 Digital Connection Co. Ltd. (DCL) was created in 2002 by Mr. Abdullah Akbar Natheer, a 
Saudi Aramco retiree, who had spent his career in Outside Plant Construction (OSP). 
 DCL undertook short form contracts in the beginning in the field of Telecommunication 
OSP. 
 During the first long form contract awarded by Saudi Aramco (Microwave Replacement, BI 
10-3988), DCL introduced the idea of converting all road and utility crossings from open cut 
method to Horizontal Directional Drilling (HDD). The proposal was implemented and 
execution time was reduced to 1/3 of the scheduled duration planned for the construction 
of road crossings. 
 This was the start of a journey which has evolved into creation of the most comprehensive 
Trenchless Technology service provider in Saudi Arabia.
D C L T R E N C H L E S S P R O J E C T S I N S A U D I A R A B I A 
Khafji 
Tanajib 
Dammam Jubail 
Khobar 
Haradh 
Nuriyah 
Abqaiq 
Shaybah 
Yanbu 
Jubail 
HORRIZONTAL 
DIRECTIONAL DRILLING 
MICROTUNNELING 
RAMMING
 DCL has completed more than 100,000 meters of utility crossings using various trenchless 
technologies, HDD, micro tunneling and pipe ramming. 
 DCL has constructed pipeline crossings up to 48 inch dia pipes using HDD. 
 DCL is credited with construction of world’s longest in length (3,045 meters) and largest in 
pipe dia (30 inch) crossing using HDD, at the time of execution back in 2008. 
 DCL has the most successful record of construction of pipeline crossings under the sand 
dunes in Shaybah.
A PILOT HOLE is a smaller hole drilled into a material prior to a larger hole being drilled
The REAMING operation consists of using an appropriate tool to open the pilot 
hole to a slightly larger diameter
The PULLBACK operation involves pulling the entire pipeline length in one segment 
(usually) back through the drilling mud along the reamed-hole pathway.
R O A D C R O S S I N G A T H A R A D H / H AW I YA H 
Client:- ROBAYA (Aramco) 
Project length – 473Mtrs 
Pipe dia – 46” 
Pipe Material – Steel 
HDD Rig – 250ton 
Client:- ROBAYA(Aramco) 
Project length – 60Mtrs 
Pipe dia – 46” 
Pipe Material – Steel 
HDD Rig – 250ton
C O N S T R U C T I O N O F B E R R I C A U S E W A Y P I P E L I N E S 2 4 ” & 3 0 ” 
Between Abu Ali island and Berri Causeway 
 Length 3,052 Meters (Each) 
 Depth=37Meters Approximately 
 Most challenging job in HDD industry 
 These crossings are the longest in the world 
to-date 
 24” crude oil pipeline is completed 
 30” water injection pipeline completed 
BERRI CAUSEWAY PIPELINES 
PROJECT 
Horizontal Directional Drilling 
(HDD) 
Contract # 6600018809 
30” ONGOING 24”COMPLETED 
ENTRY POINTS 
EXIT POINTS
Client:- SAS (Aramco) 
Project length – 1500Mtrs 
Pipe dia – 20” 
Pipe Material – Steel 
HDD Rig – 250ton 
Client:- SAS (Aramco) 
Project length – 2000Mtrs 
Pipe dia – 20” 
Pipe Material – Steel 
HDD Rig – 250ton 
S A N D U N E C R O S S I N G S I N S H A Y B A H
M I C R O T U N N E L I N G P I P E J A C K I N G 
Project :- Micro Tunneling Pipe Jacking at Water Injection Plant Tanajib 
Client :- JGC(Aramco), Project Length :- 100mtrs , Pipe Dia :-1600mm RCJ 
Project Location
R A M M E R W I T H H D D A S S I S T 
Project :- Highway Crossing by HDD & Ramming Assist 
48” Steel Pipe – 85 Mtr@ NWC project Hail 
Project :- Tama Highway Crossing Yanbu 36” 60Mtr for SRB 
Rammer 
Product Pipe 
Pulling Assembly Drill String 
HDD Machine 
Typical Ramming With HDD Assist 
Puling Assembly
HDD Site Setup 
Pipe Being Pulled inside Borehole 
Pulling Assembly Side Boom Lifting the Pipe For Pull back
Launching Shaft Machine Entry 
Launching Seal MT Machine
Feeding via Rack & Pinion Trailer version, 
11M feeding length (range 2 drill roads) 
2,500kN pull force 
9 torque 
447kW Caterpillar engine - 6 Cylinder – 
Tropical version with expanded cooling system 
Noise reduction - Progressively torque regulation via potentiometer 
Electronic motor control with automatic switching off 
Load Sensing Control Output : 1.000 l/min 
2.500Kn (250t) 
6 pcs Poclain radial piston pump motors without gear reducer 
8-15º with stable and comfortable support 
Torque : 90.000Nm -35 rpm45.000Nm -70 rpm 
Dynamic axial trust load :3.200kN (320t) 
Static axial thrust load :4.500kN(450t) 
Drive Shaft slidable for 70mm
Dcl hdd presentation 9 2-2014
Dcl hdd presentation 9 2-2014

More Related Content

Viewers also liked

Sql server ___________data control language
Sql server  ___________data control languageSql server  ___________data control language
Sql server ___________data control language
Ehtisham Ali
 
Passport_NatInsurNo_Cards_LoRes
Passport_NatInsurNo_Cards_LoResPassport_NatInsurNo_Cards_LoRes
Passport_NatInsurNo_Cards_LoResalistair markey
 
Data definition language (ddl)
Data definition language (ddl)Data definition language (ddl)
Data definition language (ddl)Dex Winadha
 
Advance Java Topics (J2EE)
Advance Java Topics (J2EE)Advance Java Topics (J2EE)
Advance Java Topics (J2EE)
slire
 
DML Commands
DML CommandsDML Commands
SQL Tutorial - Basic Commands
SQL Tutorial - Basic CommandsSQL Tutorial - Basic Commands
SQL Tutorial - Basic Commands
1keydata
 
Oracle/SQL For Beginners - DDL | DML | DCL | TCL - Quick Learning
Oracle/SQL For Beginners - DDL | DML | DCL | TCL - Quick LearningOracle/SQL For Beginners - DDL | DML | DCL | TCL - Quick Learning
Oracle/SQL For Beginners - DDL | DML | DCL | TCL - Quick Learning
eVideoTuition
 
DML, DDL, DCL ,DRL/DQL and TCL Statements in SQL with Examples
DML, DDL, DCL ,DRL/DQL and TCL Statements in SQL with ExamplesDML, DDL, DCL ,DRL/DQL and TCL Statements in SQL with Examples
DML, DDL, DCL ,DRL/DQL and TCL Statements in SQL with Examples
LGS, GBHS&IC, University Of South-Asia, TARA-Technologies
 

Viewers also liked (10)

Sql server ___________data control language
Sql server  ___________data control languageSql server  ___________data control language
Sql server ___________data control language
 
Passport_NatInsurNo_Cards_LoRes
Passport_NatInsurNo_Cards_LoResPassport_NatInsurNo_Cards_LoRes
Passport_NatInsurNo_Cards_LoRes
 
Data definition language (ddl)
Data definition language (ddl)Data definition language (ddl)
Data definition language (ddl)
 
Advance Java Topics (J2EE)
Advance Java Topics (J2EE)Advance Java Topics (J2EE)
Advance Java Topics (J2EE)
 
Dml and ddl
Dml and ddlDml and ddl
Dml and ddl
 
DML Commands
DML CommandsDML Commands
DML Commands
 
SQL Tutorial - Basic Commands
SQL Tutorial - Basic CommandsSQL Tutorial - Basic Commands
SQL Tutorial - Basic Commands
 
Sql ppt
Sql pptSql ppt
Sql ppt
 
Oracle/SQL For Beginners - DDL | DML | DCL | TCL - Quick Learning
Oracle/SQL For Beginners - DDL | DML | DCL | TCL - Quick LearningOracle/SQL For Beginners - DDL | DML | DCL | TCL - Quick Learning
Oracle/SQL For Beginners - DDL | DML | DCL | TCL - Quick Learning
 
DML, DDL, DCL ,DRL/DQL and TCL Statements in SQL with Examples
DML, DDL, DCL ,DRL/DQL and TCL Statements in SQL with ExamplesDML, DDL, DCL ,DRL/DQL and TCL Statements in SQL with Examples
DML, DDL, DCL ,DRL/DQL and TCL Statements in SQL with Examples
 

Similar to Dcl hdd presentation 9 2-2014

Dcl presentaion for hdd
Dcl presentaion for hddDcl presentaion for hdd
Dcl presentaion for hdd
Mohammed wahab
 
Pipe Jacking
Pipe JackingPipe Jacking
Pipe Jacking
Himanshu Gupta
 
Project report
Project reportProject report
Project report
ZeeshanManzoor10
 
Trenchless Technologies for New Pipe Installations
Trenchless Technologies for New Pipe InstallationsTrenchless Technologies for New Pipe Installations
Trenchless Technologies for New Pipe Installations
Loay Ghazaleh MBA, BSc Civil Eng.
 
Cable stay bridge 05.01.16-IPWE seminar NewDelhi
Cable stay bridge  05.01.16-IPWE seminar NewDelhiCable stay bridge  05.01.16-IPWE seminar NewDelhi
Cable stay bridge 05.01.16-IPWE seminar NewDelhi
Rajesh Prasad
 
Muhammad Aamir Javed
Muhammad Aamir JavedMuhammad Aamir Javed
Muhammad Aamir JavedAamir Javed
 
AME POWER PLANT REFERENCES
AME POWER PLANT REFERENCESAME POWER PLANT REFERENCES
AME POWER PLANT REFERENCESCarlo Avanzini
 
Pilot Tube Guided Boring Solutions Meet Project Challenges
Pilot Tube Guided Boring Solutions Meet Project ChallengesPilot Tube Guided Boring Solutions Meet Project Challenges
Pilot Tube Guided Boring Solutions Meet Project Challenges
Laura Anderson
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18
Rajesh Prasad
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18
Rajesh Prasad
 
Submarine outfalls & intakes ppt
Submarine outfalls & intakes pptSubmarine outfalls & intakes ppt
Submarine outfalls & intakes ppt
Abhay Ocean India ltd.
 
Report on Neelum Jhelum Hyrdoelectic project
Report on Neelum Jhelum Hyrdoelectic projectReport on Neelum Jhelum Hyrdoelectic project
Report on Neelum Jhelum Hyrdoelectic project
Rubnawaz Bhatti
 
Dismantling of existing ROB, CSB Nagpur, AFCONS
Dismantling of existing ROB, CSB Nagpur, AFCONSDismantling of existing ROB, CSB Nagpur, AFCONS
Dismantling of existing ROB, CSB Nagpur, AFCONS
SaritaJoshi5
 
Uses of Larsa 4 d and Lusas 4 D models for Implementation of Cable Stayed ...
Uses of Larsa   4 d and Lusas  4 D models for Implementation of Cable Stayed ...Uses of Larsa   4 d and Lusas  4 D models for Implementation of Cable Stayed ...
Uses of Larsa 4 d and Lusas 4 D models for Implementation of Cable Stayed ...
Rajesh Prasad
 
Larsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship PresentationLarsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
ShuBham RaNa
 

Similar to Dcl hdd presentation 9 2-2014 (20)

Dcl presentaion for hdd
Dcl presentaion for hddDcl presentaion for hdd
Dcl presentaion for hdd
 
Pipe Jacking
Pipe JackingPipe Jacking
Pipe Jacking
 
Project report
Project reportProject report
Project report
 
Trenchless Technologies for New Pipe Installations
Trenchless Technologies for New Pipe InstallationsTrenchless Technologies for New Pipe Installations
Trenchless Technologies for New Pipe Installations
 
Cable stay bridge 05.01.16-IPWE seminar NewDelhi
Cable stay bridge  05.01.16-IPWE seminar NewDelhiCable stay bridge  05.01.16-IPWE seminar NewDelhi
Cable stay bridge 05.01.16-IPWE seminar NewDelhi
 
Muhammad Aamir Javed
Muhammad Aamir JavedMuhammad Aamir Javed
Muhammad Aamir Javed
 
AME POWER PLANT REFERENCES
AME POWER PLANT REFERENCESAME POWER PLANT REFERENCES
AME POWER PLANT REFERENCES
 
Muhammad_Aslam_CV
Muhammad_Aslam_CVMuhammad_Aslam_CV
Muhammad_Aslam_CV
 
Paper
PaperPaper
Paper
 
Pilot Tube Guided Boring Solutions Meet Project Challenges
Pilot Tube Guided Boring Solutions Meet Project ChallengesPilot Tube Guided Boring Solutions Meet Project Challenges
Pilot Tube Guided Boring Solutions Meet Project Challenges
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18
 
Mohamed Behiry CV
Mohamed Behiry CVMohamed Behiry CV
Mohamed Behiry CV
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18
 
New PPT
New PPT New PPT
New PPT
 
Mahmoud Ahmed ElbadawyCV
Mahmoud Ahmed ElbadawyCVMahmoud Ahmed ElbadawyCV
Mahmoud Ahmed ElbadawyCV
 
Submarine outfalls & intakes ppt
Submarine outfalls & intakes pptSubmarine outfalls & intakes ppt
Submarine outfalls & intakes ppt
 
Report on Neelum Jhelum Hyrdoelectic project
Report on Neelum Jhelum Hyrdoelectic projectReport on Neelum Jhelum Hyrdoelectic project
Report on Neelum Jhelum Hyrdoelectic project
 
Dismantling of existing ROB, CSB Nagpur, AFCONS
Dismantling of existing ROB, CSB Nagpur, AFCONSDismantling of existing ROB, CSB Nagpur, AFCONS
Dismantling of existing ROB, CSB Nagpur, AFCONS
 
Uses of Larsa 4 d and Lusas 4 D models for Implementation of Cable Stayed ...
Uses of Larsa   4 d and Lusas  4 D models for Implementation of Cable Stayed ...Uses of Larsa   4 d and Lusas  4 D models for Implementation of Cable Stayed ...
Uses of Larsa 4 d and Lusas 4 D models for Implementation of Cable Stayed ...
 
Larsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship PresentationLarsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
 

Recently uploaded

Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*
Frank van Harmelen
 
The Future of Platform Engineering
The Future of Platform EngineeringThe Future of Platform Engineering
The Future of Platform Engineering
Jemma Hussein Allen
 
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
Product School
 
Epistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI supportEpistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI support
Alan Dix
 
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered QualitySoftware Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Inflectra
 
DevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA ConnectDevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA Connect
Kari Kakkonen
 
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdfFIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance
 
Knowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and backKnowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and back
Elena Simperl
 
Assuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyesAssuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyes
ThousandEyes
 
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
Product School
 
GraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge GraphGraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge Graph
Guy Korland
 
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdfSmart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
91mobiles
 
UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3
DianaGray10
 
Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !
KatiaHIMEUR1
 
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Jeffrey Haguewood
 
Accelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish CachingAccelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish Caching
Thijs Feryn
 
Essentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with ParametersEssentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with Parameters
Safe Software
 
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Albert Hoitingh
 
When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...
Elena Simperl
 
How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...
Product School
 

Recently uploaded (20)

Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*
 
The Future of Platform Engineering
The Future of Platform EngineeringThe Future of Platform Engineering
The Future of Platform Engineering
 
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
 
Epistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI supportEpistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI support
 
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered QualitySoftware Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
 
DevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA ConnectDevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA Connect
 
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdfFIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdf
 
Knowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and backKnowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and back
 
Assuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyesAssuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyes
 
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
 
GraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge GraphGraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge Graph
 
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdfSmart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
 
UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3
 
Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !
 
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
 
Accelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish CachingAccelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish Caching
 
Essentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with ParametersEssentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with Parameters
 
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
 
When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...
 
How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...
 

Dcl hdd presentation 9 2-2014

  • 1.
  • 2.  Digital Connection Co. Ltd. (DCL) was created in 2002 by Mr. Abdullah Akbar Natheer, a Saudi Aramco retiree, who had spent his career in Outside Plant Construction (OSP).  DCL undertook short form contracts in the beginning in the field of Telecommunication OSP.  During the first long form contract awarded by Saudi Aramco (Microwave Replacement, BI 10-3988), DCL introduced the idea of converting all road and utility crossings from open cut method to Horizontal Directional Drilling (HDD). The proposal was implemented and execution time was reduced to 1/3 of the scheduled duration planned for the construction of road crossings.  This was the start of a journey which has evolved into creation of the most comprehensive Trenchless Technology service provider in Saudi Arabia.
  • 3.
  • 4. D C L T R E N C H L E S S P R O J E C T S I N S A U D I A R A B I A Khafji Tanajib Dammam Jubail Khobar Haradh Nuriyah Abqaiq Shaybah Yanbu Jubail HORRIZONTAL DIRECTIONAL DRILLING MICROTUNNELING RAMMING
  • 5.  DCL has completed more than 100,000 meters of utility crossings using various trenchless technologies, HDD, micro tunneling and pipe ramming.  DCL has constructed pipeline crossings up to 48 inch dia pipes using HDD.  DCL is credited with construction of world’s longest in length (3,045 meters) and largest in pipe dia (30 inch) crossing using HDD, at the time of execution back in 2008.  DCL has the most successful record of construction of pipeline crossings under the sand dunes in Shaybah.
  • 6.
  • 7. A PILOT HOLE is a smaller hole drilled into a material prior to a larger hole being drilled
  • 8. The REAMING operation consists of using an appropriate tool to open the pilot hole to a slightly larger diameter
  • 9. The PULLBACK operation involves pulling the entire pipeline length in one segment (usually) back through the drilling mud along the reamed-hole pathway.
  • 10.
  • 11. R O A D C R O S S I N G A T H A R A D H / H AW I YA H Client:- ROBAYA (Aramco) Project length – 473Mtrs Pipe dia – 46” Pipe Material – Steel HDD Rig – 250ton Client:- ROBAYA(Aramco) Project length – 60Mtrs Pipe dia – 46” Pipe Material – Steel HDD Rig – 250ton
  • 12. C O N S T R U C T I O N O F B E R R I C A U S E W A Y P I P E L I N E S 2 4 ” & 3 0 ” Between Abu Ali island and Berri Causeway  Length 3,052 Meters (Each)  Depth=37Meters Approximately  Most challenging job in HDD industry  These crossings are the longest in the world to-date  24” crude oil pipeline is completed  30” water injection pipeline completed BERRI CAUSEWAY PIPELINES PROJECT Horizontal Directional Drilling (HDD) Contract # 6600018809 30” ONGOING 24”COMPLETED ENTRY POINTS EXIT POINTS
  • 13. Client:- SAS (Aramco) Project length – 1500Mtrs Pipe dia – 20” Pipe Material – Steel HDD Rig – 250ton Client:- SAS (Aramco) Project length – 2000Mtrs Pipe dia – 20” Pipe Material – Steel HDD Rig – 250ton S A N D U N E C R O S S I N G S I N S H A Y B A H
  • 14. M I C R O T U N N E L I N G P I P E J A C K I N G Project :- Micro Tunneling Pipe Jacking at Water Injection Plant Tanajib Client :- JGC(Aramco), Project Length :- 100mtrs , Pipe Dia :-1600mm RCJ Project Location
  • 15. R A M M E R W I T H H D D A S S I S T Project :- Highway Crossing by HDD & Ramming Assist 48” Steel Pipe – 85 Mtr@ NWC project Hail Project :- Tama Highway Crossing Yanbu 36” 60Mtr for SRB Rammer Product Pipe Pulling Assembly Drill String HDD Machine Typical Ramming With HDD Assist Puling Assembly
  • 16.
  • 17.
  • 18. HDD Site Setup Pipe Being Pulled inside Borehole Pulling Assembly Side Boom Lifting the Pipe For Pull back
  • 19.
  • 20.
  • 21. Launching Shaft Machine Entry Launching Seal MT Machine
  • 22.
  • 23.
  • 24. Feeding via Rack & Pinion Trailer version, 11M feeding length (range 2 drill roads) 2,500kN pull force 9 torque 447kW Caterpillar engine - 6 Cylinder – Tropical version with expanded cooling system Noise reduction - Progressively torque regulation via potentiometer Electronic motor control with automatic switching off Load Sensing Control Output : 1.000 l/min 2.500Kn (250t) 6 pcs Poclain radial piston pump motors without gear reducer 8-15º with stable and comfortable support Torque : 90.000Nm -35 rpm45.000Nm -70 rpm Dynamic axial trust load :3.200kN (320t) Static axial thrust load :4.500kN(450t) Drive Shaft slidable for 70mm