SAP White Paper
Aerospace and Defense




Driving Maximum Value from Mobile Technology
The Strategic Necessity of Enterprise Mobility
in Aerospace and Defense
Table of Contents

               5	    Executive Summary

               6	    Why a Mobility Strategy Matters
                     The Consumerization
                     of Technology
                     Expectations for
                     Increased Enterprise
                     Mobility and Productivity

               8	    The Challenges of Creating
                     a Mobile Enterprise

               9	    The Four Cs of
                     Enterprise Mobility
                     Connect
                     Consume
                     Control
                     Create

               10	   Enterprise Mobility with
                     Maximum Impact and Value
                     Enterprise Mobility
                     for Executives
                     Enterprise Mobility for
                     Program Managers
                     Enterprise Mobility for
                     Process Workers
                     The Bottom Line

               13	Conclusion
Enterprise mobility is a must-have strategy for
aerospace and defense (A&D) firms. As part of a
global industry involving mission-critical products,
A&D companies must support a workforce that is on
the move. Right now, the technology exists – from
really smart smartphones to everywhere Wi-Fi access
– to support true enterprise mobility in A&D. But how
can you make sure that mobile technology brings the
greatest value to your firm?
Enterprise Mobility Is on the Rise




Executive Summary

Aerospace and defense is an inherently      customers, and partners; and increased
mobile industry. Yet it’s plagued with      access to these solutions. Across a range
inefficiencies introduced by very large     of companies, enterprise mobility is no
production facilities, distributed work-    longer a “nice to have” feature. It is quickly
forces, far-flung points of maintenance,    becoming a strategic necessity.
and assets such as aircraft and ships         But making a workforce mobile and
that themselves are mobile. In an envi-     securely connecting business information
ronment in which mounting budget pres-      with a vast array of mobile devices can be
sure demands “doing more with less,”        a challenge. This paper details trends and
some A&D firms have looked to IT mobil-     issues behind enterprise mobility and
ity solutions as a path towards overcom-    then outlines a framework that can help
ing these challenges.                       guide A&D firms seeking to create a
   Meanwhile, enterprise mobility contin-   comprehensive and effective enterprise
ues to gain momentum. This is evidenced     mobility strategy. Finally, the paper will
by increased corporate support for a        conclude with how to identify business
broad array of smartphones and other        processes that, once they become
mobile devices; expanding support of        mobile, can drive the most value to
mobile applications for employees,          the organization.




                                            Across a range of companies, enterprise mobility is no
                                            longer a “nice to have” feature. It is quickly becoming
                                            a strategic necessity.




SAP White Paper – Driving Maximum Value from Mobile Technology                                        5
Mobile Technology Is the Next Desktop




Why a Mobility Strategy Matters

In a recent Oxford Economics survey,           The Consumerization                                Furthermore, more than 55% of the
respondents were asked to identify four        of Technology                                   companies allow employees to bring their
digital megatrends that they believe will                                                      personal mobile devices into the office
have the greatest positive impact on the       When it comes to mobile technology,             and will provide some level of support to
business landscape. Mobile technology          employees are driving how they want to          these personal devices. “This is part of a
topped the list, as shown in Figure 1.1        interact with information – and expecting       broader trend that we call the ‘consumer-
Respondents across all sectors, in firms       IT departments to support a wide range of       ization’ of IT in which employees solve
of all sizes, and in both the developed        personal mobile devices and applications.       customer and business problems using
and emerging worlds consistently rated         According to a recent survey of nearly          technology that they master first at home,
mobility technology as a game changer.         2,000 North American and European               such as social media, mobile, and video
In fact, more than 50% of the respon-          companies by Forrester Research Inc.,           services,” notes the Forrester report.4
dents within each sector indicated that        more than 45% of the firms state that              In short, employees want to interact
their firms will invest heavily in mobile      they are focused on supporting more             with business data as easily and as intui-
technologies over the next five years.2        mobile applications for employees who           tively as they use Twitter or Facebook.
As smartphone penetration and adop-            work outside of the office.3 In addition,
tion rates soar, handheld devices are          43% of the companies are planning to
poised to eclipse the desktop and laptop       support more mobile devices or smart-
as must-have technologies.                     phones for their employees.




Figure 1: Importance of Mobile Technology in Driving Business Value



Which do you believe will have the greatest positive impact on your business over the next five years?

Mobile technology
Business intelligence
Cloud computing
Social media

                                   0%             10%              20%              30%              40%            50%             60%
Source: Oxford Economics
Expectations for                                                is more complex, placing a premium on
Increased Enterprise                                            orchestration and the ability to instantly
Mobility and Productivity                                       deliver information wherever it is needed.
                                                                   The emergence of mobile solutions
Shrinking government budgets, increased                         means that IT can play a significant role in
low-cost competition, and performance-                          addressing A&D’s complex challenges by
based contracting are some of the key                           speeding critical business processes and
trends that have driven A&D firms to                            supporting rapid decision making. From
rethink how they operate. For example,                          the executive ranks, to program manag-
aerospace manufacturers – particularly                          ers, to production and service workers,
those in the commercial sector – have                           mobile solutions can enable employees to
turned to outsourcing production of                             complete complex tasks more efficiently
major assemblies and subcomponents to                           and to greater levels of quality and com-
reduce capital expenditures and labor                           pliance. According to Yankee Group
expenses. In the maintenance, repair, and                       Research Inc., “Despite initial fears that
overhaul (MRO) space, performance-                              the spread of mobile technologies would
based contracts increasingly dictate that                       spiral costs out of control and put sensi-
global firms deliver service locally and                        tive corporate data at risk, companies
efficiently. Moreover, overarching                              are increasingly looking to . . . mobile
demands in the A&D marketplace for                              applications to offer incremental business
safety, quality, and regulatory compliance                      benefits that together can have a trans-
have not lessened. This new reality in A&D                      formative impact.”5 (See Figure 2.)



Figure 2: Internal and Customer-Facing Benefits from Mobility Initiatives




Source: Yankee Group Research Inc., A Guide to Successfully Deploying Enterprise Mobile Applications, September 2011




SAP White Paper – Driving Maximum Value from Mobile Technology                                                         7
Multiple Apps, Servers, and Storage Systems Add Complexity




The Challenges of Creating
a Mobile Enterprise

A comprehensive mobility strategy is a
                                                Figure 3: The Complexity of Managing Organizational Mobility
top priority to leverage technology and
improve performance. While the need
to support such a powerful and flexible
mobility strategy is great, getting there
is complicated and difficult. Historically,            BlackBerry                     Smartphone         Windows Phone 7
many firms have pushed information –
e-mails, alerts, and static reports – out
to employees via a corporate-mandated                                              Multiple platforms
mobile device. With today’s technology,                   iOS                                                  Windows
firms can move from the push environ-
ment to an interactive one – where                                                 Multiple systems
employees are connected and interactive
all the time, anywhere, on any device.
   Making your enterprise mobile requires               iPad OS                         Android                 Tablet
getting timely business information, irre-
spective of the source, to your employees
when and where they need it. For exam-
ple, a production supervisor who is out of      Phone 7, just to name a few – quickly
the office can send out work orders using       become complicated, as illustrated in
a smartphone. Workers who are already           Figure 3. For example, do you have a pro-
on the shop floor can then access their         cess to apply necessary and timely OS
assignment from a tablet device. Maybe          patches? You need a platform that can
they drill down into details to review          help you coordinate and manage data
instructions, technical drawings, or tool       from multiple applications, servers, and
assignments. Now they can immediately           storage systems – one that can securely
begin the operation and update the task         filter large amounts of data and distribute
status without having to leave the point of     it safely.
work. Information can be shared and deci-          Given the rigorous security require-
sions can be made with fewer bottlenecks        ments in A&D, all this must be done with
and less wasted effort.                         utter confidence that data is secure at all
   While A&D firms have long desired this       times, using a system that balances rig-
level of interconnectivity, the technology      orous security with easy and trouble-free
is only now fully available to support it.      employee access. Can you enforce secu-
Smartphones and tablets – such as the           rity policies established in the provision-
iPad, Galaxy, and PlayBook – are quickly        ing stage? Provide detailed logging and
becoming mainstream. Meanwhile, Wi-Fi           reporting? Supply robust encryption
network connectivity and bandwidth is           that satisfies government standards?
ubiquitous – not just in the office, but lit-   Historically, these IT challenges have
erally everywhere.                              been addressed in an ad hoc fashion.
   However, supporting and managing the         Now, enterprise mobility platforms allow
collection and delivery of business infor-      IT to better manage data flow and ensure
mation to a wide range of wireless devices      rigorous mobile security features for the
and operating systems – BlackBerry, iOS,        connectivity of critical information to all
iPad OS, Android, Windows, and Windows          employees on any devices.
The Keys to an Effective Mobility Strategy




The Four Cs of Enterprise Mobility

Firms interested in secure mobile tech-        Control                                       Decommissioning
nology need to consider several major                                                        The final phase is decommissioning. Here
factors. We’ll call them the “four Cs”:        Your IT department needs central control      you can remotely disable or kill devices,
connect, consume, control, and create.         of all devices, as well as the information    reprovision and redeploy devices, and
                                               pulled from the platform and pushed to        enforce access violation locks. Decom-
Connect                                        those devices. For example, an effective      missioning is a critical step – as impor-
                                               practice is to build a control feature once   tant as provisioning, or perhaps even
As we’ve mentioned, any enterprise             and use it to support multiple devices.       more so. We’ve all heard stories about a
mobility strategy starts with a platform       The goal is to manage and secure each         device sold on eBay that is still loaded
for information management. Such a plat-       mobile device through its entire lifecycle,   with corporate data; that device was the
form must be able to pull all business         from provisioning to production to            victim of either theft or a poor decommis-
information from multiple data sources         decommissioning.                              sioning process. To enforce the security of
and applications – including enterprise                                                      the business, you must be able to lock or
resource planning, customer relationship       Provisioning                                  kill a lost or stolen device and to wipe all
management, supply chain management,           In the provisioning phase, you need to        data from devices about to be removed
HR, and more – to data storage devices,        configure, set up, and install devices;       from inventory and repurposed. Finally,
servers, and data marts. A flexible and        manage application deployment; and            each reprovisioned device must receive a
open infrastructure needs to make the          establish security policies. You can work     new functional image as well as the
data easily accessible to users and also       with both group and membership assign-        appropriate applications and settings.
incorporate large and sometimes unex-          ments to accomplish provisioning for a
pected changes down the road.                  large organization.                           Create

Consume                                        Production                                    Rapid-development tools make it easy to
                                               In the production phase, you must             create new mobile applications – for
A workable enterprise mobility system          remotely manage, track, and maintain          example, an expense report or sales and
must be able to deliver business informa-      devices. This includes updating and           development app. The value that mobile
tion to any mobile device for consumption      repairing software as needed, as well         technology delivers is directly related to
and use. As stated before, employees           as distributing data and content to line-     the effectiveness of the applications you
want to receive the information and ana-       of-business applications. You need to         are running. Developing mobile apps for
lyze it on the device of their choice – any-   securely back up device data, enforce         mission-critical processes – such as tal-
time and anywhere. Firms must address          compliance and security policies, and         ent management or business develop-
the complex challenges of managing a           provide login reports.                        ment – can help carve out competitive
wide and ever-changing range of both                                                         differentiation. Remember also that new
employee-owned and company devices,                                                          applications should possess the best
with multiple operating systems and                                                          qualities of well-designed consumer
upgrade schedules. For example, a report                                                     apps – small, easy to download, and easy
formatted for viewing on a BlackBerry                                                        to understand, with rapid development,
may not display correctly on an iPhone.                                                      instant value, and fast ROI.




SAP White Paper – Driving Maximum Value from Mobile Technology                                                                         9
The Key Is to Identify the Right Processes




Enterprise Mobility with Maximum
Impact and Value

A number of areas within A&D are primed      Area                         Mobile Application Examples
to use mobile technology to drive incre-
                                             Aftermarket; maintenance,    •• Work order access at the point of service
mental value, as shown in the table.
                                             repair, and overhaul (MRO)   •• Tool and part inventory tracking
   With so many use-case possibilities,
                                                                          •• Technical document reference
how do you narrow in on those that will
                                                                          •• Service history and logging
drive the biggest impact and value? You
                                                                          •• Task resolution and work sign-off
want to look for opportunities to turn
                                                                          •• Technician scheduling and availability
unproductive time, such as downtime at
an airport, into productive time, such as    Business capture             •• Lead management
completing an expense report. You also                                    •• Opportunity management
want to look for opportunities to increase                                •• Collateral access
productivity of already productive time.                                  •• Product visualization and demonstration
   At SAP we’ve developed some simple
          ,
                                             Program management           •• Time recording
guidelines for identifying processes ripe
                                                                          •• Earned value and project status reporting
for improvement using mobile applica-
                                                                          •• Dashboard of key performance indicators (KPIs)
tions. First, the workflow must be com-
                                                                             for program management
plex; you won’t get the same level of ROI
                                                                          •• Workflow approvals
on a simple process. Second, the pro-
                                                                          •• Supplier audit
cess must be time sensitive; one of the
greatest strengths of mobile apps is         Shop floor management        •• Work order assignment and tracking for shop
speeding up the time it takes to make a                                      floor supervisors
decision. Third, mobile applications can                                  •• Production bulletin board
offer significant benefits to processes                                   •• Work order access at the point of production
that multiple people touch. The net?                                      •• Quality issue management
Enterprise mobility can speed decision
time and accelerate activities in a time-    Analytics                    •• KPI monitoring
sensitive, complex process that requires                                  •• Data exploration and visualization
information, analysis, or approval from
multiple employees. Taking the above
factors into account, let’s review three
high-impact use cases in more detail.
Enterprise Mobility                          Enterprise Mobility for                        Criteria for Applying Mobility
for Executives                               Process Workers
                                                                                            To optimize your ROI in mobile technology,
                                                                                            apply it to business processes that involve:
A&D executives always need to be on top      A&D workers in engineering, production,        •• Complex workflows
of their business to accelerate time to      field support, and business operations         •• Time-sensitive decisions
action. With mobile applications, they       need rapid access to information, such         •• Multiple people touching the process
can get instant insight – in the form of     as tasks, schedules, and resource avail-
key performance indicators for all areas     ability. For example, the ability of techni-
of their business. They can review sales,    cians to access work order information
the business development pipeline, and       – especially when they are on the go in
the status on program delivery. Mobile       the field or in large production areas –
features give executives the ability to      can speed delivery and maximize the
make more educated decisions based on        value of contracts. Mobile applications
real-time data and analytic functionality,   can also improve collaboration and visi-
which ultimately speeds response time.       bility within the program ecosystem. For
                                             example, productivity apps can allow
Enterprise Mobility for                      program stakeholders to easily capture
Program Managers                             and communicate time sheets, travel
                                             expenses, and workflow requests and
With key information at their fingertips,    approvals.
program managers can use mobile appli-
cations to orchestrate the activities of     The Bottom Line
their teams and ultimately accelerate
program delivery. They need access           Understanding where to apply mobile
to all necessary information – such as       technology – to time-sensitive, complex
contract bids and proposals, system          processes requiring input from multiple
engineering and requirement details,         people – can help ensure maximum
and earned value management reports –        impact and effectiveness and speed ROI
to help bring programs in on time and        of enterprise mobility initiatives.
under budget.




SAP White Paper – Driving Maximum Value from Mobile Technology                                                                             11
You need a platform that can help you coordinate and manage
 data from multiple applications, servers, and storage systems
– one that can filter and distribute large amounts of data safely,
 balancing rigorous security with easy employee access.
Enterprise Mobility Can Drive Faster, Smarter Decisions




Conclusion

A&D firms are positioned to derive great     consume, control, and create. The best          Learn More
benefits from making their operations        candidates are complex processes that
                                                                                             In the world of aerospace and defense
mobile enterprise-wide, from executives      require rapid decisions based on informa-
                                                                                             (A&D), mobile technology is a strategic
to program managers to process workers.      tion, analysis, or approval from multiple       necessity that can boost productivity and
But to do so successfully, a firm must       people. In such cases, successful applica-      drive competitive advantage. For more
address the daunting task of supporting a    tion of mobile technology can speed deci-       information on how to maximize the value
wide-ranging ecosystem of operating sys-     sion time and accelerate both processes         of mobile technology in your A&D firm,
                                                                                             contact www.sap.com/industries
tems, devices, and applications required     and ROI.
                                                                                             /aerospace-and-defense.epx.
to empower its mobile workers. To achieve       To reap the benefits of enterprise
enterprise mobility with power and control   mobility, find a process that is ripe for
in a way that helps its users get the most   this strategy – and use the four Cs to
out of mobile technology, a firm should      start making faster, better-informed
thoroughly address the four Cs – connect,    decisions today.




                                                                                          FOOTNOTES

                                                                                          1.	 Digital Megatrends 2015: The Role of Technol-
                                                                                          ogy in the New Normal Market, Oxford Economics,
                                                                                          March 2011.
                                                                                          2.	 Ibid.
                                                                                          3.	 The Rise of Wannabe and Maverick Mobile
                                                                                          Workers, Forrester Research Inc., February 16, 2011.
                                                                                          4.	 Ibid.
                                                                                          5.	 A Guide to Successfully Deploying Enterprise
                                                                                          Mobile Applications, white paper commissioned
                                                                                          by SAP from Yankee Group Research Inc.,
                                                                                          September 2011.




SAP White Paper – Driving Maximum Value from Mobile Technology                                                                             13
Enterprise mobility can speed decision time and accelerate
activities in a time-sensitive, complex process that requires
information, analysis, or approval from multiple employees.
www.sap.com/contactsap




50 113 631 (12/06) ©2012 SAP AG. All rights reserved.
SAP R/3, SAP NetWeaver, Duet, PartnerEdge, ByDesign,
    ,
SAP BusinessObjects Explorer, StreamWork, SAP HANA, and
other SAP products and services mentioned herein as well as
their respective logos are trademarks or registered trademarks
of SAP AG in Germany and other countries.

Business Objects and the Business Objects logo, BusinessObjects,
Crystal Reports, Crystal Decisions, Web Intelligence, Xcelsius, and other
Business Objects products and services mentioned herein as well as their
respective logos are trademarks or registered trademarks of Business
Objects Software Ltd. Business Objects is an SAP company.

Sybase and Adaptive Server, iAnywhere, Sybase 365, SQL Anywhere, and
other Sybase products and services mentioned herein as well as their
respective logos are trademarks or registered trademarks of Sybase Inc.
Sybase is an SAP company.

Crossgate, m@gic EDDY, B2B 360°, and B2B 360° Services are registered
trademarks of Crossgate AG in Germany and other countries. Crossgate
is an SAP company.

All other product and service names mentioned are the trademarks of
their respective companies. Data contained in this document serves
informational purposes only. National product specifications may vary.

These materials are subject to change without notice. These materials
are provided by SAP AG and its affiliated companies (“SAP Group”)
for informational purposes only, without representation or warranty of
any kind, and SAP Group shall not be liable for errors or omissions with
respect to the materials. The only warranties for SAP Group products and
services are those that are set forth in the express warranty statements
accompanying such products and services, if any. Nothing herein should
be construed as constituting an additional warranty.

Driving maximum value_from_mobile_technology_(en) for aerospace & defense industry

  • 1.
    SAP White Paper Aerospaceand Defense Driving Maximum Value from Mobile Technology The Strategic Necessity of Enterprise Mobility in Aerospace and Defense
  • 3.
    Table of Contents 5 Executive Summary 6 Why a Mobility Strategy Matters The Consumerization of Technology Expectations for Increased Enterprise Mobility and Productivity 8 The Challenges of Creating a Mobile Enterprise 9 The Four Cs of Enterprise Mobility Connect Consume Control Create 10 Enterprise Mobility with Maximum Impact and Value Enterprise Mobility for Executives Enterprise Mobility for Program Managers Enterprise Mobility for Process Workers The Bottom Line 13 Conclusion
  • 4.
    Enterprise mobility isa must-have strategy for aerospace and defense (A&D) firms. As part of a global industry involving mission-critical products, A&D companies must support a workforce that is on the move. Right now, the technology exists – from really smart smartphones to everywhere Wi-Fi access – to support true enterprise mobility in A&D. But how can you make sure that mobile technology brings the greatest value to your firm?
  • 5.
    Enterprise Mobility Ison the Rise Executive Summary Aerospace and defense is an inherently customers, and partners; and increased mobile industry. Yet it’s plagued with access to these solutions. Across a range inefficiencies introduced by very large of companies, enterprise mobility is no production facilities, distributed work- longer a “nice to have” feature. It is quickly forces, far-flung points of maintenance, becoming a strategic necessity. and assets such as aircraft and ships But making a workforce mobile and that themselves are mobile. In an envi- securely connecting business information ronment in which mounting budget pres- with a vast array of mobile devices can be sure demands “doing more with less,” a challenge. This paper details trends and some A&D firms have looked to IT mobil- issues behind enterprise mobility and ity solutions as a path towards overcom- then outlines a framework that can help ing these challenges. guide A&D firms seeking to create a Meanwhile, enterprise mobility contin- comprehensive and effective enterprise ues to gain momentum. This is evidenced mobility strategy. Finally, the paper will by increased corporate support for a conclude with how to identify business broad array of smartphones and other processes that, once they become mobile devices; expanding support of mobile, can drive the most value to mobile applications for employees, the organization. Across a range of companies, enterprise mobility is no longer a “nice to have” feature. It is quickly becoming a strategic necessity. SAP White Paper – Driving Maximum Value from Mobile Technology 5
  • 6.
    Mobile Technology Isthe Next Desktop Why a Mobility Strategy Matters In a recent Oxford Economics survey, The Consumerization Furthermore, more than 55% of the respondents were asked to identify four of Technology companies allow employees to bring their digital megatrends that they believe will personal mobile devices into the office have the greatest positive impact on the When it comes to mobile technology, and will provide some level of support to business landscape. Mobile technology employees are driving how they want to these personal devices. “This is part of a topped the list, as shown in Figure 1.1 interact with information – and expecting broader trend that we call the ‘consumer- Respondents across all sectors, in firms IT departments to support a wide range of ization’ of IT in which employees solve of all sizes, and in both the developed personal mobile devices and applications. customer and business problems using and emerging worlds consistently rated According to a recent survey of nearly technology that they master first at home, mobility technology as a game changer. 2,000 North American and European such as social media, mobile, and video In fact, more than 50% of the respon- companies by Forrester Research Inc., services,” notes the Forrester report.4 dents within each sector indicated that more than 45% of the firms state that In short, employees want to interact their firms will invest heavily in mobile they are focused on supporting more with business data as easily and as intui- technologies over the next five years.2 mobile applications for employees who tively as they use Twitter or Facebook. As smartphone penetration and adop- work outside of the office.3 In addition, tion rates soar, handheld devices are 43% of the companies are planning to poised to eclipse the desktop and laptop support more mobile devices or smart- as must-have technologies. phones for their employees. Figure 1: Importance of Mobile Technology in Driving Business Value Which do you believe will have the greatest positive impact on your business over the next five years? Mobile technology Business intelligence Cloud computing Social media 0% 10% 20% 30% 40% 50% 60% Source: Oxford Economics
  • 7.
    Expectations for is more complex, placing a premium on Increased Enterprise orchestration and the ability to instantly Mobility and Productivity deliver information wherever it is needed. The emergence of mobile solutions Shrinking government budgets, increased means that IT can play a significant role in low-cost competition, and performance- addressing A&D’s complex challenges by based contracting are some of the key speeding critical business processes and trends that have driven A&D firms to supporting rapid decision making. From rethink how they operate. For example, the executive ranks, to program manag- aerospace manufacturers – particularly ers, to production and service workers, those in the commercial sector – have mobile solutions can enable employees to turned to outsourcing production of complete complex tasks more efficiently major assemblies and subcomponents to and to greater levels of quality and com- reduce capital expenditures and labor pliance. According to Yankee Group expenses. In the maintenance, repair, and Research Inc., “Despite initial fears that overhaul (MRO) space, performance- the spread of mobile technologies would based contracts increasingly dictate that spiral costs out of control and put sensi- global firms deliver service locally and tive corporate data at risk, companies efficiently. Moreover, overarching are increasingly looking to . . . mobile demands in the A&D marketplace for applications to offer incremental business safety, quality, and regulatory compliance benefits that together can have a trans- have not lessened. This new reality in A&D formative impact.”5 (See Figure 2.) Figure 2: Internal and Customer-Facing Benefits from Mobility Initiatives Source: Yankee Group Research Inc., A Guide to Successfully Deploying Enterprise Mobile Applications, September 2011 SAP White Paper – Driving Maximum Value from Mobile Technology 7
  • 8.
    Multiple Apps, Servers,and Storage Systems Add Complexity The Challenges of Creating a Mobile Enterprise A comprehensive mobility strategy is a Figure 3: The Complexity of Managing Organizational Mobility top priority to leverage technology and improve performance. While the need to support such a powerful and flexible mobility strategy is great, getting there is complicated and difficult. Historically, BlackBerry Smartphone Windows Phone 7 many firms have pushed information – e-mails, alerts, and static reports – out to employees via a corporate-mandated Multiple platforms mobile device. With today’s technology, iOS Windows firms can move from the push environ- ment to an interactive one – where Multiple systems employees are connected and interactive all the time, anywhere, on any device. Making your enterprise mobile requires iPad OS Android Tablet getting timely business information, irre- spective of the source, to your employees when and where they need it. For exam- ple, a production supervisor who is out of Phone 7, just to name a few – quickly the office can send out work orders using become complicated, as illustrated in a smartphone. Workers who are already Figure 3. For example, do you have a pro- on the shop floor can then access their cess to apply necessary and timely OS assignment from a tablet device. Maybe patches? You need a platform that can they drill down into details to review help you coordinate and manage data instructions, technical drawings, or tool from multiple applications, servers, and assignments. Now they can immediately storage systems – one that can securely begin the operation and update the task filter large amounts of data and distribute status without having to leave the point of it safely. work. Information can be shared and deci- Given the rigorous security require- sions can be made with fewer bottlenecks ments in A&D, all this must be done with and less wasted effort. utter confidence that data is secure at all While A&D firms have long desired this times, using a system that balances rig- level of interconnectivity, the technology orous security with easy and trouble-free is only now fully available to support it. employee access. Can you enforce secu- Smartphones and tablets – such as the rity policies established in the provision- iPad, Galaxy, and PlayBook – are quickly ing stage? Provide detailed logging and becoming mainstream. Meanwhile, Wi-Fi reporting? Supply robust encryption network connectivity and bandwidth is that satisfies government standards? ubiquitous – not just in the office, but lit- Historically, these IT challenges have erally everywhere. been addressed in an ad hoc fashion. However, supporting and managing the Now, enterprise mobility platforms allow collection and delivery of business infor- IT to better manage data flow and ensure mation to a wide range of wireless devices rigorous mobile security features for the and operating systems – BlackBerry, iOS, connectivity of critical information to all iPad OS, Android, Windows, and Windows employees on any devices.
  • 9.
    The Keys toan Effective Mobility Strategy The Four Cs of Enterprise Mobility Firms interested in secure mobile tech- Control Decommissioning nology need to consider several major The final phase is decommissioning. Here factors. We’ll call them the “four Cs”: Your IT department needs central control you can remotely disable or kill devices, connect, consume, control, and create. of all devices, as well as the information reprovision and redeploy devices, and pulled from the platform and pushed to enforce access violation locks. Decom- Connect those devices. For example, an effective missioning is a critical step – as impor- practice is to build a control feature once tant as provisioning, or perhaps even As we’ve mentioned, any enterprise and use it to support multiple devices. more so. We’ve all heard stories about a mobility strategy starts with a platform The goal is to manage and secure each device sold on eBay that is still loaded for information management. Such a plat- mobile device through its entire lifecycle, with corporate data; that device was the form must be able to pull all business from provisioning to production to victim of either theft or a poor decommis- information from multiple data sources decommissioning. sioning process. To enforce the security of and applications – including enterprise the business, you must be able to lock or resource planning, customer relationship Provisioning kill a lost or stolen device and to wipe all management, supply chain management, In the provisioning phase, you need to data from devices about to be removed HR, and more – to data storage devices, configure, set up, and install devices; from inventory and repurposed. Finally, servers, and data marts. A flexible and manage application deployment; and each reprovisioned device must receive a open infrastructure needs to make the establish security policies. You can work new functional image as well as the data easily accessible to users and also with both group and membership assign- appropriate applications and settings. incorporate large and sometimes unex- ments to accomplish provisioning for a pected changes down the road. large organization. Create Consume Production Rapid-development tools make it easy to In the production phase, you must create new mobile applications – for A workable enterprise mobility system remotely manage, track, and maintain example, an expense report or sales and must be able to deliver business informa- devices. This includes updating and development app. The value that mobile tion to any mobile device for consumption repairing software as needed, as well technology delivers is directly related to and use. As stated before, employees as distributing data and content to line- the effectiveness of the applications you want to receive the information and ana- of-business applications. You need to are running. Developing mobile apps for lyze it on the device of their choice – any- securely back up device data, enforce mission-critical processes – such as tal- time and anywhere. Firms must address compliance and security policies, and ent management or business develop- the complex challenges of managing a provide login reports. ment – can help carve out competitive wide and ever-changing range of both differentiation. Remember also that new employee-owned and company devices, applications should possess the best with multiple operating systems and qualities of well-designed consumer upgrade schedules. For example, a report apps – small, easy to download, and easy formatted for viewing on a BlackBerry to understand, with rapid development, may not display correctly on an iPhone. instant value, and fast ROI. SAP White Paper – Driving Maximum Value from Mobile Technology 9
  • 10.
    The Key Isto Identify the Right Processes Enterprise Mobility with Maximum Impact and Value A number of areas within A&D are primed Area Mobile Application Examples to use mobile technology to drive incre- Aftermarket; maintenance, •• Work order access at the point of service mental value, as shown in the table. repair, and overhaul (MRO) •• Tool and part inventory tracking With so many use-case possibilities, •• Technical document reference how do you narrow in on those that will •• Service history and logging drive the biggest impact and value? You •• Task resolution and work sign-off want to look for opportunities to turn •• Technician scheduling and availability unproductive time, such as downtime at an airport, into productive time, such as Business capture •• Lead management completing an expense report. You also •• Opportunity management want to look for opportunities to increase •• Collateral access productivity of already productive time. •• Product visualization and demonstration At SAP we’ve developed some simple , Program management •• Time recording guidelines for identifying processes ripe •• Earned value and project status reporting for improvement using mobile applica- •• Dashboard of key performance indicators (KPIs) tions. First, the workflow must be com- for program management plex; you won’t get the same level of ROI •• Workflow approvals on a simple process. Second, the pro- •• Supplier audit cess must be time sensitive; one of the greatest strengths of mobile apps is Shop floor management •• Work order assignment and tracking for shop speeding up the time it takes to make a floor supervisors decision. Third, mobile applications can •• Production bulletin board offer significant benefits to processes •• Work order access at the point of production that multiple people touch. The net? •• Quality issue management Enterprise mobility can speed decision time and accelerate activities in a time- Analytics •• KPI monitoring sensitive, complex process that requires •• Data exploration and visualization information, analysis, or approval from multiple employees. Taking the above factors into account, let’s review three high-impact use cases in more detail.
  • 11.
    Enterprise Mobility Enterprise Mobility for Criteria for Applying Mobility for Executives Process Workers To optimize your ROI in mobile technology, apply it to business processes that involve: A&D executives always need to be on top A&D workers in engineering, production, •• Complex workflows of their business to accelerate time to field support, and business operations •• Time-sensitive decisions action. With mobile applications, they need rapid access to information, such •• Multiple people touching the process can get instant insight – in the form of as tasks, schedules, and resource avail- key performance indicators for all areas ability. For example, the ability of techni- of their business. They can review sales, cians to access work order information the business development pipeline, and – especially when they are on the go in the status on program delivery. Mobile the field or in large production areas – features give executives the ability to can speed delivery and maximize the make more educated decisions based on value of contracts. Mobile applications real-time data and analytic functionality, can also improve collaboration and visi- which ultimately speeds response time. bility within the program ecosystem. For example, productivity apps can allow Enterprise Mobility for program stakeholders to easily capture Program Managers and communicate time sheets, travel expenses, and workflow requests and With key information at their fingertips, approvals. program managers can use mobile appli- cations to orchestrate the activities of The Bottom Line their teams and ultimately accelerate program delivery. They need access Understanding where to apply mobile to all necessary information – such as technology – to time-sensitive, complex contract bids and proposals, system processes requiring input from multiple engineering and requirement details, people – can help ensure maximum and earned value management reports – impact and effectiveness and speed ROI to help bring programs in on time and of enterprise mobility initiatives. under budget. SAP White Paper – Driving Maximum Value from Mobile Technology 11
  • 12.
    You need aplatform that can help you coordinate and manage data from multiple applications, servers, and storage systems – one that can filter and distribute large amounts of data safely, balancing rigorous security with easy employee access.
  • 13.
    Enterprise Mobility CanDrive Faster, Smarter Decisions Conclusion A&D firms are positioned to derive great consume, control, and create. The best Learn More benefits from making their operations candidates are complex processes that In the world of aerospace and defense mobile enterprise-wide, from executives require rapid decisions based on informa- (A&D), mobile technology is a strategic to program managers to process workers. tion, analysis, or approval from multiple necessity that can boost productivity and But to do so successfully, a firm must people. In such cases, successful applica- drive competitive advantage. For more address the daunting task of supporting a tion of mobile technology can speed deci- information on how to maximize the value wide-ranging ecosystem of operating sys- sion time and accelerate both processes of mobile technology in your A&D firm, contact www.sap.com/industries tems, devices, and applications required and ROI. /aerospace-and-defense.epx. to empower its mobile workers. To achieve To reap the benefits of enterprise enterprise mobility with power and control mobility, find a process that is ripe for in a way that helps its users get the most this strategy – and use the four Cs to out of mobile technology, a firm should start making faster, better-informed thoroughly address the four Cs – connect, decisions today. FOOTNOTES 1. Digital Megatrends 2015: The Role of Technol- ogy in the New Normal Market, Oxford Economics, March 2011. 2. Ibid. 3. The Rise of Wannabe and Maverick Mobile Workers, Forrester Research Inc., February 16, 2011. 4. Ibid. 5. A Guide to Successfully Deploying Enterprise Mobile Applications, white paper commissioned by SAP from Yankee Group Research Inc., September 2011. SAP White Paper – Driving Maximum Value from Mobile Technology 13
  • 14.
    Enterprise mobility canspeed decision time and accelerate activities in a time-sensitive, complex process that requires information, analysis, or approval from multiple employees.
  • 16.
    www.sap.com/contactsap 50 113 631(12/06) ©2012 SAP AG. All rights reserved. SAP R/3, SAP NetWeaver, Duet, PartnerEdge, ByDesign, , SAP BusinessObjects Explorer, StreamWork, SAP HANA, and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP AG in Germany and other countries. Business Objects and the Business Objects logo, BusinessObjects, Crystal Reports, Crystal Decisions, Web Intelligence, Xcelsius, and other Business Objects products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of Business Objects Software Ltd. Business Objects is an SAP company. Sybase and Adaptive Server, iAnywhere, Sybase 365, SQL Anywhere, and other Sybase products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of Sybase Inc. Sybase is an SAP company. Crossgate, m@gic EDDY, B2B 360°, and B2B 360° Services are registered trademarks of Crossgate AG in Germany and other countries. Crossgate is an SAP company. All other product and service names mentioned are the trademarks of their respective companies. Data contained in this document serves informational purposes only. National product specifications may vary. These materials are subject to change without notice. These materials are provided by SAP AG and its affiliated companies (“SAP Group”) for informational purposes only, without representation or warranty of any kind, and SAP Group shall not be liable for errors or omissions with respect to the materials. The only warranties for SAP Group products and services are those that are set forth in the express warranty statements accompanying such products and services, if any. Nothing herein should be construed as constituting an additional warranty.