Instrument Engineering
9.1. P&I Diagrams Including Vendor Supplied Diagrams
9.2. Instrument Index
9.3. Instrument Data Sheets
9.4. Calculations
9.4.1. Orifice Plates
9.4.2. Control Valves (Including Noise)
9.4.3. I S Cable Parameters
9.4.4. Power Consumption / Heat Generation
9.4.5. Fuse Discrimination
9.4.6. Fuse Ratings
9.4.7. Level Ranges
9.5 Layouts
9.5.1. DCS/PLC I/O
9.5.2. DCS/PLC Cabinet
9.5.3. Marshalling Racks
9.5.4. CRC Interface Racks
9.5.5. Power Distribution Racks
9.5.6. Auxiliary Equipment Cabinet
9.5.7. Local Panels
9.5.8. Field Junction Boxes
9.5.9. Cable Racks
9.5.10. Control/Rack Rooms
9.6 Diagrams
9.6.1. Loop Diagrams
9.6.2. Function/Logic
9.6.3. One line/Schematic
9.7 Termination Schedules
9.7.1. Junction Boxes
9.7.2. Marshalling Cabinets
9.7.3. DCS / PLC
9.7.4. CRC Cabinets
9.7.5. Auxiliary Equipment Cabinets
9.7.6. Power Distribution Cabinets
9.7.7. Local Panels
9.8 Cable Tray Routing
9.9 Cable Schedules
9.10 Range, Trip, Alarm and Set Point Schedules
9.11. Analyser Sample Loops
9.12. Power Distribution Calculations
9.13. Earthing Systems
9.14. I S Certification & SABS Approval
9.15. DCS / PLC
9.15.1. Hardware
9.15.2. Software
9.16. Instrument/Electrical Interface Documentation
9.17. Intrinsically Safe / Flame Proof Certificates
9.18. Department of Health Approvals for Nuclear Installations
9.19. Certificates of Compliance for Installations Greater Than 50 Volt
9.20. DCS Screen Layouts
9.21. Loop Checking and Hand Over Procedures
9.22. Air Conditioning and Air Purification Specifications
9.23. Hook up for Measuring and Control Instruments

More Related Content

What's hot

sayed bessat cv last rev (2)
sayed bessat cv last rev (2)sayed bessat cv last rev (2)
sayed bessat cv last rev (2)Sayed Bessat
 
Seismic Considerations Seminar | Portland, Oregon
Seismic Considerations Seminar | Portland, OregonSeismic Considerations Seminar | Portland, Oregon
Seismic Considerations Seminar | Portland, Oregon
NishkianDean
 
Control and instrumentation
Control and instrumentationControl and instrumentation
Control and instrumentation
VSRAGHU
 
H08 Principles of Power Systems Design
H08 Principles of Power Systems Design H08 Principles of Power Systems Design
H08 Principles of Power Systems Design
phase3-120A
 
VISUALISATION SOFTWARE AND OTHER UTILITIES FOR ENERGY MANAGEMENT
VISUALISATION SOFTWARE AND OTHER UTILITIES FOR ENERGY MANAGEMENTVISUALISATION SOFTWARE AND OTHER UTILITIES FOR ENERGY MANAGEMENT
VISUALISATION SOFTWARE AND OTHER UTILITIES FOR ENERGY MANAGEMENT
Messung Electrical Engineering
 
Critical Power: NFPA 110: Standard for Emergency and Standby Power
Critical Power: NFPA 110: Standard for Emergency and Standby Power Critical Power: NFPA 110: Standard for Emergency and Standby Power
Critical Power: NFPA 110: Standard for Emergency and Standby Power
ConsultingSpecifyingEngineer
 
Evaluation of standby power system architectures
Evaluation of standby power system architecturesEvaluation of standby power system architectures
Evaluation of standby power system architectures
michaeljmack
 
The most accurate and flexible temperature data acquisition system for the fa...
The most accurate and flexible temperature data acquisition system for the fa...The most accurate and flexible temperature data acquisition system for the fa...
The most accurate and flexible temperature data acquisition system for the fa...
Fluke Calibration
 
6600ingles
6600ingles6600ingles
6600ingles
rlorenzoaraujo
 
,Article reprint from_erneuerbareenergien
,Article reprint from_erneuerbareenergien,Article reprint from_erneuerbareenergien
,Article reprint from_erneuerbareenergien
Manel Montesinos
 
prakash_final
prakash_finalprakash_final
prakash_finalPrakash B
 
Gas insulated auto sectionalizer
Gas insulated auto sectionalizerGas insulated auto sectionalizer
Gas insulated auto sectionalizer
JoeChueng
 

What's hot (17)

sayed bessat cv last rev (2)
sayed bessat cv last rev (2)sayed bessat cv last rev (2)
sayed bessat cv last rev (2)
 
Seismic Considerations Seminar | Portland, Oregon
Seismic Considerations Seminar | Portland, OregonSeismic Considerations Seminar | Portland, Oregon
Seismic Considerations Seminar | Portland, Oregon
 
Control and instrumentation
Control and instrumentationControl and instrumentation
Control and instrumentation
 
Brian Norton
Brian NortonBrian Norton
Brian Norton
 
Raghu Resume
Raghu Resume Raghu Resume
Raghu Resume
 
H08 Principles of Power Systems Design
H08 Principles of Power Systems Design H08 Principles of Power Systems Design
H08 Principles of Power Systems Design
 
VISUALISATION SOFTWARE AND OTHER UTILITIES FOR ENERGY MANAGEMENT
VISUALISATION SOFTWARE AND OTHER UTILITIES FOR ENERGY MANAGEMENTVISUALISATION SOFTWARE AND OTHER UTILITIES FOR ENERGY MANAGEMENT
VISUALISATION SOFTWARE AND OTHER UTILITIES FOR ENERGY MANAGEMENT
 
Saif Ismail_CV
Saif Ismail_CVSaif Ismail_CV
Saif Ismail_CV
 
Critical Power: NFPA 110: Standard for Emergency and Standby Power
Critical Power: NFPA 110: Standard for Emergency and Standby Power Critical Power: NFPA 110: Standard for Emergency and Standby Power
Critical Power: NFPA 110: Standard for Emergency and Standby Power
 
Evaluation of standby power system architectures
Evaluation of standby power system architecturesEvaluation of standby power system architectures
Evaluation of standby power system architectures
 
The most accurate and flexible temperature data acquisition system for the fa...
The most accurate and flexible temperature data acquisition system for the fa...The most accurate and flexible temperature data acquisition system for the fa...
The most accurate and flexible temperature data acquisition system for the fa...
 
WWOR Fox Ch38D
WWOR Fox Ch38DWWOR Fox Ch38D
WWOR Fox Ch38D
 
Lingeswaran CVe
Lingeswaran CVeLingeswaran CVe
Lingeswaran CVe
 
6600ingles
6600ingles6600ingles
6600ingles
 
,Article reprint from_erneuerbareenergien
,Article reprint from_erneuerbareenergien,Article reprint from_erneuerbareenergien
,Article reprint from_erneuerbareenergien
 
prakash_final
prakash_finalprakash_final
prakash_final
 
Gas insulated auto sectionalizer
Gas insulated auto sectionalizerGas insulated auto sectionalizer
Gas insulated auto sectionalizer
 

Viewers also liked

Knowledge of Team Dynamics
Knowledge of Team DynamicsKnowledge of Team Dynamics
Knowledge of Team Dynamics
Stephanus Roux C Eng , IntPE(uk) , FIET
 
Charter template 17.01.15
Charter template 17.01.15Charter template 17.01.15
Charter template 17.01.15
Stephanus Roux C Eng , IntPE(uk) , FIET
 
Deciding Factors ; Control Systems (typical)
Deciding Factors ; Control Systems (typical)Deciding Factors ; Control Systems (typical)
Deciding Factors ; Control Systems (typical)
Stephanus Roux C Eng , IntPE(uk) , FIET
 
Control System - support capabilities
Control System - support capabilitiesControl System - support capabilities
Control System - support capabilities
Stephanus Roux C Eng , IntPE(uk) , FIET
 
Change management process 17.01.15
Change management process 17.01.15Change management process 17.01.15
Change management process 17.01.15
Stephanus Roux C Eng , IntPE(uk) , FIET
 
Standard Process Design Criteria ( typical outline)
Standard Process Design Criteria ( typical outline)Standard Process Design Criteria ( typical outline)
Standard Process Design Criteria ( typical outline)
Stephanus Roux C Eng , IntPE(uk) , FIET
 
Technical Spec : DCS ( overview / checklist )
Technical Spec : DCS ( overview / checklist )Technical Spec : DCS ( overview / checklist )
Technical Spec : DCS ( overview / checklist )
Stephanus Roux C Eng , IntPE(uk) , FIET
 
Change management roles
Change management rolesChange management roles
Lift Plan
Lift PlanLift Plan
Commissioning Procedures for Conveyors (Typical)
Commissioning Procedures for Conveyors (Typical)Commissioning Procedures for Conveyors (Typical)
Commissioning Procedures for Conveyors (Typical)
Stephanus Roux C Eng , IntPE(uk) , FIET
 
Milestone checklist
Milestone checklist   Milestone checklist
Control System - execution plan
Control System - execution planControl System - execution plan
Control System - execution plan
Stephanus Roux C Eng , IntPE(uk) , FIET
 
Design Checklist Civil & Structural
Design Checklist Civil & StructuralDesign Checklist Civil & Structural
Design Checklist Civil & Structural
Stephanus Roux C Eng , IntPE(uk) , FIET
 
Electrical checklist
Electrical checklistElectrical checklist
Electrical checklist
Electrical checklistElectrical checklist

Viewers also liked (15)

Knowledge of Team Dynamics
Knowledge of Team DynamicsKnowledge of Team Dynamics
Knowledge of Team Dynamics
 
Charter template 17.01.15
Charter template 17.01.15Charter template 17.01.15
Charter template 17.01.15
 
Deciding Factors ; Control Systems (typical)
Deciding Factors ; Control Systems (typical)Deciding Factors ; Control Systems (typical)
Deciding Factors ; Control Systems (typical)
 
Control System - support capabilities
Control System - support capabilitiesControl System - support capabilities
Control System - support capabilities
 
Change management process 17.01.15
Change management process 17.01.15Change management process 17.01.15
Change management process 17.01.15
 
Standard Process Design Criteria ( typical outline)
Standard Process Design Criteria ( typical outline)Standard Process Design Criteria ( typical outline)
Standard Process Design Criteria ( typical outline)
 
Technical Spec : DCS ( overview / checklist )
Technical Spec : DCS ( overview / checklist )Technical Spec : DCS ( overview / checklist )
Technical Spec : DCS ( overview / checklist )
 
Change management roles
Change management rolesChange management roles
Change management roles
 
Lift Plan
Lift PlanLift Plan
Lift Plan
 
Commissioning Procedures for Conveyors (Typical)
Commissioning Procedures for Conveyors (Typical)Commissioning Procedures for Conveyors (Typical)
Commissioning Procedures for Conveyors (Typical)
 
Milestone checklist
Milestone checklist   Milestone checklist
Milestone checklist
 
Control System - execution plan
Control System - execution planControl System - execution plan
Control System - execution plan
 
Design Checklist Civil & Structural
Design Checklist Civil & StructuralDesign Checklist Civil & Structural
Design Checklist Civil & Structural
 
Electrical checklist
Electrical checklistElectrical checklist
Electrical checklist
 
Electrical checklist
Electrical checklistElectrical checklist
Electrical checklist
 

Similar to Design checklist instrumentation_17.01.15 (1)

book_cmos_Data_Converters-Franco-Maloberti
book_cmos_Data_Converters-Franco-Malobertibook_cmos_Data_Converters-Franco-Maloberti
book_cmos_Data_Converters-Franco-Maloberti
VictorMatheusLima3
 
Siemens s7 300 programming
Siemens s7 300 programming Siemens s7 300 programming
Siemens s7 300 programming
satyajit patra
 
Leica Viva_Technical_reference.pdf
Leica Viva_Technical_reference.pdfLeica Viva_Technical_reference.pdf
Leica Viva_Technical_reference.pdf
ssusera698b0
 
3 g rf-opt-process.ppt
3 g rf-opt-process.ppt3 g rf-opt-process.ppt
3 g rf-opt-process.ppt
Md.Akm Sahansha
 
COMOS Engineering and Design Deliverables
COMOS Engineering and Design Deliverables COMOS Engineering and Design Deliverables
COMOS Engineering and Design Deliverables
Theko Letsie
 
3 g rf_opt_process_ppt
3 g rf_opt_process_ppt3 g rf_opt_process_ppt
3 g rf_opt_process_ppt
Hatim100
 
Pd flow i
Pd flow iPd flow i
Pd flow i
Alok Kumar
 
Symp data comm slides
Symp data comm slidesSymp data comm slides
Symp data comm slides
RTCA
 
Site Operation Manual for a Typical Air Monitoring Site
Site Operation Manual for a Typical Air Monitoring SiteSite Operation Manual for a Typical Air Monitoring Site
Site Operation Manual for a Typical Air Monitoring Site
TAMUK
 
Thunderbolt
ThunderboltThunderbolt
Thunderbolt
Praveen Kumar
 
Design for manufacture techniques for PCB design
Design for manufacture techniques for PCB designDesign for manufacture techniques for PCB design
Design for manufacture techniques for PCB design
Devangsingh Sankhala
 
Sinumerik 802 s c base line turning operation programming
Sinumerik 802 s c base line turning operation programmingSinumerik 802 s c base line turning operation programming
Sinumerik 802 s c base line turning operation programming
Raul Victor Martinez
 
Electrical-single-line-diagram
 Electrical-single-line-diagram Electrical-single-line-diagram
Electrical-single-line-diagram
azzaabo
 
Total Turnkey DAS: A Path to Ensure Rapid Business Growth and Career Success
Total Turnkey DAS: A Path to Ensure Rapid Business Growth and Career SuccessTotal Turnkey DAS: A Path to Ensure Rapid Business Growth and Career Success
Total Turnkey DAS: A Path to Ensure Rapid Business Growth and Career Success
telecom-wiring
 
305 task B electronic
305 task B  electronic305 task B  electronic
305 task B electronicAndrew Flynn
 
AutomatingManufacturingSystemsWithPLCs.pdf
AutomatingManufacturingSystemsWithPLCs.pdfAutomatingManufacturingSystemsWithPLCs.pdf
AutomatingManufacturingSystemsWithPLCs.pdf
Mahamad Jawhar
 
132kV PIPAR CITY GSS - RTU Accessories Pre-SAT Procedure (1).docx
132kV PIPAR CITY  GSS - RTU  Accessories Pre-SAT Procedure (1).docx132kV PIPAR CITY  GSS - RTU  Accessories Pre-SAT Procedure (1).docx
132kV PIPAR CITY GSS - RTU Accessories Pre-SAT Procedure (1).docx
AniketSingh198707
 

Similar to Design checklist instrumentation_17.01.15 (1) (20)

book_cmos_Data_Converters-Franco-Maloberti
book_cmos_Data_Converters-Franco-Malobertibook_cmos_Data_Converters-Franco-Maloberti
book_cmos_Data_Converters-Franco-Maloberti
 
Siemens s7 300 programming
Siemens s7 300 programming Siemens s7 300 programming
Siemens s7 300 programming
 
Leica Viva_Technical_reference.pdf
Leica Viva_Technical_reference.pdfLeica Viva_Technical_reference.pdf
Leica Viva_Technical_reference.pdf
 
3 g rf-opt-process.ppt
3 g rf-opt-process.ppt3 g rf-opt-process.ppt
3 g rf-opt-process.ppt
 
COMOS Engineering and Design Deliverables
COMOS Engineering and Design Deliverables COMOS Engineering and Design Deliverables
COMOS Engineering and Design Deliverables
 
3 g rf_opt_process_ppt
3 g rf_opt_process_ppt3 g rf_opt_process_ppt
3 g rf_opt_process_ppt
 
Pd flow i
Pd flow iPd flow i
Pd flow i
 
Symp data comm slides
Symp data comm slidesSymp data comm slides
Symp data comm slides
 
Site Operation Manual for a Typical Air Monitoring Site
Site Operation Manual for a Typical Air Monitoring SiteSite Operation Manual for a Typical Air Monitoring Site
Site Operation Manual for a Typical Air Monitoring Site
 
Thunderbolt
ThunderboltThunderbolt
Thunderbolt
 
Design for manufacture techniques for PCB design
Design for manufacture techniques for PCB designDesign for manufacture techniques for PCB design
Design for manufacture techniques for PCB design
 
Sinumerik 802 s c base line turning operation programming
Sinumerik 802 s c base line turning operation programmingSinumerik 802 s c base line turning operation programming
Sinumerik 802 s c base line turning operation programming
 
Kodak Optical Heads
Kodak Optical HeadsKodak Optical Heads
Kodak Optical Heads
 
B0150711
B0150711B0150711
B0150711
 
Electrical-single-line-diagram
 Electrical-single-line-diagram Electrical-single-line-diagram
Electrical-single-line-diagram
 
Total Turnkey DAS: A Path to Ensure Rapid Business Growth and Career Success
Total Turnkey DAS: A Path to Ensure Rapid Business Growth and Career SuccessTotal Turnkey DAS: A Path to Ensure Rapid Business Growth and Career Success
Total Turnkey DAS: A Path to Ensure Rapid Business Growth and Career Success
 
BICSI DAS Presentation
BICSI DAS PresentationBICSI DAS Presentation
BICSI DAS Presentation
 
305 task B electronic
305 task B  electronic305 task B  electronic
305 task B electronic
 
AutomatingManufacturingSystemsWithPLCs.pdf
AutomatingManufacturingSystemsWithPLCs.pdfAutomatingManufacturingSystemsWithPLCs.pdf
AutomatingManufacturingSystemsWithPLCs.pdf
 
132kV PIPAR CITY GSS - RTU Accessories Pre-SAT Procedure (1).docx
132kV PIPAR CITY  GSS - RTU  Accessories Pre-SAT Procedure (1).docx132kV PIPAR CITY  GSS - RTU  Accessories Pre-SAT Procedure (1).docx
132kV PIPAR CITY GSS - RTU Accessories Pre-SAT Procedure (1).docx
 

More from Stephanus Roux C Eng , IntPE(uk) , FIET

Design Checklist-Instrumentation & Control Systems (typical / guideline)
Design Checklist-Instrumentation & Control Systems (typical / guideline)Design Checklist-Instrumentation & Control Systems (typical / guideline)
Design Checklist-Instrumentation & Control Systems (typical / guideline)
Stephanus Roux C Eng , IntPE(uk) , FIET
 
Knowledge of negotiation techniques
Knowledge of negotiation techniques Knowledge of negotiation techniques
Knowledge of negotiation techniques
Stephanus Roux C Eng , IntPE(uk) , FIET
 
Negotiation strategies
Negotiation strategies Negotiation strategies
Stephanus Roux_Senior Project Manager
Stephanus Roux_Senior Project ManagerStephanus Roux_Senior Project Manager
Stephanus Roux_Senior Project Manager
Stephanus Roux C Eng , IntPE(uk) , FIET
 
How to manage the performance of direct reports
How to manage the performance of direct reportsHow to manage the performance of direct reports
How to manage the performance of direct reports
Stephanus Roux C Eng , IntPE(uk) , FIET
 
Basic engineering_Checklist
Basic engineering_ChecklistBasic engineering_Checklist
Basic engineering_Checklist
Stephanus Roux C Eng , IntPE(uk) , FIET
 
Project management _ cheat sheet _no1
Project management _ cheat sheet _no1Project management _ cheat sheet _no1
Project management _ cheat sheet _no1
Stephanus Roux C Eng , IntPE(uk) , FIET
 
Engineering Management : knowledge techniques for motivation
Engineering Management : knowledge techniques for motivationEngineering Management : knowledge techniques for motivation
Engineering Management : knowledge techniques for motivation
Stephanus Roux C Eng , IntPE(uk) , FIET
 
Project closeoutprocess
Project closeoutprocessProject closeoutprocess
Typical Control System Design Document/Guideline
Typical Control System Design Document/Guideline Typical Control System Design Document/Guideline
Typical Control System Design Document/Guideline
Stephanus Roux C Eng , IntPE(uk) , FIET
 

More from Stephanus Roux C Eng , IntPE(uk) , FIET (11)

Design Checklist-Instrumentation & Control Systems (typical / guideline)
Design Checklist-Instrumentation & Control Systems (typical / guideline)Design Checklist-Instrumentation & Control Systems (typical / guideline)
Design Checklist-Instrumentation & Control Systems (typical / guideline)
 
Knowledge of negotiation techniques
Knowledge of negotiation techniques Knowledge of negotiation techniques
Knowledge of negotiation techniques
 
Negotiation strategies
Negotiation strategies Negotiation strategies
Negotiation strategies
 
Stephanus Roux_Senior Project Manager
Stephanus Roux_Senior Project ManagerStephanus Roux_Senior Project Manager
Stephanus Roux_Senior Project Manager
 
Coach and Motivate Direct Reports
Coach and Motivate Direct ReportsCoach and Motivate Direct Reports
Coach and Motivate Direct Reports
 
How to manage the performance of direct reports
How to manage the performance of direct reportsHow to manage the performance of direct reports
How to manage the performance of direct reports
 
Basic engineering_Checklist
Basic engineering_ChecklistBasic engineering_Checklist
Basic engineering_Checklist
 
Project management _ cheat sheet _no1
Project management _ cheat sheet _no1Project management _ cheat sheet _no1
Project management _ cheat sheet _no1
 
Engineering Management : knowledge techniques for motivation
Engineering Management : knowledge techniques for motivationEngineering Management : knowledge techniques for motivation
Engineering Management : knowledge techniques for motivation
 
Project closeoutprocess
Project closeoutprocessProject closeoutprocess
Project closeoutprocess
 
Typical Control System Design Document/Guideline
Typical Control System Design Document/Guideline Typical Control System Design Document/Guideline
Typical Control System Design Document/Guideline
 

Recently uploaded

CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
ShahidSultan24
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
Kamal Acharya
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 

Recently uploaded (20)

CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 

Design checklist instrumentation_17.01.15 (1)

  • 1. Instrument Engineering 9.1. P&I Diagrams Including Vendor Supplied Diagrams 9.2. Instrument Index 9.3. Instrument Data Sheets 9.4. Calculations 9.4.1. Orifice Plates 9.4.2. Control Valves (Including Noise) 9.4.3. I S Cable Parameters 9.4.4. Power Consumption / Heat Generation 9.4.5. Fuse Discrimination 9.4.6. Fuse Ratings 9.4.7. Level Ranges 9.5 Layouts 9.5.1. DCS/PLC I/O 9.5.2. DCS/PLC Cabinet 9.5.3. Marshalling Racks 9.5.4. CRC Interface Racks 9.5.5. Power Distribution Racks 9.5.6. Auxiliary Equipment Cabinet 9.5.7. Local Panels 9.5.8. Field Junction Boxes 9.5.9. Cable Racks 9.5.10. Control/Rack Rooms 9.6 Diagrams 9.6.1. Loop Diagrams 9.6.2. Function/Logic 9.6.3. One line/Schematic 9.7 Termination Schedules 9.7.1. Junction Boxes 9.7.2. Marshalling Cabinets 9.7.3. DCS / PLC 9.7.4. CRC Cabinets 9.7.5. Auxiliary Equipment Cabinets 9.7.6. Power Distribution Cabinets 9.7.7. Local Panels 9.8 Cable Tray Routing 9.9 Cable Schedules 9.10 Range, Trip, Alarm and Set Point Schedules 9.11. Analyser Sample Loops 9.12. Power Distribution Calculations 9.13. Earthing Systems 9.14. I S Certification & SABS Approval 9.15. DCS / PLC 9.15.1. Hardware 9.15.2. Software 9.16. Instrument/Electrical Interface Documentation 9.17. Intrinsically Safe / Flame Proof Certificates 9.18. Department of Health Approvals for Nuclear Installations 9.19. Certificates of Compliance for Installations Greater Than 50 Volt 9.20. DCS Screen Layouts 9.21. Loop Checking and Hand Over Procedures 9.22. Air Conditioning and Air Purification Specifications 9.23. Hook up for Measuring and Control Instruments