure
The new UK & Ireland Furniture Manufacturing Collection 2017-2019 BrochureThe new UK & Ireland Furniture Manufacturing Collection 2017-2019 Brochure
The new UK & Ireland Furniture Manufacturing Collection 2017-2019 Brochure
EGGER UK
 
EGGER Compact Laminate Brochure
EGGER Compact Laminate BrochureEGGER Compact Laminate Brochure
EGGER Compact Laminate Brochure
EGGER UK
 
EGGER Structure 27 Brochure
EGGER Structure 27 Brochure EGGER Structure 27 Brochure
EGGER Structure 27 Brochure
EGGER UK
 
EGGER Worktops Contemporary Collection
EGGER Worktops Contemporary CollectionEGGER Worktops Contemporary Collection
EGGER Worktops Contemporary Collection
EGGER UK
 
EuroCucina 2016 Trend Report
EuroCucina 2016 Trend ReportEuroCucina 2016 Trend Report
EuroCucina 2016 Trend Report
EGGER UK
 
EGGER Laminate Flooring Magazine
EGGER Laminate Flooring MagazineEGGER Laminate Flooring Magazine
EGGER Laminate Flooring Magazine
EGGER UK
 
EGGER Building Solutions Brochure
EGGER Building Solutions BrochureEGGER Building Solutions Brochure
EGGER Building Solutions Brochure
EGGER UK
 
EGGER Insight Brochure
EGGER Insight BrochureEGGER Insight Brochure
EGGER Insight Brochure
EGGER UK
 
EGGER Worktops Premium Collection
EGGER Worktops Premium CollectionEGGER Worktops Premium Collection
EGGER Worktops Premium Collection
EGGER UK
 
Explore New Perspectives 2015-2016
Explore New Perspectives 2015-2016Explore New Perspectives 2015-2016
Explore New Perspectives 2015-2016
EGGER UK
 
Environment & Sustainability
Environment & SustainabilityEnvironment & Sustainability
Environment & Sustainability
EGGER UK
 

More from EGGER UK (12)

LivingKitchen 2017 Trend Report
LivingKitchen 2017 Trend ReportLivingKitchen 2017 Trend Report
LivingKitchen 2017 Trend Report
 
The new UK & Ireland Furniture Manufacturing Collection 2017-2019 Brochure
The new UK & Ireland Furniture Manufacturing Collection 2017-2019 BrochureThe new UK & Ireland Furniture Manufacturing Collection 2017-2019 Brochure
The new UK & Ireland Furniture Manufacturing Collection 2017-2019 Brochure
 
EGGER Compact Laminate Brochure
EGGER Compact Laminate BrochureEGGER Compact Laminate Brochure
EGGER Compact Laminate Brochure
 
EGGER Structure 27 Brochure
EGGER Structure 27 Brochure EGGER Structure 27 Brochure
EGGER Structure 27 Brochure
 
EGGER Worktops Contemporary Collection
EGGER Worktops Contemporary CollectionEGGER Worktops Contemporary Collection
EGGER Worktops Contemporary Collection
 
EuroCucina 2016 Trend Report
EuroCucina 2016 Trend ReportEuroCucina 2016 Trend Report
EuroCucina 2016 Trend Report
 
EGGER Laminate Flooring Magazine
EGGER Laminate Flooring MagazineEGGER Laminate Flooring Magazine
EGGER Laminate Flooring Magazine
 
EGGER Building Solutions Brochure
EGGER Building Solutions BrochureEGGER Building Solutions Brochure
EGGER Building Solutions Brochure
 
EGGER Insight Brochure
EGGER Insight BrochureEGGER Insight Brochure
EGGER Insight Brochure
 
EGGER Worktops Premium Collection
EGGER Worktops Premium CollectionEGGER Worktops Premium Collection
EGGER Worktops Premium Collection
 
Explore New Perspectives 2015-2016
Explore New Perspectives 2015-2016Explore New Perspectives 2015-2016
Explore New Perspectives 2015-2016
 
Environment & Sustainability
Environment & SustainabilityEnvironment & Sustainability
Environment & Sustainability
 

Recently uploaded

Gianluigi Torzi | Managing Director and Head of Capital Markets
Gianluigi Torzi | Managing Director and Head of Capital MarketsGianluigi Torzi | Managing Director and Head of Capital Markets
Gianluigi Torzi | Managing Director and Head of Capital Markets
Gianluigi Torzi
 
Selling your home can be easy. Our team helps make it happen.
Selling your home can be easy. Our team helps make it happen.Selling your home can be easy. Our team helps make it happen.
Selling your home can be easy. Our team helps make it happen.
Eric B. Slifkin, PA
 
Future of andhra pradesh real estate.pdf
Future of andhra pradesh real estate.pdfFuture of andhra pradesh real estate.pdf
Future of andhra pradesh real estate.pdf
narinav14
 
Why is Revit MEP Outsourcing considered an as good option for construction pr...
Why is Revit MEP Outsourcing considered an as good option for construction pr...Why is Revit MEP Outsourcing considered an as good option for construction pr...
Why is Revit MEP Outsourcing considered an as good option for construction pr...
MarsBIM1
 
SVN Live 6.17.24 Weekly Property Broadcast
SVN Live 6.17.24 Weekly Property BroadcastSVN Live 6.17.24 Weekly Property Broadcast
SVN Live 6.17.24 Weekly Property Broadcast
SVN International Corp.
 
Expressways of India: A Comprehensive Guide
Expressways of India: A Comprehensive GuideExpressways of India: A Comprehensive Guide
Expressways of India: A Comprehensive Guide
narinav14
 
Floople Real Estate Market in the UK - Current Trends and Future Prospects
Floople Real Estate Market in the UK - Current Trends and Future ProspectsFloople Real Estate Market in the UK - Current Trends and Future Prospects
Floople Real Estate Market in the UK - Current Trends and Future Prospects
Floople
 
Anilesh Ahuja Pioneering a Paradigm Shift in Real Estate Success.pptx
Anilesh Ahuja Pioneering a Paradigm Shift in Real Estate Success.pptxAnilesh Ahuja Pioneering a Paradigm Shift in Real Estate Success.pptx
Anilesh Ahuja Pioneering a Paradigm Shift in Real Estate Success.pptx
neilahuja668
 
The Slifkin Real Estate Team Listing Presentation
The Slifkin Real Estate Team Listing PresentationThe Slifkin Real Estate Team Listing Presentation
The Slifkin Real Estate Team Listing Presentation
Eric B. Slifkin, PA
 
GUIA_LEGAL_CHAPTER_11_REAL STATE PROPERTY .pdf
GUIA_LEGAL_CHAPTER_11_REAL STATE PROPERTY .pdfGUIA_LEGAL_CHAPTER_11_REAL STATE PROPERTY .pdf
GUIA_LEGAL_CHAPTER_11_REAL STATE PROPERTY .pdf
ProexportColombia1
 
Listing Turkey - Piyalepasa Istanbul Catalog
Listing Turkey -  Piyalepasa Istanbul CatalogListing Turkey -  Piyalepasa Istanbul Catalog
Listing Turkey - Piyalepasa Istanbul Catalog
Listing Turkey
 
Sunrise Infra Properties Company Profile Pradeep.pdf
Sunrise Infra Properties Company Profile Pradeep.pdfSunrise Infra Properties Company Profile Pradeep.pdf
Sunrise Infra Properties Company Profile Pradeep.pdf
babugunda75
 
Signature Global TITANIUM SPR | 3.5 & 4.5BHK High rise Apartments in Gurgaon
Signature Global TITANIUM SPR  | 3.5 & 4.5BHK High rise Apartments in GurgaonSignature Global TITANIUM SPR  | 3.5 & 4.5BHK High rise Apartments in Gurgaon
Signature Global TITANIUM SPR | 3.5 & 4.5BHK High rise Apartments in Gurgaon
globalsignature2022
 
Stark Builders: Where Quality Meets Craftsmanship!
Stark Builders: Where Quality Meets Craftsmanship!Stark Builders: Where Quality Meets Craftsmanship!
Stark Builders: Where Quality Meets Craftsmanship!
shuilykhatunnil
 
Marbo Medic Real Estate - Belgrade City.pdf
Marbo Medic Real Estate - Belgrade City.pdfMarbo Medic Real Estate - Belgrade City.pdf
Marbo Medic Real Estate - Belgrade City.pdf
IrinaKovacevic4
 
Living in an UBER World - June '24 Sales Meeting
Living in an UBER World - June '24 Sales MeetingLiving in an UBER World - June '24 Sales Meeting
Living in an UBER World - June '24 Sales Meeting
Tom Blefko
 
Office Building for Sale - 2810 City View Drive, Madison, WI
Office Building for Sale - 2810 City View Drive, Madison, WIOffice Building for Sale - 2810 City View Drive, Madison, WI
Office Building for Sale - 2810 City View Drive, Madison, WI
Lee & Associates of Madison, WI
 

Recently uploaded (17)

Gianluigi Torzi | Managing Director and Head of Capital Markets
Gianluigi Torzi | Managing Director and Head of Capital MarketsGianluigi Torzi | Managing Director and Head of Capital Markets
Gianluigi Torzi | Managing Director and Head of Capital Markets
 
Selling your home can be easy. Our team helps make it happen.
Selling your home can be easy. Our team helps make it happen.Selling your home can be easy. Our team helps make it happen.
Selling your home can be easy. Our team helps make it happen.
 
Future of andhra pradesh real estate.pdf
Future of andhra pradesh real estate.pdfFuture of andhra pradesh real estate.pdf
Future of andhra pradesh real estate.pdf
 
Why is Revit MEP Outsourcing considered an as good option for construction pr...
Why is Revit MEP Outsourcing considered an as good option for construction pr...Why is Revit MEP Outsourcing considered an as good option for construction pr...
Why is Revit MEP Outsourcing considered an as good option for construction pr...
 
SVN Live 6.17.24 Weekly Property Broadcast
SVN Live 6.17.24 Weekly Property BroadcastSVN Live 6.17.24 Weekly Property Broadcast
SVN Live 6.17.24 Weekly Property Broadcast
 
Expressways of India: A Comprehensive Guide
Expressways of India: A Comprehensive GuideExpressways of India: A Comprehensive Guide
Expressways of India: A Comprehensive Guide
 
Floople Real Estate Market in the UK - Current Trends and Future Prospects
Floople Real Estate Market in the UK - Current Trends and Future ProspectsFloople Real Estate Market in the UK - Current Trends and Future Prospects
Floople Real Estate Market in the UK - Current Trends and Future Prospects
 
Anilesh Ahuja Pioneering a Paradigm Shift in Real Estate Success.pptx
Anilesh Ahuja Pioneering a Paradigm Shift in Real Estate Success.pptxAnilesh Ahuja Pioneering a Paradigm Shift in Real Estate Success.pptx
Anilesh Ahuja Pioneering a Paradigm Shift in Real Estate Success.pptx
 
The Slifkin Real Estate Team Listing Presentation
The Slifkin Real Estate Team Listing PresentationThe Slifkin Real Estate Team Listing Presentation
The Slifkin Real Estate Team Listing Presentation
 
GUIA_LEGAL_CHAPTER_11_REAL STATE PROPERTY .pdf
GUIA_LEGAL_CHAPTER_11_REAL STATE PROPERTY .pdfGUIA_LEGAL_CHAPTER_11_REAL STATE PROPERTY .pdf
GUIA_LEGAL_CHAPTER_11_REAL STATE PROPERTY .pdf
 
Listing Turkey - Piyalepasa Istanbul Catalog
Listing Turkey -  Piyalepasa Istanbul CatalogListing Turkey -  Piyalepasa Istanbul Catalog
Listing Turkey - Piyalepasa Istanbul Catalog
 
Sunrise Infra Properties Company Profile Pradeep.pdf
Sunrise Infra Properties Company Profile Pradeep.pdfSunrise Infra Properties Company Profile Pradeep.pdf
Sunrise Infra Properties Company Profile Pradeep.pdf
 
Signature Global TITANIUM SPR | 3.5 & 4.5BHK High rise Apartments in Gurgaon
Signature Global TITANIUM SPR  | 3.5 & 4.5BHK High rise Apartments in GurgaonSignature Global TITANIUM SPR  | 3.5 & 4.5BHK High rise Apartments in Gurgaon
Signature Global TITANIUM SPR | 3.5 & 4.5BHK High rise Apartments in Gurgaon
 
Stark Builders: Where Quality Meets Craftsmanship!
Stark Builders: Where Quality Meets Craftsmanship!Stark Builders: Where Quality Meets Craftsmanship!
Stark Builders: Where Quality Meets Craftsmanship!
 
Marbo Medic Real Estate - Belgrade City.pdf
Marbo Medic Real Estate - Belgrade City.pdfMarbo Medic Real Estate - Belgrade City.pdf
Marbo Medic Real Estate - Belgrade City.pdf
 
Living in an UBER World - June '24 Sales Meeting
Living in an UBER World - June '24 Sales MeetingLiving in an UBER World - June '24 Sales Meeting
Living in an UBER World - June '24 Sales Meeting
 
Office Building for Sale - 2810 City View Drive, Madison, WI
Office Building for Sale - 2810 City View Drive, Madison, WIOffice Building for Sale - 2810 City View Drive, Madison, WI
Office Building for Sale - 2810 City View Drive, Madison, WI
 

EGGER Stammhaus (Head Office) Case Study

  • 1. Egger Stammhaus We always knew more was possible. Now we have the proof.
  • 2. 2
  • 3. EGGER Stammhaus 4 Where do we come from? Changes to earlier buildings Wood construction – Modular construction method 8 Components wall & ceiling The atrium Fire protection 12 Fire alarm and sprinkler system Ceiling above the ground floor Details 14 Air conditioning Lighting Interior design Our products in use 16 Executing companies 19 1 2 3 4 5 6 The atrium of the EGGER Stammhaus in St. Johann in Tirol 3
  • 4. Fritz Egger Senior built the first raw chipboard plant at the headquarters in St. Johann in 1961, thus launching today's EGGER Holzwerkstoffe family business. EGGER currently operates 17 plants in 5 European countries, Russia and Turkey, and, with a total of 7,400 employees, is one of the leading manufacturers of wood-based materials. The company headquarters remain in St. Johann in Tirol. The ground-breaking ceremony for the construction of a new administrative building – the EGGER Stammhaus – took place in early 2014. Naturally, wood played a key role in the construction. It was particularly important to make sure all wood-based materials came from own production. The new Stammhaus is a four-storey wooden construction, offering room for a total of more than 250 work and 48 training stations. A 220 seater employee restaurant with fresh food is also part of the building. EGGER Stammhaus The new EGGER Stammhaus locks in approximately 3000 t CO2 – as much as is needed for three flights to New York. Start of construction: 7 March 2014 Start installation wood construction: 19 May 2014 Completion: 13 March 2015 Total floor space: 8,924 m² Gross floor area: 10,440 m² Cubic area: 45,502 m³ → 4
  • 5. Building height without basement 15 m Dimensions of building components on floor plan each 15 m × 58 m including the mechanical equipment room on the roof 5
  • 6. Everything started in 2008 with an architecture competition launched by EGGER. The call for submissions focused on developing a modular and sustainable building which allows centralised execution and complies with the requirements of the various locations. The architect Bruno Moser from Breiten- bach won with his idea for an innovative, modular system. The OSB 4 TOP board with the maximum format 11.40 ×2.80 m is central to it. The EGGER Stammhaus is already the fourth building constructed with this method. Modular design possibilities Where do we come from? 1. Administrative building in Rădăuți, Romania 2. TechCenter in Unterradl- berg, Austria 3. Administrative building in Brilon, Germany 4. Headquarters in St. Johann in Tirol, Austria 6
  • 7. Changes to earlier buildings Bruno Moser's idea of a modular system was refined with every new building project. The administrative building in Rădăuți (RO) still used 11.40 m steel frames for reinforcement. This type of structure was selected due to increased earthquake exposure. The subsequent project, the TechCenter in Unterradlberg (AT), replaced the steel frames with solid wood disks. The ceiling components were struc- tured so that the load of the ceiling is distributed across four points. The building structure of the TechCenter was also used for the administrative building in Brilon (DE). The only change concerns the heating and cooling. A heating and cooling ceiling was placed in the entrance area, while the rest of the building received floor convectors. They react faster to differences in room temperature. The construction phase - the building complex was erected in a year All technical achievements from Brilon were implemented in the Stammhaus in St. Johann in Tirol (AT). But there are three distinct changes: the atrium, the circular balconies, and the wooden façade. The Stammhaus received a wooden façade with balcony instead of a copper façade, as was the case for earlier constructions. A chessboard pattern is achieved through the config- uration of larch lamellas in the façade. They also act as privacy screens. They are set closer for modules containing a coffee kitchen or toilets, and wider for modules with offices. The circular balcony protects first of all against fire spreading. It also makes it easier to clean the glass and protects the wood- en façade from the effects of weather. The balconies also prolong and open the room towards the outside. 7
  • 8. The four-storey timber frame construction, together with an innovative fire protection concept is unique in Tirol and represents a special structural challenge. Holzbau Saurer manufactured individual wood construction components and delivered them to St. Johann in Tirol. Com- ponents measuring 11.40 × 2.80 m include OSB 4 TOP boards from the EGGER plant in Wismar. Therefore, both buildings reach a total length of approximately 58 m and a width of approximately 15 m. The building is constructed by module according to a certain raster, where the size of the large-format OSB 4 TOP board dictates the basic raster. The floor plan shows one module consists of five components. Five modules aligned with each other create a building component. The width of the atrium is of four such components. The changing configuration of modules creates the chessboard pattern characteristic for the EGGER company architecture. It is clearly visible from the outside through the larch lamellas. One component is closed in each module, and four are open. Every level represents an independent unit, with ventilation, heating circuit, measuring, control and regulation technology, as well as electricity distribution. All ventilation, heating, exhaust air and cooling lines are led through the hollow box component. The lines in the ceiling component are laid into special grooves. One remarkable aspect is that loads are only carried via the corners of the components. In addition, all ceiling components are stretched longitudinally. The underground garage with 36 parking spaces is a solid construction with reinforced concrete, where clamped pillars made of reinforced concrete reaching from the ground floor to the basement ensure secure static. Starting from the basement ceiling, the building is a pure wooden construction. Interior walls were erected with the dry construction method. Wood construction – Modular construction method Except for the underground car park made of concrete, the entire four-storey building with timber frame structure consists mainly of OSB 4 Top boards, timber and glass. Products used 1,150 m3 EGGER OSB 4 TOP 185 m3 softboards 30 m3 MDF 95 m3 Larch 1,480 m3 Glulam 175 m3 Solid wood (battens, duo, solid structural timber) 8
  • 9. S C H W E Schwebius Gestaltung Firma Projekt Plan Plan Nr. Masstab Maßeinheit Datum Änderung Eg EBP EBP 243 1:2 20 Maße sind bauseits zu mm 31. Tel 08051 96 34 034 I F Balcony Slatted frame larch 1.8 mm sealing 30 mm EGGER OSB 4 TOP 360 mm glued-laminated timber support 30 mm EGGER OSB 4 TOP Wall structure Larch formwork Vapour barrier 30 mm softboard 280 mm bar layer 22 mm EGGER OSB 4 TOP white glazed Ceiling structure EGGER laminate flooring Impact sound insulating underlay 18 mm EGGER OSB 4 TOP with tongue and groove profile 30 mm softboard 30 mm EGGER OSB 4 TOP 520 mm ceiling ribs (in between approx. 60 mm chippings) 30 mm EGGER OSB 4 TOP white glazed 9
  • 10. Due to their process technology and product features, OSB 4 TOP boards with building permit fulfil key wood construction requirements. The defined high raw density of more than 600 kg/m3 leads to very good airtightness of the board, which means that solid and reliable constructions are possible without the additional use of vapour barriers. In addition, the visibly polished and surface-processed board provides interiors with a harmonious appearance. The boards are glazed white to prevent darkening. The exterior wall components consist of 28 cm thick insulated solid structural timber posts, planked with OSB 4 TOP 22 mm inside and a soft underlay board of 30 mm. The ceilings are hollow box components made of glue-lami- nated timber, which are statically secure and can handle high loads. The load is transferred to the component's corners. The maximum format of the board allows for a span width of 11.40 m, the double span width of when using solid wood boards. The static load bearing OSB 4 TOP board was also used for the ceiling components. The grit on the board, which is filled into the component via holes on site, ensures noise protection. The cables for building technology were installed in the layer above. Components Wall and ceiling 10
  • 11. The special thing about the Stammhaus is the atrium, which links both sections of the building. The roof construction is made of glue-laminated timber and lamellas of OSB boards. The structure was intention- ally built so as to create a separate space. The design with the concrete floor and the greenery is intended to remind one of a piazza or a public space, where employ- ees and customers meet and exchange thoughts. The reception area is also located in the atrium, and the employee restaurant, seminar, and training rooms can be reached from it. The staircase and the elevator shaft made of OSB 4 TOP boards are the core of the atrium. The staircase is right by the elevator, which reaches all the way to the basement. Seven glued OSB 4 TOP boards carry the load of the staircase and the ele- vator. Separately approved connection devices are used for fastening. The atrium 11
  • 12. The Stammhaus was built with the fire protection concept of Dehne und Kruse. To this end, the building was divided into several, separate fire sections – the basement, the ground floor with the atrium, and the remaining three floors. The con- cept consists of 2 exterior staircases made of incombustible steel, as well as the staircase in the atrium as escape route. Furthermore, the entire administrative building was equipped with a fire alarm system and façade sprinklers in the atrium. The fire protection doors towards the outside are steel and/or aluminium structures with safety fire protection glass. The office glass, as well as a maximum height of furniture provides a good overview. Thus, employees are able to see a fire already in its initial phase, or recognise it by its smell or fire sounds. Fire protection A well-thought fire protection concept turns the Stammhaus into a safe place. From the underground parking lot all the way to the roof. The following escape routes are available in the case of fire • the middle bridge, which leads to another fire compartment, and onto escaping to the staircase • the two external stair towers • eight direct exits on the ground floor • an emergency exit in the kitchen 12
  • 13. The circular balcony with a width of 1.40 m prevents fire from spreading from the ground floor to the upper floor. Given the low fire load equipment of the atrium, a fire spreading to both administrative sections is almost impossible, especially in connection with the bilaterally compacted sprinkling system. In addition, the central, open staircase system including the connection bridges is part of the sprinkler protection. The building is equipped with a full-surface fire alarm system in line with the Austrian standard EN 54 with automatic and non-automatic alarms. This means that fire detection and communication with the fire department is already ensured in the early stages of the fire. The suspended ceiling between the ground floor and the first upper level has a fire resistance of 90 minutes (REI90). The ceiling is built so that fire penetration is isolated in a ceiling cavity for 90 minutes. There are no ignition sources in the cavities. Regarding fire resistance, the full ceiling corresponds to a reinforced concrete ceiling. Fire alarm and sprinkler system Ceiling above the ground floor 13
  • 14. The building fulfils the low-energy-house standard and is supplied with district heating and groundwater cooling. The heating energy is gained in this case from the waste heat generated by the St. Johann plant. The energy is then led into the office via floor convectors (via 4 control systems). This means that one office can be heated and the other cooled. The offices are ventilated mechanically, and the exchange of air is of 35 m³ per person per hour. The waste air is always led outside, while there is also the option of natural ventilation by tilting the windows. Constant four-fold exchange of air is in place throughout the day for the locker rooms and shower areas in the basement. The natural lighting of the workstations is ensured via suffi- cient window areas and transparent glass ceilings. The floor to ceiling windows and doors made of wood and aluminium are triple-glazed, just like the façade elements. Every workstation has its own integrated LED lighting, which can be controlled by the employee directly. EGGER materials are also used inside, such as melamine- faced boards, laminates, compact laminates, Eurolight light- weight boards, edges and laminate flooring. Acoustic boards made of EGGER products were installed to ensure ideal room acoustics in office and training rooms. The layout provides such good overview that it is possible to have unrestricted views from central areas into individual offices and vice-versa. Thus, furniture and space separators are not higher than approx. 1.50 m. Higher built-in elements (e.g., filing cabinets) are placed by exterior walls. Door panels of interior doors are part of the inside wall cladding and thus also clad with OSB 4 TOP boards. There are communication areas in each department: conference rooms, video conference rooms, and a tea kitchen with seating as retreat area. Details Many details were taken into account when designing the interior – fresh air, lighting, furniture and co. Air conditioning Lighting Interior design 14
  • 15. The entire building, starting with the ground floor, has dry screed and EGGER laminate flooring. The only exception is the ground floor (kitchen area) with concrete screed with epoxy resin coating, and the atrium flooring with concrete pitching. Auxiliary rooms in the basement have a laminated concrete screed. LED lighting 100% 15
  • 16. Our products in use The Stammhaus "deserves" its name! It is the flagship of the EGGER Group headquartered in St. Johann in Tirol – but also the materials used mainly come from own production. Construction products Exposed ceilings, walls, balconies OSB 4 TOP 30 mm, 22 mm and 18 mm Floor structure OSB 4 TOP with tongue and groove profile 18 mm OSB 4 TOP OSB 4 TOP 16
  • 17. Furniture and interior design Reception Counter, wall and ceiling cladding W1000 ST9 Premium White, H3344 ST36 Highline Oak EGGER logo H1334 ST9 Light Ferrara Oak Foyer Wall cladding U732 ST9 Dust Grey Half-shell MDF clad, edges natural/inserted U321 China Red Counter EGGER digital print décor Heartwood Ash as laminate, U961 ST9 Graphite (interior sides, insides of drawers) Wall cladding, doors and wardrobe U702 ST9, H3078 ST22 Hacienda white History Compact laminate 8 mm U732 ST9 Dust Grey with dark core EGGER POS W1000 ST9 Premium White, U961 ST9 Graphite, H3344 ST36 Highline Oak H3344 ST36 H3344 ST36 H1334 ST9 U732 ST9 U321 ST9 U961 ST9 W1000 ST9 W1000 ST9 U961 ST9 17
  • 18. Laminate floors GF including employee restaurant H1003 Valley Oak mocca, ST65, Large, WV4, aqua+, 8 mm, CL32 1st floor H1055 Bardolino Oak, ST56, Classic, WV4, aqua+, 8+2 mm Silenzio, CL32, synchronised pore 2nd floor H1026 Vintage Knoxville Oak grey, ST43, Large, WV4, aqua+, 8 mm, CL32 3rd floor H1001 Valley Oak, ST65, Large, WV4, aqua+, 8 mm, CL32, synchronised pore Furniture Acoustic walls GF H3078 ST22 Hacienda White, H3081 ST22 Hacienda Black Tables Compact laminate 13 mm U702 ST9 with dark core, OSB Combiline U961 ST9 Graphite Sideboards U702 ST9 Cashmere Lecterns U732 ST15 Dust Grey, W1000 ST9 Premium White Wardrobes with drill holes (3rd floor): Compact laminate 13 mm with drill holes of approx. Ø 25 mm, U963 ST15 Diamond Grey White shelf (3rd floor) Compact laminate W1000 ST9 Premium White with white core Furniture and desks W980 ST9 and ST15 Platinum white, ProAkustik partition walls W980 ST9 Platinum white Furniture and interior design W1000 ST9 H3081 ST22 H3078 ST22 U702 ST9 W980 ST9/ST15 H1003 ST65 18
  • 19. FRITZ EGGER GmbH & Co OG St. Johann in Tirol (AT) www.egger.com architekturWERKSTATT Bruno Moser Breitenbach (AT) www.archimos.at SCHWEBIUS GESTALTUNG Michael Schwebius Prien am Chiemsee (DE) www.schwebius.de Johanna Egger Innenarchitektur Munich (DE) www.johanna-egger.de Holzbau Saurer Höfen (AT) www.holzbau-saurer.com Barth Innenausbau Brixen (IT) www.barth.it Tischlerei und Möbelhandel Sepp Hofer Oberndorf (AT) www.sepp-hofer.com Schreinerei Daxenberger Seeon (DE) www.schreinerei-daxenberger.de conceptlicht.at Mils (AT) www.conceptlicht.at Executing companies Such a large building project can only be executed so smoothly if everyone pulls together. Planning and implementation go hand in hand. The Stammhaus is the best example of good cooperation. Customer / builder Architect Interior designers Lighting design Fabricator Wood construction Atrium and management offices Restaurant and meeting areas Furniture and offices Photography:©ChristianVorhofer(Innsbruck) 19
  • 20. Technical hotline t +49 3841 301 - 21260 · f +49 3841 301 - 61260 buildingproducts@egger.com www.egger.com/buildingproducts Would you like to know more about our building products? Simply scan here for detailed information. EN_1162789_02/16 Subjecttotechnicalmodificationsandprintingerrors. Alldecorsspecifiedandshownarereproductions.Duetovariablesintheprintingprocess,coloursmayvaryfromtheactualproduct.