SlideShare a Scribd company logo
COST: No charge initial consultations 1
EAGA Company, LLcEAGA Company, LLc
Real Estate and DevelopmentReal Estate and Development
• Looking for a resource to develop real estate investment property?
•Looking for a comprehensive development solution?
•Concerned with contractor performance?
•Concerned with falling behind schedule?
If you answered “YES” to any of these questions, We are the company for you. EAGA
provides a “NOT ANY MORE” answer to the these questions.
Contact Us Today For a Free Consultation
215-395-6220 office 215-399-0946 fax
egodbolt@eagodboltcm.com email
Coordination and Communication Lead to Successful Projects 2
EAGA Company, LLcEAGA Company, LLc
Real Estate and DevelopmentReal Estate and Development
 Five Steps to Project Development
Successful Projects Share These Common Components. Plan To Succeed.
1. Design Management
2. Estimating & Bidding Management
3. Contract Management
4. Construction/Production Management
5. Close Out/Occupancy Management
COST: $ 1,000 – $ 3,000 average ( $1 - $1.10/ sf on avg.) 3
EAGA Step - 1EAGA Step - 1
Design Management.
Existing Floor Plans
Preliminary Design Floor Plans
Municipal Submissions
Zoning/Building Submissions
Final Construction Drawings and Permit Sets
Small Projects
Interiors Layouts: Bathrooms, Kitchens
Coordination and Communication Leads to Successful Projects 4
…………How does Design Management work
. and do I need it……………YES YOU DO….. !
….it begins with an inch by inch survey of the property……….
…. drawings of existing conditions are prepared……
..... Owner ideas for new walls, fixtures and appliances are incorporated
into the plans….
…..a materials count for doors, windows and finishes is done ….
…. the final plans are priced for materials and labor ready for bidding…
The floor plans are also ready for zoning and building permit
applications………
………. For pricing and application
COST: Included by percentage in STEP 4 5
EAGA Step - 2EAGA Step - 2
1. Estimating & Bidding Management
Three estimating methods
Itemized estimating
Assembly estimating
Quantity estimating
Three bidding methods
Qualifying Application on File
Insurance Verification
License Verification
  
CSI Labor  Total Total O&P Estimate Material M aterial
DIVISION Page Description QTY Units Hours Hours Days Price Item Cost Cost Only Only Price
1
2
24 remove plaster, on gypsum lath 0 ea 0 0.4 0 0 11.5 -$               -$                
25 Remove interior debris 0 sf 0.089 0 0 4.14 -$               -$                
25 Clean all debris from rear of building 0 sf 0.089 0 0 4.14 -$               -$                
Supply dumpsters 0 ea 0 0 708 -$               -$                
23 Remove concrete plain 4" 0 sy 0.15 0 0 6.15 -$               -$                
33 Replace concrete 3000psi 4" thick 0 sf 0.04 0 0 2.71 -$               1.21 -$                
32 curb 0 lf 0.148 0 0 16.2 -$               8 -$                
39 landscaping 0 sf 1.818 0 0 298 -$               217 -$                
34 fencing chain link 6' high  0 lf 0.209 0 0 14.45 -$               7.45 -$                
0 0 0 -$               -$                
3 0 0 0 -$               -$                
46-47 proch deck (concrete) 0 sf 0 0 -$               -$                
48 STEPS concrete(  ) 0 ea 0 0 -$               -$                
48 concrete finishing floors 0 sf 0.017 0 0 14.8 -$               12.9 -$                
33 4" coc. Sidew alk Broom finish 21712 0.04 868.48 108.56 2.71 58,839.52$    1.21 26,271.52$      
33 4" gravel base 21712 0.01 217.12 27.14 0.74 16,066.88$    0.39 8,467.68$        
44 steel curb forms 6"-12" high 1758 0.116 203.928 25.491 4.53 7,963.74$      0.53 931.74$           
32 6" curb concrete 1758 0.096 168.768 21.096 5.9 10,372.20$    2.1 3,691.80$        
33 belgiun block curb (material only) 101 ton 0 0 97 9,797.00$      -$                
32 place belgiun block  2236 0.107 239.252 29.9065 5.4 12,074.40$    1.54 3,443.44$        
33 6" drivew ay concrete 32800 sf 0.047 1541.6 192.7 3.69 121,032.00$  1.88 61,664.00$      
47 w w f 6x6x10x10 21712 0.005 108.56 13.57 0.28 6,079.36$      0.07 1,519.84$        
  0 0 0 -$               -$                
4 56 8" cmu partitions no reinforcing 0 sf 0.104 0 0 5.75 -$               1.86 -$                
8"x8' glass block 0 sf 0.25 0 0 18.45 -$               8.65 -$                
0 0 0 -$               -$                
0 0 0 -$               -$                
56 8x8x8 concrete block lintel 0 lf 0.133 0 0 8.56 -$               3.57 -$                
59 repoint mask & grout method 0 sf 0.084 0 0 3.75 -$               0.35 -$                
58 brow nstone repair 0 sf 0.4 0 0 38 -$               16.65 -$                
54 rebuild w all (brick veneer or adobe brick) 0 sf 0 0 -$               -$                
0 0 0 -$               -$                
0 0 0 -$               -$                
5 0 0 0 -$               -$                
68 3 5/8" studs on w alls 16" o.c interior w alls 0 lf 0.211 0 0 13.90$        -$               5.10$          -$                
70 3 5/8" studs on ceiling 16" oc open area 0 lf 0.381 0 0 39.00$        -$               22.00$        -$                
70 3 5/8" studs on ceiling 16" oc office room 0 lf 0.381 0 0 39.00$        -$               22.00$        -$                
76 handrails (steel, 2 rail primed 1-1/4" dia.) 0 lf 0.2 0 0 22.00$        -$               10.45$        -$                
Repair damaged framing 0 ls 0 0 -$           -$               -$                
66 Steel angle 4'6" long 0 ea 0.308 0 0 26.00$        -$               12.40$        -$                
75 cold-formed roof framing soffit 0 lf 0.2 0 0 1.74$          -$               1.58$          -$                
0 0 0 -$               -$                
0 0 0 -$               -$                
6 0 0 0 -$               -$                
Coordination and Communication
Leads to Sucessful Projects
6
…………….How does Estimating & Bidding Work ?
…. and do I need it……………YES YOU DO….. !
…from the priced floor plan other cost are added completing the
overall budget….
…quotes are requested from qualified contractor(s) ….
…contractor bids are received and reviewed….
….bids from Contractors are compared to the budget …..
… selected contractor(s) are approved by insurance and license
verification…………..
………. For protection and verification
COST: Included by percentage in STEP 4 7
EAGA Step - 3EAGA Step - 3
1. Contract Management
Contracting methods
Owner and Construction Manager
Owner as General Contractor
Owner and Subcontractor
  
Coordination and Communication
Leads to Sucessful Projects
8
………How does Contract Management work
…. and do I need it……………YES YOU DO….. !
…contracts are prepared between you and the contractor….
…contracts are reviewed for compliance with the budget ….
…contracts are reviewed for understanding of the work to be
completed….
….contracts are reviewed for method of payment…..
………. For piece of mind
COST: 7% of the projected construction cost ( includes steps 1,2,3 & 5) 9
EAGA Step - 4EAGA Step - 4
1. Construction Management (CM)
Production methods
Overall Delivery Schedule
Long Lead Purchase Agreements
Cost Tracking
Certificates of Payment for work in Place
Regulated Inspections
Warranty Program
Lawful Use
  
Coordination and Communication Leads to Successful Projects 10
………How does CM work
…. and do I need it……………YES YOU DO….. !
… CM schedules and coordinates the contract work and identifies
potential conflicts….
….CM monitors long lead purchases avoids shipping delays for
critical installations..….
…CM tracks cost, reviews and substantiates change orders to
control cost……
… CM verifies contractor invoices and verifies amounts for payment
compared to work completed …
….CM protects the owner from over payment…….…..
………. For production controls
COST: Included by percentage in STEP 4 11
EAGA Step - 5EAGA Step - 5
1. Close out and Occupancy Management
Close out methods
Final Inspections
Final Commissioning
Final Occupancy Certificate Issuance
30 Day Warranty Period
330 Day Warranty Period
Final Contractor Release 1 year
  
12
Benefits & ApplicationsBenefits & Applications
 Benefits
 Pricing for the Application,
 Owner Protection
 Contractor Verification
 Production Controls
 Piece of Mind
 Applications
Residential Projects
Renovations/ Rehabs
Commercial Projects
Fit-outs/Conversions
Daycare Centers
Churches
Charter Schools
13
www.eagodboltcm.com
A better solution to investing
 EAGA Company, LLC Real Estate and Development
 Philadelphia, Pennsylvania
 Architectural & Interior Designers
 Construction Managers
 Licensed Realtors
 Notary Publics
 215-395-6220 office, 215-399-0946 fax,
egodbolt@eagodboltcm.com
A Multi-Disciplined
Management Approach
EAGA Company, LLcEAGA Company, LLc
Real Estate and Development Sample Project GalleryReal Estate and Development Sample Project Gallery
20102010
Project progress photos for 26th
Street Commons.
EAGA Company LLc, manages project development protocols
including; architectural design, construction, sales and maintenance
services on mid to large scale building projects for a client base of
investors, homeowners and developers. Our consulting service
manages the project from discovery and acquisition of the property
through the completion of construction or renovation. We
coordinate the development of the entire project.
Our services are licensed and insured. Contact: 215-395-6220
EAGA Company, LLcEAGA Company, LLc
Real Estate and Development Sample Project GalleryReal Estate and Development Sample Project Gallery
20102010
 Discovery
 Acquisition
 Closing
 Construction
 Property Management
Project progress photos for 26th
Street Commons.
EAGA Company, LLcEAGA Company, LLc
  Real Estate and Development Sample Project GalleryReal Estate and Development Sample Project Gallery
20102010
 Building Assessment
 Electrical Assessment
 Thermo Assessment
 Supply Lines Assessment
 Elevations and Floor Level
Assessment
 Before/After
Project progress photos for 26th
Street Commons.
EAGA Company, LLcEAGA Company, LLc
Real Estate and Development Sample Project GalleryReal Estate and Development Sample Project Gallery
20102010
 Building Assessment
 Electrical Assessment
 Supply Lines Assessment
 Elevations and Floor Level
Assessment
 Before /After
Project progress photos for 26th
Street Commons.
EAGA Company, LLcEAGA Company, LLc
Real Estate and Development Sample Project GalleryReal Estate and Development Sample Project Gallery
20102010
 Existing Conditions
 First Floor Front
 Before /After
Project progress photos for 26th
Street Commons.
EAGA Company, LLcEAGA Company, LLc
Real Estate and Development Sample Project GalleryReal Estate and Development Sample Project Gallery
20102010
 First Floor Full Bathroom
 Fixture Assessment
 Re-Design Assessment
 Preliminary Cost Assessment
Project progress photos for 26th
Street Commons.
Before /After
EAGA Company, LLcEAGA Company, LLc
Real Estate and Development Sample Project GalleryReal Estate and Development Sample Project Gallery
20102010
 Second Floor Rear
 Existing Condition
 Electrical Assessment
 Supply Lines Assessment
 Elevations and Floor Level
Assessment
 Before/After
Project progress photos for 26th
Street Commons.
EAGA Company, LLcEAGA Company, LLc
Real Estate and Development Sample Project GalleryReal Estate and Development Sample Project Gallery
20102010
 Second Floor Front
 Existing Condition
 Electrical Assessment
 Supply Lines Assessment
 Elevations and Floor Level
Assessment
 Before/After
Project progress photos for 26th
Street Commons.
EAGA Company, LLcEAGA Company, LLc
Real Estate and Development Sample Project GalleryReal Estate and Development Sample Project Gallery
20102010
 Second Floor Hall
 Existing Condition
 Before/After
Project progress photos for 26th
Street Commons.
EAGA Company, LLcEAGA Company, LLc
Real Estate and Development Sample Project GalleryReal Estate and Development Sample Project Gallery
20102010
 Main Entry Foyer
Wainscoating
 Add Poly Finish
 Before/After
Project progress photos for 26th
Street Commons.
EAGA Company, LLcEAGA Company, LLc
Real Estate and Development Sample Project GalleryReal Estate and Development Sample Project Gallery
20102010
 New Roofing Membrane
 Before/After
Project progress photos for 26th
Street Commons.
EAGA Company, LLcEAGA Company, LLc
Real Estate and Development Sample Project GalleryReal Estate and Development Sample Project Gallery
20102010
 Second Floor Full
Bathroom Existing
Condition
 Before/After
Project progress photos for 26th
Street Commons.
EAGA Company, LLcEAGA Company, LLc
Real Estate and Development Sample Project GalleryReal Estate and Development Sample Project Gallery
20102010
 Third Floor Landing
 Existing Condition
 Before/After
Project progress photos for 26th
Street Commons.
EAGA Company, LLcEAGA Company, LLc
Real Estate and Development Sample Project GalleryReal Estate and Development Sample Project Gallery
20102010
 Third Floor Rear
 Existing Condition
 Before/After
Project progress photos for 26th
Street Commons.
EAGA Company, LLcEAGA Company, LLc
Real Estate and Development Sample Project GalleryReal Estate and Development Sample Project Gallery
20102010
 First Floor Unit
 Existing Condition
 Before/After
Project progress photos for 26th
Street Commons.
EAGA Company, LLcEAGA Company, LLc
Real Estate and Development Sample Project GalleryReal Estate and Development Sample Project Gallery
20102010
 Third Floor Electrical
Raceway & Wiring
Project progress photos for 26th
Street Commons.
EAGA Company, LLcEAGA Company, LLc
Real Estate and Development Sample Project GalleryReal Estate and Development Sample Project Gallery
20102010
 First floor bathroom
Project progress photos for 26th
Street Commons.
EAGA Company, LLcEAGA Company, LLc
Real Estate and Development Sample Project GalleryReal Estate and Development Sample Project Gallery
20102010
First Floor Entry Hall
Before/After
Project progress photos for 26th
Street Commons.
EAGA Company, LLcEAGA Company, LLc
Real Estate and Development Sample Project GalleryReal Estate and Development Sample Project Gallery
20102010
 First Floor Front Unit
Project progress photos for 26th
Street Commons.
EAGA Company, LLcEAGA Company, LLc
Real Estate and Development Sample Project GalleryReal Estate and Development Sample Project Gallery
20102010
Project progress photos for 26th
Street Commons.
EAGA Company, LLcEAGA Company, LLc
Real Estate and Development Sample Project GalleryReal Estate and Development Sample Project Gallery
20102010
The projects in this Gallery were designed, coordinated, managed,
supervised and installed by Eric Godbolt and subcontractors of EAGA
Company, LL C, a real estate and development consulting firm.
EAGA procures and manages architectural design, construction, sales and
maintenance services on mid to large scale building projects. Our
consulting fee is a percentage of the total development cost and GMP
(Gross Maximum Price) for construction inclusive an hourly rate for on site
construction administration and supervision.
Our services are licensed and insured. Contact: 215-395-6220

More Related Content

Similar to Eaga red 1711-02

26th Street Development
26th Street Development26th Street Development
Greg Labbe: quality control issues in housing construction
Greg Labbe: quality control issues in housing constructionGreg Labbe: quality control issues in housing construction
Greg Labbe: quality control issues in housing construction
jeff_ranson
 
RSM DESIGN SOLUTIONS
RSM DESIGN SOLUTIONSRSM DESIGN SOLUTIONS
RSM DESIGN SOLUTIONS
Rakesh Morudkar
 
Simulations Partners w-Addendum.pdf
Simulations Partners w-Addendum.pdfSimulations Partners w-Addendum.pdf
Simulations Partners w-Addendum.pdf
Brij Consulting, LLC
 
Innovation technique in construction
Innovation technique in constructionInnovation technique in construction
Innovation technique in construction
School of Planning and Architecture, new delhi
 
Brushless dc motor
Brushless dc motorBrushless dc motor
Brushless dc motor
aroosa khan
 
QM-009-Design for Six Sigma 2
QM-009-Design for Six Sigma 2QM-009-Design for Six Sigma 2
QM-009-Design for Six Sigma 2handbook
 
Measurement 4 presentation
Measurement 4 presentationMeasurement 4 presentation
Measurement 4 presentation
Lin Hui
 
OGCS_Global_Brochure 2016
OGCS_Global_Brochure 2016OGCS_Global_Brochure 2016
OGCS_Global_Brochure 2016OGCS Global
 
Simulations Partners.pdf
Simulations Partners.pdfSimulations Partners.pdf
Simulations Partners.pdf
Brij Consulting, LLC
 
Architecture And Construction Services Proposal PowerPoint Presentation Slides
Architecture And Construction Services Proposal PowerPoint Presentation SlidesArchitecture And Construction Services Proposal PowerPoint Presentation Slides
Architecture And Construction Services Proposal PowerPoint Presentation Slides
SlideTeam
 
Project Management: New Product Development for Amazon Ceramic Industries
Project Management: New Product Development for Amazon Ceramic IndustriesProject Management: New Product Development for Amazon Ceramic Industries
Project Management: New Product Development for Amazon Ceramic IndustriesYee Jie NG
 
Project Planning Organising Tracking Construction
Project Planning Organising Tracking  ConstructionProject Planning Organising Tracking  Construction
Project Planning Organising Tracking Construction
David H Moloney
 
Billgren - Product Summit Speed Layers v12.pdf
Billgren - Product Summit Speed Layers v12.pdfBillgren - Product Summit Speed Layers v12.pdf
Billgren - Product Summit Speed Layers v12.pdf
ISPMAIndia
 
Fififinalnal
FififinalnalFififinalnal
Fififinalnal
Lai Vlyn
 
Deal Review PowerPoint Presentation Slides
Deal Review PowerPoint Presentation SlidesDeal Review PowerPoint Presentation Slides
Deal Review PowerPoint Presentation Slides
SlideTeam
 
Design of Mechanical Tire-Rim Separator-1.pdf
Design of Mechanical Tire-Rim Separator-1.pdfDesign of Mechanical Tire-Rim Separator-1.pdf
Design of Mechanical Tire-Rim Separator-1.pdf
abelaxoo046
 
Executive profile and capability portfolio. updated 290616
Executive profile and capability portfolio. updated 290616Executive profile and capability portfolio. updated 290616
Executive profile and capability portfolio. updated 290616
Thành Đức Nguyễn
 

Similar to Eaga red 1711-02 (20)

26th Street Development
26th Street Development26th Street Development
26th Street Development
 
Greg Labbe: quality control issues in housing construction
Greg Labbe: quality control issues in housing constructionGreg Labbe: quality control issues in housing construction
Greg Labbe: quality control issues in housing construction
 
RSM DESIGN SOLUTIONS
RSM DESIGN SOLUTIONSRSM DESIGN SOLUTIONS
RSM DESIGN SOLUTIONS
 
Essentialsof Project Management
Essentialsof Project ManagementEssentialsof Project Management
Essentialsof Project Management
 
Simulations Partners w-Addendum.pdf
Simulations Partners w-Addendum.pdfSimulations Partners w-Addendum.pdf
Simulations Partners w-Addendum.pdf
 
Innovation technique in construction
Innovation technique in constructionInnovation technique in construction
Innovation technique in construction
 
Brushless dc motor
Brushless dc motorBrushless dc motor
Brushless dc motor
 
QM-009-Design for Six Sigma 2
QM-009-Design for Six Sigma 2QM-009-Design for Six Sigma 2
QM-009-Design for Six Sigma 2
 
Measurement 4 presentation
Measurement 4 presentationMeasurement 4 presentation
Measurement 4 presentation
 
OGCS_Global_Brochure 2016
OGCS_Global_Brochure 2016OGCS_Global_Brochure 2016
OGCS_Global_Brochure 2016
 
Simulations Partners.pdf
Simulations Partners.pdfSimulations Partners.pdf
Simulations Partners.pdf
 
Architecture And Construction Services Proposal PowerPoint Presentation Slides
Architecture And Construction Services Proposal PowerPoint Presentation SlidesArchitecture And Construction Services Proposal PowerPoint Presentation Slides
Architecture And Construction Services Proposal PowerPoint Presentation Slides
 
Project Management: New Product Development for Amazon Ceramic Industries
Project Management: New Product Development for Amazon Ceramic IndustriesProject Management: New Product Development for Amazon Ceramic Industries
Project Management: New Product Development for Amazon Ceramic Industries
 
Project Planning Organising Tracking Construction
Project Planning Organising Tracking  ConstructionProject Planning Organising Tracking  Construction
Project Planning Organising Tracking Construction
 
Billgren - Product Summit Speed Layers v12.pdf
Billgren - Product Summit Speed Layers v12.pdfBillgren - Product Summit Speed Layers v12.pdf
Billgren - Product Summit Speed Layers v12.pdf
 
Final Review
Final ReviewFinal Review
Final Review
 
Fififinalnal
FififinalnalFififinalnal
Fififinalnal
 
Deal Review PowerPoint Presentation Slides
Deal Review PowerPoint Presentation SlidesDeal Review PowerPoint Presentation Slides
Deal Review PowerPoint Presentation Slides
 
Design of Mechanical Tire-Rim Separator-1.pdf
Design of Mechanical Tire-Rim Separator-1.pdfDesign of Mechanical Tire-Rim Separator-1.pdf
Design of Mechanical Tire-Rim Separator-1.pdf
 
Executive profile and capability portfolio. updated 290616
Executive profile and capability portfolio. updated 290616Executive profile and capability portfolio. updated 290616
Executive profile and capability portfolio. updated 290616
 

Recently uploaded

Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
marketingjdass
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Arihant Webtech Pvt. Ltd
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
tjcomstrang
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
NathanBaughman3
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
KaiNexus
 
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdfDigital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
Jos Voskuil
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
RajPriye
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
dylandmeas
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
Workforce Group
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
awaisafdar
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
taqyed
 
Role of Remote Sensing and Monitoring in Mining
Role of Remote Sensing and Monitoring in MiningRole of Remote Sensing and Monitoring in Mining
Role of Remote Sensing and Monitoring in Mining
Naaraayani Minerals Pvt.Ltd
 
Lookback Analysis
Lookback AnalysisLookback Analysis
Lookback Analysis
Safe PaaS
 
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptxTaurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
my Pandit
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
ofm712785
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
seri bangash
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
zoyaansari11365
 
Global Interconnection Group Joint Venture[960] (1).pdf
Global Interconnection Group Joint Venture[960] (1).pdfGlobal Interconnection Group Joint Venture[960] (1).pdf
Global Interconnection Group Joint Venture[960] (1).pdf
Henry Tapper
 

Recently uploaded (20)

Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
 
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdfDigital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
 
Role of Remote Sensing and Monitoring in Mining
Role of Remote Sensing and Monitoring in MiningRole of Remote Sensing and Monitoring in Mining
Role of Remote Sensing and Monitoring in Mining
 
Lookback Analysis
Lookback AnalysisLookback Analysis
Lookback Analysis
 
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptxTaurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
 
Global Interconnection Group Joint Venture[960] (1).pdf
Global Interconnection Group Joint Venture[960] (1).pdfGlobal Interconnection Group Joint Venture[960] (1).pdf
Global Interconnection Group Joint Venture[960] (1).pdf
 

Eaga red 1711-02

  • 1. COST: No charge initial consultations 1 EAGA Company, LLcEAGA Company, LLc Real Estate and DevelopmentReal Estate and Development • Looking for a resource to develop real estate investment property? •Looking for a comprehensive development solution? •Concerned with contractor performance? •Concerned with falling behind schedule? If you answered “YES” to any of these questions, We are the company for you. EAGA provides a “NOT ANY MORE” answer to the these questions. Contact Us Today For a Free Consultation 215-395-6220 office 215-399-0946 fax egodbolt@eagodboltcm.com email
  • 2. Coordination and Communication Lead to Successful Projects 2 EAGA Company, LLcEAGA Company, LLc Real Estate and DevelopmentReal Estate and Development  Five Steps to Project Development Successful Projects Share These Common Components. Plan To Succeed. 1. Design Management 2. Estimating & Bidding Management 3. Contract Management 4. Construction/Production Management 5. Close Out/Occupancy Management
  • 3. COST: $ 1,000 – $ 3,000 average ( $1 - $1.10/ sf on avg.) 3 EAGA Step - 1EAGA Step - 1 Design Management. Existing Floor Plans Preliminary Design Floor Plans Municipal Submissions Zoning/Building Submissions Final Construction Drawings and Permit Sets Small Projects Interiors Layouts: Bathrooms, Kitchens
  • 4. Coordination and Communication Leads to Successful Projects 4 …………How does Design Management work . and do I need it……………YES YOU DO….. ! ….it begins with an inch by inch survey of the property………. …. drawings of existing conditions are prepared…… ..... Owner ideas for new walls, fixtures and appliances are incorporated into the plans…. …..a materials count for doors, windows and finishes is done …. …. the final plans are priced for materials and labor ready for bidding… The floor plans are also ready for zoning and building permit applications……… ………. For pricing and application
  • 5. COST: Included by percentage in STEP 4 5 EAGA Step - 2EAGA Step - 2 1. Estimating & Bidding Management Three estimating methods Itemized estimating Assembly estimating Quantity estimating Three bidding methods Qualifying Application on File Insurance Verification License Verification    CSI Labor  Total Total O&P Estimate Material M aterial DIVISION Page Description QTY Units Hours Hours Days Price Item Cost Cost Only Only Price 1 2 24 remove plaster, on gypsum lath 0 ea 0 0.4 0 0 11.5 -$               -$                 25 Remove interior debris 0 sf 0.089 0 0 4.14 -$               -$                 25 Clean all debris from rear of building 0 sf 0.089 0 0 4.14 -$               -$                 Supply dumpsters 0 ea 0 0 708 -$               -$                 23 Remove concrete plain 4" 0 sy 0.15 0 0 6.15 -$               -$                 33 Replace concrete 3000psi 4" thick 0 sf 0.04 0 0 2.71 -$               1.21 -$                 32 curb 0 lf 0.148 0 0 16.2 -$               8 -$                 39 landscaping 0 sf 1.818 0 0 298 -$               217 -$                 34 fencing chain link 6' high  0 lf 0.209 0 0 14.45 -$               7.45 -$                 0 0 0 -$               -$                 3 0 0 0 -$               -$                 46-47 proch deck (concrete) 0 sf 0 0 -$               -$                 48 STEPS concrete(  ) 0 ea 0 0 -$               -$                 48 concrete finishing floors 0 sf 0.017 0 0 14.8 -$               12.9 -$                 33 4" coc. Sidew alk Broom finish 21712 0.04 868.48 108.56 2.71 58,839.52$    1.21 26,271.52$       33 4" gravel base 21712 0.01 217.12 27.14 0.74 16,066.88$    0.39 8,467.68$         44 steel curb forms 6"-12" high 1758 0.116 203.928 25.491 4.53 7,963.74$      0.53 931.74$            32 6" curb concrete 1758 0.096 168.768 21.096 5.9 10,372.20$    2.1 3,691.80$         33 belgiun block curb (material only) 101 ton 0 0 97 9,797.00$      -$                 32 place belgiun block  2236 0.107 239.252 29.9065 5.4 12,074.40$    1.54 3,443.44$         33 6" drivew ay concrete 32800 sf 0.047 1541.6 192.7 3.69 121,032.00$  1.88 61,664.00$       47 w w f 6x6x10x10 21712 0.005 108.56 13.57 0.28 6,079.36$      0.07 1,519.84$           0 0 0 -$               -$                 4 56 8" cmu partitions no reinforcing 0 sf 0.104 0 0 5.75 -$               1.86 -$                 8"x8' glass block 0 sf 0.25 0 0 18.45 -$               8.65 -$                 0 0 0 -$               -$                 0 0 0 -$               -$                 56 8x8x8 concrete block lintel 0 lf 0.133 0 0 8.56 -$               3.57 -$                 59 repoint mask & grout method 0 sf 0.084 0 0 3.75 -$               0.35 -$                 58 brow nstone repair 0 sf 0.4 0 0 38 -$               16.65 -$                 54 rebuild w all (brick veneer or adobe brick) 0 sf 0 0 -$               -$                 0 0 0 -$               -$                 0 0 0 -$               -$                 5 0 0 0 -$               -$                 68 3 5/8" studs on w alls 16" o.c interior w alls 0 lf 0.211 0 0 13.90$        -$               5.10$          -$                 70 3 5/8" studs on ceiling 16" oc open area 0 lf 0.381 0 0 39.00$        -$               22.00$        -$                 70 3 5/8" studs on ceiling 16" oc office room 0 lf 0.381 0 0 39.00$        -$               22.00$        -$                 76 handrails (steel, 2 rail primed 1-1/4" dia.) 0 lf 0.2 0 0 22.00$        -$               10.45$        -$                 Repair damaged framing 0 ls 0 0 -$           -$               -$                 66 Steel angle 4'6" long 0 ea 0.308 0 0 26.00$        -$               12.40$        -$                 75 cold-formed roof framing soffit 0 lf 0.2 0 0 1.74$          -$               1.58$          -$                 0 0 0 -$               -$                 0 0 0 -$               -$                 6 0 0 0 -$               -$                
  • 6. Coordination and Communication Leads to Sucessful Projects 6 …………….How does Estimating & Bidding Work ? …. and do I need it……………YES YOU DO….. ! …from the priced floor plan other cost are added completing the overall budget…. …quotes are requested from qualified contractor(s) …. …contractor bids are received and reviewed…. ….bids from Contractors are compared to the budget ….. … selected contractor(s) are approved by insurance and license verification………….. ………. For protection and verification
  • 7. COST: Included by percentage in STEP 4 7 EAGA Step - 3EAGA Step - 3 1. Contract Management Contracting methods Owner and Construction Manager Owner as General Contractor Owner and Subcontractor   
  • 8. Coordination and Communication Leads to Sucessful Projects 8 ………How does Contract Management work …. and do I need it……………YES YOU DO….. ! …contracts are prepared between you and the contractor…. …contracts are reviewed for compliance with the budget …. …contracts are reviewed for understanding of the work to be completed…. ….contracts are reviewed for method of payment….. ………. For piece of mind
  • 9. COST: 7% of the projected construction cost ( includes steps 1,2,3 & 5) 9 EAGA Step - 4EAGA Step - 4 1. Construction Management (CM) Production methods Overall Delivery Schedule Long Lead Purchase Agreements Cost Tracking Certificates of Payment for work in Place Regulated Inspections Warranty Program Lawful Use   
  • 10. Coordination and Communication Leads to Successful Projects 10 ………How does CM work …. and do I need it……………YES YOU DO….. ! … CM schedules and coordinates the contract work and identifies potential conflicts…. ….CM monitors long lead purchases avoids shipping delays for critical installations..…. …CM tracks cost, reviews and substantiates change orders to control cost…… … CM verifies contractor invoices and verifies amounts for payment compared to work completed … ….CM protects the owner from over payment…….….. ………. For production controls
  • 11. COST: Included by percentage in STEP 4 11 EAGA Step - 5EAGA Step - 5 1. Close out and Occupancy Management Close out methods Final Inspections Final Commissioning Final Occupancy Certificate Issuance 30 Day Warranty Period 330 Day Warranty Period Final Contractor Release 1 year   
  • 12. 12 Benefits & ApplicationsBenefits & Applications  Benefits  Pricing for the Application,  Owner Protection  Contractor Verification  Production Controls  Piece of Mind  Applications Residential Projects Renovations/ Rehabs Commercial Projects Fit-outs/Conversions Daycare Centers Churches Charter Schools
  • 13. 13 www.eagodboltcm.com A better solution to investing  EAGA Company, LLC Real Estate and Development  Philadelphia, Pennsylvania  Architectural & Interior Designers  Construction Managers  Licensed Realtors  Notary Publics  215-395-6220 office, 215-399-0946 fax, egodbolt@eagodboltcm.com A Multi-Disciplined Management Approach
  • 14. EAGA Company, LLcEAGA Company, LLc Real Estate and Development Sample Project GalleryReal Estate and Development Sample Project Gallery 20102010 Project progress photos for 26th Street Commons. EAGA Company LLc, manages project development protocols including; architectural design, construction, sales and maintenance services on mid to large scale building projects for a client base of investors, homeowners and developers. Our consulting service manages the project from discovery and acquisition of the property through the completion of construction or renovation. We coordinate the development of the entire project. Our services are licensed and insured. Contact: 215-395-6220
  • 15. EAGA Company, LLcEAGA Company, LLc Real Estate and Development Sample Project GalleryReal Estate and Development Sample Project Gallery 20102010  Discovery  Acquisition  Closing  Construction  Property Management Project progress photos for 26th Street Commons.
  • 16. EAGA Company, LLcEAGA Company, LLc   Real Estate and Development Sample Project GalleryReal Estate and Development Sample Project Gallery 20102010  Building Assessment  Electrical Assessment  Thermo Assessment  Supply Lines Assessment  Elevations and Floor Level Assessment  Before/After Project progress photos for 26th Street Commons.
  • 17. EAGA Company, LLcEAGA Company, LLc Real Estate and Development Sample Project GalleryReal Estate and Development Sample Project Gallery 20102010  Building Assessment  Electrical Assessment  Supply Lines Assessment  Elevations and Floor Level Assessment  Before /After Project progress photos for 26th Street Commons.
  • 18. EAGA Company, LLcEAGA Company, LLc Real Estate and Development Sample Project GalleryReal Estate and Development Sample Project Gallery 20102010  Existing Conditions  First Floor Front  Before /After Project progress photos for 26th Street Commons.
  • 19. EAGA Company, LLcEAGA Company, LLc Real Estate and Development Sample Project GalleryReal Estate and Development Sample Project Gallery 20102010  First Floor Full Bathroom  Fixture Assessment  Re-Design Assessment  Preliminary Cost Assessment Project progress photos for 26th Street Commons. Before /After
  • 20. EAGA Company, LLcEAGA Company, LLc Real Estate and Development Sample Project GalleryReal Estate and Development Sample Project Gallery 20102010  Second Floor Rear  Existing Condition  Electrical Assessment  Supply Lines Assessment  Elevations and Floor Level Assessment  Before/After Project progress photos for 26th Street Commons.
  • 21. EAGA Company, LLcEAGA Company, LLc Real Estate and Development Sample Project GalleryReal Estate and Development Sample Project Gallery 20102010  Second Floor Front  Existing Condition  Electrical Assessment  Supply Lines Assessment  Elevations and Floor Level Assessment  Before/After Project progress photos for 26th Street Commons.
  • 22. EAGA Company, LLcEAGA Company, LLc Real Estate and Development Sample Project GalleryReal Estate and Development Sample Project Gallery 20102010  Second Floor Hall  Existing Condition  Before/After Project progress photos for 26th Street Commons.
  • 23. EAGA Company, LLcEAGA Company, LLc Real Estate and Development Sample Project GalleryReal Estate and Development Sample Project Gallery 20102010  Main Entry Foyer Wainscoating  Add Poly Finish  Before/After Project progress photos for 26th Street Commons.
  • 24. EAGA Company, LLcEAGA Company, LLc Real Estate and Development Sample Project GalleryReal Estate and Development Sample Project Gallery 20102010  New Roofing Membrane  Before/After Project progress photos for 26th Street Commons.
  • 25. EAGA Company, LLcEAGA Company, LLc Real Estate and Development Sample Project GalleryReal Estate and Development Sample Project Gallery 20102010  Second Floor Full Bathroom Existing Condition  Before/After Project progress photos for 26th Street Commons.
  • 26. EAGA Company, LLcEAGA Company, LLc Real Estate and Development Sample Project GalleryReal Estate and Development Sample Project Gallery 20102010  Third Floor Landing  Existing Condition  Before/After Project progress photos for 26th Street Commons.
  • 27. EAGA Company, LLcEAGA Company, LLc Real Estate and Development Sample Project GalleryReal Estate and Development Sample Project Gallery 20102010  Third Floor Rear  Existing Condition  Before/After Project progress photos for 26th Street Commons.
  • 28. EAGA Company, LLcEAGA Company, LLc Real Estate and Development Sample Project GalleryReal Estate and Development Sample Project Gallery 20102010  First Floor Unit  Existing Condition  Before/After Project progress photos for 26th Street Commons.
  • 29. EAGA Company, LLcEAGA Company, LLc Real Estate and Development Sample Project GalleryReal Estate and Development Sample Project Gallery 20102010  Third Floor Electrical Raceway & Wiring Project progress photos for 26th Street Commons.
  • 30. EAGA Company, LLcEAGA Company, LLc Real Estate and Development Sample Project GalleryReal Estate and Development Sample Project Gallery 20102010  First floor bathroom Project progress photos for 26th Street Commons.
  • 31. EAGA Company, LLcEAGA Company, LLc Real Estate and Development Sample Project GalleryReal Estate and Development Sample Project Gallery 20102010 First Floor Entry Hall Before/After Project progress photos for 26th Street Commons.
  • 32. EAGA Company, LLcEAGA Company, LLc Real Estate and Development Sample Project GalleryReal Estate and Development Sample Project Gallery 20102010  First Floor Front Unit Project progress photos for 26th Street Commons.
  • 33. EAGA Company, LLcEAGA Company, LLc Real Estate and Development Sample Project GalleryReal Estate and Development Sample Project Gallery 20102010 Project progress photos for 26th Street Commons.
  • 34. EAGA Company, LLcEAGA Company, LLc Real Estate and Development Sample Project GalleryReal Estate and Development Sample Project Gallery 20102010 The projects in this Gallery were designed, coordinated, managed, supervised and installed by Eric Godbolt and subcontractors of EAGA Company, LL C, a real estate and development consulting firm. EAGA procures and manages architectural design, construction, sales and maintenance services on mid to large scale building projects. Our consulting fee is a percentage of the total development cost and GMP (Gross Maximum Price) for construction inclusive an hourly rate for on site construction administration and supervision. Our services are licensed and insured. Contact: 215-395-6220

Editor's Notes

  1. Existing 90’s kitchen with mirrored back splash
  2. Existing 90’s kitchen with mirrored back splash
  3. Existing 90’s kitchen with mirrored back splash
  4. Existing 90’s kitchen with mirrored back splash
  5. Existing 90’s kitchen with mirrored back splash
  6. Existing 90’s kitchen with mirrored back splash
  7. Existing 90’s kitchen with mirrored back splash
  8. Existing 90’s kitchen with mirrored back splash
  9. Existing 90’s kitchen with mirrored back splash
  10. Existing 90’s kitchen with mirrored back splash
  11. Existing 90’s kitchen with mirrored back splash
  12. Existing 90’s kitchen with mirrored back splash
  13. Existing 90’s kitchen with mirrored back splash
  14. Existing 90’s kitchen with mirrored back splash
  15. Existing 90’s kitchen with mirrored back splash
  16. Existing 90’s kitchen with mirrored back splash
  17. Existing 90’s kitchen with mirrored back splash
  18. Existing 90’s kitchen with mirrored back splash
  19. Existing 90’s kitchen with mirrored back splash
  20. Existing 90’s kitchen with mirrored back splash
  21. Existing 90’s kitchen with mirrored back splash