NAMIBIA CONCESSION MODEL
INTRODUCTION 
•CONCESSION MEANS THE RIGHTS, WHETHER FULL OR RESTRICTED, SHARED OR EXCLUSIVE TO CONDUCT TOURISM ACTIVITIES. 
•CONCESSION ON STATE LAND HAVE SIGNIFICANT ROLE TO PLAY IN NAMIBIA AND COMPLEMENT OTHER CONTRIBUTORS TO THE ECONOMY OF THE COUNTRY. 
•CONCESSION ALSO CREATE OPPORTUNITIES FOR BUSINESS DEVELOPMENT AND THE ECONOMIC EMPOWERMENT OF FORMERLY DISADVANTAGES NAMIBIA THROUGH ACCESS TO TOURISM, HUNTING AND INDUSTRIES BASED ON WILDLIFE PLANT AND ANIMAL RESOURCES.
BOT (BUILD OPERATE TRANSFER) VS MOT (MANAGE OPERATE TRANSFER) 
STATE LESSOR/CONCESSOR(MET) 
CONSERVANCYCONCESSIONAIRE 
(COMMUNITY) 
OPERATOR 
OPERATING COMPANY 
STATE LESSOR/CONCESSOR(MET) 
CONSERVANCYCONCESSIONAIRE 
(COMMUNITY) 
PROJECT COMPANY (COMMUNITY) 
MANAGEMENT COMPANY (C0NTRACT)
THE STATE 
•THE STATE AWARDS THE HEAD CONCESSION CONTRACT TO THE CONSERVANCY. 
•THE STATE GIVES TOURISM RIGHTS TO BUILD A LODGE OR A TRAVERSING RIGHT TO DO GAME DRIVES TO THE CONSERVANCY INSIDE PROTECTED AREAS. 
•THE STATE USES TEMPLATE CONTRACTS AND STANDARDIZED PROCEDURE TO ABIDE THE CONSERVANCY TO THE TERMS AND CONDITION AS REQUIRED BY THE CONCESSOR (MET). 
•AFTER THE SIGNING OF THE CONTRACT, THE CONSERVANCY/THE HEAD CONCESSION CONTRACT HOLDER THAN ASSUME THE RIGHTS AND DUTIES. 
•MET HELPS THE CONSERVANCY IN SEEKING FOR A JOINT VENTURE PARTNER (OPERATOR). 
•ONCE THE OPERATOR IS APPOINTED, HE TAKES OVER THE ONGOING OVERSIGHT AND REGULATORY FUNCTIONS. 
•THE OPERATOR TAKES FULL RESPONSIBILITY AFTER THE SIGNING OF THE OPERATORS CONCESSION CONTACT.
CONSERVANCY 
•(CONSERVANCY OR OTHER REPRESENTATIVE LEGAL BODY): RECEIVES HEAD‐CONCESSION- CONTRACT FROM STATE. 
•ASSUMES RIGHTS & DUTIES OF HEAD-CONCESSION-CONTRACT 
•THE CONSERVANCY SUBLEASES THEIR RIGHTS IN THE HEAD-CONCESSIONS-CONTRACT TO PROJECT/OPERATING COMPANY USING STANDARDIZED DOCUMENTS & PROCEDURES 
•THE OPERATING COMPANY ASSUMES RIGHTS & DUTIES OF SUBLEASE/--‐CONCESSION 
•RECEIVES INCOME BASED ON FIXED AND VARIABLE FEES 
•PAYS A FEE OR % OF INCOME TO STATE AND USES OR DISTRIBUTES BALANCE
PROJECT COMPANY (INVESTOR) 
•RECEIVES OPERATORS CONCESSION CONTRACT FROM THE CONSERVANCY 
•ASSUMES RIGHTS AND DUTIES OF THE OPERATOR. 
•CARRIES CAPITAL AND OPERATING RISK 
•PAYS ‘RESOURCE FEE’ WITH FIXED AND VARIABLE ELEMENTS 
•ALSO FINANCES, DESIGNS, BUILDS, OPERATES, MAINTAINS REFURBISHES, MARKETS, TRANSFERS BACK… 
•…AND ENSURES BROAD--‐BASED COMMUNITY EMPOWERMENT 
•VARIATION IN COMMUNITY PARTICIPATION AT PROJECT COMPANY LEVELS
THE TWO MODELS USED IN NAMIBIA 
(BOT)-BUILD-OPERATE- TRANSFER 
BASIC STRUCTURE WITH NO CONSERVANCY SHARE IN THE PROJECT COMPONY 
THIS IS A CONTRACT WITH FULL MAINTENANCE OBLIGATION 
THE PROJECT COMPANY OWN BY PRIVATE PARTNER WITH PDN- (PRIVIOUSLY DISADVANTAGE NAMIBIAN) SHAREHOLDING…. 
PROCURED THROUGH TENDER PROCESS. 
SUBJECTED TO EMPOWERMENT OBLIGATIONS AND INCLUDING, PREFERENTIAL EMPLOYMENT, TRAINING, LOCAL CONTRACTING AND SOCIAL INVESTMENT 
THE COMPANY CARRIES ALL RISK IN MAKING THINGS WORK…. 
FULL OWNERSHIP WITH 3RD PARTY MANAGEMENT 
BASIC STRUCTURE PLUS CONSERVANCY OWNERSHIP OF PROJECT COMPANY. 
PROJECT COMPANY FINANCE AND RETAINS BOT RESPONSIBILITY….BUT APPOINTS EXTERNAL MANAGER ON MANAGEMENT CONTRACT. 
PROJECT COMPANY OWNED BY THE COMMUNITY/CONSERVANCY….THEY BUILD OPERATE AND TRANSFER TO THE MANAGEMENT CONTRACT. 
MANAGEMENT COMPANY WILL DO THE OPERATIONS & MARKETING 
THE MAIN DIFFERENCE IN THIS MODEL IS THE CONSERVANCY CARRIES THE WHOLE RISK
ADVANTAGES AND DISADVANTAGES 
BOT 
Advantages 
Disadvantages 
□ Clear definition of roles 
□ Perceived low levels of empowerment 
□ Simple structure 
□ Perceived 'passive role' for conservancy 
□ Conservancy 'head rights' secure 
□ Capital returns accrue to private investor 
□ 'Resource-use' fee secure 
□ Operating returns accrue to private partner 
□ Distributes risks/roles to appropriate parties? 
□ Overall, low-risk but low-return model 
Some Implications 
MOT 
Advantages 
Disadvantages 
□ Clear definition of roles 
□ Levels of empowerment still perceived to be low 
□ Simple structure 
□ Perceived 'passive role' for conservancy 
□ Conservancy 'head rights' secure 
□ Operating returns accrue to private partner 
□ 'Resource-use' fee secure 
□ Capital risk with conservancy (or shared with private partner according to % inputs) 
□ Capital returns accrue to community (or shared with private partner according to % inputs) 
□ Conservancy requires access to large capital sum 
Some Implications
SOME IMPLICATIONS ON THE BOT (BUILD OPERATE TRANSFER) MODEL 
Project financing - Requires no community capital because project is entirely financed by private 
partner 
Conflict resolution - Contractually governed (Joint Management Committee followed by mediation 
and arbitration) 
Exit strategies - Contractually governed (termination after exhaustion of required procedures) 
Support requirements- Low compared to other options; but still requires support (compliance and 
enforcement)
SOME IMPLICATIONS ON THE MOT MODEL 
Project financing - Requires community capital; fixed assets (or portion of) financed by conservancy; 
moveable assets & operating capital by private partner 
Conflict resolution - Contractually governed (Joint Management Committee followed by mediation and 
arbitration) 
Exit strategies - Contractually governed (termination after exhaustion of required procedures)
THE END 
THANK YOU AND ENJOY THE REST OF THE WORKSHOP

More Related Content

Viewers also liked

Naturally Namibia 2014
Naturally Namibia 2014 Naturally Namibia 2014
Naturally Namibia 2014
Ben Forbes
 
National Parks Of The World
National Parks Of The WorldNational Parks Of The World
National Parks Of The World
trisha garcia
 
Conservancy Safaris Presentation
Conservancy Safaris PresentationConservancy Safaris Presentation
Conservancy Safaris Presentation
Sarah Fazendin
 
Ser 2011
Ser 2011Ser 2011
Ser 2011
Sequitorian
 
National parks.......
National parks.......National parks.......
National parks.......
Neethu Kannan
 
Chobe Water Villas - Namibia - Presentation October 2014
Chobe Water Villas - Namibia - Presentation October 2014Chobe Water Villas - Namibia - Presentation October 2014
Chobe Water Villas - Namibia - Presentation October 2014
Ohlthaver List
 
Republic Of Namibia
Republic Of NamibiaRepublic Of Namibia
Republic Of Namibia
John *
 
National parks presentation slide
National parks presentation slideNational parks presentation slide
National parks presentation slide
Chong Chin Pin
 
National parks
National parksNational parks
National parks
Bilal Arshad
 

Viewers also liked (9)

Naturally Namibia 2014
Naturally Namibia 2014 Naturally Namibia 2014
Naturally Namibia 2014
 
National Parks Of The World
National Parks Of The WorldNational Parks Of The World
National Parks Of The World
 
Conservancy Safaris Presentation
Conservancy Safaris PresentationConservancy Safaris Presentation
Conservancy Safaris Presentation
 
Ser 2011
Ser 2011Ser 2011
Ser 2011
 
National parks.......
National parks.......National parks.......
National parks.......
 
Chobe Water Villas - Namibia - Presentation October 2014
Chobe Water Villas - Namibia - Presentation October 2014Chobe Water Villas - Namibia - Presentation October 2014
Chobe Water Villas - Namibia - Presentation October 2014
 
Republic Of Namibia
Republic Of NamibiaRepublic Of Namibia
Republic Of Namibia
 
National parks presentation slide
National parks presentation slideNational parks presentation slide
National parks presentation slide
 
National parks
National parksNational parks
National parks
 

Similar to Day 1 namibia concession model vitalis mushongo_ministry of environment and tourism

Alternative sources of financing
Alternative sources of financingAlternative sources of financing
Alternative sources of financing
Sonali Jindal
 
Answer to Soft Economy – Mega Developments Phasing & Sustainability Issue...
Answer to Soft Economy – Mega Developments Phasing & Sustainability Issue...Answer to Soft Economy – Mega Developments Phasing & Sustainability Issue...
Answer to Soft Economy – Mega Developments Phasing & Sustainability Issue...
Loay Ghazaleh MBA, BSc Civil Eng.
 
Blended Finance - Session 11 Managing Project Preparation for Climate Change ...
Blended Finance - Session 11 Managing Project Preparation for Climate Change ...Blended Finance - Session 11 Managing Project Preparation for Climate Change ...
Blended Finance - Session 11 Managing Project Preparation for Climate Change ...
UNDP Climate
 
Infrastruture Financing 2.pptx
Infrastruture Financing 2.pptxInfrastruture Financing 2.pptx
Infrastruture Financing 2.pptx
ssuserc606c7
 
F5 Linking Economic Development and Social Equity
F5   Linking Economic Development and Social EquityF5   Linking Economic Development and Social Equity
F5 Linking Economic Development and Social Equity
Southern New England American Planning Association
 
Self Guide Es Finance
Self Guide Es FinanceSelf Guide Es Finance
Self Guide Es Finance
Michael Winters
 
The Economic Consequences of New Models
The Economic Consequences of New ModelsThe Economic Consequences of New Models
The Economic Consequences of New Models
ScottMadden, Inc.
 
AGRI-CLINICS AND AGRI-BUSINESS CENTRES (ACABC) SCHEME
AGRI-CLINICS AND AGRI-BUSINESS CENTRES (ACABC) SCHEMEAGRI-CLINICS AND AGRI-BUSINESS CENTRES (ACABC) SCHEME
AGRI-CLINICS AND AGRI-BUSINESS CENTRES (ACABC) SCHEME
Diraviam Jayaraj
 
Public private partnership
Public private partnershipPublic private partnership
Public private partnership
Ankit GAJJAR
 
Credit appraisal and evaluation
Credit appraisal and evaluationCredit appraisal and evaluation
Credit appraisal and evaluation
VAIBHAV SINHA
 
Economics of solar farms india dec 3 2015
Economics of solar farms  india dec 3 2015Economics of solar farms  india dec 3 2015
Economics of solar farms india dec 3 2015
Vinod K Kala
 
On-the-Ground Challenges and Opportunities in Solar Implementation
On-the-Ground Challenges and Opportunities in Solar ImplementationOn-the-Ground Challenges and Opportunities in Solar Implementation
On-the-Ground Challenges and Opportunities in Solar Implementation
Frederick Heinle
 
Midwest Housing Equity Group
Midwest Housing Equity GroupMidwest Housing Equity Group
Midwest Housing Equity Group
Midwest Housing Equity Group, Inc
 
UC-PNC Outlook: Debt Markets - Port Authority tools
UC-PNC Outlook: Debt Markets - Port Authority toolsUC-PNC Outlook: Debt Markets - Port Authority tools
UC-PNC Outlook: Debt Markets - Port Authority tools
The Port
 
Lm010815 investor-presentation-gs
Lm010815 investor-presentation-gsLm010815 investor-presentation-gs
Lm010815 investor-presentation-gs
SandRidgeEnergyInc
 
projectfinancingandpublicprivatepartnershipppp-191120191032.pdf
projectfinancingandpublicprivatepartnershipppp-191120191032.pdfprojectfinancingandpublicprivatepartnershipppp-191120191032.pdf
projectfinancingandpublicprivatepartnershipppp-191120191032.pdf
Seshukumar53
 
Project financing and public private partnership (ppp)
Project financing and public private partnership (ppp)Project financing and public private partnership (ppp)
Project financing and public private partnership (ppp)
M. Asim U Khan
 
Sullivan Communities Investment Criteria & History
Sullivan Communities Investment Criteria & HistorySullivan Communities Investment Criteria & History
Sullivan Communities Investment Criteria & History
Michael Brown
 
CAIIB Super Notes: Corporate Banking: Module C: Project and Infrastructure Fi...
CAIIB Super Notes: Corporate Banking: Module C: Project and Infrastructure Fi...CAIIB Super Notes: Corporate Banking: Module C: Project and Infrastructure Fi...
CAIIB Super Notes: Corporate Banking: Module C: Project and Infrastructure Fi...
PsychoTech Services
 
Power plant project finance overview
Power plant project finance overviewPower plant project finance overview
Power plant project finance overview
John Coletti
 

Similar to Day 1 namibia concession model vitalis mushongo_ministry of environment and tourism (20)

Alternative sources of financing
Alternative sources of financingAlternative sources of financing
Alternative sources of financing
 
Answer to Soft Economy – Mega Developments Phasing & Sustainability Issue...
Answer to Soft Economy – Mega Developments Phasing & Sustainability Issue...Answer to Soft Economy – Mega Developments Phasing & Sustainability Issue...
Answer to Soft Economy – Mega Developments Phasing & Sustainability Issue...
 
Blended Finance - Session 11 Managing Project Preparation for Climate Change ...
Blended Finance - Session 11 Managing Project Preparation for Climate Change ...Blended Finance - Session 11 Managing Project Preparation for Climate Change ...
Blended Finance - Session 11 Managing Project Preparation for Climate Change ...
 
Infrastruture Financing 2.pptx
Infrastruture Financing 2.pptxInfrastruture Financing 2.pptx
Infrastruture Financing 2.pptx
 
F5 Linking Economic Development and Social Equity
F5   Linking Economic Development and Social EquityF5   Linking Economic Development and Social Equity
F5 Linking Economic Development and Social Equity
 
Self Guide Es Finance
Self Guide Es FinanceSelf Guide Es Finance
Self Guide Es Finance
 
The Economic Consequences of New Models
The Economic Consequences of New ModelsThe Economic Consequences of New Models
The Economic Consequences of New Models
 
AGRI-CLINICS AND AGRI-BUSINESS CENTRES (ACABC) SCHEME
AGRI-CLINICS AND AGRI-BUSINESS CENTRES (ACABC) SCHEMEAGRI-CLINICS AND AGRI-BUSINESS CENTRES (ACABC) SCHEME
AGRI-CLINICS AND AGRI-BUSINESS CENTRES (ACABC) SCHEME
 
Public private partnership
Public private partnershipPublic private partnership
Public private partnership
 
Credit appraisal and evaluation
Credit appraisal and evaluationCredit appraisal and evaluation
Credit appraisal and evaluation
 
Economics of solar farms india dec 3 2015
Economics of solar farms  india dec 3 2015Economics of solar farms  india dec 3 2015
Economics of solar farms india dec 3 2015
 
On-the-Ground Challenges and Opportunities in Solar Implementation
On-the-Ground Challenges and Opportunities in Solar ImplementationOn-the-Ground Challenges and Opportunities in Solar Implementation
On-the-Ground Challenges and Opportunities in Solar Implementation
 
Midwest Housing Equity Group
Midwest Housing Equity GroupMidwest Housing Equity Group
Midwest Housing Equity Group
 
UC-PNC Outlook: Debt Markets - Port Authority tools
UC-PNC Outlook: Debt Markets - Port Authority toolsUC-PNC Outlook: Debt Markets - Port Authority tools
UC-PNC Outlook: Debt Markets - Port Authority tools
 
Lm010815 investor-presentation-gs
Lm010815 investor-presentation-gsLm010815 investor-presentation-gs
Lm010815 investor-presentation-gs
 
projectfinancingandpublicprivatepartnershipppp-191120191032.pdf
projectfinancingandpublicprivatepartnershipppp-191120191032.pdfprojectfinancingandpublicprivatepartnershipppp-191120191032.pdf
projectfinancingandpublicprivatepartnershipppp-191120191032.pdf
 
Project financing and public private partnership (ppp)
Project financing and public private partnership (ppp)Project financing and public private partnership (ppp)
Project financing and public private partnership (ppp)
 
Sullivan Communities Investment Criteria & History
Sullivan Communities Investment Criteria & HistorySullivan Communities Investment Criteria & History
Sullivan Communities Investment Criteria & History
 
CAIIB Super Notes: Corporate Banking: Module C: Project and Infrastructure Fi...
CAIIB Super Notes: Corporate Banking: Module C: Project and Infrastructure Fi...CAIIB Super Notes: Corporate Banking: Module C: Project and Infrastructure Fi...
CAIIB Super Notes: Corporate Banking: Module C: Project and Infrastructure Fi...
 
Power plant project finance overview
Power plant project finance overviewPower plant project finance overview
Power plant project finance overview
 

More from Boundless Southern Africa

Day 1 what makes a project bankable idc_martin potgieter
Day 1 what makes a project bankable idc_martin potgieterDay 1 what makes a project bankable idc_martin potgieter
Day 1 what makes a project bankable idc_martin potgieter
Boundless Southern Africa
 
Day 1 tourism trends in tfc as and protected areas_michael wright_sivest
Day 1 tourism trends in tfc as and protected areas_michael wright_sivestDay 1 tourism trends in tfc as and protected areas_michael wright_sivest
Day 1 tourism trends in tfc as and protected areas_michael wright_sivest
Boundless Southern Africa
 
Day 1 the role of ng os in facilitating tourism concessions_african safari fo...
Day 1 the role of ng os in facilitating tourism concessions_african safari fo...Day 1 the role of ng os in facilitating tourism concessions_african safari fo...
Day 1 the role of ng os in facilitating tourism concessions_african safari fo...
Boundless Southern Africa
 
Day 1 the process of packaging projects michael wright_sivest
Day 1 the process of packaging projects michael wright_sivestDay 1 the process of packaging projects michael wright_sivest
Day 1 the process of packaging projects michael wright_sivest
Boundless Southern Africa
 
Day 1 operating in tfc as_the voice of experience_tfpd_glynn o'leary
Day 1 operating in tfc as_the voice of experience_tfpd_glynn o'learyDay 1 operating in tfc as_the voice of experience_tfpd_glynn o'leary
Day 1 operating in tfc as_the voice of experience_tfpd_glynn o'leary
Boundless Southern Africa
 
Day 1 investment in tfc as_setting the scene_deborah kahatano_boundless south...
Day 1 investment in tfc as_setting the scene_deborah kahatano_boundless south...Day 1 investment in tfc as_setting the scene_deborah kahatano_boundless south...
Day 1 investment in tfc as_setting the scene_deborah kahatano_boundless south...
Boundless Southern Africa
 
Day 1 creating an enabling environment for investments dr ezekiel dembe_tanza...
Day 1 creating an enabling environment for investments dr ezekiel dembe_tanza...Day 1 creating an enabling environment for investments dr ezekiel dembe_tanza...
Day 1 creating an enabling environment for investments dr ezekiel dembe_tanza...
Boundless Southern Africa
 

More from Boundless Southern Africa (7)

Day 1 what makes a project bankable idc_martin potgieter
Day 1 what makes a project bankable idc_martin potgieterDay 1 what makes a project bankable idc_martin potgieter
Day 1 what makes a project bankable idc_martin potgieter
 
Day 1 tourism trends in tfc as and protected areas_michael wright_sivest
Day 1 tourism trends in tfc as and protected areas_michael wright_sivestDay 1 tourism trends in tfc as and protected areas_michael wright_sivest
Day 1 tourism trends in tfc as and protected areas_michael wright_sivest
 
Day 1 the role of ng os in facilitating tourism concessions_african safari fo...
Day 1 the role of ng os in facilitating tourism concessions_african safari fo...Day 1 the role of ng os in facilitating tourism concessions_african safari fo...
Day 1 the role of ng os in facilitating tourism concessions_african safari fo...
 
Day 1 the process of packaging projects michael wright_sivest
Day 1 the process of packaging projects michael wright_sivestDay 1 the process of packaging projects michael wright_sivest
Day 1 the process of packaging projects michael wright_sivest
 
Day 1 operating in tfc as_the voice of experience_tfpd_glynn o'leary
Day 1 operating in tfc as_the voice of experience_tfpd_glynn o'learyDay 1 operating in tfc as_the voice of experience_tfpd_glynn o'leary
Day 1 operating in tfc as_the voice of experience_tfpd_glynn o'leary
 
Day 1 investment in tfc as_setting the scene_deborah kahatano_boundless south...
Day 1 investment in tfc as_setting the scene_deborah kahatano_boundless south...Day 1 investment in tfc as_setting the scene_deborah kahatano_boundless south...
Day 1 investment in tfc as_setting the scene_deborah kahatano_boundless south...
 
Day 1 creating an enabling environment for investments dr ezekiel dembe_tanza...
Day 1 creating an enabling environment for investments dr ezekiel dembe_tanza...Day 1 creating an enabling environment for investments dr ezekiel dembe_tanza...
Day 1 creating an enabling environment for investments dr ezekiel dembe_tanza...
 

Recently uploaded

2024-deutsche-bank-global-consumer-conference.pdf
2024-deutsche-bank-global-consumer-conference.pdf2024-deutsche-bank-global-consumer-conference.pdf
2024-deutsche-bank-global-consumer-conference.pdf
Sysco_Investors
 
AGM Presentation Probe June 11 Final.pdf
AGM Presentation Probe June 11 Final.pdfAGM Presentation Probe June 11 Final.pdf
AGM Presentation Probe June 11 Final.pdf
Probe Gold
 
Mandalay Resouces June 2024 Investor Relations PPT
Mandalay Resouces June 2024 Investor Relations PPTMandalay Resouces June 2024 Investor Relations PPT
Mandalay Resouces June 2024 Investor Relations PPT
MandalayResources
 
Understanding-the-E-Way-Bill-A-Digital-Transformation-in-Logistics.pptx
Understanding-the-E-Way-Bill-A-Digital-Transformation-in-Logistics.pptxUnderstanding-the-E-Way-Bill-A-Digital-Transformation-in-Logistics.pptx
Understanding-the-E-Way-Bill-A-Digital-Transformation-in-Logistics.pptx
cosmo-soil
 
ppt-namibia-worldeconomy-standardbank.ppt
ppt-namibia-worldeconomy-standardbank.pptppt-namibia-worldeconomy-standardbank.ppt
ppt-namibia-worldeconomy-standardbank.ppt
TestOrg1
 
一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理
一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理
一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理
ybout
 
Collective Mining | Corporate Presentation - June 2024
Collective Mining | Corporate Presentation - June 2024Collective Mining | Corporate Presentation - June 2024
Collective Mining | Corporate Presentation - June 2024
CollectiveMining1
 
Cyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdfCyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdf
CyberAgent, Inc.
 
快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样
快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样
快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样
f3wjr2q2
 
MUTUAL FUNDS (ICICI Prudential Mutual Fund) BY JAMES RODRIGUES
MUTUAL FUNDS (ICICI Prudential Mutual Fund) BY JAMES RODRIGUESMUTUAL FUNDS (ICICI Prudential Mutual Fund) BY JAMES RODRIGUES
MUTUAL FUNDS (ICICI Prudential Mutual Fund) BY JAMES RODRIGUES
WilliamRodrigues148
 
Methanex Investor Presentation - April 2024
Methanex Investor Presentation - April 2024Methanex Investor Presentation - April 2024
Methanex Investor Presentation - April 2024
Methanex Corporation
 
Osisko Development - Investor Presentation - June 24
Osisko Development - Investor Presentation - June 24Osisko Development - Investor Presentation - June 24
Osisko Development - Investor Presentation - June 24
Philip Rabenok
 
Cleades robinson:The Diplomat is Blue
Cleades robinson:The Diplomat is BlueCleades robinson:The Diplomat is Blue
Cleades robinson:The Diplomat is Blue
Cleades Robinson
 
ZKsync airdrop of 3.6 billion ZK tokens is scheduled by ZKsync for next week.pdf
ZKsync airdrop of 3.6 billion ZK tokens is scheduled by ZKsync for next week.pdfZKsync airdrop of 3.6 billion ZK tokens is scheduled by ZKsync for next week.pdf
ZKsync airdrop of 3.6 billion ZK tokens is scheduled by ZKsync for next week.pdf
SOFTTECHHUB
 

Recently uploaded (14)

2024-deutsche-bank-global-consumer-conference.pdf
2024-deutsche-bank-global-consumer-conference.pdf2024-deutsche-bank-global-consumer-conference.pdf
2024-deutsche-bank-global-consumer-conference.pdf
 
AGM Presentation Probe June 11 Final.pdf
AGM Presentation Probe June 11 Final.pdfAGM Presentation Probe June 11 Final.pdf
AGM Presentation Probe June 11 Final.pdf
 
Mandalay Resouces June 2024 Investor Relations PPT
Mandalay Resouces June 2024 Investor Relations PPTMandalay Resouces June 2024 Investor Relations PPT
Mandalay Resouces June 2024 Investor Relations PPT
 
Understanding-the-E-Way-Bill-A-Digital-Transformation-in-Logistics.pptx
Understanding-the-E-Way-Bill-A-Digital-Transformation-in-Logistics.pptxUnderstanding-the-E-Way-Bill-A-Digital-Transformation-in-Logistics.pptx
Understanding-the-E-Way-Bill-A-Digital-Transformation-in-Logistics.pptx
 
ppt-namibia-worldeconomy-standardbank.ppt
ppt-namibia-worldeconomy-standardbank.pptppt-namibia-worldeconomy-standardbank.ppt
ppt-namibia-worldeconomy-standardbank.ppt
 
一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理
一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理
一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理
 
Collective Mining | Corporate Presentation - June 2024
Collective Mining | Corporate Presentation - June 2024Collective Mining | Corporate Presentation - June 2024
Collective Mining | Corporate Presentation - June 2024
 
Cyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdfCyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdf
 
快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样
快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样
快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样
 
MUTUAL FUNDS (ICICI Prudential Mutual Fund) BY JAMES RODRIGUES
MUTUAL FUNDS (ICICI Prudential Mutual Fund) BY JAMES RODRIGUESMUTUAL FUNDS (ICICI Prudential Mutual Fund) BY JAMES RODRIGUES
MUTUAL FUNDS (ICICI Prudential Mutual Fund) BY JAMES RODRIGUES
 
Methanex Investor Presentation - April 2024
Methanex Investor Presentation - April 2024Methanex Investor Presentation - April 2024
Methanex Investor Presentation - April 2024
 
Osisko Development - Investor Presentation - June 24
Osisko Development - Investor Presentation - June 24Osisko Development - Investor Presentation - June 24
Osisko Development - Investor Presentation - June 24
 
Cleades robinson:The Diplomat is Blue
Cleades robinson:The Diplomat is BlueCleades robinson:The Diplomat is Blue
Cleades robinson:The Diplomat is Blue
 
ZKsync airdrop of 3.6 billion ZK tokens is scheduled by ZKsync for next week.pdf
ZKsync airdrop of 3.6 billion ZK tokens is scheduled by ZKsync for next week.pdfZKsync airdrop of 3.6 billion ZK tokens is scheduled by ZKsync for next week.pdf
ZKsync airdrop of 3.6 billion ZK tokens is scheduled by ZKsync for next week.pdf
 

Day 1 namibia concession model vitalis mushongo_ministry of environment and tourism

  • 2. INTRODUCTION •CONCESSION MEANS THE RIGHTS, WHETHER FULL OR RESTRICTED, SHARED OR EXCLUSIVE TO CONDUCT TOURISM ACTIVITIES. •CONCESSION ON STATE LAND HAVE SIGNIFICANT ROLE TO PLAY IN NAMIBIA AND COMPLEMENT OTHER CONTRIBUTORS TO THE ECONOMY OF THE COUNTRY. •CONCESSION ALSO CREATE OPPORTUNITIES FOR BUSINESS DEVELOPMENT AND THE ECONOMIC EMPOWERMENT OF FORMERLY DISADVANTAGES NAMIBIA THROUGH ACCESS TO TOURISM, HUNTING AND INDUSTRIES BASED ON WILDLIFE PLANT AND ANIMAL RESOURCES.
  • 3. BOT (BUILD OPERATE TRANSFER) VS MOT (MANAGE OPERATE TRANSFER) STATE LESSOR/CONCESSOR(MET) CONSERVANCYCONCESSIONAIRE (COMMUNITY) OPERATOR OPERATING COMPANY STATE LESSOR/CONCESSOR(MET) CONSERVANCYCONCESSIONAIRE (COMMUNITY) PROJECT COMPANY (COMMUNITY) MANAGEMENT COMPANY (C0NTRACT)
  • 4. THE STATE •THE STATE AWARDS THE HEAD CONCESSION CONTRACT TO THE CONSERVANCY. •THE STATE GIVES TOURISM RIGHTS TO BUILD A LODGE OR A TRAVERSING RIGHT TO DO GAME DRIVES TO THE CONSERVANCY INSIDE PROTECTED AREAS. •THE STATE USES TEMPLATE CONTRACTS AND STANDARDIZED PROCEDURE TO ABIDE THE CONSERVANCY TO THE TERMS AND CONDITION AS REQUIRED BY THE CONCESSOR (MET). •AFTER THE SIGNING OF THE CONTRACT, THE CONSERVANCY/THE HEAD CONCESSION CONTRACT HOLDER THAN ASSUME THE RIGHTS AND DUTIES. •MET HELPS THE CONSERVANCY IN SEEKING FOR A JOINT VENTURE PARTNER (OPERATOR). •ONCE THE OPERATOR IS APPOINTED, HE TAKES OVER THE ONGOING OVERSIGHT AND REGULATORY FUNCTIONS. •THE OPERATOR TAKES FULL RESPONSIBILITY AFTER THE SIGNING OF THE OPERATORS CONCESSION CONTACT.
  • 5. CONSERVANCY •(CONSERVANCY OR OTHER REPRESENTATIVE LEGAL BODY): RECEIVES HEAD‐CONCESSION- CONTRACT FROM STATE. •ASSUMES RIGHTS & DUTIES OF HEAD-CONCESSION-CONTRACT •THE CONSERVANCY SUBLEASES THEIR RIGHTS IN THE HEAD-CONCESSIONS-CONTRACT TO PROJECT/OPERATING COMPANY USING STANDARDIZED DOCUMENTS & PROCEDURES •THE OPERATING COMPANY ASSUMES RIGHTS & DUTIES OF SUBLEASE/--‐CONCESSION •RECEIVES INCOME BASED ON FIXED AND VARIABLE FEES •PAYS A FEE OR % OF INCOME TO STATE AND USES OR DISTRIBUTES BALANCE
  • 6. PROJECT COMPANY (INVESTOR) •RECEIVES OPERATORS CONCESSION CONTRACT FROM THE CONSERVANCY •ASSUMES RIGHTS AND DUTIES OF THE OPERATOR. •CARRIES CAPITAL AND OPERATING RISK •PAYS ‘RESOURCE FEE’ WITH FIXED AND VARIABLE ELEMENTS •ALSO FINANCES, DESIGNS, BUILDS, OPERATES, MAINTAINS REFURBISHES, MARKETS, TRANSFERS BACK… •…AND ENSURES BROAD--‐BASED COMMUNITY EMPOWERMENT •VARIATION IN COMMUNITY PARTICIPATION AT PROJECT COMPANY LEVELS
  • 7. THE TWO MODELS USED IN NAMIBIA (BOT)-BUILD-OPERATE- TRANSFER BASIC STRUCTURE WITH NO CONSERVANCY SHARE IN THE PROJECT COMPONY THIS IS A CONTRACT WITH FULL MAINTENANCE OBLIGATION THE PROJECT COMPANY OWN BY PRIVATE PARTNER WITH PDN- (PRIVIOUSLY DISADVANTAGE NAMIBIAN) SHAREHOLDING…. PROCURED THROUGH TENDER PROCESS. SUBJECTED TO EMPOWERMENT OBLIGATIONS AND INCLUDING, PREFERENTIAL EMPLOYMENT, TRAINING, LOCAL CONTRACTING AND SOCIAL INVESTMENT THE COMPANY CARRIES ALL RISK IN MAKING THINGS WORK…. FULL OWNERSHIP WITH 3RD PARTY MANAGEMENT BASIC STRUCTURE PLUS CONSERVANCY OWNERSHIP OF PROJECT COMPANY. PROJECT COMPANY FINANCE AND RETAINS BOT RESPONSIBILITY….BUT APPOINTS EXTERNAL MANAGER ON MANAGEMENT CONTRACT. PROJECT COMPANY OWNED BY THE COMMUNITY/CONSERVANCY….THEY BUILD OPERATE AND TRANSFER TO THE MANAGEMENT CONTRACT. MANAGEMENT COMPANY WILL DO THE OPERATIONS & MARKETING THE MAIN DIFFERENCE IN THIS MODEL IS THE CONSERVANCY CARRIES THE WHOLE RISK
  • 8. ADVANTAGES AND DISADVANTAGES BOT Advantages Disadvantages □ Clear definition of roles □ Perceived low levels of empowerment □ Simple structure □ Perceived 'passive role' for conservancy □ Conservancy 'head rights' secure □ Capital returns accrue to private investor □ 'Resource-use' fee secure □ Operating returns accrue to private partner □ Distributes risks/roles to appropriate parties? □ Overall, low-risk but low-return model Some Implications MOT Advantages Disadvantages □ Clear definition of roles □ Levels of empowerment still perceived to be low □ Simple structure □ Perceived 'passive role' for conservancy □ Conservancy 'head rights' secure □ Operating returns accrue to private partner □ 'Resource-use' fee secure □ Capital risk with conservancy (or shared with private partner according to % inputs) □ Capital returns accrue to community (or shared with private partner according to % inputs) □ Conservancy requires access to large capital sum Some Implications
  • 9. SOME IMPLICATIONS ON THE BOT (BUILD OPERATE TRANSFER) MODEL Project financing - Requires no community capital because project is entirely financed by private partner Conflict resolution - Contractually governed (Joint Management Committee followed by mediation and arbitration) Exit strategies - Contractually governed (termination after exhaustion of required procedures) Support requirements- Low compared to other options; but still requires support (compliance and enforcement)
  • 10. SOME IMPLICATIONS ON THE MOT MODEL Project financing - Requires community capital; fixed assets (or portion of) financed by conservancy; moveable assets & operating capital by private partner Conflict resolution - Contractually governed (Joint Management Committee followed by mediation and arbitration) Exit strategies - Contractually governed (termination after exhaustion of required procedures)
  • 11. THE END THANK YOU AND ENJOY THE REST OF THE WORKSHOP