SlideShare a Scribd company logo
1 of 10
MURDANI ACHMAD SIRAJO
QUALITY SPECIFICATION LEVEL
API SPECIFICATION 6D SPECIFICATION FOR PIPELINE AND PIPING VALVES
ADDITIONAL TEST AND DOCUMENTS REQUIREMENT FOR QUALITY
SPECIFICATION LEVEL (QSL):
• NON-DESRUCTIVE EVALUATION (NDE) REQUIREMENT
• PRESSURE TEST REQUIREMENT
• DOCUMENTATION REQUIREMENT
Additional supplementary non-destructive test and pressure test perform by Manufacturer on-site, off-site and/or out-
sourced. These supplementary non-destructive test and pressure test according to API Specification 6D in annex G, H, I
and J.
QUALITY SPECIFICATION LEVEL
NON-DESRUCTIVE EVALUATION (NDE) REQUIREMENT
PARTS
QSL 3 QSL 4
CAST FORGE PLATE CAST FORGE PLATE
Body; Closures; End-Connections;
Bonnet; Cover; Gland-Housing
VT1
RT1
UT4
VT2
UT2
VT2
UT2
VT1
RT1
UT1
MT1/PT1
VT2
UT2
MT1/PT1
VT2
UT2
MT1/PT1
Welding Ends
VT1
RT3/UT4
MT1/PT1
VT2
UT2
MT1/PT1
VT2
UT2
MT1/PT1
VT1
RT3/UT4
MT1/PT1
VT2
UT2
MT1/PT1
VT2
UT2
MT1/PT1
Stem; Shaft NONE
VT2
MT1/PT1
NONE NONE
VT2
UT2
MT1/PT1
NONE
Trunnion; Bearing Plates VT1 VT2 VT2
VT1
UT1
MT1/PT1
VT2
UT2
MT1/PT1
VT2
UT2
MT1/PT1
Bolting NONE VT2 NONE NONE
VT2
MT1/PT1
NONE
Ball; Gate VT1 VT2 VT3
VT1
MT1/PT1
VT2
MT1/PT1
VT2
MT1/PT1
QUALITY SPECIFICATION LEVEL
NON-DESRUCTIVE EVALUATION (NDE) REQUIREMENT-CONT’D
PARTS
QSL 3 QSL 4
CAST FORGE PLATE CAST FORGE PLATE
Ball; Gate VT1 VT2 VT3
VT1
MT1/PT1
VT2
MT1/PT1
VT2
MT1/PT1
Plug; Clapper disc VT1 VT2 VT2
VT1
RT3/UT4
MT1/PT1
VT2
MT1/PT1
VT2
MT1/PT1
Clapper Disc Arm VT1 VT2 VT2
VT1
RT3/UT4
MT1/PT1
VT2
MT1/PT1
VT2
MT1/PT1
Seat Rings VT1 VT2 VT2
VT1
RT3/UT4
MT1/PT1
VT2
UT2
MT1/PT1
VT2
UT2
MT1/PT1
Corrosion-Resistant Overlay
VT3
PT1
VT3
UT3
PT1
Seals Gaskets VT4
Seat Springs VT4
QUALITY SPECIFICATION LEVEL
NON-DESRUCTIVE EVALUATION (NDE) REQUIREMENT-CONT’D
PARTS
QSL 3 QSL 4
CAST FORGE PLATE CAST FORGE PLATE
Pressure-Containing Welds
VT3
RT2/UT3
MT1/PT1
Reinforcement; Stiffening Welds VT3
Fillet; Attachment Welds
VT3
MT1/PT1
Pipe Pup Pieces
VT3
RT2
MT1/PT1
Plating VT4
Hard Facing
VT4
PT1
Sealing Surfaces MT2/PT2
QSL 1 and QSL 2 without any additional testing required.
QUALITY SPECIFICATION LEVEL
METHODE OF NON-DESRUCTIVE EVALUATION (NDE) REQUIREMENT
EXAMINATION NDE EXTENT METHOD ACCEPTANCE
RT1 CASTING CRITICAL AREA ASME SEC. V ART. 2 ASME SEC. VIII DIV. 1 APP. 7
RT2 WELDMENT 100% ASME SEC. V ART. 2 ASME SEC. VIII DIV. 1
RT3 CASTING 100% ASME SEC. V ART. 2
ASME SEC VIII,
DIV. 1 APP. 7
UT1 CASTING REMAINING AREA OF RT1 ASME SEC. V ART. 5 ASTM A609 TABLE 2 QUALITY LEVEL 2
UT2 FORGING; PLATE ALL SURFACE ASME SEC. V ART. 5 ASME SEC. VIII DIV. 1
UT3
WELDMENT 100% ASME SEC. V ART. 4 ASME SEC. VIII DIV. 1 APP. 12
OVERLAY 100% ASME SEC. V ART. 4 ASTM A578A LEVEL C.
UT4 CASTING 100% ASME SEC. V ART. 5 ASTM A609 TABLE 2 QUALITY LEVEL 1
MT1 EXTERNAL; INTERNAL SURFACE 100% ASME SEC. V ART. 7 ASME SEC. VIII DIV. 1 APP. 7
MT2 SEALING SURFACE 100% ASME SEC. V ART. 7 ASME SEC. VIII DIV. 1 APP. 6
PT1 EXTERNAL; INTERNAL SURFACE 100% ASME B16.34 APP. III ASME B16.34 APP. III
PT2 SEALING SURFACE 100% ASME SEC. V ART. 6 ASME SEC. VIII DIV. 1 APP. 8
VT1 CASTING 100% MSS SP-55 API SPEC 6D ARTICLE 8.6
VT2 FORGING; PLATE 100%
ASME SEC. VIII DIV. 1
UF-45; UF-46
ASME SEC. VIII DIV. 1
UF-45; UF-46
VT3 WELDMENT 100% ASME SEC. V ART. 9 API SPEC 6D TABLE J.2
VT4 OTHERS 100% APPLICABLE STANDARD APPLICABLE STANDARD
QUALITY SPECIFICATION LEVEL
PRESSURE TESTING REQUIREMENT
TEST TYPE
QUALITY SPECIFICATION LEVEL (QSL)
QSL 1 QSL 2 QSL 3 QSL 4
High-pressure
hydrostatic shell
test @ 1.5 times
the rated
pressure per 9.3
• Test per 9.3 • Test per 9.3
• 2 tests required.
• After 1st test
reduce pressure to
zero and repeat test
• 3 tests are required.
• Reduce pressure to
zero between each
test.
• Tests 1 and 3 shall
have a test duration
as specified in Table
5.
• Test 2 shall have an
extended duration
of four times that
stated in Table 5.
High-pressure
hydrostatic
seat test @ 1.1
times the rated
pressure per 9.4
• Test per 9.4 • Test per 9.4
• 2 tests each seat
required.
• After 1st test reduce
pressure to zero
and cycle fully open
and fully closed and
repeat test.
• 3 tests each seat is
required.
• Reduce pressure to
zero
• and cycle fully open
and fully closed
after each test
• Tests 1 and 3 shall
have test duration
as specified in Table
6. Test 2 shall have
an extended
duration of four
times that stated in
Table 6.
QUALITY SPECIFICATION LEVEL
PRESSURE TESTING REQUIREMENT-CONT’D
TEST TYPE
QUALITY SPECIFICATION LEVEL (QSL)
QSL 1 QSL 2 QSL 3 QSL 4
Low-pressure
pneumatic
seat test @ 80
psi to 100 psi
per H.3.3 Type II
NONE
• Test each seat per
H.3.3 Type II
• 2 tests each seat
required.
• Reduce pressure to
zero and cycle valve
fully open and fully
closed and repeat
test of each seat.
• 3 tests each seat is
required.
• Reduce pressure to
zero
• and cycle fully open
and fully closed
after each test.
• Tests 1 and 3 shall
have test
• duration as
specified in Table 6.
• Test 2 shall have an
extended duration
of four times that
stated in Table 6.
High-pressure
pneumatic
shell test @ 1.1
times the rated
pressure per
H.4.2
NONE NONE
• 2 tests required.
• After 1st test
reduce pressure to
zero and repeat
test.
• 3 tests are required.
• Reduce pressure to
zero between each
test.
• Tests 1 and 3 shall
have test
• duration as
specified in Table
H.1.
• Test 2 shall have an
extended duration
of four times that
stated in Table H.1.
QUALITY SPECIFICATION LEVEL
PRESSURE TESTING REQUIREMENT-CONT’D
TEST TYPE
QUALITY SPECIFICATION LEVEL (QSL)
QSL 1 QSL 2 QSL 3 QSL 4
High-pressure
pneumatic seat
test @ 1.1 times
the rated
pressure per
H.4.3
NONE NONE
• 2 tests each seat
required.
• After 1st test reduce
pressure to zero
and cycle fully open
and fully closed and
repeat test.
• 3 tests each seat is
required.
• Reduce pressure to
zero
• and cycle fully open
and fully closed
after each test.
• Tests 1 and 3 shall
have test
• duration as
specified in
• Table H.1.
• Test 2 shall have an
extended duration
of four times that
stated in Table H.1.
QUALITY SPECIFICATION LEVEL
DOCUMENTS REQUIREMENT
DOCUMENTS REQUIRED QSL 1 QSL 2 QSL 3 QSL 4
Certificate of Conformance to this specification YES YES YES YES
Hardness test report on pressure-controlling parts NONE NONE YES YES
Hardness test report on pressure-containing parts NONE NONE YES YES
Pressure test report (including pressure, test duration, test medium, and
acceptance criteria) including copy of chart recorder used on pressure
test
NONE YES YES YES
Calibration certificates on pressure test equipment used (e.g. pressure gauges,
transducers, and chart recorders)
NONE NONE YES YES
Heat-treatment records including times and temperatures, e.g. charts NONE NONE YES YES
Material test reports on all pressure-containing and pressure-controlling
parts
NONE YES YES YES
For sour service valves, certificate of conformance to ANSI/NACE MR0175/ISO
15156
NONE YES YES YES
General arrangements drawings NONE YES YES YES
NDE records NONE NONE YES YES
Cross-sectional assembly drawings with parts list and materials list NONE NONE YES YES
Installation, operation, and maintenance instructions/manuals NONE YES YES YES

More Related Content

What's hot

Asme viii Div. 1 presentation rev.0
Asme viii Div. 1  presentation   rev.0Asme viii Div. 1  presentation   rev.0
Asme viii Div. 1 presentation rev.0Mohammad Mahrous
 
Flange management presentation
Flange management presentationFlange management presentation
Flange management presentationMohamed Gaafar
 
Presentation API 570 -510-653.pptx
Presentation API 570 -510-653.pptxPresentation API 570 -510-653.pptx
Presentation API 570 -510-653.pptxhesham ismail
 
Repair a crack in pressure vessel head
Repair a crack in pressure vessel headRepair a crack in pressure vessel head
Repair a crack in pressure vessel headmohamed magdy khalifa
 
Flanged Joint Alignment
Flanged Joint AlignmentFlanged Joint Alignment
Flanged Joint AlignmentMervyn Luthau
 
Presentation on wpqr wps asme_ix
Presentation on wpqr wps asme_ixPresentation on wpqr wps asme_ix
Presentation on wpqr wps asme_ixmayank0738
 
Methods of examination of joints(RT) - API 650 Tanks
Methods of examination of joints(RT) - API 650 TanksMethods of examination of joints(RT) - API 650 Tanks
Methods of examination of joints(RT) - API 650 TanksRajSamy
 
Asme section ii c new
Asme section ii c newAsme section ii c new
Asme section ii c newJithu John
 
Cswip welding inspection notes and questions
Cswip welding inspection notes and questionsCswip welding inspection notes and questions
Cswip welding inspection notes and questionsKarthik Banari
 
Inspection of Pressure Vessels as per ASME Sec VIII Division -1
Inspection of Pressure Vessels as per ASME Sec VIII Division -1Inspection of Pressure Vessels as per ASME Sec VIII Division -1
Inspection of Pressure Vessels as per ASME Sec VIII Division -1Gaurav Singh Rajput
 
Plumbness & Roundness of storage tanks
Plumbness & Roundness of storage tanksPlumbness & Roundness of storage tanks
Plumbness & Roundness of storage tanksWeld Maniac
 
Twi welding training_6
Twi welding training_6Twi welding training_6
Twi welding training_6Alif Elhasani
 
Offshore qc welding inspection versi 1
Offshore qc welding inspection versi 1Offshore qc welding inspection versi 1
Offshore qc welding inspection versi 1Ramdani Diningrat
 
Online Pressure Vessel Training.pdf
Online Pressure Vessel Training.pdfOnline Pressure Vessel Training.pdf
Online Pressure Vessel Training.pdfDharmeshBhati2
 
ASME SEC IX PPT.pdf
ASME SEC IX PPT.pdfASME SEC IX PPT.pdf
ASME SEC IX PPT.pdfPKNanavati
 

What's hot (20)

WPS & WPQ
WPS & WPQWPS & WPQ
WPS & WPQ
 
Asme viii Div. 1 presentation rev.0
Asme viii Div. 1  presentation   rev.0Asme viii Div. 1  presentation   rev.0
Asme viii Div. 1 presentation rev.0
 
Flange management presentation
Flange management presentationFlange management presentation
Flange management presentation
 
How to Qualify a Welding Procedure
How to Qualify a Welding ProcedureHow to Qualify a Welding Procedure
How to Qualify a Welding Procedure
 
Presentation API 570 -510-653.pptx
Presentation API 570 -510-653.pptxPresentation API 570 -510-653.pptx
Presentation API 570 -510-653.pptx
 
Inspection of-pressure-vessels
Inspection of-pressure-vesselsInspection of-pressure-vessels
Inspection of-pressure-vessels
 
Repair a crack in pressure vessel head
Repair a crack in pressure vessel headRepair a crack in pressure vessel head
Repair a crack in pressure vessel head
 
Valve Testing and Repair
Valve Testing and Repair Valve Testing and Repair
Valve Testing and Repair
 
Flanged Joint Alignment
Flanged Joint AlignmentFlanged Joint Alignment
Flanged Joint Alignment
 
Presentation on wpqr wps asme_ix
Presentation on wpqr wps asme_ixPresentation on wpqr wps asme_ix
Presentation on wpqr wps asme_ix
 
Methods of examination of joints(RT) - API 650 Tanks
Methods of examination of joints(RT) - API 650 TanksMethods of examination of joints(RT) - API 650 Tanks
Methods of examination of joints(RT) - API 650 Tanks
 
Asme section ii c new
Asme section ii c newAsme section ii c new
Asme section ii c new
 
Cswip welding inspection notes and questions
Cswip welding inspection notes and questionsCswip welding inspection notes and questions
Cswip welding inspection notes and questions
 
Inspection of Pressure Vessels as per ASME Sec VIII Division -1
Inspection of Pressure Vessels as per ASME Sec VIII Division -1Inspection of Pressure Vessels as per ASME Sec VIII Division -1
Inspection of Pressure Vessels as per ASME Sec VIII Division -1
 
Plumbness & Roundness of storage tanks
Plumbness & Roundness of storage tanksPlumbness & Roundness of storage tanks
Plumbness & Roundness of storage tanks
 
Welders qualification
Welders qualificationWelders qualification
Welders qualification
 
Twi welding training_6
Twi welding training_6Twi welding training_6
Twi welding training_6
 
Offshore qc welding inspection versi 1
Offshore qc welding inspection versi 1Offshore qc welding inspection versi 1
Offshore qc welding inspection versi 1
 
Online Pressure Vessel Training.pdf
Online Pressure Vessel Training.pdfOnline Pressure Vessel Training.pdf
Online Pressure Vessel Training.pdf
 
ASME SEC IX PPT.pdf
ASME SEC IX PPT.pdfASME SEC IX PPT.pdf
ASME SEC IX PPT.pdf
 

Similar to API Specification 6D Quality Specification Level (QSL)

G.c power point by royal debnath
G.c power point by royal debnathG.c power point by royal debnath
G.c power point by royal debnathhusnatazeen
 
TEST RIG FOR HYDRAULIC FLUID (A3987) - NEOMETRIX DEFENCE
TEST RIG FOR HYDRAULIC FLUID (A3987) - NEOMETRIX DEFENCETEST RIG FOR HYDRAULIC FLUID (A3987) - NEOMETRIX DEFENCE
TEST RIG FOR HYDRAULIC FLUID (A3987) - NEOMETRIX DEFENCENeometrix_Engineering_Pvt_Ltd
 
Qualification of Analytical Equipments
Qualification of Analytical EquipmentsQualification of Analytical Equipments
Qualification of Analytical EquipmentsDhawal_Raghuvanshi
 
Qualification of gc equipment by manoj kumar
Qualification of gc equipment by manoj kumarQualification of gc equipment by manoj kumar
Qualification of gc equipment by manoj kumarhimaja donthula
 
Hydrotest REPORT FOR 4'' 158m Line.
Hydrotest REPORT FOR 4'' 158m Line.Hydrotest REPORT FOR 4'' 158m Line.
Hydrotest REPORT FOR 4'' 158m Line.Emeka Ngwobia
 
API 622, API 624 and API 641 for Fugitive Emissions
API 622, API 624 and API 641 for Fugitive EmissionsAPI 622, API 624 and API 641 for Fugitive Emissions
API 622, API 624 and API 641 for Fugitive EmissionsPGE India - PILOT Gaskets
 
Valve Emissions Testing Webinar
Valve Emissions Testing WebinarValve Emissions Testing Webinar
Valve Emissions Testing WebinarA.W.Chesterton
 
Kia crt 3500 user manual eng
Kia crt 3500 user manual engKia crt 3500 user manual eng
Kia crt 3500 user manual engHoang Duong
 
Differential pressure cylinder tester
Differential pressure cylinder testerDifferential pressure cylinder tester
Differential pressure cylinder testerholasoychalito
 
CNG Technical & Hydrogen Blending in Natural Gas pipeline.pptx
CNG Technical & Hydrogen Blending in Natural Gas pipeline.pptxCNG Technical & Hydrogen Blending in Natural Gas pipeline.pptx
CNG Technical & Hydrogen Blending in Natural Gas pipeline.pptxRishabh Sirvaiya
 
2020-6_TechPres_Ball.pdf
2020-6_TechPres_Ball.pdf2020-6_TechPres_Ball.pdf
2020-6_TechPres_Ball.pdftuanvuthanh4
 
Presentazione completa 2012
Presentazione   completa 2012 Presentazione   completa 2012
Presentazione completa 2012 massimo capriolo
 
Bubbler Method Liquid Tank Level Measurement Instruments
Bubbler Method Liquid Tank Level Measurement InstrumentsBubbler Method Liquid Tank Level Measurement Instruments
Bubbler Method Liquid Tank Level Measurement InstrumentsMiller Energy, Inc.
 
2621100109_ENQ_Tech doc.pdf
2621100109_ENQ_Tech doc.pdf2621100109_ENQ_Tech doc.pdf
2621100109_ENQ_Tech doc.pdfashish123sati
 
G 175 – 03 _RZE3NQ__.pdf
G 175 – 03  _RZE3NQ__.pdfG 175 – 03  _RZE3NQ__.pdf
G 175 – 03 _RZE3NQ__.pdfLeo letter
 

Similar to API Specification 6D Quality Specification Level (QSL) (20)

NONG YAO PROJECT SUBSEA VALVE Rev 0
NONG YAO PROJECT SUBSEA VALVE Rev 0NONG YAO PROJECT SUBSEA VALVE Rev 0
NONG YAO PROJECT SUBSEA VALVE Rev 0
 
G.c power point by royal debnath
G.c power point by royal debnathG.c power point by royal debnath
G.c power point by royal debnath
 
TEST RIG FOR HYDRAULIC FLUID (A3987) - NEOMETRIX DEFENCE
TEST RIG FOR HYDRAULIC FLUID (A3987) - NEOMETRIX DEFENCETEST RIG FOR HYDRAULIC FLUID (A3987) - NEOMETRIX DEFENCE
TEST RIG FOR HYDRAULIC FLUID (A3987) - NEOMETRIX DEFENCE
 
Qualification of Analytical Equipments
Qualification of Analytical EquipmentsQualification of Analytical Equipments
Qualification of Analytical Equipments
 
Qualification of gc equipment by manoj kumar
Qualification of gc equipment by manoj kumarQualification of gc equipment by manoj kumar
Qualification of gc equipment by manoj kumar
 
Hydrotest REPORT FOR 4'' 158m Line.
Hydrotest REPORT FOR 4'' 158m Line.Hydrotest REPORT FOR 4'' 158m Line.
Hydrotest REPORT FOR 4'' 158m Line.
 
Qualification of gc equipment
Qualification of gc equipmentQualification of gc equipment
Qualification of gc equipment
 
Vpa3145
 Vpa3145 Vpa3145
Vpa3145
 
API 622, API 624 and API 641 for Fugitive Emissions
API 622, API 624 and API 641 for Fugitive EmissionsAPI 622, API 624 and API 641 for Fugitive Emissions
API 622, API 624 and API 641 for Fugitive Emissions
 
Valve Emissions Testing Webinar
Valve Emissions Testing WebinarValve Emissions Testing Webinar
Valve Emissions Testing Webinar
 
Kia crt 3500 user manual eng
Kia crt 3500 user manual engKia crt 3500 user manual eng
Kia crt 3500 user manual eng
 
Differential pressure cylinder tester
Differential pressure cylinder testerDifferential pressure cylinder tester
Differential pressure cylinder tester
 
CNG Technical & Hydrogen Blending in Natural Gas pipeline.pptx
CNG Technical & Hydrogen Blending in Natural Gas pipeline.pptxCNG Technical & Hydrogen Blending in Natural Gas pipeline.pptx
CNG Technical & Hydrogen Blending in Natural Gas pipeline.pptx
 
Piping hydrotest
Piping hydrotestPiping hydrotest
Piping hydrotest
 
2020-6_TechPres_Ball.pdf
2020-6_TechPres_Ball.pdf2020-6_TechPres_Ball.pdf
2020-6_TechPres_Ball.pdf
 
Presentazione completa 2012
Presentazione   completa 2012 Presentazione   completa 2012
Presentazione completa 2012
 
Bubbler Method Liquid Tank Level Measurement Instruments
Bubbler Method Liquid Tank Level Measurement InstrumentsBubbler Method Liquid Tank Level Measurement Instruments
Bubbler Method Liquid Tank Level Measurement Instruments
 
2621100109_ENQ_Tech doc.pdf
2621100109_ENQ_Tech doc.pdf2621100109_ENQ_Tech doc.pdf
2621100109_ENQ_Tech doc.pdf
 
G 175 – 03 _RZE3NQ__.pdf
G 175 – 03  _RZE3NQ__.pdfG 175 – 03  _RZE3NQ__.pdf
G 175 – 03 _RZE3NQ__.pdf
 
Astm.a516.1990
Astm.a516.1990Astm.a516.1990
Astm.a516.1990
 

Recently uploaded

CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
EduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIEduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIkoyaldeepu123
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 

Recently uploaded (20)

CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
EduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIEduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AI
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 

API Specification 6D Quality Specification Level (QSL)

  • 2. QUALITY SPECIFICATION LEVEL API SPECIFICATION 6D SPECIFICATION FOR PIPELINE AND PIPING VALVES ADDITIONAL TEST AND DOCUMENTS REQUIREMENT FOR QUALITY SPECIFICATION LEVEL (QSL): • NON-DESRUCTIVE EVALUATION (NDE) REQUIREMENT • PRESSURE TEST REQUIREMENT • DOCUMENTATION REQUIREMENT Additional supplementary non-destructive test and pressure test perform by Manufacturer on-site, off-site and/or out- sourced. These supplementary non-destructive test and pressure test according to API Specification 6D in annex G, H, I and J.
  • 3. QUALITY SPECIFICATION LEVEL NON-DESRUCTIVE EVALUATION (NDE) REQUIREMENT PARTS QSL 3 QSL 4 CAST FORGE PLATE CAST FORGE PLATE Body; Closures; End-Connections; Bonnet; Cover; Gland-Housing VT1 RT1 UT4 VT2 UT2 VT2 UT2 VT1 RT1 UT1 MT1/PT1 VT2 UT2 MT1/PT1 VT2 UT2 MT1/PT1 Welding Ends VT1 RT3/UT4 MT1/PT1 VT2 UT2 MT1/PT1 VT2 UT2 MT1/PT1 VT1 RT3/UT4 MT1/PT1 VT2 UT2 MT1/PT1 VT2 UT2 MT1/PT1 Stem; Shaft NONE VT2 MT1/PT1 NONE NONE VT2 UT2 MT1/PT1 NONE Trunnion; Bearing Plates VT1 VT2 VT2 VT1 UT1 MT1/PT1 VT2 UT2 MT1/PT1 VT2 UT2 MT1/PT1 Bolting NONE VT2 NONE NONE VT2 MT1/PT1 NONE Ball; Gate VT1 VT2 VT3 VT1 MT1/PT1 VT2 MT1/PT1 VT2 MT1/PT1
  • 4. QUALITY SPECIFICATION LEVEL NON-DESRUCTIVE EVALUATION (NDE) REQUIREMENT-CONT’D PARTS QSL 3 QSL 4 CAST FORGE PLATE CAST FORGE PLATE Ball; Gate VT1 VT2 VT3 VT1 MT1/PT1 VT2 MT1/PT1 VT2 MT1/PT1 Plug; Clapper disc VT1 VT2 VT2 VT1 RT3/UT4 MT1/PT1 VT2 MT1/PT1 VT2 MT1/PT1 Clapper Disc Arm VT1 VT2 VT2 VT1 RT3/UT4 MT1/PT1 VT2 MT1/PT1 VT2 MT1/PT1 Seat Rings VT1 VT2 VT2 VT1 RT3/UT4 MT1/PT1 VT2 UT2 MT1/PT1 VT2 UT2 MT1/PT1 Corrosion-Resistant Overlay VT3 PT1 VT3 UT3 PT1 Seals Gaskets VT4 Seat Springs VT4
  • 5. QUALITY SPECIFICATION LEVEL NON-DESRUCTIVE EVALUATION (NDE) REQUIREMENT-CONT’D PARTS QSL 3 QSL 4 CAST FORGE PLATE CAST FORGE PLATE Pressure-Containing Welds VT3 RT2/UT3 MT1/PT1 Reinforcement; Stiffening Welds VT3 Fillet; Attachment Welds VT3 MT1/PT1 Pipe Pup Pieces VT3 RT2 MT1/PT1 Plating VT4 Hard Facing VT4 PT1 Sealing Surfaces MT2/PT2 QSL 1 and QSL 2 without any additional testing required.
  • 6. QUALITY SPECIFICATION LEVEL METHODE OF NON-DESRUCTIVE EVALUATION (NDE) REQUIREMENT EXAMINATION NDE EXTENT METHOD ACCEPTANCE RT1 CASTING CRITICAL AREA ASME SEC. V ART. 2 ASME SEC. VIII DIV. 1 APP. 7 RT2 WELDMENT 100% ASME SEC. V ART. 2 ASME SEC. VIII DIV. 1 RT3 CASTING 100% ASME SEC. V ART. 2 ASME SEC VIII, DIV. 1 APP. 7 UT1 CASTING REMAINING AREA OF RT1 ASME SEC. V ART. 5 ASTM A609 TABLE 2 QUALITY LEVEL 2 UT2 FORGING; PLATE ALL SURFACE ASME SEC. V ART. 5 ASME SEC. VIII DIV. 1 UT3 WELDMENT 100% ASME SEC. V ART. 4 ASME SEC. VIII DIV. 1 APP. 12 OVERLAY 100% ASME SEC. V ART. 4 ASTM A578A LEVEL C. UT4 CASTING 100% ASME SEC. V ART. 5 ASTM A609 TABLE 2 QUALITY LEVEL 1 MT1 EXTERNAL; INTERNAL SURFACE 100% ASME SEC. V ART. 7 ASME SEC. VIII DIV. 1 APP. 7 MT2 SEALING SURFACE 100% ASME SEC. V ART. 7 ASME SEC. VIII DIV. 1 APP. 6 PT1 EXTERNAL; INTERNAL SURFACE 100% ASME B16.34 APP. III ASME B16.34 APP. III PT2 SEALING SURFACE 100% ASME SEC. V ART. 6 ASME SEC. VIII DIV. 1 APP. 8 VT1 CASTING 100% MSS SP-55 API SPEC 6D ARTICLE 8.6 VT2 FORGING; PLATE 100% ASME SEC. VIII DIV. 1 UF-45; UF-46 ASME SEC. VIII DIV. 1 UF-45; UF-46 VT3 WELDMENT 100% ASME SEC. V ART. 9 API SPEC 6D TABLE J.2 VT4 OTHERS 100% APPLICABLE STANDARD APPLICABLE STANDARD
  • 7. QUALITY SPECIFICATION LEVEL PRESSURE TESTING REQUIREMENT TEST TYPE QUALITY SPECIFICATION LEVEL (QSL) QSL 1 QSL 2 QSL 3 QSL 4 High-pressure hydrostatic shell test @ 1.5 times the rated pressure per 9.3 • Test per 9.3 • Test per 9.3 • 2 tests required. • After 1st test reduce pressure to zero and repeat test • 3 tests are required. • Reduce pressure to zero between each test. • Tests 1 and 3 shall have a test duration as specified in Table 5. • Test 2 shall have an extended duration of four times that stated in Table 5. High-pressure hydrostatic seat test @ 1.1 times the rated pressure per 9.4 • Test per 9.4 • Test per 9.4 • 2 tests each seat required. • After 1st test reduce pressure to zero and cycle fully open and fully closed and repeat test. • 3 tests each seat is required. • Reduce pressure to zero • and cycle fully open and fully closed after each test • Tests 1 and 3 shall have test duration as specified in Table 6. Test 2 shall have an extended duration of four times that stated in Table 6.
  • 8. QUALITY SPECIFICATION LEVEL PRESSURE TESTING REQUIREMENT-CONT’D TEST TYPE QUALITY SPECIFICATION LEVEL (QSL) QSL 1 QSL 2 QSL 3 QSL 4 Low-pressure pneumatic seat test @ 80 psi to 100 psi per H.3.3 Type II NONE • Test each seat per H.3.3 Type II • 2 tests each seat required. • Reduce pressure to zero and cycle valve fully open and fully closed and repeat test of each seat. • 3 tests each seat is required. • Reduce pressure to zero • and cycle fully open and fully closed after each test. • Tests 1 and 3 shall have test • duration as specified in Table 6. • Test 2 shall have an extended duration of four times that stated in Table 6. High-pressure pneumatic shell test @ 1.1 times the rated pressure per H.4.2 NONE NONE • 2 tests required. • After 1st test reduce pressure to zero and repeat test. • 3 tests are required. • Reduce pressure to zero between each test. • Tests 1 and 3 shall have test • duration as specified in Table H.1. • Test 2 shall have an extended duration of four times that stated in Table H.1.
  • 9. QUALITY SPECIFICATION LEVEL PRESSURE TESTING REQUIREMENT-CONT’D TEST TYPE QUALITY SPECIFICATION LEVEL (QSL) QSL 1 QSL 2 QSL 3 QSL 4 High-pressure pneumatic seat test @ 1.1 times the rated pressure per H.4.3 NONE NONE • 2 tests each seat required. • After 1st test reduce pressure to zero and cycle fully open and fully closed and repeat test. • 3 tests each seat is required. • Reduce pressure to zero • and cycle fully open and fully closed after each test. • Tests 1 and 3 shall have test • duration as specified in • Table H.1. • Test 2 shall have an extended duration of four times that stated in Table H.1.
  • 10. QUALITY SPECIFICATION LEVEL DOCUMENTS REQUIREMENT DOCUMENTS REQUIRED QSL 1 QSL 2 QSL 3 QSL 4 Certificate of Conformance to this specification YES YES YES YES Hardness test report on pressure-controlling parts NONE NONE YES YES Hardness test report on pressure-containing parts NONE NONE YES YES Pressure test report (including pressure, test duration, test medium, and acceptance criteria) including copy of chart recorder used on pressure test NONE YES YES YES Calibration certificates on pressure test equipment used (e.g. pressure gauges, transducers, and chart recorders) NONE NONE YES YES Heat-treatment records including times and temperatures, e.g. charts NONE NONE YES YES Material test reports on all pressure-containing and pressure-controlling parts NONE YES YES YES For sour service valves, certificate of conformance to ANSI/NACE MR0175/ISO 15156 NONE YES YES YES General arrangements drawings NONE YES YES YES NDE records NONE NONE YES YES Cross-sectional assembly drawings with parts list and materials list NONE NONE YES YES Installation, operation, and maintenance instructions/manuals NONE YES YES YES