1974 – Paris – DC-10 Ship 29
• Turkish Airlines – 346 passengers
• 10,000 feet
• Cargo door failed, floor of passenger
compartment collapsed
• All hydraulic & electrical connections
were severed
• Airplane uncontrollable
• Plane crashed
• All aboard were killed
What Went Wrong?
Who is Responsible?
2
Design Process
• In designing the airframe,
McDonnell-Douglas chose to
make the DC-10 much like the
older DC-8 and DC-9, two very
successful and safe aircraft.
– PRO: sped up design process;
• fitted “an oft-stated company policy of
technological caution”
– CON: question as to whether same
principles apply to wide-body aircraft
“technological caution”
Quotes from McDonnell-Douglas
company literature expressing this
aspect of corporate culture:
– “Be not the first by whom the
new are tried / Nor yet the last
to lay the old aside.”
(Alexander Pope)
– “Pioneering don’t pay.” (Andrew
Carnegie)
More Info About Process
• The DC-10 engineers were constrained by
management to use the existing airframe
technology (which was not necessarily adequate
for an aircraft the size of the DC-10)
• Both Boeing and Lockheed had made several
advancements in their airframe structural
designs for the 747 and the L-1011,
respectively.
• These design advances were not proprietary
• So one might argue that the accepted
engineering practice for building a jumbo jet
was significantly different from what McDonnell-
Douglas was doing. (Fledderman, 76)
Another opinion:
“There are a few points on which most
experts agree, however:
– the DC-10 is fully airworthy in the
sense that it meets all federal
standards for airworthiness;
– from a statistical point of view, it
has been, like the other jet-powered
aircraft, a very safe airplane; . . .
– and the airlines that operate DC-10s
appear satisfied that it does the job
for which it was intended” (Newhouse, 2, p.84)
3
Airworthiness
“If in inspecting an airplane, the
F.A.A. sees a need to repair or
modify something, it issues what is
called an airworthiness directive.
Once issued, such a directive has the
force of law.” (Newhouse, 2, p. 84)
83 directivesDC-10
56 directives747
58 directivesL-1011
As of May 25, 1982, McDonnell-Douglas was well ahead:
“In most ways that matter to airlines, the DC-10 is
similar and does not compare unfavorably with the
other wide-bodies.”
Cargo-Door Latching System
• 3 choices: Plug design / Hydraulic / Electric
– Plug (DC-9) infeasible for larger door
– Electric
• Lighter, fewer parts, easier to maintain
• Exerts pressure only when switched on; irreversible
• If it fails to close completely, it holds more securely
• but more catastrophic failure – sudden
depressurization at high altitude
– Hydraulic
• Heavier, more parts, harder to maintain
• Continually exerts pressure; not irreversible
• If it fails to close completely, more frequent failures
• but less catastrophic failures – less violent
depressurization at much lower altitude
Cargo-Door Latching System
• McDonnell-Douglas went with the
electrical system
– Failure less likely
– More catastrophic if it does fail
4
Passenger Floor Supports
• Followed DC-9 format for number of floor
supports.
• In retrospect, this was relatively few floor
supports given the wide-bodied nature of
the plane.
• WHY? The principle of “technological
caution,” together with severe financial
straits of the company “was apparently
interpreted by its engineers to dictate that
corners be cut and existing Douglas
technology be used, even if it meant that
some systems that were rejected as inferior
by its competitors would be designed into
the DC-10.” (French, 6)
Redundancies of hydraulic & electrical systems
• DC-10: 3 redundant systems
– Both competitors had 4 systems
– How many redundancies becomes a
waste?
• Location of systems
– DC-10: all 3 systems ran in parallel
under the cabin floor
– Boeing: control lines run through the
ceiling above the cabin
FMEA Report
(Failure Mode and Effects Analysis)
One of nine possible failure sequences that
could result in life endangering hazards:
Door will close and latch, but will not
safety lock. Indicator light will indicate
normal position. Door will open in flight--
resulting in sudden depressurization and
possibly structural failure of floor; also
damage to empennage by expelled cargo and/or
detached door. Class IV hazard in flight.
– “Class IV hazard” = possible loss of life
– “empennage” = tail assembly
This report was never submitted to the FAA
Ship 1 (1970)
• the prototype ship was undergoing
standard pressurization tests
• on the ground outside Long Beach
plant
– The cargo door blew and
– The cabin floor collapsed
5
1972 – Windsor, Ontario
• Cargo door failed in flight
• Floor of passenger cabin buckled
• Several (but not all) of the hydraulic
lines were severed
• Pilot maintained control of plane and
landed safely
Remediation (?) after Windsor
• Agreement reached with FAA for
modification of cargo doors
• July 1972 – Ship 29 to Long Beach
“The plant records for July 1972 indicate
that three inspectors stamped the work
records for Ship 29 to indicate the
modifications had been completed and that the
plane was in compliance with FAA guidelines.”
• None of the work had actually been
done
Stated Company Policy
“You are responsible for any work that
your stamp appears on record for
accepting.”
Actual Company Practice
• One of the inspectors explained the
presence of his stamp by saying “it was
high summer” and he probably became
confused.
• The other 2 offered no explanation at all.
• Corporate executives rushed to deny any
responsibility for seeing that the work
was actually done
6
French’s Analysis:
• “the McDonnell-Douglas system . . . Is
fundamentally weak and easily compromised by
employees who have fallen into a rather
automatic pattern of behavior encouraged by
that company policy and procedure.” (French, 9)
• “The evidence supports the view that over the
years McDonnell-Douglas established an
inspection procedure that invites or tempts
inspectors to be lax and careless and some of
the inspectors, either through inadvertence
or because of conditioning to laxness,
cursorily performed tasks that, given the
basically poor design of the aircraft, called
for the closest attention to detail to insure
safety.” (French, 9)
Who’s to blame? French says:
• “The actions of the three inspectors
are not excusable . . .
• but it would be a grand offense to
our moral intuitions . . . to hold
these inspectors primarily
responsible for the crash of Ship 29.
• We are brought back to the principal
actor in the design, manufacture, and
sale of Ship 29, McDonnell-Douglas
Corporation.” (French, 10)
Corporate, not Individual Responsibility
Two Speculative Scenarios:
1. “invites or tempts” – Inspectors hear
management complain frequently about
government mandates, expressing the
view that the modifications ordered are
meaningless and make no difference with
regard to safety.
2. The company’s financial straits leads to
cutting several personnel lines for
inspectors. Those remaining are given
heavier workloads than they can possibly
carry out. When they complain, they are
told “Do the best you can.”
Bibliography
• Peter French, “What is Hamlet to
McDonnell-Douglas or McDonnell-Douglas to
Hamlet?” Business & Professional Ethics
Journal vol. 1, no. 2 (1982), pp. 1-13.
• Daniel A. Vallero, and P. Aarne Vesilind.
Socially Responsible Engineering Justice in
Risk Management. (Hoboken, NJ John Wiley
& Sons, 2007), pp. 66-71.
• Charles B. Fleddermann. Engineering Ethics.
(Upper Saddle River, NJ Prentice Hall,
1999).
7
Bibliography (2)
John Newhouse, “A Reporter at
Large: A Sporty Game,” The
New Yorker
1. “Betting the Company” – June 14,
1982 (pp. 48-105)
2. “Turbulent” – June 21, 1982 (pp. 46-
93)
3. “Big, Bigger, Jumbo” – June 28,
1982 (pp. 45-86)
4. “A Hole in the Market” – July 5, 1982
(pp. 44-89)
Webography
• Applying Lessons Learned from
Accidents: Turk Hava Flight TK981, DC-10, Paris
http://faalessons.workforceconnect.org/l2/Turk/
• Aviation Safety Network
http://aviation-safety.net/database/type/type.php?type=352

More Related Content

What's hot

Unit III GE8076 Professional Ethics in Engineering by Dr.Selvaganesan
Unit III GE8076 Professional Ethics in Engineering by Dr.SelvaganesanUnit III GE8076 Professional Ethics in Engineering by Dr.Selvaganesan
Unit III GE8076 Professional Ethics in Engineering by Dr.SelvaganesanDr. SELVAGANESAN S
 
Professional Ethics Module 3 Notes
Professional Ethics Module 3 NotesProfessional Ethics Module 3 Notes
Professional Ethics Module 3 NotesBella Meraki
 
Engineering as social experimentation 17 18
Engineering as social experimentation 17 18Engineering as social experimentation 17 18
Engineering as social experimentation 17 18rajeshvbe
 
Bhopal case study professional ethics
Bhopal case study professional ethicsBhopal case study professional ethics
Bhopal case study professional ethicsSKS
 
Engineering Ethics
Engineering EthicsEngineering Ethics
Engineering EthicsDon W. Lewis
 
DOT HazMat Shipping Compliance
DOT HazMat Shipping ComplianceDOT HazMat Shipping Compliance
DOT HazMat Shipping ComplianceKPADealerWebinars
 
Unit 2-GE 6075 – PROFESSIONAL ETHICS IN ENGINEERING ...
Unit 2-GE 6075 – PROFESSIONAL ETHICS IN ENGINEERING                          ...Unit 2-GE 6075 – PROFESSIONAL ETHICS IN ENGINEERING                          ...
Unit 2-GE 6075 – PROFESSIONAL ETHICS IN ENGINEERING ...Mohanumar S
 
Professional Ethics in Engineering
Professional Ethics in Engineering Professional Ethics in Engineering
Professional Ethics in Engineering Karthikeyan I
 
Ge6075 professional ethics in engineering unit 1
Ge6075 professional ethics in engineering  unit 1Ge6075 professional ethics in engineering  unit 1
Ge6075 professional ethics in engineering unit 1Dr Geetha Mohan
 
Professional Ethics Module 5 Notes
Professional Ethics Module 5 NotesProfessional Ethics Module 5 Notes
Professional Ethics Module 5 NotesBella Meraki
 
Engineers as experts and advisors
Engineers as experts and advisorsEngineers as experts and advisors
Engineers as experts and advisorsSKS
 
principle of management and professional ethics
principle of management and professional ethicsprinciple of management and professional ethics
principle of management and professional ethicssabarish k.v
 
Global Issues-Professional Ethics
Global Issues-Professional EthicsGlobal Issues-Professional Ethics
Global Issues-Professional EthicsHari Haran
 
Unit 4-GE 6075 – PROFESSIONAL ETHICS IN ENGINEERING ...
Unit 4-GE 6075 – PROFESSIONAL ETHICS IN ENGINEERING                          ...Unit 4-GE 6075 – PROFESSIONAL ETHICS IN ENGINEERING                          ...
Unit 4-GE 6075 – PROFESSIONAL ETHICS IN ENGINEERING ...Mohanumar S
 
Unit II Engineering Ethics (GE8076 Professional Ethics in Engineering)
Unit II Engineering Ethics (GE8076 Professional Ethics in Engineering)Unit II Engineering Ethics (GE8076 Professional Ethics in Engineering)
Unit II Engineering Ethics (GE8076 Professional Ethics in Engineering)Dr. SELVAGANESAN S
 
Engineers are responsible experimenters
Engineers are responsible experimentersEngineers are responsible experimenters
Engineers are responsible experimentersSKS
 

What's hot (20)

CHALLENGER CASE STUDY
CHALLENGER CASE STUDYCHALLENGER CASE STUDY
CHALLENGER CASE STUDY
 
Unit III GE8076 Professional Ethics in Engineering by Dr.Selvaganesan
Unit III GE8076 Professional Ethics in Engineering by Dr.SelvaganesanUnit III GE8076 Professional Ethics in Engineering by Dr.Selvaganesan
Unit III GE8076 Professional Ethics in Engineering by Dr.Selvaganesan
 
Professional Ethics Module 3 Notes
Professional Ethics Module 3 NotesProfessional Ethics Module 3 Notes
Professional Ethics Module 3 Notes
 
Engineering Ethics
Engineering EthicsEngineering Ethics
Engineering Ethics
 
Engineering as social experimentation 17 18
Engineering as social experimentation 17 18Engineering as social experimentation 17 18
Engineering as social experimentation 17 18
 
Bhopal case study professional ethics
Bhopal case study professional ethicsBhopal case study professional ethics
Bhopal case study professional ethics
 
Engineering Ethics
Engineering EthicsEngineering Ethics
Engineering Ethics
 
Senses of engineering ethics1
Senses of engineering ethics1Senses of engineering ethics1
Senses of engineering ethics1
 
DOT HazMat Shipping Compliance
DOT HazMat Shipping ComplianceDOT HazMat Shipping Compliance
DOT HazMat Shipping Compliance
 
Unit 2-GE 6075 – PROFESSIONAL ETHICS IN ENGINEERING ...
Unit 2-GE 6075 – PROFESSIONAL ETHICS IN ENGINEERING                          ...Unit 2-GE 6075 – PROFESSIONAL ETHICS IN ENGINEERING                          ...
Unit 2-GE 6075 – PROFESSIONAL ETHICS IN ENGINEERING ...
 
Professional Ethics in Engineering
Professional Ethics in Engineering Professional Ethics in Engineering
Professional Ethics in Engineering
 
Ge6075 professional ethics in engineering unit 1
Ge6075 professional ethics in engineering  unit 1Ge6075 professional ethics in engineering  unit 1
Ge6075 professional ethics in engineering unit 1
 
Professional Ethics Module 5 Notes
Professional Ethics Module 5 NotesProfessional Ethics Module 5 Notes
Professional Ethics Module 5 Notes
 
Engineers as experts and advisors
Engineers as experts and advisorsEngineers as experts and advisors
Engineers as experts and advisors
 
principle of management and professional ethics
principle of management and professional ethicsprinciple of management and professional ethics
principle of management and professional ethics
 
GE6075 PROFESSIONAL ETHICS IN ENGINEERING Unit 4
GE6075 PROFESSIONAL ETHICS IN ENGINEERINGUnit 4GE6075 PROFESSIONAL ETHICS IN ENGINEERINGUnit 4
GE6075 PROFESSIONAL ETHICS IN ENGINEERING Unit 4
 
Global Issues-Professional Ethics
Global Issues-Professional EthicsGlobal Issues-Professional Ethics
Global Issues-Professional Ethics
 
Unit 4-GE 6075 – PROFESSIONAL ETHICS IN ENGINEERING ...
Unit 4-GE 6075 – PROFESSIONAL ETHICS IN ENGINEERING                          ...Unit 4-GE 6075 – PROFESSIONAL ETHICS IN ENGINEERING                          ...
Unit 4-GE 6075 – PROFESSIONAL ETHICS IN ENGINEERING ...
 
Unit II Engineering Ethics (GE8076 Professional Ethics in Engineering)
Unit II Engineering Ethics (GE8076 Professional Ethics in Engineering)Unit II Engineering Ethics (GE8076 Professional Ethics in Engineering)
Unit II Engineering Ethics (GE8076 Professional Ethics in Engineering)
 
Engineers are responsible experimenters
Engineers are responsible experimentersEngineers are responsible experimenters
Engineers are responsible experimenters
 

Viewers also liked

3Com 3C16976
3Com 3C169763Com 3C16976
3Com 3C16976savomir
 
3Com QS-200
3Com QS-2003Com QS-200
3Com QS-200savomir
 
3Com 2012-10 REV E
3Com 2012-10 REV E3Com 2012-10 REV E
3Com 2012-10 REV Esavomir
 
Ganz schön überzeugend
Ganz schön überzeugendGanz schön überzeugend
Ganz schön überzeugendJingleT
 
Músculos del Abdomen
Músculos del AbdomenMúsculos del Abdomen
Músculos del AbdomenCarlos Parra
 
Chapitre 2: I. Les origines de la séparation
Chapitre 2: I. Les origines de la séparationChapitre 2: I. Les origines de la séparation
Chapitre 2: I. Les origines de la séparationPierrot Caron
 
Guia para elaborar un presupuesto familiar
Guia para elaborar un presupuesto familiarGuia para elaborar un presupuesto familiar
Guia para elaborar un presupuesto familiarHacienda de las Flores
 
Conservacao alimentos 2015
Conservacao alimentos 2015Conservacao alimentos 2015
Conservacao alimentos 2015Ana Paula F
 
Herramientas tecnicas para computación
Herramientas tecnicas para computaciónHerramientas tecnicas para computación
Herramientas tecnicas para computaciónJuan Correa Muñoz
 
Trabajo medicion-del-desempeno-de-una-organizacion-lluvias-de-ideas
Trabajo medicion-del-desempeno-de-una-organizacion-lluvias-de-ideasTrabajo medicion-del-desempeno-de-una-organizacion-lluvias-de-ideas
Trabajo medicion-del-desempeno-de-una-organizacion-lluvias-de-ideasCinthya Jael Pena Mejia
 

Viewers also liked (16)

3Com 3C16976
3Com 3C169763Com 3C16976
3Com 3C16976
 
3Com QS-200
3Com QS-2003Com QS-200
3Com QS-200
 
3Com 2012-10 REV E
3Com 2012-10 REV E3Com 2012-10 REV E
3Com 2012-10 REV E
 
Los correos electrónicos roglys
Los correos electrónicos roglysLos correos electrónicos roglys
Los correos electrónicos roglys
 
Ganz schön überzeugend
Ganz schön überzeugendGanz schön überzeugend
Ganz schön überzeugend
 
Umdsd2017 kickoff 3
Umdsd2017 kickoff 3Umdsd2017 kickoff 3
Umdsd2017 kickoff 3
 
Globalworth media
Globalworth mediaGlobalworth media
Globalworth media
 
Músculos del Abdomen
Músculos del AbdomenMúsculos del Abdomen
Músculos del Abdomen
 
Chapitre 2: I. Les origines de la séparation
Chapitre 2: I. Les origines de la séparationChapitre 2: I. Les origines de la séparation
Chapitre 2: I. Les origines de la séparation
 
Guia para elaborar un presupuesto familiar
Guia para elaborar un presupuesto familiarGuia para elaborar un presupuesto familiar
Guia para elaborar un presupuesto familiar
 
Phillip king
Phillip kingPhillip king
Phillip king
 
Conservacao alimentos 2015
Conservacao alimentos 2015Conservacao alimentos 2015
Conservacao alimentos 2015
 
Herramientas tecnicas para computación
Herramientas tecnicas para computaciónHerramientas tecnicas para computación
Herramientas tecnicas para computación
 
020530 pulpitis
020530 pulpitis020530 pulpitis
020530 pulpitis
 
Trabajo medicion-del-desempeno-de-una-organizacion-lluvias-de-ideas
Trabajo medicion-del-desempeno-de-una-organizacion-lluvias-de-ideasTrabajo medicion-del-desempeno-de-una-organizacion-lluvias-de-ideas
Trabajo medicion-del-desempeno-de-una-organizacion-lluvias-de-ideas
 
Soldadura
SoldaduraSoldadura
Soldadura
 

Similar to DC-10

Ieeepro techno solutions ieee 2014 embedded project next-generation airbo...
Ieeepro techno solutions    ieee 2014 embedded project  next-generation airbo...Ieeepro techno solutions    ieee 2014 embedded project  next-generation airbo...
Ieeepro techno solutions ieee 2014 embedded project next-generation airbo...srinivasanece7
 
Reliability engineering chapter-1csi
Reliability engineering chapter-1csiReliability engineering chapter-1csi
Reliability engineering chapter-1csiCharlton Inao
 
Case study swiss air flight 111 crash investigation
Case study swiss air flight 111 crash investigationCase study swiss air flight 111 crash investigation
Case study swiss air flight 111 crash investigationNatalia Welton-Torres
 
Knuckledragger Disasters and What Engineers Can Do to Prevent Them
Knuckledragger Disasters and What Engineers Can Do to Prevent ThemKnuckledragger Disasters and What Engineers Can Do to Prevent Them
Knuckledragger Disasters and What Engineers Can Do to Prevent Themwboelter
 
ENGINEERING_ETHICS_CASE_STUDIES.pdf
ENGINEERING_ETHICS_CASE_STUDIES.pdfENGINEERING_ETHICS_CASE_STUDIES.pdf
ENGINEERING_ETHICS_CASE_STUDIES.pdfEmiNaito
 
The concorde project
The concorde projectThe concorde project
The concorde projectAsim Kulkarni
 
Stewart ACADIA Presentation v3.pptx
Stewart ACADIA Presentation v3.pptxStewart ACADIA Presentation v3.pptx
Stewart ACADIA Presentation v3.pptxRichardHolt44
 
Lecture 10: Creative Spaces
Lecture 10: Creative SpacesLecture 10: Creative Spaces
Lecture 10: Creative SpacesTathagat Varma
 
Zlozenie wraku
Zlozenie wrakuZlozenie wraku
Zlozenie wrakuwikb
 
CAV_2323_CHAPTER_1_INTRODUCTION_TO_HUMAN.pptx
CAV_2323_CHAPTER_1_INTRODUCTION_TO_HUMAN.pptxCAV_2323_CHAPTER_1_INTRODUCTION_TO_HUMAN.pptx
CAV_2323_CHAPTER_1_INTRODUCTION_TO_HUMAN.pptxEndris Mohammed
 
Concorde project
Concorde projectConcorde project
Concorde projectDao Hoa
 
Airline Accidents.pptx
Airline Accidents.pptxAirline Accidents.pptx
Airline Accidents.pptxRanaImam
 
Final Presentation STL UAM.pptx
Final Presentation STL UAM.pptxFinal Presentation STL UAM.pptx
Final Presentation STL UAM.pptxsanathviswanathan
 
Stress analysis on compressor blades during bird strike.pptx
Stress analysis on compressor blades during bird strike.pptxStress analysis on compressor blades during bird strike.pptx
Stress analysis on compressor blades during bird strike.pptxGANGIDISAINATHREDDY
 
I will give you a choice of two topics to write about. Choose one .docx
I will give you a choice of two topics to write about. Choose one .docxI will give you a choice of two topics to write about. Choose one .docx
I will give you a choice of two topics to write about. Choose one .docxsheronlewthwaite
 

Similar to DC-10 (20)

Business ethics
Business ethicsBusiness ethics
Business ethics
 
Ieeepro techno solutions ieee 2014 embedded project next-generation airbo...
Ieeepro techno solutions    ieee 2014 embedded project  next-generation airbo...Ieeepro techno solutions    ieee 2014 embedded project  next-generation airbo...
Ieeepro techno solutions ieee 2014 embedded project next-generation airbo...
 
Reliability engineering chapter-1csi
Reliability engineering chapter-1csiReliability engineering chapter-1csi
Reliability engineering chapter-1csi
 
Case study swiss air flight 111 crash investigation
Case study swiss air flight 111 crash investigationCase study swiss air flight 111 crash investigation
Case study swiss air flight 111 crash investigation
 
Knuckledragger Disasters and What Engineers Can Do to Prevent Them
Knuckledragger Disasters and What Engineers Can Do to Prevent ThemKnuckledragger Disasters and What Engineers Can Do to Prevent Them
Knuckledragger Disasters and What Engineers Can Do to Prevent Them
 
ENGINEERING_ETHICS_CASE_STUDIES.pdf
ENGINEERING_ETHICS_CASE_STUDIES.pdfENGINEERING_ETHICS_CASE_STUDIES.pdf
ENGINEERING_ETHICS_CASE_STUDIES.pdf
 
The Comet Disaster.pptx
The Comet Disaster.pptxThe Comet Disaster.pptx
The Comet Disaster.pptx
 
Omni Essay
Omni EssayOmni Essay
Omni Essay
 
The Comet Disaster.pptx
The Comet Disaster.pptxThe Comet Disaster.pptx
The Comet Disaster.pptx
 
The concorde project
The concorde projectThe concorde project
The concorde project
 
Stewart ACADIA Presentation v3.pptx
Stewart ACADIA Presentation v3.pptxStewart ACADIA Presentation v3.pptx
Stewart ACADIA Presentation v3.pptx
 
Lecture 10: Creative Spaces
Lecture 10: Creative SpacesLecture 10: Creative Spaces
Lecture 10: Creative Spaces
 
Zlozenie wraku
Zlozenie wrakuZlozenie wraku
Zlozenie wraku
 
CAV_2323_CHAPTER_1_INTRODUCTION_TO_HUMAN.pptx
CAV_2323_CHAPTER_1_INTRODUCTION_TO_HUMAN.pptxCAV_2323_CHAPTER_1_INTRODUCTION_TO_HUMAN.pptx
CAV_2323_CHAPTER_1_INTRODUCTION_TO_HUMAN.pptx
 
Concorde project
Concorde projectConcorde project
Concorde project
 
Airline Accidents.pptx
Airline Accidents.pptxAirline Accidents.pptx
Airline Accidents.pptx
 
Final Presentation STL UAM.pptx
Final Presentation STL UAM.pptxFinal Presentation STL UAM.pptx
Final Presentation STL UAM.pptx
 
Download
DownloadDownload
Download
 
Stress analysis on compressor blades during bird strike.pptx
Stress analysis on compressor blades during bird strike.pptxStress analysis on compressor blades during bird strike.pptx
Stress analysis on compressor blades during bird strike.pptx
 
I will give you a choice of two topics to write about. Choose one .docx
I will give you a choice of two topics to write about. Choose one .docxI will give you a choice of two topics to write about. Choose one .docx
I will give you a choice of two topics to write about. Choose one .docx
 

Recently uploaded

Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfakmcokerachita
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting DataJhengPantaleon
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 

Recently uploaded (20)

Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdf
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 

DC-10

  • 1. 1 DC-10 Problems Whose Responsibility? Glenn C. Graber Christopher D. Pionke Philosophy Mechanical, Aerospace & Biomedical Engineering 1974 – Paris – DC-10 Ship 29 • Turkish Airlines – 346 passengers • 10,000 feet • Cargo door failed, floor of passenger compartment collapsed • All hydraulic & electrical connections were severed • Airplane uncontrollable • Plane crashed • All aboard were killed What Went Wrong? Who is Responsible?
  • 2. 2 Design Process • In designing the airframe, McDonnell-Douglas chose to make the DC-10 much like the older DC-8 and DC-9, two very successful and safe aircraft. – PRO: sped up design process; • fitted “an oft-stated company policy of technological caution” – CON: question as to whether same principles apply to wide-body aircraft “technological caution” Quotes from McDonnell-Douglas company literature expressing this aspect of corporate culture: – “Be not the first by whom the new are tried / Nor yet the last to lay the old aside.” (Alexander Pope) – “Pioneering don’t pay.” (Andrew Carnegie) More Info About Process • The DC-10 engineers were constrained by management to use the existing airframe technology (which was not necessarily adequate for an aircraft the size of the DC-10) • Both Boeing and Lockheed had made several advancements in their airframe structural designs for the 747 and the L-1011, respectively. • These design advances were not proprietary • So one might argue that the accepted engineering practice for building a jumbo jet was significantly different from what McDonnell- Douglas was doing. (Fledderman, 76) Another opinion: “There are a few points on which most experts agree, however: – the DC-10 is fully airworthy in the sense that it meets all federal standards for airworthiness; – from a statistical point of view, it has been, like the other jet-powered aircraft, a very safe airplane; . . . – and the airlines that operate DC-10s appear satisfied that it does the job for which it was intended” (Newhouse, 2, p.84)
  • 3. 3 Airworthiness “If in inspecting an airplane, the F.A.A. sees a need to repair or modify something, it issues what is called an airworthiness directive. Once issued, such a directive has the force of law.” (Newhouse, 2, p. 84) 83 directivesDC-10 56 directives747 58 directivesL-1011 As of May 25, 1982, McDonnell-Douglas was well ahead: “In most ways that matter to airlines, the DC-10 is similar and does not compare unfavorably with the other wide-bodies.” Cargo-Door Latching System • 3 choices: Plug design / Hydraulic / Electric – Plug (DC-9) infeasible for larger door – Electric • Lighter, fewer parts, easier to maintain • Exerts pressure only when switched on; irreversible • If it fails to close completely, it holds more securely • but more catastrophic failure – sudden depressurization at high altitude – Hydraulic • Heavier, more parts, harder to maintain • Continually exerts pressure; not irreversible • If it fails to close completely, more frequent failures • but less catastrophic failures – less violent depressurization at much lower altitude Cargo-Door Latching System • McDonnell-Douglas went with the electrical system – Failure less likely – More catastrophic if it does fail
  • 4. 4 Passenger Floor Supports • Followed DC-9 format for number of floor supports. • In retrospect, this was relatively few floor supports given the wide-bodied nature of the plane. • WHY? The principle of “technological caution,” together with severe financial straits of the company “was apparently interpreted by its engineers to dictate that corners be cut and existing Douglas technology be used, even if it meant that some systems that were rejected as inferior by its competitors would be designed into the DC-10.” (French, 6) Redundancies of hydraulic & electrical systems • DC-10: 3 redundant systems – Both competitors had 4 systems – How many redundancies becomes a waste? • Location of systems – DC-10: all 3 systems ran in parallel under the cabin floor – Boeing: control lines run through the ceiling above the cabin FMEA Report (Failure Mode and Effects Analysis) One of nine possible failure sequences that could result in life endangering hazards: Door will close and latch, but will not safety lock. Indicator light will indicate normal position. Door will open in flight-- resulting in sudden depressurization and possibly structural failure of floor; also damage to empennage by expelled cargo and/or detached door. Class IV hazard in flight. – “Class IV hazard” = possible loss of life – “empennage” = tail assembly This report was never submitted to the FAA Ship 1 (1970) • the prototype ship was undergoing standard pressurization tests • on the ground outside Long Beach plant – The cargo door blew and – The cabin floor collapsed
  • 5. 5 1972 – Windsor, Ontario • Cargo door failed in flight • Floor of passenger cabin buckled • Several (but not all) of the hydraulic lines were severed • Pilot maintained control of plane and landed safely Remediation (?) after Windsor • Agreement reached with FAA for modification of cargo doors • July 1972 – Ship 29 to Long Beach “The plant records for July 1972 indicate that three inspectors stamped the work records for Ship 29 to indicate the modifications had been completed and that the plane was in compliance with FAA guidelines.” • None of the work had actually been done Stated Company Policy “You are responsible for any work that your stamp appears on record for accepting.” Actual Company Practice • One of the inspectors explained the presence of his stamp by saying “it was high summer” and he probably became confused. • The other 2 offered no explanation at all. • Corporate executives rushed to deny any responsibility for seeing that the work was actually done
  • 6. 6 French’s Analysis: • “the McDonnell-Douglas system . . . Is fundamentally weak and easily compromised by employees who have fallen into a rather automatic pattern of behavior encouraged by that company policy and procedure.” (French, 9) • “The evidence supports the view that over the years McDonnell-Douglas established an inspection procedure that invites or tempts inspectors to be lax and careless and some of the inspectors, either through inadvertence or because of conditioning to laxness, cursorily performed tasks that, given the basically poor design of the aircraft, called for the closest attention to detail to insure safety.” (French, 9) Who’s to blame? French says: • “The actions of the three inspectors are not excusable . . . • but it would be a grand offense to our moral intuitions . . . to hold these inspectors primarily responsible for the crash of Ship 29. • We are brought back to the principal actor in the design, manufacture, and sale of Ship 29, McDonnell-Douglas Corporation.” (French, 10) Corporate, not Individual Responsibility Two Speculative Scenarios: 1. “invites or tempts” – Inspectors hear management complain frequently about government mandates, expressing the view that the modifications ordered are meaningless and make no difference with regard to safety. 2. The company’s financial straits leads to cutting several personnel lines for inspectors. Those remaining are given heavier workloads than they can possibly carry out. When they complain, they are told “Do the best you can.” Bibliography • Peter French, “What is Hamlet to McDonnell-Douglas or McDonnell-Douglas to Hamlet?” Business & Professional Ethics Journal vol. 1, no. 2 (1982), pp. 1-13. • Daniel A. Vallero, and P. Aarne Vesilind. Socially Responsible Engineering Justice in Risk Management. (Hoboken, NJ John Wiley & Sons, 2007), pp. 66-71. • Charles B. Fleddermann. Engineering Ethics. (Upper Saddle River, NJ Prentice Hall, 1999).
  • 7. 7 Bibliography (2) John Newhouse, “A Reporter at Large: A Sporty Game,” The New Yorker 1. “Betting the Company” – June 14, 1982 (pp. 48-105) 2. “Turbulent” – June 21, 1982 (pp. 46- 93) 3. “Big, Bigger, Jumbo” – June 28, 1982 (pp. 45-86) 4. “A Hole in the Market” – July 5, 1982 (pp. 44-89) Webography • Applying Lessons Learned from Accidents: Turk Hava Flight TK981, DC-10, Paris http://faalessons.workforceconnect.org/l2/Turk/ • Aviation Safety Network http://aviation-safety.net/database/type/type.php?type=352