Final Capstone project created by me. The drawing package is meant to summarize all the knowledge I have received in residential design and construction at the end of my school year.
Final Capstone project created by me. The drawing package is meant to summarize all the knowledge I have received in residential design and construction at the end of my school year.
Imtech Mold Mexico is a korean company who has been in business for over 32 years.
Imtech Mold Mexico builds quality injection tools for the automotive industry and several markets . Imtech Mold for more than 20 years is an innovative company with a high level of competitiveness, focused on excellence and quality tooling.
Imtech Mold recently expanded operations to Puebla , Queretaro, Guanajuato & Estado de Mexico , to supply tooling to their customers in Mexico.
Event Management System Vb Net Project Report.pdfKamal Acharya
In present era, the scopes of information technology growing with a very fast .We do not see any are untouched from this industry. The scope of information technology has become wider includes: Business and industry. Household Business, Communication, Education, Entertainment, Science, Medicine, Engineering, Distance Learning, Weather Forecasting. Carrier Searching and so on.
My project named “Event Management System” is software that store and maintained all events coordinated in college. It also helpful to print related reports. My project will help to record the events coordinated by faculties with their Name, Event subject, date & details in an efficient & effective ways.
In my system we have to make a system by which a user can record all events coordinated by a particular faculty. In our proposed system some more featured are added which differs it from the existing system such as security.
Imtech Mold Mexico is a korean company who has been in business for over 32 years.
Imtech Mold Mexico builds quality injection tools for the automotive industry and several markets . Imtech Mold for more than 20 years is an innovative company with a high level of competitiveness, focused on excellence and quality tooling.
Imtech Mold recently expanded operations to Puebla , Queretaro, Guanajuato & Estado de Mexico , to supply tooling to their customers in Mexico.
Event Management System Vb Net Project Report.pdfKamal Acharya
In present era, the scopes of information technology growing with a very fast .We do not see any are untouched from this industry. The scope of information technology has become wider includes: Business and industry. Household Business, Communication, Education, Entertainment, Science, Medicine, Engineering, Distance Learning, Weather Forecasting. Carrier Searching and so on.
My project named “Event Management System” is software that store and maintained all events coordinated in college. It also helpful to print related reports. My project will help to record the events coordinated by faculties with their Name, Event subject, date & details in an efficient & effective ways.
In my system we have to make a system by which a user can record all events coordinated by a particular faculty. In our proposed system some more featured are added which differs it from the existing system such as security.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
Explore the innovative world of trenchless pipe repair with our comprehensive guide, "The Benefits and Techniques of Trenchless Pipe Repair." This document delves into the modern methods of repairing underground pipes without the need for extensive excavation, highlighting the numerous advantages and the latest techniques used in the industry.
Learn about the cost savings, reduced environmental impact, and minimal disruption associated with trenchless technology. Discover detailed explanations of popular techniques such as pipe bursting, cured-in-place pipe (CIPP) lining, and directional drilling. Understand how these methods can be applied to various types of infrastructure, from residential plumbing to large-scale municipal systems.
Ideal for homeowners, contractors, engineers, and anyone interested in modern plumbing solutions, this guide provides valuable insights into why trenchless pipe repair is becoming the preferred choice for pipe rehabilitation. Stay informed about the latest advancements and best practices in the field.
Chat application through client server management system project.pdfKamal Acharya
This project focused on creating a chatting application with communication environment. The objective of our project is to build a chatting system to facilitate the communication between two or more clients to obtain an effective channel among the clients themselves. For the application itself, this system can serve as a link to reach out for all clients. The design of the system depends on socket concept where is a software endpoint that establishes bidirectional communication between a server program and one or more client programs. Languages that will be used for the development of this system: Java Development Kit (JDK): is a development environment for building applications and components using the Java programming language.
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
This document is by explosives industry in which document discussed manufacturing process and flow charts details by nitric acid and sulfuric acid and tetra benzene and step by step details of explosive industry explosives industry is produced raw materials and manufacture it by manufacturing process
Toll tax management system project report..pdfKamal Acharya
Toll Tax Management System is a web based application that can provide all the information related to toll plazas and the passenger checks in and pays the amount, then he/she will be provided by a receipt. With this receipt he/she can leave the toll booth without waiting for any verification call.
The information would also cover registration of staff, toll plaza collection, toll plaza collection entry for vehicles, date wise report entry, Vehicle passes and passes reports b/w dates.
Overview of the fundamental roles in Hydropower generation and the components involved in wider Electrical Engineering.
This paper presents the design and construction of hydroelectric dams from the hydrologist’s survey of the valley before construction, all aspects and involved disciplines, fluid dynamics, structural engineering, generation and mains frequency regulation to the very transmission of power through the network in the United Kingdom.
Author: Robbie Edward Sayers
Collaborators and co editors: Charlie Sims and Connor Healey.
(C) 2024 Robbie E. Sayers
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSEDuvanRamosGarzon1
AIRCRAFT GENERAL
The Single Aisle is the most advanced family aircraft in service today, with fly-by-wire flight controls.
The A318, A319, A320 and A321 are twin-engine subsonic medium range aircraft.
The family offers a choice of engines
Online blood donation management system project.pdfKamal Acharya
Blood Donation Management System is a web database application that enables the public to make online session reservation, to view nationwide blood donation events online and at the same time provides centralized donor and blood stock database. This application is developed
by using ASP.NET technology from Visual Studio with the MySQL 5.0 as the database management system. The methodology used to develop this system as a whole is Object Oriented Analysis and Design; whilst, the database for BDMS is developed by following the steps in Database Life Cycle. The targeted users for this application are the public who is eligible to donate blood ,'system moderator, administrator from National Blood Center and the staffs who are working in the blood banks of the participating hospitals. The main objective of the development of this application is to overcome the problems that exist in the current system, which are the lack of facilities for online session reservation and online advertising on the nationwide blood donation events, and also decentralized donor and blood stock database. Besides, extra features in the system such as security protection by using password, generating reports, reminders of blood stock shortage and workflow tracking can even enhance the efficiency of the management in the blood banks. The final result of this project is the development of web database application, which is the BDMS.
Online resume builder management system project report.pdfKamal Acharya
This project aims at the Introduction to app Service Management.
This software is designed keeping in mind the user’s efficiency & ease of handling and maintenance , as and secured system over centralized data handling and providing with the features to get the complete study and control over the business.
The report depicts the basics logic used for software development long with the Activity diagrams so that logics may be apprehended without difficulty.
For detailed information, screen layouts, provided along with this report can be viewed.
Although this report is prepared with considering the results required these may be across since the project is subjected to future enhancements as per the need of organizations.
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
CFD analysis is incredibly effective at solving mysteries and improving the performance of complex systems!
Here's a great example: At a large natural gas-fired power plant, where they use waste heat to generate steam and energy, they were puzzled that their boiler wasn't producing as much steam as expected.
R&R and Tetra Engineering Group Inc. were asked to solve the issue with reduced steam production.
An inspection had shown that a significant amount of hot flue gas was bypassing the boiler tubes, where the heat was supposed to be transferred.
R&R Consult conducted a CFD analysis, which revealed that 6.3% of the flue gas was bypassing the boiler tubes without transferring heat. The analysis also showed that the flue gas was instead being directed along the sides of the boiler and between the modules that were supposed to capture the heat. This was the cause of the reduced performance.
Based on our results, Tetra Engineering installed covering plates to reduce the bypass flow. This improved the boiler's performance and increased electricity production.
It is always satisfying when we can help solve complex challenges like this. Do your systems also need a check-up or optimization? Give us a call!
Work done in cooperation with James Malloy and David Moelling from Tetra Engineering.
More examples of our work https://www.r-r-consult.dk/en/cases-en/
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
Do AGN. Office Working drawings .pdf
1. W1
1i
Room Name
101
View Name
Sheet No.
A101
View Name
View
Name
View Name
View
Name
ATR1
1t
1t
1
A101
Material
Lighting Fixture
Drowing Symbols
Interior Elevation
Wall Section
Callout
Level
Material Tag
Lighting Fixture Tag
Room Tag
Door Tag
Window Tag
Curtain Wall Tag
Furniture Tag
Air Terminal Tag
Architectural Abbreviations
A
ACM ASBESTOS CONTAINING
MATERIAL
ACP ACOUSTICAL CEILING PANEL
ADA AMERICANS WITH DISABILITIES
ACT
AFF ABOVE FINISH FLOOR
AL ALUMINUM
ALT ALTERNATE
C
CJ CONTROL JOINT
CMU CONCRETE MASONRY UNIT
COL COLUMN
CONC CONCRETE
CPT CARPET
CT CERAMIC TILE
CONT CONTINUOUS
D
DIA DIAMETER
DIM DIMENSION(S)
DR DOOR
DWG DRAWING
E
EA EACH
EL ELEVATION
EQ EQUAL
EWC ELECTRIC WATER COOLER
EX EXISTING
EXP EXISTING, PAINT
EXIST EXISTING
F
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FFE FINISH FLOOR ELEVATION
FV FIELD VERIFY
G
GA GAUGE
GALV GALVANIZED
GSF GROSS SQUARE FEET
GWB GYPSUM WALLBOARD
H
HM HOLLOW METAL
HOR HORIZONTAL
HR HOUR(S)
I
INS INSULATED
L
LAV LAVATORY
M
MAX MAXIMUM
MIN MINIMUM
MIN MINUTES
MFG MANUFACTURER
MTL METAL
N
NIC NOT IN CONTACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
O
OC ON CENTER
OD OUTSIDE DIAMETER
OPP OPPOSITE
P
PF PREFINISHED
PT PAINT
S
SCH SCHEDULE
SF SQUARE FEET
SIM SIMILAR
STC SOUND TRANSMISSION CLASS
STL STEEL
T
TYP TYPICAL
U
UON UNLESS OTHERWISE NOTED
UL UNDERWRITERS LABORATORY
V
VCB VINYL COVE BASE
VCT VINYL COMPOSITION TILE
VERT VERTICAL
W
W/ WITH
WC WATER CLOSET
WD WOOD
Project Description :
Project Information
General notes:
A. All work performed per these drawings must
conform with the latest Edition of state building
code, local ordinances, and the ada. Local building
Inspector to have jurisdiction.
B. The contractor shall be fully familiar with
appropriate documents. Contractor shall review
contract documents and notify architect of any
Discrepancies in writing before starting work
C. The contractor shall verify existing conditions
and dimensions of existing work in field before .
Starting work. The contractor shall coordinate all
discrepancies with this work, and notify the
architect in writing of any discrepancies. Work
includes coordination with existing conditions.
Contractor is responsible for informing all
inspecting and approval officials of relevant
clarifications or changes to the work.
D. Do not scale drawings. Contractor shall review
documents and identify in writing to the architect
additional dimensions or clarifications required
before starting work.
E. Work not by M.A designs, inc. To be included as
part of the work:
- Structure work
- Emergency power systems
- Plumbing systems
- Acoustic systems
- Fire protection systems
- Electrical systems
- Mechanical systems
F. Mechanical, electrical, plumbing and fire
protection symbols reflect desired locations.
G. Repair and finish all existing surfaces as
required by new construction.
H. These drawings show design intent only. Means
and methods of construction are the responsibility
of the contractor. Requests for clarification of the
design intent shall be made in writing to the
architect.
Total area : 166 m²
Owner : Do AGN.
Project Name : Do AGN. Office
Work Type : Working Drowings
Project Type : Interior Design
Project Address : New damietta,
financial district, Land No. 196/12
Project Issue Date : 5/12/2022
Start Date : 1/12/2022
Building Name : 196+
Sheet List
Sheet
Number
Sheet
Name Type
Sheet Issue
Date Drawn By Scale
AR01 Original Plan Plan 2/12/2022 Mohannad A.Ullah 1 : 50
AR02 Unit Floor
Plan
Plan 2/12/2022 Mohannad A.Ullah 1 : 50
AR03 Reflected
Ceiling Plan
Plan 4/12/2022 Mohannad A.Ullah 1 : 50
AR04 Furniture
plan
Plan 5/12/2022 Mohannad A.Ullah 1 : 30
AR05 Meeting Interior
Elevation
3/12/2022 Mohannad A.Ullah 1 : 25
AR06 Office Interior
Elevation
3/12/2022 Mohannad A.Ullah 1 : 25
AR07 Work space Interior
Elevation
3/12/2022 Mohannad A.Ullah 1 : 25
AR08 Board Room Interior
Elevation
3/12/2022 Mohannad A.Ullah 1 : 25
AR09 reception
desk
Interior
Elevation
3/12/2022 Mohannad A.Ullah 1 : 25
AR10 Flooring plan Plan 3/12/2022 Mohannad A.Ullah 1 : 30
AR11 Doors &
Windows
Details 5/12/2022 Mohannad A.Ullah As
indicated
AR12 Curtain Wall Details 5/12/2022 Mohannad A.Ullah 1 : 25
AR13 Details Details 4/12/2022 Mohannad A.Ullah As
indicated
AR14 Schedules documents 4/12/2022 Mohannad A.Ullah ---
online publishing
version
*This version does not contain a complete project and documentation, and this version is intended for publishing and marketing only.
Do AGN. digital marketing agency, the
agency wants to design a new
workspace, to contribute to increasing
productivity.
If you are using your mobile
phone, rotate it please.
3. 1
2
3
4
D
D
1'
2'
0.30
0.20
4.99
0.51
0.54
0.51
0.61
0.51
6.95
2.64
0.65
2.97
0.72
5.50
0.15
14.62
1.02 0.44
W1
W1
W1
D1
Notes
Scale : 1 : 50
Project : Do AGN. Office
Owner : Do AGN.
Date : 2/12/2022
No : AR01
Sheet : Original Plan
Designed By : Mohannad A.Ullah
Drawn By : Mohannad A.Ullah
-These drawings are revit files. should not be altered by any softwares without prior
notice.
-All levels are in meters.
-All dimensions shown are in millimeters, unless otherwise specified.
-All dimensions used to be verified on site. any discrepancies should be notified.
-For structure elements refer to str. Drawings.
-For pluming and drainage elements refer to mechanical drawings
-For hvac elements refer to mechanical drawings.
-For lighting fixture refer to electrical drawings.
Sheet Key
4. C
C
C
AR05
2
-
A
2
-
C
2 - B
2 - D
AR06
4 - A
4
-
B
4
-
D
4 - C
AR07
3
-
A
AR07
3 - B-1
3
-
C
3 - D
3 - B
AR06
5 - A
5
-
B
5
-
D
5 - C
Meeting Room
1
1
2
3
4
A
A
B
B
C
C
office
2
office
3
Work space
4
corridor
5
5.50
3.68
3.29
5.50
9.15
1.42
2.91
1.17
9.15
3.47 4.16
0.20
0.10 3.18 0.50 3.55 0.50
12.87
3.47 4.16
0.86 2.07 0.54 7.94
3.47 9.39
1.12
2.91
1.13
0.10
3.04
1.01
1.01
0.09
0.16 0.79 2.30 0.80
0.79 2.30 0.59
1.04
0.94
3.09
0.08
0.20
1.85
0.82
0.07
0.60
0.05
0.88
0.51
3.55 0.28
3.18 0.20
3.09 0.23
0.290.33 2.07 0.29
3.32
2.71
0.21
0.11
3.14
0.17
2.03
0.84
0.07
0.22
0.10
2.11
0.93
0.05
0.22
1.82
1.16
0.51
3.18
0.80
0.24
0.75
0.07
0.14
2.66
0.05
0.14
0.071.07
D2
D2
D2
D2'
CW8 CW7
CW4
CW5
CW9
CW3
CW1
CW2
CWD1
W2
W2
W2
W2
WS1
AR12
WS4
AR13
WS5
AR13
WS6
AR13
1 : 50
Unit Floor Plan
5. C
AR09
1
-
A
1 - D
1
-
C
1 - B
AR08
6 - A
3
-
A-1
6 - C
6
-
B
6
-
D
1
2
3
4
D
D
Board Room
6
Kitchen
7
WC
8
WC
9
reception desk
10
1'
2'
4.94
4.34 0.30
0.20
4.99
0.51
0.54
0.51
0.61
0.51
6.95
2.64
0.65
2.97
0.72
5.50
0.15
14.62
4.94
1.02 0.44
3.39 1.02 0.24
3.01 0.30
2.50
0.02
0.91 1.78 0.63
3.31
1.36
0.60
0.13
0.80
0.04
2.20
W1
W1
W1
D1
D3
D3
O1
CW6
D2
W2
WS3
AR11
WS7
AR13
Notes
Scale : 1 : 50
Project : Do AGN. Office
Owner : Do AGN.
Date : 2/12/2022
No : AR02
Sheet : Unit Floor Plan
Designed By : Mohannad A.Ullah
Drawn By : Mohannad A.Ullah
Rooms Finish Schedule
No. Name
Floor
Finish
skirting
Finish
Wall
Finish
Ceiling
Finish
1 Meeting
Room
ceramic
tiles
Marble Wood &
PVC
cladding
White
board &
wood grille
2 office ceramic
tiles
Marble paint & PVC
cladding
White
board
3 office ceramic
tiles
Marble paint & PVC
cladding
White
board
4 Work
space
ceramic
tiles
Marble paint & PVC
cladding
White &
dark board
5 corridor ceramic
tiles
Marble paint & PVC
cladding
wood grille
6 Board
Room
ceramic
tiles
lighting
skirting
paint, Wood
& cladding
White
board
7 Kitchen ceramic
tiles
- ceramic tiles -
8 WC ceramic
tiles
- ceramic tiles -
9 WC ceramic
tiles
- ceramic tiles -
10 reception
desk
ceramic
tiles
Marble paint, Wood
& cladding
White &
wood
board
-These drawings are revit files. should not be altered by any softwares without prior
notice.
-All levels are in meters.
-All dimensions shown are in millimeters, unless otherwise specified.
-All dimensions used to be verified on site. any discrepancies should be notified.
-For structure elements refer to str. Drawings.
-For pluming and drainage elements refer to mechanical drawings
-For hvac elements refer to mechanical drawings.
-For lighting fixture refer to electrical drawings.
Sheet Key
7. 1
2
3
4
D
D
1'
2'
0.30
0.20
4.99
0.51
0.54
0.51
0.61
0.51
6.95
2.64
0.65
2.97
0.72
5.50
0.15
14.62
1
UWH1
UWH1
UWH2
LT2
LT1
LT3
SL1
SL1
LT6
LT6
LT8
LT8
ATE1
ATR1
ATS3
2.60
2.60
2.60
ATE2
Notes
Scale : 1 : 50
Project : Do AGN. Office
Owner : Do AGN.
Date : 4/12/2022
No : AR03
Sheet : Reflected Ceiling Plan
Designed By : Designer
Drawn By : Mohannad A.Ullah
-These drawings are revit files. should not be altered by any softwares without prior
notice.
-All levels are in meters.
-All dimensions shown are in meters, unless otherwise specified.
-All dimensions used to be verified on site. any discrepancies should be notified.
-For structure elements refer to str. Drawings.
-For pluming and drainage elements refer to mechanical drawings
-For hvac elements refer to mechanical drawings.
-For lighting fixture refer to electrical drawings.
Sheet Key
Schedules in separate sheet.
9. C
ST1
RD1
TB5
ST4 ST4
ST4
ST4
ST4
ST4
ST4 ST4
ST5
T4
Notes
Scale : 1 : 30
Project : Do AGN. Office
Owner : Do AGN.
Date : 5/12/2022
No : AR04
Sheet : Furniture plan
Designed By : Designer
Drawn By : Mohannad A.Ullah
-These drawings are revit files. should not be altered by any softwares without prior
notice.
-All levels are in meters.
-All dimensions shown are in millimeters, unless otherwise specified.
-All dimensions used to be verified on site. any discrepancies should be notified.
Furniture Schedule
Type
Mark Description Count Manufacturer
6
RD1 receiption disk Full
specifications attached to the
sheets
1 custom made
SG1 Storage backdesk full
specifications attached to the
sheets
2 custom made
ST1 Office chair LANCASTER Low
back, green blue
13 Steelcase
ST2 Crossover modern executive
supported by a casted
aluminium base, Base 5 star
powder coated black ral 9005,
fabric colline
12 icons of denmark
ST3 FIRKANT medium size, shape
of the poufs are a hybrid
between a square and a circle,
Fabric Twill Weave
3 icons of denmark
ST4 The DROP 88.5*45.5*54.5 cm
3110, Not Upholstered Salsa 3
Textile / Black
11 Fritz Hansen
ST5 pluto stool, Handle in leather,
golden sand color
3 inoff
TB1 Conference table audrey 320 x
120 x 72 cm,thickness table
surface:2.2 cm black frame,
dark grey top, with 5
electrical_outlets, Seating
10-12
1 AUDREY
TB2 KOKUYO Office Table
Workstation WORK FIT
2 ---
TB3 Manager set desk : W160 x
D70 x H72 cm. Side cabinet :
W160 x D40 x H64.5 cm.
2 COSMOS
TB4 Manager set coffee table :
W110 x D56 x H60 cm. Side
cabinet : W160 x D40 x H64.5
cm.
2 COSMOS
TB5 Woodstock round table
diameter 160 h 74 cm table top
— linoleum spring green base
oak black lacquer feet — metal
powder coated black ral 9005
edge — finish white lacquered
mdf edge — shape bevelled
lacquered mdf
1 icons of denmark
Sheet Key
13. base)
0.00
evel 8
3.30
3
AR13
Level 7 (base)
0.00
Level 8
3.30
A
B
1.35
0.10
1.29
0.51
2.74
0.51
1.51 1.08 0.27 0.14
WW2
WSK1
LT9
0.12
2.74
3.25
WS6
AR13
el 7 (base)
0.00
Level 8
3.30
Level 7 (base)
0.00
Level 8
3.30
2 3
0.51
2.74
0.51
0.04
0.50
1.90
0.18
0.12
electric outlet
WSK1
WW2
WP2
WW2
LT9
0.00
2.74
3.25
7 (base)
0.00
Level 8
3.30
Notes
Scale : 1 : 25
Project : Do AGN. Office
Owner : Do AGN.
Date : 3/12/2022
No : AR06
Sheet : Office
Designed By : Mohannad A.Ullah
Drawn By : Mohannad A.Ullah
1 : 25
4 - C
1 : 25
5 - B
-These drawings are revit files. should not be altered by any softwares without prior
notice.
-All levels are in meters.
-All dimensions shown are in millimeters, unless otherwise specified.
-All dimensions used to be verified on site. any discrepancies should be notified.
-For structure elements refer to str. Drawings.
-For pluming and drainage elements refer to mechanical drawings
-For hvac elements refer to mechanical drawings.
-For lighting fixture refer to electrical drawings.
Key plan
Walls Materials
Mark Manufacturer Description
WP2 GLC essence -N0300- Paper cream
WP4 GLC essence -B10050- Warm water
WP5 GLC essence -R84040- Ancient Blue
WP6 GLC Bloom -Y21050- Morning sun
WSK1 Marmocasa For
Marble And
Granite
marble London Grey 80cm Ovolo
profile 14.5mm Width
WW2 modecor Nature texture Size : 25.0mm x
120mm x 2440mm -
NT-701-ANTIQUE COFFEE
Sheet Key
15. Level 7 (base)
0.00
Level 8
3.30
B
3.32
3.86
0.48
0.40
0.18
7
5
.
0
0
°
105.00°
R
0.52
R
0.52
0.29 0.23 0.74 0.23
0.40 0.95
0.52
WP2
WP4
WP5
0.00
1.17
2.76
2.61
WSK1
WS5
AR13
Level 7 (base)
0.00
Level 8
3.30
C
0.10
0.73
0.66
0.21
0.53
0.71
3.84
LT5
WSK1
Level 7 (base)
0.00
Level 8
3.30
1.15
9
1.15
0.97
1.69
0.59
all paper
LT7
0.00
3.25
2.79
Notes
Scale : 1 : 25
Project : Do AGN. Office
Owner : Do AGN.
Date : 3/12/2022
No : AR07
Sheet : Work space
Designed By : Mohannad A.Ullah
Drawn By : Mohannad A.Ullah
-These drawings are revit files. should not be altered by any softwares without prior
notice.
-All levels are in meters.
-All dimensions shown are in millimeters, unless otherwise specified.
-All dimensions used to be verified on site. any discrepancies should be notified.
-For structure elements refer to str. Drawings.
-For pluming and drainage elements refer to mechanical drawings
-For hvac elements refer to mechanical drawings.
-For lighting fixture refer to electrical drawings.
Key plan
Sheet Key
Walls Materials
Mark Manufacturer Description
WP2 GLC essence -N0300- Paper cream
WP3 ahmed elsallab pvc marble ML-210 size 122*280cm
WP4 GLC essence -B10050- Warm water
WP5 GLC essence -R84040- Ancient Blue
WP6 GLC Bloom -Y21050- Morning sun
WSK1 Marmocasa For
Marble And
Granite
marble London Grey 80cm Ovolo
profile 14.5mm Width
WV1 BAUX BAUX Tiles Hexagon Clouds Grey
size 25*28.9*14.4cm
WV2 BAUX BAUX Tiles Hexagon Clouds White
size 25*28.9*14.4cm
WV3 BAUX BAUX Tiles Hexagon Earth Brown
size 25*28.9*14.4cm
WV4 - Hexagon Wood with Artificial green
& grass size 25*28.9*14.4cm
WW1 custom made Wood - bamboo finished semigloss
WW2 modecor Nature texture Size : 25.0mm x
120mm x 2440mm -
NT-701-ANTIQUE COFFEE
21. C
FL2
FL8
8
Notes
Scale : 1 : 30
Project : Do AGN. Office
Owner : Do AGN.
Date : 3/12/2022
No : AR10
Sheet : Flooring plan
Designed By : Designer
Drawn By : Mohannad A.Ullah
-These drawings are revit files. should not be altered by any softwares without prior
notice.
-All levels are in meters.
-All dimensions shown are in meters, unless otherwise specified.
-All dimensions used to be verified on site. any discrepancies should be notified.
-For structure elements refer to str. Drawings.
-For pluming and drainage elements refer to mechanical drawings
-For hvac elements refer to mechanical drawings.
-For lighting fixture refer to electrical drawings.
Sheet Key
Floors Materials
Mark Material Descrip. Manuf. Area
FL1 Avalon 14*86 cm Beige,
1 of 6 Listello
Beige II,
Herringbone
pattern
GEMMA 17 m²
FL2 Corfu 15*143 cm
Anthracite liner
pattern
GEMMA 3 m²
FL3 Ego 50*50 cm Dark
Beige
GEMMA 12 m²
FL4 Orlando 14*115 cm Beige GEMMA 108 m²
FL5 Avalon(1) 14*86 cm Listello
Brown I,
GEMMA 4 m²
FL6 Ranch 60*60 cm Ivory
Stripe & Brown
Stripe
GEMMA 58 m²
FL7 Glory 50*50 cm
Anthracite
GEMMA 9 m²
FL8 Terra 50*50 cm Ivory GEMMA 8 m²
FL9 Escape 60*60 cm Grey GEMMA 43 m²
Avalon
Listello Beige II Beige
Listello Beige II
Corfu
Anthracite
Ego
Dark Beige
Orlando
Beige
Ranch
Brown Stripe Ivory Stripe
Glory
Anthracite
Terra
Ivory
Escape
Grey
23. RC Lintel 5 cm
12.5 cm thick brick wall
Neoprene noise seal Wood frame
Fastener
Hard Wood
Door seal kit
MDF
Skirting
Hard Wood
Nc-2 sponge neoprene
Floor layers
RC Lintel 5 cm
RC Lintel 5 cm
Fastener
12.5 cm thick brick wall
12.5 cm thick brick wall
framing profile
outer profile
inner profile
outer profile
inner profile
Glass
Notes
Scale : As indicated
Project : Do AGN. Office
Owner : Do AGN.
Date : 5/12/2022
No : AR11
Sheet : Doors & Windows
Designed By : Designer
Drawn By : Mohannad A.Ullah
Door Schedule
Type
Mark Height Width Description
D1 2.13 0.91 custom made
D3 2.20 0.70 custom made
O1 2.20 0.91 Internal Cased Opening
-These drawings are revit files. should not be altered by any softwares without prior
notice.
-All dimensions shown are in meters, unless otherwise specified.
-All dimensions used to be verified on site. any discrepancies should be notified.
-For structure elements refer to str. Drawings.
-For pluming and drainage elements refer to mechanical drawings
-For hvac elements refer to mechanical drawings.
-For lighting fixture refer to electrical drawings.
-Doors & windows in Curtain walls are varies, So drawings placed on Curtain walls
sheets.
Window Schedule
Type
Mark
Sill
Height Height Width Description
W1 1.66 0.80 0.60 Pvc window, white
color, double hinges
directions, double
glass layers clear
glazing, handle
stainless steel
1 : 5
Bottom & Top Door detail
D1
1 : 5
Bottom & Top window detail
D2
25. 2.40
0.49
1.33
0.05
0.43
2.07
0.96
0.05
0.96
0.53
0.13
0.67
0.13
0.53 W2
0.30
2.70
0.00
3.25
3.25
0.97
0.05
2.13
84
0.05
0.81
.66
5
3
1.20
0.05
1.20
2.55
0.30
2.85
3.18
0.72
0.05
0.74
0.05
0.74
0.05
0.72
2.55
1.24
0.05
1.16
0.63
0.13
1.00
0.13
0.58
W2
0.30
2.85
covering profile
EPDM Gasket
Tempered Clear Glass (Sısecam)
mm Air Double Glass
Galvanized Steel Anchor
Vertical Profile Line
Aluminium profile
Notes
Project : Do AGN. Office
Owner : Do AGN.
Date : 5/12/2022
No : AR12
Sheet : Curtain Wall
Designed By : Designer
Drawn By : Mohannad A.Ullah
Scale : 1 : 25
CW4
CW8
Curtain Wall Schedule
Mark Length Description
CW1 5.07 aluminum mullion, glazed panel
CW2 2.91 aluminum mullion, glazed panel
CW3 2.83 aluminum mullion, glazed panel
CW4 2.07 aluminum mullion, glazed panel
CW5 2.93 aluminum mullion, glazed panel
CW6 3.01 aluminum mullion, glazed panel
CW7 3.55 aluminum mullion, glazed panel
CW8 3.18 aluminum mullion, glazed panel
CW9 2.74 aluminum mullion, glazed panel
CWD1 1.19 aluminum mullion, glazed panel
Sheet Key
-These drawings are revit files. should not be altered by any softwares without prior
notice.
-All levels are in meters.
-All dimensions shown are in meters, unless otherwise specified.
-All dimensions used to be verified on site. any discrepancies should be notified.
-For structure elements refer to str. Drawings.
-For lighting fixture refer to electrical drawings.
-All levels relative base to finish level.
Curtain Walls Key plan
Door Schedule CW
Type
Mark Height Description
D2 2.13 aluminum frame, glazed panel, chrome handle
D2' 2.13 aluminum frame, glazed panel, chrome handle
Window Schedule CW
Type
Mark Description
W2 Pvc window, white color, double hinges directions, double
glass layers clear glazing, handle stainless steel
1 : 5
Curtain Wall Detail
26. 5
AR13
6
AR13
7
AR13
8
AR13
9
AR13
Countersunk Screw 7.5 cm
wooden box
wood block
Gravel
wooden nose
artificial grass
LED profile
bracket
PVC Marble 5mm
with UV VARNISH
Double adhesive layer
on base surface &
back of the Marble
sheet
Brick wall
Cement
Skirting
Gypsum board
panel
Prelude Suspension
System
AR Bracket
Self Tapping
Fixing 40 mm
adjustment nut
1 : 20
Wall Section 4
1 : 20
Wall Section 5
1 : 20
Wall Section 6
1 : 20
Wall Section 7
1 : 5
Wall Section 4 -Callout 1
5
1 : 5
Wall Section 5 -Callout 1
6
1 : 5
Wall Section
7
1 : 5
Wall
9
27. Dryline Screw 25mm
bracket profile aluminum
Bottom No.3200
LED profile
LED profile
Wood Wool
Double adhesive layer
on base surface & back
of the wood wool
Tack Nail
75 mm
Dryline Screw 25mm
bracket profile aluminum
Gap 10mm No.3202
Gap
10mm
Metal Stud Layer
Gypsum Wall Board
Dryline Screw 25mm
bracket profile aluminum
Bottom No.3200
wood panel
Notes
Scale : As indicated
Project : Do AGN. Office
Owner : Do AGN.
Date : 4/12/2022
No : AR13
Sheet : Details
Designed By : Mohannad A.Ullah
Drawn By : Mohannad A.Ullah
n 6 -Callout 1
l Section 7 -Callout 1
-These drawings are revit files. should not be altered by any softwares without
prior notice.
-All levels are in meters.
-All dimensions shown are in millimeters, unless otherwise specified.
-All dimensions used to be verified on site. any discrepancies
should be notified.
-For structure elements refer to str. Drawings.
-For hvac elements refer to mechanical drawings.
-For lighting fixture refer to electrical drawings.
1 : 5
Wall Section 6 -Callout 2
8
Callout View List
View
Name
Title on
Sheet Target
WS4 -
Callout 1
Wall Section
4 -Callout 1
artificial grass
boxwood
WS5 -
Callout 1
Wall Section
5 -Callout 1
pvc marble sheet
installation
WS6 -
Callout 1
Wall Section
6 -Callout 1
Ceiling Board
installation
WS6 -
Callout 2
Wall Section
6 -Callout 2
wood panels
installation
WS7 -
Callout 1
Wall Section
7 -Callout 1
-Indicate LED lighting
-Wood wool
installation
-Wood panels
installation
28. Air Terminal Schedule
Type
Mark Manufacturer Model Description
System
Classification
ATE1 Anjos Ventilation BEIP Exhaust Air
ATE2 Anjos Ventilation BEIP Exhaust Air
ATR1 Metalaire ® Reference
"Selected
Model" in
Construction
Tab
Architectural Linear Diffusers
Formations, Linear Concealed Mounting
Return Air
ATR2 AIRZONE INVALID –
Type not
loaded via
type catalog
Swirl diffuser for modular ceiling Return Air
ATR3 Metalaire ® Reference
"Selected
Model" in
Construction
Tab
Adjustable Linear Slot Diffuser - Supply Return Air
ATS1 Metalaire ® Reference
"Selected
Model" in
Construction
Tab
Architectural Linear Diffusers
Formations, Linear Concealed Mounting
Supply Air
ATS2 AIRZONE INVALID –
Type not
loaded via
type catalog
Swirl diffuser for modular ceiling Supply Air
ATS3 Metalaire ® Reference
"Selected
Model" in
Construction
Tab
Adjustable Linear Slot Diffuser - Supply Supply Air
Ceiling Material
Mark Name Manuf. Model Description
Total
Area
CGR1 Gray
ACOUSTIB
UILT
armstrong ACOUSTIBUILT® Item
No.2604
Material : Wet-formed mineral fiber.
Surface Finish : Acoustically transparent membrane with
factory-applied latex paint
6 m²
CRP1 Red Painted
lyra
armstrong LYRA® PB Concealed
Item No.8432PB
Material : Fiberglass with acoustically transparent
membrane.
Surface Finish : Acoustically transparent membrane with
Metallic paint - red with flakes
4 m²
CWH1 White lyra armstrong LYRA® PB Concealed
Item No.8432PB
Material : Fiberglass with acoustically transparent
membrane.
Surface Finish : Acoustically transparent membrane with
factory-applied latex paint
87 m²
FQW1 Grille –
Forté
Quartered
Walnut
armstrong WOODWORKS® Grille
– Forté Item No.6336L _
S14
Material : Fire-rated particle board (FRPB) with real wood
veneers. Vertical Grain Fir (NVF) is FRPB with a
reconstituted veneer
Surface Finish : Tinted semi-gloss
SUSPENSION SYSTEMS : Heavy-duty PRELUDE® XL®
HD Main Beam &
Cross Tee
22 m²
GMP-WG
T
Maple grille
tegular
armstrong Woodworks grille tegular
Item No.663008
Material : Solid Poplar (yellow or hybrid) (RA-COC-003601)
Surface Finish : Tinted semi-gloss
11 m²
LBK1 Lyra Black armstrong LYRA® PB CAPZ Item
No.8856PBBK
Material : Fiberglass with acoustically transparent
membrane.
Surface Finish : Acoustically transparent membrane with
factory-applied latex paint
4 m²
UWH1 ULTIMA®W
hite
armstrong ULTIMA® High NRC
Item No.1940
Material : Wet-formed mineral fiber with DuraBrite®
acoustically transparent membrane
Surface Finish : Acoustically transparent membrane with
factory-applied latex paint
SUSPENSION SYSTEMS : Prelude® Blizzard White
4 m²
UWH2 ULTIMA®W
hite 48"
armstrong ULTIMA® High NRC
Item No.1943
Material : Wet-formed mineral fiber with DuraBrite®
acoustically transparent membrane
Surface Finish : Acoustically transparent membrane with
factory-applied latex paint
SUSPENSION SYSTEMS : Prelude® Blizzard White
4 m²
WP1 Bamboo
dark
custom made - Wood - bamboo finished semigloss 3 m²
Type
Mark Manufac
LT1 VIBIA
LT2 Vibia
LT3 Lumenw
LT4 Molto Lu
LT5 L&E
LT6 LENA LIGH
LT7 LENA LIGHTI
LT8 Örsjö
LT9 EAE
LT10 L&E
SL1 L&E
SL2 L&E
SP1 L&L Luce&
29. Notes
Scale :
Project : Do AGN. Office
Owner : Do AGN.
Date : 4/12/2022
No : AR14
Sheet : Schedules
Designed By : Designer
Drawn By : Mohannad A.Ullah
Lighting Fixture
cturer Model Description Count
A HALO 2341-03 HALO is a hanging lamp with three intertwined, straight
pieces, which creates subtle, By combining different
pieces you can show off hanging lights, matt white
lacquer.
1
a STRUCTURAL,
CEILING, TRIPLE
Ceiling light where different cubic volumes meet or
expand to provide flexible solutions, maintaining spatial
order.
1
werx Hex Pendant - 3
Cells Indirect
matte white side reflectors combined with
High-Efficiency Lambertian Optic (HLO), SIZE: 2" X 3
7/16" HEXAGON, LED, Pendant with 3 direct cells,
CHROMATICITY: STATIC WHITE
1
uce Ride Pendant
Cubic
Ride Ring, . With a profile of only 35x35 mm, LED
lighting systems, 750 mm and The converter built into
the body creates a minimalist ceiling base, black color in
a system,
1
E RLPL105-1 LED RECESSED FLUORESCENT 7
HTING SQ600 SQ 600 LED 2900LM PLX DALI I KL. 592X592MM 830
(29W)
2
ING S. A. Doblo LED LED, 4000K, OPAL, suspended, Decorative lighting
fitting with the effect of indirect light constituting 30% of
the total light output of the luminaire.
2
ö Baklava Ceiling
Lamp M
White textile cord. Triple layer shade in off-white textile.
The shade changes colour when the light is on. meduim
size.
3
E YODA Aluminum extrusion housing, Opal diffuser, SMD LED,
Natural White Temperature, Installation Pendant, Color
RAL 9005.
4
E RLPL109-4 LED RECESSED FLUORESCENT 8
E RLPL203-4 LED RECESSED FLUORESCENT 1
E RLPL003-1 Thick LED RECESSED FLUORESCENT 2
&Light Bitpop C 2.2 Indoor ceiling mounted cubic lighting, White aluminium 41
-These drawings are revit files. should not be altered by any softwares without
prior notice.
-All levels are in meters.
-All dimensions shown are in millimeters, unless otherwise specified.
-All dimensions used to be verified on site. any discrepancies
should be notified.
-For structure elements refer to str. Drawings.
-For hvac elements refer to mechanical drawings.
-For lighting fixture refer to electrical drawings.
-Full data sheets for any element, attached in family information.
30. Thank You
Mohannad Rabea Abdullah
www.linkedin.com/in/p-mohannad
m.abdullah.architect@gmail.com
+20155 865 7734
For contact