SlideShare a Scribd company logo
1 of 9
Download to read offline
L00 07.05.2014 For Approval CK MOS
REV. DATE REASON FOR ISSUE PREP. CHECKED APPROVED
FOSTER WHEELER BİMAŞ DOCUMENT NUMBER
ED0733A-50A10_5
DRS-00-VBR-TR-FWB-006 TYPE
A 07.05.14
Rev. Qua. Sheet No
Doc.
Sign Date
DERWEZE
SIMPLE CYCLE POWER PLANT
APPROVED
SECTION / AREA
Stage Sheet No Total Sheet No
CHECKED - 1 9
PREPARED GENERAL REQUIREMENTS FOR
STEAM TRAPS
FOSTER WHEELER
BİMAŞ
GENERAL NOTES AND VENDOR
DOCUMENTS FOR VESSELS,
TRAYS AND AUXILIARIES
ÇALIK Doc. No. : DRS-00-VBR-TR-FWB-006
Page : 2 of 9
Date : 07.05.2014
ÇALIK Revision : A
FWB Doc. No. : ED0733A-50A_5
FWB Rev. No. : L00FOSTER WHEELER BİMAŞ
CONTENTS
I. GENERAL
II. CODES , STANDARDS AND SPECIFICATIONS
III. DESIGN AND SPECIAL REQUIREMENTS
IV. STEAM TRAPS MARKING AND IDENTIFICATION
V. QUALITY CONTROL
VI. PROTECTIVE COATING AND END PROTECTION
VII. ADDITIONAL TECHNICAL REQUIREMENTS
VIII. DOCUMENTATION REQUIREMENTS
GENERAL NOTES AND VENDOR
DOCUMENTS FOR VESSELS,
TRAYS AND AUXILIARIES
ÇALIK Doc. No. : DRS-00-VBR-TR-FWB-006
Page : 3 of 9
Date : 07.05.2014
ÇALIK Revision : A
FWB Doc. No. : ED0733A-50A_5
FWB Rev. No. : L00FOSTER WHEELER BİMAŞ
I. GENERAL
A. This Job Specification covers requirements for steam traps and compact
manifolds and shall be considered as part of the requirements for the steam traps
and compact manifolds covered by the associated Material Requisition(s).
B. Any conflict between this standard and any other specifications referred to herein
or in the associated Material Requisition(s) shall be reconciled with Purchaser
before proceeding.
C. List of Abbreviations End Connections
RF Raised Face FF Flat Face
RTJ Ring Type Joint LG Large Groove
LT Large Tongue SG Small Groove
ST Small Tongue LF Large Female
LM Large Male SF Small Female
SM Small Male SJ Solder Joint
BW Butt Weld SW Socket Weld
THDD/TH Threaded SCRD Screwed
II. STANDARDS AND SPECIFICATIONS
A. All materials shall comply with material specification/norm specified in Material
Requisition.
B. All steam traps shall comply with the requirements quoted on the relevant
Material Requisition together with any additional requirement included in this
standard.
C. It shall be assumed by Purchaser that, unless Vendor makes specific exceptions
in his quotation, all equipment supplied shall comply exactly with the
requirements specified in the Material Requisitions and Specifications attached
thereto.
D. Vendor must clearly state in his quotation all instances in which the steam trap
offered deviates from the Material Requisition Specification; including, but not
limited to, all differences in duty, mechanical design, codes of fabrication or
design, materials of construction and extent of supply.
E. Codes & standards for the requirements to be applied on steam traps and
compact manifolds shall be the latest addition of the following:
API Std. 598 Valve Inspection and Testing
ASME B1.20.1 Screw Threads-Pipe Threads, General Purpose (Inch)
ASME B16.5 Pipe Flanges and Flanged Fittings – NPS ½ Through NPS 24
ASME B16.10 Face to Face & End to End Dimensions of Valves.
ASME B16.11 Forged Fittings, Socket Weld and Threaded
ASME B16.25 Buttwelding Ends
ASME B16.34 Valves – Flanged, Threaded and Welding End
GENERAL NOTES AND VENDOR
DOCUMENTS FOR VESSELS,
TRAYS AND AUXILIARIES
ÇALIK Doc. No. : DRS-00-VBR-TR-FWB-006
Page : 4 of 9
Date : 07.05.2014
ÇALIK Revision : A
FWB Doc. No. : ED0733A-50A_5
FWB Rev. No. : L00FOSTER WHEELER BİMAŞ
MSS SP55 Quality Standard for Steel Casting for Valves, Flanges and
Fittings and other Piping Components. Visual Method for
Evaluation of Irregularities
ASME B31.1 Power Piping
ASME B31.3 Process Piping
ISO 6552 Automatic Steam Traps – Definition of Technical TermsMSS SP
25 Marking system for valves, fittings, flanges and unions
III. DESIGN AND SPECIAL REQUIREMENTS
A. Steam Traps Body Materials
STEAM TRAP
MATERIAL
FORGED CONSTRUCTION
(note 3)
C.S. ASTM A105
S.S. 304 ASTM A182 Gr F304
S.S. 304 L ASTM A182 Gr F304 L
S.S. 316 ASTM A182 Gr F316
S.S. 316 L ASTM A182 Gr F316 L
S.S. 321 ASTM A182 Gr F321
S.S. 347 ASTM A182 Gr F347
1.25% Cr 0.5%Mo ASTM A182 Gr F11 Cl 2
2.25% Cr 1%Mo ASTM A182 Gr F22 Cl 3
5% Cr 0.5%Mo ASTM A182 Gr F5
9% Cr 1%Mo-V ASTM A182 Gr F91
Notes:
1) Steam traps and compact manifolds shall be certified as suitable for the
full range of design pressure/temperature given by ASME B.16.34 for the
material and rating specified in Material Requisition .
2) Alternative cast construction may be proposed by Vendor. Acceptance of
cast construction is subject to additional technical requirements.
B. Flanged Cover and bolting
1. The type of facing of flanged joints shall be equal or superior to the end
flange facing.
2. Unless otherwise indicated on Material Requisitions the body to bonnet
gaskets shall be as follow as per Manufacturer Standard. Use of asbestos
is prohibited.
3. Unless otherwise indicated on Material Requisitions, the bolting material
for ferrous steam traps shall be:
GENERAL NOTES AND VENDOR
DOCUMENTS FOR VESSELS,
TRAYS AND AUXILIARIES
ÇALIK Doc. No. : DRS-00-VBR-TR-FWB-006
Page : 5 of 9
Date : 07.05.2014
ÇALIK Revision : A
FWB Doc. No. : ED0733A-50A_5
FWB Rev. No. : L00FOSTER WHEELER BİMAŞ
STEAM TRAP
MATERIAL
BOLT MATERIAL NUT MATERIAL
C.S. ASTM A193 Gr B7 ASTM A194 Gr 2H
Alloy Steel ASTM A193 Gr B16 ASTM A194 Gr 2H
S.S. ASTM A193 Gr B8 Cl 2 ASTM A194 Gr 8
C. Flanged Steam Traps
1. Steam traps to "MANUFACTURER'S STANDARDS" shall have face to
face dimensions to ASME B16.10 wherever possible. Such steam traps
face to face dimensions shall be subject to the acceptance of Purchaser.
2. When face to face dimensions of a steam traps do not conform to a ASME
, API, MSS or BS Standard the Manufacturer must specifically highlight
this in his quotation.
3. For flanged steam traps, the gasket surface finishing shall be per ASME
B16.5.
D. Screwed Steam Traps and Tapped Connections in Steam Traps
1. Steam traps or compact manifolds threaded ends and tapped connections
shall be threaded female in accordance to ASME B1.20.1
E. Welding End Steam Traps
1. The ends of socket weld steam traps and compact manifolds shall be in
accordance with ASME B16.11.
2. The ends of butt weld steam traps and compact manifolds shall be to
ASME B16.25. The outer diameter and wall thickness of bevel ends shall
be as stated on Material Requisition.
IV. STEAM TRAPS MARKING AND IDENTIFICATION
A. The marking of steam traps and compact manifolds can be provided as per
Manufacturer Standard. This shall be hard-marked or stamped on a non-
corrodible metal tag which shall be securely attached to the steam trap and
compact manifolds (by screws or rivets). For forged steam traps, tags may be
wired to the body.
B. Proprietary steam traps and compact manifolds not ordered to a standardized
specification shall be marked with the rating, material and size as stated on the
Material Requisition together with the Manufacturer's name and Purchase steam
traps /compact manifolds numbers as specified above.
Butt welded end steam traps and compact manifolds, in addition to other required
markings, shall have the pipe wall schedule (e.g., 40, 80S, STD, XXS) marked as
suffix in Company’s steam trap or compact manifold number. Marking
identification shall be in accordance with ASME B36.10 or ASME B36.19.
GENERAL NOTES AND VENDOR
DOCUMENTS FOR VESSELS,
TRAYS AND AUXILIARIES
ÇALIK Doc. No. : DRS-00-VBR-TR-FWB-006
Page : 6 of 9
Date : 07.05.2014
ÇALIK Revision : A
FWB Doc. No. : ED0733A-50A_5
FWB Rev. No. : L00FOSTER WHEELER BİMAŞ
V. QUALITY CONTROL
A. No grease shall be used during steam traps and compact manifolds assembly
and testing as specified by API 598.
B. Inspection
All steam traps and compact manifolds covered by the Material Requisition are
subject to inspection both during the manufacture and before shipment ,by
Purchaser and/or its Client or an Approved Inspection Authority.
C. Normal Tests
1. All steam traps and compact manifolds, including those in accordance to
Manufacturer's Standards, shall be tested by Manufacturer in accordance
with applicable code, and in particular:
1. Check of chemical and mechanical properties of the material used
2. Dimensional check
3. Pressure test of body bonnet
2. The hydrostatic test liquid shall be water with the addition of wetting
agent.
3. When stainless steel steam traps are to be tested using water as the test
liquid, potable water with a chloride content less than 30 ppm shall be
used to obviate stress corrosion cracking. After test the steam traps shall
be carefully drained and air blown.
4. Ends of forged BW steam traps and compact manifolds shall be 100% MT
or LP examined.
5. Welds on nippled SW steam traps and compact manifolds shall be 100%
MT/LP examined.
6. If any, flange to body socket or butt weld joints shall be 100% MT or LP
examined
D. Additional Test
The following additional test shall be made only if expressly mentioned in this
Eng. Std. or in Material Requisition:
1. Radiographic examination of the weld joining the flanges to the body of
the steam traps.
2. Magnetic particle or liquid penetration examination of steam traps body.
E. Final Test
1. Purchaser reserve the right to inspect the steam traps and and compact
manifolds including the use of regular inspection equipment.
F. Certification
1. It is the Vendor's responsibility to ensure that all materials used in the
manufacture of steam traps and compact manifolds comply with the
requirements of the relevant specifications.
GENERAL NOTES AND VENDOR
DOCUMENTS FOR VESSELS,
TRAYS AND AUXILIARIES
ÇALIK Doc. No. : DRS-00-VBR-TR-FWB-006
Page : 7 of 9
Date : 07.05.2014
ÇALIK Revision : A
FWB Doc. No. : ED0733A-50A_5
FWB Rev. No. : L00FOSTER WHEELER BİMAŞ
2. The Vendor shall keep a record of the certified chemical and mechanical
properties of the material used and certificates shall be supplied when
required by the relevant specifications or when specified on the purchase
documents. For pressure parts (bodies, bonnets, covers and bolting for
body/bonnets joints) material certificates shall be in accordance with EN
10204-3.1 (–if the manufacturer is ISO 9001 approved by a European
Accredited Notified Body) or EN 10204-3.2 (if the manufacturer is not ISO
9001 approved) is required.
3. The Supplier must classify and mark alloy steam traps in accordance to
material Colour Coding and is responsible for the correct application of
colour bands before shipping said materials to shop fabricator or fields. It
is Vendor responsibility to select colour bands and carry out P.M.I.
examination.
VI. PROTECTIVE COATING AND END PROTECTION
A. All un-machined exterior surfaces of carbon steel and low alloy steam traps and
compact manifolds shall be painted per Manufacturer Standard paint suitable for
Refinery or Industrial Atmospheric conditions.
B. All machined or threaded surfaces (C.S. and A.S.), with a nominal chemistry of
12 Cr and below subject to atmospheric corrosion during shipment or subsequent
storage shall be coated with Manufacturer's standard rust preventive suitable for
an exposure period of twelve months, to a normal industrial environment. This
protective must be easily removable with a petroleum solvent.
C. End Protection - steam traps with threaded or socket weld ends shall have the
ends protected with metal, wood, or plastic plugs.
D. Cover for the protection of gasket surfaces of end flanges, and for the protection
of welding ends shall be either: metal of 3,5 mm. min. thickness, hardboard, or
solid wood.
E. Although austenitic stainless steels and high nickel alloy materials do not require
painting, they must not come into contact with any substance that may contain
chlorides; temporary protection for shipping has to be suitably provided by
Vendor.
F. Inside protective coatings like Enamel “Japanese black” are not allowed.
GENERAL NOTES AND VENDOR
DOCUMENTS FOR VESSELS,
TRAYS AND AUXILIARIES
ÇALIK Doc. No. : DRS-00-VBR-TR-FWB-006
Page : 8 of 9
Date : 07.05.2014
ÇALIK Revision : A
FWB Doc. No. : ED0733A-50A_5
FWB Rev. No. : L00FOSTER WHEELER BİMAŞ
VII. ADDITIONAL TECHNICAL REQUIREMENTS
CASTINGS ORIGIN
Wherever alternative casting construction is approved by FWI/Purchaser for
steam traps, the Vendor shall mandatorily declare the origin of castings foundry
in the quotation for FWI/Purchaser acceptance.
REQUIREMENTS FOR STEAM TRAPS ASME B31.1
Where ASME B31.1 is indicated on the Material Requisition, steam traps shall be
supplied in accordance with the following requirements
1. LTCS supplied as alternative to CS is not acceptable
2. All “L” grades stainless steels as alternative to other grades or dual certified
stainless steels are not acceptable
3. All pressure containing parts (bolting included) shall be supplied conforming to
ASME specifications in accordance to ASME B31.1. Materials conforming to
ASTM specifications proposed as alternative to ASME SA material (e.g. “ASTM
A105” vs. “SA-105”) may be considered acceptable provided that the
requirements of ASME B31.1 para. 123.2.2 will be applied
COMPACT MANIFOLDS INSULATION
Each compact manifold shall be provided of insulation jacket; the model supplied
can be according to Manufacturer Standard. Insulation jackets supplied shall be
suitable for the same operating temperature of steam traps specified for steam
tracing service (for applicable operating temperature see para VII.E)
GENERAL NOTES AND VENDOR
DOCUMENTS FOR VESSELS,
TRAYS AND AUXILIARIES
ÇALIK Doc. No. : DRS-00-VBR-TR-FWB-006
Page : 9 of 9
Date : 07.05.2014
ÇALIK Revision : A
FWB Doc. No. : ED0733A-50A_5
FWB Rev. No. : L00FOSTER WHEELER BİMAŞ
OPERATING AND DESIGN DATA
The proper operation of steam traps must be guaranteed by the Supplier in consideration of the
design/operating conditions reported in the following table:
Steam Trap Service
Steam Trap Type
Steam Trap Rating/
Steam Traps End connections
Steam Trap Body Material
Service
Normal operating temp. [°C] in/out
Normal operating pressure [barg] upstr./downstr.
Minimum operating pressure [barg]
Design pressure [barg]
Design temperature [°C]
OPERATING AND DESIGN DATA
VIII. DOCUMENTATION REQUIREMENTS FOR STEAM TRAPS
The Vendor shall supply the required technical documentation (e.g. steam traps and
compact manifolds drawings, technical datasheets, instruction and maintenance
manuals, WPS & PQR’s) according to the prescriptions and time schedule provided in
the attached Eng. Std. 59B9

More Related Content

What's hot

Piping sample report
Piping sample reportPiping sample report
Piping sample reportram111eg
 
API Specification 6D Quality Specification Level (QSL)
API Specification 6D Quality Specification Level (QSL)API Specification 6D Quality Specification Level (QSL)
API Specification 6D Quality Specification Level (QSL)Murdani Achmad Sirajo
 
Piping inspector questions 1
Piping inspector questions  1 Piping inspector questions  1
Piping inspector questions 1 MOHAMMAD ATIF ALI
 
Industrial Solenoid Valves, Bronze and Stainless Steel
Industrial Solenoid Valves, Bronze and Stainless SteelIndustrial Solenoid Valves, Bronze and Stainless Steel
Industrial Solenoid Valves, Bronze and Stainless SteelMiller Energy, Inc.
 
Bubbler Method Liquid Tank Level Measurement Instruments
Bubbler Method Liquid Tank Level Measurement InstrumentsBubbler Method Liquid Tank Level Measurement Instruments
Bubbler Method Liquid Tank Level Measurement InstrumentsMiller Energy, Inc.
 
Product guide for industrial gauges from Ametek U.S. Gauge
Product guide for industrial gauges from Ametek U.S. GaugeProduct guide for industrial gauges from Ametek U.S. Gauge
Product guide for industrial gauges from Ametek U.S. GaugeMiller Energy, Inc.
 

What's hot (14)

ACTEON CATALOGUE
ACTEON CATALOGUEACTEON CATALOGUE
ACTEON CATALOGUE
 
Back pressure valves for industrial process control
Back pressure valves for industrial process controlBack pressure valves for industrial process control
Back pressure valves for industrial process control
 
Piping sample report
Piping sample reportPiping sample report
Piping sample report
 
API Specification 6D Quality Specification Level (QSL)
API Specification 6D Quality Specification Level (QSL)API Specification 6D Quality Specification Level (QSL)
API Specification 6D Quality Specification Level (QSL)
 
A234 a234m − 14
A234 a234m − 14A234 a234m − 14
A234 a234m − 14
 
Piping inspector questions 1
Piping inspector questions  1 Piping inspector questions  1
Piping inspector questions 1
 
Industrial Solenoid Valves, Bronze and Stainless Steel
Industrial Solenoid Valves, Bronze and Stainless SteelIndustrial Solenoid Valves, Bronze and Stainless Steel
Industrial Solenoid Valves, Bronze and Stainless Steel
 
Bubbler Method Liquid Tank Level Measurement Instruments
Bubbler Method Liquid Tank Level Measurement InstrumentsBubbler Method Liquid Tank Level Measurement Instruments
Bubbler Method Liquid Tank Level Measurement Instruments
 
Pressure regulator valves for industrial process control
Pressure regulator valves for industrial process controlPressure regulator valves for industrial process control
Pressure regulator valves for industrial process control
 
Api 575 rev.2
Api 575 rev.2Api 575 rev.2
Api 575 rev.2
 
Product guide for industrial gauges from Ametek U.S. Gauge
Product guide for industrial gauges from Ametek U.S. GaugeProduct guide for industrial gauges from Ametek U.S. Gauge
Product guide for industrial gauges from Ametek U.S. Gauge
 
1260 onf bfv
1260   onf bfv1260   onf bfv
1260 onf bfv
 
Piping and Pipeline Accessories - Titan Flow Control, Inc.
Piping and Pipeline Accessories - Titan Flow Control, Inc.Piping and Pipeline Accessories - Titan Flow Control, Inc.
Piping and Pipeline Accessories - Titan Flow Control, Inc.
 
Asme b31,pressure piping code
Asme b31,pressure piping codeAsme b31,pressure piping code
Asme b31,pressure piping code
 

Viewers also liked

Ed0733 a 50a10-1 - drs-00-vbr-tr-fwb-002_a
Ed0733 a 50a10-1 - drs-00-vbr-tr-fwb-002_aEd0733 a 50a10-1 - drs-00-vbr-tr-fwb-002_a
Ed0733 a 50a10-1 - drs-00-vbr-tr-fwb-002_addmozsubasi
 
Ed0733 a 50a10-1 - drs-00-vbr-tr-fwb-002_a
Ed0733 a 50a10-1 - drs-00-vbr-tr-fwb-002_aEd0733 a 50a10-1 - drs-00-vbr-tr-fwb-002_a
Ed0733 a 50a10-1 - drs-00-vbr-tr-fwb-002_addmozsubasi
 
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-aEd0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-addmozsubasi
 
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-aEd0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-addmozsubasi
 
Introduction to AmecFW Presentation
Introduction to AmecFW PresentationIntroduction to AmecFW Presentation
Introduction to AmecFW PresentationVince Lee
 
AMEC Training & Development Services - for a competent, confident, and safe w...
AMEC Training & Development Services - for a competent, confident, and safe w...AMEC Training & Development Services - for a competent, confident, and safe w...
AMEC Training & Development Services - for a competent, confident, and safe w...Sistema FIEB
 
Ed0733 a 50a10-4 - drs-00-vbr-tr-fwb-005_a
Ed0733 a 50a10-4 - drs-00-vbr-tr-fwb-005_aEd0733 a 50a10-4 - drs-00-vbr-tr-fwb-005_a
Ed0733 a 50a10-4 - drs-00-vbr-tr-fwb-005_addmozsubasi
 
Gas Liquid Engineering - Presentation Brazil
Gas Liquid Engineering - Presentation BrazilGas Liquid Engineering - Presentation Brazil
Gas Liquid Engineering - Presentation BrazilSistema FIEB
 
Apresentação SEFAZ - Nilson Moscon Ribeiro
Apresentação SEFAZ - Nilson Moscon RibeiroApresentação SEFAZ - Nilson Moscon Ribeiro
Apresentação SEFAZ - Nilson Moscon RibeiroSistema FIEB
 
CO2 capture within refining: case studies - Rosa Maria Domenichini, Foster Wh...
CO2 capture within refining: case studies - Rosa Maria Domenichini, Foster Wh...CO2 capture within refining: case studies - Rosa Maria Domenichini, Foster Wh...
CO2 capture within refining: case studies - Rosa Maria Domenichini, Foster Wh...Global CCS Institute
 
Technological Innovation Creating Opportunities for Development
Technological Innovation  Creating Opportunities for DevelopmentTechnological Innovation  Creating Opportunities for Development
Technological Innovation Creating Opportunities for DevelopmentSistema FIEB
 
Modularisation – The Next Step - Presentation by Bill Meyer, Foster Wheeler U...
Modularisation – The Next Step - Presentation by Bill Meyer, Foster Wheeler U...Modularisation – The Next Step - Presentation by Bill Meyer, Foster Wheeler U...
Modularisation – The Next Step - Presentation by Bill Meyer, Foster Wheeler U...IQPC Australia
 
How Farming Can Help You Frame the Solution
How Farming Can Help You Frame the SolutionHow Farming Can Help You Frame the Solution
How Farming Can Help You Frame the SolutionLeslie Bradshaw
 
Embraer - Innovation and Technology
Embraer - Innovation and TechnologyEmbraer - Innovation and Technology
Embraer - Innovation and TechnologySistema FIEB
 
Innovation and Advanced Technology - High Speed Train – Hitachi Brasil Ltda
Innovation and Advanced Technology  - High Speed Train – Hitachi Brasil LtdaInnovation and Advanced Technology  - High Speed Train – Hitachi Brasil Ltda
Innovation and Advanced Technology - High Speed Train – Hitachi Brasil LtdaSistema FIEB
 
meaning of life and faith
meaning of life and faithmeaning of life and faith
meaning of life and faithshabeel pn
 
Mercury and other trace metals in the gas from an oxy-combustion demonstratio...
Mercury and other trace metals in the gas from an oxy-combustion demonstratio...Mercury and other trace metals in the gas from an oxy-combustion demonstratio...
Mercury and other trace metals in the gas from an oxy-combustion demonstratio...Global CCS Institute
 
Boiler commissioning procedure
Boiler commissioning procedureBoiler commissioning procedure
Boiler commissioning procedureABVSAI
 

Viewers also liked (20)

Ed0733 a 50a10-1 - drs-00-vbr-tr-fwb-002_a
Ed0733 a 50a10-1 - drs-00-vbr-tr-fwb-002_aEd0733 a 50a10-1 - drs-00-vbr-tr-fwb-002_a
Ed0733 a 50a10-1 - drs-00-vbr-tr-fwb-002_a
 
Ed0733 a 50a10-1 - drs-00-vbr-tr-fwb-002_a
Ed0733 a 50a10-1 - drs-00-vbr-tr-fwb-002_aEd0733 a 50a10-1 - drs-00-vbr-tr-fwb-002_a
Ed0733 a 50a10-1 - drs-00-vbr-tr-fwb-002_a
 
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-aEd0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
 
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-aEd0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
 
India capability web
India capability webIndia capability web
India capability web
 
Introduction to AmecFW Presentation
Introduction to AmecFW PresentationIntroduction to AmecFW Presentation
Introduction to AmecFW Presentation
 
AMEC Training & Development Services - for a competent, confident, and safe w...
AMEC Training & Development Services - for a competent, confident, and safe w...AMEC Training & Development Services - for a competent, confident, and safe w...
AMEC Training & Development Services - for a competent, confident, and safe w...
 
Ed0733 a 50a10-4 - drs-00-vbr-tr-fwb-005_a
Ed0733 a 50a10-4 - drs-00-vbr-tr-fwb-005_aEd0733 a 50a10-4 - drs-00-vbr-tr-fwb-005_a
Ed0733 a 50a10-4 - drs-00-vbr-tr-fwb-005_a
 
Gas Liquid Engineering - Presentation Brazil
Gas Liquid Engineering - Presentation BrazilGas Liquid Engineering - Presentation Brazil
Gas Liquid Engineering - Presentation Brazil
 
Apresentação SEFAZ - Nilson Moscon Ribeiro
Apresentação SEFAZ - Nilson Moscon RibeiroApresentação SEFAZ - Nilson Moscon Ribeiro
Apresentação SEFAZ - Nilson Moscon Ribeiro
 
CO2 capture within refining: case studies - Rosa Maria Domenichini, Foster Wh...
CO2 capture within refining: case studies - Rosa Maria Domenichini, Foster Wh...CO2 capture within refining: case studies - Rosa Maria Domenichini, Foster Wh...
CO2 capture within refining: case studies - Rosa Maria Domenichini, Foster Wh...
 
Technological Innovation Creating Opportunities for Development
Technological Innovation  Creating Opportunities for DevelopmentTechnological Innovation  Creating Opportunities for Development
Technological Innovation Creating Opportunities for Development
 
Modularisation – The Next Step - Presentation by Bill Meyer, Foster Wheeler U...
Modularisation – The Next Step - Presentation by Bill Meyer, Foster Wheeler U...Modularisation – The Next Step - Presentation by Bill Meyer, Foster Wheeler U...
Modularisation – The Next Step - Presentation by Bill Meyer, Foster Wheeler U...
 
How Farming Can Help You Frame the Solution
How Farming Can Help You Frame the SolutionHow Farming Can Help You Frame the Solution
How Farming Can Help You Frame the Solution
 
Embraer - Innovation and Technology
Embraer - Innovation and TechnologyEmbraer - Innovation and Technology
Embraer - Innovation and Technology
 
Innovation and Advanced Technology - High Speed Train – Hitachi Brasil Ltda
Innovation and Advanced Technology  - High Speed Train – Hitachi Brasil LtdaInnovation and Advanced Technology  - High Speed Train – Hitachi Brasil Ltda
Innovation and Advanced Technology - High Speed Train – Hitachi Brasil Ltda
 
meaning of life and faith
meaning of life and faithmeaning of life and faith
meaning of life and faith
 
Mercury and other trace metals in the gas from an oxy-combustion demonstratio...
Mercury and other trace metals in the gas from an oxy-combustion demonstratio...Mercury and other trace metals in the gas from an oxy-combustion demonstratio...
Mercury and other trace metals in the gas from an oxy-combustion demonstratio...
 
Boiler commissioning procedure
Boiler commissioning procedureBoiler commissioning procedure
Boiler commissioning procedure
 
isolation
isolationisolation
isolation
 

Similar to Ed0733 a 50a10-5 - drs-00-vbr-tr-fwb-006_a

0140.10 general welding fabrication and testing
0140.10   general welding fabrication and testing0140.10   general welding fabrication and testing
0140.10 general welding fabrication and testingRamamoorthy Madhan
 
Flange management presentation
Flange management presentationFlange management presentation
Flange management presentationMohamed Gaafar
 
ASTM A105 material standard
ASTM A105 material standard ASTM A105 material standard
ASTM A105 material standard wang yilia
 
vdocuments.net_norsok-piping-standard.pdf
vdocuments.net_norsok-piping-standard.pdfvdocuments.net_norsok-piping-standard.pdf
vdocuments.net_norsok-piping-standard.pdfHadiSwts
 
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...Versli Lietuva (Enterprise Lithuania)
 
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...Denis Senin
 
2621100109_ENQ_Tech doc.pdf
2621100109_ENQ_Tech doc.pdf2621100109_ENQ_Tech doc.pdf
2621100109_ENQ_Tech doc.pdfashish123sati
 
135695390 mss-sp-85-1994
135695390 mss-sp-85-1994135695390 mss-sp-85-1994
135695390 mss-sp-85-1994Indranil Sarkar
 
Astm a128a-128m-93-reapproved-2003
Astm a128a-128m-93-reapproved-2003Astm a128a-128m-93-reapproved-2003
Astm a128a-128m-93-reapproved-2003Carlos Trujillo
 
Piping Code & Standards Presentation
Piping Code & Standards PresentationPiping Code & Standards Presentation
Piping Code & Standards Presentationssuser4f6d4b
 
Chapter 13 fuel oil piping and storage
Chapter 13 fuel oil piping and storageChapter 13 fuel oil piping and storage
Chapter 13 fuel oil piping and storageAYM1979
 
Astm a105
Astm a105Astm a105
Astm a105Luis_76
 
Codes and standards by madhur mahajan
Codes and standards by madhur mahajanCodes and standards by madhur mahajan
Codes and standards by madhur mahajanMadhur Mahajan
 
A 105 a3
A 105 a3A 105 a3
A 105 a3Hans A
 
A694 forgings for flanges, fittings, valves, hi press trans
A694 forgings for flanges, fittings, valves, hi press transA694 forgings for flanges, fittings, valves, hi press trans
A694 forgings for flanges, fittings, valves, hi press transJairoFranciscoArroyo
 

Similar to Ed0733 a 50a10-5 - drs-00-vbr-tr-fwb-006_a (20)

0140.10 general welding fabrication and testing
0140.10   general welding fabrication and testing0140.10   general welding fabrication and testing
0140.10 general welding fabrication and testing
 
Flange management presentation
Flange management presentationFlange management presentation
Flange management presentation
 
ASTM A105 material standard
ASTM A105 material standard ASTM A105 material standard
ASTM A105 material standard
 
vdocuments.net_norsok-piping-standard.pdf
vdocuments.net_norsok-piping-standard.pdfvdocuments.net_norsok-piping-standard.pdf
vdocuments.net_norsok-piping-standard.pdf
 
03c-eil-mr-3002-dd1059.pdf
03c-eil-mr-3002-dd1059.pdf03c-eil-mr-3002-dd1059.pdf
03c-eil-mr-3002-dd1059.pdf
 
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
 
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
 
2621100109_ENQ_Tech doc.pdf
2621100109_ENQ_Tech doc.pdf2621100109_ENQ_Tech doc.pdf
2621100109_ENQ_Tech doc.pdf
 
Plate material
Plate materialPlate material
Plate material
 
135695390 mss-sp-85-1994
135695390 mss-sp-85-1994135695390 mss-sp-85-1994
135695390 mss-sp-85-1994
 
Astm a128a-128m-93-reapproved-2003
Astm a128a-128m-93-reapproved-2003Astm a128a-128m-93-reapproved-2003
Astm a128a-128m-93-reapproved-2003
 
Piping Code & Standards Presentation
Piping Code & Standards PresentationPiping Code & Standards Presentation
Piping Code & Standards Presentation
 
Chapter 13 fuel oil piping and storage
Chapter 13 fuel oil piping and storageChapter 13 fuel oil piping and storage
Chapter 13 fuel oil piping and storage
 
Gc hv-005 rev.a01
Gc hv-005 rev.a01Gc hv-005 rev.a01
Gc hv-005 rev.a01
 
A105 a105m − 14
A105 a105m − 14A105 a105m − 14
A105 a105m − 14
 
Astm a105
Astm a105Astm a105
Astm a105
 
Codes and standards by madhur mahajan
Codes and standards by madhur mahajanCodes and standards by madhur mahajan
Codes and standards by madhur mahajan
 
Piston Isolation Valves For Steam and Condensate
Piston Isolation Valves For Steam and CondensatePiston Isolation Valves For Steam and Condensate
Piston Isolation Valves For Steam and Condensate
 
A 105 a3
A 105 a3A 105 a3
A 105 a3
 
A694 forgings for flanges, fittings, valves, hi press trans
A694 forgings for flanges, fittings, valves, hi press transA694 forgings for flanges, fittings, valves, hi press trans
A694 forgings for flanges, fittings, valves, hi press trans
 

Recently uploaded

Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedKaiNexus
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 

Recently uploaded (20)

Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 

Ed0733 a 50a10-5 - drs-00-vbr-tr-fwb-006_a

  • 1. L00 07.05.2014 For Approval CK MOS REV. DATE REASON FOR ISSUE PREP. CHECKED APPROVED FOSTER WHEELER BİMAŞ DOCUMENT NUMBER ED0733A-50A10_5 DRS-00-VBR-TR-FWB-006 TYPE A 07.05.14 Rev. Qua. Sheet No Doc. Sign Date DERWEZE SIMPLE CYCLE POWER PLANT APPROVED SECTION / AREA Stage Sheet No Total Sheet No CHECKED - 1 9 PREPARED GENERAL REQUIREMENTS FOR STEAM TRAPS FOSTER WHEELER BİMAŞ
  • 2. GENERAL NOTES AND VENDOR DOCUMENTS FOR VESSELS, TRAYS AND AUXILIARIES ÇALIK Doc. No. : DRS-00-VBR-TR-FWB-006 Page : 2 of 9 Date : 07.05.2014 ÇALIK Revision : A FWB Doc. No. : ED0733A-50A_5 FWB Rev. No. : L00FOSTER WHEELER BİMAŞ CONTENTS I. GENERAL II. CODES , STANDARDS AND SPECIFICATIONS III. DESIGN AND SPECIAL REQUIREMENTS IV. STEAM TRAPS MARKING AND IDENTIFICATION V. QUALITY CONTROL VI. PROTECTIVE COATING AND END PROTECTION VII. ADDITIONAL TECHNICAL REQUIREMENTS VIII. DOCUMENTATION REQUIREMENTS
  • 3. GENERAL NOTES AND VENDOR DOCUMENTS FOR VESSELS, TRAYS AND AUXILIARIES ÇALIK Doc. No. : DRS-00-VBR-TR-FWB-006 Page : 3 of 9 Date : 07.05.2014 ÇALIK Revision : A FWB Doc. No. : ED0733A-50A_5 FWB Rev. No. : L00FOSTER WHEELER BİMAŞ I. GENERAL A. This Job Specification covers requirements for steam traps and compact manifolds and shall be considered as part of the requirements for the steam traps and compact manifolds covered by the associated Material Requisition(s). B. Any conflict between this standard and any other specifications referred to herein or in the associated Material Requisition(s) shall be reconciled with Purchaser before proceeding. C. List of Abbreviations End Connections RF Raised Face FF Flat Face RTJ Ring Type Joint LG Large Groove LT Large Tongue SG Small Groove ST Small Tongue LF Large Female LM Large Male SF Small Female SM Small Male SJ Solder Joint BW Butt Weld SW Socket Weld THDD/TH Threaded SCRD Screwed II. STANDARDS AND SPECIFICATIONS A. All materials shall comply with material specification/norm specified in Material Requisition. B. All steam traps shall comply with the requirements quoted on the relevant Material Requisition together with any additional requirement included in this standard. C. It shall be assumed by Purchaser that, unless Vendor makes specific exceptions in his quotation, all equipment supplied shall comply exactly with the requirements specified in the Material Requisitions and Specifications attached thereto. D. Vendor must clearly state in his quotation all instances in which the steam trap offered deviates from the Material Requisition Specification; including, but not limited to, all differences in duty, mechanical design, codes of fabrication or design, materials of construction and extent of supply. E. Codes & standards for the requirements to be applied on steam traps and compact manifolds shall be the latest addition of the following: API Std. 598 Valve Inspection and Testing ASME B1.20.1 Screw Threads-Pipe Threads, General Purpose (Inch) ASME B16.5 Pipe Flanges and Flanged Fittings – NPS ½ Through NPS 24 ASME B16.10 Face to Face & End to End Dimensions of Valves. ASME B16.11 Forged Fittings, Socket Weld and Threaded ASME B16.25 Buttwelding Ends ASME B16.34 Valves – Flanged, Threaded and Welding End
  • 4. GENERAL NOTES AND VENDOR DOCUMENTS FOR VESSELS, TRAYS AND AUXILIARIES ÇALIK Doc. No. : DRS-00-VBR-TR-FWB-006 Page : 4 of 9 Date : 07.05.2014 ÇALIK Revision : A FWB Doc. No. : ED0733A-50A_5 FWB Rev. No. : L00FOSTER WHEELER BİMAŞ MSS SP55 Quality Standard for Steel Casting for Valves, Flanges and Fittings and other Piping Components. Visual Method for Evaluation of Irregularities ASME B31.1 Power Piping ASME B31.3 Process Piping ISO 6552 Automatic Steam Traps – Definition of Technical TermsMSS SP 25 Marking system for valves, fittings, flanges and unions III. DESIGN AND SPECIAL REQUIREMENTS A. Steam Traps Body Materials STEAM TRAP MATERIAL FORGED CONSTRUCTION (note 3) C.S. ASTM A105 S.S. 304 ASTM A182 Gr F304 S.S. 304 L ASTM A182 Gr F304 L S.S. 316 ASTM A182 Gr F316 S.S. 316 L ASTM A182 Gr F316 L S.S. 321 ASTM A182 Gr F321 S.S. 347 ASTM A182 Gr F347 1.25% Cr 0.5%Mo ASTM A182 Gr F11 Cl 2 2.25% Cr 1%Mo ASTM A182 Gr F22 Cl 3 5% Cr 0.5%Mo ASTM A182 Gr F5 9% Cr 1%Mo-V ASTM A182 Gr F91 Notes: 1) Steam traps and compact manifolds shall be certified as suitable for the full range of design pressure/temperature given by ASME B.16.34 for the material and rating specified in Material Requisition . 2) Alternative cast construction may be proposed by Vendor. Acceptance of cast construction is subject to additional technical requirements. B. Flanged Cover and bolting 1. The type of facing of flanged joints shall be equal or superior to the end flange facing. 2. Unless otherwise indicated on Material Requisitions the body to bonnet gaskets shall be as follow as per Manufacturer Standard. Use of asbestos is prohibited. 3. Unless otherwise indicated on Material Requisitions, the bolting material for ferrous steam traps shall be:
  • 5. GENERAL NOTES AND VENDOR DOCUMENTS FOR VESSELS, TRAYS AND AUXILIARIES ÇALIK Doc. No. : DRS-00-VBR-TR-FWB-006 Page : 5 of 9 Date : 07.05.2014 ÇALIK Revision : A FWB Doc. No. : ED0733A-50A_5 FWB Rev. No. : L00FOSTER WHEELER BİMAŞ STEAM TRAP MATERIAL BOLT MATERIAL NUT MATERIAL C.S. ASTM A193 Gr B7 ASTM A194 Gr 2H Alloy Steel ASTM A193 Gr B16 ASTM A194 Gr 2H S.S. ASTM A193 Gr B8 Cl 2 ASTM A194 Gr 8 C. Flanged Steam Traps 1. Steam traps to "MANUFACTURER'S STANDARDS" shall have face to face dimensions to ASME B16.10 wherever possible. Such steam traps face to face dimensions shall be subject to the acceptance of Purchaser. 2. When face to face dimensions of a steam traps do not conform to a ASME , API, MSS or BS Standard the Manufacturer must specifically highlight this in his quotation. 3. For flanged steam traps, the gasket surface finishing shall be per ASME B16.5. D. Screwed Steam Traps and Tapped Connections in Steam Traps 1. Steam traps or compact manifolds threaded ends and tapped connections shall be threaded female in accordance to ASME B1.20.1 E. Welding End Steam Traps 1. The ends of socket weld steam traps and compact manifolds shall be in accordance with ASME B16.11. 2. The ends of butt weld steam traps and compact manifolds shall be to ASME B16.25. The outer diameter and wall thickness of bevel ends shall be as stated on Material Requisition. IV. STEAM TRAPS MARKING AND IDENTIFICATION A. The marking of steam traps and compact manifolds can be provided as per Manufacturer Standard. This shall be hard-marked or stamped on a non- corrodible metal tag which shall be securely attached to the steam trap and compact manifolds (by screws or rivets). For forged steam traps, tags may be wired to the body. B. Proprietary steam traps and compact manifolds not ordered to a standardized specification shall be marked with the rating, material and size as stated on the Material Requisition together with the Manufacturer's name and Purchase steam traps /compact manifolds numbers as specified above. Butt welded end steam traps and compact manifolds, in addition to other required markings, shall have the pipe wall schedule (e.g., 40, 80S, STD, XXS) marked as suffix in Company’s steam trap or compact manifold number. Marking identification shall be in accordance with ASME B36.10 or ASME B36.19.
  • 6. GENERAL NOTES AND VENDOR DOCUMENTS FOR VESSELS, TRAYS AND AUXILIARIES ÇALIK Doc. No. : DRS-00-VBR-TR-FWB-006 Page : 6 of 9 Date : 07.05.2014 ÇALIK Revision : A FWB Doc. No. : ED0733A-50A_5 FWB Rev. No. : L00FOSTER WHEELER BİMAŞ V. QUALITY CONTROL A. No grease shall be used during steam traps and compact manifolds assembly and testing as specified by API 598. B. Inspection All steam traps and compact manifolds covered by the Material Requisition are subject to inspection both during the manufacture and before shipment ,by Purchaser and/or its Client or an Approved Inspection Authority. C. Normal Tests 1. All steam traps and compact manifolds, including those in accordance to Manufacturer's Standards, shall be tested by Manufacturer in accordance with applicable code, and in particular: 1. Check of chemical and mechanical properties of the material used 2. Dimensional check 3. Pressure test of body bonnet 2. The hydrostatic test liquid shall be water with the addition of wetting agent. 3. When stainless steel steam traps are to be tested using water as the test liquid, potable water with a chloride content less than 30 ppm shall be used to obviate stress corrosion cracking. After test the steam traps shall be carefully drained and air blown. 4. Ends of forged BW steam traps and compact manifolds shall be 100% MT or LP examined. 5. Welds on nippled SW steam traps and compact manifolds shall be 100% MT/LP examined. 6. If any, flange to body socket or butt weld joints shall be 100% MT or LP examined D. Additional Test The following additional test shall be made only if expressly mentioned in this Eng. Std. or in Material Requisition: 1. Radiographic examination of the weld joining the flanges to the body of the steam traps. 2. Magnetic particle or liquid penetration examination of steam traps body. E. Final Test 1. Purchaser reserve the right to inspect the steam traps and and compact manifolds including the use of regular inspection equipment. F. Certification 1. It is the Vendor's responsibility to ensure that all materials used in the manufacture of steam traps and compact manifolds comply with the requirements of the relevant specifications.
  • 7. GENERAL NOTES AND VENDOR DOCUMENTS FOR VESSELS, TRAYS AND AUXILIARIES ÇALIK Doc. No. : DRS-00-VBR-TR-FWB-006 Page : 7 of 9 Date : 07.05.2014 ÇALIK Revision : A FWB Doc. No. : ED0733A-50A_5 FWB Rev. No. : L00FOSTER WHEELER BİMAŞ 2. The Vendor shall keep a record of the certified chemical and mechanical properties of the material used and certificates shall be supplied when required by the relevant specifications or when specified on the purchase documents. For pressure parts (bodies, bonnets, covers and bolting for body/bonnets joints) material certificates shall be in accordance with EN 10204-3.1 (–if the manufacturer is ISO 9001 approved by a European Accredited Notified Body) or EN 10204-3.2 (if the manufacturer is not ISO 9001 approved) is required. 3. The Supplier must classify and mark alloy steam traps in accordance to material Colour Coding and is responsible for the correct application of colour bands before shipping said materials to shop fabricator or fields. It is Vendor responsibility to select colour bands and carry out P.M.I. examination. VI. PROTECTIVE COATING AND END PROTECTION A. All un-machined exterior surfaces of carbon steel and low alloy steam traps and compact manifolds shall be painted per Manufacturer Standard paint suitable for Refinery or Industrial Atmospheric conditions. B. All machined or threaded surfaces (C.S. and A.S.), with a nominal chemistry of 12 Cr and below subject to atmospheric corrosion during shipment or subsequent storage shall be coated with Manufacturer's standard rust preventive suitable for an exposure period of twelve months, to a normal industrial environment. This protective must be easily removable with a petroleum solvent. C. End Protection - steam traps with threaded or socket weld ends shall have the ends protected with metal, wood, or plastic plugs. D. Cover for the protection of gasket surfaces of end flanges, and for the protection of welding ends shall be either: metal of 3,5 mm. min. thickness, hardboard, or solid wood. E. Although austenitic stainless steels and high nickel alloy materials do not require painting, they must not come into contact with any substance that may contain chlorides; temporary protection for shipping has to be suitably provided by Vendor. F. Inside protective coatings like Enamel “Japanese black” are not allowed.
  • 8. GENERAL NOTES AND VENDOR DOCUMENTS FOR VESSELS, TRAYS AND AUXILIARIES ÇALIK Doc. No. : DRS-00-VBR-TR-FWB-006 Page : 8 of 9 Date : 07.05.2014 ÇALIK Revision : A FWB Doc. No. : ED0733A-50A_5 FWB Rev. No. : L00FOSTER WHEELER BİMAŞ VII. ADDITIONAL TECHNICAL REQUIREMENTS CASTINGS ORIGIN Wherever alternative casting construction is approved by FWI/Purchaser for steam traps, the Vendor shall mandatorily declare the origin of castings foundry in the quotation for FWI/Purchaser acceptance. REQUIREMENTS FOR STEAM TRAPS ASME B31.1 Where ASME B31.1 is indicated on the Material Requisition, steam traps shall be supplied in accordance with the following requirements 1. LTCS supplied as alternative to CS is not acceptable 2. All “L” grades stainless steels as alternative to other grades or dual certified stainless steels are not acceptable 3. All pressure containing parts (bolting included) shall be supplied conforming to ASME specifications in accordance to ASME B31.1. Materials conforming to ASTM specifications proposed as alternative to ASME SA material (e.g. “ASTM A105” vs. “SA-105”) may be considered acceptable provided that the requirements of ASME B31.1 para. 123.2.2 will be applied COMPACT MANIFOLDS INSULATION Each compact manifold shall be provided of insulation jacket; the model supplied can be according to Manufacturer Standard. Insulation jackets supplied shall be suitable for the same operating temperature of steam traps specified for steam tracing service (for applicable operating temperature see para VII.E)
  • 9. GENERAL NOTES AND VENDOR DOCUMENTS FOR VESSELS, TRAYS AND AUXILIARIES ÇALIK Doc. No. : DRS-00-VBR-TR-FWB-006 Page : 9 of 9 Date : 07.05.2014 ÇALIK Revision : A FWB Doc. No. : ED0733A-50A_5 FWB Rev. No. : L00FOSTER WHEELER BİMAŞ OPERATING AND DESIGN DATA The proper operation of steam traps must be guaranteed by the Supplier in consideration of the design/operating conditions reported in the following table: Steam Trap Service Steam Trap Type Steam Trap Rating/ Steam Traps End connections Steam Trap Body Material Service Normal operating temp. [°C] in/out Normal operating pressure [barg] upstr./downstr. Minimum operating pressure [barg] Design pressure [barg] Design temperature [°C] OPERATING AND DESIGN DATA VIII. DOCUMENTATION REQUIREMENTS FOR STEAM TRAPS The Vendor shall supply the required technical documentation (e.g. steam traps and compact manifolds drawings, technical datasheets, instruction and maintenance manuals, WPS & PQR’s) according to the prescriptions and time schedule provided in the attached Eng. Std. 59B9