CONTENTS
1. Process of Air pre-heater
2. Economizer
3. Boiler basics
4. Heat Exchangers
5. Cross Flow & Compact Heat Exchangers
6. Design Calculation of Economizer
7. Design Calculation of Air pre-heater
8. Boiler Efficiency
9. Heat Balance sheet
10. Conclusion
Process of Air pre-heater
• An air pre-heater (APH) is a general term to describe any device designed to heat air
before another process (for example, combustion in a boiler) with the primary objective of
increasing the thermal efficiency of the process.
• There are two types of air pre-heaters for use in steam generators in thermal power
stations: One is a tubular type built into the boiler flue gas ducting, and the other is a
regenerative air pre-heater.
• Ambient air is forced by a fan through ducting at one end of the pre-heater tubes and at
other end the heated air from inside of the tubes emerges into another set of ducting,
which carries it to the boiler furnace for combustion
• There are two types of regenerative air pre-heaters: the rotating-plate regenerative air pre-
heaters (RAPH) and the stationary-plate regenerative air pre-heaters.
• Rotating-plate regenerative air pre-heater
• The rotating-plate design (RAPH) consists of a central rotating-plate element installed
within a casing that is divided into two (bi-sector type), three (tri-sector type) or four
(quad-sector type) sectors containing seals around the element.
• In stationary-plate regenerative air pre-heaters the heating plate elements are also installed
in a casing, but the heating plate elements are stationary rather than rotating.
Economizer
• Economizers are mechanical devices intended to reduce energy
consumption, or to perform another useful function such as preheating a
fluid.
• Economizer performs a key function in providing high overall boiler
thermal efficiency by recovering low level energy from the flue gas before
it is exhausted to the atmosphere.
• Economizer recovers the energy by heating the boiler feed water.
• It scavenge the waste heat from thermal exhaust flue gases by passing the
exhaust effluent through heat transfer surfaces to transfer some of the
waste heat to a process media.
• It Efficiency is in direct relationship to equipment design and stack gas
velocities.
• Velocity increases through the stack as firing rate increases, which results
in a decrease in contact time with the economizer heating surfaces
BOILER BASICS
• The hot water or steam under pressure is then usable for transferring the heat for the steam
requirements of process industries or for power generation.
• During the combustion process, oxygen reacts with carbon, hydrogen and other elements
in the fuel to produce a flame and hot combustion gases.
• As these gases are drawn through the boiler, they cool as heat is transferred to water
• The main components in a boiler system are boiler feed water heaters, deaerator, feed
pump, economizer, super heater, Attemperators, condenser and condensate pump.
Heat Exchangers
Heat Exchangers are classified according to their function and geometry:
Function:
Recuperative: two fluids separated by a solid wall
Evaporative: enthalpy of evaporation of one fluid is used to heat or cool the other fluid.
Regenerative: use a third material which stores/releases heat
Geometry: 1. Double Tube 2. Shell and Tube
3. Cross-flow Heat Exchangers 4. Compact Heat Exchangers
Heat Exchangers
• The heat transfer rate for most heat exchangers can be calculated using the LMTD-method
(Log Mean Temperature Difference), if the inlet (T1) and outlet (T2) temperatures are
known:
U = Overall heat transfer coefficient [ W/m2-oC ]
A = Effective heat transfer surface area [ m2 ]
F = Geometry correction factor
= Log mean temperature difference
 
F
TT
TT
T
12
12
/ln 


TAUQ 
T
Cross flow and compact heat exchangers
• Cross-flow and compact heat exchangers are used where space is limited. These aim to
maximize the heat transfer surface area.
• Commonly used in gas (air) heating applications.
• The heat transfer is influenced by whether the fluids are unmixed (i.e. confined in a
channel) or mixed (i.e. not confined, hence free to contact several different heat transfer
surfaces).
• In a cross-flow heat exchanger the direction of fluids are perpendicular to each other.
Compact heat exchangers
• In Compact heat exchangers, the heat transfer rate is directly related to pressure loss
Advantages:
• very small
• Ideal for transferring heat to / from fluids with very low conductivity or where the heat
transfer must be done in very small spaces
Disadvantages:
• high manufacturing costs
• very heavy
• Extremely high pressure losses.
DESIGN OF ECONOMIZER
ASSUMPTION:
• The properties are remains constant under steady state conditions and neglect
surrounding losses. Kinetic and potential energies are neglected.
DESIGN ANALYSIS:
Heat Transfer,
Q = m x c x Δt
• Where m = mass of fluid in kg
C = specific heat of water in kj/kg oc
Δt = temperature difference
• Here m = 1800 kg/h
= 5 kg/sec
• Specific heat of water is 4.18 kj/kg oc
• Temperature difference, Δt = (70oc - 40oc) = 30oc
Q = 5 x 4.18 x 30oc
Q = 627 kW
• Heat loosing fluid
Qc = m x c x Δt
= 16 x 1.005 x (200 – 160)
= 643.2 kw.
• In Counter flow
LMTD = ((Th1 – Tc2) - (Th2– Tc1)) / ln ((Th1 – Tc2 ) - ( Th2 – Tc1 ))
= ((200-70) – (160-40)) / ln ((200-70)/ (160-40))
= (130-120) / ln (130/120)
= 10 / ln (1.083)
= 10 / 0.0797
• LMTD = 125.47oc
• Actually this economizer is a cross flow economizer so, the LMTD equation becomes,
(LMTD)cross = F X (LMTD)counter
Here F = correction factor
• It is calculated by using graphical method by using dimension parameters P, Z from graph,
P= (Tc2-Tc1)/(Th1-Tc2)
P= (70-40)/ (200-70)
P= 0.2307
• Z= (Th1-Th2)/(Tc2-Tc1)
Z= (200-160)/ (70-40)
Z= 1.33
• From this values we get F = 0.98 (from graphically, pgno:31)
• So we have multiplied the counter flow LMTD with correction factor F, then we
get LMTD of cross flow
(LMTD) cross = F X (LMTD) counter
= 0.98 x 125.47
= 122.96oc
• From heat transfer equation we calculate the area of economizer as follows
Q = UAΔTm x F
Here F = Correction factor F = 0.98
A = Area of Economizer
A = (627 x 1000) / (850 x 125.4 x 0.98)
A = 6.01 m2
U = 850 w / m2 oc (from tables)
• From Average velocity in the tube and discharge we Calculate total flow area
m = ρ A u
Here m = mass of water
A = Tube flow area
U = velocity of flow = 0.2 m/sec
A = 5 / (1000 x 0.2)
A = 0.025 m2
• The above area is equal to actual cross – sectional area of tube
0.025 =n x π/4 x d2
0.025 = n x 3.14 x (0.025)2 / 4
n= 50
• From Equation 1 the area is 17.47 m2
• Then the total surface area in 2 tube pass is given below
2nπdL = 6.01
L = 6.01/(2 x 0.025 x 3.14 x 50)
L = 76 mtrs
• Each tube = 2.2 mtrs
No. of passes = 2
No. of tubes = 50
DESIGN OF AIR PRE HEATER
• ASSUMPTIONS: The properties are remains constant under steady state conditions and
neglect surrounding losses. Kinetic and potential energies are neglected.
• DESIGN ANALYSIS:
Heat Transfer,
Q = m x c x Δt
Where m = mass flow rate
C = specific heat of air in kJ/kg oc
C = 1.005
Δt = temperature difference in oc
• Here m = 5 kg/sec
Specific heat of water is 4.18 kJ/kg oc
Temperature difference, Δt = (110 oc - 50 oc) = 60 oc
Q = 5 x 1.005 x 60 oc
Q = 301.5 kw
Heat loosing of fluid Q = m x c x Δt
= 5 x 1.005 x (270-200)
= 351.75 kw
• LMTD = ((Th1 – Tc2 ) - ( Th2 – Tc1 )) / ln((Th1 – Tc2 )- ( Th2 – Tc1 ))
= ((270-110) – (200-50))/ln ((270-110)/(200-50))
= (160-150)/ln (160/150)
LMTD = 156.46 oc
• Actually this Air pre-heater is a cross flow Air pre-heater so the LMTD equation
Becomes,
(LMTD)cross = F X (LMTD)counter
Here F = correction factor
• It is calculated by using graphical method by using dimension parameters P, Z from graph,
P= (Tc2-Tc1)/(Th1-Tc2)
P= (110-50)/(270-110)
P= 60/160
P=0.375
Z = (Th1-Th2)/(Tc2-Tc1)
Z = (270-200)/(110-50)
Z = 70/60
Z = 1.16
• From this values we get F = 0.94 (from graphically)
• So we have multiplied the counter flow LMTD with correction factor F, then we get
LMTD of cross flow
(LMTD)cross = F X (LMTD)counter
= 0.94 x 156.46
= 147.07 oc
• Q = UA ΔTm x F
Where U = overall heat transfer coefficient
A = Area of Air Pre heater
F = correction factor
U = 50 w / m2 oc (As per standard tables)
• From Average velocity in the tube and discharge we Calculate total flow area
Here correction factor F = 0.94
A = q / U ΔTm x F
= (301.5X 1000) / (50 x 0.94 x 156.4)
= 43.015m2
m = ρA u
Here m = mass flow rate kg/sec
A = Tube flow area m2
U = velocity of flow = 0.2 m/sec
ρ = 1.5 kg / m3
• From continuity equation
Q = A1 X V1
5 / 1000 = 3.14 X (0.04)2 X V1
V1 = 3.98 m/sec
m = ρA u
A= m/(ρ x V1)
A=5/(1.5 x 3.98 ) = 0.83 m2
A = 0.83 m2
• The above area is equal to actual cross – sectional area of tube
0.83 m2 = n X π/4 X d2
n = 658 tubes
Length of tube for two passes
nπdL = 43.015m2
L = 43.015 / (658 x 3.14 x 0.04)
L = 0.52m
No. of tubes = 658
No. of passes = 2, Length = 0.52m
BOILER EFFICIENCY
• Now we calculate the boiler efficiency of thermax boiler.
• Capacity of boiler = 6 tons/hour
• Exisisting values
• Water temperature (tw) = 35 oc
• Mass of steam (ms) = 6000kg/hr
• Mass of fuel (mf) = 1250 kg/hr
• Calorific value of husk = 3500 k.cal/kg = 14644.35kj/kg ( 1 joule = 0.239 k.cal )
• Temperature of steam (ts ) = 190 oc
• Boiler efficiency = ms (hs-hw)/mf x c.v
• Enthalpy of water at 35 oc hw =hf +x hfg
(x = 0, i.e., dryness factor, by using steam tables)
hw = 151.5 + 0 x hfg
hw = 151.5 kj/kg
• Enthalpy of steam at 190 oc
hs =hf +x hfg
hs = 8067 + (0.8 X 1977.5)
hs = 2388.7 kj/kg
• Therefore, boiler efficiency = ms (hs-hw) /(mf x c.v) x 100
= 6000(2388.7-151.5)/1250 x 14644.35) x 100
= 0.733 x 100 = 73.3%
8.1 BOILER EFFICIENCY WITH ECONOMIZER
• Now introducing economizer the temperature of water increases from 35 oc TO 50 oc
now water temperature (tw) = 50 oc
And quality of steam increases up to 90 percent
• Economizer with boiler efficiency = ms(hs-hw)/mf x c.vx100
• enthalpy of water at 50 oc (hw) = hf + x hfg
= 213.7 + 0 x hfg
hw = 213.7 kj/kg
• enthalpy of steam at 190 oc (hs) = hf+ x hfg
= 806.7 + (0.9 x 1977.5) (here quality of the steam 90%)
= 806.7 + 1779.5
= 2586.45 kj/kg
• Economizer with boiler effieciency = ms(hs-hw)/mf x c.v x 100
= 6000 (2586.45 - 213.7)/(1250 x 14644.35) x 100
=0.77 x 100
=77%
8.2 BOILER EFFICIENCY WITH AIR PRE-HEATER
• Now we are introducing air preheater the husk consumption reduced to 1250 kg to
1083 kg/hr
• Boiler efficiency with air preheater = MS (HS –HW)/MF X CV X 100
= 6000 (2586.45-213.7)/1083 X 14644.35) X 100
= 14236500/15859831.05 X 100
= 0.89 X 100
• Boiler efficiency with air preheater = 89%
• Water consumption per hour = 4250
• Specific heat of water = 1
ΔT = T2-T1
= 95 OC -85 OC
= 10OC
• MCPΔT = 4250 X 1 X 10 X 24 = 1020000 K.CAL
= 291.42857 KJ/KG
• Therefore 291.42857 KJ/KG Rice husk is saving
Heat Balance Sheet
• Pressure of Steam = 14.2 bar
• Steam produced = 6000 kg/hour
• Coal used = 1250 kg/hour
• Moisture in Fuel = 2% of mass
• Mass of Dry Fuel gas = 9 kg of fuel
• Calorific Value of Fuel = 3500 k.cal
• Temperature of gas = 2000c
• Temperature of Boiler room = 280c
• Feed water Temperature = 500c
• Specific heat of gas = 1.005 kj/kg
• Quality of steam = 0.9%
• Heat supplied for the fuel = mf x c.v
H.S = 1 x 3500
= 3500 k.cal
• Heat supplied = 3500 k.cal
• If moisture is present then heat supplied by 1 kg of fuel = (1- mm) c.v
• Where mm is percentage of moisture
= (1-0.02) x 3500
= 3430 k.cal
= 4913.043 kj
• Heat utilized in producing Steam = ms/mf (hs-hw) →1
Where hs = hf + x hfg
= 806.7 + (0.9 x 977.5)
= 2586.45 kg
• hw = hf
hw = 806.7
= 6000/1250 (2586.45 – 206.7)
= 4.8 x 2379.75
= 11422.8 kj
• Heat carried away by the exert gases = mg cp g (Tg-Ts)
= 9 x 1.005 (2000c – 500c)
= 1356.75 kj
• Heat carried away by the moisture in the fuel = mm (2676 + 2.1 (Tg – 100) – hf)
= 0.02 (2676 + 2.1 (200 – 100) - hf)
= 0.02 (2676 + 2.1 (200 – 100) – 121.4)
= 55.292 kj
1250 1250
1083
950
1000
1050
1100
1150
1200
1250
1300
0
10
20
30
40
50
60
70
80
90
100
1 2 3
fuel consumption ( kg/hr
)
boiler efficiency (%)
Name fuel consumption
( kg/hr )
Boiler efficiency
(%)
without airpreheater and
economizer
1250 73.3
with economizer 1250 77
with airpreheater 1083 89
CONCLUSION
• In this course of project it came to learn about the Design of Air pre-heater and
Economizer in boiler.
• By using the Air pre-heater and Economizer boiler Efficiency can be increased.
• Gas flow distribution or heat transfer into the economizer section is improved through use
of guide vanes at inlet of economizer duct.
• Analysis of economizer module was carried out to predict the economizer feed water
outlet temperature.
• The economizer size optimized by reducing the number of tubes of module by enhancing
the heat transfer across the module.
• By installing the Air pre-heater and Economizer the total husk consumption rate is
reduced and the efficiency of the boiler is also increased to 73% to 89%
DESIGN OF AIR PRE HEATER AND ECONOMIZER

More Related Content

What's hot

Evaluation of a Boiler performance
Evaluation of a Boiler performanceEvaluation of a Boiler performance
Evaluation of a Boiler performanceHashim Hasnain Hadi
 
Reciprocating Compressor
Reciprocating CompressorReciprocating Compressor
Reciprocating CompressorAditya Sharma
 
Relief and safety valves for thermal power plants
Relief and safety valves for thermal power plantsRelief and safety valves for thermal power plants
Relief and safety valves for thermal power plantsSHIVAJI CHOUDHURY
 
Parts of shell and tube heat exchanger
Parts of shell and tube heat exchangerParts of shell and tube heat exchanger
Parts of shell and tube heat exchangerKarnav Rana
 
Critical thickness of insulation
Critical thickness of insulationCritical thickness of insulation
Critical thickness of insulationMdNoorruddin
 
Boilers and Its Auxiliaries & Plant Overview
Boilers and Its Auxiliaries & Plant OverviewBoilers and Its Auxiliaries & Plant Overview
Boilers and Its Auxiliaries & Plant Overviewseshu seelamsetti
 
Boiler Drum And Its Internals
Boiler Drum And Its InternalsBoiler Drum And Its Internals
Boiler Drum And Its InternalsAshrant Dass
 
Steam Turbine Performance in TPS
Steam Turbine Performance in TPSSteam Turbine Performance in TPS
Steam Turbine Performance in TPSManohar Tatwawadi
 
Cooling towers in thermal power plants
Cooling towers in thermal power plantsCooling towers in thermal power plants
Cooling towers in thermal power plantsManohar Tatwawadi
 
Shell and tube heat exchanger design
Shell and tube heat exchanger designShell and tube heat exchanger design
Shell and tube heat exchanger designhossie
 
Vapor Compression Refrigeration System
Vapor Compression Refrigeration System Vapor Compression Refrigeration System
Vapor Compression Refrigeration System Abduljalil Al-Abidi
 
THERMAL POWER PLANT EFFICIENCY AND HEAT RATE
THERMAL POWER PLANT EFFICIENCY AND HEAT RATETHERMAL POWER PLANT EFFICIENCY AND HEAT RATE
THERMAL POWER PLANT EFFICIENCY AND HEAT RATEManohar Tatwawadi
 

What's hot (20)

Evaluation of a Boiler performance
Evaluation of a Boiler performanceEvaluation of a Boiler performance
Evaluation of a Boiler performance
 
Reciprocating Compressor
Reciprocating CompressorReciprocating Compressor
Reciprocating Compressor
 
Relief and safety valves for thermal power plants
Relief and safety valves for thermal power plantsRelief and safety valves for thermal power plants
Relief and safety valves for thermal power plants
 
cooling towers
cooling towerscooling towers
cooling towers
 
Parts of shell and tube heat exchanger
Parts of shell and tube heat exchangerParts of shell and tube heat exchanger
Parts of shell and tube heat exchanger
 
Critical thickness of insulation
Critical thickness of insulationCritical thickness of insulation
Critical thickness of insulation
 
Boilers and Its Auxiliaries & Plant Overview
Boilers and Its Auxiliaries & Plant OverviewBoilers and Its Auxiliaries & Plant Overview
Boilers and Its Auxiliaries & Plant Overview
 
Compressor
CompressorCompressor
Compressor
 
Gas turbine course
Gas turbine courseGas turbine course
Gas turbine course
 
Gas turbine cycles
Gas turbine cyclesGas turbine cycles
Gas turbine cycles
 
Cooling tower
Cooling towerCooling tower
Cooling tower
 
Boiler Drum And Its Internals
Boiler Drum And Its InternalsBoiler Drum And Its Internals
Boiler Drum And Its Internals
 
Heat Exchangers
Heat ExchangersHeat Exchangers
Heat Exchangers
 
Compressor final
Compressor finalCompressor final
Compressor final
 
Steam Condensers
Steam CondensersSteam Condensers
Steam Condensers
 
Steam Turbine Performance in TPS
Steam Turbine Performance in TPSSteam Turbine Performance in TPS
Steam Turbine Performance in TPS
 
Cooling towers in thermal power plants
Cooling towers in thermal power plantsCooling towers in thermal power plants
Cooling towers in thermal power plants
 
Shell and tube heat exchanger design
Shell and tube heat exchanger designShell and tube heat exchanger design
Shell and tube heat exchanger design
 
Vapor Compression Refrigeration System
Vapor Compression Refrigeration System Vapor Compression Refrigeration System
Vapor Compression Refrigeration System
 
THERMAL POWER PLANT EFFICIENCY AND HEAT RATE
THERMAL POWER PLANT EFFICIENCY AND HEAT RATETHERMAL POWER PLANT EFFICIENCY AND HEAT RATE
THERMAL POWER PLANT EFFICIENCY AND HEAT RATE
 

Similar to DESIGN OF AIR PRE HEATER AND ECONOMIZER

carnot cycle (a theoretical thermodynamic cycle).ppt
carnot cycle (a theoretical thermodynamic cycle).pptcarnot cycle (a theoretical thermodynamic cycle).ppt
carnot cycle (a theoretical thermodynamic cycle).pptHafizMudaserAhmad
 
مبدل های حرارتی
مبدل های حرارتیمبدل های حرارتی
مبدل های حرارتیObeid Aghaei
 
integrated brayton and rankine cycle
integrated brayton and rankine cycle integrated brayton and rankine cycle
integrated brayton and rankine cycle UPENDRA YADAV
 
Chemical engineering department
Chemical engineering departmentChemical engineering department
Chemical engineering departmentMujeeb UR Rahman
 
FABRICATION OF EXPERIMENTAL SETUP TO EVALUATE CONVECTIVE HEAT TRANSFER COEFFI...
FABRICATION OF EXPERIMENTAL SETUP TO EVALUATE CONVECTIVE HEAT TRANSFER COEFFI...FABRICATION OF EXPERIMENTAL SETUP TO EVALUATE CONVECTIVE HEAT TRANSFER COEFFI...
FABRICATION OF EXPERIMENTAL SETUP TO EVALUATE CONVECTIVE HEAT TRANSFER COEFFI...Bishal Bhandari
 
Radial heat conduction
Radial heat conductionRadial heat conduction
Radial heat conductionAree Salah
 
Heat exchanger training 02. 25. 15
Heat exchanger training 02. 25. 15 Heat exchanger training 02. 25. 15
Heat exchanger training 02. 25. 15 Sharon Wenger
 
Thermal transfer Characteristics of TCM
Thermal transfer Characteristics of TCMThermal transfer Characteristics of TCM
Thermal transfer Characteristics of TCMjlrapter
 
New shell & tube heat exchanger
New shell & tube heat exchangerNew shell & tube heat exchanger
New shell & tube heat exchangervatsalpateln
 
Design of Heat Exchanger
Design of Heat ExchangerDesign of Heat Exchanger
Design of Heat ExchangerIRJET Journal
 
Design of heat exchanger
Design of heat exchangerDesign of heat exchanger
Design of heat exchangerRana Abdul Rauf
 
Boiler design-calculation 3
Boiler design-calculation 3Boiler design-calculation 3
Boiler design-calculation 3Ebra21
 
4.4.heat exchanger
4.4.heat exchanger4.4.heat exchanger
4.4.heat exchangercmyan
 
Design and Analysis Of Double Pipe Concentric Tube Heat Exchanger
Design and Analysis Of Double Pipe Concentric Tube Heat ExchangerDesign and Analysis Of Double Pipe Concentric Tube Heat Exchanger
Design and Analysis Of Double Pipe Concentric Tube Heat ExchangerFahim Mahmud
 
Improvement in the efficiency of thermal power plant
Improvement in the efficiency of thermal power plantImprovement in the efficiency of thermal power plant
Improvement in the efficiency of thermal power plantAnshu Agrawal
 

Similar to DESIGN OF AIR PRE HEATER AND ECONOMIZER (20)

carnot cycle.ppt
carnot cycle.pptcarnot cycle.ppt
carnot cycle.ppt
 
carnot cycle (a theoretical thermodynamic cycle).ppt
carnot cycle (a theoretical thermodynamic cycle).pptcarnot cycle (a theoretical thermodynamic cycle).ppt
carnot cycle (a theoretical thermodynamic cycle).ppt
 
مبدل های حرارتی
مبدل های حرارتیمبدل های حرارتی
مبدل های حرارتی
 
integrated brayton and rankine cycle
integrated brayton and rankine cycle integrated brayton and rankine cycle
integrated brayton and rankine cycle
 
Chemical engineering department
Chemical engineering departmentChemical engineering department
Chemical engineering department
 
FABRICATION OF EXPERIMENTAL SETUP TO EVALUATE CONVECTIVE HEAT TRANSFER COEFFI...
FABRICATION OF EXPERIMENTAL SETUP TO EVALUATE CONVECTIVE HEAT TRANSFER COEFFI...FABRICATION OF EXPERIMENTAL SETUP TO EVALUATE CONVECTIVE HEAT TRANSFER COEFFI...
FABRICATION OF EXPERIMENTAL SETUP TO EVALUATE CONVECTIVE HEAT TRANSFER COEFFI...
 
project ppt
project pptproject ppt
project ppt
 
Radial heat conduction
Radial heat conductionRadial heat conduction
Radial heat conduction
 
Heat exchanger training 02. 25. 15
Heat exchanger training 02. 25. 15 Heat exchanger training 02. 25. 15
Heat exchanger training 02. 25. 15
 
Thermal transfer Characteristics of TCM
Thermal transfer Characteristics of TCMThermal transfer Characteristics of TCM
Thermal transfer Characteristics of TCM
 
New shell & tube heat exchanger
New shell & tube heat exchangerNew shell & tube heat exchanger
New shell & tube heat exchanger
 
Design of Heat Exchanger
Design of Heat ExchangerDesign of Heat Exchanger
Design of Heat Exchanger
 
Design of heat exchanger
Design of heat exchangerDesign of heat exchanger
Design of heat exchanger
 
C1303071722
C1303071722C1303071722
C1303071722
 
Plate Type Heat Exchanger Design
Plate Type Heat Exchanger DesignPlate Type Heat Exchanger Design
Plate Type Heat Exchanger Design
 
Boiler design-calculation 3
Boiler design-calculation 3Boiler design-calculation 3
Boiler design-calculation 3
 
4.4.heat exchanger
4.4.heat exchanger4.4.heat exchanger
4.4.heat exchanger
 
Design and Analysis Of Double Pipe Concentric Tube Heat Exchanger
Design and Analysis Of Double Pipe Concentric Tube Heat ExchangerDesign and Analysis Of Double Pipe Concentric Tube Heat Exchanger
Design and Analysis Of Double Pipe Concentric Tube Heat Exchanger
 
Heat exchanger
Heat exchangerHeat exchanger
Heat exchanger
 
Improvement in the efficiency of thermal power plant
Improvement in the efficiency of thermal power plantImprovement in the efficiency of thermal power plant
Improvement in the efficiency of thermal power plant
 

Recently uploaded

VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130Suhani Kapoor
 
SCRIP Lua HTTP PROGRACMACION PLC WECON CA
SCRIP Lua HTTP PROGRACMACION PLC  WECON CASCRIP Lua HTTP PROGRACMACION PLC  WECON CA
SCRIP Lua HTTP PROGRACMACION PLC WECON CANestorGamez6
 
PODSCAPE - Brochure 2023_ prefab homes in Bangalore India
PODSCAPE - Brochure 2023_ prefab homes in Bangalore IndiaPODSCAPE - Brochure 2023_ prefab homes in Bangalore India
PODSCAPE - Brochure 2023_ prefab homes in Bangalore IndiaYathish29
 
Raj Nagar Extension Call Girls 9711199012 WhatsApp No, Delhi Escorts in Raj N...
Raj Nagar Extension Call Girls 9711199012 WhatsApp No, Delhi Escorts in Raj N...Raj Nagar Extension Call Girls 9711199012 WhatsApp No, Delhi Escorts in Raj N...
Raj Nagar Extension Call Girls 9711199012 WhatsApp No, Delhi Escorts in Raj N...ankitnayak356677
 
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130Suhani Kapoor
 
Fashion trends before and after covid.pptx
Fashion trends before and after covid.pptxFashion trends before and after covid.pptx
Fashion trends before and after covid.pptxVanshNarang19
 
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...Amil baba
 
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk GurgaonCheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk GurgaonDelhi Call girls
 
VIP Russian Call Girls in Saharanpur Deepika 8250192130 Independent Escort Se...
VIP Russian Call Girls in Saharanpur Deepika 8250192130 Independent Escort Se...VIP Russian Call Girls in Saharanpur Deepika 8250192130 Independent Escort Se...
VIP Russian Call Girls in Saharanpur Deepika 8250192130 Independent Escort Se...Suhani Kapoor
 
VIP Call Girls Bhiwandi Ananya 8250192130 Independent Escort Service Bhiwandi
VIP Call Girls Bhiwandi Ananya 8250192130 Independent Escort Service BhiwandiVIP Call Girls Bhiwandi Ananya 8250192130 Independent Escort Service Bhiwandi
VIP Call Girls Bhiwandi Ananya 8250192130 Independent Escort Service BhiwandiSuhani Kapoor
 
VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...
VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...
VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...Suhani Kapoor
 
Cosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable BricksCosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable Bricksabhishekparmar618
 
Revit Understanding Reference Planes and Reference lines in Revit for Family ...
Revit Understanding Reference Planes and Reference lines in Revit for Family ...Revit Understanding Reference Planes and Reference lines in Revit for Family ...
Revit Understanding Reference Planes and Reference lines in Revit for Family ...Narsimha murthy
 
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779Delhi Call girls
 
SD_The MATATAG Curriculum Training Design.pptx
SD_The MATATAG Curriculum Training Design.pptxSD_The MATATAG Curriculum Training Design.pptx
SD_The MATATAG Curriculum Training Design.pptxjanettecruzeiro1
 
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service AmravatiVIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service AmravatiSuhani Kapoor
 
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdfThe_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdfAmirYakdi
 
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...Call Girls in Nagpur High Profile
 
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service 🧵
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service  🧵CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service  🧵
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service 🧵anilsa9823
 

Recently uploaded (20)

VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
 
SCRIP Lua HTTP PROGRACMACION PLC WECON CA
SCRIP Lua HTTP PROGRACMACION PLC  WECON CASCRIP Lua HTTP PROGRACMACION PLC  WECON CA
SCRIP Lua HTTP PROGRACMACION PLC WECON CA
 
PODSCAPE - Brochure 2023_ prefab homes in Bangalore India
PODSCAPE - Brochure 2023_ prefab homes in Bangalore IndiaPODSCAPE - Brochure 2023_ prefab homes in Bangalore India
PODSCAPE - Brochure 2023_ prefab homes in Bangalore India
 
Raj Nagar Extension Call Girls 9711199012 WhatsApp No, Delhi Escorts in Raj N...
Raj Nagar Extension Call Girls 9711199012 WhatsApp No, Delhi Escorts in Raj N...Raj Nagar Extension Call Girls 9711199012 WhatsApp No, Delhi Escorts in Raj N...
Raj Nagar Extension Call Girls 9711199012 WhatsApp No, Delhi Escorts in Raj N...
 
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
 
Fashion trends before and after covid.pptx
Fashion trends before and after covid.pptxFashion trends before and after covid.pptx
Fashion trends before and after covid.pptx
 
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
 
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk GurgaonCheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
 
VIP Russian Call Girls in Saharanpur Deepika 8250192130 Independent Escort Se...
VIP Russian Call Girls in Saharanpur Deepika 8250192130 Independent Escort Se...VIP Russian Call Girls in Saharanpur Deepika 8250192130 Independent Escort Se...
VIP Russian Call Girls in Saharanpur Deepika 8250192130 Independent Escort Se...
 
VIP Call Girls Bhiwandi Ananya 8250192130 Independent Escort Service Bhiwandi
VIP Call Girls Bhiwandi Ananya 8250192130 Independent Escort Service BhiwandiVIP Call Girls Bhiwandi Ananya 8250192130 Independent Escort Service Bhiwandi
VIP Call Girls Bhiwandi Ananya 8250192130 Independent Escort Service Bhiwandi
 
VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...
VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...
VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...
 
Cosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable BricksCosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable Bricks
 
Revit Understanding Reference Planes and Reference lines in Revit for Family ...
Revit Understanding Reference Planes and Reference lines in Revit for Family ...Revit Understanding Reference Planes and Reference lines in Revit for Family ...
Revit Understanding Reference Planes and Reference lines in Revit for Family ...
 
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
 
SD_The MATATAG Curriculum Training Design.pptx
SD_The MATATAG Curriculum Training Design.pptxSD_The MATATAG Curriculum Training Design.pptx
SD_The MATATAG Curriculum Training Design.pptx
 
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
 
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service AmravatiVIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
 
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdfThe_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
 
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
 
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service 🧵
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service  🧵CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service  🧵
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service 🧵
 

DESIGN OF AIR PRE HEATER AND ECONOMIZER

  • 1. DESIGN OF AIR PRE HEATER AND ECONOMIZER Submitted by J.SHANMUKA VENKATA GOPICHAND (101FA08133) L.SURYA TEJA (101FA08141) Under the guidance of(Internal) N.B.PRAKASH TIRUVEEDULA ASSISTANT PROFESSOR VIGNAN UNIVERSITY Under the guidance of(External) Mr. SREEKANTH JABADE GM AND PROJECT ENGG HARTEX RUBBER PVT LTD
  • 2. CONTENTS 1. Process of Air pre-heater 2. Economizer 3. Boiler basics 4. Heat Exchangers 5. Cross Flow & Compact Heat Exchangers 6. Design Calculation of Economizer 7. Design Calculation of Air pre-heater 8. Boiler Efficiency 9. Heat Balance sheet 10. Conclusion
  • 3. Process of Air pre-heater • An air pre-heater (APH) is a general term to describe any device designed to heat air before another process (for example, combustion in a boiler) with the primary objective of increasing the thermal efficiency of the process. • There are two types of air pre-heaters for use in steam generators in thermal power stations: One is a tubular type built into the boiler flue gas ducting, and the other is a regenerative air pre-heater. • Ambient air is forced by a fan through ducting at one end of the pre-heater tubes and at other end the heated air from inside of the tubes emerges into another set of ducting, which carries it to the boiler furnace for combustion
  • 4. • There are two types of regenerative air pre-heaters: the rotating-plate regenerative air pre- heaters (RAPH) and the stationary-plate regenerative air pre-heaters. • Rotating-plate regenerative air pre-heater
  • 5. • The rotating-plate design (RAPH) consists of a central rotating-plate element installed within a casing that is divided into two (bi-sector type), three (tri-sector type) or four (quad-sector type) sectors containing seals around the element. • In stationary-plate regenerative air pre-heaters the heating plate elements are also installed in a casing, but the heating plate elements are stationary rather than rotating.
  • 6. Economizer • Economizers are mechanical devices intended to reduce energy consumption, or to perform another useful function such as preheating a fluid. • Economizer performs a key function in providing high overall boiler thermal efficiency by recovering low level energy from the flue gas before it is exhausted to the atmosphere. • Economizer recovers the energy by heating the boiler feed water.
  • 7. • It scavenge the waste heat from thermal exhaust flue gases by passing the exhaust effluent through heat transfer surfaces to transfer some of the waste heat to a process media. • It Efficiency is in direct relationship to equipment design and stack gas velocities. • Velocity increases through the stack as firing rate increases, which results in a decrease in contact time with the economizer heating surfaces
  • 8. BOILER BASICS • The hot water or steam under pressure is then usable for transferring the heat for the steam requirements of process industries or for power generation. • During the combustion process, oxygen reacts with carbon, hydrogen and other elements in the fuel to produce a flame and hot combustion gases. • As these gases are drawn through the boiler, they cool as heat is transferred to water • The main components in a boiler system are boiler feed water heaters, deaerator, feed pump, economizer, super heater, Attemperators, condenser and condensate pump.
  • 9. Heat Exchangers Heat Exchangers are classified according to their function and geometry: Function: Recuperative: two fluids separated by a solid wall Evaporative: enthalpy of evaporation of one fluid is used to heat or cool the other fluid. Regenerative: use a third material which stores/releases heat Geometry: 1. Double Tube 2. Shell and Tube 3. Cross-flow Heat Exchangers 4. Compact Heat Exchangers
  • 10. Heat Exchangers • The heat transfer rate for most heat exchangers can be calculated using the LMTD-method (Log Mean Temperature Difference), if the inlet (T1) and outlet (T2) temperatures are known: U = Overall heat transfer coefficient [ W/m2-oC ] A = Effective heat transfer surface area [ m2 ] F = Geometry correction factor = Log mean temperature difference   F TT TT T 12 12 /ln    TAUQ  T
  • 11. Cross flow and compact heat exchangers • Cross-flow and compact heat exchangers are used where space is limited. These aim to maximize the heat transfer surface area. • Commonly used in gas (air) heating applications. • The heat transfer is influenced by whether the fluids are unmixed (i.e. confined in a channel) or mixed (i.e. not confined, hence free to contact several different heat transfer surfaces). • In a cross-flow heat exchanger the direction of fluids are perpendicular to each other.
  • 12. Compact heat exchangers • In Compact heat exchangers, the heat transfer rate is directly related to pressure loss Advantages: • very small • Ideal for transferring heat to / from fluids with very low conductivity or where the heat transfer must be done in very small spaces Disadvantages: • high manufacturing costs • very heavy • Extremely high pressure losses.
  • 13. DESIGN OF ECONOMIZER ASSUMPTION: • The properties are remains constant under steady state conditions and neglect surrounding losses. Kinetic and potential energies are neglected. DESIGN ANALYSIS: Heat Transfer, Q = m x c x Δt • Where m = mass of fluid in kg C = specific heat of water in kj/kg oc Δt = temperature difference
  • 14. • Here m = 1800 kg/h = 5 kg/sec • Specific heat of water is 4.18 kj/kg oc • Temperature difference, Δt = (70oc - 40oc) = 30oc Q = 5 x 4.18 x 30oc Q = 627 kW • Heat loosing fluid Qc = m x c x Δt = 16 x 1.005 x (200 – 160) = 643.2 kw.
  • 15. • In Counter flow LMTD = ((Th1 – Tc2) - (Th2– Tc1)) / ln ((Th1 – Tc2 ) - ( Th2 – Tc1 )) = ((200-70) – (160-40)) / ln ((200-70)/ (160-40)) = (130-120) / ln (130/120) = 10 / ln (1.083) = 10 / 0.0797 • LMTD = 125.47oc
  • 16. • Actually this economizer is a cross flow economizer so, the LMTD equation becomes, (LMTD)cross = F X (LMTD)counter Here F = correction factor • It is calculated by using graphical method by using dimension parameters P, Z from graph, P= (Tc2-Tc1)/(Th1-Tc2) P= (70-40)/ (200-70) P= 0.2307
  • 17. • Z= (Th1-Th2)/(Tc2-Tc1) Z= (200-160)/ (70-40) Z= 1.33 • From this values we get F = 0.98 (from graphically, pgno:31) • So we have multiplied the counter flow LMTD with correction factor F, then we get LMTD of cross flow (LMTD) cross = F X (LMTD) counter = 0.98 x 125.47 = 122.96oc
  • 18. • From heat transfer equation we calculate the area of economizer as follows Q = UAΔTm x F Here F = Correction factor F = 0.98 A = Area of Economizer A = (627 x 1000) / (850 x 125.4 x 0.98) A = 6.01 m2 U = 850 w / m2 oc (from tables)
  • 19. • From Average velocity in the tube and discharge we Calculate total flow area m = ρ A u Here m = mass of water A = Tube flow area U = velocity of flow = 0.2 m/sec A = 5 / (1000 x 0.2) A = 0.025 m2
  • 20. • The above area is equal to actual cross – sectional area of tube 0.025 =n x π/4 x d2 0.025 = n x 3.14 x (0.025)2 / 4 n= 50 • From Equation 1 the area is 17.47 m2 • Then the total surface area in 2 tube pass is given below 2nπdL = 6.01 L = 6.01/(2 x 0.025 x 3.14 x 50) L = 76 mtrs
  • 21. • Each tube = 2.2 mtrs No. of passes = 2 No. of tubes = 50
  • 22. DESIGN OF AIR PRE HEATER • ASSUMPTIONS: The properties are remains constant under steady state conditions and neglect surrounding losses. Kinetic and potential energies are neglected. • DESIGN ANALYSIS: Heat Transfer, Q = m x c x Δt Where m = mass flow rate C = specific heat of air in kJ/kg oc C = 1.005 Δt = temperature difference in oc
  • 23. • Here m = 5 kg/sec Specific heat of water is 4.18 kJ/kg oc Temperature difference, Δt = (110 oc - 50 oc) = 60 oc Q = 5 x 1.005 x 60 oc Q = 301.5 kw Heat loosing of fluid Q = m x c x Δt = 5 x 1.005 x (270-200) = 351.75 kw
  • 24. • LMTD = ((Th1 – Tc2 ) - ( Th2 – Tc1 )) / ln((Th1 – Tc2 )- ( Th2 – Tc1 )) = ((270-110) – (200-50))/ln ((270-110)/(200-50)) = (160-150)/ln (160/150) LMTD = 156.46 oc • Actually this Air pre-heater is a cross flow Air pre-heater so the LMTD equation Becomes, (LMTD)cross = F X (LMTD)counter Here F = correction factor
  • 25. • It is calculated by using graphical method by using dimension parameters P, Z from graph, P= (Tc2-Tc1)/(Th1-Tc2) P= (110-50)/(270-110) P= 60/160 P=0.375 Z = (Th1-Th2)/(Tc2-Tc1) Z = (270-200)/(110-50) Z = 70/60 Z = 1.16 • From this values we get F = 0.94 (from graphically)
  • 26. • So we have multiplied the counter flow LMTD with correction factor F, then we get LMTD of cross flow (LMTD)cross = F X (LMTD)counter = 0.94 x 156.46 = 147.07 oc • Q = UA ΔTm x F Where U = overall heat transfer coefficient A = Area of Air Pre heater F = correction factor U = 50 w / m2 oc (As per standard tables)
  • 27. • From Average velocity in the tube and discharge we Calculate total flow area Here correction factor F = 0.94 A = q / U ΔTm x F = (301.5X 1000) / (50 x 0.94 x 156.4) = 43.015m2 m = ρA u Here m = mass flow rate kg/sec A = Tube flow area m2 U = velocity of flow = 0.2 m/sec ρ = 1.5 kg / m3
  • 28. • From continuity equation Q = A1 X V1 5 / 1000 = 3.14 X (0.04)2 X V1 V1 = 3.98 m/sec m = ρA u A= m/(ρ x V1) A=5/(1.5 x 3.98 ) = 0.83 m2 A = 0.83 m2
  • 29. • The above area is equal to actual cross – sectional area of tube 0.83 m2 = n X π/4 X d2 n = 658 tubes Length of tube for two passes nπdL = 43.015m2 L = 43.015 / (658 x 3.14 x 0.04) L = 0.52m No. of tubes = 658 No. of passes = 2, Length = 0.52m
  • 30. BOILER EFFICIENCY • Now we calculate the boiler efficiency of thermax boiler. • Capacity of boiler = 6 tons/hour • Exisisting values • Water temperature (tw) = 35 oc • Mass of steam (ms) = 6000kg/hr • Mass of fuel (mf) = 1250 kg/hr • Calorific value of husk = 3500 k.cal/kg = 14644.35kj/kg ( 1 joule = 0.239 k.cal ) • Temperature of steam (ts ) = 190 oc • Boiler efficiency = ms (hs-hw)/mf x c.v
  • 31. • Enthalpy of water at 35 oc hw =hf +x hfg (x = 0, i.e., dryness factor, by using steam tables) hw = 151.5 + 0 x hfg hw = 151.5 kj/kg • Enthalpy of steam at 190 oc hs =hf +x hfg hs = 8067 + (0.8 X 1977.5) hs = 2388.7 kj/kg • Therefore, boiler efficiency = ms (hs-hw) /(mf x c.v) x 100 = 6000(2388.7-151.5)/1250 x 14644.35) x 100 = 0.733 x 100 = 73.3%
  • 32. 8.1 BOILER EFFICIENCY WITH ECONOMIZER • Now introducing economizer the temperature of water increases from 35 oc TO 50 oc now water temperature (tw) = 50 oc And quality of steam increases up to 90 percent • Economizer with boiler efficiency = ms(hs-hw)/mf x c.vx100 • enthalpy of water at 50 oc (hw) = hf + x hfg = 213.7 + 0 x hfg hw = 213.7 kj/kg
  • 33. • enthalpy of steam at 190 oc (hs) = hf+ x hfg = 806.7 + (0.9 x 1977.5) (here quality of the steam 90%) = 806.7 + 1779.5 = 2586.45 kj/kg • Economizer with boiler effieciency = ms(hs-hw)/mf x c.v x 100 = 6000 (2586.45 - 213.7)/(1250 x 14644.35) x 100 =0.77 x 100 =77%
  • 34. 8.2 BOILER EFFICIENCY WITH AIR PRE-HEATER • Now we are introducing air preheater the husk consumption reduced to 1250 kg to 1083 kg/hr • Boiler efficiency with air preheater = MS (HS –HW)/MF X CV X 100 = 6000 (2586.45-213.7)/1083 X 14644.35) X 100 = 14236500/15859831.05 X 100 = 0.89 X 100 • Boiler efficiency with air preheater = 89%
  • 35. • Water consumption per hour = 4250 • Specific heat of water = 1 ΔT = T2-T1 = 95 OC -85 OC = 10OC • MCPΔT = 4250 X 1 X 10 X 24 = 1020000 K.CAL = 291.42857 KJ/KG • Therefore 291.42857 KJ/KG Rice husk is saving
  • 36. Heat Balance Sheet • Pressure of Steam = 14.2 bar • Steam produced = 6000 kg/hour • Coal used = 1250 kg/hour • Moisture in Fuel = 2% of mass • Mass of Dry Fuel gas = 9 kg of fuel • Calorific Value of Fuel = 3500 k.cal • Temperature of gas = 2000c • Temperature of Boiler room = 280c • Feed water Temperature = 500c • Specific heat of gas = 1.005 kj/kg • Quality of steam = 0.9%
  • 37. • Heat supplied for the fuel = mf x c.v H.S = 1 x 3500 = 3500 k.cal • Heat supplied = 3500 k.cal • If moisture is present then heat supplied by 1 kg of fuel = (1- mm) c.v • Where mm is percentage of moisture = (1-0.02) x 3500 = 3430 k.cal = 4913.043 kj • Heat utilized in producing Steam = ms/mf (hs-hw) →1 Where hs = hf + x hfg = 806.7 + (0.9 x 977.5) = 2586.45 kg
  • 38. • hw = hf hw = 806.7 = 6000/1250 (2586.45 – 206.7) = 4.8 x 2379.75 = 11422.8 kj
  • 39. • Heat carried away by the exert gases = mg cp g (Tg-Ts) = 9 x 1.005 (2000c – 500c) = 1356.75 kj • Heat carried away by the moisture in the fuel = mm (2676 + 2.1 (Tg – 100) – hf) = 0.02 (2676 + 2.1 (200 – 100) - hf) = 0.02 (2676 + 2.1 (200 – 100) – 121.4) = 55.292 kj
  • 40. 1250 1250 1083 950 1000 1050 1100 1150 1200 1250 1300 0 10 20 30 40 50 60 70 80 90 100 1 2 3 fuel consumption ( kg/hr ) boiler efficiency (%) Name fuel consumption ( kg/hr ) Boiler efficiency (%) without airpreheater and economizer 1250 73.3 with economizer 1250 77 with airpreheater 1083 89
  • 41. CONCLUSION • In this course of project it came to learn about the Design of Air pre-heater and Economizer in boiler. • By using the Air pre-heater and Economizer boiler Efficiency can be increased. • Gas flow distribution or heat transfer into the economizer section is improved through use of guide vanes at inlet of economizer duct. • Analysis of economizer module was carried out to predict the economizer feed water outlet temperature. • The economizer size optimized by reducing the number of tubes of module by enhancing the heat transfer across the module. • By installing the Air pre-heater and Economizer the total husk consumption rate is reduced and the efficiency of the boiler is also increased to 73% to 89%