G-CON Manufacturing, Inc. | Technically Speaking
Mark Taylor
Director of Engineering and Project Management
G-CON Manufacturing, Inc.
Delivery of the First POD to Europe...
Achieved with Flying Colors
Introduction
In late 2018, G-CON began working with a global
pharmaceutical company whose goal was to scale up their
manufacturing operations in the US and Europe for an
approved CAR-T product. Specifically, the client was
establishing internal lentivirus production capabilities, starting
with a fast-track clinical facility at the one of their existing sites.
In addition to the demand for clinical capabilities, a 200L
commercial operation was also required. Both projects were
schedule driven. The client chose G-CON’s POD technology for
the clinical portion due to its higher probability of success in
schedule driven projects.
Project Execution
To ensure project success in this new market, G-CON enlisted the
help of the Asgard Cleanroom Solutions (Asgard) and McElroy
Associates (MEA). Asgard, G-CON’s European supplier, is the
leading installer of architectural cleanroom components in
Europe. MEA is an engineering firm located in Dublin, has over 28
years’ experience supporting the pharmaceutical cleanroom
industry in Europe.
Asgard’s main objective/role was organizing the manufacturing
support to fabricate PODs for the European market. Their
expertise in architectural cleanroom systems and relationships
with other MEP installers ensured that G-CON provided their
customer with the highest quality components without
increasing the overall project cost.
MEA’s long standing knowledge of structural and MEP systems
allowed G-CON to quickly drive the design forward to POD
fabrication and fit out. As customer specifications and
requirements expanded during the project, MEA was able to
quickly adapt and update critical design elements without
delaying POD progress.
Project Challenges
In addition to being the first POD system G-CON has successfully
manufactured and installed at a client’s site in Europe, this project
presented several challenges that G-CON had not previously
faced:
This was the first POD system to be installed on the 5th floor of a
customer facility (with no additional landing) requiring the use of
multiple cranes to lift the PODs in place. The use of a second crane
provided stabilization so that the rigging points of the first crane
could be safely removed as the PODs entered the opening.
The truck staging area where PODs were lifted by cranes was on a
severe and unavoidable slope. In addition, there was only single
lane access where the PODs were rigged and lifted off the trailers.
After each trailer was set in place, an engineered ramp had to be
assembled so that the trucks could back on to it. Utilizing the ramps
and by making adjustments to the trucks air suspension, the PODs
were able to be leveled prior to their removal from the trailers.
The balcony at the POD entrance was unable to take on additional
loading. Working with the onsite construction team, arrangements
were made to add the final finished surface to the balcony once
the PODs were in place. This offset height was calculated with an
understanding of how far the PODs could enter the building prior to
removing their first rigging point in conjunction with the POD
overhead clearance.
The clearance dimensions around the PODs totaled 125 mm
(approximately 5 inches) both vertically and horizontally (75mm on
each side of the final SubPOD).
The local work force spoke German.
The overall clearance between the host facilities floors limited
access to the top of the PODs requiring a different approach to
plenum access.
Meeting Customer Needs
Through diligent planning and precision execution, G-CON was
able to deliver this POD system on time and within budget without
sacrificing any of G-CON’s stringent quality and safety
requirements. Once again, G-CON’s met its true measurement of
success, meeting customer needs so that all parties can focus on
what really matters, the patient.
www.gconbio.com

More Related Content

What's hot

Procon Systems Presentation.2007.Eng
Procon Systems Presentation.2007.EngProcon Systems Presentation.2007.Eng
Procon Systems Presentation.2007.Engaaupcfira
 
Professional Presentation
Professional PresentationProfessional Presentation
Professional Presentation
jorgedemorais
 
Cv srinivasan
Cv srinivasanCv srinivasan
Cv srinivasan
Srinivasan Seshadri
 
Cv vinaya
Cv vinayaCv vinaya
Cv vinaya
Vinaya Sunil
 
Resume uttam r
Resume uttam rResume uttam r
Resume uttam r
Uttam Tiwari
 
Paul Jeffery CV - FH 2016
Paul Jeffery CV - FH 2016Paul Jeffery CV - FH 2016
Paul Jeffery CV - FH 2016Paul Jeffery
 
Eric_Nager_-resume_Dec 2015
Eric_Nager_-resume_Dec 2015Eric_Nager_-resume_Dec 2015
Eric_Nager_-resume_Dec 2015Eric Nager
 
hemant kadam 6.3yrs exp
hemant kadam 6.3yrs exp hemant kadam 6.3yrs exp
hemant kadam 6.3yrs exp Hemant Kadam
 
Resume dharmendrakumar
Resume dharmendrakumarResume dharmendrakumar
Resume dharmendrakumar
Dharmendra Kumar
 
Resume 2018
Resume 2018Resume 2018
Resume 2018
Timothy Sobczynski
 
Brian teague resume10.29.14
Brian teague    resume10.29.14Brian teague    resume10.29.14
Brian teague resume10.29.14briansrobert
 
anil kumar .B1
anil kumar .B1anil kumar .B1
anil kumar .B1Anil Kumar
 
Owais Khan - NED cv
Owais Khan - NED cvOwais Khan - NED cv
Owais Khan - NED cvOwais Khan
 
Resume_Inthiyaz_02AUG2016
Resume_Inthiyaz_02AUG2016Resume_Inthiyaz_02AUG2016
Resume_Inthiyaz_02AUG2016Inthiyaz SM
 

What's hot (19)

Procon Systems Presentation.2007.Eng
Procon Systems Presentation.2007.EngProcon Systems Presentation.2007.Eng
Procon Systems Presentation.2007.Eng
 
Professional Presentation
Professional PresentationProfessional Presentation
Professional Presentation
 
Cv srinivasan
Cv srinivasanCv srinivasan
Cv srinivasan
 
CV_bioche_17_1_en
CV_bioche_17_1_enCV_bioche_17_1_en
CV_bioche_17_1_en
 
Cv vinaya
Cv vinayaCv vinaya
Cv vinaya
 
Resume uttam r
Resume uttam rResume uttam r
Resume uttam r
 
Paul Jeffery CV - FH 2016
Paul Jeffery CV - FH 2016Paul Jeffery CV - FH 2016
Paul Jeffery CV - FH 2016
 
Eric_Nager_-resume_Dec 2015
Eric_Nager_-resume_Dec 2015Eric_Nager_-resume_Dec 2015
Eric_Nager_-resume_Dec 2015
 
hemant kadam 6.3yrs exp
hemant kadam 6.3yrs exp hemant kadam 6.3yrs exp
hemant kadam 6.3yrs exp
 
Resume dharmendrakumar
Resume dharmendrakumarResume dharmendrakumar
Resume dharmendrakumar
 
Resume 2018
Resume 2018Resume 2018
Resume 2018
 
Brian teague resume10.29.14
Brian teague    resume10.29.14Brian teague    resume10.29.14
Brian teague resume10.29.14
 
anil kumar .B1
anil kumar .B1anil kumar .B1
anil kumar .B1
 
Portfolio_2014
Portfolio_2014Portfolio_2014
Portfolio_2014
 
Sandeep B_resume
Sandeep B_resumeSandeep B_resume
Sandeep B_resume
 
Paul Krynski
Paul KrynskiPaul Krynski
Paul Krynski
 
Owais Khan - NED cv
Owais Khan - NED cvOwais Khan - NED cv
Owais Khan - NED cv
 
resume_dharmendrakumar
resume_dharmendrakumarresume_dharmendrakumar
resume_dharmendrakumar
 
Resume_Inthiyaz_02AUG2016
Resume_Inthiyaz_02AUG2016Resume_Inthiyaz_02AUG2016
Resume_Inthiyaz_02AUG2016
 

Similar to Delivery of the First POD to Europe... Achieved with Flying Colors

Portfolio
PortfolioPortfolio
Portfolio
CraigW
 
HMAF Company Brochure
HMAF Company BrochureHMAF Company Brochure
HMAF Company BrochurePatrick Ralph
 
Building utility scale projects in MENA. The mounting systems perspective.
Building utility scale projects in MENA. The mounting systems perspective. Building utility scale projects in MENA. The mounting systems perspective.
Building utility scale projects in MENA. The mounting systems perspective.
Yiorgos Eftychiou
 
Airport Capacity Solutions
Airport Capacity SolutionsAirport Capacity Solutions
Airport Capacity SolutionsMatthew Bates
 
Resource partnership case study
Resource partnership   case studyResource partnership   case study
Resource partnership case study
Zubin Poonawalla
 
Resource partnership case study
Resource partnership   case studyResource partnership   case study
Resource partnership case studyZubin Poonawalla
 
How to Get iCON Ready
How to Get iCON ReadyHow to Get iCON Ready
How to Get iCON Ready
Brittany Berryman
 
Siemens.move up 2010-1-en
Siemens.move up 2010-1-enSiemens.move up 2010-1-en
Siemens.move up 2010-1-enIntenta
 
MOHAMED ATEF C.V. (updated Sept. 2015)
MOHAMED ATEF C.V. (updated Sept. 2015)MOHAMED ATEF C.V. (updated Sept. 2015)
MOHAMED ATEF C.V. (updated Sept. 2015)mohamed atef
 
1 s2.0-s2351978920320436-main
1 s2.0-s2351978920320436-main1 s2.0-s2351978920320436-main
1 s2.0-s2351978920320436-main
BelalKAIBA
 
general introduction.pdf
general introduction.pdfgeneral introduction.pdf
general introduction.pdf
Mohanad83
 
Octink construction product guide 2013
Octink construction product guide 2013Octink construction product guide 2013
Octink construction product guide 2013
Paul Gilligan
 
Cv jason dixon dated 20160124
Cv jason dixon dated 20160124Cv jason dixon dated 20160124
Cv jason dixon dated 20160124
Jason Dixon
 
BIM professional Portfolio
BIM professional PortfolioBIM professional Portfolio
BIM professional Portfolio
Mohamed Amer
 
Customer presentation
Customer presentationCustomer presentation
Customer presentation
Daniel Webb
 
Company Profile 24 - 2 -2015
Company Profile 24 - 2 -2015Company Profile 24 - 2 -2015
Company Profile 24 - 2 -2015Yousef H. Odeh
 

Similar to Delivery of the First POD to Europe... Achieved with Flying Colors (20)

Portfolio
PortfolioPortfolio
Portfolio
 
HMAF Company Brochure
HMAF Company BrochureHMAF Company Brochure
HMAF Company Brochure
 
Building utility scale projects in MENA. The mounting systems perspective.
Building utility scale projects in MENA. The mounting systems perspective. Building utility scale projects in MENA. The mounting systems perspective.
Building utility scale projects in MENA. The mounting systems perspective.
 
James McCann CV
James McCann CVJames McCann CV
James McCann CV
 
NOORMOHAMED K
NOORMOHAMED KNOORMOHAMED K
NOORMOHAMED K
 
Airport Capacity Solutions
Airport Capacity SolutionsAirport Capacity Solutions
Airport Capacity Solutions
 
Resource partnership case study
Resource partnership   case studyResource partnership   case study
Resource partnership case study
 
Resource partnership case study
Resource partnership   case studyResource partnership   case study
Resource partnership case study
 
How to Get iCON Ready
How to Get iCON ReadyHow to Get iCON Ready
How to Get iCON Ready
 
Siemens.move up 2010-1-en
Siemens.move up 2010-1-enSiemens.move up 2010-1-en
Siemens.move up 2010-1-en
 
MOHAMED ATEF C.V. (updated Sept. 2015)
MOHAMED ATEF C.V. (updated Sept. 2015)MOHAMED ATEF C.V. (updated Sept. 2015)
MOHAMED ATEF C.V. (updated Sept. 2015)
 
1 s2.0-s2351978920320436-main
1 s2.0-s2351978920320436-main1 s2.0-s2351978920320436-main
1 s2.0-s2351978920320436-main
 
general introduction.pdf
general introduction.pdfgeneral introduction.pdf
general introduction.pdf
 
Octink construction product guide 2013
Octink construction product guide 2013Octink construction product guide 2013
Octink construction product guide 2013
 
Cv jason dixon dated 20160124
Cv jason dixon dated 20160124Cv jason dixon dated 20160124
Cv jason dixon dated 20160124
 
BIM professional Portfolio
BIM professional PortfolioBIM professional Portfolio
BIM professional Portfolio
 
MEKA BULLETIN
MEKA BULLETINMEKA BULLETIN
MEKA BULLETIN
 
Customer presentation
Customer presentationCustomer presentation
Customer presentation
 
Company Profile 24 - 2 -2015
Company Profile 24 - 2 -2015Company Profile 24 - 2 -2015
Company Profile 24 - 2 -2015
 
CV.2016
CV.2016CV.2016
CV.2016
 

More from Brittany Berryman

Standardized Cleanrooms Give Biopharma the Speed it Needs
Standardized Cleanrooms Give Biopharma the Speed it NeedsStandardized Cleanrooms Give Biopharma the Speed it Needs
Standardized Cleanrooms Give Biopharma the Speed it Needs
Brittany Berryman
 
White paper 2020: G-CON's Transmissible Disease Defense Units
White paper 2020: G-CON's Transmissible Disease Defense UnitsWhite paper 2020: G-CON's Transmissible Disease Defense Units
White paper 2020: G-CON's Transmissible Disease Defense Units
Brittany Berryman
 
The Importance of Reduced and Predictable Project Timelines, By: Dennis Power...
The Importance of Reduced and Predictable Project Timelines, By: Dennis Power...The Importance of Reduced and Predictable Project Timelines, By: Dennis Power...
The Importance of Reduced and Predictable Project Timelines, By: Dennis Power...
Brittany Berryman
 
iCON: The Turnkey Facility of the Future Here Today
iCON: The Turnkey Facility of the Future Here TodayiCON: The Turnkey Facility of the Future Here Today
iCON: The Turnkey Facility of the Future Here Today
Brittany Berryman
 
Deployable Facilities Offer Pay As-You-Go Biomanufacturing Says Just
Deployable Facilities Offer Pay As-You-Go Biomanufacturing Says JustDeployable Facilities Offer Pay As-You-Go Biomanufacturing Says Just
Deployable Facilities Offer Pay As-You-Go Biomanufacturing Says Just
Brittany Berryman
 
Cleanroom PODs with LifeAire Systems
Cleanroom PODs with LifeAire SystemsCleanroom PODs with LifeAire Systems
Cleanroom PODs with LifeAire Systems
Brittany Berryman
 
Trends of Modular Mobile Cleanroom Facilities
Trends of Modular Mobile Cleanroom FacilitiesTrends of Modular Mobile Cleanroom Facilities
Trends of Modular Mobile Cleanroom Facilities
Brittany Berryman
 
Cost Comparison of Cleanroom Designs
Cost Comparison of Cleanroom DesignsCost Comparison of Cleanroom Designs
Cost Comparison of Cleanroom Designs
Brittany Berryman
 

More from Brittany Berryman (8)

Standardized Cleanrooms Give Biopharma the Speed it Needs
Standardized Cleanrooms Give Biopharma the Speed it NeedsStandardized Cleanrooms Give Biopharma the Speed it Needs
Standardized Cleanrooms Give Biopharma the Speed it Needs
 
White paper 2020: G-CON's Transmissible Disease Defense Units
White paper 2020: G-CON's Transmissible Disease Defense UnitsWhite paper 2020: G-CON's Transmissible Disease Defense Units
White paper 2020: G-CON's Transmissible Disease Defense Units
 
The Importance of Reduced and Predictable Project Timelines, By: Dennis Power...
The Importance of Reduced and Predictable Project Timelines, By: Dennis Power...The Importance of Reduced and Predictable Project Timelines, By: Dennis Power...
The Importance of Reduced and Predictable Project Timelines, By: Dennis Power...
 
iCON: The Turnkey Facility of the Future Here Today
iCON: The Turnkey Facility of the Future Here TodayiCON: The Turnkey Facility of the Future Here Today
iCON: The Turnkey Facility of the Future Here Today
 
Deployable Facilities Offer Pay As-You-Go Biomanufacturing Says Just
Deployable Facilities Offer Pay As-You-Go Biomanufacturing Says JustDeployable Facilities Offer Pay As-You-Go Biomanufacturing Says Just
Deployable Facilities Offer Pay As-You-Go Biomanufacturing Says Just
 
Cleanroom PODs with LifeAire Systems
Cleanroom PODs with LifeAire SystemsCleanroom PODs with LifeAire Systems
Cleanroom PODs with LifeAire Systems
 
Trends of Modular Mobile Cleanroom Facilities
Trends of Modular Mobile Cleanroom FacilitiesTrends of Modular Mobile Cleanroom Facilities
Trends of Modular Mobile Cleanroom Facilities
 
Cost Comparison of Cleanroom Designs
Cost Comparison of Cleanroom DesignsCost Comparison of Cleanroom Designs
Cost Comparison of Cleanroom Designs
 

Recently uploaded

Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 

Recently uploaded (20)

Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 

Delivery of the First POD to Europe... Achieved with Flying Colors

  • 1. TECHNICALLY SPEAKING G-CON Manufacturing, Inc. | Technically Speaking Mark Taylor Director of Engineering and Project Management G-CON Manufacturing, Inc. Delivery of the First POD to Europe... Achieved with Flying Colors Introduction In late 2018, G-CON began working with a global pharmaceutical company whose goal was to scale up their manufacturing operations in the US and Europe for an approved CAR-T product. Specifically, the client was establishing internal lentivirus production capabilities, starting with a fast-track clinical facility at the one of their existing sites. In addition to the demand for clinical capabilities, a 200L commercial operation was also required. Both projects were schedule driven. The client chose G-CON’s POD technology for the clinical portion due to its higher probability of success in schedule driven projects. Project Execution To ensure project success in this new market, G-CON enlisted the help of the Asgard Cleanroom Solutions (Asgard) and McElroy Associates (MEA). Asgard, G-CON’s European supplier, is the leading installer of architectural cleanroom components in Europe. MEA is an engineering firm located in Dublin, has over 28 years’ experience supporting the pharmaceutical cleanroom industry in Europe. Asgard’s main objective/role was organizing the manufacturing support to fabricate PODs for the European market. Their expertise in architectural cleanroom systems and relationships with other MEP installers ensured that G-CON provided their customer with the highest quality components without increasing the overall project cost. MEA’s long standing knowledge of structural and MEP systems allowed G-CON to quickly drive the design forward to POD fabrication and fit out. As customer specifications and requirements expanded during the project, MEA was able to quickly adapt and update critical design elements without delaying POD progress. Project Challenges In addition to being the first POD system G-CON has successfully manufactured and installed at a client’s site in Europe, this project presented several challenges that G-CON had not previously faced: This was the first POD system to be installed on the 5th floor of a customer facility (with no additional landing) requiring the use of multiple cranes to lift the PODs in place. The use of a second crane provided stabilization so that the rigging points of the first crane could be safely removed as the PODs entered the opening. The truck staging area where PODs were lifted by cranes was on a severe and unavoidable slope. In addition, there was only single lane access where the PODs were rigged and lifted off the trailers. After each trailer was set in place, an engineered ramp had to be assembled so that the trucks could back on to it. Utilizing the ramps and by making adjustments to the trucks air suspension, the PODs were able to be leveled prior to their removal from the trailers. The balcony at the POD entrance was unable to take on additional loading. Working with the onsite construction team, arrangements were made to add the final finished surface to the balcony once the PODs were in place. This offset height was calculated with an understanding of how far the PODs could enter the building prior to removing their first rigging point in conjunction with the POD overhead clearance. The clearance dimensions around the PODs totaled 125 mm (approximately 5 inches) both vertically and horizontally (75mm on each side of the final SubPOD). The local work force spoke German. The overall clearance between the host facilities floors limited access to the top of the PODs requiring a different approach to plenum access. Meeting Customer Needs Through diligent planning and precision execution, G-CON was able to deliver this POD system on time and within budget without sacrificing any of G-CON’s stringent quality and safety requirements. Once again, G-CON’s met its true measurement of success, meeting customer needs so that all parties can focus on what really matters, the patient. www.gconbio.com