SlideShare a Scribd company logo
1 of 36
Download to read offline
The Djibouti Geothermal Project
Building 50MW geothermal power plant
2
 European Union will build the
transmission line from the power plant
to the grid.
 The Power Plant influence could be:
 Boost the country´s economy.
 Solution to Djibouti´s electricity scarcity.
 First nation to provide high percentage
of supply with a green electricity from
geothermal source.
 Regarded by other African countries as a
showcase for harnessing geothermal
energy.
 Train local people to become skilled
worker.
 Possible to contribute to the majority of
the UN Millennium Development Goals.
 Exclusive license 2007 for geothermal
utilization in the Assal Rift
 Head of Terms contracts for PA and
PPA signed in Djibouti April 2008.
 Joint Development Agreement
between REI and IFC June 2008.
 Initial stage 50 MW – possible
extension to 150 MW later.
 Project cost estimated 170 million
USD
 Pre-feasibility study completed
 Exploratory drilling now prepared
 Estimated cost is 30 million USD
 Electricity production expected to start
2014
Geothermal Power Plant in Assal area
2
3
About Djibouti
Facts about Djibouti
 French colony until 1977 – French Somaliland -
Djibouti
 GDP per capita: 1,200 USD and foreign
assistance
 Population ~800,000 and > 50% unemployment
 Desert land 22,000 km2 and most food
imported
 Access to water and electricity limits growth
 Electricity prices one of the highest in Africa
 Lack of infrastructure
 Strategic location and free trade zone
 Stands out to have stability and neutrality
 Ethiopia’s main hub for imports and exports
 French and USA army
 Previous drilling in Assal proved the
geothermal resource (360°C)
 The distance between Djibouti city and
the geothermal area in Assal is 100 km
 European Union will finance and build
the transmission line from the power
plant to the grid
 Transmission line to Ethiopia is under
construction
 The Port: Transhipment port for Asia,
Africa and Europe
4
5
 The port: DP World is rehabilitating the main port for 400 million USD
which serves as a transshipment port for Asia, Africa and Europe.
 Oil port for Djibouti and Ethiopia.
 Military bases: French, American and German. The US has plans to build a
large permanent base there (potentially the largest US base in Africa and
the middle-east).
 International Airport operated by DP World.
 Government operations: Administration, hospitals, schools, etc.
 Salt Investment (expected to export 4 million tons of salt per year). Their
development is in the same area as the potential power plant.
 Real estate development.
 Parallel to recent development in Djibouti various contractor and service
companies have been formed.
Activites in Djibouti
5
6
 Sector Context:
 Integrated monopoly supplier (EDD)
 No regulator
 Essentially no transmission outside Djibouti City
 Tariff range (mid 2008) 28 to 35 cents/kWh
 Ethiopia-Djibouti interconnection powerline under construction
 Existing Supply:
 EDD has 50 - 60 MW capacity
 Existing capacity is exclusively HFO/diesel
 Plant is on average 20 years old
Djibouti’s Power Sector
6
Assal Area
7
 The geothermal plant in
Djibouti will be located in the
Assal Area.
 From 1975 to 1988 studies of
the area were conducted. They
proved that there is a heat
source (350°C) in the area and
that the fluids are highly saline.
 Since then technology has been
developed that is able to cope
with the salinity of the fluid.
 A geothermal power plant in
Iceland has applied that
technology in an area that is
geologically similar to the Assal
Area.
Sea
Fiale
Lake Assal
8
The Presidents of Iceland and Djibouti, the Mayor of
Reykjavik and the Chairman of the Board of RE
8
9
Technical issues
10
Project Phases
 Phase I 2007-2008 - Pre-feasibility study - Completed
 Surface exploration and negotiation of contracts for harvesting the
geothermal energy
 Phase II 2008-2011 - Feasibility study
 Drilling of exploration wells and finalizing contracts
 Phase III 2011-2014
 Construction of the power plant.
 Phase IV 2014
 Operation of the power plant over 20 years plus 10-20 years
10
Phase I 2007-2008
Pre-Feasibility Study - Completed
11
1. Evaluation of previous study
2. Surface exploration
3. Negotiation of contracts
4. Environmental management plan
5. Pre-feasibility study report
Equipment from former drilling
• Geology
– bed rock*
– Volcanology*
– Tectonic*
– groundwater
• Geophysics
– Resistivity*
– magnetic
– soil temperature
– gravity
– seismisity
• Geochemistry
– origin of water
– geothermometry
– mixing of water types
– flow directions
– extent of an area
– exploitation characteristics
• Environment*
• Model of geothermal field*
*research done by the current project, in addition to previous study, to complete the surface exploration
12
Phase I 2007-2008
Best Practice in Surface Exploration
Phase I 2007-2008
Geochemistry
13
 Ground water in the area is seawater, geothermal fluid is highly saline.
 The main challenge with the fluid is scaling problems and surface corrosion
when brine comes in contact with oxygen.
 Geothermal power plants around the world are encountering and using
saline geothermal fluids.
 To counter act with the scaling and corrosion:
 Current tariff calculation accounts for higher operation cost and shorter well life
than in fresh water reservoirs (4% per year of construction cost).
 Using of wellhead pressures exceeding 20 bars.
 Drilling strategies from Icelandic projects; e.g. large diameter, directional wells.
 Separation facilities designed to minimize scaling deposition in well.
Phase I 2007-2008
Finding of the Environmental Study
 Area of interest is
within the Lava Lake.
 Physical activities will
be outside the Lava
Lake.
 Drilling targets will be
reached by directional
drilling.
14
Lava Lake
Picture: Aerial photograph of Fiale area
Phase I 2007-2008
Findings of the Study
15
 Of the three identified up flow
zones the Fiale area is considered
most attractive for development
 The research indicates that the
chemistry of the Fiale area is more
benign than at the old well field
 Well sites have been chosen to
reach specific drilling target
identified by the first conceptual
model
16
 The pre-feasibility study is complete.
 Of the three identified up flow zones the Fiale area is considered most
attractive for development
 The research indicates that the chemistry of the Fiale area is more benign
than at the old well field
 Well sites have been chosen to reach specific drilling target identified by
the first conceptual model
 Favorable geological setting plus a 3-4 km2 reservoir with temperatures
above 240 °C indicates a generating capacity at least 50 Mwe and up to
150 MWe
 Methods that are applicable to the Assal chemistry will be designed
based on previous plants and the well testing at Assal.
 Activity´s will be kept outside the Lava Lake, but drilling targets will be
reached by directional drilling.
Phase I 2007-2008
Conclusion of the Pre-Feasibility Study
Fiale Area
17
18
 Main tasks of the current Phase:
 Financing of feasibility study expected to be closed in 3Q of 2010.
 Cost estimate for four deep directional drilled geothermal well is 30 million US$
 Tender and evaluation of tenders for Drilling service (has been done)
 Civil work - Roads, drilling pads, water supply, accommodations, etc.
 Drilling of four exploration wells
 Confirm the power potential
 Conceptual design of the Power plant.
 Finalize the PPA
 Environmental Impact Assessment Report for the 50 MW Power Plant.
 At Financial Close to acquire funding for the third phase.
Phase II – 2008 - 2010
Current Phase
18
19
 Civil work - Design and preparation for construction almost finished
 Road to the site – tender out to local contractors
 Drilling pads and cellars – tender out to local contractors
 Water supply – purchase pipes, pumps and generators. Installation by local
contractor
 Drilling with small rig
 Conductor and surface casings
 Investigations wells
 Accommodations for the drilling crew to be build close to Salt Investment.
Phase II – 2008 - 2010
Civil work and preparation
19
20
 Services needed for the drilling work
 Drilling rig (from MB-Century)
 Casings and liners – 3 months delivery time
 Mud services
 Cementing services
 Directional drilling services
 Aerated drilling services
 Geological services – Icelandic and local scientist
 Etc. etc.
Phase II – 2008 - 2010
Drilling of geothermal wells
20
Phase III 2010-2013
Future Phase
 The designing and construction of the Power Plant will be based on:
 Experience that has been gained in Iceland's during the last decades
 Knowledge from Icelandic experts
 Similarity between Djibouti and Iceland:
 Similar chemistry of the fluids from the wells in Djibouti and in Iceland
 Similar geological settings
 Time period:
 20 years concession.
 Extension for 10-20 years
 O&M contract with Reykjavik Energy.
21
22
Financial issues
Project Company
Assal Geothermal
Power
(AGP) in Djibouti
1. Sponsor(s)
Funding
2. Lender(s)
Financing
PPA PA Power
Off-taker
Government guarantee
3. Contractor
EPC Contract
4. Operator
O&M
Agreement
Independent Power Producer model (IPP)
23
Risk
Mitigation
: WB PRG
Estimated Project Cost USD 170 mn.
USD 3,4 mn. per MW
24
Calculation based on:
• 10 production wells or average MW per well
• 2 re-injection wells
• 2 turbines
• Drilling cost is relatively high
25
Tariff:
• 10 years tax holidays.
• Repayment of loans 15 years.
• Construction cost, interest rate and ROE are most critical to tariff calculation.
• Tariff or levelized tariff to be negotiated.
Tariff vs Levelized Tariff
An example, not final.
26
 ARGeo initially consisted of six
African countries, the World Bank,
GEF-fund and UNEP
 The aim is to promote geothermal
development in Africa
 Djibouti and REI have applied for
Risk Mitigation from ARGeo funds
 The Environmental Management
Plan is prepared according to World
Bank and local requirements
 Djibouti will be the first country to
receives the ARGeo support
 Waiting for final approvement and
contracts from World Bank
 Max. amount ca. 5 million USD26
ARGeo Mitigation
27
Similar geological setting in Djibouti
and Iceland
Picture from Fiale area in Djibouti
Nesjavellir - Iceland
120 MW electricity
4 x 30 MW turbines
300 MW thermal
28
Hellisheiði - Iceland
213 MW electricity
4 x 45 MW + 33 MW
90 MWe under construction
400 MW thermal under construction
Decision taken 2003 and 90 MW in
operation late 2006
Power Plants owned by Reykjavík Energy
29
Similar geological settings in Iceland and Djibouti
Iceland Djibouti
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
Nesjavellir
Power Plant
Hellisheidi
Power Plant
Fiale - future
Power Plant
30
Pictures from Djibouti
31
32
33
34
35
36

More Related Content

What's hot

Well Test Design
Well Test DesignWell Test Design
Well Test Designadsnah
 
Evaluation of low resistivity zones
Evaluation of low resistivity zonesEvaluation of low resistivity zones
Evaluation of low resistivity zonesShahnawaz Mustafa
 
Tahapan eksplorasi dan produksi
Tahapan eksplorasi dan produksiTahapan eksplorasi dan produksi
Tahapan eksplorasi dan produksiHendri Anur
 
Geology & geophysics in oil exploration
Geology & geophysics in oil explorationGeology & geophysics in oil exploration
Geology & geophysics in oil explorationFelipe Andrés
 
Teknik eksplorasi_chapter 1_eksplorasi langsung
Teknik eksplorasi_chapter 1_eksplorasi langsungTeknik eksplorasi_chapter 1_eksplorasi langsung
Teknik eksplorasi_chapter 1_eksplorasi langsungheny novi
 
A description on the petroleum system of Bangladesh
A description on the petroleum system of BangladeshA description on the petroleum system of Bangladesh
A description on the petroleum system of BangladeshShahadat Saimon
 
Teknik Produksi Migas
Teknik Produksi Migas Teknik Produksi Migas
Teknik Produksi Migas lombkTBK
 
Eksplorasi sumber daya bahan galian
Eksplorasi sumber daya bahan galianEksplorasi sumber daya bahan galian
Eksplorasi sumber daya bahan galianIpung Noor
 
Thermal method in Well logging and Geothermal Energy
Thermal method in Well logging and Geothermal EnergyThermal method in Well logging and Geothermal Energy
Thermal method in Well logging and Geothermal EnergyAmir I. Abdelaziz
 
pendekatan tektonik indonesia Geologi Pngea UPN
 pendekatan tektonik indonesia Geologi Pngea UPN  pendekatan tektonik indonesia Geologi Pngea UPN
pendekatan tektonik indonesia Geologi Pngea UPN Hardika Abrianto
 
Formasi Geologi Sulawesi ( Armstrong . Unima )
Formasi Geologi Sulawesi ( Armstrong . Unima )Formasi Geologi Sulawesi ( Armstrong . Unima )
Formasi Geologi Sulawesi ( Armstrong . Unima )Armstrong Sompotan
 
Elements of Reservoir Rocks & Fluid Properties
Elements of Reservoir Rocks & Fluid PropertiesElements of Reservoir Rocks & Fluid Properties
Elements of Reservoir Rocks & Fluid PropertiesM.T.H Group
 
Sifat Batuan dan Fluida Panas Bumi
Sifat Batuan dan Fluida Panas BumiSifat Batuan dan Fluida Panas Bumi
Sifat Batuan dan Fluida Panas BumiEstrela Bellia Muaja
 
Extra heavy oil and bitumen impact of technologies on the recovery factor -...
Extra heavy oil and bitumen   impact of technologies on the recovery factor -...Extra heavy oil and bitumen   impact of technologies on the recovery factor -...
Extra heavy oil and bitumen impact of technologies on the recovery factor -...gusgon
 

What's hot (20)

Well Test Design
Well Test DesignWell Test Design
Well Test Design
 
Evaluation of low resistivity zones
Evaluation of low resistivity zonesEvaluation of low resistivity zones
Evaluation of low resistivity zones
 
Tahapan eksplorasi dan produksi
Tahapan eksplorasi dan produksiTahapan eksplorasi dan produksi
Tahapan eksplorasi dan produksi
 
Geology & geophysics in oil exploration
Geology & geophysics in oil explorationGeology & geophysics in oil exploration
Geology & geophysics in oil exploration
 
Petroleum formation summary
Petroleum formation summaryPetroleum formation summary
Petroleum formation summary
 
Well drilling design
Well drilling designWell drilling design
Well drilling design
 
Teknik eksplorasi_chapter 1_eksplorasi langsung
Teknik eksplorasi_chapter 1_eksplorasi langsungTeknik eksplorasi_chapter 1_eksplorasi langsung
Teknik eksplorasi_chapter 1_eksplorasi langsung
 
Bentuk asal fluvial
Bentuk asal fluvialBentuk asal fluvial
Bentuk asal fluvial
 
A description on the petroleum system of Bangladesh
A description on the petroleum system of BangladeshA description on the petroleum system of Bangladesh
A description on the petroleum system of Bangladesh
 
Teknik Produksi Migas
Teknik Produksi Migas Teknik Produksi Migas
Teknik Produksi Migas
 
Eksplorasi sumber daya bahan galian
Eksplorasi sumber daya bahan galianEksplorasi sumber daya bahan galian
Eksplorasi sumber daya bahan galian
 
Basic Petroleum System.pptx
Basic Petroleum System.pptxBasic Petroleum System.pptx
Basic Petroleum System.pptx
 
Resistivity Survey
Resistivity SurveyResistivity Survey
Resistivity Survey
 
The geology of sumatra
The geology of sumatraThe geology of sumatra
The geology of sumatra
 
Thermal method in Well logging and Geothermal Energy
Thermal method in Well logging and Geothermal EnergyThermal method in Well logging and Geothermal Energy
Thermal method in Well logging and Geothermal Energy
 
pendekatan tektonik indonesia Geologi Pngea UPN
 pendekatan tektonik indonesia Geologi Pngea UPN  pendekatan tektonik indonesia Geologi Pngea UPN
pendekatan tektonik indonesia Geologi Pngea UPN
 
Formasi Geologi Sulawesi ( Armstrong . Unima )
Formasi Geologi Sulawesi ( Armstrong . Unima )Formasi Geologi Sulawesi ( Armstrong . Unima )
Formasi Geologi Sulawesi ( Armstrong . Unima )
 
Elements of Reservoir Rocks & Fluid Properties
Elements of Reservoir Rocks & Fluid PropertiesElements of Reservoir Rocks & Fluid Properties
Elements of Reservoir Rocks & Fluid Properties
 
Sifat Batuan dan Fluida Panas Bumi
Sifat Batuan dan Fluida Panas BumiSifat Batuan dan Fluida Panas Bumi
Sifat Batuan dan Fluida Panas Bumi
 
Extra heavy oil and bitumen impact of technologies on the recovery factor -...
Extra heavy oil and bitumen   impact of technologies on the recovery factor -...Extra heavy oil and bitumen   impact of technologies on the recovery factor -...
Extra heavy oil and bitumen impact of technologies on the recovery factor -...
 

Viewers also liked

Greenfield projects manufacturing india status
Greenfield projects manufacturing india statusGreenfield projects manufacturing india status
Greenfield projects manufacturing india statusNilesh Singh
 
Geothermal Energy Savings Study
Geothermal Energy Savings StudyGeothermal Energy Savings Study
Geothermal Energy Savings StudyDon Belman Homes
 
Simulation 3 d ( alalei amina & sara djebnoun )
Simulation 3 d ( alalei amina & sara djebnoun )Simulation 3 d ( alalei amina & sara djebnoun )
Simulation 3 d ( alalei amina & sara djebnoun )Minocha Archit
 
Djibouti geothermal project Reykjavik Energy Invest
Djibouti geothermal project Reykjavik Energy InvestDjibouti geothermal project Reykjavik Energy Invest
Djibouti geothermal project Reykjavik Energy InvestParti Djibouti
 
Geothermal energy case study: Tuscany and Hungary
Geothermal energy case study: Tuscany and Hungary Geothermal energy case study: Tuscany and Hungary
Geothermal energy case study: Tuscany and Hungary Luca Madiai
 
AS Level Physics' Radioactivity Presentation
AS Level Physics' Radioactivity PresentationAS Level Physics' Radioactivity Presentation
AS Level Physics' Radioactivity PresentationAkmal Cikmat
 
Enhancing the Healing Environment with Geothermal Energy - Sherman Hospital
Enhancing the Healing Environment with Geothermal Energy - Sherman HospitalEnhancing the Healing Environment with Geothermal Energy - Sherman Hospital
Enhancing the Healing Environment with Geothermal Energy - Sherman HospitalIllinois ASHRAE
 
Geothermal energy projects in Hungary and Tuscany
Geothermal energy projects in Hungary and TuscanyGeothermal energy projects in Hungary and Tuscany
Geothermal energy projects in Hungary and TuscanyLuca Madiai
 
Radioactivity
RadioactivityRadioactivity
RadioactivityE H Annex
 
Radioactivity
RadioactivityRadioactivity
Radioactivitywilsone
 
موقع سلايد شير
موقع سلايد شيرموقع سلايد شير
موقع سلايد شيرMohamed Elshazly
 
Renewable Energy Sources
Renewable Energy SourcesRenewable Energy Sources
Renewable Energy SourcesStoyan Dimitrov
 
A Guide to SlideShare Analytics - Excerpts from Hubspot's Step by Step Guide ...
A Guide to SlideShare Analytics - Excerpts from Hubspot's Step by Step Guide ...A Guide to SlideShare Analytics - Excerpts from Hubspot's Step by Step Guide ...
A Guide to SlideShare Analytics - Excerpts from Hubspot's Step by Step Guide ...SlideShare
 

Viewers also liked (20)

Greenfield projects manufacturing india status
Greenfield projects manufacturing india statusGreenfield projects manufacturing india status
Greenfield projects manufacturing india status
 
Radioactivity
RadioactivityRadioactivity
Radioactivity
 
Geothermal Energy Savings Study
Geothermal Energy Savings StudyGeothermal Energy Savings Study
Geothermal Energy Savings Study
 
Simulation 3 d ( alalei amina & sara djebnoun )
Simulation 3 d ( alalei amina & sara djebnoun )Simulation 3 d ( alalei amina & sara djebnoun )
Simulation 3 d ( alalei amina & sara djebnoun )
 
Djibouti geothermal project Reykjavik Energy Invest
Djibouti geothermal project Reykjavik Energy InvestDjibouti geothermal project Reykjavik Energy Invest
Djibouti geothermal project Reykjavik Energy Invest
 
Geothermal energy case study: Tuscany and Hungary
Geothermal energy case study: Tuscany and Hungary Geothermal energy case study: Tuscany and Hungary
Geothermal energy case study: Tuscany and Hungary
 
AS Level Physics' Radioactivity Presentation
AS Level Physics' Radioactivity PresentationAS Level Physics' Radioactivity Presentation
AS Level Physics' Radioactivity Presentation
 
Enhancing the Healing Environment with Geothermal Energy - Sherman Hospital
Enhancing the Healing Environment with Geothermal Energy - Sherman HospitalEnhancing the Healing Environment with Geothermal Energy - Sherman Hospital
Enhancing the Healing Environment with Geothermal Energy - Sherman Hospital
 
Radioactivity
RadioactivityRadioactivity
Radioactivity
 
Geothermal energy projects in Hungary and Tuscany
Geothermal energy projects in Hungary and TuscanyGeothermal energy projects in Hungary and Tuscany
Geothermal energy projects in Hungary and Tuscany
 
Radioactivity
RadioactivityRadioactivity
Radioactivity
 
Radioactivity
RadioactivityRadioactivity
Radioactivity
 
Radioactivity.ppt
Radioactivity.pptRadioactivity.ppt
Radioactivity.ppt
 
Radioactivity
RadioactivityRadioactivity
Radioactivity
 
RADIOACTIVE DECAY AND HALF-LIFE CONCEPTS
RADIOACTIVE DECAY AND HALF-LIFE CONCEPTSRADIOACTIVE DECAY AND HALF-LIFE CONCEPTS
RADIOACTIVE DECAY AND HALF-LIFE CONCEPTS
 
geothermal energy
geothermal energygeothermal energy
geothermal energy
 
Radioactivity
RadioactivityRadioactivity
Radioactivity
 
موقع سلايد شير
موقع سلايد شيرموقع سلايد شير
موقع سلايد شير
 
Renewable Energy Sources
Renewable Energy SourcesRenewable Energy Sources
Renewable Energy Sources
 
A Guide to SlideShare Analytics - Excerpts from Hubspot's Step by Step Guide ...
A Guide to SlideShare Analytics - Excerpts from Hubspot's Step by Step Guide ...A Guide to SlideShare Analytics - Excerpts from Hubspot's Step by Step Guide ...
A Guide to SlideShare Analytics - Excerpts from Hubspot's Step by Step Guide ...
 

Similar to Djibouti geothermal project study

B4 - Status of Geothermal Exploration and Development in Ethiopia
B4 - Status of  Geothermal Exploration and Development in EthiopiaB4 - Status of  Geothermal Exploration and Development in Ethiopia
B4 - Status of Geothermal Exploration and Development in EthiopiaIceland Geothermal
 
B4 - RG: The Corbetti and Tulu Moye Geothermal Projects
B4 - RG: The Corbetti and Tulu Moye Geothermal ProjectsB4 - RG: The Corbetti and Tulu Moye Geothermal Projects
B4 - RG: The Corbetti and Tulu Moye Geothermal ProjectsIceland Geothermal
 
Presentation project miel_ii
Presentation project miel_iiPresentation project miel_ii
Presentation project miel_iiProColombia
 
Renewable Energy and Local Opportunities
Renewable Energy and Local OpportunitiesRenewable Energy and Local Opportunities
Renewable Energy and Local OpportunitiesSustainability East
 
Theoretical Estimation of CO2 Compression and Transport Costs for an hypothet...
Theoretical Estimation of CO2 Compression and Transport Costs for an hypothet...Theoretical Estimation of CO2 Compression and Transport Costs for an hypothet...
Theoretical Estimation of CO2 Compression and Transport Costs for an hypothet...Dr. Amarjeet Singh
 
4th Year Project Proposal Presentation
4th Year Project Proposal Presentation4th Year Project Proposal Presentation
4th Year Project Proposal Presentationewanbaird
 
RCREEE-enerMENA_NREA Srategy_ jordan august 2013
RCREEE-enerMENA_NREA Srategy_ jordan august 2013RCREEE-enerMENA_NREA Srategy_ jordan august 2013
RCREEE-enerMENA_NREA Srategy_ jordan august 2013RCREEE
 
Djibouti geothermal proposal 2012 drilling
Djibouti geothermal proposal 2012 drillingDjibouti geothermal proposal 2012 drilling
Djibouti geothermal proposal 2012 drillingParti Djibouti
 
Penarroyo ADB Geothermal Presentation 2012
Penarroyo ADB Geothermal Presentation 2012Penarroyo ADB Geothermal Presentation 2012
Penarroyo ADB Geothermal Presentation 2012Fernando Penarroyo
 
Antonie de Wilde- De-Risking Geothermal Development
Antonie de Wilde- De-Risking Geothermal DevelopmentAntonie de Wilde- De-Risking Geothermal Development
Antonie de Wilde- De-Risking Geothermal DevelopmentAntonie de Wilde
 
EIA Presentation Group-2 Final.pptx
EIA Presentation Group-2 Final.pptxEIA Presentation Group-2 Final.pptx
EIA Presentation Group-2 Final.pptxNOORAISLAM
 
ILFI presentation on energy sector by ILFI National Council on Energy
ILFI presentation on energy sector by ILFI National Council on EnergyILFI presentation on energy sector by ILFI National Council on Energy
ILFI presentation on energy sector by ILFI National Council on EnergyILFIindia
 
7th study meeting Tokyo - Holger Bietz
7th study meeting Tokyo - Holger Bietz7th study meeting Tokyo - Holger Bietz
7th study meeting Tokyo - Holger BietzGlobal CCS Institute
 
Realizing the Geothermal Value Chain in developing countries
Realizing the Geothermal Value Chain in developing countriesRealizing the Geothermal Value Chain in developing countries
Realizing the Geothermal Value Chain in developing countriesIceland Geothermal
 
JA CV 050915 (1) (1)
JA CV 050915 (1) (1)JA CV 050915 (1) (1)
JA CV 050915 (1) (1)John Adams
 
Life cycle of tarbella dam
Life cycle of tarbella dam Life cycle of tarbella dam
Life cycle of tarbella dam JunaidAshraf31
 

Similar to Djibouti geothermal project study (20)

B4 - Status of Geothermal Exploration and Development in Ethiopia
B4 - Status of  Geothermal Exploration and Development in EthiopiaB4 - Status of  Geothermal Exploration and Development in Ethiopia
B4 - Status of Geothermal Exploration and Development in Ethiopia
 
B4 - RG: The Corbetti and Tulu Moye Geothermal Projects
B4 - RG: The Corbetti and Tulu Moye Geothermal ProjectsB4 - RG: The Corbetti and Tulu Moye Geothermal Projects
B4 - RG: The Corbetti and Tulu Moye Geothermal Projects
 
Presentation project miel_ii
Presentation project miel_iiPresentation project miel_ii
Presentation project miel_ii
 
Renewable Energy and Local Opportunities
Renewable Energy and Local OpportunitiesRenewable Energy and Local Opportunities
Renewable Energy and Local Opportunities
 
Water Management Financing in the Caribbean - Part 2
Water Management Financing in the Caribbean - Part 2Water Management Financing in the Caribbean - Part 2
Water Management Financing in the Caribbean - Part 2
 
Theoretical Estimation of CO2 Compression and Transport Costs for an hypothet...
Theoretical Estimation of CO2 Compression and Transport Costs for an hypothet...Theoretical Estimation of CO2 Compression and Transport Costs for an hypothet...
Theoretical Estimation of CO2 Compression and Transport Costs for an hypothet...
 
4th Year Project Proposal Presentation
4th Year Project Proposal Presentation4th Year Project Proposal Presentation
4th Year Project Proposal Presentation
 
RCREEE-enerMENA_NREA Srategy_ jordan august 2013
RCREEE-enerMENA_NREA Srategy_ jordan august 2013RCREEE-enerMENA_NREA Srategy_ jordan august 2013
RCREEE-enerMENA_NREA Srategy_ jordan august 2013
 
Djibouti geothermal proposal 2012 drilling
Djibouti geothermal proposal 2012 drillingDjibouti geothermal proposal 2012 drilling
Djibouti geothermal proposal 2012 drilling
 
Penarroyo ADB Geothermal Presentation 2012
Penarroyo ADB Geothermal Presentation 2012Penarroyo ADB Geothermal Presentation 2012
Penarroyo ADB Geothermal Presentation 2012
 
2.1 obeso sep2015_nafin_re_geothermal
2.1 obeso sep2015_nafin_re_geothermal2.1 obeso sep2015_nafin_re_geothermal
2.1 obeso sep2015_nafin_re_geothermal
 
Antonie de Wilde- De-Risking Geothermal Development
Antonie de Wilde- De-Risking Geothermal DevelopmentAntonie de Wilde- De-Risking Geothermal Development
Antonie de Wilde- De-Risking Geothermal Development
 
EIA Presentation Group-2 Final.pptx
EIA Presentation Group-2 Final.pptxEIA Presentation Group-2 Final.pptx
EIA Presentation Group-2 Final.pptx
 
ILFI presentation on energy sector by ILFI National Council on Energy
ILFI presentation on energy sector by ILFI National Council on EnergyILFI presentation on energy sector by ILFI National Council on Energy
ILFI presentation on energy sector by ILFI National Council on Energy
 
7th study meeting Tokyo - Holger Bietz
7th study meeting Tokyo - Holger Bietz7th study meeting Tokyo - Holger Bietz
7th study meeting Tokyo - Holger Bietz
 
Realizing the Geothermal Value Chain in developing countries
Realizing the Geothermal Value Chain in developing countriesRealizing the Geothermal Value Chain in developing countries
Realizing the Geothermal Value Chain in developing countries
 
List of outstanding designs
List of outstanding designsList of outstanding designs
List of outstanding designs
 
JA CV 050915 (1) (1)
JA CV 050915 (1) (1)JA CV 050915 (1) (1)
JA CV 050915 (1) (1)
 
offshore.pptx
offshore.pptxoffshore.pptx
offshore.pptx
 
Life cycle of tarbella dam
Life cycle of tarbella dam Life cycle of tarbella dam
Life cycle of tarbella dam
 

More from Parti Djibouti

Djibouti country strategy world bank 2014
Djibouti country strategy world bank 2014Djibouti country strategy world bank 2014
Djibouti country strategy world bank 2014Parti Djibouti
 
Djibouti changing influence Djibouti Chatham House
Djibouti  changing influence  Djibouti Chatham HouseDjibouti  changing influence  Djibouti Chatham House
Djibouti changing influence Djibouti Chatham HouseParti Djibouti
 
Djibouti appel global 2013 – revue a mi parcours myr 2013-djibouti_fr
Djibouti appel global 2013 – revue a mi parcours myr 2013-djibouti_frDjibouti appel global 2013 – revue a mi parcours myr 2013-djibouti_fr
Djibouti appel global 2013 – revue a mi parcours myr 2013-djibouti_frParti Djibouti
 
Démocratie et mondialisation
Démocratie et mondialisationDémocratie et mondialisation
Démocratie et mondialisationParti Djibouti
 
Capitalisme, socialisme et démocratie jaschumpeter
Capitalisme, socialisme et démocratie jaschumpeterCapitalisme, socialisme et démocratie jaschumpeter
Capitalisme, socialisme et démocratie jaschumpeterParti Djibouti
 
Djibouti Atelier de formation sur la pêche 2012
Djibouti Atelier de formation sur la pêche 2012Djibouti Atelier de formation sur la pêche 2012
Djibouti Atelier de formation sur la pêche 2012Parti Djibouti
 
Afrique énergies renouvelables irena 2013
Afrique énergies renouvelables irena 2013Afrique énergies renouvelables irena 2013
Afrique énergies renouvelables irena 2013Parti Djibouti
 
Infrastructures africaines : une Transformation impérative
 Infrastructures africaines : une Transformation impérative Infrastructures africaines : une Transformation impérative
Infrastructures africaines : une Transformation impérativeParti Djibouti
 
Aide au développement et changement climatique
Aide au développement et changement climatiqueAide au développement et changement climatique
Aide au développement et changement climatiqueParti Djibouti
 
Djibouti Bilan ministère finance premier trimestre 2012
Djibouti Bilan ministère finance premier trimestre 2012Djibouti Bilan ministère finance premier trimestre 2012
Djibouti Bilan ministère finance premier trimestre 2012Parti Djibouti
 
102ème session de la conférence internationale du travail, genève
102ème session de la conférence internationale du travail, genève102ème session de la conférence internationale du travail, genève
102ème session de la conférence internationale du travail, genèveParti Djibouti
 
Djibouti intégrité du secteur privé
Djibouti   intégrité du secteur privéDjibouti   intégrité du secteur privé
Djibouti intégrité du secteur privéParti Djibouti
 
Le plan d'action AU-NEPAD 2010-2015
Le plan d'action AU-NEPAD 2010-2015Le plan d'action AU-NEPAD 2010-2015
Le plan d'action AU-NEPAD 2010-2015Parti Djibouti
 
L’énergie-en-Afrique-a-l'horizon-2050
L’énergie-en-Afrique-a-l'horizon-2050L’énergie-en-Afrique-a-l'horizon-2050
L’énergie-en-Afrique-a-l'horizon-2050Parti Djibouti
 
Djibouti Rb milestone-ehr-initial-valuation-report1
Djibouti Rb milestone-ehr-initial-valuation-report1Djibouti Rb milestone-ehr-initial-valuation-report1
Djibouti Rb milestone-ehr-initial-valuation-report1Parti Djibouti
 
Djibouti energy initiatives project 1986
Djibouti  energy  initiatives project 1986Djibouti  energy  initiatives project 1986
Djibouti energy initiatives project 1986Parti Djibouti
 
Jalaludin study geothermal djibouti unu gtp-sc-11-46
Jalaludin study geothermal djibouti unu gtp-sc-11-46Jalaludin study geothermal djibouti unu gtp-sc-11-46
Jalaludin study geothermal djibouti unu gtp-sc-11-46Parti Djibouti
 
Comprendre l'islam Au Nom d’Allah Le Très-Miséricordieux, Le Tout-Miséricordieux
Comprendre l'islam Au Nom d’Allah Le Très-Miséricordieux, Le Tout-MiséricordieuxComprendre l'islam Au Nom d’Allah Le Très-Miséricordieux, Le Tout-Miséricordieux
Comprendre l'islam Au Nom d’Allah Le Très-Miséricordieux, Le Tout-MiséricordieuxParti Djibouti
 
La Médiation dans les processus de paix. Manuel pratique pour l’Union Africai...
La Médiation dans les processus de paix. Manuel pratique pour l’Union Africai...La Médiation dans les processus de paix. Manuel pratique pour l’Union Africai...
La Médiation dans les processus de paix. Manuel pratique pour l’Union Africai...Parti Djibouti
 
Menace islamiste a djibouti
Menace islamiste a djiboutiMenace islamiste a djibouti
Menace islamiste a djiboutiParti Djibouti
 

More from Parti Djibouti (20)

Djibouti country strategy world bank 2014
Djibouti country strategy world bank 2014Djibouti country strategy world bank 2014
Djibouti country strategy world bank 2014
 
Djibouti changing influence Djibouti Chatham House
Djibouti  changing influence  Djibouti Chatham HouseDjibouti  changing influence  Djibouti Chatham House
Djibouti changing influence Djibouti Chatham House
 
Djibouti appel global 2013 – revue a mi parcours myr 2013-djibouti_fr
Djibouti appel global 2013 – revue a mi parcours myr 2013-djibouti_frDjibouti appel global 2013 – revue a mi parcours myr 2013-djibouti_fr
Djibouti appel global 2013 – revue a mi parcours myr 2013-djibouti_fr
 
Démocratie et mondialisation
Démocratie et mondialisationDémocratie et mondialisation
Démocratie et mondialisation
 
Capitalisme, socialisme et démocratie jaschumpeter
Capitalisme, socialisme et démocratie jaschumpeterCapitalisme, socialisme et démocratie jaschumpeter
Capitalisme, socialisme et démocratie jaschumpeter
 
Djibouti Atelier de formation sur la pêche 2012
Djibouti Atelier de formation sur la pêche 2012Djibouti Atelier de formation sur la pêche 2012
Djibouti Atelier de formation sur la pêche 2012
 
Afrique énergies renouvelables irena 2013
Afrique énergies renouvelables irena 2013Afrique énergies renouvelables irena 2013
Afrique énergies renouvelables irena 2013
 
Infrastructures africaines : une Transformation impérative
 Infrastructures africaines : une Transformation impérative Infrastructures africaines : une Transformation impérative
Infrastructures africaines : une Transformation impérative
 
Aide au développement et changement climatique
Aide au développement et changement climatiqueAide au développement et changement climatique
Aide au développement et changement climatique
 
Djibouti Bilan ministère finance premier trimestre 2012
Djibouti Bilan ministère finance premier trimestre 2012Djibouti Bilan ministère finance premier trimestre 2012
Djibouti Bilan ministère finance premier trimestre 2012
 
102ème session de la conférence internationale du travail, genève
102ème session de la conférence internationale du travail, genève102ème session de la conférence internationale du travail, genève
102ème session de la conférence internationale du travail, genève
 
Djibouti intégrité du secteur privé
Djibouti   intégrité du secteur privéDjibouti   intégrité du secteur privé
Djibouti intégrité du secteur privé
 
Le plan d'action AU-NEPAD 2010-2015
Le plan d'action AU-NEPAD 2010-2015Le plan d'action AU-NEPAD 2010-2015
Le plan d'action AU-NEPAD 2010-2015
 
L’énergie-en-Afrique-a-l'horizon-2050
L’énergie-en-Afrique-a-l'horizon-2050L’énergie-en-Afrique-a-l'horizon-2050
L’énergie-en-Afrique-a-l'horizon-2050
 
Djibouti Rb milestone-ehr-initial-valuation-report1
Djibouti Rb milestone-ehr-initial-valuation-report1Djibouti Rb milestone-ehr-initial-valuation-report1
Djibouti Rb milestone-ehr-initial-valuation-report1
 
Djibouti energy initiatives project 1986
Djibouti  energy  initiatives project 1986Djibouti  energy  initiatives project 1986
Djibouti energy initiatives project 1986
 
Jalaludin study geothermal djibouti unu gtp-sc-11-46
Jalaludin study geothermal djibouti unu gtp-sc-11-46Jalaludin study geothermal djibouti unu gtp-sc-11-46
Jalaludin study geothermal djibouti unu gtp-sc-11-46
 
Comprendre l'islam Au Nom d’Allah Le Très-Miséricordieux, Le Tout-Miséricordieux
Comprendre l'islam Au Nom d’Allah Le Très-Miséricordieux, Le Tout-MiséricordieuxComprendre l'islam Au Nom d’Allah Le Très-Miséricordieux, Le Tout-Miséricordieux
Comprendre l'islam Au Nom d’Allah Le Très-Miséricordieux, Le Tout-Miséricordieux
 
La Médiation dans les processus de paix. Manuel pratique pour l’Union Africai...
La Médiation dans les processus de paix. Manuel pratique pour l’Union Africai...La Médiation dans les processus de paix. Manuel pratique pour l’Union Africai...
La Médiation dans les processus de paix. Manuel pratique pour l’Union Africai...
 
Menace islamiste a djibouti
Menace islamiste a djiboutiMenace islamiste a djibouti
Menace islamiste a djibouti
 

Recently uploaded

VIP Girls Available Call or WhatsApp 9711199012
VIP Girls Available Call or WhatsApp 9711199012VIP Girls Available Call or WhatsApp 9711199012
VIP Girls Available Call or WhatsApp 9711199012ankitnayak356677
 
Top 10 Wealthiest People In The World.pdf
Top 10 Wealthiest People In The World.pdfTop 10 Wealthiest People In The World.pdf
Top 10 Wealthiest People In The World.pdfauroraaudrey4826
 
complaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfkcomplaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfkbhavenpr
 
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...Axel Bruns
 
Referendum Party 2024 Election Manifesto
Referendum Party 2024 Election ManifestoReferendum Party 2024 Election Manifesto
Referendum Party 2024 Election ManifestoSABC News
 
Quiz for Heritage Indian including all the rounds
Quiz for Heritage Indian including all the roundsQuiz for Heritage Indian including all the rounds
Quiz for Heritage Indian including all the roundsnaxymaxyy
 
N Chandrababu Naidu Launches 'Praja Galam' As Part of TDP’s Election Campaign
N Chandrababu Naidu Launches 'Praja Galam' As Part of TDP’s Election CampaignN Chandrababu Naidu Launches 'Praja Galam' As Part of TDP’s Election Campaign
N Chandrababu Naidu Launches 'Praja Galam' As Part of TDP’s Election Campaignanjanibaddipudi1
 
Chandrayaan 3 Successful Moon Landing Mission.pdf
Chandrayaan 3 Successful Moon Landing Mission.pdfChandrayaan 3 Successful Moon Landing Mission.pdf
Chandrayaan 3 Successful Moon Landing Mission.pdfauroraaudrey4826
 
Brief biography of Julius Robert Oppenheimer
Brief biography of Julius Robert OppenheimerBrief biography of Julius Robert Oppenheimer
Brief biography of Julius Robert OppenheimerOmarCabrera39
 
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...Ismail Fahmi
 
Manipur-Book-Final-2-compressed.pdfsal'rpk
Manipur-Book-Final-2-compressed.pdfsal'rpkManipur-Book-Final-2-compressed.pdfsal'rpk
Manipur-Book-Final-2-compressed.pdfsal'rpkbhavenpr
 
Opportunities, challenges, and power of media and information
Opportunities, challenges, and power of media and informationOpportunities, challenges, and power of media and information
Opportunities, challenges, and power of media and informationReyMonsales
 
AP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep Victory
AP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep VictoryAP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep Victory
AP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep Victoryanjanibaddipudi1
 
Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.NaveedKhaskheli1
 
57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdfGerald Furnkranz
 

Recently uploaded (15)

VIP Girls Available Call or WhatsApp 9711199012
VIP Girls Available Call or WhatsApp 9711199012VIP Girls Available Call or WhatsApp 9711199012
VIP Girls Available Call or WhatsApp 9711199012
 
Top 10 Wealthiest People In The World.pdf
Top 10 Wealthiest People In The World.pdfTop 10 Wealthiest People In The World.pdf
Top 10 Wealthiest People In The World.pdf
 
complaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfkcomplaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfk
 
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...
 
Referendum Party 2024 Election Manifesto
Referendum Party 2024 Election ManifestoReferendum Party 2024 Election Manifesto
Referendum Party 2024 Election Manifesto
 
Quiz for Heritage Indian including all the rounds
Quiz for Heritage Indian including all the roundsQuiz for Heritage Indian including all the rounds
Quiz for Heritage Indian including all the rounds
 
N Chandrababu Naidu Launches 'Praja Galam' As Part of TDP’s Election Campaign
N Chandrababu Naidu Launches 'Praja Galam' As Part of TDP’s Election CampaignN Chandrababu Naidu Launches 'Praja Galam' As Part of TDP’s Election Campaign
N Chandrababu Naidu Launches 'Praja Galam' As Part of TDP’s Election Campaign
 
Chandrayaan 3 Successful Moon Landing Mission.pdf
Chandrayaan 3 Successful Moon Landing Mission.pdfChandrayaan 3 Successful Moon Landing Mission.pdf
Chandrayaan 3 Successful Moon Landing Mission.pdf
 
Brief biography of Julius Robert Oppenheimer
Brief biography of Julius Robert OppenheimerBrief biography of Julius Robert Oppenheimer
Brief biography of Julius Robert Oppenheimer
 
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
 
Manipur-Book-Final-2-compressed.pdfsal'rpk
Manipur-Book-Final-2-compressed.pdfsal'rpkManipur-Book-Final-2-compressed.pdfsal'rpk
Manipur-Book-Final-2-compressed.pdfsal'rpk
 
Opportunities, challenges, and power of media and information
Opportunities, challenges, and power of media and informationOpportunities, challenges, and power of media and information
Opportunities, challenges, and power of media and information
 
AP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep Victory
AP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep VictoryAP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep Victory
AP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep Victory
 
Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.
 
57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf
 

Djibouti geothermal project study

  • 1. The Djibouti Geothermal Project Building 50MW geothermal power plant
  • 2. 2  European Union will build the transmission line from the power plant to the grid.  The Power Plant influence could be:  Boost the country´s economy.  Solution to Djibouti´s electricity scarcity.  First nation to provide high percentage of supply with a green electricity from geothermal source.  Regarded by other African countries as a showcase for harnessing geothermal energy.  Train local people to become skilled worker.  Possible to contribute to the majority of the UN Millennium Development Goals.  Exclusive license 2007 for geothermal utilization in the Assal Rift  Head of Terms contracts for PA and PPA signed in Djibouti April 2008.  Joint Development Agreement between REI and IFC June 2008.  Initial stage 50 MW – possible extension to 150 MW later.  Project cost estimated 170 million USD  Pre-feasibility study completed  Exploratory drilling now prepared  Estimated cost is 30 million USD  Electricity production expected to start 2014 Geothermal Power Plant in Assal area 2
  • 4. Facts about Djibouti  French colony until 1977 – French Somaliland - Djibouti  GDP per capita: 1,200 USD and foreign assistance  Population ~800,000 and > 50% unemployment  Desert land 22,000 km2 and most food imported  Access to water and electricity limits growth  Electricity prices one of the highest in Africa  Lack of infrastructure  Strategic location and free trade zone  Stands out to have stability and neutrality  Ethiopia’s main hub for imports and exports  French and USA army  Previous drilling in Assal proved the geothermal resource (360°C)  The distance between Djibouti city and the geothermal area in Assal is 100 km  European Union will finance and build the transmission line from the power plant to the grid  Transmission line to Ethiopia is under construction  The Port: Transhipment port for Asia, Africa and Europe 4
  • 5. 5  The port: DP World is rehabilitating the main port for 400 million USD which serves as a transshipment port for Asia, Africa and Europe.  Oil port for Djibouti and Ethiopia.  Military bases: French, American and German. The US has plans to build a large permanent base there (potentially the largest US base in Africa and the middle-east).  International Airport operated by DP World.  Government operations: Administration, hospitals, schools, etc.  Salt Investment (expected to export 4 million tons of salt per year). Their development is in the same area as the potential power plant.  Real estate development.  Parallel to recent development in Djibouti various contractor and service companies have been formed. Activites in Djibouti 5
  • 6. 6  Sector Context:  Integrated monopoly supplier (EDD)  No regulator  Essentially no transmission outside Djibouti City  Tariff range (mid 2008) 28 to 35 cents/kWh  Ethiopia-Djibouti interconnection powerline under construction  Existing Supply:  EDD has 50 - 60 MW capacity  Existing capacity is exclusively HFO/diesel  Plant is on average 20 years old Djibouti’s Power Sector 6
  • 7. Assal Area 7  The geothermal plant in Djibouti will be located in the Assal Area.  From 1975 to 1988 studies of the area were conducted. They proved that there is a heat source (350°C) in the area and that the fluids are highly saline.  Since then technology has been developed that is able to cope with the salinity of the fluid.  A geothermal power plant in Iceland has applied that technology in an area that is geologically similar to the Assal Area. Sea Fiale Lake Assal
  • 8. 8 The Presidents of Iceland and Djibouti, the Mayor of Reykjavik and the Chairman of the Board of RE 8
  • 10. 10 Project Phases  Phase I 2007-2008 - Pre-feasibility study - Completed  Surface exploration and negotiation of contracts for harvesting the geothermal energy  Phase II 2008-2011 - Feasibility study  Drilling of exploration wells and finalizing contracts  Phase III 2011-2014  Construction of the power plant.  Phase IV 2014  Operation of the power plant over 20 years plus 10-20 years 10
  • 11. Phase I 2007-2008 Pre-Feasibility Study - Completed 11 1. Evaluation of previous study 2. Surface exploration 3. Negotiation of contracts 4. Environmental management plan 5. Pre-feasibility study report Equipment from former drilling
  • 12. • Geology – bed rock* – Volcanology* – Tectonic* – groundwater • Geophysics – Resistivity* – magnetic – soil temperature – gravity – seismisity • Geochemistry – origin of water – geothermometry – mixing of water types – flow directions – extent of an area – exploitation characteristics • Environment* • Model of geothermal field* *research done by the current project, in addition to previous study, to complete the surface exploration 12 Phase I 2007-2008 Best Practice in Surface Exploration
  • 13. Phase I 2007-2008 Geochemistry 13  Ground water in the area is seawater, geothermal fluid is highly saline.  The main challenge with the fluid is scaling problems and surface corrosion when brine comes in contact with oxygen.  Geothermal power plants around the world are encountering and using saline geothermal fluids.  To counter act with the scaling and corrosion:  Current tariff calculation accounts for higher operation cost and shorter well life than in fresh water reservoirs (4% per year of construction cost).  Using of wellhead pressures exceeding 20 bars.  Drilling strategies from Icelandic projects; e.g. large diameter, directional wells.  Separation facilities designed to minimize scaling deposition in well.
  • 14. Phase I 2007-2008 Finding of the Environmental Study  Area of interest is within the Lava Lake.  Physical activities will be outside the Lava Lake.  Drilling targets will be reached by directional drilling. 14 Lava Lake Picture: Aerial photograph of Fiale area
  • 15. Phase I 2007-2008 Findings of the Study 15  Of the three identified up flow zones the Fiale area is considered most attractive for development  The research indicates that the chemistry of the Fiale area is more benign than at the old well field  Well sites have been chosen to reach specific drilling target identified by the first conceptual model
  • 16. 16  The pre-feasibility study is complete.  Of the three identified up flow zones the Fiale area is considered most attractive for development  The research indicates that the chemistry of the Fiale area is more benign than at the old well field  Well sites have been chosen to reach specific drilling target identified by the first conceptual model  Favorable geological setting plus a 3-4 km2 reservoir with temperatures above 240 °C indicates a generating capacity at least 50 Mwe and up to 150 MWe  Methods that are applicable to the Assal chemistry will be designed based on previous plants and the well testing at Assal.  Activity´s will be kept outside the Lava Lake, but drilling targets will be reached by directional drilling. Phase I 2007-2008 Conclusion of the Pre-Feasibility Study
  • 18. 18  Main tasks of the current Phase:  Financing of feasibility study expected to be closed in 3Q of 2010.  Cost estimate for four deep directional drilled geothermal well is 30 million US$  Tender and evaluation of tenders for Drilling service (has been done)  Civil work - Roads, drilling pads, water supply, accommodations, etc.  Drilling of four exploration wells  Confirm the power potential  Conceptual design of the Power plant.  Finalize the PPA  Environmental Impact Assessment Report for the 50 MW Power Plant.  At Financial Close to acquire funding for the third phase. Phase II – 2008 - 2010 Current Phase 18
  • 19. 19  Civil work - Design and preparation for construction almost finished  Road to the site – tender out to local contractors  Drilling pads and cellars – tender out to local contractors  Water supply – purchase pipes, pumps and generators. Installation by local contractor  Drilling with small rig  Conductor and surface casings  Investigations wells  Accommodations for the drilling crew to be build close to Salt Investment. Phase II – 2008 - 2010 Civil work and preparation 19
  • 20. 20  Services needed for the drilling work  Drilling rig (from MB-Century)  Casings and liners – 3 months delivery time  Mud services  Cementing services  Directional drilling services  Aerated drilling services  Geological services – Icelandic and local scientist  Etc. etc. Phase II – 2008 - 2010 Drilling of geothermal wells 20
  • 21. Phase III 2010-2013 Future Phase  The designing and construction of the Power Plant will be based on:  Experience that has been gained in Iceland's during the last decades  Knowledge from Icelandic experts  Similarity between Djibouti and Iceland:  Similar chemistry of the fluids from the wells in Djibouti and in Iceland  Similar geological settings  Time period:  20 years concession.  Extension for 10-20 years  O&M contract with Reykjavik Energy. 21
  • 23. Project Company Assal Geothermal Power (AGP) in Djibouti 1. Sponsor(s) Funding 2. Lender(s) Financing PPA PA Power Off-taker Government guarantee 3. Contractor EPC Contract 4. Operator O&M Agreement Independent Power Producer model (IPP) 23 Risk Mitigation : WB PRG
  • 24. Estimated Project Cost USD 170 mn. USD 3,4 mn. per MW 24 Calculation based on: • 10 production wells or average MW per well • 2 re-injection wells • 2 turbines • Drilling cost is relatively high
  • 25. 25 Tariff: • 10 years tax holidays. • Repayment of loans 15 years. • Construction cost, interest rate and ROE are most critical to tariff calculation. • Tariff or levelized tariff to be negotiated. Tariff vs Levelized Tariff An example, not final.
  • 26. 26  ARGeo initially consisted of six African countries, the World Bank, GEF-fund and UNEP  The aim is to promote geothermal development in Africa  Djibouti and REI have applied for Risk Mitigation from ARGeo funds  The Environmental Management Plan is prepared according to World Bank and local requirements  Djibouti will be the first country to receives the ARGeo support  Waiting for final approvement and contracts from World Bank  Max. amount ca. 5 million USD26 ARGeo Mitigation
  • 27. 27 Similar geological setting in Djibouti and Iceland Picture from Fiale area in Djibouti
  • 28. Nesjavellir - Iceland 120 MW electricity 4 x 30 MW turbines 300 MW thermal 28 Hellisheiði - Iceland 213 MW electricity 4 x 45 MW + 33 MW 90 MWe under construction 400 MW thermal under construction Decision taken 2003 and 90 MW in operation late 2006 Power Plants owned by Reykjavík Energy
  • 29. 29 Similar geological settings in Iceland and Djibouti Iceland Djibouti . . . . . . . . . . . . . . . . . . . Nesjavellir Power Plant Hellisheidi Power Plant Fiale - future Power Plant
  • 31. 31
  • 32. 32
  • 33. 33
  • 34. 34
  • 35. 35
  • 36. 36