(revision date: 02/25/2014)
Current State of Virtual Project Management and
Global Project Implementations
Felix J Ekpo
Northcentral University
School of Business & Technology Management
Prescott Valley, AZ
May 2015
Committee Chair: Dr. Gary White
Committee Member: Dr. Vanessa Claus
Committee Member: Dr. Rachel Piferi
Overview
• Introduction
- Background
- Statement of the Problem
- Support for Statement of the Problem
- Purpose of the Study
- Research Questions
• Literature Review
• Research Method and Design
• Data Collection, Processing, and Analysis
• Findings
• Conclusions
• Recommendations
2
Background
Introduction
•The focus of this dissertation was to identify the perceptions of project
managers and corporate project coordinators on the current state of virtual
project management and global project implementations.
•Although virtual projects rely mostly on the technology for information sharing
and communication across the organization, very little is known about the
perceptions of project managers and corporate project coordinators on the use
of virtual project tools.
Background:
•In every organization, project management is developed to control, plan,
manage and coordinate the diverse and complex operations of large projects
(Dinsmore & Cabanis-Brewin, 2011). The common cause of all these projects is
the projection of activities and ideas into new endeavors (Frolunde et al., 2011).
The objective of project management is to forecast and analyze all possible
problems and issues that may disrupt the defined objectives of the projects
(Kerzner, 2013).
3
Statement of the Problem/ Purpose of the Study
Statement of the Problem
For an organization to achieve project goals and objectives, a structure has to be
put into place to efficiently integrate human and technical resources (Aubrey et
al., 2009).
•Support for Statement of the Problem
- Lack of global partner’s ability to provide the services required for a project
(GarcĂ­a et al., 2010).
- Global acquisitions in 2014 were 34% higher compared to 2013 with $719 billion
and that represents the highest since 2008 (Pervaiz, & Zafar, 2014). No evidence
of any study that examines project managers’ and corporate project coordinators’
perceptions as it relates to virtual project management environment challenges
and practices
Purpose of the Study
The purpose of this qualitative embedded case study was to obtain the perceptions of
project managers and corporate project coordinators from project management offices
(PMOs) in U.S. based multinational organizations with regard to the current state of
virtual project management environment challenges and practices.
4
Research Questions
Research Questions: The research questions address the perceptions of project
managers and corporate project coordinators with regard to the current state of
virtual project management environment challenges and practices. The results
from these research questions allowed me to identify possible solutions, critical
to the success of virtual project performance.
•Q 1. How does the current state of environment challenges and practices of virtual
project management tools in a global project environment vary, as perceived by project
managers and corporate project coordinators from U.S. based multinational
organizations?
•Q 2. How does the current state of environment challenges and practices of virtual
project management tools influence the process of project management as perceived by
project managers and corporate project coordinators from U.S. based multinational
organizations?
5
Research Questions Contd.
• Q 3. How does the current state of environment challenges and
practices of virtual project management tools optimize the value
of virtual project management within the global project
environment as perceived by project managers and corporate
project coordinators from U.S. based multinational organizations?
• Q 4. How does the current state of environment challenges and
practices of virtual project management tools used in global
project management influence overall organization project
performance as perceived by project managers and corporate
project coordinators from U.S. based multinational organizations?
Nature of the Study/ Significance of the Study
Nature of the Study
•The nature of the research develops the perceptions from a qualitative
method by means of an embedded case study (Yin, 2009). An embedded
case study approach was used to develop constructs of comparative
analysis of the perceptions for the experienced project managers and
corporate project coordinators about their understanding of virtual project
management tools in the global project management environment.
Significance of the Study
•The study identified how the use of virtual project management tools can
mitigate the challenges facing virtual project management and improve
overall organizational project performance.
7
Literature Review
• Literature review was used to understand the current state of virtual
project management and global project implementations and identify
the gap in the literature to be addressed in this dissertation as it relates
to project management, virtual project management, building virtual
communities, virtual management tools, challenges of virtual project
management and contribution of project management to organizational
performance
Project Management:
• Project management techniques became easier due to the use of PC and
information technology and telecommunication systems (Pasian,
Sankaran, & Boydell, 2012; Xu et al., 2014). It is used by organizations to
perform tasks, solve problems and undertake complex projects
(Dinsmore & Cabanis-Brewin, 2011). And to address some of the
organizational problems in an organized manner (Meredith & Mantel,
2011; Xu et al., 2014).
8
Literature Review Cont.
Virtual Project Management:
•Virtual project management is the framework by which virtual groups
cooperate for the determinate of time for particular objective (Anantatmula &
Thomas, 2010; Meredith & Mantel, 2011; Ward & Daniel, 2013).
•Existing studies revealed that virtual operations enhanced financial gain by
improving productivity, reducing travel time and cutting back on other costs
(Anantatmula & Thomas, 2010; Drouin et al., 2010; Kuruppuarachchi, 2009).
Building Virtual Communities:
•Engaging virtual project teams in a global project gives the organization
flexibility, awareness, lower labor costs, and better deployment of resources
necessary to meet project requirements in global project management
environments (Anantatmula & Thomas, 2010; Bierly et al., 2009; Curlee, 2008;
Drouin et al., 2010; GarcĂ­a et al., 2010; Ren et al., 2012).
9
Literature Review Cont.
Virtual Management Tools:
•The virtual management tools play important roles in coordinating virtual teams toward a
cohesive environment (Hamilton et al., 2010; Ren et al., 2012; Sotomayor, Montero,
Llorente, & Foster, 2009). Attachment among team members are initiated with the use of
virtual management tools between a member and the organization (Hamilton et al., 2010;
Ren et al., 2012; Sotomayor et al., 2009; Tohidi, 2011).
•While virtual tools application that facilitates trust may be beneficial towards effective
management and achievement of a solid virtual team, poor virtual tools or even poor
management of such tools may be detrimental to managing such environments like global
projects that is becoming heavily dependent on virtual teams (Bierly et al., 2009; Curlee,
2008).
Challenges of Virtual Project Management:
•The challenges encountered within the project management circles are vast and how the
project teams optimize the worth of virtual management within projects is desirable
•The main reasons for global organizations’ adoption of the virtual teams are to respond to
decentralization and globalization and to meet the increasing challenges related to market
competition and turbulence (Lee-Kelley & Sankey, 2007; Zander et al., 2012).
•Due to the distance between virtual project team members, they must depend on
technology to build effective communication (Lee-Kelley & Sankey, 2007; Zander et al., 2012). 10
Literature Review Cont.
Contribution of Project Management to Organizational
Performance:
•A cluster of studies have concluded that project management contributions to
organizational performance is an on-going phenomenon of change in the global scenario
as a driver of organizational aspirations towards growth and subsequent contributions
of effective project management on the overall performance of business entities (Aubry
& Hobbs, 2011; Fernandez & Fernandez, 2009; Lee, 2008; Nambisan, 2003; Reed &
Knight, 2011; Thomas & Mengel, 2008).
•Virtual project teams are hardly in corporal proximity, which means that the
attachment and acquaintance of conventional environments of group dynamic is absent
(Curlee, 2008; Drouin et al., 2010; Ren et al., 2012).
•The contributions of virtual project teams to organizational performance are the results
and outcomes of individual performance in creating the value of the team to the
organization through the use of communication, trust, team formation and
collaboration (GlĂĽckler & Schrott, 2007).
11
Research Method and Design
• An embedded case study design approach
- An embedded case study was selected to acquire the information that was needed in the
research.
- An embedded case study approach was selected over other qualitative approaches
because of the closer alignment with the problem and research question.
- Cooper and Schindler (2006) stated that one of the most crucial parts of an embedded case
study is the selection of right methodology to enhance the integrity of the study and
acquire better outcomes.
• The qualitative research method helped explain the how and why:
- According to Yin (2009), a qualitative case study is the suitable research method after it is
established that (a) answer to statement of the problem can be found by asking “why” and
“how” research questions, (b) the researcher and research has limited or no control over
the events of the study or the subjects of the research and (c) the case study is of
contemporary nature.
- Characteristic of qualitative studies are the development of themes, achieved from
evidences and the showing of data to create a clear and consistent depiction (Yin, 2009).
- Qualitative research comprises of the understanding of different perspectives, experiences,
and meanings that individuals or groups attribute to a human or social problem (Borrego,
Elliot, & Catherine, 2009; Creswell, 2013; Yin, 2009).
12
Population & Sample
• Population
- The population was Project Managers and Corporate Project Coordinators who are senior
decision-making executives in the field of health information technology and oil producing
project management.
- The health information systems and oil producing organizations implement virtual projects
that varied in durations, costs, project team sizes, and complexities. These projects
represents a diverse variety of industries in scopes, disperse locations and have the
characteristics similar to those of most multinational organizations.
• Sample
- Final sample was 12 project managers and corporate project coordinators
- Have virtual project management experience and
- have led virtual projects within the last three years
13
Field-Tested
• The interview questions were field-tested
- By one project manager and two corporate project coordinators who were not
members of the study’s sample
- To test the procedures
• These non-participating members of the study were qualified to
comment on the interview protocol because of the similarity in
interests to those that participated in the study (Raiyani, 2012; Salkind,
2010; Venkatesh et al., 2013).
• Field test results were used to improve the interview questions and
formats (Raiyani, 2012; Salkind, 2010; Venkatesh et al., 2013).
14
Data Collection, Processing, and Analysis
• Prior to the start of the data collection, informed consent forms were
distributed to each participant to signed and return.
• The research participants were briefed before the interview on the research
topic, purpose of the study, informed consent, duration and structure of the
interview (Kvale & Brinkmann, 2009).
• Data collection came from semi-structured interviews of project managers
and corporate project coordinators. Semi-structured interviews were
appropriate as the research sought to obtain or explore participant insights
(Yin, 2009).
• The semi-structured, open-ended questions provided rich information
regarding the phenomenon of virtual project management (Creswell, 2009;
2013).
15
Data Collection, Processing, and Analysis
• Telephone interviews lasted 30 – 45 and were digitally recorded and note taken on
every interview sessions.
• Verbatim data was manually transcribed immediately after every interview session.
Data collected was kept in a fully encrypted storage device(s).
• Data collection concluded following the saturation of emerging responses from the
nine project managers and three corporate project coordinators.
Data Analysis
• The analysis of the collected data started once the interviews were completed
• The constant comparative method was used to identify emerging themes pertaining
to virtual project management tools and information technology.
• The emerging themes were identified, analyzed and grouped into themes or codes
(Kvale & Brinkmann, 2009).
• Triangulation was used to address the techniques for accuracy and trustworthiness
(Buyukkaya, & Abdallah, 2009; Flick, 2009; Homburg, Klarmann, Reimann, & Schilke,
2012; Jonsen, & Jehn, 2009).
• According to Yin (2009), triangulation method is technique used to increase the
trustworthiness of the data collection and interpretation.
16
Demographic Characteristics of the Participants
• Demographic information was obtained from each participant and indicated that all
twelve participants, are in project management occupation, have over 3 years of
project management experiences and all college graduates with project locations in
United States. The participants were seven males and five females, and represented
three organizations.
Table 1: shows the demographic profile of the participants.
17
Participant # and Position
Year of
Service Gender Age Level of Education Project Location Organization
# 1 Corporate Project
Coordinator 17 Male MBA USA Meditech
# 2 Project Manager 12 Female BSc USA Meditech
# 3 Project Manager 5 Female MBA USA Meditech
# 4 Project Manager 12 Male MSc USA Meditech
# 5 Project Manager 13 Male MA USA Meditech
# 6 Project Manager 7 Female MBA USA Meditech
# 7 Corporate Project
Coordinator
5 Female MBA USA Murphy Oil
# 8 Project Manager 24 Male MSc USA PPI
# 9 Project Manager 4 Male BSc USA PPI
# 10 Project Manager 6 Male BSc USA Meditech
# 11 Corporate Project
Coordinator
12 Male BSc USA PPI
# 12 Project Manager 16 Female BSc USA PPI
Findings
• Results
• During the data collections, all of the participants were assigned a unique identifier
(e.g., Participant #) to ensure privacy and confidentiality. The transcribed interviews
were analyzed through NVivo software to group, categorize, and analyze the data. This
software tool helped to identify themes present in the research questions.
• To begin, research participants were asked how often they had face-to-face encounters
with their virtual project members per year.
• Research participants’ responses reveal that how often virtual project members meet
face-to-face often depends on the particular project and its location, although half of
the participants prefer monthly face-to-face encounters.
• Responses reveal the importance of technologies for overcoming the limits of distance
in research participants’ perceptions of the current state of virtual project
management tools based on their own experiences as a project manager in both
conventional and virtual project environments.
• Responses reveal that communication, issues related to personality, documents,
software, team and time management are the most influential challenges of the virtual
project environment with relation to the process of project management.
• When asked about their perceptions of working as member of a virtual project team,
research participants reveal the importance of both communication and relationships.
18
Findings Cont.
• Participants were asked to discuss their experiences of a virtual project team’s
contribution to projects in relations to: global project environments, team cooperation
and collaboration (teamwork), team productivity, the use of information technologies,
communications, information sharing and overall organization project performance
(outcomes).
Responses were reveal as follows:
- In relations to global project environments: communication, efficiency, geography
and team work were important themes.
- In relation to team cooperation and collaboration: trust, communication and team
leadership as important themes.
- In relation to use of information technologies. The responses reveal that virtual
projects rely on information technologies.
- In relation to communications. The responses reveal the importance of utilizing the
right tools and technologies.
- In relation to information sharing. The responses reveal the importance of tools and
technologies as well as the importance of information sharing for virtual projects.
- In relation to organization project performance. The responses reveal the importance
of selecting the right tools and technologies as well as the importance of
communication for organization project performance. 19
Findings Cont.
• Research participants were asked to describe how successful or unsuccessful the
use of virtual project management tools are based on their experiences in virtual
project environments. Their responses reveal that the use of virtual project
management tools were most successful when good communication and trust were
present, and least successful when these areas were lacking.
• Research participants were asked how virtual project environment practices
optimize the value of virtual project management. Their responses reveal the
importance of information technologies, communication and communication tools
and technologies for optimizing the value of virtual project management.
• Research participants were asked whether virtual project teams are more
advantageous or disadvantageous to successful project team performance than
those of conventional team settings. Research participants overwhelmingly saw
virtual project teams as more advantageous than conventional team settings and
noted the use of information technology, cost saving and team collaboration as the
aspects that make virtual project teams more advantageous.
•
20
Evaluation of Findings
• Research participants were asked how often they had face-to-face encounters with
their virtual project members per year. Half of the research participants (6 out of 12
research participants) stated that they had face-to-face encounters with their
virtual project members once per month. In addition, half of the research
participants stated that it depended on other factors regarding how often they had
face-to-face encounters with their virtual project members.
- The findings are in support of various literatures that showed regularity of face-to-face contacts as the
supplementary basis for categorization in virtual project (Verburg et al., 2013; Fayard, & Weeks, 2011).
• When asked about their perceptions of the current state of virtual project
management tools based on their own experiences as a project manager in both
conventional and virtual project environments, the majority (8 out of the 12
research participants) mentioned technologies in their answer. In particular, half (4
out of 8) describe technologies as essential.
- This is in agreement with studies that indicated that virtual project management tools play important
roles in virtual projects environment (Hamilton et al., 2010; Ren et al., 2012; Sotomayor, Montero,
Llorente, & Foster, 2009). For example, Participant 4 stated, “The current state of virtual project
management tools are dependent on technology in order to work properly.”
• On how virtual tools overcome the limits of distance
- The findings concur with previous evidence that suggests virtual project management tools in a virtual
project environment are interconnected and communally supportive attributes of communication,
technology, trust, and leadership (Bierly et al., 2009; Curlee, 2008; Drouin et al., 2010; GarcĂ­a et al.,
2010; Hamilton et al., 2010; Reed & Knight, 2011).
21
Evaluation of Findings
• Research participants were asked about the challenges of virtual project
environments that influence the process of project management. Their responses
reveal that communication, issues related to personality, documents, software,
team and time management are the most influential challenges of the virtual
project environment with relation to the process of project management.
- The findings align with previous studies of the challenges in virtual management of projects,
dislocation of team members, utilization of interactive media for communication, distinctions in time,
and disparities related to culture (Lee-Kelley & Sankey, 2007; Zander et al., 2012).
• When asked about their perceptions of working as member of a virtual project
team half of the research participants (6 out of 12) mentioned communication in
their answers.
- The findings agrees with a previous study that stated that virtual project team members are keen to
using virtual communication tools and willing to share the acquired knowledge with others in the
virtual community with the leadership of project manager or project management office (Gilson et al.,
2013).
• When asked how virtual project environment practices optimize the value of virtual
project management, half of the research participants (6 out of 12) mentioned
information technologies in their responses.
- The findings concur with the study that revealed communication within virtual project teams to
optimize the value of virtual project management through instant messages, e-mails and other
technologically-oriented tools (Anantatmula & Thomas, 2010).
22
Conclusions
Implications for Practice
•Information that assists in recognizing and identifying the challenges that the
use of digital collaboration tools such webinars, audio, and video conferencing
posed with virtual project teams, can be found in this study.
•This useful information can aid in making informed decisions on selecting the
right virtual project management tools that can increase the potential for
successful project implementation in a virtual project environments.
- The research concurs with the findings in the study by Lee-Kelley and Sankey (2007) that
found virtual project management teams generally utilize innovative technologies to
attain their predetermined organizational objectives.
•The benefit this study provides to the practice of virtual project management
is that information technologies are one of the most desired tools of project
managers and corporate coordinators and they relied on these tools as the
ways for interaction among team members.
•The research community can benefit from this research. The advantage to the
research community is that this study adds valuable research evidence on
virtual project management tools, the perceptions of project managers and
corporate project coordinators where a clear gap exists.
23
Recommendations
• As a result of the research findings, the following
recommendations were developed:
- that formal training be developed and made available to virtual project
team members before their participation in a virtual project. The training
should cover such innovations as e-mail, member’s portal, SharePoint,
audio/video/data conferencing, and automated workflow.
- the use of standardized information technologies in a virtual project
environment. The standardized of information technologies should be
tailored to the needs of the virtual project teams and in turn will minimize
the need for face-to-face interaction.
- incorporating a series of weekly or biweekly virtual meetings that allows for
frequent interactions and sharing of project information. Virtual meetings
facilitate emotions and feelings, while documents sharing through the use of
SharePoint assist in a richer communication of the virtual project message.
24
Future Research
 The following future research areas were recommended:
• Study on perceptions of project managers and corporate project
coordinators that compare worldwide responses against US based
responses. Understanding the perceptions of other countries will help
strengthen the results, beneficial to global PMOs and project team members
working on international projects.
• A quantitative study to complement the qualitative research. This aims at
the limitation of being unable to generalize results. The results of this study
could be tested using quantitative methods by examining responses by both
project managers and corporate project coordinators who are experienced
in virtual project management.
• To expand the research to participants who are member of a virtual project
team. The study should focused on all virtual project team members
because their perceptions might be different than that of only the project
managers and corporate project coordinators.
25
Thank You for Your
Attendance
26
27
Abdelhameed, W. A. (2012). Virtual reality applications in project management scheduling.
Computer-Aided Design & Applications, 9(1), 71-78. doi:10.3722/cadaps.2012.71-78.
http://dx.doi.org/10.3722/cadaps.2012.71-78
Ainamo, A., Artto, K., Levitt, R., Orr, R., Scott, W., & Tainio, R. (2010). Global projects:
Strategic perspectives. Scandinavian Journal of Management, 26, 343-351.
http://dx.doi.org/10.1016/j.scaman.2010.09.005
Aubry, M., Hobbs, B., & Thuillier, D. (2009). The contribution of the project management office
to organizational performance. International Journal of Managing Projects in Business,
2(1), 141-148. doi:http://dx.doi.org/10.1108/17538370910930563
Dinsmore, P. C., & Cabanis-Brewin, J. (2011). The AMA handbook of project
management. New York: Amacom Books.
Drouin, N., Bourgault, M., & Gervais, C. (2010). Effects of organizational support on
components of virtual project teams. International Journal of Managing Projects in
Business, 3, 625-641. doi: 10.1108/17538371011076082
Frølunde, L., Teigland, R., & Flåten, B. (2011). Final scientific/ expert report on virtual world
entrepreneurship: A look at entrepreneurs in the Nordic region exploring the use of
virtual worlds for entrepreneurial activity. Oslo, Norway: Nordic Innovation.
References - 1
28
García, G. J., Saldaña, R, J., Seco, A., & Sanz, E, A. (2010). How to get mature global virtual
teams: A framework to improve team process management in distributed software teams.
Software Quality Journal, 18, 409-435. doi: 10.1007/s11219-010-9096-5
Gilson, L., Maynard, M., & Bergiel, E. (2013). Virtual team effectiveness: An experimental
activity. Small Group Research, 44(4), 412-427.
GlĂĽckler, J., & Schrott, G. (2007). Leadership and performance in virtual teams: Exploring
brokerage in electronic communication. International Journal of E-Collaboration, 3(3),
31-52. Retrieved from
http://search.proquest.com.proxy1.ncu.edu/docview/222338062?accountid=28180
Grant, K., & Pennypacker, J. (2006). Project Management Maturity: An Assessment of Project
Management Capabilities among and Between Selected Industries. IEEE Transactions on
Engineering Management, 53(1), 59-68.
Green, D. D., & Roberts, G. E., PhD. (2010). Personnel implications of public sector virtual
organizations. Public Personnel Management, 39(1), 47-57. Retrieved from
http://search.proquest.com.proxy1.ncu.edu/docview/215951122?accountid=28180
Hamilton, G., Hodgkinson, J., & Byatt, G. (2010). Managing a virtual project team. Retrieved
from http://asapm.org/asapmag/articles/VirtualTeams.pdf
Homburg, C., Klarmann, M., Reimann, M., & Schilke, O. (2012). What Drives Key Informant
Accuracy? Journal of Marketing Research (JMR), 49(4), 594-608.
doi:10.1509/jmr.09.0174
References - 2
29
Howe, K. R. (2012). Mixed methods, triangulation, and causal explanation. Journal of Mixed
Methods Research, 6(2), 89-96.
Kerzner, H. (2009). Project management: A systems approach to planning, scheduling, and
controlling. Hoboken, NJ: John Wiley and Sons.
Kvale, S., & Brinkmann, S. (2009). InterViews: Learning the craft of qualitative research
interviewing (2nd ed.). Los Angeles, London, New Delhi & Singapore: Sage.
Lee-Kelley, L., & Sankey, T. (2007). Global virtual teams for value creation and project success:
A case study. International Journal of Project Management, 26, 51-62.
Meredith, J. R., & Mantel Jr, S. J. (2011). Project Management: A managerial approach. John
Wiley & Sons.
Pasian, B., Sankaran, S., & Boydell, S. (2012). Project management maturity: a critical analysis
of existing and emergent factors. International Journal of Managing Projects in
Business, 5(1), 146-157. doi: 10.1108/17538371211192946
Pervaiz, M. M., & Zafar, F. F. (2014). Strategic Management Approach to Deal with Mergers in
the era of Globalization. International Journal of Information, Business & Management,
6(3), 170-181.
Venkatesh, V., Brown, S. A., & Bala, H. (2013). Bridging the qualitative-quantitative divide:
Guidelines for conducting mixed methods research in information systems. MIS
Quarterly, 37(1), 21-54.
Verburg, R. M., Bosch-Sijtsema, P., & Vartiainen, M. (2013). Getting it done: Critical success
factors for project managers in virtual work settings. International Journal of Project
Management, 31 (1), 68–79.
References - 3
30
Virtual Team Report Survey 2010. (2010). The challenge of working in virtual teams. RW LLC.
Ward, J., & Daniel, E. M. (2013). The role of project management offices (PMOs) in IS project
success and management satisfaction. Journal of Enterprise Information Management,
26(3), 316-336. doi: 10.1108/17410391311325252.
Warrick, D. D. (2011). The urgent need for skilled transformational leaders: Integrating
transformational leadership and organization development. Journal of Leadership,
Accountability and Ethics, 8(5), 11-26. Retrieved from
http://search.proquest.com.proxy1.ncu.edu/docview/909486088?accountid=28180
Wademan, M. R., Spuches, C. M., & Doughty, P. L. (2007). The people capability maturity
model: Its approach and potential to improve workforce performance. Performance
Improvement Quarterly, 20(1), 97-123. Retrieved from
http://search.proquest.com.proxy1.ncu.edu/docview/218517526?accountid=28180
Zander, L., Mockaitis, A. I. & Butler, C. L. (2012). Leading global teams. Journal of World
Business. 47, 592-603.
Xu, Z., Ming, X. X., Song, W., He, L., & Li, M. (2014). Collaborative Project Management: A
Systemic Approach to Heavy Equipment Manufacturing Project Management. Systemic Practice
& Action Research, 27(2), 141-164. doi: 10.1007/s11213-012-9261-9
References - 4

More Related Content

What's hot

THE PERCEPTIONS OF AGILE METHODOLOGY IN SOUTH AFRICA
THE PERCEPTIONS OF AGILE METHODOLOGY IN SOUTH AFRICATHE PERCEPTIONS OF AGILE METHODOLOGY IN SOUTH AFRICA
THE PERCEPTIONS OF AGILE METHODOLOGY IN SOUTH AFRICAcsandit
 
The challenges of remote scientific collaboration
The challenges of remote scientific collaborationThe challenges of remote scientific collaboration
The challenges of remote scientific collaborationProyecto CeVALE2
 
Project Management: Alignment at the top
Project Management: Alignment at the topProject Management: Alignment at the top
Project Management: Alignment at the topDavid Davis
 
Information Technology Project Management - part 04
Information Technology Project Management - part 04Information Technology Project Management - part 04
Information Technology Project Management - part 04Rizwan Khurram
 
Studentfolio, employability and social media skills, is there a case to be ma...
Studentfolio, employability and social media skills, is there a case to be ma...Studentfolio, employability and social media skills, is there a case to be ma...
Studentfolio, employability and social media skills, is there a case to be ma...Craig Wakefield
 
GI Net 7 - Global mind, local act: The art of change leadership
GI Net 7 - Global mind, local act: The art of change leadershipGI Net 7 - Global mind, local act: The art of change leadership
GI Net 7 - Global mind, local act: The art of change leadershipHora Tjitra
 
Process protocol for virtual team effectiveness
Process protocol for virtual team effectivenessProcess protocol for virtual team effectiveness
Process protocol for virtual team effectivenessWestern Illinois University
 
Executive Summary of what happens in a Knowledge Exchange and Enterprise Netw...
Executive Summary of what happens in a Knowledge Exchange and Enterprise Netw...Executive Summary of what happens in a Knowledge Exchange and Enterprise Netw...
Executive Summary of what happens in a Knowledge Exchange and Enterprise Netw...University of Wolverhampton
 
Effects of Individual Success on Globally Distributed Team Performance
Effects of Individual Success on Globally Distributed Team PerformanceEffects of Individual Success on Globally Distributed Team Performance
Effects of Individual Success on Globally Distributed Team PerformanceOnur Yılmaz
 
Engagement Methods
Engagement Methods Engagement Methods
Engagement Methods Alexandra Okada
 
Virtual team -_project_management_-_university_of_surrey-libre
Virtual team -_project_management_-_university_of_surrey-libreVirtual team -_project_management_-_university_of_surrey-libre
Virtual team -_project_management_-_university_of_surrey-libresandeep15121983
 
Using Developmental Evaluation to Support Prototyping: A Workshop
Using Developmental Evaluation to Support Prototyping:A Workshop Using Developmental Evaluation to Support Prototyping:A Workshop
Using Developmental Evaluation to Support Prototyping: A Workshop unitedwaycgy
 
Healthy and Innovative Organizations - DeGuerre
Healthy and Innovative Organizations - DeGuerreHealthy and Innovative Organizations - DeGuerre
Healthy and Innovative Organizations - DeGuerreSociotechnical Roundtable
 
The Partnership Health of ICT Projects in Developing Countries - Pacis 2009...
The Partnership Health of ICT Projects in Developing Countries  -  Pacis 2009...The Partnership Health of ICT Projects in Developing Countries  -  Pacis 2009...
The Partnership Health of ICT Projects in Developing Countries - Pacis 2009...Anand Sheombar
 
CAA 2012 Closing Address
CAA 2012 Closing Address CAA 2012 Closing Address
CAA 2012 Closing Address jisc-elearning
 
PMI Presentation on Virtual Teams
PMI Presentation on Virtual TeamsPMI Presentation on Virtual Teams
PMI Presentation on Virtual TeamsPaula Mugnier
 
Liberact conference 2013 Gnome Surfer & Moclo Planner
Liberact conference 2013 Gnome Surfer & Moclo PlannerLiberact conference 2013 Gnome Surfer & Moclo Planner
Liberact conference 2013 Gnome Surfer & Moclo PlannerConsuelo Valdes
 
Sociotechnical Systems in Virtual Organization: The Challenge of Coordinating...
Sociotechnical Systems in Virtual Organization: The Challenge of Coordinating...Sociotechnical Systems in Virtual Organization: The Challenge of Coordinating...
Sociotechnical Systems in Virtual Organization: The Challenge of Coordinating...Sociotechnical Roundtable
 

What's hot (20)

THE PERCEPTIONS OF AGILE METHODOLOGY IN SOUTH AFRICA
THE PERCEPTIONS OF AGILE METHODOLOGY IN SOUTH AFRICATHE PERCEPTIONS OF AGILE METHODOLOGY IN SOUTH AFRICA
THE PERCEPTIONS OF AGILE METHODOLOGY IN SOUTH AFRICA
 
The challenges of remote scientific collaboration
The challenges of remote scientific collaborationThe challenges of remote scientific collaboration
The challenges of remote scientific collaboration
 
Project Management: Alignment at the top
Project Management: Alignment at the topProject Management: Alignment at the top
Project Management: Alignment at the top
 
Information Technology Project Management - part 04
Information Technology Project Management - part 04Information Technology Project Management - part 04
Information Technology Project Management - part 04
 
Studentfolio, employability and social media skills, is there a case to be ma...
Studentfolio, employability and social media skills, is there a case to be ma...Studentfolio, employability and social media skills, is there a case to be ma...
Studentfolio, employability and social media skills, is there a case to be ma...
 
GI Net 7 - Global mind, local act: The art of change leadership
GI Net 7 - Global mind, local act: The art of change leadershipGI Net 7 - Global mind, local act: The art of change leadership
GI Net 7 - Global mind, local act: The art of change leadership
 
Process protocol for virtual team effectiveness
Process protocol for virtual team effectivenessProcess protocol for virtual team effectiveness
Process protocol for virtual team effectiveness
 
Executive Summary of what happens in a Knowledge Exchange and Enterprise Netw...
Executive Summary of what happens in a Knowledge Exchange and Enterprise Netw...Executive Summary of what happens in a Knowledge Exchange and Enterprise Netw...
Executive Summary of what happens in a Knowledge Exchange and Enterprise Netw...
 
Effects of Individual Success on Globally Distributed Team Performance
Effects of Individual Success on Globally Distributed Team PerformanceEffects of Individual Success on Globally Distributed Team Performance
Effects of Individual Success on Globally Distributed Team Performance
 
Engagement Methods
Engagement Methods Engagement Methods
Engagement Methods
 
Virtual team -_project_management_-_university_of_surrey-libre
Virtual team -_project_management_-_university_of_surrey-libreVirtual team -_project_management_-_university_of_surrey-libre
Virtual team -_project_management_-_university_of_surrey-libre
 
Using Developmental Evaluation to Support Prototyping: A Workshop
Using Developmental Evaluation to Support Prototyping:A Workshop Using Developmental Evaluation to Support Prototyping:A Workshop
Using Developmental Evaluation to Support Prototyping: A Workshop
 
Healthy and Innovative Organizations - DeGuerre
Healthy and Innovative Organizations - DeGuerreHealthy and Innovative Organizations - DeGuerre
Healthy and Innovative Organizations - DeGuerre
 
The Partnership Health of ICT Projects in Developing Countries - Pacis 2009...
The Partnership Health of ICT Projects in Developing Countries  -  Pacis 2009...The Partnership Health of ICT Projects in Developing Countries  -  Pacis 2009...
The Partnership Health of ICT Projects in Developing Countries - Pacis 2009...
 
Tell me what you want and I’ll show you what you can have: who drives design ...
Tell me what you want and I’ll show you what you can have: who drives design ...Tell me what you want and I’ll show you what you can have: who drives design ...
Tell me what you want and I’ll show you what you can have: who drives design ...
 
CAA 2012 Closing Address
CAA 2012 Closing Address CAA 2012 Closing Address
CAA 2012 Closing Address
 
PMI Presentation on Virtual Teams
PMI Presentation on Virtual TeamsPMI Presentation on Virtual Teams
PMI Presentation on Virtual Teams
 
Liberact conference 2013 Gnome Surfer & Moclo Planner
Liberact conference 2013 Gnome Surfer & Moclo PlannerLiberact conference 2013 Gnome Surfer & Moclo Planner
Liberact conference 2013 Gnome Surfer & Moclo Planner
 
Experimental Modes Case Study Analysis
Experimental Modes Case Study AnalysisExperimental Modes Case Study Analysis
Experimental Modes Case Study Analysis
 
Sociotechnical Systems in Virtual Organization: The Challenge of Coordinating...
Sociotechnical Systems in Virtual Organization: The Challenge of Coordinating...Sociotechnical Systems in Virtual Organization: The Challenge of Coordinating...
Sociotechnical Systems in Virtual Organization: The Challenge of Coordinating...
 

Viewers also liked

Giảm đau khớp – hy vọng mong manh từ Glucosamin
Giảm đau khớp – hy vọng mong manh từ GlucosaminGiảm đau khớp – hy vọng mong manh từ Glucosamin
Giảm đau khớp – hy vọng mong manh từ Glucosaminruss665
 
Apresentação para décimo primeiro ano, aula 32
Apresentação para décimo primeiro ano, aula 32Apresentação para décimo primeiro ano, aula 32
Apresentação para décimo primeiro ano, aula 32luisprista
 
Launching a Leadership Culture in YOUR Church--Pre-Conference Intensive/Jonat...
Launching a Leadership Culture in YOUR Church--Pre-Conference Intensive/Jonat...Launching a Leadership Culture in YOUR Church--Pre-Conference Intensive/Jonat...
Launching a Leadership Culture in YOUR Church--Pre-Conference Intensive/Jonat...CoachNet Global LLC
 
Long Distance Relationship
Long Distance RelationshipLong Distance Relationship
Long Distance RelationshipJeyrob
 
Resume tiffany thornton1
Resume tiffany thornton1Resume tiffany thornton1
Resume tiffany thornton1Tiffany Thornton
 
LPV aircraft certification. EGNOS workshop
LPV aircraft certification. EGNOS workshopLPV aircraft certification. EGNOS workshop
LPV aircraft certification. EGNOS workshopGama Aviation Plc
 
resume_NeilSampsel docx
resume_NeilSampsel docxresume_NeilSampsel docx
resume_NeilSampsel docxNeil Sampsel
 

Viewers also liked (10)

Nanotecnologia
NanotecnologiaNanotecnologia
Nanotecnologia
 
Giảm đau khớp – hy vọng mong manh từ Glucosamin
Giảm đau khớp – hy vọng mong manh từ GlucosaminGiảm đau khớp – hy vọng mong manh từ Glucosamin
Giảm đau khớp – hy vọng mong manh từ Glucosamin
 
Apresentação para décimo primeiro ano, aula 32
Apresentação para décimo primeiro ano, aula 32Apresentação para décimo primeiro ano, aula 32
Apresentação para décimo primeiro ano, aula 32
 
Launching a Leadership Culture in YOUR Church--Pre-Conference Intensive/Jonat...
Launching a Leadership Culture in YOUR Church--Pre-Conference Intensive/Jonat...Launching a Leadership Culture in YOUR Church--Pre-Conference Intensive/Jonat...
Launching a Leadership Culture in YOUR Church--Pre-Conference Intensive/Jonat...
 
Long Distance Relationship
Long Distance RelationshipLong Distance Relationship
Long Distance Relationship
 
Resume tiffany thornton1
Resume tiffany thornton1Resume tiffany thornton1
Resume tiffany thornton1
 
LPV aircraft certification. EGNOS workshop
LPV aircraft certification. EGNOS workshopLPV aircraft certification. EGNOS workshop
LPV aircraft certification. EGNOS workshop
 
resume_NeilSampsel docx
resume_NeilSampsel docxresume_NeilSampsel docx
resume_NeilSampsel docx
 
CV Jarle Saethermoen
CV Jarle SaethermoenCV Jarle Saethermoen
CV Jarle Saethermoen
 
SmallvillePS.com 11-17
SmallvillePS.com 11-17SmallvillePS.com 11-17
SmallvillePS.com 11-17
 

Similar to Dr. Felix Ekpo's Dissertation defense

Final year project (standardized factors)
Final year project (standardized factors)Final year project (standardized factors)
Final year project (standardized factors)Anaam Shafique
 
Effective virtual teams
Effective virtual teamsEffective virtual teams
Effective virtual teamsNader Ale Ebrahim
 
Exploring the Strategic Impact of Online Communities: A Dynamic Capabilities ...
Exploring the Strategic Impact of Online Communities: A Dynamic Capabilities ...Exploring the Strategic Impact of Online Communities: A Dynamic Capabilities ...
Exploring the Strategic Impact of Online Communities: A Dynamic Capabilities ...Dr. David Wagner
 
Gary Broils, D.B.A. - Dissertation Defense: Virtual Teaming and Collaboration...
Gary Broils, D.B.A. - Dissertation Defense: Virtual Teaming and Collaboration...Gary Broils, D.B.A. - Dissertation Defense: Virtual Teaming and Collaboration...
Gary Broils, D.B.A. - Dissertation Defense: Virtual Teaming and Collaboration...Gary Broils, DBA, PMP
 
Pm600 1103 a-02-schwappach-loren-p2-t2
Pm600 1103 a-02-schwappach-loren-p2-t2Pm600 1103 a-02-schwappach-loren-p2-t2
Pm600 1103 a-02-schwappach-loren-p2-t2Loren Schwappach
 
Career Counseling Application Prototype.pptx
Career Counseling Application Prototype.pptxCareer Counseling Application Prototype.pptx
Career Counseling Application Prototype.pptxMee Mee Alainmar
 
An Empirical Analysis Of The Importance Of Teamwork On Project Management Th...
An Empirical Analysis Of The Importance Of Teamwork On Project Management  Th...An Empirical Analysis Of The Importance Of Teamwork On Project Management  Th...
An Empirical Analysis Of The Importance Of Teamwork On Project Management Th...Becky Gilbert
 
Project Management Effectiveness in organizational Conditions
Project Management Effectiveness in organizational ConditionsProject Management Effectiveness in organizational Conditions
Project Management Effectiveness in organizational Conditionspmb25
 
Student 1 Hi,Project is a temporary goal that a team or an .docx
Student 1 Hi,Project is a temporary goal that a team or an .docxStudent 1 Hi,Project is a temporary goal that a team or an .docx
Student 1 Hi,Project is a temporary goal that a team or an .docxcpatriciarpatricia
 
Student 1 Hi,Project is a temporary goal that a team or an .docx
Student 1 Hi,Project is a temporary goal that a team or an .docxStudent 1 Hi,Project is a temporary goal that a team or an .docx
Student 1 Hi,Project is a temporary goal that a team or an .docxdeanmtaylor1545
 
KNOWLEDGE BASE OF PROJECT MANAGERS IN THE SOUTH AFRICAN ICT SECTOR
KNOWLEDGE BASE OF PROJECT MANAGERS IN THE SOUTH AFRICAN ICT SECTORKNOWLEDGE BASE OF PROJECT MANAGERS IN THE SOUTH AFRICAN ICT SECTOR
KNOWLEDGE BASE OF PROJECT MANAGERS IN THE SOUTH AFRICAN ICT SECTORcscpconf
 
Pm certifications & accreditations
Pm certifications & accreditationsPm certifications & accreditations
Pm certifications & accreditationsmasilamani ramasamy
 
Mustafa Degerli - 2010 - Annotated Bibliography - IS 720 Research Methods in ...
Mustafa Degerli - 2010 - Annotated Bibliography - IS 720 Research Methods in ...Mustafa Degerli - 2010 - Annotated Bibliography - IS 720 Research Methods in ...
Mustafa Degerli - 2010 - Annotated Bibliography - IS 720 Research Methods in ...Dr. Mustafa DeÄźerli
 
WEBINAR : PeopleWiz-Reconfig
WEBINAR : PeopleWiz-ReconfigWEBINAR : PeopleWiz-Reconfig
WEBINAR : PeopleWiz-ReconfigPeopleWiz Consulting
 
Mba viva slides (scm009432) (1)
Mba viva slides (scm009432) (1)Mba viva slides (scm009432) (1)
Mba viva slides (scm009432) (1)David Goh
 
Project Evaluation, Recycling and Closing
Project Evaluation, Recycling and ClosingProject Evaluation, Recycling and Closing
Project Evaluation, Recycling and ClosingJo Balucanag - Bitonio
 

Similar to Dr. Felix Ekpo's Dissertation defense (20)

Final year project (standardized factors)
Final year project (standardized factors)Final year project (standardized factors)
Final year project (standardized factors)
 
Effective virtual teams
Effective virtual teamsEffective virtual teams
Effective virtual teams
 
Exploring the Strategic Impact of Online Communities: A Dynamic Capabilities ...
Exploring the Strategic Impact of Online Communities: A Dynamic Capabilities ...Exploring the Strategic Impact of Online Communities: A Dynamic Capabilities ...
Exploring the Strategic Impact of Online Communities: A Dynamic Capabilities ...
 
Gary Broils, D.B.A. - Dissertation Defense: Virtual Teaming and Collaboration...
Gary Broils, D.B.A. - Dissertation Defense: Virtual Teaming and Collaboration...Gary Broils, D.B.A. - Dissertation Defense: Virtual Teaming and Collaboration...
Gary Broils, D.B.A. - Dissertation Defense: Virtual Teaming and Collaboration...
 
Pm600 1103 a-02-schwappach-loren-p2-t2
Pm600 1103 a-02-schwappach-loren-p2-t2Pm600 1103 a-02-schwappach-loren-p2-t2
Pm600 1103 a-02-schwappach-loren-p2-t2
 
Career Counseling Application Prototype.pptx
Career Counseling Application Prototype.pptxCareer Counseling Application Prototype.pptx
Career Counseling Application Prototype.pptx
 
Stakeholder analysis tool
Stakeholder analysis toolStakeholder analysis tool
Stakeholder analysis tool
 
Stakeholder analysis tool
Stakeholder analysis toolStakeholder analysis tool
Stakeholder analysis tool
 
An Empirical Analysis Of The Importance Of Teamwork On Project Management Th...
An Empirical Analysis Of The Importance Of Teamwork On Project Management  Th...An Empirical Analysis Of The Importance Of Teamwork On Project Management  Th...
An Empirical Analysis Of The Importance Of Teamwork On Project Management Th...
 
Ch01
Ch01Ch01
Ch01
 
Project Management Effectiveness in organizational Conditions
Project Management Effectiveness in organizational ConditionsProject Management Effectiveness in organizational Conditions
Project Management Effectiveness in organizational Conditions
 
Student 1 Hi,Project is a temporary goal that a team or an .docx
Student 1 Hi,Project is a temporary goal that a team or an .docxStudent 1 Hi,Project is a temporary goal that a team or an .docx
Student 1 Hi,Project is a temporary goal that a team or an .docx
 
Student 1 Hi,Project is a temporary goal that a team or an .docx
Student 1 Hi,Project is a temporary goal that a team or an .docxStudent 1 Hi,Project is a temporary goal that a team or an .docx
Student 1 Hi,Project is a temporary goal that a team or an .docx
 
01 itpm6
01 itpm601 itpm6
01 itpm6
 
KNOWLEDGE BASE OF PROJECT MANAGERS IN THE SOUTH AFRICAN ICT SECTOR
KNOWLEDGE BASE OF PROJECT MANAGERS IN THE SOUTH AFRICAN ICT SECTORKNOWLEDGE BASE OF PROJECT MANAGERS IN THE SOUTH AFRICAN ICT SECTOR
KNOWLEDGE BASE OF PROJECT MANAGERS IN THE SOUTH AFRICAN ICT SECTOR
 
Pm certifications & accreditations
Pm certifications & accreditationsPm certifications & accreditations
Pm certifications & accreditations
 
Mustafa Degerli - 2010 - Annotated Bibliography - IS 720 Research Methods in ...
Mustafa Degerli - 2010 - Annotated Bibliography - IS 720 Research Methods in ...Mustafa Degerli - 2010 - Annotated Bibliography - IS 720 Research Methods in ...
Mustafa Degerli - 2010 - Annotated Bibliography - IS 720 Research Methods in ...
 
WEBINAR : PeopleWiz-Reconfig
WEBINAR : PeopleWiz-ReconfigWEBINAR : PeopleWiz-Reconfig
WEBINAR : PeopleWiz-Reconfig
 
Mba viva slides (scm009432) (1)
Mba viva slides (scm009432) (1)Mba viva slides (scm009432) (1)
Mba viva slides (scm009432) (1)
 
Project Evaluation, Recycling and Closing
Project Evaluation, Recycling and ClosingProject Evaluation, Recycling and Closing
Project Evaluation, Recycling and Closing
 

Recently uploaded

Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxEyham Joco
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfSumit Tiwari
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfMr Bounab Samir
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfUjwalaBharambe
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
MICROBIOLOGY biochemical test detailed.pptx
MICROBIOLOGY biochemical test detailed.pptxMICROBIOLOGY biochemical test detailed.pptx
MICROBIOLOGY biochemical test detailed.pptxabhijeetpadhi001
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementmkooblal
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentInMediaRes1
 
Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...jaredbarbolino94
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxAvyJaneVismanos
 

Recently uploaded (20)

OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptx
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
MICROBIOLOGY biochemical test detailed.pptx
MICROBIOLOGY biochemical test detailed.pptxMICROBIOLOGY biochemical test detailed.pptx
MICROBIOLOGY biochemical test detailed.pptx
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of management
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media Component
 
Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptx
 

Dr. Felix Ekpo's Dissertation defense

  • 1. (revision date: 02/25/2014) Current State of Virtual Project Management and Global Project Implementations Felix J Ekpo Northcentral University School of Business & Technology Management Prescott Valley, AZ May 2015 Committee Chair: Dr. Gary White Committee Member: Dr. Vanessa Claus Committee Member: Dr. Rachel Piferi
  • 2. Overview • Introduction - Background - Statement of the Problem - Support for Statement of the Problem - Purpose of the Study - Research Questions • Literature Review • Research Method and Design • Data Collection, Processing, and Analysis • Findings • Conclusions • Recommendations 2
  • 3. Background Introduction •The focus of this dissertation was to identify the perceptions of project managers and corporate project coordinators on the current state of virtual project management and global project implementations. •Although virtual projects rely mostly on the technology for information sharing and communication across the organization, very little is known about the perceptions of project managers and corporate project coordinators on the use of virtual project tools. Background: •In every organization, project management is developed to control, plan, manage and coordinate the diverse and complex operations of large projects (Dinsmore & Cabanis-Brewin, 2011). The common cause of all these projects is the projection of activities and ideas into new endeavors (Frolunde et al., 2011). The objective of project management is to forecast and analyze all possible problems and issues that may disrupt the defined objectives of the projects (Kerzner, 2013). 3
  • 4. Statement of the Problem/ Purpose of the Study Statement of the Problem For an organization to achieve project goals and objectives, a structure has to be put into place to efficiently integrate human and technical resources (Aubrey et al., 2009). •Support for Statement of the Problem - Lack of global partner’s ability to provide the services required for a project (GarcĂ­a et al., 2010). - Global acquisitions in 2014 were 34% higher compared to 2013 with $719 billion and that represents the highest since 2008 (Pervaiz, & Zafar, 2014). No evidence of any study that examines project managers’ and corporate project coordinators’ perceptions as it relates to virtual project management environment challenges and practices Purpose of the Study The purpose of this qualitative embedded case study was to obtain the perceptions of project managers and corporate project coordinators from project management offices (PMOs) in U.S. based multinational organizations with regard to the current state of virtual project management environment challenges and practices. 4
  • 5. Research Questions Research Questions: The research questions address the perceptions of project managers and corporate project coordinators with regard to the current state of virtual project management environment challenges and practices. The results from these research questions allowed me to identify possible solutions, critical to the success of virtual project performance. •Q 1. How does the current state of environment challenges and practices of virtual project management tools in a global project environment vary, as perceived by project managers and corporate project coordinators from U.S. based multinational organizations? •Q 2. How does the current state of environment challenges and practices of virtual project management tools influence the process of project management as perceived by project managers and corporate project coordinators from U.S. based multinational organizations? 5
  • 6. Research Questions Contd. • Q 3. How does the current state of environment challenges and practices of virtual project management tools optimize the value of virtual project management within the global project environment as perceived by project managers and corporate project coordinators from U.S. based multinational organizations? • Q 4. How does the current state of environment challenges and practices of virtual project management tools used in global project management influence overall organization project performance as perceived by project managers and corporate project coordinators from U.S. based multinational organizations?
  • 7. Nature of the Study/ Significance of the Study Nature of the Study •The nature of the research develops the perceptions from a qualitative method by means of an embedded case study (Yin, 2009). An embedded case study approach was used to develop constructs of comparative analysis of the perceptions for the experienced project managers and corporate project coordinators about their understanding of virtual project management tools in the global project management environment. Significance of the Study •The study identified how the use of virtual project management tools can mitigate the challenges facing virtual project management and improve overall organizational project performance. 7
  • 8. Literature Review • Literature review was used to understand the current state of virtual project management and global project implementations and identify the gap in the literature to be addressed in this dissertation as it relates to project management, virtual project management, building virtual communities, virtual management tools, challenges of virtual project management and contribution of project management to organizational performance Project Management: • Project management techniques became easier due to the use of PC and information technology and telecommunication systems (Pasian, Sankaran, & Boydell, 2012; Xu et al., 2014). It is used by organizations to perform tasks, solve problems and undertake complex projects (Dinsmore & Cabanis-Brewin, 2011). And to address some of the organizational problems in an organized manner (Meredith & Mantel, 2011; Xu et al., 2014). 8
  • 9. Literature Review Cont. Virtual Project Management: •Virtual project management is the framework by which virtual groups cooperate for the determinate of time for particular objective (Anantatmula & Thomas, 2010; Meredith & Mantel, 2011; Ward & Daniel, 2013). •Existing studies revealed that virtual operations enhanced financial gain by improving productivity, reducing travel time and cutting back on other costs (Anantatmula & Thomas, 2010; Drouin et al., 2010; Kuruppuarachchi, 2009). Building Virtual Communities: •Engaging virtual project teams in a global project gives the organization flexibility, awareness, lower labor costs, and better deployment of resources necessary to meet project requirements in global project management environments (Anantatmula & Thomas, 2010; Bierly et al., 2009; Curlee, 2008; Drouin et al., 2010; GarcĂ­a et al., 2010; Ren et al., 2012). 9
  • 10. Literature Review Cont. Virtual Management Tools: •The virtual management tools play important roles in coordinating virtual teams toward a cohesive environment (Hamilton et al., 2010; Ren et al., 2012; Sotomayor, Montero, Llorente, & Foster, 2009). Attachment among team members are initiated with the use of virtual management tools between a member and the organization (Hamilton et al., 2010; Ren et al., 2012; Sotomayor et al., 2009; Tohidi, 2011). •While virtual tools application that facilitates trust may be beneficial towards effective management and achievement of a solid virtual team, poor virtual tools or even poor management of such tools may be detrimental to managing such environments like global projects that is becoming heavily dependent on virtual teams (Bierly et al., 2009; Curlee, 2008). Challenges of Virtual Project Management: •The challenges encountered within the project management circles are vast and how the project teams optimize the worth of virtual management within projects is desirable •The main reasons for global organizations’ adoption of the virtual teams are to respond to decentralization and globalization and to meet the increasing challenges related to market competition and turbulence (Lee-Kelley & Sankey, 2007; Zander et al., 2012). •Due to the distance between virtual project team members, they must depend on technology to build effective communication (Lee-Kelley & Sankey, 2007; Zander et al., 2012). 10
  • 11. Literature Review Cont. Contribution of Project Management to Organizational Performance: •A cluster of studies have concluded that project management contributions to organizational performance is an on-going phenomenon of change in the global scenario as a driver of organizational aspirations towards growth and subsequent contributions of effective project management on the overall performance of business entities (Aubry & Hobbs, 2011; Fernandez & Fernandez, 2009; Lee, 2008; Nambisan, 2003; Reed & Knight, 2011; Thomas & Mengel, 2008). •Virtual project teams are hardly in corporal proximity, which means that the attachment and acquaintance of conventional environments of group dynamic is absent (Curlee, 2008; Drouin et al., 2010; Ren et al., 2012). •The contributions of virtual project teams to organizational performance are the results and outcomes of individual performance in creating the value of the team to the organization through the use of communication, trust, team formation and collaboration (GlĂĽckler & Schrott, 2007). 11
  • 12. Research Method and Design • An embedded case study design approach - An embedded case study was selected to acquire the information that was needed in the research. - An embedded case study approach was selected over other qualitative approaches because of the closer alignment with the problem and research question. - Cooper and Schindler (2006) stated that one of the most crucial parts of an embedded case study is the selection of right methodology to enhance the integrity of the study and acquire better outcomes. • The qualitative research method helped explain the how and why: - According to Yin (2009), a qualitative case study is the suitable research method after it is established that (a) answer to statement of the problem can be found by asking “why” and “how” research questions, (b) the researcher and research has limited or no control over the events of the study or the subjects of the research and (c) the case study is of contemporary nature. - Characteristic of qualitative studies are the development of themes, achieved from evidences and the showing of data to create a clear and consistent depiction (Yin, 2009). - Qualitative research comprises of the understanding of different perspectives, experiences, and meanings that individuals or groups attribute to a human or social problem (Borrego, Elliot, & Catherine, 2009; Creswell, 2013; Yin, 2009). 12
  • 13. Population & Sample • Population - The population was Project Managers and Corporate Project Coordinators who are senior decision-making executives in the field of health information technology and oil producing project management. - The health information systems and oil producing organizations implement virtual projects that varied in durations, costs, project team sizes, and complexities. These projects represents a diverse variety of industries in scopes, disperse locations and have the characteristics similar to those of most multinational organizations. • Sample - Final sample was 12 project managers and corporate project coordinators - Have virtual project management experience and - have led virtual projects within the last three years 13
  • 14. Field-Tested • The interview questions were field-tested - By one project manager and two corporate project coordinators who were not members of the study’s sample - To test the procedures • These non-participating members of the study were qualified to comment on the interview protocol because of the similarity in interests to those that participated in the study (Raiyani, 2012; Salkind, 2010; Venkatesh et al., 2013). • Field test results were used to improve the interview questions and formats (Raiyani, 2012; Salkind, 2010; Venkatesh et al., 2013). 14
  • 15. Data Collection, Processing, and Analysis • Prior to the start of the data collection, informed consent forms were distributed to each participant to signed and return. • The research participants were briefed before the interview on the research topic, purpose of the study, informed consent, duration and structure of the interview (Kvale & Brinkmann, 2009). • Data collection came from semi-structured interviews of project managers and corporate project coordinators. Semi-structured interviews were appropriate as the research sought to obtain or explore participant insights (Yin, 2009). • The semi-structured, open-ended questions provided rich information regarding the phenomenon of virtual project management (Creswell, 2009; 2013). 15
  • 16. Data Collection, Processing, and Analysis • Telephone interviews lasted 30 – 45 and were digitally recorded and note taken on every interview sessions. • Verbatim data was manually transcribed immediately after every interview session. Data collected was kept in a fully encrypted storage device(s). • Data collection concluded following the saturation of emerging responses from the nine project managers and three corporate project coordinators. Data Analysis • The analysis of the collected data started once the interviews were completed • The constant comparative method was used to identify emerging themes pertaining to virtual project management tools and information technology. • The emerging themes were identified, analyzed and grouped into themes or codes (Kvale & Brinkmann, 2009). • Triangulation was used to address the techniques for accuracy and trustworthiness (Buyukkaya, & Abdallah, 2009; Flick, 2009; Homburg, Klarmann, Reimann, & Schilke, 2012; Jonsen, & Jehn, 2009). • According to Yin (2009), triangulation method is technique used to increase the trustworthiness of the data collection and interpretation. 16
  • 17. Demographic Characteristics of the Participants • Demographic information was obtained from each participant and indicated that all twelve participants, are in project management occupation, have over 3 years of project management experiences and all college graduates with project locations in United States. The participants were seven males and five females, and represented three organizations. Table 1: shows the demographic profile of the participants. 17 Participant # and Position Year of Service Gender Age Level of Education Project Location Organization # 1 Corporate Project Coordinator 17 Male MBA USA Meditech # 2 Project Manager 12 Female BSc USA Meditech # 3 Project Manager 5 Female MBA USA Meditech # 4 Project Manager 12 Male MSc USA Meditech # 5 Project Manager 13 Male MA USA Meditech # 6 Project Manager 7 Female MBA USA Meditech # 7 Corporate Project Coordinator 5 Female MBA USA Murphy Oil # 8 Project Manager 24 Male MSc USA PPI # 9 Project Manager 4 Male BSc USA PPI # 10 Project Manager 6 Male BSc USA Meditech # 11 Corporate Project Coordinator 12 Male BSc USA PPI # 12 Project Manager 16 Female BSc USA PPI
  • 18. Findings • Results • During the data collections, all of the participants were assigned a unique identifier (e.g., Participant #) to ensure privacy and confidentiality. The transcribed interviews were analyzed through NVivo software to group, categorize, and analyze the data. This software tool helped to identify themes present in the research questions. • To begin, research participants were asked how often they had face-to-face encounters with their virtual project members per year. • Research participants’ responses reveal that how often virtual project members meet face-to-face often depends on the particular project and its location, although half of the participants prefer monthly face-to-face encounters. • Responses reveal the importance of technologies for overcoming the limits of distance in research participants’ perceptions of the current state of virtual project management tools based on their own experiences as a project manager in both conventional and virtual project environments. • Responses reveal that communication, issues related to personality, documents, software, team and time management are the most influential challenges of the virtual project environment with relation to the process of project management. • When asked about their perceptions of working as member of a virtual project team, research participants reveal the importance of both communication and relationships. 18
  • 19. Findings Cont. • Participants were asked to discuss their experiences of a virtual project team’s contribution to projects in relations to: global project environments, team cooperation and collaboration (teamwork), team productivity, the use of information technologies, communications, information sharing and overall organization project performance (outcomes). Responses were reveal as follows: - In relations to global project environments: communication, efficiency, geography and team work were important themes. - In relation to team cooperation and collaboration: trust, communication and team leadership as important themes. - In relation to use of information technologies. The responses reveal that virtual projects rely on information technologies. - In relation to communications. The responses reveal the importance of utilizing the right tools and technologies. - In relation to information sharing. The responses reveal the importance of tools and technologies as well as the importance of information sharing for virtual projects. - In relation to organization project performance. The responses reveal the importance of selecting the right tools and technologies as well as the importance of communication for organization project performance. 19
  • 20. Findings Cont. • Research participants were asked to describe how successful or unsuccessful the use of virtual project management tools are based on their experiences in virtual project environments. Their responses reveal that the use of virtual project management tools were most successful when good communication and trust were present, and least successful when these areas were lacking. • Research participants were asked how virtual project environment practices optimize the value of virtual project management. Their responses reveal the importance of information technologies, communication and communication tools and technologies for optimizing the value of virtual project management. • Research participants were asked whether virtual project teams are more advantageous or disadvantageous to successful project team performance than those of conventional team settings. Research participants overwhelmingly saw virtual project teams as more advantageous than conventional team settings and noted the use of information technology, cost saving and team collaboration as the aspects that make virtual project teams more advantageous. • 20
  • 21. Evaluation of Findings • Research participants were asked how often they had face-to-face encounters with their virtual project members per year. Half of the research participants (6 out of 12 research participants) stated that they had face-to-face encounters with their virtual project members once per month. In addition, half of the research participants stated that it depended on other factors regarding how often they had face-to-face encounters with their virtual project members. - The findings are in support of various literatures that showed regularity of face-to-face contacts as the supplementary basis for categorization in virtual project (Verburg et al., 2013; Fayard, & Weeks, 2011). • When asked about their perceptions of the current state of virtual project management tools based on their own experiences as a project manager in both conventional and virtual project environments, the majority (8 out of the 12 research participants) mentioned technologies in their answer. In particular, half (4 out of 8) describe technologies as essential. - This is in agreement with studies that indicated that virtual project management tools play important roles in virtual projects environment (Hamilton et al., 2010; Ren et al., 2012; Sotomayor, Montero, Llorente, & Foster, 2009). For example, Participant 4 stated, “The current state of virtual project management tools are dependent on technology in order to work properly.” • On how virtual tools overcome the limits of distance - The findings concur with previous evidence that suggests virtual project management tools in a virtual project environment are interconnected and communally supportive attributes of communication, technology, trust, and leadership (Bierly et al., 2009; Curlee, 2008; Drouin et al., 2010; GarcĂ­a et al., 2010; Hamilton et al., 2010; Reed & Knight, 2011). 21
  • 22. Evaluation of Findings • Research participants were asked about the challenges of virtual project environments that influence the process of project management. Their responses reveal that communication, issues related to personality, documents, software, team and time management are the most influential challenges of the virtual project environment with relation to the process of project management. - The findings align with previous studies of the challenges in virtual management of projects, dislocation of team members, utilization of interactive media for communication, distinctions in time, and disparities related to culture (Lee-Kelley & Sankey, 2007; Zander et al., 2012). • When asked about their perceptions of working as member of a virtual project team half of the research participants (6 out of 12) mentioned communication in their answers. - The findings agrees with a previous study that stated that virtual project team members are keen to using virtual communication tools and willing to share the acquired knowledge with others in the virtual community with the leadership of project manager or project management office (Gilson et al., 2013). • When asked how virtual project environment practices optimize the value of virtual project management, half of the research participants (6 out of 12) mentioned information technologies in their responses. - The findings concur with the study that revealed communication within virtual project teams to optimize the value of virtual project management through instant messages, e-mails and other technologically-oriented tools (Anantatmula & Thomas, 2010). 22
  • 23. Conclusions Implications for Practice •Information that assists in recognizing and identifying the challenges that the use of digital collaboration tools such webinars, audio, and video conferencing posed with virtual project teams, can be found in this study. •This useful information can aid in making informed decisions on selecting the right virtual project management tools that can increase the potential for successful project implementation in a virtual project environments. - The research concurs with the findings in the study by Lee-Kelley and Sankey (2007) that found virtual project management teams generally utilize innovative technologies to attain their predetermined organizational objectives. •The benefit this study provides to the practice of virtual project management is that information technologies are one of the most desired tools of project managers and corporate coordinators and they relied on these tools as the ways for interaction among team members. •The research community can benefit from this research. The advantage to the research community is that this study adds valuable research evidence on virtual project management tools, the perceptions of project managers and corporate project coordinators where a clear gap exists. 23
  • 24. Recommendations • As a result of the research findings, the following recommendations were developed: - that formal training be developed and made available to virtual project team members before their participation in a virtual project. The training should cover such innovations as e-mail, member’s portal, SharePoint, audio/video/data conferencing, and automated workflow. - the use of standardized information technologies in a virtual project environment. The standardized of information technologies should be tailored to the needs of the virtual project teams and in turn will minimize the need for face-to-face interaction. - incorporating a series of weekly or biweekly virtual meetings that allows for frequent interactions and sharing of project information. Virtual meetings facilitate emotions and feelings, while documents sharing through the use of SharePoint assist in a richer communication of the virtual project message. 24
  • 25. Future Research  The following future research areas were recommended: • Study on perceptions of project managers and corporate project coordinators that compare worldwide responses against US based responses. Understanding the perceptions of other countries will help strengthen the results, beneficial to global PMOs and project team members working on international projects. • A quantitative study to complement the qualitative research. This aims at the limitation of being unable to generalize results. The results of this study could be tested using quantitative methods by examining responses by both project managers and corporate project coordinators who are experienced in virtual project management. • To expand the research to participants who are member of a virtual project team. The study should focused on all virtual project team members because their perceptions might be different than that of only the project managers and corporate project coordinators. 25
  • 26. Thank You for Your Attendance 26
  • 27. 27 Abdelhameed, W. A. (2012). Virtual reality applications in project management scheduling. Computer-Aided Design & Applications, 9(1), 71-78. doi:10.3722/cadaps.2012.71-78. http://dx.doi.org/10.3722/cadaps.2012.71-78 Ainamo, A., Artto, K., Levitt, R., Orr, R., Scott, W., & Tainio, R. (2010). Global projects: Strategic perspectives. Scandinavian Journal of Management, 26, 343-351. http://dx.doi.org/10.1016/j.scaman.2010.09.005 Aubry, M., Hobbs, B., & Thuillier, D. (2009). The contribution of the project management office to organizational performance. International Journal of Managing Projects in Business, 2(1), 141-148. doi:http://dx.doi.org/10.1108/17538370910930563 Dinsmore, P. C., & Cabanis-Brewin, J. (2011). The AMA handbook of project management. New York: Amacom Books. Drouin, N., Bourgault, M., & Gervais, C. (2010). Effects of organizational support on components of virtual project teams. International Journal of Managing Projects in Business, 3, 625-641. doi: 10.1108/17538371011076082 Frølunde, L., Teigland, R., & FlĂĄten, B. (2011). Final scientific/ expert report on virtual world entrepreneurship: A look at entrepreneurs in the Nordic region exploring the use of virtual worlds for entrepreneurial activity. Oslo, Norway: Nordic Innovation. References - 1
  • 28. 28 GarcĂ­a, G. J., Saldaña, R, J., Seco, A., & Sanz, E, A. (2010). How to get mature global virtual teams: A framework to improve team process management in distributed software teams. Software Quality Journal, 18, 409-435. doi: 10.1007/s11219-010-9096-5 Gilson, L., Maynard, M., & Bergiel, E. (2013). Virtual team effectiveness: An experimental activity. Small Group Research, 44(4), 412-427. GlĂĽckler, J., & Schrott, G. (2007). Leadership and performance in virtual teams: Exploring brokerage in electronic communication. International Journal of E-Collaboration, 3(3), 31-52. Retrieved from http://search.proquest.com.proxy1.ncu.edu/docview/222338062?accountid=28180 Grant, K., & Pennypacker, J. (2006). Project Management Maturity: An Assessment of Project Management Capabilities among and Between Selected Industries. IEEE Transactions on Engineering Management, 53(1), 59-68. Green, D. D., & Roberts, G. E., PhD. (2010). Personnel implications of public sector virtual organizations. Public Personnel Management, 39(1), 47-57. Retrieved from http://search.proquest.com.proxy1.ncu.edu/docview/215951122?accountid=28180 Hamilton, G., Hodgkinson, J., & Byatt, G. (2010). Managing a virtual project team. Retrieved from http://asapm.org/asapmag/articles/VirtualTeams.pdf Homburg, C., Klarmann, M., Reimann, M., & Schilke, O. (2012). What Drives Key Informant Accuracy? Journal of Marketing Research (JMR), 49(4), 594-608. doi:10.1509/jmr.09.0174 References - 2
  • 29. 29 Howe, K. R. (2012). Mixed methods, triangulation, and causal explanation. Journal of Mixed Methods Research, 6(2), 89-96. Kerzner, H. (2009). Project management: A systems approach to planning, scheduling, and controlling. Hoboken, NJ: John Wiley and Sons. Kvale, S., & Brinkmann, S. (2009). InterViews: Learning the craft of qualitative research interviewing (2nd ed.). Los Angeles, London, New Delhi & Singapore: Sage. Lee-Kelley, L., & Sankey, T. (2007). Global virtual teams for value creation and project success: A case study. International Journal of Project Management, 26, 51-62. Meredith, J. R., & Mantel Jr, S. J. (2011). Project Management: A managerial approach. John Wiley & Sons. Pasian, B., Sankaran, S., & Boydell, S. (2012). Project management maturity: a critical analysis of existing and emergent factors. International Journal of Managing Projects in Business, 5(1), 146-157. doi: 10.1108/17538371211192946 Pervaiz, M. M., & Zafar, F. F. (2014). Strategic Management Approach to Deal with Mergers in the era of Globalization. International Journal of Information, Business & Management, 6(3), 170-181. Venkatesh, V., Brown, S. A., & Bala, H. (2013). Bridging the qualitative-quantitative divide: Guidelines for conducting mixed methods research in information systems. MIS Quarterly, 37(1), 21-54. Verburg, R. M., Bosch-Sijtsema, P., & Vartiainen, M. (2013). Getting it done: Critical success factors for project managers in virtual work settings. International Journal of Project Management, 31 (1), 68–79. References - 3
  • 30. 30 Virtual Team Report Survey 2010. (2010). The challenge of working in virtual teams. RW LLC. Ward, J., & Daniel, E. M. (2013). The role of project management offices (PMOs) in IS project success and management satisfaction. Journal of Enterprise Information Management, 26(3), 316-336. doi: 10.1108/17410391311325252. Warrick, D. D. (2011). The urgent need for skilled transformational leaders: Integrating transformational leadership and organization development. Journal of Leadership, Accountability and Ethics, 8(5), 11-26. Retrieved from http://search.proquest.com.proxy1.ncu.edu/docview/909486088?accountid=28180 Wademan, M. R., Spuches, C. M., & Doughty, P. L. (2007). The people capability maturity model: Its approach and potential to improve workforce performance. Performance Improvement Quarterly, 20(1), 97-123. Retrieved from http://search.proquest.com.proxy1.ncu.edu/docview/218517526?accountid=28180 Zander, L., Mockaitis, A. I. & Butler, C. L. (2012). Leading global teams. Journal of World Business. 47, 592-603. Xu, Z., Ming, X. X., Song, W., He, L., & Li, M. (2014). Collaborative Project Management: A Systemic Approach to Heavy Equipment Manufacturing Project Management. Systemic Practice & Action Research, 27(2), 141-164. doi: 10.1007/s11213-012-9261-9 References - 4

Editor's Notes

  1. Use abstrate and background information
  2. .
  3. Also, please note that templates and outlines are available to both Mentors and students for the Topic Paper, Concept Paper, and Dissertation Proposal.
  4. Also, please note that templates and outlines are available to both Mentors and students for the Topic Paper, Concept Paper, and Dissertation Proposal.
  5. Also, please note that templates and outlines are available to both Mentors and students for the Topic Paper, Concept Paper, and Dissertation Proposal.
  6. Also, please note that templates and outlines are available to both Mentors and students for the Topic Paper, Concept Paper, and Dissertation Proposal.
  7. Also, please note that templates and outlines are available to both Mentors and students for the Topic Paper, Concept Paper, and Dissertation Proposal.